FIBRE FINENESS, YARN COUNTS AND CONVERSIONS
Micronaire Value (Cotton) : The unit is micrograms per inch. The average weight of one inch
length of fibre, expressed in micrograms(0.000001 gram).

Denier (Man-Made Fibres) : Weight in grams per 9000 meters of fibre.
Micron (Wool) : Fineness is expressed as fibre diameter in microns(0.001mm)
Conversions:
·

Denier = 0.354 x Micronaire value

·

Micronaire value = 2.824 x Denier

YARN COUNTS
It is broadly classified into;
1.

DIRECT SYSTEM

2.

INDIRECT SYSTEM

INDIRECT SYSTEM
·

English count (Ne)

·

French count(Nf)

·

Metric count(Nm)

·

Worsted count

Metric system: Metric count(Nm) indicates the number of 1 kilometer(1000 meter) lengths per
Kg.
Nm = length in Km / weight in kg (or)
Nm = length meter / weight in grams

DIRECT SYSTEM
·

Tex count

·

Denier

file:///D:/textile cal/TEXCALTEXT detail.mht

1/15
10/27/13

TEXTILE CALCULATIONS

CONVERSION TABLE FOR YARN COUNTS
Tex
Ne

590.54/tex

Nm

Grains/yd

den/9

Tex

Den

1000/Nm

gr.yd x 70.86

5314.9/den

Nm x .5905

8.33 / gr/yd

9000/Nm

gr/yd x 637.7

Den

tex x 9

Nm

1000/tex

9000/den

tex / 70.86

den / 637.7

Grains/yd

14.1 / gr/yd
14.1/Nm

Where, Nm – metric count, Nec – cotton count

CONVERSION TABLE FOR WEIGHTS
Ounce

Grains

Grams

437.5 grains

Ounce

Grains

28.350 grams

0.03527
ounces

Kilograms

0.0648 grams

Grams

0.03527 grains 15.432 grains

Kilograms

35.274 ounces

15432 grains

1000 grams

16.0 ounces

7000 grains

453.59 grams

Pounds

Pounds

0.001 kgs
2.2046
pounds
0.4536 kgs

CONVERSION TABLE FOR LINEAR MEASURES
Yard

Inches

Centimeter

Meter

3 feet

Yard

Feet

36 inches

91.44 cms

0.9144
meter

12 inches

30.48 cms

0.3048
meter

2.54 cms

0.254
meter

Feet

0.3333 yards

Inches

0.0278 yards

0.0833 feet

Centimeter

0.0109 yards

0.0328 feet

0.3937 inches

Meter

1.0936 yards

3.281 feet

39.37 inches

0.01meter
100 cms

CALCULATIONS
Grams per meter = 0.5905 / Ne
Grams per yard = 0.54 / Ne
Tex = den x .11 = 1000/Nm = Mic/25.4
Ne = Nm/1.693
DRAFT = (feed weight in g/m) / (delivery weight in g/m)
DRAFT = Tex (feed) / Tex(delivery)
DRAFT = delivery roll surface speed / feed roll surface speed
No of hanks delivered by m/c = (Length delivered in m/min) / 1.605
file:///D:/textile cal/TEXCALTEXT detail.mht

2/15
10/27/13

TEXTILE CALCULATIONS

BLOW ROOM
(1)

% trash in cotton - % trash in lap
Blow-room Cleaning Efficiency% (CE) = ------------------------------------------% trash in cotton

(2)

Lint in waste (%) = 100 - CE

CARDING
(1)

P =( L x 1.0936 x 60 x Effy ) / (Hank (Ne) x 36 x 840 x 2.2045)
P - production in kgs / hr
L - delivery speed in m/min
effy- efficiency
Ne - English count ( number of 840 yards in one pound)
840 - constant
2.2045- to convert from lbs to kilograms

(2)

Production In Kgs / Hr = (L x Ktex x 60 x Effy) / ( 1000)
L - delivery speed in m/min
Ktex- sliver count in Ktex (kilotex)
effy - efficiency
1000- to convert to kilograms from grams

(3)

Production In Kgs / 8 Hrs = (0.2836 x L x Effy) / (Ne)
L - delivery speed in m/min
effy - efficiency
Ne - English count

(4)

Prodn / 8 Hrs = (Hank x Nd) /( Ne x 2.2045)
Hank = no of hank (840 yards)delivered by the machine
Nd = no of deliveries
Ne = hank of the material

(5)

Total Draft in Card = (Feed Weight in g/m) / (Sliver Weight in g/m)

file:///D:/textile cal/TEXCALTEXT detail.mht

3/15
10/27/13

(6)

TEXTILE CALCULATIONS

Actual draft

Wt. per yard of lap fed
= -----------------------------------------------Wt. per yard of card sliver delivered

Length of card sliver delivered
(7) Mechanical draft = ---------------------------------------Length of lap fed
or
Draft constant of card machine
= -----------------------------------------Draft change pinion
(8)

Actual draft is always greater than the mechanical draft in carding because it is the
carding waste% that increases the actual draft.

DRAWFRAME
(1)

Break Draft = Surface Speed of 2nd Roller / Surface Speed of Back Roller

(2)

Main Draft = Surface Speed of 1st Roller / Surface Speed of 2nd
Roller

(3)

Total Draft = Surface speed of delivery roller / surface of feed roller

(4)

Production In Kgs / 8 Hrs = (0.2836 x L x Effy x Nd) / (Ne)

(Middle)

L - delivery speed in m/min
effy - efficiency
Ne - english count
Nd - No of delvieries
(5)

Prodn In Kgs / Hr = (FRD x Fr. rpm x 3.14 x 60 x Effy x Nd) / (Ne x 840 x 36 x
2.2045)
FRD - front roller dia in inches
FRrpm - front roller rpm
effy - efficiency
Ne - Sliver hank
Nd - number of deliveries

SPEEDFRAME + RINGFRAME
(1)

Twist / Inch (TPI) = Spindle Speed / FRS
FRS - front roller surface speed in inches/min

file:///D:/textile cal/TEXCALTEXT detail.mht

4/15
10/27/13

(2)

TEXTILE CALCULATIONS

FRS = Fr. rpm x 3.14 x FRD
FRS - Front roller surface speed
FRD - front roller diameter

(3)

T.P.I = T.M. x Sqrt (Count or Hank)
T.M. - Twist multiplier
sqrt - square root

(4)

Prodn in Kgs / 8 Hrs = (7.2 x SS x Effy) / (TPI x Ne x 1000)
SS - spindle speed

(5)

Spindle Speed = M/Min x TPI x 39.37

(6)

Hank Delivered = Spindle Speed / ( Tpi x 62.89)

(7)

