NTCC REPORT
ON
VALUATION OF A NON-GREEN BUILDING (EROS
CORPORATETOWER) IN COMPARISON TO A GREEN BUILDING (GREEN
BOULEVARD)...
3
DECLARATION
I hereby declare, this Dissertation Report “Valuation Of A Non Green
Building In Comparision With A Green Bu...
4
ACKNOWLEDGEMENT
First of all, I would like to thank almighty, whose generous blessings made the
internship a success and...
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité

Consultez-les par la suite

1 sur 32 Publicité

Plus De Contenu Connexe

Diaporamas pour vous (20)

Similaire à Green buildings- PAHARPUR BUSINESS CENTRE (20)

Publicité

Plus récents (20)

Green buildings- PAHARPUR BUSINESS CENTRE

  1. 1. NTCC REPORT ON VALUATION OF A NON-GREEN BUILDING (EROS CORPORATETOWER) IN COMPARISON TO A GREEN BUILDING (GREEN BOULEVARD) LOCATED IN NOIDA MBA-REUI 2013-2015 To RICS School of Built Environment By Akash Gupta (A13558913055) Under the guidance of Prof. Saurabh Verma In Partial Fulfillment of the Requirements for the Degree of Master of Business Administration At RICS SCHOOL OF BUILT ENVIRONMENT AMITY UNIVERSITY UTTAR PRADESH SECTOR 125, NOIDA – 201303, UTTAR PRADESH, INDIA
  2. 2. 3 DECLARATION I hereby declare, this Dissertation Report “Valuation Of A Non Green Building In Comparision With A Green Building” which is submitted for partial time fulfillment of the requirement for the award of degree of Masters of Business Administration (MBA)-Urban Infrastructure and Real estate to RICS School of Built Environment, Amity University as my own work and no part of my report has been copied from other reports or directly from websites except where due reference has been made. AKASH GUPTA MR. Saurabh Verma Roll Number –A13558913055 (Faculty Guide) MBA (REUI) Batch 2013-2015
  3. 3. 4 ACKNOWLEDGEMENT First of all, I would like to thank almighty, whose generous blessings made the internship a success and I want to thank my supportive parents from whom I learned the value of writing succinct sentences. I am very thankful to my Faculty Mentor- Mr. Saurabh Verma for giving me an opportunity to carry out dissertation on “Valuation Of A Non Green Building In Comparision With A Green Building” Last but not the least; I would like to thank all the interviews and respondents without whom it was impossible to complete my research. AKASH GUPTA MR. SAURABH VERMA Roll No. A135589113055 (Faculty Guide) MBA (REUI) Batch2013-2015
  4. 4. 5 CERTIFICATE This is to certify that the dissertation done on “Valuation Of A Non Green Building In Comparision With A Green Building” submitted to RICS School of Built Environment, Amity Schoolby Mr. AKASH GUPTA a student of post graduate Degree in MBA (REUI), Batch 2013-2015), is the student’s own work carried out under my supervision. The matter present in this dissertation report has not been submitted anywhere else for the award of any other degree. AKASH GUPTA MR. SAURABH VERMA Roll No. A135589113055 (Faculty Guide) MBA (REUI) Batch2013-2015
  5. 5. 6 Table of Contents Green Buildings & India.....................................................................................................8 Introduction................................................................................................................. 8 The Growing Crises....................................................................................................... 9 Green Rating Systems ................................................................................................. 11 Green Buildings in India............................................................................................... 12 Costs & benefits of Green Buildings in India.................................................................. 13 Cost Premium of Green Buildings................................................................................. 14 Paharpur Business Centre............................................................................................... 16 PRODUCTIVITY ANALYSIS............................................................................................... 17 Valuation.................................................................................................................... 22 Eros Corporate Tower .................................................................................................... 