SlideShare a Scribd company logo
1 of 9
QPlan

                        Fast and Flawless
                         Setup Creation




www.proventustech.com
SAVINGS
• Wasted time on NPI loop:
  – SMT Machine Time
  – SMT Programmer Time
  – First Article Inspection Time
• SMT Programmer and SMT Inspector
  become stressed.
SMT Process Difficulties In Flow

      Customers
                   NPI Loop




SMT Programmer    SMT Machine     FAI
                    Feedback



                                Soldering
Solution
• QPlan finds and helps to eliminate errors
  in SMT setup by quick tests.
• QPlan generates chart, report and
  dynamic view of PCB with test result.
• QPlan exports new SMT setup directly to
  SMT Server.
Focus on Tests
QPlan helps to correct:
• Angles – Detection and Correction by the
  difference “Zero” angles between machine
  settings and PCB editor settings
• X,Y position of component zero point -
  Detection and Correction component
  center deflection problems included
  component center in the first pin
Focus on Tests
QPlan examines:
• Overlapping space between components -
  Component over Component, shared PAD
  position and etc.
• Pin size vs. Pad size
• Pin on Pad symmetric positions
• Keep Out between Components
• Components/Pads on PCB margins
Functionality
• QPlan does footprint tests based on SMT
  machine component database as
  Database Part List and an extra
  information (like shape group, tolerance
  and etc.).
• QPlan gives an easy way to create an
  examination profiles (per Customers and
  etc.).
• QPlan operates as Wizard
Also includes …
• CAD file import with preview
• BOM file import with complete
  examination
• Merging CAD and BOM with a
  discrepancy report.
• Connection between CAD & BOM to
  component library and reports of missing
  components
• Tools to fix missing components
Why QPlan?
                                 • Time
• Quality                           – Wizard for importing Circuit
   – Accuracy                         Boards design file and BOM
   – Detailed validation rules      – Component Datasheet
   – Defined user standards           wizard
                                    – Online simulation
                                    – Creating Setup for SMT

                 • Simple
                     – Graphic display
                     – Friendly interface
                     – Based on component library

More Related Content

What's hot

20080215 jbpm Business Process Simulation with Jboss jBPM
20080215 jbpm Business Process Simulation with Jboss jBPM20080215 jbpm Business Process Simulation with Jboss jBPM
20080215 jbpm Business Process Simulation with Jboss jBPM
camunda services GmbH
 
smalltalk numbercrunching
smalltalk numbercrunchingsmalltalk numbercrunching
smalltalk numbercrunching
Daniel Poon
 
Certifyenhancements
CertifyenhancementsCertifyenhancements
Certifyenhancements
talktoabdul
 
QBM Dash Board
QBM Dash BoardQBM Dash Board
QBM Dash Board
iswaarlc
 

What's hot (14)

20080215 jbpm Business Process Simulation with Jboss jBPM
20080215 jbpm Business Process Simulation with Jboss jBPM20080215 jbpm Business Process Simulation with Jboss jBPM
20080215 jbpm Business Process Simulation with Jboss jBPM
 
smalltalk numbercrunching
smalltalk numbercrunchingsmalltalk numbercrunching
smalltalk numbercrunching
 
Feature cam 2018 whats new flyer
Feature cam 2018 whats new flyerFeature cam 2018 whats new flyer
Feature cam 2018 whats new flyer
 
NCM Training - Part 2 - Automation, Notification, Compliance and Reports
NCM Training - Part 2 - Automation, Notification, Compliance and ReportsNCM Training - Part 2 - Automation, Notification, Compliance and Reports
NCM Training - Part 2 - Automation, Notification, Compliance and Reports
 
Much Ado About CPU
Much Ado About CPUMuch Ado About CPU
Much Ado About CPU
 
Certifyenhancements
CertifyenhancementsCertifyenhancements
Certifyenhancements
 
Application performance analytics with Applications Manager
Application performance analytics with Applications ManagerApplication performance analytics with Applications Manager
Application performance analytics with Applications Manager
 
Top 5 performance and capacity challenges for z/OS
Top 5 performance and capacity challenges for z/OS Top 5 performance and capacity challenges for z/OS
Top 5 performance and capacity challenges for z/OS
 
jBPM Introduction - JudCon Brazil 2013
jBPM Introduction - JudCon Brazil 2013jBPM Introduction - JudCon Brazil 2013
jBPM Introduction - JudCon Brazil 2013
 
QBM Dash Board
QBM Dash BoardQBM Dash Board
QBM Dash Board
 
Daulat Basis Question
Daulat Basis QuestionDaulat Basis Question
Daulat Basis Question
 