Single yarn strength (gm)
RKM = ----------------------------------Tex number of yarn

(8)

Ring bobbin content = 3.1 LD2 (L = Lift in inch, D = ring dia in inch)

(9)

Doubling bobbin content = 3.7 LD2

(10)

Corrected count

(11)

Weight per yard of roving fed
Actual draft of ring frame = ----------------------------------------------------------Weight per yard of yarn delivered on bobbin

(12)

=

Actual count x (1 + Present regain)
-----------------------------------------------1 + Standard regain

Mechanical draft of ring frame =

=

Surface speed of front roller
-------------------------------------Surface speed of back roller
Draft constant
-------------------------Draft change pinion

(13) Twist contraction % = It is basically the percent shortening in length of
yarn between the front roller and the bobbin. The length at the
front roll is taken as 100%. For example 5% twist contraction
means, the yarn length on the bobbin is 95% of the length at the
file:///D:/textile cal/TEXCALTEXT detail.mht

5/15
10/27/13

TEXTILE CALCULATIONS

front roll.

=

Yarn count at front roll - yarn count at bobbin
------------------------------------------------------------ x 100
Yarn count at front roll

(14)

TC%

(15)

Example of twist contraction given yarn;
Count on bobbin = 10s
Twist contraction = 5%
10 x 1.00
Yarn count at front roll = -------------- = 10.53s
95%

(16)

Mechanical draft is always greater than actual draft in ring spinning?
It is necessary to draft the roving to a finer yarn count at front roll that what is to be
bobbin. Because due to twist contraction of yarn, the count of yarn on bobbin becomes
coarser than the count of yarn at front roller.

(17)

Twist per inch (TPI)
Twist multiplier or Twist factor = ---------------------------Ö Count (Ne)

(18)

TPI = Twist multiplier x ÖCount (Ne)
or

(19)

Twist constant of ring frame
TPI = ------------------------------------Twist change pinion

(20)

Turns per metre (TPM) = Twist factor ÖNm

(21)

TPI = TPM x 0.0254

(22)

Ring Traveller Speed
Ring Traveller Speed in m/Sec= (Spindle Speed x Ring Dia in mm x 3.14)/
(60 x 1000)
Actual ring traveler speed ?
Assume, spindle speed
Ring Diameter

file:///D:/textile cal/TEXCALTEXT detail.mht

=
=

9,000 rpm
57 mm
6/15
10/27/13

TEXTILE CALCULATIONS

Front roll delivery
Package circumference

= 64 metre/min.
= 102 mm (avg)

Front roll delivery (m/min) x 1000
Traveller lag (rpm) = Spindle speed - ——————————————
Package circumference (mm)
14x1000
= 900 - ————
102

= 8363 rpm

Traveller lag 900 – 8863 = 137 rpm
Uncorrected traveller speed (m/sec.) :
Spindle speed x Ring diameter (mm) x p
= ——————————————————
1000 x 60
9000 x 57 x 3.142
= ——--—————— =
1000 x 60

26.8 m/sec.

Corrected Traveller speed (m/sec.) :

Traveller speed (m/sec) –

Ring dia (mm) xp x Trav. Lag (rpm)
—————————————————
60 x 1000

57x 3.142 x 137
= 26.8 - ———————— = 26.39 m/sec.
60 x 1000

(23) Weights of ring travellers No. 1 and 1/0.
For No. 1 = 90 grains / 100 travellers
For No.1/0 = 80 grains/100 travellers

WINDING
1.

Slub catcher settings :
a.

Fixed Blade = Carded - (2.0 to 2.5) x diameter
Combed - (1.5 to 2.0) x diameter

file:///D:/textile cal/TEXCALTEXT detail.mht

7/15
10/27/13

TEXTILE CALCULATIONS

b.

Electronic yarn clearer = 3 cm x 3 diameter
= 1/( 28 x Öcount )

Diameter in inch
for Blended yarn

= 10 to 15% more settings
2.

Yarn clearer efficiency =
objectionable thick faults removed by slub catcher
=
Total objectionable thick faults present in yarn before winding

Number of
x 100

Total breaks during winding (at faults)
3.

Knot factor =
No. of breaks due to objectionable yarn faults
Strength of spliced joint x 100

4.

Retained splice strength =
Strength of parent yarn

5.

Winding Tension = 0.1 x Single yarn strength in grams
4500 x Y

6.

Expected efficiency E

=
S x N (12 + 98)

7.

Winder’s workload (0.17 min/operation on conventional winding m/c = 2300 operations
per shift of 8 hours
where,
1 creeling or 1 piecing = 1 operation
1 doffing = 2 operations

8.

Winder’s workload on autoconer (0.08 min per operation) = 4800 operations/shift of 8
hours
where,
1 bobbing feeding = 1 operation
1 doffing (manual) = 4.5 operation
Y
B
S
C

(9)

= Length/Bobbin (metres)
= Breaks per bobbin
= Winding speed (metres/min)
= English count

Production in Kgs / 8 Hrs = (0.2836 x L x Effy x Nd) / (Ne)

file:///D:/textile cal/TEXCALTEXT detail.mht

8/15
10/27/13

TEXTILE CALCULATIONS

L - delivery speed in m/min
effy - efficiency
Ne - english count
Nd - No of delvieries
(10)

P =( L x 1.0936 x 60 x Effy ) / (Hank (Ne) x 36 x 840 x 2.2045)
P - production in kgs / hr
L - delivery speed in m/min
effy- efficiency
Ne - English count ( number of 840 yards in one pound)
840 - constant
2.2045- to convert from lbs to kilograms

WARPING
R x 100
1.

Machine Efficiency E =
R+S
R = Uninterrupted running time for 1,000 meters (in sec)
1000 x 60
=
Machine speed in mtr/min.
S = Total of time in seconds for which the machine is stopped for a production of
1,000 meters
B X N X T1
T2
T3
= R + --------------- + ----- + ---------- + T4
400
L
L xC
B = Ends breaks/400 ends/1,000 meters
N = Number of ends
L = Set length in 1,000 meters
C = Beams per creel
Timing of activities in seconds are :
T1 = To mend a break
T2 = To change a beam
T3 = To change a creel
T4 = Miscellaneous Time loss/1,000 mtrs.

file:///D:/textile cal/TEXCALTEXT detail.mht

9/15
10/27/13

TEXTILE CALCULATIONS

2.

Production in metres per 8 hrs. (K) = 480 x mtrs/min x E/100 kgs.

3.

Production in Kgs. per 8 hrs. = (K x N)/(1693 x English Count)

4.

Warping Tension = 0.03 to 0.05 x Single thread strength

SIZING
Length in metre x 1.094 x Total ends
1.