23 Productivity Analysis...................................................................................................... 24 Location Analysis........................................................................................................ 27 Valuation....................................................................................................................... 30 Comparative Analysis...................................................................................................... 31 Conclusion ..................................................................................................................... 32
  6. 6. 7 Figure 1: Constituent parts of Sustainability ..................................................................... 10 Figure 2: Performance of Green Buildings in India............................................................. 14 Figure 3: Paharpur Business Centre.................................................................................. 16 Figure 4: Location Map of Paharpur Business Centre .............. Error! Bookmark not defined. Figure 5: Catchment Areas of Paharpur Business Centre ................................................... 21 Figure 6: Eros Corporate Tower....................................................................................... 23
  7. 7. 8 Green Buildings & India... Introduction The tremendous growth in economic activity across the globe is placing pressure on natural and environmental resources. There is increasing evidence that human activities are causing an irreversible damage to the global environment, which will have an adverse impact on the quality of life of future generations. The rising concern for the environment in response to global warming is driving thinkers to seek sustainable solutions. The real estate industry is a significant contributor to the global warming due to extensive emissions of greenhouse gases (GHGs) from the energy use in buildings. In some countries, the built environment accounts for about 40% of the energy used. Therefore, there is an imperative for the industry to develop sustainable building technologies and green buildings. The construction industry in India is growing rapidly at a rate of 10% compared with the world average of 5.2%. It is observed that buildings in India consume about 20% of the total electricity in the country. Hence, real estate activity in India has a significant impact on the environment and resources. This indicates that there is a real opportunity to develop green buildings in the country. However, developers face a major challenge in the development of green buildings as in some cases this increases construction costs. Developers find it difficult to opt for green buildings due to price constraints, difficulty in sourcing green building materials, technologies and service providers or facilitators in India.
  8. 8. 9 The Growing Crises Global warming is the increase in the average measured temperature of the Earth’s near-surface air and oceans since the mid-20th century. Global warming can cause a 20% recession in the world’s GDP as this phenomenon increases the possibility of occurrence of natural disasters altering the world’s GDP. It threatens the melting of glacial ice, increasing the seawater level and causing devastating effects on the coastal world. It is learnt that GHGs, which are produced and emitted due to human activity, are responsible for global warming. The world is taking action in addressing the issues leading to global warming. The first step in this regard was the United Nations Framework Convention on Climate Change (UNFCCC) treaty in 1992. UNFCCC was formalised as the Kyoto Protocol on 11 December 1997, with the objective of reducing GHG emissions to prevent the man-made global warming process. The Kyoto Protocol aims to be a holistic guideline restricting and reducing emissions in developed countries and at the same time facilitating emission reduction in the developing world. GHG emission in developed countries is capped with a fixed quota. However, if countries or companies exceed their quota of emission, they can still earn carbon reduction credits either by buying credits in the international carbon credit market and/or through clean development mechanisms (CDMs). Global warming can cause a 20% recession in the world’s GDP as this phenomenon increases the possibility of occurrence of natural disasters altering the world’s GDP The framework provided by UNFCCC has revived the concept of sustainability and placed the focus squarely on GHGs emissions. It has also given a fillip to the green industry movement such as renewable energy production and the efficient usage of energy resources and other resources.
