SlideShare une entreprise Scribd logo
1  sur  89
Télécharger pour lire hors ligne
Institutional Framework for quality
assurance on infrastructure provisions in
city mobility



Presented by:
Ashok Bhattacharjee,
Director - Urban Transport Planner,
United Traffic & Transportation
Infrastructure (Planning & Engineering)   Assisted by:
Center                                    Adarsha Kapoor
Delhi Development authority               Urban Designer, UTTIPEC, DDA
City    Infrastructure  Quality  Institutional
Mobility   Provisions   Assurance Framework


                                                                      NUTP

                                                                     Transport
                                                                    Master Plan

                                                                    IRC Codes
                        Dead    Min. 1.8 M x 2.4 M
                        Width                                 04A
                                Clear Pedestrian Zone
                                with no Visual Obstructions


 Human
Access for       Equitable
             Urban form which                                       Policy
                                                  Assurance of UTTIPEC
                                                Assurance of Guidelines and
 Mobility
 all users     distribution of
              suits equitable                     lowering Public Framework
                                                Quality Water
                                                 Storm of of
                                                     Energy
                                                     Safety
                                                   Quality of     Approvals
                road space
             use of all modes                      Transport &
                                                Management
                                                 conservation
                                                Environmental
                                                   Materials
                                                      Space
                                                    pollution
City    Infrastructure  Quality  Institutional
Mobility   Provisions   Assurance Framework
Redefining mobility




       Image Source: Internet

       As per Indian National Transport Policy:
“The Central Government would, encourage measures that allocate road space
             on a more equitable basis, with people as its focus.”
Policy Framework
         Indian National Transport Policy:
VISION

• To recognize that people occupy center-stage in our                 cities
  and all plans would be for their common benefit and well being

• To make our cities the most livable in the world and enable
  them to become the “engines of economic growth” that power India’s
  development in the 21st century

• To allow our cities   to evolve into an urban form that is
   best suited for the unique geography of their locations and is best
   placed to support the main social and economic activities that take place in
   the city.
Policy Framework
   As per Transport chapter of MPD 2021:
VISION

• 80: 20 Modal Split (Set 5-year targets)
• Women safety
• Zero fatality
• Air quality targets
• Equity and inclusion
• Sustainable transport – equity, environment
CURRENT ISSUES
Flyovers do not reduce congestion
They Reduce Mobility of ALL Road Users!!        Context
                          Information Source:   Increase in:
                          Miscellaneous new
                          paper clippings
                                                Traffic = 21 times
                                                Road space = 3.1 times

                                                Congestion has
                                                doubled in the last 8 to
                                                10 years.”

                                                Ring road:
                                                Designed for 75,000
                                                vehicles a day,
                                                Carries 4,00,000
                                                vehicles a day.

                                                70/170 traffic locations
                                                carry more than their
                                                vehicle carrying
                                                capacity
Environmental Pollution                                                              Context
                                                                    Pollution same as that before CNG

                                                                    Vehicle pollution - 3 times of industrial
                                                                    pollution

                                                                    Vehicles are major cause of
                                                                    respiratory fatalities.

                                                                    21 people die of respiratory diseases
                                                                    in capital every day

  Sources of Air Pollution in Delhi:                        Information Source:
                          Delhi-Pollution                   Miscellaneous new paper
                                                            clippings and Delhi Master
                  DG sets, cooking,                         Plan
 Industrial       biomass                   Vehicular
  Emission        10%
                                            Emission
      20%                                   Industrial
                                            Emission
                                            Other Sources


                                  70%
                           VEHICULAR EMISSION
  Source: MPD 2021, p57
Human Safety                                                       Context
   VICTIM                   2011             VEHICLES AT FALUT                 2011
                        No. OF     PERSONS                                No. OF      PERSONS
                      ACCIDENTS     KILLED                              ACCIDENTS      KILLED

PEDESTRIAN                 937        946    UNKNOWN VEHICLES                827         841
CYCLE & NMT                131        131    PRIVATE VEHICLES                452         460
CAR PVT                     63         69    COMMERCIAL VEHICLES             412         440
OTHER MODES                876        920    BUSES                            100         102
          TOTAL           2007       2066
                                             GRAMIN SEWA                       21          21
                                                                TOTAL        2007       2066
Information Source:
Delhi Police



     • More pedestrians and cyclists die.

     • More Private/ commercial vehicles kill
1 Failure of Existing Transport Network Context
Delhi Traffic dependent on major arterial roads




Image Source: Google satellite imagery
Failure of Traffic Infrastructure   Context
Delhi                                           China




Present                                       Future
                                     Image Source: internet
Ideal Transport Network                  Context
Traffic dependent on dense network of streets




Image Source: Google satellite imagery
2 Non-Signalised High Speed corridors             Context
Average Peak Hour Speed- 5-10Km/Hr




                         Average Off-Peak Hour Speed- 80Km/Hr



Increased fatality for pedestrians and cyclists
Image Source: Internet
3 Out of scale Infrastructure        Context




Safety of humans, cyclists at risk
Image Source: Internet
4 Unplanned & Unregulated parking              Context
Parking lots need to be planned along with an overall transit
strategy




Image Source: Internet

Citizen’s of Delhi get a wrong notion- THEY CAN PARK THEIR
VEHICLE ANYWHERE
5 Wrong planning of pedestrian Infrastructure     Context




Foot over bridge- Failure due to longer walking

Every 2nd death on road is of a pedestrian
Image Source: Internet
Alternatives for travelling                                     Context
Image Source: Oasis Design Inc
                                 Public Transport Modes




City Buses/Metro Buses                                    Pedestrian




Auto Rickshaws                                            Cycling




ShuttleAuto Rickshaws/Tempo                               Cycle Rickshaw
YET….
        Image Source: Internet
                                                Context




     About 15% road users (cars) take up 80% of road space

Transportation Infrastructure still being designed only for cars
Clear and present Danger                                                                 Context
                80
                                                               Reverse Mode Shift is
                70
                                                               happening….
                60                                             • Mode share of Public Transport is
                                                                 declining, Private modes going up…!!
                50
                                                               • High levels of Congestion
 Mode Share %




                40
                                                               • Unhealthy Levels of Pollution
                30


                20
                                                                                                   CAR
                                                                                                   2W
                10
                                                                                                   AUTO
                                                                                                   Public Transport
                 0
                      Base 2007       Business as Usual   Metro + Closed BRT Originally Proposed
                                           (2021)           (with Parking     2021 + Bus Speed
                                                            Charges) 2021     25Kmph + Higher
                     With No Policy change….                                   Parking Charges
                                                                                                              20
Data Source: RITES TDF Study for DoT, GNCTD
Degrading Urban fabric                                     Context




Image Source: Primary survey by UTTIPEC, dated june 2012

Degrading Quality of Life

            Planning for vehicles  No respect for humans
DESPERATE NEED FOR A
      PARADIGM SHIFT
Transport Infrastructure
Design Transport Infrastructure for
                Pedestrians
                    Cyclists
  Intermediate Public Transport
            Public Transport
                   And Cars




     Image Source: Internet
Transport Infrastructure
    Pedestrians                               Motorized Vehicles            Intermediate Public
                                                                            Transport (Autos)
                       Cycles and Other Non
                                                                    Buses
                       motorized vehicles




    Public Utilities         Hawkers/ Vendors             Table tops and kerb ramps
                                                          for universal access
                Equitable distribution of road space.
Image Source: Vikas Marg Transit Corridor improvement project, UTTIPEC
Quality Assurance
                        HUMAN SAFETY AND COMFORT




Source: UTTIPEC Street Design Guidelines
Quality Assurance
PROVIDE CLIMATIC COMFORT




                           Source: UTTIPEC Street
                               Design Guidelines
Quality Assurance
          UNIVERSAL ACCESSIBILITY AND PUBLIC UTILITIES




Source: UTTIPEC Street
Design Guidelines
Quality Assurance
REDUCE HEAT ISLAND EFFECT & STORM WATER
              MANAGEMENT




                                    Source: UTTIPEC
                                      Street Design
                                          Guidelines
Enhance Connectivity   Urban Form


                             Image Source:
                                  Internet
Transit Oriented Development        Urban Form
Image Source: Internet




Encourage use of Public Transport through Urban Design
Before UTTIPEC                                    Work Culture
                       Technical
                      Consultants                                 Traffic
        Road                               Municipal             Research
       Owning                             Corporation              Body
       Agency


                                                                Traffic
                                                                Police
    Road
  Congress                             Urban
                                    Development                            Academic
                                     Authority                            Researchers
                Development
                 Authority                               Transport
                                                        Department

   Metro Rail                  Railway
   Authority                   planning                                    Planning
                                board                                     Organization



Concerned departments work with different priority and program
After creation of UTTIPEC                       Work Culture
                              Technical        Municipal
                     Road                                      Traffic
                             Consultants      Corporation
                    Owning                                    Research
                    Agency                                      Body
       Urban
    Development                                                          Traffic
     Authority                                                           Police


   Road
 Congress
                             UTTIPEC                                       Academic
                                                                          Researchers


       Metro Rail
       Authority                                                  Planning
                     Development   Railway        Transport
                                                                 Organization
                      Authority    planning      Department
                                    board


Concerned departments together to address interrelated issues
Institutional Framework
UTTIPEC Aim


Image Source: www.uttipec.nic.in
UTTIPEC Functioning
 UTTIPEC’s mode of Operation

Decision making       Deliberation

                     Working Groups
                     (Bi-monthly meetings,
Governing Body       as required)
(Monthly meetings)
                     Core Groups
                     (Meetings to monitor
                     progress of work, as
                     required)
UTTIPEC Composition
                             Governing Body
Honourable LG, Delhi                             Chairman
Vice-Chairman, DDA                               Vice-Chairman
Engineer Member, DDA                             Member
Pr. Commissioner-Cum-Secy (TPT),GNCTD            Member
OSD (MRTS), MOUD                                 Member
Commissioner (Plg.), DDA                         Member
Secretary, Indian Roads Congress (IRC)           Member
Chief Planner,TCPO                               Member
Head, Traffic & Transportation Division, CRRI    Member
Managing Director, DIMTS                         Member
Chief Town Planner, MCD                          Member
Engineer-In-Chief, MCD                           Member
Engineer-In-Chief, PWD                           Member
Engineer-In-Chief, NDMC                          Member
Chief Engineer, Northern Railway (Centre)        Member
Director (Project), DMRC                         Member
Joint Commissioner of Police (Traffic)           Member
Additional Commissioner (Planning) TB & C, DDA   Member
President, AAUI                                  Member
Director (Plg.) UTTIPEC, DDA                     Member-Secy
Source: www.uttipec.nic.in
UTTIPEC Composition
                              Working Groups
Module – I                   INTEGRATED URBAN TRANSPORT                &   POLICY
                             PLANNING
Working Group I A            Development of Planning Guidelines
Working Group I B            Planning & Engg. Norms/Standards
Working Group I C            Documentation & Data Dissemination

  Module – II                ROAD CAPACITY BUILDING
Working Group II A           Processing & Evaluation of New Projects
Working Group II B           Retrofitting of Existing Corridors

Module – III
Working Group III A          Real-Time Traffic Management
Working Group III B          Regulatory Changes for Traffic Improvements

Module – IV                  COMMUNITY PARTICIPATION
Working Group IV             Development of Website

Module – V           QUALITY ASSURANCE/AUDIT
Working group-V
         TRANSIT ORIENTED DEVELOPMENT (TOD) TASK FORCE
                           TOD Group

Source: www.uttipec.nic.in
UTTIPEC Composition
         Core Groups


  Core Groups are created with
  representatives from various
  stake holder departments, to
     expedite the process of
information collection, planning,
 deliberation, co-ordination and
           monitoring.
UTTIPEC Initiatives
1. MPD- Transit          • ENCOURAGES USE OF
   Oriented                PUBLIC TRANSPORT
   Development Chapter   • DISCOURAGES USE
                           OF PRIVATE
2. MPD- Transport          TRANSPORT
   Chapter               • THROUGH URBAN
                           DESIGN AND
3. Open Space Master       PLANNING.
   Plan

4. Policy for Parking    1. Pedestrian and NMT friendly
   Fees and                 environment
   Management            2. Connectivity
                         3. Multi modal integration
5. Eco Mobility Master   4. Modal shift
   Plan and cycling      5. Place making
   Master Plan           6. High density mixed use-
                            mixed income                    Image Source: Sustainable Citiess China;
                         7. Sustainable infrastructure      Design Manual For Low Carbon
                                                            Development

   Policy formation             Guidelines                Projects- Street Design &
                                                     Retrofitting, MRTS Integration, TOD
UTTIPEC Initiatives
1. MPD- Transit
   Oriented
   Development Chapter

2. MPD- Transport
   Chapter

3. Open Space Master                                         Network Plan of Bus Dedicated
   Plan                                                                  Corridors in Delhi
                         Image Source: Internet
4. Policy for Parking                               Transport Master plan vision:
   Fees and                                         • sustainable transport system
   Management                                       • 80: 20 Modal Split
                                                    • Women safety
5. Eco Mobility Master                              • Zero fatality on roads
   Plan and cycling                                 • improvement in air quality
   Master Plan                                      • equitable distribution of space
                                                    • inclusion of all segments of
                                                       society.