Warp weight =
(in kg.)

x 100
840 x 2.204 x Warp count
Sized warp weight - Unsized warp weight

2.
3.

Size pick-up
%age

=

x 100
Un-sized warp weight

Weight of size =

Warp Weight x Size pick up %
Sized warp length - Unsized warp length

4.

Stretch %age =

x 100
Un-sized warp length
Total-ends x Warp length in yards

5.

Sized yarn
count

=
Sized warp weight (lbs) x 840
Wt. of sized yarn - Wt. of oven dried yarn

6.

%age Moisture=
content

x 100
Wt. of sized yarn
Deliver counter reading - Feed counter reading

7.

%age Stretch =
100

x
Feed counter reading
840,000 x D x C

8.

%age Droppings =
on loom

x 100
454 Y x N x P

D = Dropping in gms.
Y = Length woven (yds.)
P = % size add on
9.

C = English Count
N = Number of Ends

Invisible Loss% =
Amount of size material issued - Amount of size added on yarn
=

x 100
Amount of size issued

file:///D:/textile cal/TEXCALTEXT detail.mht

10/15
10/27/13

TEXTILE CALCULATIONS

Steam, Consumption (Sizing M/c) = 2.0 kg/kg of sized yarn
(Cooker) = 0.3 kg/kg of liquor
(Sow box) = 0.2 kg/kg of yarn
No. of Cylinder x 1,000 x English count
10. Max. Speed of machine
(metres/min)

=
Number of ends
Number of ends x 0.6

11. Wt. of warp in gms/mtr =
English count

WEAVING
1.

Reed Count :
It is calculated in stock port system.
EPI
Reed width =
1 + Weft crimp %age
No. of dents in 2 inches is called Reed Count

2.

Reed Width :
100 + Weft crimp %age
Reed width = Cloth width x
100

3.

Crimp % age :
Warp length - Cloth length
Warp Crimp %age

=

x 100
Cloth length

Weft length - Cloth length
Weft Crimp %age =

x 100
Cloth length
EPI

4.

Warp cover factor =
ÖWarp Count
PPI

5.

Weft cover factor =
ÖWeft count
Wp.C.F. x Wt. C.F.

6.

Cloth cover factor = Wp.C.F. + Wt.C.F. -

file:///D:/textile cal/TEXCALTEXT detail.mht

11/15
10/27/13

TEXTILE CALCULATIONS

28
7.

Maximum EPI for particular count :
a.

For plain fabrics = 14 x ÖCount

b.

For drill fabrics

= ÖCount x 28 x 4/6

c.

For satin fabric

= ÖCount x 28 x 5/7
Ends/repeat x 1 / yarn diameter

d.

Other design =
No. of intersections / repeat + ends/repeat
1

8.

Yarn diameter =
28 x ÖCount

Weave Density
1.

Warp density = Ends/cm x ÖTex x K
= < 250

2.

Filling density = Picks/cm x ÖTex x K
= < 350
(Warp density - 100) x F.D.- 100

3.

Weave Density = 50 +
(Weft density - 100) x F.D.- 100

4.

Effective weave density = W.D. x K of loom width x K of Design = < 72

To change the count and number of thread/inch, keeping the same denseness of the
fabric :
1.

To change the EPI without altering the denseness :

file:///D:/textile cal/TEXCALTEXT detail.mht

12/15
10/27/13

TEXTILE CALCULATIONS

EPI in given cloth x Ö Warp count in expected cloth
EPI in Exp.Cloth =
2.

Ö Warp count in given cloth
To change the count without altering the denseness :
EPI in exp. cloth2
EPI in exp. cloth =

x Count in given cloth
EPI in given cloth

Warp requirement to weave a cloth :
Total ends x 1.0936 x 453.59 x crimp%
1. Warp weight in gms/mtrs. =
Waste

2.

x
840 x Count

Weft weight in gms/mtrs. =
R.S. in inches x 453.59 x PPI
=
840 x Count

%age

x Crimp %age x Waste %age

Weft wt. in kgs. x Weft count x 1848 x 0.9144
3.

Cloth length in mtrs.with =
the given weft weight

PPI x R.S. in inches

For Silk and Polyester :

1.

Warp weight in gms/mtrs. =
Total ends x Count (Denier)
=

x Crimp% x Waste %age
9000

2.

Weft weight in gms/mtrs. =
RS in inches x PPI x Count (Denier)
=
9000

x Crimp% x Waste %age

Allowance for count in Bleached and Dyed Fabric :
¨

Count becomes 4%

¨

Finer Dyed counts become max.6% Coarser

FABRIC PRODUCTION
file:///D:/textile cal/TEXCALTEXT detail.mht

13/15
10/27/13

TEXTILE CALCULATIONS

Motor pulley diameter
1.

Loom speed = Motor RPM x
Loom pulley diameter

2.

Actual production
Loom Efficiency %age = ----------------------------- x 100
Calculated production

3.

Yarn weight - Dryed yarn weight
Moisture Regain %age = --------------------------------------------- x 100
Dryed yarn weight

4.

Yarn weight - dried yarn weight
Moisture Content %age = -------------------------------------------- x 100
Yarn weight

5.

Total ends x Tape length in metre
Warp weight in Kg. = ---------------------------------------------1693.6 x Warp count

6.

RS in centimetres x Coth length in metres x PPI
Weft weight in Kg. = ---------------------------------------------------------------4301.14 x Weft count

7.

EPI
PPI
Cloth weight in GSM = ----------------- + ----------------- x 25.6
Warp count
Weft count

8.

GSM (Grams per sq. metre)
Oz (Ounce) per sq.yard = ------------------------------------34

Material measurement :
For calculating of length of any rolled fabrics :

L =

0.0655 (D - d) (D + d)
------------------------------t

Where,
L = Length of material (feet)
t = Thickness of fabrics (inches)
D = Outside diameter (inches)
d = Inside diameter (inches)

Weight of yarn in a cloth :
file:///D:/textile cal/TEXCALTEXT detail.mht

14/15
10/27/13

TEXTILE CALCULATIONS

The weight of cloth manufactured on loom depends upon the weight of yarns in the warp and
weft : ends/inch, picks/inch and the weight of size on the warp.
Therefore, Cloth weight = Weight of warp + Weight of weft + Weight of size (All in lbs.)
Total No. of Ends x Tape length in yds.
Where as Weight of warp in lbs = ---------------------------------------------------840 x Warp yarn count

Also Weight of weft in lbs. =
Length of cloth (yds) x Picks/inch in cloth x Reed width (inch)
= ----------------------------------------------------------------------------------840 x Weft yarn count

file:///D:/textile cal/TEXCALTEXT detail.mht

15/15

More Related Content

What's hot (20)

Wrap spinning
Wrap spinningWrap spinning
Wrap spinning
 
Draw frame
Draw frameDraw frame
Draw frame
 
Production Calculation of s/j circular knitting m/c.
Production Calculation of s/j circular knitting m/c.Production Calculation of s/j circular knitting m/c.
Production Calculation of s/j circular knitting m/c.
 
