Case study for coppice primary school

Airtherm Engineering
Airtherm EngineeringAirtherm Engineering Limited

Natural Ventilation Case Study

Project Profile
Coppice Primary School, Wythall

Consultant
■

Stuart Associates

Client
■

MVS Limited

Sector
Hall Terminals

■ Education

Products
■ Wind-iVent Systems

Equipment
■ Natural Ventilation Systems
Wind-iVent - Natural Ventilation Systems

Application
■ Balance Terminals
Control Solutions Available

The Coppice Primary School is a two form entry school ,though larger than
the average primary school. Airtherm have already completed the 1 st phase
works by installing two ‘Wind-iVent’ Systems to the newly completed single
storey class rooms. The 2nd phase fix features a further six 1.2msq units for
the Hall area and a further six 1.1msq units serving the Classrooms
The new installation of fourteen natural ventilation systems for MVS
Limited had been designed and carefully selected from the room data
sheets provided, ensuring adequate ventilation rates for the pupils are met.
The natural ventilation systems have been designed in line with all current
publications such as CIBSE guidelines, AM10 Natural Ventilation in
commercial buildings and Building Bulletin 101. The terminal sizes have
been selected by our new computer aided software ‘Wind-iCalc’ and fully
conforms to the CIBSE requirements.

0844 809 2509 | airtherm.co.uk | info@airtherm.co.uk
Product Solution
Product Range
The Airtherm “Wind-iVent” Class ‘A’ is a natural ventilation system operating on
established aerodynamic principles. As external wind flows around the terminal
itself, positive and negative pressure areas are generated. On the positive side air
enters the louvres of the terminal and is directed down through the internal vanes
into the room below allowing a fresh air supply to be delivered, and on the negative
side the stack draws the stale unwanted air which is expelled through the terminal
into the atmosphere.

Manufacture

Classroom Ventilation Terminals

The units are be manufactured in accordance with BS EN ISO 9001, and to suit the
architectural and design parameters as indicated in the design specification and
drawings. Internal airways are to be protected by incorporating anti-bird mesh to the
terminal louvers. Our systems can be manufactured to achieve 99.8% effectiveness
(class A) when tested with a simulate rainfall of 75mm/hour and wind speed of
15m/sec based on a free area of 55%.

Installation
Units can be installed on almost every roof including flat, pitched and even on the
roof apex where appropriate. The roof fabric of commercial applications has bearing
on the openings and roof plates that are required to install the systems competently.
We offer a roof plate solution for all situations, including self mount flashings and
curb mount flashings with suitable upstands.
The features and advantages of such a system:
☼ A fresh air supply for workers - proven to
External view on flat roof

increase productivity & reduce staff sickness
☼ Naturally ventilated - reduce your energy costs

Contact Details:

and carbon footprint without the need for

Airtherm Engineering Ltd

mechanical ventilation

Unit 8A,

☼ Night time purge of stale air - creating a fresh

Gainsborough Trading Est

working environment for staff the following

Stourbridge

morning

West Midlands
DY9 7ND

☼ Better control of building temperature and CO²
levels

Typical diagram

☼ Free cooling
Tel: 0844 8092509
Fax: 01384 375218

0844 809 2509 | airtherm.co.uk | info@airtherm.co.uk

Contenu connexe

En vedette(15)

Farley junior school case studyFarley junior school case study
Farley junior school case study
Karen Amos390 vues
TCP-India - IIM BangaloreTCP-India - IIM Bangalore
TCP-India - IIM Bangalore
the climate project india1.3K vues
A Case Study Report at Restaurant A Case Study Report at Restaurant
A Case Study Report at Restaurant
ASHISH KUMAR15.2K vues
Master Architect Louis SullivanMaster Architect Louis Sullivan
Master Architect Louis Sullivan
ButterflyWaltz3.6K vues
Louis sullivanLouis sullivan
Louis sullivan
Vibhor Soni8.7K vues
Restaturant 26.12.13Restaturant 26.12.13
Restaturant 26.12.13
Atikul Islam17.1K vues
School rooms and placesSchool rooms and places
School rooms and places
beamcgc97K vues
School designsSchool designs
School designs
Laya Hague10.8K vues
Raj rewal pptRaj rewal ppt
Raj rewal ppt
Vandana Srinivas36.5K vues
Case study/ Literature of a SchoolCase study/ Literature of a School
Case study/ Literature of a School
Sarthak Kaura78.5K vues

Similaire à Case study for coppice primary school(20)

Air handlings units catalogueAir handlings units catalogue
Air handlings units catalogue
nuairedigital497 vues
Digital edition may 2020Digital edition may 2020
Digital edition may 2020
Shyam Sunder Budhwar31 vues
Mini natural ventilation brochure 2013Mini natural ventilation brochure 2013
Mini natural ventilation brochure 2013
Airtherm Engineering882 vues
BB FZE Brochure 2016BB FZE Brochure 2016
BB FZE Brochure 2016
Danilo Mamaril329 vues
Dehumidifier machine automation with messung's nx era xpress.Dehumidifier machine automation with messung's nx era xpress.
Dehumidifier machine automation with messung's nx era xpress.
Messung Industrial Automation & Controls71 vues
 flue dilution solution  flue dilution solution
flue dilution solution
Airtherm Engineering519 vues
Case Study: Office Complex CoolingCase Study: Office Complex Cooling
Case Study: Office Complex Cooling
A.T.E. Private Limited234 vues
EcoCooling IT Sales ManualEcoCooling IT Sales Manual
EcoCooling IT Sales Manual
Alan Beresford99 vues
ACI company overview 2011ACI company overview 2011
ACI company overview 2011
mforknall01706 vues
The importance of temperature monitoringThe importance of temperature monitoring
The importance of temperature monitoring
Milling and Grain magazine275 vues
Egicat Presentation 2016Egicat Presentation 2016
Egicat Presentation 2016
Mohamed Osama Aldalel137 vues
Advanced Design Studio 2Advanced Design Studio 2
Advanced Design Studio 2
ong93196 vues