   Policy formation            Guidelines              Projects- Street Design &
                                                  Retrofitting, MRTS Integration, TOD
UTTIPEC Initiatives
1. MPD- Transit
   Oriented
   Development Chapter

2. MPD- Transport
   Chapter

3. Open Space Master
   Plan

4. Policy for Parking
   Fees and
   Management

5. Eco Mobility Master
   Plan and cycling
   Master Plan



   Policy formation      Guidelines        Projects- Street Design &
                                      Retrofitting, MRTS Integration, TOD
UTTIPEC Initiatives
1. MPD- Transit
   Oriented
   Development Chapter

2. MPD- Transport
   Chapter

3. Open Space Master
   Plan

4. Policy for Parking
   Fees and
   Management

5. Eco Mobility Master
   Plan and cycling
   Master Plan



   Policy formation      Guidelines        Projects- Street Design &
                                      Retrofitting, MRTS Integration, TOD
UTTIPEC Initiatives
                         Type of Parking Location         Existing   Proposed           Penalty for extra time
1. MPD- Transit                                           Rates      Rates
   Oriented              5 Min Drop off   On Street       Rs. 10     Free               Pay for 1 Hr
   Development Chapter   Upto 1 Hr        On Street       Rs. 10     Rs. X              Pay for 1.5 Hr
                         Upto 1 ½ Hrs     On Street       Rs. 10     Rs. 2X             Pay for 2 Hrs

2. MPD- Transport
   Chapter               Upto 2 Hrs       On Street       Rs. 10     Rs. 4X             Either move to stack
                                                                                        parking OR the Car
                                                                                        would be Impounded
3. Open Space Master                                                                    with Rs.1000 as fine.
   Plan                                   NO ON STREET PARKING ALLOWED BEYOND 2Hrs.
                         8Hr              Stack Parking   Rs. 10     Rs. 2X
                         Night Only       Stack Parking   Rs. 20     Rs. 1 ½ X
4. Policy for Parking
                         Monthly          Stack Parking   Rs. 600-   Rs. 60X
   Fees and                                               700
   Management                                                                    Long Term Stack
                                                                                     Parking




                          Exponentially high street Parking                                             Laxmi Nagar Metro


5. Eco Mobility Master
                                                                                                             Station




   Plan and cycling                            fees
   Master Plan            Symbiotic ON/OFF street parking
                           One PMZ  One Management
                                                                                                                            500M Zone



                                                                                 Short term On Street
                                                                                        Parking




   Policy formation            Guidelines                       Projects- Street Design &
                                                           Retrofitting, MRTS Integration, TOD
UTTIPEC Initiatives
1. MPD- Transit
   Oriented
   Development Chapter

2. MPD- Transport
   Chapter

3. Open Space Master
   Plan

4. Policy for Parking
   Fees and
   Management

5. Eco Mobility Master
   Plan and cycling
   Master Plan



   Policy formation      Guidelines        Projects- Street Design &
                                      Retrofitting, MRTS Integration, TOD
1. Street Design
                             UTTIPEC Initiatives
   Guidelines

2. Multi Modal
   Integration Guidelines

3. TOD Sustainability
   Guidelines

4. Guidelines for Storm
   Water Management

5. Guidelines for
   Retrofitting of Streets
   with high Fatality

6. BEAD (BRT Evaluation
   Tool)

7. Women Safety
   Guidelines

   Policy formation          Guidelines        Projects- Street Design &
                                          Retrofitting, MRTS Integration, TOD
1. Street Design
                                 UTTIPEC Initiatives
                          SAMPLE SECTION
   Guidelines

2. Multi Modal
   Integration Guidelines

3. TOD Sustainability
   Guidelines

4. Guidelines for Storm
   Water Management

5. Guidelines for
   Retrofitting of Streets
   with high Fatality

6. BEAD (BRT Evaluation
   Tool)

7. Women Safety
   Guidelines

   Policy formation                Guidelines        Projects- Street Design &
                                                Retrofitting, MRTS Integration, TOD
1. Street Design
                                 UTTIPEC Initiatives
                          SAMPLE SECTION
   Guidelines

2. Multi Modal
   Integration Guidelines

3. TOD Sustainability
   Guidelines

4. Guidelines for Storm
   Water Management

5. Guidelines for
   Retrofitting of Streets
   with high Fatality

6. BEAD (BRT Evaluation
   Tool)

7. Women Safety
   Guidelines

   Policy formation                Guidelines        Projects- Street Design &
                                                Retrofitting, MRTS Integration, TOD
1. Street Design
                                 UTTIPEC Initiatives
   Guidelines
                             Zones as per UTTIPEC MRTS Checklist w.r.t. Metro Stations

2. Multi Modal
   Integration Guidelines    50m zone-               Bus stop, Cycle rental, Cycle rickshaw stand
                             100m zone-              Cycle and Two-Wheeler parking stand
                             150m zone-              Auto Rickshaw stand
3. TOD Sustainability        250m zone-              Taxi stand, Private car drop-off
   Guidelines                Beyond 250m-            Long Term Stack parking

4. Guidelines for Storm
   Water Management

5. Guidelines for
   Retrofitting of Streets
   with high Fatality

6. BEAD (BRT Evaluation
   Tool)
                             Laxmi Nagar Station          Nirman Vihar Station           Preet Vihar Station
7. Women Safety
   Guidelines

   Policy formation                 Guidelines                      Projects- Street Design &
                                                               Retrofitting, MRTS Integration, TOD
1. Street Design
                             UTTIPEC Initiatives
   Guidelines

2. Multi Modal
   Integration Guidelines

3. TOD Sustainability
   Guidelines

4. Guidelines for Storm
   Water Management

5. Guidelines for
   Retrofitting of Streets
   with high Fatality

6. BEAD (BRT Evaluation
   Tool)

7. Women Safety
   Guidelines
                             Segregated Uses, Random density   Mixed Uses, Transit-Density Pyramid

   Policy formation          Guidelines                    Projects- Street Design &
                                                      Retrofitting, MRTS Integration, TOD
1. Street Design
                             UTTIPEC Initiatives
   Guidelines

2. Multi Modal
   Integration Guidelines

3. TOD Sustainability
   Guidelines

4. Guidelines for Storm
   Water Management

5. Guidelines for
   Retrofitting of Streets
   with high Fatality

6. BEAD (BRT Evaluation
   Tool)

7. Women Safety
   Guidelines

   Policy formation          Guidelines        Projects- Street Design &
                                          Retrofitting, MRTS Integration, TOD
1. Street Design
                             UTTIPEC Initiatives
   Guidelines

2. Multi Modal
   Integration Guidelines

3. TOD Sustainability
   Guidelines

4. Guidelines for Storm
   Water Management

5. Guidelines for
   Retrofitting of Streets
   with high Fatality

6. BEAD (BRT Evaluation
   Tool)

7. Women Safety
   Guidelines

   Policy formation          Guidelines        Projects- Street Design &
                                          Retrofitting, MRTS Integration, TOD
1. Street Design
                             UTTIPEC Initiatives
   Guidelines

2. Multi Modal
   Integration Guidelines

3. TOD Sustainability
   Guidelines

4. Guidelines for Storm
   Water Management

5. Guidelines for
   Retrofitting of Streets
   with high Fatality

6. BEAD (BRT Evaluation
   Tool)

7. Women Safety
   Guidelines

   Policy formation          Guidelines        Projects- Street Design &
                                          Retrofitting, MRTS Integration, TOD
1. Street Design
                             UTTIPEC Initiatives
   Guidelines

2. Multi Modal
   Integration Guidelines

3. TOD Sustainability
   Guidelines

4. Guidelines for Storm
   Water Management

5. Guidelines for
   Retrofitting of Streets
   with high Fatality

6. BEAD (BRT Evaluation
   Tool)

7. Women Safety
   Guidelines

   Policy formation          Guidelines        Projects- Street Design &
                                          Retrofitting, MRTS Integration, TOD
1.    Delhi Metro Phase I & II-
                                      UTTIPEC Initiatives
      Multi Modal Integration
2.    Delhi Metro Phase III- Multi   Strategy for Multi
      Modal Integration              Modal Integration
3.    Pedestrianization of Karol           through
      Bagh
4.    ITO TOD- Masterplan & UD          retrofitting of
      Framework                      Existing Phase 1 &
5.    Dwarka Retrofitting Plan        2 Metro Stations
6.    Aurobindo Marg Retrofitting
      Plan and Parking Strategy
                                       of Delhi Metro
7.    Vikas Marg Retrofitting Plan
      and Parking Strategy
                                                          Chattarpur Metro Station MRTS Integration Strategy
8.    Lakshmi Nagar TOD Scheme                                                        Source: OASIS Design Inc.
9.    Karkarduma Delhi Metro
      Phase II, TOD Scheme
10.   Mundka TOD Scheme
11.   Rohini- UER2- TOD Scheme
12.   Bus Depot Land Planning
13.   ORR-RTR strategy of
      decongestion
14.   Road No 56, Retrofitting
15.   S.P. Mukherjee Marg- Station
      plan
16.   14 Nos. Bus Dedicated
      Corridors

      Policy formation                   Guidelines            Projects- Street Design &
                                                          Retrofitting, MRTS Integration, TOD
1.    Delhi Metro Phase I & II-
                                       UTTIPEC Initiatives
      Multi Modal Integration             Strategy for
2.    Delhi Metro Phase III- Multi
      Modal Integration                  Multi Modal
3.    Pedestrianization of Karol          Integration
      Bagh
4.    ITO TOD- Masterplan & UD         while designing
      Framework                           of Phase III
5.    Dwarka Retrofitting Plan
6.    Aurobindo Marg Retrofitting
                                      Stations of Delhi
      Plan and Parking Strategy              Metro
7.    Vikas Marg Retrofitting Plan
      and Parking Strategy
8.    Lakshmi Nagar TOD Scheme
9.    Karkarduma Delhi Metro
      Phase II, TOD Scheme
10.   Mundka TOD Scheme
11.   Rohini- UER2- TOD Scheme
12.   Bus Depot Land Planning
13.   ORR-RTR strategy of
      decongestion
14.   Road No 56, Retrofitting
15.   S.P. Mukherjee Marg- Station
      plan                         Image is only for reference
16.   14 Nos. Bus Dedicated
                                   Image Source: Internet
      Corridors

      Policy formation                     Guidelines                 Projects- Street Design &
                                                                 Retrofitting, MRTS Integration, TOD
1.    Delhi Metro Phase I & II-
                                      UTTIPEC Initiatives
      Multi Modal Integration
2.    Delhi Metro Phase III- Multi
                                                                   Karol Bagh Pedestrianization Strategy
      Modal Integration                                            Source: NilaA Architecture & Urban Design
3.    Pedestrianization of Karol
      Bagh
4.    ITO TOD- Masterplan & UD
      Framework
5.    Dwarka Retrofitting Plan
6.    Aurobindo Marg Retrofitting
      Plan and Parking Strategy
7.    Vikas Marg Retrofitting Plan
      and Parking Strategy
8.    Lakshmi Nagar TOD Scheme
9.    Karkarduma Delhi Metro
      Phase II, TOD Scheme
10.   Mundka TOD Scheme
11.   Rohini- UER2- TOD Scheme
12.   Bus Depot Land Planning
13.   ORR-RTR strategy of
      decongestion
14.   Road No 56, Retrofitting         1. Pedestrianization of Ajmal Khan Road
15.   S.P. Mukherjee Marg- Station
      plan
                                     2. Improved pedestrian and cycling facilities
16.   14 Nos. Bus Dedicated
      Corridors

      Policy formation                  Guidelines           Projects- Street Design &
                                                        Retrofitting, MRTS Integration, TOD
1.    Delhi Metro Phase I & II-
                                     UTTIPEC Initiatives
      Multi Modal Integration
2.    Delhi Metro Phase III- Multi
      Modal Integration
3.    Pedestrianization of Karol
      Bagh
4.    ITO TOD- Masterplan & UD
      Framework
5.    Dwarka Retrofitting Plan
6.    Aurobindo Marg Retrofitting
      Plan and Parking Strategy
7.    Vikas Marg Retrofitting Plan
      and Parking Strategy
8.    Lakshmi Nagar TOD Scheme
9.    Karkarduma Delhi Metro
      Phase II, TOD Scheme
10.   Mundka TOD Scheme
11.   Rohini- UER2- TOD Scheme
12.   Bus Depot Land Planning
13.   ORR-RTR strategy of
      decongestion                                                            Karol Bagh
14.   Road No 56, Retrofitting                                               Pedestrianiz
15.   S.P. Mukherjee Marg- Station                                                  ation
      plan                                                                      Strategy
                                                                              Source: NilaA
16.   14 Nos. Bus Dedicated                                                  Architecture &
      Corridors                                                               Urban Design

      Policy formation               Guidelines        Projects- Street Design &
                                                  Retrofitting, MRTS Integration, TOD
1.    Delhi Metro Phase I & II-
                                     UTTIPEC Initiatives
      Multi Modal Integration
2.    Delhi Metro Phase III- Multi
      Modal Integration
3.    Pedestrianization of Karol
      Bagh
4.    ITO TOD- Masterplan & UD
      Framework
5.    Dwarka Retrofitting Plan
6.    Aurobindo Marg Retrofitting
      Plan and Parking Strategy
7.    Vikas Marg Retrofitting Plan
      and Parking Strategy
8.    Lakshmi Nagar TOD Scheme
9.    Karkarduma Delhi Metro
      Phase II, TOD Scheme
10.   Mundka TOD Scheme
11.   Rohini- UER2- TOD Scheme
12.   Bus Depot Land Planning
13.   ORR-RTR strategy of
                                                            ITO TOD- Masterplan & UD Framework
      decongestion                                           Source: NilaA Architecture & Urban Design
14.   Road No 56, Retrofitting
15.   S.P. Mukherjee Marg- Station
      plan
16.   14 Nos. Bus Dedicated
      Corridors