  9. 9. 10 Sustainable Real Estate Development & Green Buildings Sustainable development is defined as ‘Meeting the needs of the present generation without compromising the ability of future generations to meet their needs’. The field of sustainable development can be conceptually broken into three constituent parts - social sustainability, environmental sustainability and economic sustainability (Figure 1). The performance of the industrial economy has always been measured through single bottom-line (financial) results. However, striking a balance between environmental, social and economic performance is a key to achieving sustainable outcomes. This has given rise to the concept of triple bottom line. The real estate industry is one the major energy consumers and GHG emitters. According to a report by the Intergovernmental Panel on Climate Change (IPCC) in 1996, the real estate industry is expected to consume 38% of the global energy and emit 3,800 mega tonnes of GHGs every year. This does not include the usage of other resources such as water. Therefore, the increasing crises of global warming, depleting resources and consumer pressures have pushed the agenda of sustainability in the real estate sector. Growing human activity has increased the concern for sustainability even more in recent times. Sustainability in the real estate context is not only limited to energy conservation, but also includes resource usage, impact on the neighbouring environment and working conditions for tenants. This concern has led to the development of green buildings. The green building concept broadly integrates many interests and aspects of sustainability emphasising reduction of environmental impacts through a holistic approach to land and building uses and construction strategies. Figure 1: Constituent parts of Sustainability
  10. 10. 11 A green building uses less energy, water and natural resources than a conventional building. It also creates less waste and provides a healthier living environment for people living inside it compared to a conventional building. Green buildings incorporate several sustainable features such as efficient use of water, energy- efficient and eco-friendly environment, use of renewable energy and recycled/recyclable materials, effective use of landscapes, effective control and building management systems and improved indoor quality for health and comfort. Sustainability is not just limited to energy conservation, but it has also been expanded to resource usage, the neighbouring environment and working conditions for tenants. This concern has led to the development of green buildings. The overall benefits of green buildings mostly depend on the extent to which the sustainable features are addressed during the initial planning and design. A green building is most likely to succeed in its objective if sustainable features are envisioned and incorporated right at the design stage. The design has to take into consideration the entire supply chain—from material sourcing, energy modelling, resource reuse, civic amenities & waste disposal to tenant education. Green Rating Systems The green building movement has led to the emergence of various green rating systems. The BREEAM •Building Research Establishment Environmental Assessment Method •Widely used in UK LEED •Leadership in Energy & Environmental Design •Developed by US Green Building Council •Used in the US Green Star •Developed by the Green Building Council of Australia and used in Australia •New Zealand GBC have their own version of Green Star CASBEE •Comprehensive Assessment System for Building Environmental Efficiency •Developed by Japan Sustainable Building Consortium •Used in Japan Green Mark •Used in Singapore •Mandated by the Building & Construction Authority for all new development and retrofit works NABERS •National Australian Built Environment Rating System •Managed by NSW Dept. of Environment & Climate Change •Only rating system to measure ongoing operational performance