Spinning calculations
Spinning calculationsSpinning calculations
Spinning calculations
 
Knitting technology
Knitting technologyKnitting technology
Knitting technology
 
Knitting calculation
Knitting calculationKnitting calculation
Knitting calculation
 
Yarn Geometry
Yarn GeometryYarn Geometry
Yarn Geometry
 
ROTOR SPINNING PROCESS
ROTOR SPINNING PROCESSROTOR SPINNING PROCESS
ROTOR SPINNING PROCESS
 
Principles and machinery for yarn production
Principles and machinery for yarn productionPrinciples and machinery for yarn production
Principles and machinery for yarn production
 
Rotor spinning
Rotor spinningRotor spinning
Rotor spinning
 
Abhi rana)4. dry laid non woven fabrics
Abhi rana)4. dry laid non woven fabricsAbhi rana)4. dry laid non woven fabrics
Abhi rana)4. dry laid non woven fabrics
 
Spinning Plan Calculation
Spinning Plan CalculationSpinning Plan Calculation
Spinning Plan Calculation
 
Costing
CostingCosting
Costing
 
Autoconer
AutoconerAutoconer
Autoconer
 
Study on knitting elements of circular knitting machine (butex)
Study on knitting elements of circular knitting machine (butex)Study on knitting elements of circular knitting machine (butex)
Study on knitting elements of circular knitting machine (butex)
 
Automation in combers ppt
Automation in combers pptAutomation in combers ppt
Automation in combers ppt
 
Rotor spinning
Rotor spinningRotor spinning
Rotor spinning
 
Friction spinning System
Friction spinning System Friction spinning System
Friction spinning System
 
Warping
WarpingWarping
Warping
 
Single jersey Knitting Machine
Single jersey Knitting MachineSingle jersey Knitting Machine
Single jersey Knitting Machine
 

Viewers also liked

Different Count Used In Textile
Different Count Used In TextileDifferent Count Used In Textile
Different Count Used In TextileRH Ovy
 
eco friendly textile processing
eco friendly textile processingeco friendly textile processing
eco friendly textile processingOmkar S Parmaj
 
Workshop on fabrics manufacturing technology
Workshop on fabrics manufacturing technologyWorkshop on fabrics manufacturing technology
Workshop on fabrics manufacturing technologyLutfor Shanzid
 
Institute of professional textile technology IPTT Panipat
Institute of professional textile technology IPTT PanipatInstitute of professional textile technology IPTT Panipat
Institute of professional textile technology IPTT Panipatvisalkosik
 
Industrial Internship Report on Opex Sinha Textile Group
Industrial Internship Report on Opex Sinha Textile GroupIndustrial Internship Report on Opex Sinha Textile Group
Industrial Internship Report on Opex Sinha Textile GroupNasif Chowdhury
 
Yarn printing (Space dyeing)
Yarn printing (Space dyeing)Yarn printing (Space dyeing)
Yarn printing (Space dyeing)Azmir Latif Beg
 
Waterless dyeing by supercritical co2
Waterless dyeing by supercritical co2Waterless dyeing by supercritical co2
Waterless dyeing by supercritical co2nidhisachan
 
Chemicals used in textile wet processing & their function assignment work
Chemicals used in textile wet processing & their function assignment workChemicals used in textile wet processing & their function assignment work
Chemicals used in textile wet processing & their function assignment workDaffodil International University
 

Viewers also liked (20)

Weaving calculation
Weaving calculationWeaving calculation
Weaving calculation
 
Process control and yarn quality in spinning woodhead publishing-karthik
Process control and yarn quality in spinning woodhead publishing-karthikProcess control and yarn quality in spinning woodhead publishing-karthik
Process control and yarn quality in spinning woodhead publishing-karthik
 
Relation among gsm,yarn count,stitch length & fabric construction
Relation among gsm,yarn count,stitch length & fabric constructionRelation among gsm,yarn count,stitch length & fabric construction
Relation among gsm,yarn count,stitch length & fabric construction
 
Textile software
Textile softwareTextile software
Textile software
 
Different Count Used In Textile
Different Count Used In TextileDifferent Count Used In Textile
Different Count Used In Textile
 
eco friendly textile processing
eco friendly textile processingeco friendly textile processing
eco friendly textile processing
 
Workshop on fabrics manufacturing technology
Workshop on fabrics manufacturing technologyWorkshop on fabrics manufacturing technology
Workshop on fabrics manufacturing technology
 
Lotus fibre
Lotus fibreLotus fibre
Lotus fibre
 
Institute of professional textile technology IPTT Panipat
Institute of professional textile technology IPTT PanipatInstitute of professional textile technology IPTT Panipat
Institute of professional textile technology IPTT Panipat
 
Yarn count
Yarn countYarn count
Yarn count
 
Textile coloration
Textile  colorationTextile  coloration
Textile coloration
 
Industrial Internship Report on Opex Sinha Textile Group
Industrial Internship Report on Opex Sinha Textile GroupIndustrial Internship Report on Opex Sinha Textile Group
Industrial Internship Report on Opex Sinha Textile Group
 
DyeManager
DyeManagerDyeManager
DyeManager
 
Yarn printing (Space dyeing)
Yarn printing (Space dyeing)Yarn printing (Space dyeing)
Yarn printing (Space dyeing)
 
Eco friendly dyes and dyeing procedure
Eco friendly dyes and dyeing procedureEco friendly dyes and dyeing procedure
Eco friendly dyes and dyeing procedure
 
Dyeing parameter
Dyeing parameterDyeing parameter
Dyeing parameter
 
Scouring
ScouringScouring
Scouring
 
Super critical fluid dyeing
Super critical fluid dyeingSuper critical fluid dyeing
Super critical fluid dyeing
 
Waterless dyeing by supercritical co2
Waterless dyeing by supercritical co2Waterless dyeing by supercritical co2
Waterless dyeing by supercritical co2
 
Chemicals used in textile wet processing & their function assignment work
Chemicals used in textile wet processing & their function assignment workChemicals used in textile wet processing & their function assignment work
Chemicals used in textile wet processing & their function assignment work
 

Similar to Textile calculations

Textile calculations - Vignesh Dhanabalan
Textile calculations - Vignesh DhanabalanTextile calculations - Vignesh Dhanabalan
Textile calculations - Vignesh DhanabalanVignesh Dhanabalan
 