Rate limits and performance Talk
Rate limits and performance TalkRate limits and performance Talk
Rate limits and performance Talk
 
Rate limits and Performance
Rate limits and PerformanceRate limits and Performance
Rate limits and Performance
 
JBoss Developer Webinar jBPM5
JBoss Developer Webinar jBPM5JBoss Developer Webinar jBPM5
JBoss Developer Webinar jBPM5
 

Viewers also liked

Formulario ventas
Formulario ventasFormulario ventas
Formulario ventas
angiedaiana
 
дорогой дружбы и добра
дорогой дружбы и добрадорогой дружбы и добра
дорогой дружбы и добра
killaruns
 
O net คณิตศาสตร์ 2552
O net คณิตศาสตร์ 2552O net คณิตศาสตร์ 2552
O net คณิตศาสตร์ 2552
Justice MengKing
 
собрание егэ 2014
собрание егэ 2014собрание егэ 2014
собрание егэ 2014
killaruns
 
Course 2 week 6 lesson 10
Course 2 week 6 lesson 10Course 2 week 6 lesson 10
Course 2 week 6 lesson 10
Joe Mellin
 

Viewers also liked (19)

Diseminare Curs Grundtvig, Malta 2012
Diseminare Curs Grundtvig, Malta 2012Diseminare Curs Grundtvig, Malta 2012
Diseminare Curs Grundtvig, Malta 2012
 
Tabla paciente
Tabla pacienteTabla paciente
Tabla paciente
 
Formulario ventas
Formulario ventasFormulario ventas
Formulario ventas
 
Ucsf 3 3 ppt
Ucsf 3 3 pptUcsf 3 3 ppt
Ucsf 3 3 ppt
 
Typebook fbf2
Typebook fbf2Typebook fbf2
Typebook fbf2
 
1 14 section1
1 14 section11 14 section1
1 14 section1
 
дорогой дружбы и добра
дорогой дружбы и добрадорогой дружбы и добра
дорогой дружбы и добра
 
Apresentação Bibliotecas Itinerantes/Bibliomóvel - Pecs - Hungria
Apresentação Bibliotecas Itinerantes/Bibliomóvel - Pecs - HungriaApresentação Bibliotecas Itinerantes/Bibliomóvel - Pecs - Hungria
Apresentação Bibliotecas Itinerantes/Bibliomóvel - Pecs - Hungria
 
O net คณิตศาสตร์ 2552
O net คณิตศาสตร์ 2552O net คณิตศาสตร์ 2552
O net คณิตศาสตร์ 2552
 
5S Iyanah Civilization
5S Iyanah Civilization 5S Iyanah Civilization
5S Iyanah Civilization
 
Requerdos iino lviidabless
Requerdos iino lviidablessRequerdos iino lviidabless
Requerdos iino lviidabless
 
2 english – a language of the world
2 english – a language of the world2 english – a language of the world
2 english – a language of the world
 
English speaking countries the united kingdom of great britain and northern i...
English speaking countries the united kingdom of great britain and northern i...English speaking countries the united kingdom of great britain and northern i...
English speaking countries the united kingdom of great britain and northern i...
 
собрание егэ 2014
собрание егэ 2014собрание егэ 2014
собрание егэ 2014
 
Course 2 week 6 lesson 10
Course 2 week 6 lesson 10Course 2 week 6 lesson 10
Course 2 week 6 lesson 10
 
Deportes edicion imagenes
Deportes edicion imagenesDeportes edicion imagenes
Deportes edicion imagenes
 
Ucsf 2 3
Ucsf 2 3Ucsf 2 3
Ucsf 2 3
 
140722 exetastea uli_gel_g
140722 exetastea uli_gel_g140722 exetastea uli_gel_g
140722 exetastea uli_gel_g
 
Конкурсный урок
Конкурсный урокКонкурсный урок
Конкурсный урок
 

Similar to Q-Plan

Meritronics_Company rev 07.02.14
Meritronics_Company rev 07.02.14Meritronics_Company rev 07.02.14
Meritronics_Company rev 07.02.14
Fides Sales
 
Siemens-PLM-Quality-Planning-Environment-br-X29
Siemens-PLM-Quality-Planning-Environment-br-X29Siemens-PLM-Quality-Planning-Environment-br-X29
Siemens-PLM-Quality-Planning-Environment-br-X29
Brady Walther
 
Verification for system companies (LI) - value proposition
Verification for system companies (LI) - value propositionVerification for system companies (LI) - value proposition
Verification for system companies (LI) - value proposition
Hagai Arbel
 

Similar to Q-Plan (20)