  11. 11. 12 predominant ones are: The green rating systems followed in India are: LEED India - administered by the Indian Green Building Council (IGBC); GRIHA - Green Rating for Integrated Habitat Assessment developed by TERI (The Energy and Research Institute). These tools are relatively new and have not fully evolved. There is no doubt that more and more developers are resorting to these systems to get their buildings certified. Rating systems provide a tool to enable comparison of buildings on their sustainability credentials. Many occupiers and investors are using these tools as a guide to selecting properties for lease or acquisition. Meanwhile, these systems are also being constantly improved. Therefore, the entire green building ecosystem is getting in place. Among all these rating systems, LEED has emerged as the most popular and is followed across 24 countries across the globe, including India. A green building is most likely to succeed in its objective if sustainable features are envisioned and incorporated right at the design stage. Green Buildingsin India The green building movement in India started with the establishment of the IGBC in 2001, which was an initiative of the Confederation of Indian Industries (CII) along with the World Green Building Council and the USGBC. The first green building in India, CII-Sohrabji Godrej Green Business Centre in Hyderabad, was inaugurated on 14 July 2004. This was a great symbolic achievement. Since then, the number and volume of green buildings in India has been phenomenal. The movement started with 20,000 sq. ft. in 2004 and has grown exponentially, with an expected green building footprint of 15 million sq. ft. by end-2008. There are 18 LEED certified
  12. 12. 13 buildings with a total area of about 8.5 million sq. ft. and 195 projects registered for LEED certification with a total area of about 110 million sq. ft.as of year-end 2007. The real estate industry is one of the biggest emitter of GHGs in India. According to a report by the Ministry of Power in June 2004, 20–25% of the electricity consumed in government buildings is wasted due to inefficient design. ‘The scenario is almost the same in the private sector. It is heartening to know that the green building concept is widely being adopted in the Indian real estate industry. However, efforts are not enough and a greater push is required to make real estate development sustainable. In the next 3-4 years about 200 million sq. ft. of commercial space and 45 million of retail space is expected to be constructed across the major cities of India which indicates that there is a great opportunity for developers and occupiers to promote green buildings. Costs & benefits of Green Buildings in India In terms of appearance or use, there is no difference between green buildings and conventional ones. The major differences are that green buildings have improved indoor environment and they offer operational savings. Green buildings have been observed to have tangible and intangible benefits. The tangible benefits such as the economic advantages are not immediately visible. However, the lifetime payback is much higher compared with that of conventional buildings, which mainly accrue from operational cost savings, reduced carbon emission credits and potentially higher rental or capital values. The intangible benefits such as social advantages are due to the positive impact of green buildings in the neighbourhood environment. Moreover, due to better working conditions, the productivity of occupier increases and health problems decreases. The tangible benefits such as the economic advantages are not immediately visible. However, the lifetime payback is much