      Policy formation               Guidelines        Projects- Street Design &
                                                  Retrofitting, MRTS Integration, TOD
1.    Delhi Metro Phase I & II-
                                     UTTIPEC Initiatives
      Multi Modal Integration
2.    Delhi Metro Phase III- Multi
      Modal Integration
3.    Pedestrianization of Karol
      Bagh
4.    ITO TOD- Masterplan & UD
      Framework
5.    Dwarka Retrofitting Plan
6.    Aurobindo Marg Retrofitting
      Plan and Parking Strategy
7.    Vikas Marg Retrofitting Plan
      and Parking Strategy
8.    Lakshmi Nagar TOD Scheme
9.    Karkarduma Delhi Metro
      Phase II, TOD Scheme
10.   Mundka TOD Scheme
11.   Rohini- UER2- TOD Scheme
12.   Bus Depot Land Planning
13.   ORR-RTR strategy of
      decongestion
14.   Road No 56, Retrofitting
15.   S.P. Mukherjee Marg- Station
      plan
16.   14 Nos. Bus Dedicated                                 ITO TOD- Masterplan & UD Framework
      Corridors                                              Source: NilaA Architecture & Urban Design


      Policy formation               Guidelines        Projects- Street Design &
                                                  Retrofitting, MRTS Integration, TOD
1.    Delhi Metro Phase I & II-
                                     UTTIPEC Initiatives
      Multi Modal Integration
2.    Delhi Metro Phase III- Multi
      Modal Integration
3.    Pedestrianization of Karol
      Bagh
4.    ITO TOD- Masterplan & UD
      Framework
5.    Dwarka Retrofitting Plan
6.    Aurobindo Marg Retrofitting
      Plan and Parking Strategy
7.    Vikas Marg Retrofitting Plan
      and Parking Strategy
8.    Lakshmi Nagar TOD Scheme
9.    Karkarduma Delhi Metro
      Phase II, TOD Scheme
10.   Mundka TOD Scheme
11.   Rohini- UER2- TOD Scheme
12.   Bus Depot Land Planning
13.   ORR-RTR strategy of
      decongestion
14.   Road No 56, Retrofitting
15.   S.P. Mukherjee Marg- Station   Improvement of connectivity, ensuring women safety
      plan
16.   14 Nos. Bus Dedicated           through street design and Multi Modal Integration.
      Corridors

      Policy formation                Guidelines             Projects- Street Design &
                                                        Retrofitting, MRTS Integration, TOD
1.    Delhi Metro Phase I & II-
                                         UTTIPEC Initiatives
                                                        Cycle Accidents          Pedestrian Accidents
      Multi Modal Integration
                                     Aurobindo Marg
2.    Delhi Metro Phase III- Multi
      Modal Integration
3.    Pedestrianization of Karol
      Bagh
4.    ITO TOD- Masterplan & UD                    N
      Framework
5.    Dwarka Retrofitting Plan
6.    Aurobindo Marg Retrofitting
      Plan and Parking Strategy
7.    Vikas Marg Retrofitting Plan
      and Parking Strategy
8.    Lakshmi Nagar TOD Scheme
9.    Karkarduma Delhi Metro
      Phase II, TOD Scheme
10.   Mundka TOD Scheme
11.   Rohini- UER2- TOD Scheme
12.   Bus Depot Land Planning
13.   ORR-RTR strategy of
      decongestion
14.   Road No 56, Retrofitting
15.   S.P. Mukherjee Marg- Station
      plan
16.   14 Nos. Bus Dedicated
      Corridors

      Policy formation                     Guidelines                   Projects- Street Design &
                                                                   Retrofitting, MRTS Integration, TOD
1.    Delhi Metro Phase I & II-
                                     UTTIPEC Initiatives
                                   Image Source: Vikas Marg Transit Corridor improvement project, UTTIPEC
      Multi Modal Integration                                                         MRTS Integration
2.    Delhi Metro Phase III- Multi
      Modal Integration
3.    Pedestrianization of Karol
      Bagh
4.    ITO TOD- Masterplan & UD
      Framework
5.    Dwarka Retrofitting Plan
6.    Aurobindo Marg Retrofitting
      Plan and Parking Strategy
7.    Vikas Marg Retrofitting Plan                                                       Street Design
      and Parking Strategy
8.    Lakshmi Nagar TOD Scheme
9.    Karkarduma Delhi Metro
      Phase II, TOD Scheme
10.   Mundka TOD Scheme
11.   Rohini- UER2- TOD Scheme
12.   Bus Depot Land Planning
13.   ORR-RTR strategy of
      decongestion
14.   Road No 56, Retrofitting
15.   S.P. Mukherjee Marg- Station
      plan
16.   14 Nos. Bus Dedicated
      Corridors

      Policy formation                  Guidelines                  Projects- Street Design &
                                                               Retrofitting, MRTS Integration, TOD
1.    Delhi Metro Phase I & II-
                                     UTTIPEC Initiatives
                                   Image Source: Vikas Marg Transit Corridor improvement project, UTTIPEC
      Multi Modal Integration
2.    Delhi Metro Phase III- Multi
      Modal Integration
3.    Pedestrianization of Karol
      Bagh
4.    ITO TOD- Masterplan & UD
      Framework                                                                          Stack Parking
5.    Dwarka Retrofitting Plan
6.    Aurobindo Marg Retrofitting
                                                                                           Provision
      Plan and Parking Strategy
7.    Vikas Marg Retrofitting Plan                                                       Urban Design
      and Parking Strategy
8.    Lakshmi Nagar TOD Scheme
9.    Karkarduma Delhi Metro
      Phase II, TOD Scheme
10.   Mundka TOD Scheme
11.   Rohini- UER2- TOD Scheme
12.   Bus Depot Land Planning
13.   ORR-RTR strategy of
      decongestion
14.   Road No 56, Retrofitting
15.   S.P. Mukherjee Marg- Station
      plan
16.   14 Nos. Bus Dedicated
      Corridors

      Policy formation                   Guidelines                  Projects- Street Design &
                                                                Retrofitting, MRTS Integration, TOD
1.    Delhi Metro Phase I & II-
                                     UTTIPEC Initiatives
                                   Image Source: Vikas Marg Transit Corridor improvement project, UTTIPEC
      Multi Modal Integration
2.    Delhi Metro Phase III- Multi
      Modal Integration
3.    Pedestrianization of Karol
      Bagh
4.    ITO TOD- Masterplan & UD
      Framework
5.    Dwarka Retrofitting Plan
6.    Aurobindo Marg Retrofitting
      Plan and Parking Strategy
7.    Vikas Marg Retrofitting Plan
      and Parking Strategy
8.    Lakshmi Nagar TOD Scheme
9.    Karkarduma Delhi Metro
      Phase II, TOD Scheme
10.   Mundka TOD Scheme
11.   Rohini- UER2- TOD Scheme
12.   Bus Depot Land Planning
13.   ORR-RTR strategy of
      decongestion
14.   Road No 56, Retrofitting
15.   S.P. Mukherjee Marg- Station
      plan
16.   14 Nos. Bus Dedicated
      Corridors

      Policy formation                   Guidelines                  Projects- Street Design &
                                                                Retrofitting, MRTS Integration, TOD
1.    Delhi Metro Phase I & II-
                                     UTTIPEC Initiatives
                                   Image Source: Vikas Marg Transit Corridor improvement project, UTTIPEC
      Multi Modal Integration
2.    Delhi Metro Phase III- Multi
      Modal Integration
3.    Pedestrianization of Karol
      Bagh
4.    ITO TOD- Masterplan & UD
      Framework
5.    Dwarka Retrofitting Plan
6.    Aurobindo Marg Retrofitting
      Plan and Parking Strategy
7.    Vikas Marg Retrofitting Plan
      and Parking Strategy
8.    Lakshmi Nagar TOD Scheme
9.    Karkarduma Delhi Metro                                                             Stack Parking
      Phase II, TOD Scheme
10.   Mundka TOD Scheme                                                                    Provision
11.   Rohini- UER2- TOD Scheme
12.   Bus Depot Land Planning
13.   ORR-RTR strategy of
                                                                                         Urban Design
      decongestion
14.   Road No 56, Retrofitting
15.   S.P. Mukherjee Marg- Station
      plan
16.   14 Nos. Bus Dedicated
      Corridors

      Policy formation                   Guidelines                  Projects- Street Design &
                                                                Retrofitting, MRTS Integration, TOD
1.    Delhi Metro Phase I & II-
                                     UTTIPEC Initiatives
                                   Image Source: Vikas Marg Transit Corridor improvement project, UTTIPEC
      Multi Modal Integration
2.    Delhi Metro Phase III- Multi
      Modal Integration
3.    Pedestrianization of Karol
      Bagh
4.    ITO TOD- Masterplan & UD
      Framework
5.    Dwarka Retrofitting Plan
6.    Aurobindo Marg Retrofitting
      Plan and Parking Strategy
7.    Vikas Marg Retrofitting Plan
      and Parking Strategy
8.    Lakshmi Nagar TOD Scheme
9.    Karkarduma Delhi Metro
      Phase II, TOD Scheme
10.   Mundka TOD Scheme
11.   Rohini- UER2- TOD Scheme
12.   Bus Depot Land Planning
13.   ORR-RTR strategy of
      decongestion
14.   Road No 56, Retrofitting
15.   S.P. Mukherjee Marg- Station
      plan
16.   14 Nos. Bus Dedicated
      Corridors

      Policy formation                   Guidelines                  Projects- Street Design &
                                                                Retrofitting, MRTS Integration, TOD
1.    Delhi Metro Phase I & II-
                                     UTTIPEC Initiatives
      Multi Modal Integration
2.    Delhi Metro Phase III- Multi
      Modal Integration
3.    Pedestrianization of Karol
      Bagh
4.    ITO TOD- Masterplan & UD
      Framework
5.    Dwarka Retrofitting Plan
6.    Aurobindo Marg Retrofitting
      Plan and Parking Strategy
7.    Vikas Marg Retrofitting Plan
      and Parking Strategy
8.    Lakshmi Nagar TOD Scheme
9.    Karkarduma Delhi Metro
      Phase II, TOD Scheme
10.   Mundka TOD Scheme
11.   Rohini- UER2- TOD Scheme
12.   Bus Depot Land Planning
13.   ORR-RTR strategy of
      decongestion
14.   Road No 56, Retrofitting
15.   S.P. Mukherjee Marg- Station
      plan
16.   14 Nos. Bus Dedicated
      Corridors                    Image Source: Vikas Marg Transit Corridor improvement project, UTTIPEC
      Policy formation                   Guidelines                  Projects- Street Design &
                                                                Retrofitting, MRTS Integration, TOD
1.    Delhi Metro Phase I & II-
                                     UTTIPEC Initiatives
      Multi Modal Integration
2.    Delhi Metro Phase III- Multi
      Modal Integration
3.    Pedestrianization of Karol
      Bagh
4.    ITO TOD- Masterplan & UD
      Framework
5.    Dwarka Retrofitting Plan
6.    Aurobindo Marg Retrofitting
      Plan and Parking Strategy
7.    Vikas Marg Retrofitting Plan
      and Parking Strategy
8.    Lakshmi Nagar TOD Scheme
9.    Karkarduma Delhi Metro
      Phase II, TOD Scheme
10.   Mundka TOD Scheme
11.   Rohini- UER2- TOD Scheme
12.   Bus Depot Land Planning
13.   ORR-RTR strategy of
      decongestion
14.   Road No 56, Retrofitting
15.   S.P. Mukherjee Marg- Station
      plan
16.   14 Nos. Bus Dedicated
                                   Image Source: Karkardooma TOD Project, UTTIPEC
      Corridors

      Policy formation                  Guidelines                   Projects- Street Design &
                                                                Retrofitting, MRTS Integration, TOD
1.    Delhi Metro Phase I & II-
                                     UTTIPEC Initiatives
      Multi Modal Integration
2.    Delhi Metro Phase III- Multi
      Modal Integration
3.    Pedestrianization of Karol
      Bagh
4.    ITO TOD- Masterplan & UD
      Framework
5.    Dwarka Retrofitting Plan
6.    Aurobindo Marg Retrofitting
      Plan and Parking Strategy
7.    Vikas Marg Retrofitting Plan
      and Parking Strategy
8.    Lakshmi Nagar TOD Scheme
9.    Karkarduma Delhi Metro
      Phase II, TOD Scheme
10.   Mundka TOD Scheme
11.   Rohini- UER2- TOD Scheme
12.   Bus Depot Land Planning
13.   ORR-RTR strategy of
      decongestion
14.   Road No 56, Retrofitting
15.   S.P. Mukherjee Marg- Station
      plan
16.   14 Nos. Bus Dedicated
                                   Image Source: Mundka TOD Project, UTTIPEC
      Corridors