Production calculation.ppt
Production calculation.pptProduction calculation.ppt
Production calculation.pptJSathish3
 
Yarn calculations-130804183138-phpapp02
Yarn calculations-130804183138-phpapp02Yarn calculations-130804183138-phpapp02
Yarn calculations-130804183138-phpapp02Md Rakibuzzaman
 
Spin plan for 80s combed yarn
Spin plan for 80s combed yarnSpin plan for 80s combed yarn
Spin plan for 80s combed yarnSwaraz Mollick
 
Platoon Control of Nonholonomic Robots using Quintic Bezier Splines
Platoon Control of Nonholonomic Robots using Quintic Bezier SplinesPlatoon Control of Nonholonomic Robots using Quintic Bezier Splines
Platoon Control of Nonholonomic Robots using Quintic Bezier SplinesKaustav Mondal
 
Design of an automotive differential with reduction ratio greater than 6
Design of an automotive differential with reduction ratio greater than 6Design of an automotive differential with reduction ratio greater than 6
Design of an automotive differential with reduction ratio greater than 6eSAT Publishing House
 
Micron gearbox dura_true_specsheet
Micron gearbox dura_true_specsheetMicron gearbox dura_true_specsheet
Micron gearbox dura_true_specsheetElectromate
 
Analytical Optimization of Chassis Frame for 40ft Dual-Axle Flatbed Trailer D...
Analytical Optimization of Chassis Frame for 40ft Dual-Axle Flatbed Trailer D...Analytical Optimization of Chassis Frame for 40ft Dual-Axle Flatbed Trailer D...
Analytical Optimization of Chassis Frame for 40ft Dual-Axle Flatbed Trailer D...IOSR Journals
 
Cylindrical liner
Cylindrical linerCylindrical liner
Cylindrical linerHridoy Saha
 
Vertical Screw Conveyor - Design Project
Vertical Screw Conveyor - Design ProjectVertical Screw Conveyor - Design Project
Vertical Screw Conveyor - Design ProjectPoorna Hewapathirana
 
IRJET- Design and Development of Open Differential for Transmission System of...
IRJET- Design and Development of Open Differential for Transmission System of...IRJET- Design and Development of Open Differential for Transmission System of...
IRJET- Design and Development of Open Differential for Transmission System of...IRJET Journal
 
Design of an effective automated machine for quality palm kernel production
Design of an effective automated machine for quality palm kernel  productionDesign of an effective automated machine for quality palm kernel  production
Design of an effective automated machine for quality palm kernel productionIOSR Journals
 
Design and analysis of worm pair used in self locking system with development...
Design and analysis of worm pair used in self locking system with development...Design and analysis of worm pair used in self locking system with development...
Design and analysis of worm pair used in self locking system with development...eSAT Publishing House
 
IRJET- Design of a Compact Go Kart Vehicle
IRJET- Design of a Compact Go Kart VehicleIRJET- Design of a Compact Go Kart Vehicle
IRJET- Design of a Compact Go Kart VehicleIRJET Journal
 
Design and Manufacture of Groundnut Sheller
Design and Manufacture of Groundnut ShellerDesign and Manufacture of Groundnut Sheller
Design and Manufacture of Groundnut Shellerpaperpublications3
 
Lc серия Бонфиглиоли
Lc серия БонфиглиолиLc серия Бонфиглиоли
Lc серия БонфиглиолиArve
 
Diseno y-calculo-de-puentes
Diseno y-calculo-de-puentesDiseno y-calculo-de-puentes
Diseno y-calculo-de-puentescarlos
 

Similar to Textile calculations (20)

Textile calculations - Vignesh Dhanabalan
Textile calculations - Vignesh DhanabalanTextile calculations - Vignesh Dhanabalan
Textile calculations - Vignesh Dhanabalan
 
Production calculation.ppt
Production calculation.pptProduction calculation.ppt
Production calculation.ppt
 
Yarn calculations-130804183138-phpapp02
Yarn calculations-130804183138-phpapp02Yarn calculations-130804183138-phpapp02
Yarn calculations-130804183138-phpapp02
 
Spin plan for 80s combed yarn
Spin plan for 80s combed yarnSpin plan for 80s combed yarn
Spin plan for 80s combed yarn
 
Platoon Control of Nonholonomic Robots using Quintic Bezier Splines
Platoon Control of Nonholonomic Robots using Quintic Bezier SplinesPlatoon Control of Nonholonomic Robots using Quintic Bezier Splines
Platoon Control of Nonholonomic Robots using Quintic Bezier Splines
 
Basic E&Mcalculations for a coal mining project
Basic E&Mcalculations for a coal mining projectBasic E&Mcalculations for a coal mining project
Basic E&Mcalculations for a coal mining project
 
Design of an automotive differential with reduction ratio greater than 6
Design of an automotive differential with reduction ratio greater than 6Design of an automotive differential with reduction ratio greater than 6
Design of an automotive differential with reduction ratio greater than 6
 
optimization.pdf
optimization.pdfoptimization.pdf
optimization.pdf
 
Micron gearbox dura_true_specsheet
Micron gearbox dura_true_specsheetMicron gearbox dura_true_specsheet
Micron gearbox dura_true_specsheet
 
Analytical Optimization of Chassis Frame for 40ft Dual-Axle Flatbed Trailer D...
Analytical Optimization of Chassis Frame for 40ft Dual-Axle Flatbed Trailer D...Analytical Optimization of Chassis Frame for 40ft Dual-Axle Flatbed Trailer D...
Analytical Optimization of Chassis Frame for 40ft Dual-Axle Flatbed Trailer D...
 
Cylindrical liner
Cylindrical linerCylindrical liner
Cylindrical liner
 
Vertical Screw Conveyor - Design Project
Vertical Screw Conveyor - Design ProjectVertical Screw Conveyor - Design Project
Vertical Screw Conveyor - Design Project
 
IRJET- Design and Development of Open Differential for Transmission System of...
IRJET- Design and Development of Open Differential for Transmission System of...IRJET- Design and Development of Open Differential for Transmission System of...
IRJET- Design and Development of Open Differential for Transmission System of...
 
Design of an effective automated machine for quality palm kernel production
Design of an effective automated machine for quality palm kernel  productionDesign of an effective automated machine for quality palm kernel  production
Design of an effective automated machine for quality palm kernel production
 
Design and analysis of worm pair used in self locking system with development...
Design and analysis of worm pair used in self locking system with development...Design and analysis of worm pair used in self locking system with development...
Design and analysis of worm pair used in self locking system with development...
 