  13. 13. 14 Figure 2: Performance of Green Buildings in India higher compared with that of conventional buildings, which mainly accrue from operational cost savings, reduced carbon emission credits and probably higher rental or capital values. The performance of green buildings in India, as mentioned in Table 2 below, indicates that platinum-rated buildings have a higher payback period of five to seven years, while gold-rated and silver-rated buildings have a payback period of three to four years. These tangible and intangible benefits define the triple-bottom-line returns of green buildings. Cost Premium of Green Buildings The general sentiment among the developer community is that green buildings cost higher than similar conventional buildings, and it is difficult to get positive returns on this extra investment. This issue is mainly due to:  The still-evolving nature of green buildings;  The lack of technical information;  The incomplete/inefficient execution of green projects;  The short-term view on returns, instead of focusing on lifetime return on investment (ROI) of these buildings. In mature markets the cost premium range from 1-6%. Cost premium in India is in the range of 6–18% (Table 2) depending on the level of rating. This can be attributed to lack of technical know-how, immaturity of the market and lack of resources. We foresee the cost premium in India to realign to the mature markets with the increase in awareness and availability of resources.
  14. 14. 15 Scope / Nature of Work Our major objective throughout this project would remain to test the credibility and credentials of various reports suggesting that green rated buildings accrue benefits not only to the occupants and the environment, but also to owners of green rated buildings. We would be working towards judging these very points and draw conclusions based on the results we procure based on our study of the chosen buildings in the region of Delhi NCR. Our main area of focus would remain the owner’s perspective and his financial gains, if there are any. The whole project entails the comparable required to compare the green building with a conventional one. The way forward would be enlist various parameters for comparison between the 2 buildings. The buildings for the purpose of study have been chosen. The green building which we are looking at is Paharpur Business Centre & the conventional buildings which would act as comparable building is EROS Commercial Tower. The above mentioned buildings have been visited and analysed for further research, the facilities management team of the various buildings have been met in order to procure the relevant information.
  15. 15. 16 Figure 3: Paharpur Business Centre Paharpur Business Centre Paharpur Business Centre & Software Technology Incubator Park started its serviced office business in 1990. Paharpur Business Centre is a trusted brand for many corporate & multinationals. It has and is delivering quality service to its customers for over two decades. It is the only business centre in Delhi meeting five international quality standards. Located in Nehru Place, a prime commercial centre, Paharpur Business Centre is easy to approach. Key Points:  Indoor Air Quality system confirms to ASHRAE Standards, ensuring fresh air in the facility ultimately resulting to increased productivity  Accessible 24/7 and 365 days open, Business Hours: 9a.m - 7p.m (Monday to Friday). Option available for late working, extendable to 24 hours as per requirement  Dedicated Parking facilities for our customers  Insurance to cover immediate relocation in case of disaster (fire, earthquake, etc.)  Paharpur Business Centre is also a signatory to UN Global Compact & Women’s Empowerment Principles (WEP). It is a Government recognized private STIP unit  Paharpur Business Centre is a registered Software Technology Park with Government of India
  16. 16. 17 PRODUCTIVITY ANALYSIS Certifications-  ISO 9001:2008 for Quality Management System  ISO 14001:2004 for Environment Management System  ISO 22000:2005 for Food Safety Management System  ISO 50001:2011 for Energy Management Services  OHSAS 18001:2007 for Occupational Health & Safety  SA 8000:2008 for Social Accountability TOTALBUILT UPAREA 50,400SQ.FT NO. OF FLOORS B+G+6 FLOORPLATEAREA 6300SQ.FT LEASED UP AREA 15000SQ.FT VACANT AREA 35,400SQ.FT NO. OF PARKINGS 3 PARKING COST 4000/CAR/MONTH CONFERENCEROOM 20 VIRTUAL OFFICESPACE YES MEMBERSHIPCHARGES RS.4000/LIFETIME TENANT DETAILS FLOORNO TENANT NAME AREA OCCUPIED(SQ.FT) RENT G CAFETERIA 1500 RESTURANT 2500 1ST FLIPKART 3000 RS.200/SQ.FT - 3200 2ND EMC 1500 RS.200/SQ.FT SHELL 1500 RS.200/SQ.FT HALLMARK 2000 RS.200/SQ.FT - 1300 3RD FIRELLI 6300 RS.350/SQ.FT 4TH MICROSOFT 1000 RS.350/SQ.FT 5TH - 6300 RS.350/SQ.FT 6TH - 6300 RS.350/SQ.FT