      Policy formation                  Guidelines                   Projects- Street Design &
                                                                Retrofitting, MRTS Integration, TOD
1.    Delhi Metro Phase I & II-
                                            UTTIPEC Initiatives
      Multi Modal Integration
                                                                      1500 M walking
2.    Delhi Metro Phase III- Multi                                    radius
      Modal Integration
3.    Pedestrianization of Karol
      Bagh
4.    ITO TOD- Masterplan & UD
      Framework
5.    Dwarka Retrofitting Plan
6.    Aurobindo Marg Retrofitting
      Plan and Parking Strategy
7.    Vikas Marg Retrofitting Plan                                                                      Rapid Transit Station
      and Parking Strategy                                                                              (Metro/ BRT)
                                                                           Projects to adhere to influence zone
8.    Lakshmi Nagar TOD Scheme                                             layout plan
9.    Karkarduma Delhi Metro
      Phase II, TOD Scheme
10.   Mundka TOD Scheme
11.   Rohini- UER2- TOD Scheme
12.   Bus Depot Land Planning
13.   ORR-RTR strategy of
      decongestion
14.   Road No 56, Retrofitting
15.   S.P. Mukherjee Marg- Station
      plan
16.   14 Nos. Bus Dedicated
                                   Image Source: Rohini TOD Project, UTTIPEC
      Corridors

      Policy formation                          Guidelines                       Projects- Street Design &
                                                                            Retrofitting, MRTS Integration, TOD
1.    Delhi Metro Phase I & II-
                                     UTTIPEC Initiatives
      Multi Modal Integration
2.    Delhi Metro Phase III- Multi
      Modal Integration
3.    Pedestrianization of Karol
      Bagh
4.    ITO TOD- Masterplan & UD
      Framework
5.    Dwarka Retrofitting Plan
6.    Aurobindo Marg Retrofitting
      Plan and Parking Strategy
7.    Vikas Marg Retrofitting Plan
      and Parking Strategy
8.    Lakshmi Nagar TOD Scheme
9.    Karkarduma Delhi Metro
      Phase II, TOD Scheme
10.   Mundka TOD Scheme
11.   Rohini- UER2- TOD Scheme
12.   Bus Depot Land Planning
13.   ORR-RTR strategy of
      decongestion
14.   Road No 56, Retrofitting
15.   S.P. Mukherjee Marg- Station
      plan
16.   14 Nos. Bus Dedicated                          ITO Bus Parking Strategy
                                       Source: NilaA Architecture & Urban Design
      Corridors

      Policy formation               Guidelines                          Projects- Street Design &
                                                                    Retrofitting, MRTS Integration, TOD
1.    Delhi Metro Phase I & II-
                                       UTTIPEC Initiatives
      Multi Modal Integration
2.    Delhi Metro Phase III- Multi
      Modal Integration
3.    Pedestrianization of Karol
      Bagh
4.    ITO TOD- Masterplan & UD
      Framework
5.    Dwarka Retrofitting Plan
6.    Aurobindo Marg Retrofitting
      Plan and Parking Strategy
7.    Vikas Marg Retrofitting Plan
      and Parking Strategy
8.    Lakshmi Nagar TOD Scheme
9.    Karkarduma Delhi Metro
      Phase II, TOD Scheme
10.   Mundka TOD Scheme
11.   Rohini- UER2- TOD Scheme
12.   Bus Depot Land Planning
13.   ORR-RTR strategy of
      decongestion
14.   Road No 56, Retrofitting
15.   S.P. Mukherjee Marg- Station
      plan                           Traffic management strategy for decongestion of road and
16.   14 Nos. Bus Dedicated                           reduction of fatality
      Corridors

      Policy formation                    Guidelines             Projects- Street Design &
                                                            Retrofitting, MRTS Integration, TOD
1.    Delhi Metro Phase I & II-
                                        UTTIPEC for decongestion of road and
                                     Traffic management strategy
                                                                 Initiatives
      Multi Modal Integration
2.    Delhi Metro Phase III- Multi                   reduction of fatality
      Modal Integration
3.    Pedestrianization of Karol
      Bagh
4.    ITO TOD- Masterplan & UD
      Framework
5.    Dwarka Retrofitting Plan
6.    Aurobindo Marg Retrofitting
      Plan and Parking Strategy
7.    Vikas Marg Retrofitting Plan
      and Parking Strategy
8.    Lakshmi Nagar TOD Scheme
9.    Karkarduma Delhi Metro
      Phase II, TOD Scheme
10.   Mundka TOD Scheme
11.   Rohini- UER2- TOD Scheme
12.   Bus Depot Land Planning
13.   ORR-RTR strategy of
      decongestion
14.   Road No 56, Retrofitting
15.   S.P. Mukherjee Marg- Station
      plan
16.   14 Nos. Bus Dedicated
      Corridors

      Policy formation                  Guidelines             Projects- Street Design &
                                                          Retrofitting, MRTS Integration, TOD
1.    Delhi Metro Phase I & II-
                                     UTTIPEC Initiatives
      Multi Modal Integration
2.    Delhi Metro Phase III- Multi
      Modal Integration
3.    Pedestrianization of Karol
      Bagh
4.    ITO TOD- Masterplan & UD
      Framework
5.    Dwarka Retrofitting Plan
6.    Aurobindo Marg Retrofitting
      Plan and Parking Strategy
7.    Vikas Marg Retrofitting Plan
      and Parking Strategy
8.    Lakshmi Nagar TOD Scheme
9.    Karkarduma Delhi Metro
      Phase II, TOD Scheme
10.   Mundka TOD Scheme
11.   Rohini- UER2- TOD Scheme
12.   Bus Depot Land Planning
13.   ORR-RTR strategy of
      decongestion
14.   Road No 56, Retrofitting
15.   S.P. Mukherjee Marg- Station
      plan
16.   14 Nos. Bus Dedicated
                                                           Multi Modal Integration
      Corridors

      Policy formation               Guidelines        Projects- Street Design &
                                                  Retrofitting, MRTS Integration, TOD
1.    Delhi Metro Phase I & II-
                                     UTTIPEC Initiatives
      Multi Modal Integration
2.    Delhi Metro Phase III- Multi
      Modal Integration
3.    Pedestrianization of Karol
      Bagh
4.    ITO TOD- Masterplan & UD
      Framework
5.    Dwarka Retrofitting Plan
6.    Aurobindo Marg Retrofitting
      Plan and Parking Strategy
7.    Vikas Marg Retrofitting Plan
      and Parking Strategy
8.    Lakshmi Nagar TOD Scheme
9.    Karkarduma Delhi Metro
      Phase II, TOD Scheme
10.   Mundka TOD Scheme
11.   Rohini- UER2- TOD Scheme
12.   Bus Depot Land Planning
13.   ORR-RTR strategy of
      decongestion
14.   Road No 56, Retrofitting
15.   S.P. Mukherjee Marg- Station
      plan
16.   14 Nos. Bus Dedicated
      Corridors

      Policy formation               Guidelines        Projects- Street Design &
                                                  Retrofitting, MRTS Integration, TOD
Public Participation
1. Public Participation at
   planning and design phases.

2. Public Awareness program
   for Karol Bagh
   Pedestrianization

3. Stake Holder Consultation
   and public awareness for
   ITO-TOD Proposal

4. Public Awareness program
   for Vikas Marg Transit
   Corridor Improvement.

5. TOD Stake Holder
   Consultation

6. Pune Walkability Workshop,
   2012- Preparation of Pune
   Street Design Guidelines


    Public Outreach              Capacity Building Workshops     Public Awareness
      Programs                      for other departments      through social media
Public Participation
1. Public Participation at
   planning and design phases.

2. Public Awareness program
   for Karol Bagh
   Pedestrianization

3. Stake Holder Consultation
   and public awareness for
   ITO-TOD Proposal

4. Public Awareness program
   for Vikas Marg Transit
   Corridor Improvement.

5. TOD Stake Holder
   Consultation

6. Pune Walkability Workshop,
   2012- Preparation of Pune       Image only for reference
   Street Design Guidelines        Image Source: Internet



    Public Outreach              Capacity Building Workshops     Public Awareness
      Programs                      for other departments      through social media
Public Participation
1. Public Participation at
   planning and design phases.

2. Public Awareness program
   for Karol Bagh
   Pedestrianization

3. Stake Holder Consultation
   and public awareness for
   ITO-TOD Proposal

4. Public Awareness program
   for Vikas Marg Transit
   Corridor Improvement.

5. TOD Stake Holder
   Consultation

6. Pune Walkability Workshop,
                                 Image only for reference
   2012- Preparation of Pune     Image Source: Internet
   Street Design Guidelines


    Public Outreach              Capacity Building Workshops     Public Awareness
      Programs                      for other departments      through social media
Public Participation
1. Public Participation at
   planning and design phases.

2. Public Awareness program
   for Karol Bagh
   Pedestrianization

3. Stake Holder Consultation
   and public awareness for
                                               Upcoming
   ITO-TOD Proposal

4. Public Awareness program
   for Vikas Marg Transit
                                           A joint initiative by
   Corridor Improvement.                  UTTIPEC, DDA, EDMC
5. TOD Stake Holder
   Consultation
                                                and PWD
6. Pune Walkability Workshop,
   2012- Preparation of Pune
   Street Design Guidelines


    Public Outreach              Capacity Building Workshops     Public Awareness
      Programs                      for other departments      through social media
Public Participation
1. Public Participation at
   planning and design phases.

2. Public Awareness program
   for Karol Bagh
   Pedestrianization

3. Stake Holder Consultation
   and public awareness for
   ITO-TOD Proposal

4. Public Awareness program
   for Vikas Marg Transit
   Corridor Improvement.

5. TOD Stake Holder
   Consultations

6. Pune Walkability Workshop,
   2012- Preparation of Pune       Image only for reference
   Street Design Guidelines        Image Source: Internet



    Public Outreach              Capacity Building Workshops     Public Awareness
      Programs                      for other departments      through social media
Public Participation
1. Public Participation at
   planning and design phases.

2. Public Awareness program
   for Karol Bagh
   Pedestrianization

3. Stake Holder Consultation
   and public awareness for
   ITO-TOD Proposal

4. Public Awareness program
   for Vikas Marg Transit
   Corridor Improvement.

5. TOD Stake Holder
   Consultation

6. Pune Walkability Workshop,
   2012- Preparation of Pune
   Street Design Guidelines


    Public Outreach              Capacity Building Workshops     Public Awareness
      Programs                      for other departments      through social media
Public Participation
1. Workshop with EDMC
   Engineers.

2. Workshop with PWD
   Engineers

3. Workshop with DMRC
   Architects and
   Consultants for DMRC
   Phase III, Multi Modal
   Integration




    Public Outreach         Capacity Building Workshops     Public Awareness
      Programs                 for other departments      through social media
Public Participation
1. Workshop with EDMC
   Engineers.

2. Workshop with PWD
   Engineers

3. Workshop with DMRC
   Architects and
   Consultants for DMRC
                                       Upcoming
   Phase III, Multi Modal
   Integration

                                   An initiative by, PWD




    Public Outreach         Capacity Building Workshops     Public Awareness
      Programs                 for other departments      through social media
Public Participation
1. Workshop with EDMC
   Engineers.

2. Workshop with PWD
   Engineers

3. Workshop with DMRC
   Architects and
   Consultants for DMRC
   Phase III, Multi Modal
   Integration




                              Image only for reference
                              Image Source: Internet


    Public Outreach         Capacity Building Workshops     Public Awareness
      Programs                 for other departments      through social media
Public Participation
1. Facebook page and
   public participation

2. UTTIPEC Blog and
   public discussion
   forum

3. www.uttipec.nic.in
   Suggestion Forum.




    Public Outreach       Capacity Building Workshops     Public Awareness
      Programs               for other departments      through social media
Public Participation
1. Facebook page and
   public participation

2. UTTIPEC Blog and
   public discussion
   forum

3. www.uttipec.nic.in
   Suggestion Forum.




    Public Outreach       Capacity Building Workshops     Public Awareness
      Programs               for other departments      through social media
Public Participation
1. Facebook page and
   public participation

2. UTTIPEC Blog and
   public discussion
   forum

3. www.uttipec.nic.in
   Suggestion Forum.




    Public Outreach       Capacity Building Workshops     Public Awareness
      Programs               for other departments      through social media
Way Forward
                                Planning/
     Government                 Designing               Private
     Organization                                     Organization
                    Arranging         Stake holder
                    for funds         consultations
         Non
     Government                                        Individual/
     Organization                                     co-operative
                           Implementing




A collective effort can bring in a big change
UTTIPEC team
If there is a will, there is a way…..

Contenu connexe

Tendances

Trash to treasure PCMCs initiative with Rag pickers
Trash to treasure  PCMCs initiative with Rag pickersTrash to treasure  PCMCs initiative with Rag pickers
Trash to treasure PCMCs initiative with Rag pickersexpressionsindia
 
MobiliCity Brochure
MobiliCity BrochureMobiliCity Brochure
MobiliCity BrochurePraja
 
Blake Lapthorn South Coast green breakfast - carbon neutral world class event...
Blake Lapthorn South Coast green breakfast - carbon neutral world class event...Blake Lapthorn South Coast green breakfast - carbon neutral world class event...
Blake Lapthorn South Coast green breakfast - carbon neutral world class event...Blake Morgan
 
RoadMap_Slum-Free-Delhi-03aug2010
RoadMap_Slum-Free-Delhi-03aug2010RoadMap_Slum-Free-Delhi-03aug2010
RoadMap_Slum-Free-Delhi-03aug2010Paromita Roy
 
Transportation: Inspiring a Sustainability Action Agenda
Transportation: Inspiring a Sustainability Action AgendaTransportation: Inspiring a Sustainability Action Agenda
Transportation: Inspiring a Sustainability Action AgendaBarry Wellar
 

Tendances (6)

Trash to treasure PCMCs initiative with Rag pickers
Trash to treasure  PCMCs initiative with Rag pickersTrash to treasure  PCMCs initiative with Rag pickers
Trash to treasure PCMCs initiative with Rag pickers
 
Corporate Visions & Project Investments
Corporate Visions &  Project Investments Corporate Visions &  Project Investments
Corporate Visions & Project Investments
 
MobiliCity Brochure
MobiliCity BrochureMobiliCity Brochure
MobiliCity Brochure
 
Blake Lapthorn South Coast green breakfast - carbon neutral world class event...
Blake Lapthorn South Coast green breakfast - carbon neutral world class event...Blake Lapthorn South Coast green breakfast - carbon neutral world class event...
Blake Lapthorn South Coast green breakfast - carbon neutral world class event...
 