IRJET- Design of a Compact Go Kart Vehicle
IRJET- Design of a Compact Go Kart VehicleIRJET- Design of a Compact Go Kart Vehicle
IRJET- Design of a Compact Go Kart Vehicle
 
Design and Manufacture of Groundnut Sheller
Design and Manufacture of Groundnut ShellerDesign and Manufacture of Groundnut Sheller
Design and Manufacture of Groundnut Sheller
 
Lc серия Бонфиглиоли
Lc серия БонфиглиолиLc серия Бонфиглиоли
Lc серия Бонфиглиоли
 
Diseno y-calculo-de-puentes
Diseno y-calculo-de-puentesDiseno y-calculo-de-puentes
Diseno y-calculo-de-puentes
 
B012460814
B012460814B012460814
B012460814
 

Recently uploaded

Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxMaryGraceBautista27
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 

Recently uploaded (20)

OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptx
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 

Textile calculations

  • 1. 10/27/13 TEXTILE CALCULATIONS TEXTILE CALCULATIONS FIBRE FINENESS, YARN COUNTS AND CONVERSIONS Micronaire Value (Cotton) : The unit is micrograms per inch. The average weight of one inch length of fibre, expressed in micrograms(0.000001 gram). Denier (Man-Made Fibres) : Weight in grams per 9000 meters of fibre. Micron (Wool) : Fineness is expressed as fibre diameter in microns(0.001mm) Conversions: · Denier = 0.354 x Micronaire value · Micronaire value = 2.824 x Denier YARN COUNTS It is broadly classified into; 1. DIRECT SYSTEM 2. INDIRECT SYSTEM INDIRECT SYSTEM · English count (Ne) · French count(Nf) · Metric count(Nm) · Worsted count Metric system: Metric count(Nm) indicates the number of 1 kilometer(1000 meter) lengths per Kg. Nm = length in Km / weight in kg (or) Nm = length meter / weight in grams DIRECT SYSTEM · Tex count · Denier file:///D:/textile cal/TEXCALTEXT detail.mht 1/15
  • 2. 10/27/13 TEXTILE CALCULATIONS CONVERSION TABLE FOR YARN COUNTS Tex Ne 590.54/tex Nm Grains/yd den/9 Tex Den 1000/Nm gr.yd x 70.86 5314.9/den Nm x .5905 8.33 / gr/yd 9000/Nm gr/yd x 637.7 Den tex x 9 Nm 1000/tex 9000/den tex / 70.86 den / 637.7 Grains/yd 14.1 / gr/yd 14.1/Nm Where, Nm – metric count, Nec – cotton count CONVERSION TABLE FOR WEIGHTS Ounce Grains Grams 437.5 grains Ounce Grains 28.350 grams 0.03527 ounces Kilograms 0.0648 grams Grams 0.03527 grains 15.432 grains Kilograms 35.274 ounces 15432 grains 1000 grams 16.0 ounces 7000 grains 453.59 grams Pounds Pounds 0.001 kgs 2.2046 pounds 0.4536 kgs CONVERSION TABLE FOR LINEAR MEASURES Yard Inches Centimeter Meter 3 feet Yard Feet 36 inches 91.44 cms 0.9144 meter 12 inches 30.48 cms 0.3048 meter 2.54 cms 0.254 meter Feet 0.3333 yards Inches 0.0278 yards 0.0833 feet Centimeter 0.0109 yards 0.0328 feet 0.3937 inches Meter 1.0936 yards 3.281 feet 39.37 inches 0.01meter 100 cms CALCULATIONS Grams per meter = 0.5905 / Ne Grams per yard = 0.54 / Ne Tex = den x .11 = 1000/Nm = Mic/25.4 Ne = Nm/1.693 DRAFT = (feed weight in g/m) / (delivery weight in g/m) DRAFT = Tex (feed) / Tex(delivery) DRAFT = delivery roll surface speed / feed roll surface speed No of hanks delivered by m/c = (Length delivered in m/min) / 1.605 file:///D:/textile cal/TEXCALTEXT detail.mht 2/15
  • 3. 10/27/13 TEXTILE CALCULATIONS BLOW ROOM (1) % trash in cotton - % trash in lap Blow-room Cleaning Efficiency% (CE) = ------------------------------------------% trash in cotton (2) Lint in waste (%) = 100 - CE CARDING (1) P =( L x 1.0936 x 60 x Effy ) / (Hank (Ne) x 36 x 840 x 2.2045) P - production in kgs / hr L - delivery speed in m/min effy- efficiency Ne - English count ( number of 840 yards in one pound) 840 - constant 2.2045- to convert from lbs to kilograms (2) Production In Kgs / Hr = (L x Ktex x 60 x Effy) / ( 1000) L - delivery speed in m/min Ktex- sliver count in Ktex (kilotex) effy - efficiency 1000- to convert to kilograms from grams (3) Production In Kgs / 8 Hrs = (0.2836 x L x Effy) / (Ne) L - delivery speed in m/min effy - efficiency Ne - English count (4) Prodn / 8 Hrs = (Hank x Nd) /( Ne x 2.2045) Hank = no of hank (840 yards)delivered by the machine Nd = no of deliveries Ne = hank of the material (5) Total Draft in Card = (Feed Weight in g/m) / (Sliver Weight in g/m) file:///D:/textile cal/TEXCALTEXT detail.mht 3/15
  • 4. 10/27/13 (6) TEXTILE CALCULATIONS Actual draft Wt. per yard of lap fed = -----------------------------------------------Wt. per yard of card sliver delivered Length of card sliver delivered (7) Mechanical draft = ---------------------------------------Length of lap fed or Draft constant of card machine = -----------------------------------------Draft change pinion (8) Actual draft is always greater than the mechanical draft in carding because it is the carding waste% that increases the actual draft. DRAWFRAME (1) Break Draft = Surface Speed of 2nd Roller / Surface Speed of Back Roller (2) Main Draft = Surface Speed of 1st Roller / Surface Speed of 2nd Roller (3) Total Draft = Surface speed of delivery roller / surface of feed roller (4) Production In Kgs / 8 Hrs = (0.2836 x L x Effy x Nd) / (Ne) (Middle) L - delivery speed in m/min effy - efficiency Ne - english count Nd - No of delvieries (5) Prodn In Kgs / Hr = (FRD x Fr. rpm x 3.14 x 60 x Effy x Nd) / (Ne x 840 x 36 x 2.2045) FRD - front roller dia in inches FRrpm - front roller rpm effy - efficiency Ne - Sliver hank Nd - number of deliveries SPEEDFRAME + RINGFRAME (1) Twist / Inch (TPI) = Spindle Speed / FRS FRS - front roller surface speed in inches/min file:///D:/textile cal/TEXCALTEXT detail.mht 4/15