  17. 17. 18 OTHERINCOME  20 CONFERENCEROOMS  4 PERSONTO 100PERSON – RS400/ PER PERSON/ PER HOUR VIRTUAL ROOMS  PLAN 1 - RS.3000/MONTH  PLAN 2 - RS.6000/MONTH  PLAN 3 - RS.9000/MONTH OPERATIONAND MAINTENANCECOSTS MAINTENANCECOST RS.100/SQ.FT SINKING FUND RS.50/SQFT/YEAR INSURANCE COST RS.1 PER SQ.FT/YEAR LEASE AND MANAGEMENT CHARGES RS.1/SQ.FT/YEAR FACILITIES TRAINING ROOM  Trainingroom withacapacityof 15 to 20 person  Equippedwithstate-of-the-art computersnetworkedwithAT & T,CAT 5E Cabling  XGA compatibleLCDprojectorwithlaserPointer. Internet access CONFERENCEFACILITY  Myconferencetm -Capacity6 to 25persons  Interview cabins  Meetingrooms,  Video conferencing,  Audio conferencing,  Web conferencing OFFICEFACILITIES  Instant fully servicedoffices - modulesfor2 to 150persons  Combinationsofmoduleswithareasperpersonrangingfrom 50 to 200 sq. Ft .:. 1200 nodes on LAN COMMONAREAS  Reception  Waitingarea  Lounges
  18. 18. 19 TRANSPORTATIONFACILITY  DELHI METRO  CAR POOLING SERVICES  DTCBUSSERVICE  TAXI SERVICE  AUTO STAND EXTERNALENVIRONMENT  6 ACRE SURROUNDING PARKS  CAR PARKING ON 3 SIDES OF THEBUILDING  MAIN ROAD ONTHEFRONT SIDE  PETROLPUMPONTHEBACKSIDE Lightinglevels  Meetslux level requirementsasperDIN 5035 part 2 - InternationalStandard   Lightingconservationinitiatives  5 stars rated electricalappliancesareused.  Installedmotionsensorsto controlthemisuseof electricity.  . Replacedallthedesktopswith laptops.  Noiselevel meetingISnotificationinrespectof noiseas per the gazette of India extraordinaire of Feb14, 2000.  LEDs use only2-10 watts of electricity(1/3rd to 1/30th of IncandescentorCompact FluorescentLights)andlast upto 10timesas longas CFL's.  • ReplacedCFLswithLEDlights. • UpgradedHVAC,electrical systemandcoolingtowersthathave apayback periodof 8-14 years. Noise level Meets Indian standard notification in respectofnoise, as per the Gazette ofIndia extraordinary of Feb. 14, 2000 Security & Fire Safety 24 hours security on each floor. Access control and screening ofall visitors. Closed circuitTV security systems. Fire clearance certificate from Delhi Fire Department. Fully automatic fire alarm system, smoke sensors,firefighting equipmentStaff trained in the use of fire fighting and evacuation procedures.Special diesel engine driven pump for fire wet riser, with underground 200,000 litre storage tank for fire emergency
  19. 19. 20 Air Quality It uses patentedtechnologyto detoxify indoorairand growmountainfreshair. Theygrowfresh air with the helpof morethan 1200toxin-removingindoor plants. WATER CONSERVATIONTECHNIQUES  SensorTaps  Use of Soap FreeWater for Gardening  Installationof cisternbased4/2 Liter Water Closet (WC)  RainWater Harvesting LocationAnalysis Proximities Distance Bus Stop 150 m Metro Station 380 m
  20. 20. 21 Airport 15 km Delhi CBD 7.5 km Paharpur Business Centre is located in Nehru Place, South Delhi, which is the most elite location to be in. It thus, holds a high capital value as among other locations throughout Delhi. Catchment Area Primary Catchment Area covers most of the South Delhi Area as the tenants looking for an office in this area will give their first preference to Nehru Place. Secondary Catchment Area covers almost all of Delhi as prospects wanting to have an office in Delhi will give their first preference to Nehru Place too. Tertiary Catchment Area covers the areas of Gurgaon, Faridabad & NOIDA, including the major area of NCR. The prospects of this area will have South Delhi as their preferable option. Figure 4: Catchment Areas of Paharpur Business Centre
  21. 21. 22 Valuation Inflow Escalation VIRTUAL ROOM CHARGES ESCLATION 3% RENT ESCALATION 5% PARKING CHARGES ESCLATION 2% INCREASE IN CONFERENCE FACILITY CHARGES 5% By following the DCF method under Income Approach, the value of the building is same as its NPV. From the above calculations, the Value of the building is ₹ 2517,56,381.96 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Gross Income (GI) 59460000.00 62433000.00 65554650.00 68832382.50 72274001.63 758 Outflows 23721400 24515956 25349916.52 26225245.23 27144003.85 281 Net Operating Income (NOI) 357,38,600.00 379,17,044.00 402,04,733.48 426,07,137.27 451,29,997.77 477,7 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 50.00 68832382.50 72274001.63 75887701.71 79682086.79 83666191.13 87849500.69 92241975.72 16.52 26225245.23 27144003.85 28108357.05 29120577.6 30183051.74 31298284.92 32468907.68 33.48 426,07,137.27 451,29,997.77 477,79,344.65 505,61,509.19 534,83,139.39 565,51,215.76 597,73,068.04 Insurance Expenses 0.50% of cost of construction CAMCharges 100 Rs. Per sq ft per month Lease and asset management charges 1% of basic rent & parking charges Marketing Expenses 50,00,000.00 per year SINKING FUND 50 /SQ.FT/YEAR Outflows