RoadMap_Slum-Free-Delhi-03aug2010
RoadMap_Slum-Free-Delhi-03aug2010RoadMap_Slum-Free-Delhi-03aug2010
RoadMap_Slum-Free-Delhi-03aug2010
 
Transportation: Inspiring a Sustainability Action Agenda
Transportation: Inspiring a Sustainability Action AgendaTransportation: Inspiring a Sustainability Action Agenda
Transportation: Inspiring a Sustainability Action Agenda
 

En vedette

Guidelines for the Development of a Quality Assurance (QA) Framework for Ope...
Guidelines for the Development of a Quality Assurance (QA) Framework for Ope...Guidelines for the Development of a Quality Assurance (QA) Framework for Ope...
Guidelines for the Development of a Quality Assurance (QA) Framework for Ope...African Virtual University
 
Metadata Quality Assurance Framework at QQML2016 conference - full version
Metadata Quality Assurance Framework at QQML2016 conference - full versionMetadata Quality Assurance Framework at QQML2016 conference - full version
Metadata Quality Assurance Framework at QQML2016 conference - full versionPéter Király
 
Applying eTOM (enhanced Telecom Operations Map) Framework to Non-Telecommunic...
Applying eTOM (enhanced Telecom Operations Map) Framework to Non-Telecommunic...Applying eTOM (enhanced Telecom Operations Map) Framework to Non-Telecommunic...
Applying eTOM (enhanced Telecom Operations Map) Framework to Non-Telecommunic...Alan McSweeney
 
Software quality assurance
Software quality assuranceSoftware quality assurance
Software quality assuranceAman Adhikari
 
Quality Assurance Vs Quality Control
Quality Assurance Vs Quality ControlQuality Assurance Vs Quality Control
Quality Assurance Vs Quality ControlYogita patil
 

En vedette (9)

Guidelines for the Development of a Quality Assurance (QA) Framework for Ope...
Guidelines for the Development of a Quality Assurance (QA) Framework for Ope...Guidelines for the Development of a Quality Assurance (QA) Framework for Ope...
Guidelines for the Development of a Quality Assurance (QA) Framework for Ope...
 
Metadata Quality Assurance Framework at QQML2016 conference - full version
Metadata Quality Assurance Framework at QQML2016 conference - full versionMetadata Quality Assurance Framework at QQML2016 conference - full version
Metadata Quality Assurance Framework at QQML2016 conference - full version
 
Applying eTOM (enhanced Telecom Operations Map) Framework to Non-Telecommunic...
Applying eTOM (enhanced Telecom Operations Map) Framework to Non-Telecommunic...Applying eTOM (enhanced Telecom Operations Map) Framework to Non-Telecommunic...
Applying eTOM (enhanced Telecom Operations Map) Framework to Non-Telecommunic...
 
Quality Assurance in Software Ind.
Quality Assurance in Software Ind.Quality Assurance in Software Ind.
Quality Assurance in Software Ind.
 
Software quality assurance
Software quality assuranceSoftware quality assurance
Software quality assurance
 
Quality Assurance Vs Quality Control
Quality Assurance Vs Quality ControlQuality Assurance Vs Quality Control
Quality Assurance Vs Quality Control
 
Quality Assurance & Control
Quality Assurance & ControlQuality Assurance & Control
Quality Assurance & Control
 
Quality assurance
Quality assuranceQuality assurance
Quality assurance
 
QUALITY ASSURANCE
QUALITY ASSURANCEQUALITY ASSURANCE
QUALITY ASSURANCE
 

Similaire à Institutional Framework for Quality Assurance in City Mobility Infrastructure

V3 08 03 12 introduction to irf pc
V3 08 03 12 introduction to irf pcV3 08 03 12 introduction to irf pc
V3 08 03 12 introduction to irf pcitssa-presentations
 
Decision Support for Urban Environmental Planning
Decision Support for Urban Environmental PlanningDecision Support for Urban Environmental Planning
Decision Support for Urban Environmental Planningurbanmetabolism
 
Alraouf energy conservation presentation
Alraouf energy conservation  presentation   Alraouf energy conservation  presentation
Alraouf energy conservation presentation Ali Alraouf
 
Mobility xs guided tour2.0
Mobility xs guided tour2.0Mobility xs guided tour2.0
Mobility xs guided tour2.0Manoj Mohan
 
Kaohsiung Info-Transport System (KITs)
Kaohsiung Info-Transport System (KITs)Kaohsiung Info-Transport System (KITs)
Kaohsiung Info-Transport System (KITs)Bao-Wen Chen
 
Real Time Information
Real Time InformationReal Time Information
Real Time Informationmanoj manduva
 
Smart and Connected Transport - A Case Study of Delhi
Smart and Connected Transport - A Case Study of DelhiSmart and Connected Transport - A Case Study of Delhi
Smart and Connected Transport - A Case Study of DelhiJaspal Singh
 
Shifting to Net Zero: A Case Study of New Delhi
Shifting to Net Zero: A Case Study of New DelhiShifting to Net Zero: A Case Study of New Delhi
Shifting to Net Zero: A Case Study of New DelhiESD UNU-IAS
 
Sustainable101 For Stupa4 [Compatibility Mode]
Sustainable101 For Stupa4 [Compatibility Mode]Sustainable101 For Stupa4 [Compatibility Mode]
Sustainable101 For Stupa4 [Compatibility Mode]Elisa Sutanudjaja
 
General info on Low Carbon Cities Framework (LCCF) Malaysia
General info on Low Carbon Cities Framework (LCCF) MalaysiaGeneral info on Low Carbon Cities Framework (LCCF) Malaysia
General info on Low Carbon Cities Framework (LCCF) MalaysiaSteve Lojuntin
 
Shared Vision of a World-Class Neighborhood
Shared Vision of a World-Class Neighborhood Shared Vision of a World-Class Neighborhood
Shared Vision of a World-Class Neighborhood Chandra Vikash
 
Metro lite guided tour2.0
Metro lite guided tour2.0Metro lite guided tour2.0
Metro lite guided tour2.0Chandra Vikash
 
L-G Tod Uttipec May2009
L-G Tod Uttipec May2009L-G Tod Uttipec May2009
L-G Tod Uttipec May2009uttipecDRAFT
 
O.P. Agarwal - Una Visión de Experiencia India en Política de Transporte Urba...
O.P. Agarwal - Una Visión de Experiencia India en Política de Transporte Urba...O.P. Agarwal - Una Visión de Experiencia India en Política de Transporte Urba...
O.P. Agarwal - Una Visión de Experiencia India en Política de Transporte Urba...Fagner Glinski
 
Smart City Expo: Making cities work
Smart City Expo: Making cities workSmart City Expo: Making cities work
Smart City Expo: Making cities workSiemens España
 
Sx sw int transport ecosystem
Sx sw int   transport ecosystemSx sw int   transport ecosystem
Sx sw int transport ecosystemtrey_baker
 
Geetam Tiwari_Understanding Sustainable Mobility
Geetam Tiwari_Understanding Sustainable MobilityGeetam Tiwari_Understanding Sustainable Mobility
Geetam Tiwari_Understanding Sustainable MobilityCarlo Vezzoli
 

Similaire à Institutional Framework for Quality Assurance in City Mobility Infrastructure (20)

V3 08 03 12 introduction to irf pc
V3 08 03 12 introduction to irf pcV3 08 03 12 introduction to irf pc
V3 08 03 12 introduction to irf pc
 
Decision Support for Urban Environmental Planning
Decision Support for Urban Environmental PlanningDecision Support for Urban Environmental Planning
Decision Support for Urban Environmental Planning
 
Smarter Planet: Transportation
Smarter Planet: TransportationSmarter Planet: Transportation
Smarter Planet: Transportation
 
Alraouf energy conservation presentation
Alraouf energy conservation  presentation   Alraouf energy conservation  presentation
Alraouf energy conservation presentation
 
Mobility xs guided tour2.0
Mobility xs guided tour2.0Mobility xs guided tour2.0
Mobility xs guided tour2.0
 
Kaohsiung Info-Transport System (KITs)
Kaohsiung Info-Transport System (KITs)Kaohsiung Info-Transport System (KITs)
Kaohsiung Info-Transport System (KITs)
 
Real Time Information
Real Time InformationReal Time Information
Real Time Information
 
Smart and Connected Transport - A Case Study of Delhi
Smart and Connected Transport - A Case Study of DelhiSmart and Connected Transport - A Case Study of Delhi
Smart and Connected Transport - A Case Study of Delhi
 
Shifting to Net Zero: A Case Study of New Delhi
Shifting to Net Zero: A Case Study of New DelhiShifting to Net Zero: A Case Study of New Delhi
Shifting to Net Zero: A Case Study of New Delhi
 
Sustainable101 For Stupa4 [Compatibility Mode]
Sustainable101 For Stupa4 [Compatibility Mode]Sustainable101 For Stupa4 [Compatibility Mode]
Sustainable101 For Stupa4 [Compatibility Mode]
 
General info on Low Carbon Cities Framework (LCCF) Malaysia
General info on Low Carbon Cities Framework (LCCF) MalaysiaGeneral info on Low Carbon Cities Framework (LCCF) Malaysia
General info on Low Carbon Cities Framework (LCCF) Malaysia
 
Shared Vision of a World-Class Neighborhood
Shared Vision of a World-Class Neighborhood Shared Vision of a World-Class Neighborhood
Shared Vision of a World-Class Neighborhood
 
Metro lite guided tour2.0
Metro lite guided tour2.0Metro lite guided tour2.0
Metro lite guided tour2.0
 
111006 sidt 2011 inturri
111006 sidt 2011 inturri111006 sidt 2011 inturri
111006 sidt 2011 inturri
 
L-G Tod Uttipec May2009
L-G Tod Uttipec May2009L-G Tod Uttipec May2009
L-G Tod Uttipec May2009
 
O.P. Agarwal - Una Visión de Experiencia India en Política de Transporte Urba...
O.P. Agarwal - Una Visión de Experiencia India en Política de Transporte Urba...O.P. Agarwal - Una Visión de Experiencia India en Política de Transporte Urba...
O.P. Agarwal - Una Visión de Experiencia India en Política de Transporte Urba...
 
Smart City Expo: Making cities work
Smart City Expo: Making cities workSmart City Expo: Making cities work
Smart City Expo: Making cities work
 
Sx sw int transport ecosystem
Sx sw int   transport ecosystemSx sw int   transport ecosystem
Sx sw int transport ecosystem
 
Nyu Poly 2012 R Lyle V1.0
Nyu Poly 2012 R Lyle V1.0Nyu Poly 2012 R Lyle V1.0
Nyu Poly 2012 R Lyle V1.0
 
Geetam Tiwari_Understanding Sustainable Mobility
Geetam Tiwari_Understanding Sustainable MobilityGeetam Tiwari_Understanding Sustainable Mobility
Geetam Tiwari_Understanding Sustainable Mobility
 

Dernier

16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdfGerald Furnkranz
 
Experience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming TrendExperience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming TrendFabwelt
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest2
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkbhavenpr
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.NaveedKhaskheli1
 
15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeAbdulGhani778830
 

Dernier (8)

16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf
 
Experience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming TrendExperience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming Trend
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global News
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.
 