  • 5. 10/27/13 (2) TEXTILE CALCULATIONS FRS = Fr. rpm x 3.14 x FRD FRS - Front roller surface speed FRD - front roller diameter (3) T.P.I = T.M. x Sqrt (Count or Hank) T.M. - Twist multiplier sqrt - square root (4) Prodn in Kgs / 8 Hrs = (7.2 x SS x Effy) / (TPI x Ne x 1000) SS - spindle speed (5) Spindle Speed = M/Min x TPI x 39.37 (6) Hank Delivered = Spindle Speed / ( Tpi x 62.89) (7) Single yarn strength (gm) RKM = ----------------------------------Tex number of yarn (8) Ring bobbin content = 3.1 LD2 (L = Lift in inch, D = ring dia in inch) (9) Doubling bobbin content = 3.7 LD2 (10) Corrected count (11) Weight per yard of roving fed Actual draft of ring frame = ----------------------------------------------------------Weight per yard of yarn delivered on bobbin (12) = Actual count x (1 + Present regain) -----------------------------------------------1 + Standard regain Mechanical draft of ring frame = = Surface speed of front roller -------------------------------------Surface speed of back roller Draft constant -------------------------Draft change pinion (13) Twist contraction % = It is basically the percent shortening in length of yarn between the front roller and the bobbin. The length at the front roll is taken as 100%. For example 5% twist contraction means, the yarn length on the bobbin is 95% of the length at the file:///D:/textile cal/TEXCALTEXT detail.mht 5/15
  • 6. 10/27/13 TEXTILE CALCULATIONS front roll. = Yarn count at front roll - yarn count at bobbin ------------------------------------------------------------ x 100 Yarn count at front roll (14) TC% (15) Example of twist contraction given yarn; Count on bobbin = 10s Twist contraction = 5% 10 x 1.00 Yarn count at front roll = -------------- = 10.53s 95% (16) Mechanical draft is always greater than actual draft in ring spinning? It is necessary to draft the roving to a finer yarn count at front roll that what is to be bobbin. Because due to twist contraction of yarn, the count of yarn on bobbin becomes coarser than the count of yarn at front roller. (17) Twist per inch (TPI) Twist multiplier or Twist factor = ---------------------------Ö Count (Ne) (18) TPI = Twist multiplier x ÖCount (Ne) or (19) Twist constant of ring frame TPI = ------------------------------------Twist change pinion (20) Turns per metre (TPM) = Twist factor ÖNm (21) TPI = TPM x 0.0254 (22) Ring Traveller Speed Ring Traveller Speed in m/Sec= (Spindle Speed x Ring Dia in mm x 3.14)/ (60 x 1000) Actual ring traveler speed ? Assume, spindle speed Ring Diameter file:///D:/textile cal/TEXCALTEXT detail.mht = = 9,000 rpm 57 mm 6/15
  • 7. 10/27/13 TEXTILE CALCULATIONS Front roll delivery Package circumference = 64 metre/min. = 102 mm (avg) Front roll delivery (m/min) x 1000 Traveller lag (rpm) = Spindle speed - —————————————— Package circumference (mm) 14x1000 = 900 - ———— 102 = 8363 rpm Traveller lag 900 – 8863 = 137 rpm Uncorrected traveller speed (m/sec.) : Spindle speed x Ring diameter (mm) x p = —————————————————— 1000 x 60 9000 x 57 x 3.142 = ——--—————— = 1000 x 60 26.8 m/sec. Corrected Traveller speed (m/sec.) : Traveller speed (m/sec) – Ring dia (mm) xp x Trav. Lag (rpm) ————————————————— 60 x 1000 57x 3.142 x 137 = 26.8 - ———————— = 26.39 m/sec. 60 x 1000 (23) Weights of ring travellers No. 1 and 1/0. For No. 1 = 90 grains / 100 travellers For No.1/0 = 80 grains/100 travellers WINDING 1. Slub catcher settings : a. Fixed Blade = Carded - (2.0 to 2.5) x diameter Combed - (1.5 to 2.0) x diameter file:///D:/textile cal/TEXCALTEXT detail.mht 7/15
  • 8. 10/27/13 TEXTILE CALCULATIONS b. Electronic yarn clearer = 3 cm x 3 diameter = 1/( 28 x Öcount ) Diameter in inch for Blended yarn = 10 to 15% more settings 2. Yarn clearer efficiency = objectionable thick faults removed by slub catcher = Total objectionable thick faults present in yarn before winding Number of x 100 Total breaks during winding (at faults) 3. Knot factor = No. of breaks due to objectionable yarn faults Strength of spliced joint x 100 4. Retained splice strength = Strength of parent yarn 5. Winding Tension = 0.1 x Single yarn strength in grams 4500 x Y 6. Expected efficiency E = S x N (12 + 98) 7. Winder’s workload (0.17 min/operation on conventional winding m/c = 2300 operations per shift of 8 hours where, 1 creeling or 1 piecing = 1 operation 1 doffing = 2 operations 8. Winder’s workload on autoconer (0.08 min per operation) = 4800 operations/shift of 8 hours where, 1 bobbing feeding = 1 operation 1 doffing (manual) = 4.5 operation Y B S C (9) = Length/Bobbin (metres) = Breaks per bobbin = Winding speed (metres/min) = English count Production in Kgs / 8 Hrs = (0.2836 x L x Effy x Nd) / (Ne) file:///D:/textile cal/TEXCALTEXT detail.mht 8/15
  • 9. 10/27/13 TEXTILE CALCULATIONS L - delivery speed in m/min effy - efficiency Ne - english count Nd - No of delvieries (10) P =( L x 1.0936 x 60 x Effy ) / (Hank (Ne) x 36 x 840 x 2.2045) P - production in kgs / hr L - delivery speed in m/min effy- efficiency Ne - English count ( number of 840 yards in one pound) 840 - constant 2.2045- to convert from lbs to kilograms WARPING R x 100 1. Machine Efficiency E = R+S R = Uninterrupted running time for 1,000 meters (in sec) 1000 x 60 = Machine speed in mtr/min. S = Total of time in seconds for which the machine is stopped for a production of 1,000 meters B X N X T1 T2 T3 = R + --------------- + ----- + ---------- + T4 400 L L xC B = Ends breaks/400 ends/1,000 meters N = Number of ends L = Set length in 1,000 meters C = Beams per creel Timing of activities in seconds are : T1 = To mend a break T2 = To change a beam T3 = To change a creel T4 = Miscellaneous Time loss/1,000 mtrs. file:///D:/textile cal/TEXCALTEXT detail.mht 9/15