  22. 22. 23 Eros Corporate Tower Eros Corporate Tower is strategically located in the Nehru Place District Centre situated opposite to Nehru Place Metro Station. The tower is one of the world class premium addresses in the business world. Many leading multinational companies like Microsoft, Barclays Bank, ENI India, Jetro, BT India Pvt. Ltd., Sinosteel India, Suzlon, Finmeccanica, Sjitz India, HDFC Ergo, Axis Bank, Russell Reynold, Regus, Korean Exim Bank, OOCL India, Royal China etc., have chosen to operate their businesses from this tower with its perfect location. It is a sixteen storey commercial tower with interconnected seven storey car parking which can accommodate 1000 cars and 50 buses, thus being just one of its kind to match international quality standards. The complex has a built-up area of approx. 6,50,000 sq ft. (60,400 sq mtr.). The commercial tower offers approx. 14,000 sq.ft. (1300 sq.mtr.) per floor. Figure 5: Eros Corporate Tower
  23. 23. 24 Productivity Analysis Internal Emenities  AirConditioned  IntercomFacility  Internet/Wi-Fi Connectivity  RO Water System External Emenities  PowerBack  Lift  ReservedParking  Security  Water Storage  Service/GoodsLift  VisitorParking  Cafeteria/Food Court  Conference Room  24 HRS SECURITY The Location: South Delhi Sub Location Name: Nehru Place Developer Name: Eros Group Property Type: Commercial Properties Property Sub Type High Rise (Campus type) Property Status: Functional Building Floor Available: Office space is subjectto the availability Total Floors in Building Ground + 16 Floors Building Facing North East
  24. 24. 25 Area specifications AREA CALCULATION AREA(SQ.FT) LAND AREA 1,96,020 TOTAL BUILT UP AREA 6,50,000 COMMERCIAL TOWER AREA 2,47,337 PARKING AREA 3,72,663 SOLDOUT AREA 46,243 SELF OCCUPIED 23,377 LEASED UP AREA 1,56,263 VACANT AREA 21454 RETAIL SHOPS 30,000 FLOOR PLATE AREA 13740.94444 CONSTRUCTION COST 445206600 CAR PARKING TOTAL BUILT UP AREA 3,72,663 SQ.FT TOTAL CARS PARKED 1000 CARS TOTAL BUSSES 50 BUSES SPACE ACQUIRED BY 1 CAR- 372 SQ.FT TOTAL CARS IN A DAY 700 CARS IN A YEAR 2,10,000 CARS AVERAGE RENT/CAR RS.30/CAR FIXED CARS RENTAL RS.5000/ MONTH NO. OF FIXED CARS 200 TOTAL RENT FROM FIXED CARS 1,20,00,000 INCOME RS.2,04,00,000/- ANNUALLY OPERATINGANDMAINTENANCECOSTS INSURANCECOST RS.1/SQ.FTANNUALLY SINKINGFUND RS.24/SQ.FT/ANNUALLY MAINTENANCECHARGES RS.25/SQ.FT/MONTH LEASE ANDASSET MANAGEMENT CHARGES RS.1/SQ.FTANNUALLY
  25. 25. 26 Key tenants FLOOR NO TENANT NAME GROUND BARCLAYS BANK PLC HDFC ERGO GENERAL INSURANCE CO.LTD 1 BARCLAYS BANK PLC 2 FINMECCANICA AGUSTA WESTLAND FINCANTIERI 3 ABC CONSULTANTS PVT.LTD VRACKAL TRADING OOCL LOGISTICS INABENSA BHARAT PVT.LTD 4 JAPAN EXTERNAL TRADE ORGANISATION INTERNATIONAL ENTERPRISE SINGAPORE BELTECH INDUSTRIAL KOREA WESTERN DIGITAL 5 MICROSOFT CORPORATION INDIA PVT LTD TRANSASIA INFRASTRUCTURE INDIA PVT.LT SALEXES INDIA PVT.LTD 6 KYOSON INDIA PVT.LTD ANDRITZ INDIA PVT.LTD IDEMITSU EFACEC INDIA PVT.LTD JETRO 7 SOJITZ INDIA PVT.LTD SOJITZINDIA PVT.LTD 8 EROS OFFICE 9 SUZLO.N ENERGY LTD FIRST SOLAR POWER INDIA PVT. LTD SINGAPORE TOURISM 10 TREND MICRO INDIA LTD STEVEN ROCK EROS OFFICE 11 YANMAR INDIA PVT. LTD DT INDIA PVT.LTD 12 ST ENGINEERING VOSSLOH SINO Steel India Pvt.Ltd HITACHI 14 LINTEC INDRA Eni India ltd 15 Regus
  26. 26. 27 Figure 6: Location Map of Eros Corporate Tower Space available for rent FLOOR NO. SPACE AVAILABLE rent/sq.ft total rent CONTACT PERSON CONTACT NO. 1 6000 250 15,00,000 Sanjeet Sharma 9810069114 5 7500 175 13,12,500 7 2500 200 5,00,000 12 5500 175 9,62,500 Location Analysis Proximities Distance Bus Stop 150 m Metro Station 380 m Airport 15 km Delhi CBD 7.5 km Eros Corporate Tower is located in Nehru Place, South Delhi, which is the most elite location to be in. It thus, holds a high capital value as among other locations throughout Delhi.