15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for Justice
 

Institutional Framework for Quality Assurance in City Mobility Infrastructure

  • 1. Institutional Framework for quality assurance on infrastructure provisions in city mobility Presented by: Ashok Bhattacharjee, Director - Urban Transport Planner, United Traffic & Transportation Infrastructure (Planning & Engineering) Assisted by: Center Adarsha Kapoor Delhi Development authority Urban Designer, UTTIPEC, DDA
  • 2. City Infrastructure Quality Institutional Mobility Provisions Assurance Framework NUTP Transport Master Plan IRC Codes Dead Min. 1.8 M x 2.4 M Width 04A Clear Pedestrian Zone with no Visual Obstructions Human Access for Equitable Urban form which Policy Assurance of UTTIPEC Assurance of Guidelines and Mobility all users distribution of suits equitable lowering Public Framework Quality Water Storm of of Energy Safety Quality of Approvals road space use of all modes Transport & Management conservation Environmental Materials Space pollution
  • 3. City Infrastructure Quality Institutional Mobility Provisions Assurance Framework
  • 4. Redefining mobility Image Source: Internet As per Indian National Transport Policy: “The Central Government would, encourage measures that allocate road space on a more equitable basis, with people as its focus.”
  • 5. Policy Framework Indian National Transport Policy: VISION • To recognize that people occupy center-stage in our cities and all plans would be for their common benefit and well being • To make our cities the most livable in the world and enable them to become the “engines of economic growth” that power India’s development in the 21st century • To allow our cities to evolve into an urban form that is best suited for the unique geography of their locations and is best placed to support the main social and economic activities that take place in the city.
  • 6. Policy Framework As per Transport chapter of MPD 2021: VISION • 80: 20 Modal Split (Set 5-year targets) • Women safety • Zero fatality • Air quality targets • Equity and inclusion • Sustainable transport – equity, environment
  • 8. Flyovers do not reduce congestion They Reduce Mobility of ALL Road Users!! Context Information Source: Increase in: Miscellaneous new paper clippings Traffic = 21 times Road space = 3.1 times Congestion has doubled in the last 8 to 10 years.” Ring road: Designed for 75,000 vehicles a day, Carries 4,00,000 vehicles a day. 70/170 traffic locations carry more than their vehicle carrying capacity
  • 9. Environmental Pollution Context Pollution same as that before CNG Vehicle pollution - 3 times of industrial pollution Vehicles are major cause of respiratory fatalities. 21 people die of respiratory diseases in capital every day Sources of Air Pollution in Delhi: Information Source: Delhi-Pollution Miscellaneous new paper clippings and Delhi Master DG sets, cooking, Plan Industrial biomass Vehicular Emission 10% Emission 20% Industrial Emission Other Sources 70% VEHICULAR EMISSION Source: MPD 2021, p57
  • 10. Human Safety Context VICTIM 2011 VEHICLES AT FALUT 2011 No. OF PERSONS No. OF PERSONS ACCIDENTS KILLED ACCIDENTS KILLED PEDESTRIAN 937 946 UNKNOWN VEHICLES 827 841 CYCLE & NMT 131 131 PRIVATE VEHICLES 452 460 CAR PVT 63 69 COMMERCIAL VEHICLES 412 440 OTHER MODES 876 920 BUSES 100 102 TOTAL 2007 2066 GRAMIN SEWA 21 21 TOTAL 2007 2066 Information Source: Delhi Police • More pedestrians and cyclists die. • More Private/ commercial vehicles kill
  • 11. 1 Failure of Existing Transport Network Context Delhi Traffic dependent on major arterial roads Image Source: Google satellite imagery
  • 12. Failure of Traffic Infrastructure Context Delhi China Present Future Image Source: internet
  • 13. Ideal Transport Network Context Traffic dependent on dense network of streets Image Source: Google satellite imagery
  • 14. 2 Non-Signalised High Speed corridors Context Average Peak Hour Speed- 5-10Km/Hr Average Off-Peak Hour Speed- 80Km/Hr Increased fatality for pedestrians and cyclists Image Source: Internet
  • 15. 3 Out of scale Infrastructure Context Safety of humans, cyclists at risk Image Source: Internet
  • 16. 4 Unplanned & Unregulated parking Context Parking lots need to be planned along with an overall transit strategy Image Source: Internet Citizen’s of Delhi get a wrong notion- THEY CAN PARK THEIR VEHICLE ANYWHERE
  • 17. 5 Wrong planning of pedestrian Infrastructure Context Foot over bridge- Failure due to longer walking Every 2nd death on road is of a pedestrian Image Source: Internet
  • 18. Alternatives for travelling Context Image Source: Oasis Design Inc Public Transport Modes City Buses/Metro Buses Pedestrian Auto Rickshaws Cycling ShuttleAuto Rickshaws/Tempo Cycle Rickshaw
  • 19. YET…. Image Source: Internet Context About 15% road users (cars) take up 80% of road space Transportation Infrastructure still being designed only for cars
  • 20. Clear and present Danger Context 80 Reverse Mode Shift is 70 happening…. 60 • Mode share of Public Transport is declining, Private modes going up…!! 50 • High levels of Congestion Mode Share % 40 • Unhealthy Levels of Pollution 30 20 CAR 2W 10 AUTO Public Transport 0 Base 2007 Business as Usual Metro + Closed BRT Originally Proposed (2021) (with Parking 2021 + Bus Speed Charges) 2021 25Kmph + Higher With No Policy change…. Parking Charges 20 Data Source: RITES TDF Study for DoT, GNCTD
  • 21. Degrading Urban fabric Context Image Source: Primary survey by UTTIPEC, dated june 2012 Degrading Quality of Life Planning for vehicles  No respect for humans
  • 22. DESPERATE NEED FOR A PARADIGM SHIFT
  • 23. Transport Infrastructure Design Transport Infrastructure for Pedestrians Cyclists Intermediate Public Transport Public Transport And Cars Image Source: Internet
  • 24. Transport Infrastructure Pedestrians Motorized Vehicles Intermediate Public Transport (Autos) Cycles and Other Non Buses motorized vehicles Public Utilities Hawkers/ Vendors Table tops and kerb ramps for universal access Equitable distribution of road space. Image Source: Vikas Marg Transit Corridor improvement project, UTTIPEC
  • 25. Quality Assurance HUMAN SAFETY AND COMFORT Source: UTTIPEC Street Design Guidelines
  • 26. Quality Assurance PROVIDE CLIMATIC COMFORT Source: UTTIPEC Street Design Guidelines
  • 27. Quality Assurance UNIVERSAL ACCESSIBILITY AND PUBLIC UTILITIES Source: UTTIPEC Street Design Guidelines
  • 28. Quality Assurance REDUCE HEAT ISLAND EFFECT & STORM WATER MANAGEMENT Source: UTTIPEC Street Design Guidelines
  • 29. Enhance Connectivity Urban Form Image Source: Internet
  • 30. Transit Oriented Development Urban Form Image Source: Internet Encourage use of Public Transport through Urban Design
  • 31. Before UTTIPEC Work Culture Technical Consultants Traffic Road Municipal Research Owning Corporation Body Agency Traffic Police Road Congress Urban Development Academic Authority Researchers Development Authority Transport Department Metro Rail Railway Authority planning Planning board Organization Concerned departments work with different priority and program
  • 32. After creation of UTTIPEC Work Culture Technical Municipal Road Traffic Consultants Corporation Owning Research Agency Body Urban Development Traffic Authority Police Road Congress UTTIPEC Academic Researchers Metro Rail Authority Planning Development Railway Transport Organization Authority planning Department board Concerned departments together to address interrelated issues
  • 34. UTTIPEC Aim Image Source: www.uttipec.nic.in
  • 35. UTTIPEC Functioning UTTIPEC’s mode of Operation Decision making  Deliberation Working Groups (Bi-monthly meetings, Governing Body as required) (Monthly meetings) Core Groups (Meetings to monitor progress of work, as required)
  • 36. UTTIPEC Composition Governing Body Honourable LG, Delhi Chairman Vice-Chairman, DDA Vice-Chairman Engineer Member, DDA Member Pr. Commissioner-Cum-Secy (TPT),GNCTD Member OSD (MRTS), MOUD Member Commissioner (Plg.), DDA Member Secretary, Indian Roads Congress (IRC) Member Chief Planner,TCPO Member Head, Traffic & Transportation Division, CRRI Member Managing Director, DIMTS Member Chief Town Planner, MCD Member Engineer-In-Chief, MCD Member Engineer-In-Chief, PWD Member Engineer-In-Chief, NDMC Member Chief Engineer, Northern Railway (Centre) Member Director (Project), DMRC Member Joint Commissioner of Police (Traffic) Member Additional Commissioner (Planning) TB & C, DDA Member President, AAUI Member Director (Plg.) UTTIPEC, DDA Member-Secy Source: www.uttipec.nic.in
  • 37. UTTIPEC Composition Working Groups Module – I INTEGRATED URBAN TRANSPORT & POLICY PLANNING Working Group I A Development of Planning Guidelines Working Group I B Planning & Engg. Norms/Standards Working Group I C Documentation & Data Dissemination Module – II ROAD CAPACITY BUILDING Working Group II A Processing & Evaluation of New Projects Working Group II B Retrofitting of Existing Corridors Module – III Working Group III A Real-Time Traffic Management Working Group III B Regulatory Changes for Traffic Improvements Module – IV COMMUNITY PARTICIPATION Working Group IV Development of Website Module – V QUALITY ASSURANCE/AUDIT Working group-V TRANSIT ORIENTED DEVELOPMENT (TOD) TASK FORCE TOD Group Source: www.uttipec.nic.in
  • 38. UTTIPEC Composition Core Groups Core Groups are created with representatives from various stake holder departments, to expedite the process of information collection, planning, deliberation, co-ordination and monitoring.
  • 39. UTTIPEC Initiatives 1. MPD- Transit • ENCOURAGES USE OF Oriented PUBLIC TRANSPORT Development Chapter • DISCOURAGES USE OF PRIVATE 2. MPD- Transport TRANSPORT Chapter • THROUGH URBAN DESIGN AND 3. Open Space Master PLANNING. Plan 4. Policy for Parking 1. Pedestrian and NMT friendly Fees and environment Management 2. Connectivity 3. Multi modal integration 5. Eco Mobility Master 4. Modal shift Plan and cycling 5. Place making Master Plan 6. High density mixed use- mixed income Image Source: Sustainable Citiess China; 7. Sustainable infrastructure Design Manual For Low Carbon Development Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 40. UTTIPEC Initiatives 1. MPD- Transit Oriented Development Chapter 2. MPD- Transport Chapter 3. Open Space Master Network Plan of Bus Dedicated Plan Corridors in Delhi Image Source: Internet 4. Policy for Parking Transport Master plan vision: Fees and • sustainable transport system Management • 80: 20 Modal Split • Women safety 5. Eco Mobility Master • Zero fatality on roads Plan and cycling • improvement in air quality Master Plan • equitable distribution of space • inclusion of all segments of society. Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 41. UTTIPEC Initiatives 1. MPD- Transit Oriented Development Chapter 2. MPD- Transport Chapter 3. Open Space Master Plan 4. Policy for Parking Fees and Management 5. Eco Mobility Master Plan and cycling Master Plan Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 42. UTTIPEC Initiatives 1. MPD- Transit Oriented Development Chapter 2. MPD- Transport Chapter 3. Open Space Master Plan 4. Policy for Parking Fees and Management 5. Eco Mobility Master Plan and cycling Master Plan Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 43. UTTIPEC Initiatives Type of Parking Location Existing Proposed Penalty for extra time 1. MPD- Transit Rates Rates Oriented 5 Min Drop off On Street Rs. 10 Free Pay for 1 Hr Development Chapter Upto 1 Hr On Street Rs. 10 Rs. X Pay for 1.5 Hr Upto 1 ½ Hrs On Street Rs. 10 Rs. 2X Pay for 2 Hrs 2. MPD- Transport Chapter Upto 2 Hrs On Street Rs. 10 Rs. 4X Either move to stack parking OR the Car would be Impounded 3. Open Space Master with Rs.1000 as fine. Plan NO ON STREET PARKING ALLOWED BEYOND 2Hrs. 8Hr Stack Parking Rs. 10 Rs. 2X Night Only Stack Parking Rs. 20 Rs. 1 ½ X 4. Policy for Parking Monthly Stack Parking Rs. 600- Rs. 60X Fees and 700 Management Long Term Stack Parking Exponentially high street Parking Laxmi Nagar Metro 5. Eco Mobility Master Station Plan and cycling fees Master Plan Symbiotic ON/OFF street parking One PMZ  One Management 500M Zone Short term On Street Parking Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 44. UTTIPEC Initiatives 1. MPD- Transit Oriented Development Chapter 2. MPD- Transport Chapter 3. Open Space Master Plan 4. Policy for Parking Fees and Management 5. Eco Mobility Master Plan and cycling Master Plan Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 45. 1. Street Design UTTIPEC Initiatives Guidelines 2. Multi Modal Integration Guidelines 3. TOD Sustainability Guidelines 4. Guidelines for Storm Water Management 5. Guidelines for Retrofitting of Streets with high Fatality 6. BEAD (BRT Evaluation Tool) 7. Women Safety Guidelines Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 46. 