  • 10. 10/27/13 TEXTILE CALCULATIONS 2. Production in metres per 8 hrs. (K) = 480 x mtrs/min x E/100 kgs. 3. Production in Kgs. per 8 hrs. = (K x N)/(1693 x English Count) 4. Warping Tension = 0.03 to 0.05 x Single thread strength SIZING Length in metre x 1.094 x Total ends 1. Warp weight = (in kg.) x 100 840 x 2.204 x Warp count Sized warp weight - Unsized warp weight 2. 3. Size pick-up %age = x 100 Un-sized warp weight Weight of size = Warp Weight x Size pick up % Sized warp length - Unsized warp length 4. Stretch %age = x 100 Un-sized warp length Total-ends x Warp length in yards 5. Sized yarn count = Sized warp weight (lbs) x 840 Wt. of sized yarn - Wt. of oven dried yarn 6. %age Moisture= content x 100 Wt. of sized yarn Deliver counter reading - Feed counter reading 7. %age Stretch = 100 x Feed counter reading 840,000 x D x C 8. %age Droppings = on loom x 100 454 Y x N x P D = Dropping in gms. Y = Length woven (yds.) P = % size add on 9. C = English Count N = Number of Ends Invisible Loss% = Amount of size material issued - Amount of size added on yarn = x 100 Amount of size issued file:///D:/textile cal/TEXCALTEXT detail.mht 10/15
  • 11. 10/27/13 TEXTILE CALCULATIONS Steam, Consumption (Sizing M/c) = 2.0 kg/kg of sized yarn (Cooker) = 0.3 kg/kg of liquor (Sow box) = 0.2 kg/kg of yarn No. of Cylinder x 1,000 x English count 10. Max. Speed of machine (metres/min) = Number of ends Number of ends x 0.6 11. Wt. of warp in gms/mtr = English count WEAVING 1. Reed Count : It is calculated in stock port system. EPI Reed width = 1 + Weft crimp %age No. of dents in 2 inches is called Reed Count 2. Reed Width : 100 + Weft crimp %age Reed width = Cloth width x 100 3. Crimp % age : Warp length - Cloth length Warp Crimp %age = x 100 Cloth length Weft length - Cloth length Weft Crimp %age = x 100 Cloth length EPI 4. Warp cover factor = ÖWarp Count PPI 5. Weft cover factor = ÖWeft count Wp.C.F. x Wt. C.F. 6. Cloth cover factor = Wp.C.F. + Wt.C.F. - file:///D:/textile cal/TEXCALTEXT detail.mht 11/15
  • 12. 10/27/13 TEXTILE CALCULATIONS 28 7. Maximum EPI for particular count : a. For plain fabrics = 14 x ÖCount b. For drill fabrics = ÖCount x 28 x 4/6 c. For satin fabric = ÖCount x 28 x 5/7 Ends/repeat x 1 / yarn diameter d. Other design = No. of intersections / repeat + ends/repeat 1 8. Yarn diameter = 28 x ÖCount Weave Density 1. Warp density = Ends/cm x ÖTex x K = < 250 2. Filling density = Picks/cm x ÖTex x K = < 350 (Warp density - 100) x F.D.- 100 3. Weave Density = 50 + (Weft density - 100) x F.D.- 100 4. Effective weave density = W.D. x K of loom width x K of Design = < 72 To change the count and number of thread/inch, keeping the same denseness of the fabric : 1. To change the EPI without altering the denseness : file:///D:/textile cal/TEXCALTEXT detail.mht 12/15
  • 13. 10/27/13 TEXTILE CALCULATIONS EPI in given cloth x Ö Warp count in expected cloth EPI in Exp.Cloth = 2. Ö Warp count in given cloth To change the count without altering the denseness : EPI in exp. cloth2 EPI in exp. cloth = x Count in given cloth EPI in given cloth Warp requirement to weave a cloth : Total ends x 1.0936 x 453.59 x crimp% 1. Warp weight in gms/mtrs. = Waste 2. x 840 x Count Weft weight in gms/mtrs. = R.S. in inches x 453.59 x PPI = 840 x Count %age x Crimp %age x Waste %age Weft wt. in kgs. x Weft count x 1848 x 0.9144 3. Cloth length in mtrs.with = the given weft weight PPI x R.S. in inches For Silk and Polyester : 1. Warp weight in gms/mtrs. = Total ends x Count (Denier) = x Crimp% x Waste %age 9000 2. Weft weight in gms/mtrs. = RS in inches x PPI x Count (Denier) = 9000 x Crimp% x Waste %age Allowance for count in Bleached and Dyed Fabric : ¨ Count becomes 4% ¨ Finer Dyed counts become max.6% Coarser FABRIC PRODUCTION file:///D:/textile cal/TEXCALTEXT detail.mht 13/15
  • 14. 10/27/13 TEXTILE CALCULATIONS Motor pulley diameter 1. Loom speed = Motor RPM x Loom pulley diameter 2. Actual production Loom Efficiency %age = ----------------------------- x 100 Calculated production 3. Yarn weight - Dryed yarn weight Moisture Regain %age = --------------------------------------------- x 100 Dryed yarn weight 4. Yarn weight - dried yarn weight Moisture Content %age = -------------------------------------------- x 100 Yarn weight 5. Total ends x Tape length in metre Warp weight in Kg. = ---------------------------------------------1693.6 x Warp count 6. RS in centimetres x Coth length in metres x PPI Weft weight in Kg. = ---------------------------------------------------------------4301.14 x Weft count 7. EPI PPI Cloth weight in GSM = ----------------- + ----------------- x 25.6 Warp count Weft count 8. GSM (Grams per sq. metre) Oz (Ounce) per sq.yard = ------------------------------------34 Material measurement : For calculating of length of any rolled fabrics : L = 0.0655 (D - d) (D + d) ------------------------------t Where, L = Length of material (feet) t = Thickness of fabrics (inches) D = Outside diameter (inches) d = Inside diameter (inches) Weight of yarn in a cloth : file:///D:/textile cal/TEXCALTEXT detail.mht 14/15
  • 15. 10/27/13 TEXTILE CALCULATIONS The weight of cloth manufactured on loom depends upon the weight of yarns in the warp and weft : ends/inch, picks/inch and the weight of size on the warp. Therefore, Cloth weight = Weight of warp + Weight of weft + Weight of size (All in lbs.) Total No. of Ends x Tape length in yds. Where as Weight of warp in lbs = ---------------------------------------------------840 x Warp yarn count Also Weight of weft in lbs. = Length of cloth (yds) x Picks/inch in cloth x Reed width (inch) = ----------------------------------------------------------------------------------840 x Weft yarn count file:///D:/textile cal/TEXCALTEXT detail.mht 15/15