  27. 27. 28 Figure 7: Catchment areas of Eros Corporate Tower Catchment Area Primary Catchment Area covers most of the South Delhi Area as the tenants looking for an office in this area will give their first preference to Paharpur Business Centre. Secondary Catchment Area covers almost all of Delhi as prospects wanting to have an office in Delhi will give their first preference to Nehru Place. Tertiary Catchment Area covers the areas of Gurgaon, Faridabad & NOIDA, including the major area of NCR. The prospects of this area will have South Delhi as their preferable option. Areas near Nehru Place  Chirag Delhi  Okhla  Kalkaji  Sarita Vihar  Govindpuri  Jasola Vihar  Chittaranjan Park  Siri Fort
  28. 28. 29 NEARBY COMMERCIAL BUILDINGS  International Trade Tower  Eros Corporate Tower  IFCITower  DevikaTower  Chiranjeevi Tower  Ansal Tower  HemkuntTower  PaharpurBusinessCentre RENT IN NEARBY BUILDINGS 1. ANSAL TOWER- RS100/SQFT 2. DEVIKA TOWER- RS 80/SQFT 3. MODI TOWER- RS 100/SQFT 4. INTERNATIONAL TRADE TOWER- RS125/SQF
  29. 29. 30 Valuation Following an Income Approach, the value of the building is assessed by dividing the Net Operating Income of the Building with the Capitalization rate of the Area. In Nehru Place, the Cap. Rate is at 9% Thus, the value of the building = NOI/Cap. Rate =23,96,71,213/0.09 = ₹ 26630,13,477.78 Inflows Rent Office Space: Ground 34,35,236.11 Rest 205,81,569.44 Retail - Parking 2,04,00,000 Other Virtual Rooms 24,00,000.00 Total Inflows 264,16,805.56 Outflows Maintenance 61,83,425.00 Asset Management 2,40,168.06 Insurance 20,611.42 Total Outflow 64,44,204.47 Net Operating Income Monthly 199,72,601.08 Annual 2396,71,213.00 Office rentals 1-16 FLOOR/MONTH 170 Per Sq Ft Office rentals (GF)/MONTH 250 Per Sq Ft Retail Rentals/MONTH 300 Per Sq Ft No. of paid car parking slots occupied 150 Parking charges per car per month 5000 Inflows Insurance Expenses 1 SQ.FT/ANNUM CAMCharges 25 Rs. Per sq ft per month Lease and asset management charges 1% of basic rent & parking charges SINKING FUND 24 RS/SQ.FT/YEAR Outflows
  30. 30. 31 Comparative Analysis Eros Corporate Tower is a successful commercial building in the area. It has reputed clients & is having a good amount of profit. It even has a decent value to itself. Paharpur Business Centre on the other hand, though being Green, is making a Y-o-Y loss. It still has a lot of area vacant but has managed to lease out to some reputed tenants. The reasons for Paharpur Business Centre not performing as good as Eros Corporate Tower are: o Higher Rent because of higher construction cost o Market not willing to pay for Green PBC has incurred high construction costs for its LEED Platinum Certification. Which is why it is demanding higher rent than ECT. Also, the people still think that Green Buildings are a gimmick & just a marketing strategy, making them unwilling to pay higher rent for the Green. However, due to the rise of Green buildings in India, people are becoming aware of the benefits they can derive from Green Building. Thus, over a few years’ time, PBC is ought to be able to lease out its vacant space & make higher profits. Eros Corporate Tower, on the other hand, can benefit by inculcating some green practices in the building. These can include glazed windows, solar panels, natural ventilation, efficient equipment, etc. These features will reduce the operating expenses of the building, thus, making it even more profitable.
  31. 31. 32 Conclusion The idea of energy efficient, healthy buildings has been around for a long time, now that the concept of “green” or “sustainable” building is entering the mainstream and catching the attention of fortune 500 companies like Wall Mart, Dupont, and Home Depot etc. There are probably several reasons; Global Warming, rising energy costs, the growing awareness and liability costs associated with “Sick Building Syndrome”, declining oil reserves, and concerns about our limited water supply. The list goes on, but whatever the reason or reasons; sustainable building is a concept whose time has come. Green building revolves around four key issues: 1. Designing for energy efficiency including the use of renewal energy sources such as wind, geothermal, and solar. 2. Creating a healthy indoor air environment with adequate ventilation and making material choices that minimize volatile organic compound (VOC’s) outgassing within the home. 3. Specifying building materials and resources that are sustainable, have low embodied energy, and produce a minimal amount of upstream environmental impact. 4. Providing for the efficient use of water via appliance, faucet, and shower head choices and in arid climates by xeriscaping and recycling grey water and capturing rain water for landscaping and other non-potable uses. All these above features can exactly be seen in AECOM building whereas Oberthur Company does not stand for any of these features. A green building costs less than a conventional building. Despite public perception to the contrary, today here is no statistically significant difference in construction cost between LEED and non LEED building. And the LEED building will have energy cost savings, on average, of more than 33% compared with the non LEED building.
  32. 32. 33 The green building market has matured such that we can today, state with certainty the hard data on performance proves that when first costs of green building are considered with direct energy savings, a green building costs less than a conventional building. Though the AECOM building cost much more than the Oberthur building if area is taken into consideration also the initial cost of building is very high but when the other benefits of the building are seen than the cost is really low and benefits are many of a green building.

×