1. Street Design UTTIPEC Initiatives SAMPLE SECTION Guidelines 2. Multi Modal Integration Guidelines 3. TOD Sustainability Guidelines 4. Guidelines for Storm Water Management 5. Guidelines for Retrofitting of Streets with high Fatality 6. BEAD (BRT Evaluation Tool) 7. Women Safety Guidelines Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 47. 1. Street Design UTTIPEC Initiatives SAMPLE SECTION Guidelines 2. Multi Modal Integration Guidelines 3. TOD Sustainability Guidelines 4. Guidelines for Storm Water Management 5. Guidelines for Retrofitting of Streets with high Fatality 6. BEAD (BRT Evaluation Tool) 7. Women Safety Guidelines Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 48. 1. Street Design UTTIPEC Initiatives Guidelines Zones as per UTTIPEC MRTS Checklist w.r.t. Metro Stations 2. Multi Modal Integration Guidelines 50m zone- Bus stop, Cycle rental, Cycle rickshaw stand 100m zone- Cycle and Two-Wheeler parking stand 150m zone- Auto Rickshaw stand 3. TOD Sustainability 250m zone- Taxi stand, Private car drop-off Guidelines Beyond 250m- Long Term Stack parking 4. Guidelines for Storm Water Management 5. Guidelines for Retrofitting of Streets with high Fatality 6. BEAD (BRT Evaluation Tool) Laxmi Nagar Station Nirman Vihar Station Preet Vihar Station 7. Women Safety Guidelines Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 49. 1. Street Design UTTIPEC Initiatives Guidelines 2. Multi Modal Integration Guidelines 3. TOD Sustainability Guidelines 4. Guidelines for Storm Water Management 5. Guidelines for Retrofitting of Streets with high Fatality 6. BEAD (BRT Evaluation Tool) 7. Women Safety Guidelines Segregated Uses, Random density Mixed Uses, Transit-Density Pyramid Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 50. 1. Street Design UTTIPEC Initiatives Guidelines 2. Multi Modal Integration Guidelines 3. TOD Sustainability Guidelines 4. Guidelines for Storm Water Management 5. Guidelines for Retrofitting of Streets with high Fatality 6. BEAD (BRT Evaluation Tool) 7. Women Safety Guidelines Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 51. 1. Street Design UTTIPEC Initiatives Guidelines 2. Multi Modal Integration Guidelines 3. TOD Sustainability Guidelines 4. Guidelines for Storm Water Management 5. Guidelines for Retrofitting of Streets with high Fatality 6. BEAD (BRT Evaluation Tool) 7. Women Safety Guidelines Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 52. 1. Street Design UTTIPEC Initiatives Guidelines 2. Multi Modal Integration Guidelines 3. TOD Sustainability Guidelines 4. Guidelines for Storm Water Management 5. Guidelines for Retrofitting of Streets with high Fatality 6. BEAD (BRT Evaluation Tool) 7. Women Safety Guidelines Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 53. 1. Street Design UTTIPEC Initiatives Guidelines 2. Multi Modal Integration Guidelines 3. TOD Sustainability Guidelines 4. Guidelines for Storm Water Management 5. Guidelines for Retrofitting of Streets with high Fatality 6. BEAD (BRT Evaluation Tool) 7. Women Safety Guidelines Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 54. 1. Delhi Metro Phase I & II- UTTIPEC Initiatives Multi Modal Integration 2. Delhi Metro Phase III- Multi Strategy for Multi Modal Integration Modal Integration 3. Pedestrianization of Karol through Bagh 4. ITO TOD- Masterplan & UD retrofitting of Framework Existing Phase 1 & 5. Dwarka Retrofitting Plan 2 Metro Stations 6. Aurobindo Marg Retrofitting Plan and Parking Strategy of Delhi Metro 7. Vikas Marg Retrofitting Plan and Parking Strategy Chattarpur Metro Station MRTS Integration Strategy 8. Lakshmi Nagar TOD Scheme Source: OASIS Design Inc. 9. Karkarduma Delhi Metro Phase II, TOD Scheme 10. Mundka TOD Scheme 11. Rohini- UER2- TOD Scheme 12. Bus Depot Land Planning 13. ORR-RTR strategy of decongestion 14. Road No 56, Retrofitting 15. S.P. Mukherjee Marg- Station plan 16. 14 Nos. Bus Dedicated Corridors Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 55. 1. Delhi Metro Phase I & II- UTTIPEC Initiatives Multi Modal Integration Strategy for 2. Delhi Metro Phase III- Multi Modal Integration Multi Modal 3. Pedestrianization of Karol Integration Bagh 4. ITO TOD- Masterplan & UD while designing Framework of Phase III 5. Dwarka Retrofitting Plan 6. Aurobindo Marg Retrofitting Stations of Delhi Plan and Parking Strategy Metro 7. Vikas Marg Retrofitting Plan and Parking Strategy 8. Lakshmi Nagar TOD Scheme 9. Karkarduma Delhi Metro Phase II, TOD Scheme 10. Mundka TOD Scheme 11. Rohini- UER2- TOD Scheme 12. Bus Depot Land Planning 13. ORR-RTR strategy of decongestion 14. Road No 56, Retrofitting 15. S.P. Mukherjee Marg- Station plan Image is only for reference 16. 14 Nos. Bus Dedicated Image Source: Internet Corridors Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 56. 1. Delhi Metro Phase I & II- UTTIPEC Initiatives Multi Modal Integration 2. Delhi Metro Phase III- Multi Karol Bagh Pedestrianization Strategy Modal Integration Source: NilaA Architecture & Urban Design 3. Pedestrianization of Karol Bagh 4. ITO TOD- Masterplan & UD Framework 5. Dwarka Retrofitting Plan 6. Aurobindo Marg Retrofitting Plan and Parking Strategy 7. Vikas Marg Retrofitting Plan and Parking Strategy 8. Lakshmi Nagar TOD Scheme 9. Karkarduma Delhi Metro Phase II, TOD Scheme 10. Mundka TOD Scheme 11. Rohini- UER2- TOD Scheme 12. Bus Depot Land Planning 13. ORR-RTR strategy of decongestion 14. Road No 56, Retrofitting 1. Pedestrianization of Ajmal Khan Road 15. S.P. Mukherjee Marg- Station plan 2. Improved pedestrian and cycling facilities 16. 14 Nos. Bus Dedicated Corridors Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 57. 1. Delhi Metro Phase I & II- UTTIPEC Initiatives Multi Modal Integration 2. Delhi Metro Phase III- Multi Modal Integration 3. Pedestrianization of Karol Bagh 4. ITO TOD- Masterplan & UD Framework 5. Dwarka Retrofitting Plan 6. Aurobindo Marg Retrofitting Plan and Parking Strategy 7. Vikas Marg Retrofitting Plan and Parking Strategy 8. Lakshmi Nagar TOD Scheme 9. Karkarduma Delhi Metro Phase II, TOD Scheme 10. Mundka TOD Scheme 11. Rohini- UER2- TOD Scheme 12. Bus Depot Land Planning 13. ORR-RTR strategy of decongestion Karol Bagh 14. Road No 56, Retrofitting Pedestrianiz 15. S.P. Mukherjee Marg- Station ation plan Strategy Source: NilaA 16. 14 Nos. Bus Dedicated Architecture & Corridors Urban Design Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 58. 1. Delhi Metro Phase I & II- UTTIPEC Initiatives Multi Modal Integration 2. Delhi Metro Phase III- Multi Modal Integration 3. Pedestrianization of Karol Bagh 4. ITO TOD- Masterplan & UD Framework 5. Dwarka Retrofitting Plan 6. Aurobindo Marg Retrofitting Plan and Parking Strategy 7. Vikas Marg Retrofitting Plan and Parking Strategy 8. Lakshmi Nagar TOD Scheme 9. Karkarduma Delhi Metro Phase II, TOD Scheme 10. Mundka TOD Scheme 11. Rohini- UER2- TOD Scheme 12. Bus Depot Land Planning 13. ORR-RTR strategy of ITO TOD- Masterplan & UD Framework decongestion Source: NilaA Architecture & Urban Design 14. Road No 56, Retrofitting 15. S.P. Mukherjee Marg- Station plan 16. 14 Nos. Bus Dedicated Corridors Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 59. 1. Delhi Metro Phase I & II- UTTIPEC Initiatives Multi Modal Integration 2. Delhi Metro Phase III- Multi Modal Integration 3. Pedestrianization of Karol Bagh 4. ITO TOD- Masterplan & UD Framework 5. Dwarka Retrofitting Plan 6. Aurobindo Marg Retrofitting Plan and Parking Strategy 7. Vikas Marg Retrofitting Plan and Parking Strategy 8. Lakshmi Nagar TOD Scheme 9. Karkarduma Delhi Metro Phase II, TOD Scheme 10. Mundka TOD Scheme 11. Rohini- UER2- TOD Scheme 12. Bus Depot Land Planning 13. ORR-RTR strategy of decongestion 14. Road No 56, Retrofitting 15. S.P. Mukherjee Marg- Station plan 16. 14 Nos. Bus Dedicated ITO TOD- Masterplan & UD Framework Corridors Source: NilaA Architecture & Urban Design Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 60. 1. Delhi Metro Phase I & II- UTTIPEC Initiatives Multi Modal Integration 2. Delhi Metro Phase III- Multi Modal Integration 3. Pedestrianization of Karol Bagh 4. ITO TOD- Masterplan & UD Framework 5. Dwarka Retrofitting Plan 6. Aurobindo Marg Retrofitting Plan and Parking Strategy 7. Vikas Marg Retrofitting Plan and Parking Strategy 8. Lakshmi Nagar TOD Scheme 9. Karkarduma Delhi Metro Phase II, TOD Scheme 10. Mundka TOD Scheme 11. Rohini- UER2- TOD Scheme 12. Bus Depot Land Planning 13. ORR-RTR strategy of decongestion 14. Road No 56, Retrofitting 15. S.P. Mukherjee Marg- Station Improvement of connectivity, ensuring women safety plan 16. 14 Nos. Bus Dedicated through street design and Multi Modal Integration. Corridors Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 61. 1. Delhi Metro Phase I & II- UTTIPEC Initiatives Cycle Accidents Pedestrian Accidents Multi Modal Integration Aurobindo Marg 2. Delhi Metro Phase III- Multi Modal Integration 3. Pedestrianization of Karol Bagh 4. ITO TOD- Masterplan & UD N Framework 5. Dwarka Retrofitting Plan 6. Aurobindo Marg Retrofitting Plan and Parking Strategy 7. Vikas Marg Retrofitting Plan and Parking Strategy 8. Lakshmi Nagar TOD Scheme 9. Karkarduma Delhi Metro Phase II, TOD Scheme 10. Mundka TOD Scheme 11. Rohini- UER2- TOD Scheme 12. Bus Depot Land Planning 13. ORR-RTR strategy of decongestion 14. Road No 56, Retrofitting 15. S.P. Mukherjee Marg- Station plan 16. 14 Nos. Bus Dedicated Corridors Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 62. 1. Delhi Metro Phase I & II- UTTIPEC Initiatives Image Source: Vikas Marg Transit Corridor improvement project, UTTIPEC Multi Modal Integration MRTS Integration 2. Delhi Metro Phase III- Multi Modal Integration 3. Pedestrianization of Karol Bagh 4. ITO TOD- Masterplan & UD Framework 5. Dwarka Retrofitting Plan 6. Aurobindo Marg Retrofitting Plan and Parking Strategy 7. Vikas Marg Retrofitting Plan Street Design and Parking Strategy 8. Lakshmi Nagar TOD Scheme 9. Karkarduma Delhi Metro Phase II, TOD Scheme 10. Mundka TOD Scheme 11. Rohini- UER2- TOD Scheme 12. Bus Depot Land Planning 13. ORR-RTR strategy of decongestion 14. Road No 56, Retrofitting 15. S.P. Mukherjee Marg- Station plan 16. 14 Nos. Bus Dedicated Corridors Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 63. 1. Delhi Metro Phase I & II- UTTIPEC Initiatives Image Source: Vikas Marg Transit Corridor improvement project, UTTIPEC Multi Modal Integration 2. Delhi Metro Phase III- Multi Modal Integration 3. Pedestrianization of Karol Bagh 4. ITO TOD- Masterplan & UD Framework Stack Parking 5. Dwarka Retrofitting Plan 6. Aurobindo Marg Retrofitting Provision Plan and Parking Strategy 7. Vikas Marg Retrofitting Plan Urban Design and Parking Strategy 8. Lakshmi Nagar TOD Scheme 9. Karkarduma Delhi Metro Phase II, TOD Scheme 10. Mundka TOD Scheme 11. Rohini- UER2- TOD Scheme 12. Bus Depot Land Planning 13. ORR-RTR strategy of decongestion 14. Road No 56, Retrofitting 15. S.P. Mukherjee Marg- Station plan 16. 14 Nos. Bus Dedicated Corridors Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 64. 1. Delhi Metro Phase I & II- UTTIPEC Initiatives Image Source: Vikas Marg Transit Corridor improvement project, UTTIPEC Multi Modal Integration 2. Delhi Metro Phase III- Multi Modal Integration 3. Pedestrianization of Karol Bagh 4. ITO TOD- Masterplan & UD Framework 5. Dwarka Retrofitting Plan 6. Aurobindo Marg Retrofitting Plan and Parking Strategy 7. Vikas Marg Retrofitting Plan and Parking Strategy 8. Lakshmi Nagar TOD Scheme 9. Karkarduma Delhi Metro Phase II, TOD Scheme 10. Mundka TOD Scheme 11. Rohini- UER2- TOD Scheme 12. Bus Depot Land Planning 13. ORR-RTR strategy of decongestion 14. Road No 56, Retrofitting 15. S.P. Mukherjee Marg- Station plan 16. 14 Nos. Bus Dedicated Corridors Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 65. 1. Delhi Metro Phase I & II- UTTIPEC Initiatives Image Source: Vikas Marg Transit Corridor improvement project, UTTIPEC Multi Modal Integration 2. Delhi Metro Phase III- Multi Modal Integration 3. Pedestrianization of Karol Bagh 4. ITO TOD- Masterplan & UD Framework 5. Dwarka Retrofitting Plan 6. Aurobindo Marg Retrofitting Plan and Parking Strategy 7. Vikas Marg Retrofitting Plan and Parking Strategy 8. Lakshmi Nagar TOD Scheme 9. Karkarduma Delhi Metro Stack Parking Phase II, TOD Scheme 10. Mundka TOD Scheme Provision 11. Rohini- UER2- TOD Scheme 12. Bus Depot Land Planning 13. ORR-RTR strategy of Urban Design decongestion 14. Road No 56, Retrofitting 15. S.P. Mukherjee Marg- Station plan 16. 14 Nos. Bus Dedicated Corridors Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 66. 