Plus de Airtherm Engineering(18)

Airtherm nat vent brochureAirtherm nat vent brochure
Airtherm nat vent brochure
Airtherm Engineering301 vues
Chimney & Flue Systems MF BrocureChimney & Flue Systems MF Brocure
Chimney & Flue Systems MF Brocure
Airtherm Engineering480 vues
Natural Ventilation Brochure 2014Natural Ventilation Brochure 2014
Natural Ventilation Brochure 2014
Airtherm Engineering763 vues
natural ventilation - Airtherm case study   natural ventilation - Airtherm case study
natural ventilation - Airtherm case study
Airtherm Engineering254 vues
Case study for lambeth hospital    londonCase study for lambeth hospital    london
Case study for lambeth hospital london
Airtherm Engineering157 vues
Airtherm productsAirtherm products
Airtherm products
Airtherm Engineering198 vues
Generator Flues BrochureGenerator Flues Brochure
Generator Flues Brochure
Airtherm Engineering368 vues
Airtherm flue portfolioAirtherm flue portfolio
Airtherm flue portfolio
Airtherm Engineering435 vues
Airtherm product rangeAirtherm product range
Airtherm product range
Airtherm Engineering256 vues
Airtherm grilles & louvre bookletAirtherm grilles & louvre booklet
Airtherm grilles & louvre booklet
Airtherm Engineering1.3K vues
flues and chimneys brochure 2013flues and chimneys brochure 2013
flues and chimneys brochure 2013
Airtherm Engineering328 vues
Airtherm heat recovery solutionsAirtherm heat recovery solutions
Airtherm heat recovery solutions
Airtherm Engineering237 vues
 natural ventilation brochure  natural ventilation brochure
natural ventilation brochure
Airtherm Engineering777 vues
window natural ventilation brochurewindow natural ventilation brochure
window natural ventilation brochure
Airtherm Engineering520 vues

Case study for coppice primary school

  • 1. Project Profile Coppice Primary School, Wythall Consultant ■ Stuart Associates Client ■ MVS Limited Sector Hall Terminals ■ Education Products ■ Wind-iVent Systems Equipment ■ Natural Ventilation Systems Wind-iVent - Natural Ventilation Systems Application ■ Balance Terminals Control Solutions Available The Coppice Primary School is a two form entry school ,though larger than the average primary school. Airtherm have already completed the 1 st phase works by installing two ‘Wind-iVent’ Systems to the newly completed single storey class rooms. The 2nd phase fix features a further six 1.2msq units for the Hall area and a further six 1.1msq units serving the Classrooms The new installation of fourteen natural ventilation systems for MVS Limited had been designed and carefully selected from the room data sheets provided, ensuring adequate ventilation rates for the pupils are met. The natural ventilation systems have been designed in line with all current publications such as CIBSE guidelines, AM10 Natural Ventilation in commercial buildings and Building Bulletin 101. The terminal sizes have been selected by our new computer aided software ‘Wind-iCalc’ and fully conforms to the CIBSE requirements. 0844 809 2509 | airtherm.co.uk | info@airtherm.co.uk
  • 2. Product Solution Product Range The Airtherm “Wind-iVent” Class ‘A’ is a natural ventilation system operating on established aerodynamic principles. As external wind flows around the terminal itself, positive and negative pressure areas are generated. On the positive side air enters the louvres of the terminal and is directed down through the internal vanes into the room below allowing a fresh air supply to be delivered, and on the negative side the stack draws the stale unwanted air which is expelled through the terminal into the atmosphere. Manufacture Classroom Ventilation Terminals The units are be manufactured in accordance with BS EN ISO 9001, and to suit the architectural and design parameters as indicated in the design specification and drawings. Internal airways are to be protected by incorporating anti-bird mesh to the terminal louvers. Our systems can be manufactured to achieve 99.8% effectiveness (class A) when tested with a simulate rainfall of 75mm/hour and wind speed of 15m/sec based on a free area of 55%. Installation Units can be installed on almost every roof including flat, pitched and even on the roof apex where appropriate. The roof fabric of commercial applications has bearing on the openings and roof plates that are required to install the systems competently. We offer a roof plate solution for all situations, including self mount flashings and curb mount flashings with suitable upstands. The features and advantages of such a system: ☼ A fresh air supply for workers - proven to External view on flat roof increase productivity & reduce staff sickness ☼ Naturally ventilated - reduce your energy costs Contact Details: and carbon footprint without the need for Airtherm Engineering Ltd mechanical ventilation Unit 8A, ☼ Night time purge of stale air - creating a fresh Gainsborough Trading Est working environment for staff the following Stourbridge morning West Midlands DY9 7ND ☼ Better control of building temperature and CO² levels Typical diagram ☼ Free cooling Tel: 0844 8092509 Fax: 01384 375218 0844 809 2509 | airtherm.co.uk | info@airtherm.co.uk