1. Delhi Metro Phase I & II- UTTIPEC Initiatives Image Source: Vikas Marg Transit Corridor improvement project, UTTIPEC Multi Modal Integration 2. Delhi Metro Phase III- Multi Modal Integration 3. Pedestrianization of Karol Bagh 4. ITO TOD- Masterplan & UD Framework 5. Dwarka Retrofitting Plan 6. Aurobindo Marg Retrofitting Plan and Parking Strategy 7. Vikas Marg Retrofitting Plan and Parking Strategy 8. Lakshmi Nagar TOD Scheme 9. Karkarduma Delhi Metro Phase II, TOD Scheme 10. Mundka TOD Scheme 11. Rohini- UER2- TOD Scheme 12. Bus Depot Land Planning 13. ORR-RTR strategy of decongestion 14. Road No 56, Retrofitting 15. S.P. Mukherjee Marg- Station plan 16. 14 Nos. Bus Dedicated Corridors Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 67. 1. Delhi Metro Phase I & II- UTTIPEC Initiatives Multi Modal Integration 2. Delhi Metro Phase III- Multi Modal Integration 3. Pedestrianization of Karol Bagh 4. ITO TOD- Masterplan & UD Framework 5. Dwarka Retrofitting Plan 6. Aurobindo Marg Retrofitting Plan and Parking Strategy 7. Vikas Marg Retrofitting Plan and Parking Strategy 8. Lakshmi Nagar TOD Scheme 9. Karkarduma Delhi Metro Phase II, TOD Scheme 10. Mundka TOD Scheme 11. Rohini- UER2- TOD Scheme 12. Bus Depot Land Planning 13. ORR-RTR strategy of decongestion 14. Road No 56, Retrofitting 15. S.P. Mukherjee Marg- Station plan 16. 14 Nos. Bus Dedicated Corridors Image Source: Vikas Marg Transit Corridor improvement project, UTTIPEC Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 68. 1. Delhi Metro Phase I & II- UTTIPEC Initiatives Multi Modal Integration 2. Delhi Metro Phase III- Multi Modal Integration 3. Pedestrianization of Karol Bagh 4. ITO TOD- Masterplan & UD Framework 5. Dwarka Retrofitting Plan 6. Aurobindo Marg Retrofitting Plan and Parking Strategy 7. Vikas Marg Retrofitting Plan and Parking Strategy 8. Lakshmi Nagar TOD Scheme 9. Karkarduma Delhi Metro Phase II, TOD Scheme 10. Mundka TOD Scheme 11. Rohini- UER2- TOD Scheme 12. Bus Depot Land Planning 13. ORR-RTR strategy of decongestion 14. Road No 56, Retrofitting 15. S.P. Mukherjee Marg- Station plan 16. 14 Nos. Bus Dedicated Image Source: Karkardooma TOD Project, UTTIPEC Corridors Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 69. 1. Delhi Metro Phase I & II- UTTIPEC Initiatives Multi Modal Integration 2. Delhi Metro Phase III- Multi Modal Integration 3. Pedestrianization of Karol Bagh 4. ITO TOD- Masterplan & UD Framework 5. Dwarka Retrofitting Plan 6. Aurobindo Marg Retrofitting Plan and Parking Strategy 7. Vikas Marg Retrofitting Plan and Parking Strategy 8. Lakshmi Nagar TOD Scheme 9. Karkarduma Delhi Metro Phase II, TOD Scheme 10. Mundka TOD Scheme 11. Rohini- UER2- TOD Scheme 12. Bus Depot Land Planning 13. ORR-RTR strategy of decongestion 14. Road No 56, Retrofitting 15. S.P. Mukherjee Marg- Station plan 16. 14 Nos. Bus Dedicated Image Source: Mundka TOD Project, UTTIPEC Corridors Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 70. 1. Delhi Metro Phase I & II- UTTIPEC Initiatives Multi Modal Integration 1500 M walking 2. Delhi Metro Phase III- Multi radius Modal Integration 3. Pedestrianization of Karol Bagh 4. ITO TOD- Masterplan & UD Framework 5. Dwarka Retrofitting Plan 6. Aurobindo Marg Retrofitting Plan and Parking Strategy 7. Vikas Marg Retrofitting Plan Rapid Transit Station and Parking Strategy (Metro/ BRT) Projects to adhere to influence zone 8. Lakshmi Nagar TOD Scheme layout plan 9. Karkarduma Delhi Metro Phase II, TOD Scheme 10. Mundka TOD Scheme 11. Rohini- UER2- TOD Scheme 12. Bus Depot Land Planning 13. ORR-RTR strategy of decongestion 14. Road No 56, Retrofitting 15. S.P. Mukherjee Marg- Station plan 16. 14 Nos. Bus Dedicated Image Source: Rohini TOD Project, UTTIPEC Corridors Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 71. 1. Delhi Metro Phase I & II- UTTIPEC Initiatives Multi Modal Integration 2. Delhi Metro Phase III- Multi Modal Integration 3. Pedestrianization of Karol Bagh 4. ITO TOD- Masterplan & UD Framework 5. Dwarka Retrofitting Plan 6. Aurobindo Marg Retrofitting Plan and Parking Strategy 7. Vikas Marg Retrofitting Plan and Parking Strategy 8. Lakshmi Nagar TOD Scheme 9. Karkarduma Delhi Metro Phase II, TOD Scheme 10. Mundka TOD Scheme 11. Rohini- UER2- TOD Scheme 12. Bus Depot Land Planning 13. ORR-RTR strategy of decongestion 14. Road No 56, Retrofitting 15. S.P. Mukherjee Marg- Station plan 16. 14 Nos. Bus Dedicated ITO Bus Parking Strategy Source: NilaA Architecture & Urban Design Corridors Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 72. 1. Delhi Metro Phase I & II- UTTIPEC Initiatives Multi Modal Integration 2. Delhi Metro Phase III- Multi Modal Integration 3. Pedestrianization of Karol Bagh 4. ITO TOD- Masterplan & UD Framework 5. Dwarka Retrofitting Plan 6. Aurobindo Marg Retrofitting Plan and Parking Strategy 7. Vikas Marg Retrofitting Plan and Parking Strategy 8. Lakshmi Nagar TOD Scheme 9. Karkarduma Delhi Metro Phase II, TOD Scheme 10. Mundka TOD Scheme 11. Rohini- UER2- TOD Scheme 12. Bus Depot Land Planning 13. ORR-RTR strategy of decongestion 14. Road No 56, Retrofitting 15. S.P. Mukherjee Marg- Station plan Traffic management strategy for decongestion of road and 16. 14 Nos. Bus Dedicated reduction of fatality Corridors Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 73. 1. Delhi Metro Phase I & II- UTTIPEC for decongestion of road and Traffic management strategy Initiatives Multi Modal Integration 2. Delhi Metro Phase III- Multi reduction of fatality Modal Integration 3. Pedestrianization of Karol Bagh 4. ITO TOD- Masterplan & UD Framework 5. Dwarka Retrofitting Plan 6. Aurobindo Marg Retrofitting Plan and Parking Strategy 7. Vikas Marg Retrofitting Plan and Parking Strategy 8. Lakshmi Nagar TOD Scheme 9. Karkarduma Delhi Metro Phase II, TOD Scheme 10. Mundka TOD Scheme 11. Rohini- UER2- TOD Scheme 12. Bus Depot Land Planning 13. ORR-RTR strategy of decongestion 14. Road No 56, Retrofitting 15. S.P. Mukherjee Marg- Station plan 16. 14 Nos. Bus Dedicated Corridors Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 74. 1. Delhi Metro Phase I & II- UTTIPEC Initiatives Multi Modal Integration 2. Delhi Metro Phase III- Multi Modal Integration 3. Pedestrianization of Karol Bagh 4. ITO TOD- Masterplan & UD Framework 5. Dwarka Retrofitting Plan 6. Aurobindo Marg Retrofitting Plan and Parking Strategy 7. Vikas Marg Retrofitting Plan and Parking Strategy 8. Lakshmi Nagar TOD Scheme 9. Karkarduma Delhi Metro Phase II, TOD Scheme 10. Mundka TOD Scheme 11. Rohini- UER2- TOD Scheme 12. Bus Depot Land Planning 13. ORR-RTR strategy of decongestion 14. Road No 56, Retrofitting 15. S.P. Mukherjee Marg- Station plan 16. 14 Nos. Bus Dedicated Multi Modal Integration Corridors Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 75. 1. Delhi Metro Phase I & II- UTTIPEC Initiatives Multi Modal Integration 2. Delhi Metro Phase III- Multi Modal Integration 3. Pedestrianization of Karol Bagh 4. ITO TOD- Masterplan & UD Framework 5. Dwarka Retrofitting Plan 6. Aurobindo Marg Retrofitting Plan and Parking Strategy 7. Vikas Marg Retrofitting Plan and Parking Strategy 8. Lakshmi Nagar TOD Scheme 9. Karkarduma Delhi Metro Phase II, TOD Scheme 10. Mundka TOD Scheme 11. Rohini- UER2- TOD Scheme 12. Bus Depot Land Planning 13. ORR-RTR strategy of decongestion 14. Road No 56, Retrofitting 15. S.P. Mukherjee Marg- Station plan 16. 14 Nos. Bus Dedicated Corridors Policy formation Guidelines Projects- Street Design & Retrofitting, MRTS Integration, TOD
  • 76. Public Participation 1. Public Participation at planning and design phases. 2. Public Awareness program for Karol Bagh Pedestrianization 3. Stake Holder Consultation and public awareness for ITO-TOD Proposal 4. Public Awareness program for Vikas Marg Transit Corridor Improvement. 5. TOD Stake Holder Consultation 6. Pune Walkability Workshop, 2012- Preparation of Pune Street Design Guidelines Public Outreach Capacity Building Workshops Public Awareness Programs for other departments through social media
  • 77. Public Participation 1. Public Participation at planning and design phases. 2. Public Awareness program for Karol Bagh Pedestrianization 3. Stake Holder Consultation and public awareness for ITO-TOD Proposal 4. Public Awareness program for Vikas Marg Transit Corridor Improvement. 5. TOD Stake Holder Consultation 6. Pune Walkability Workshop, 2012- Preparation of Pune Image only for reference Street Design Guidelines Image Source: Internet Public Outreach Capacity Building Workshops Public Awareness Programs for other departments through social media
  • 78. Public Participation 1. Public Participation at planning and design phases. 2. Public Awareness program for Karol Bagh Pedestrianization 3. Stake Holder Consultation and public awareness for ITO-TOD Proposal 4. Public Awareness program for Vikas Marg Transit Corridor Improvement. 5. TOD Stake Holder Consultation 6. Pune Walkability Workshop, Image only for reference 2012- Preparation of Pune Image Source: Internet Street Design Guidelines Public Outreach Capacity Building Workshops Public Awareness Programs for other departments through social media
  • 79. Public Participation 1. Public Participation at planning and design phases. 2. Public Awareness program for Karol Bagh Pedestrianization 3. Stake Holder Consultation and public awareness for Upcoming ITO-TOD Proposal 4. Public Awareness program for Vikas Marg Transit A joint initiative by Corridor Improvement. UTTIPEC, DDA, EDMC 5. TOD Stake Holder Consultation and PWD 6. Pune Walkability Workshop, 2012- Preparation of Pune Street Design Guidelines Public Outreach Capacity Building Workshops Public Awareness Programs for other departments through social media
  • 80. Public Participation 1. Public Participation at planning and design phases. 2. Public Awareness program for Karol Bagh Pedestrianization 3. Stake Holder Consultation and public awareness for ITO-TOD Proposal 4. Public Awareness program for Vikas Marg Transit Corridor Improvement. 5. TOD Stake Holder Consultations 6. Pune Walkability Workshop, 2012- Preparation of Pune Image only for reference Street Design Guidelines Image Source: Internet Public Outreach Capacity Building Workshops Public Awareness Programs for other departments through social media
  • 81. Public Participation 1. Public Participation at planning and design phases. 2. Public Awareness program for Karol Bagh Pedestrianization 3. Stake Holder Consultation and public awareness for ITO-TOD Proposal 4. Public Awareness program for Vikas Marg Transit Corridor Improvement. 5. TOD Stake Holder Consultation 6. Pune Walkability Workshop, 2012- Preparation of Pune Street Design Guidelines Public Outreach Capacity Building Workshops Public Awareness Programs for other departments through social media
  • 82. Public Participation 1. Workshop with EDMC Engineers. 2. Workshop with PWD Engineers 3. Workshop with DMRC Architects and Consultants for DMRC Phase III, Multi Modal Integration Public Outreach Capacity Building Workshops Public Awareness Programs for other departments through social media
  • 83. Public Participation 1. Workshop with EDMC Engineers. 2. Workshop with PWD Engineers 3. Workshop with DMRC Architects and Consultants for DMRC Upcoming Phase III, Multi Modal Integration An initiative by, PWD Public Outreach Capacity Building Workshops Public Awareness Programs for other departments through social media
  • 84. Public Participation 1. Workshop with EDMC Engineers. 2. Workshop with PWD Engineers 3. Workshop with DMRC Architects and Consultants for DMRC Phase III, Multi Modal Integration Image only for reference Image Source: Internet Public Outreach Capacity Building Workshops Public Awareness Programs for other departments through social media
  • 85. Public Participation 1. Facebook page and public participation 2. UTTIPEC Blog and public discussion forum 3. www.uttipec.nic.in Suggestion Forum. Public Outreach Capacity Building Workshops Public Awareness Programs for other departments through social media
  • 86. Public Participation 1. Facebook page and public participation 2. UTTIPEC Blog and public discussion forum 3. www.uttipec.nic.in Suggestion Forum. Public Outreach Capacity Building Workshops Public Awareness Programs for other departments through social media
  • 87. Public Participation 1. Facebook page and public participation 2. UTTIPEC Blog and public discussion forum 3. www.uttipec.nic.in Suggestion Forum. Public Outreach Capacity Building Workshops Public Awareness Programs for other departments through social media
  • 88. Way Forward Planning/ Government Designing Private Organization Organization Arranging Stake holder for funds consultations Non Government Individual/ Organization co-operative Implementing A collective effort can bring in a big change
  • 89. UTTIPEC team If there is a will, there is a way…..