Capp
CappCapp
Capp
 
CAPP
CAPPCAPP
CAPP
 
Camunda BPM 7.2 - English
Camunda BPM 7.2 - EnglishCamunda BPM 7.2 - English
Camunda BPM 7.2 - English
 
Enterprise presentation
Enterprise presentationEnterprise presentation
Enterprise presentation
 
IBM POWER8 as an HPC platform
IBM POWER8 as an HPC platformIBM POWER8 as an HPC platform
IBM POWER8 as an HPC platform
 
Experts in Precision Laserage Contract Manufacturing
Experts in Precision Laserage Contract ManufacturingExperts in Precision Laserage Contract Manufacturing
Experts in Precision Laserage Contract Manufacturing
 
Meritronics_Company rev 07.02.14
Meritronics_Company rev 07.02.14Meritronics_Company rev 07.02.14
Meritronics_Company rev 07.02.14
 
3DEXPERIENCE_Machining
3DEXPERIENCE_Machining3DEXPERIENCE_Machining
3DEXPERIENCE_Machining
 
Cad cam-cae
Cad cam-caeCad cam-cae
Cad cam-cae
 
Automation test
Automation testAutomation test
Automation test
 
3Dexperience Machining
3Dexperience Machining3Dexperience Machining
3Dexperience Machining
 
Maximizing Database Tuning in SAP SQL Anywhere
Maximizing Database Tuning in SAP SQL AnywhereMaximizing Database Tuning in SAP SQL Anywhere
Maximizing Database Tuning in SAP SQL Anywhere
 
TEST 2.pptx
TEST 2.pptxTEST 2.pptx
TEST 2.pptx
 
TEST 2.pdf
TEST 2.pdfTEST 2.pdf
TEST 2.pdf
 
Autodesk CAM Portfolio – Russ Adams PartMaker
Autodesk CAM Portfolio – Russ Adams PartMakerAutodesk CAM Portfolio – Russ Adams PartMaker
Autodesk CAM Portfolio – Russ Adams PartMaker
 
Siemens-PLM-Quality-Planning-Environment-br-X29
Siemens-PLM-Quality-Planning-Environment-br-X29Siemens-PLM-Quality-Planning-Environment-br-X29
Siemens-PLM-Quality-Planning-Environment-br-X29
 
Semantic Validation: Enforcing Kafka Data Quality Through Schema-Driven Verif...
Semantic Validation: Enforcing Kafka Data Quality Through Schema-Driven Verif...Semantic Validation: Enforcing Kafka Data Quality Through Schema-Driven Verif...
Semantic Validation: Enforcing Kafka Data Quality Through Schema-Driven Verif...
 
Cim presentation (1)
Cim presentation (1)Cim presentation (1)
Cim presentation (1)
 
Verification for system companies (LI) - value proposition
Verification for system companies (LI) - value propositionVerification for system companies (LI) - value proposition
Verification for system companies (LI) - value proposition
 
Introduction to Agile Hardware
Introduction to Agile Hardware Introduction to Agile Hardware
Introduction to Agile Hardware
 

Q-Plan

  • 1. QPlan Fast and Flawless Setup Creation www.proventustech.com
  • 2. SAVINGS • Wasted time on NPI loop: – SMT Machine Time – SMT Programmer Time – First Article Inspection Time • SMT Programmer and SMT Inspector become stressed.
  • 3. SMT Process Difficulties In Flow Customers NPI Loop SMT Programmer SMT Machine FAI Feedback Soldering
  • 4. Solution • QPlan finds and helps to eliminate errors in SMT setup by quick tests. • QPlan generates chart, report and dynamic view of PCB with test result. • QPlan exports new SMT setup directly to SMT Server.
  • 5. Focus on Tests QPlan helps to correct: • Angles – Detection and Correction by the difference “Zero” angles between machine settings and PCB editor settings • X,Y position of component zero point - Detection and Correction component center deflection problems included component center in the first pin
  • 6. Focus on Tests QPlan examines: • Overlapping space between components - Component over Component, shared PAD position and etc. • Pin size vs. Pad size • Pin on Pad symmetric positions • Keep Out between Components • Components/Pads on PCB margins
  • 7. Functionality • QPlan does footprint tests based on SMT machine component database as Database Part List and an extra information (like shape group, tolerance and etc.). • QPlan gives an easy way to create an examination profiles (per Customers and etc.). • QPlan operates as Wizard
  • 8. Also includes … • CAD file import with preview • BOM file import with complete examination • Merging CAD and BOM with a discrepancy report. • Connection between CAD & BOM to component library and reports of missing components • Tools to fix missing components
  • 9. Why QPlan? • Time • Quality – Wizard for importing Circuit – Accuracy Boards design file and BOM – Detailed validation rules – Component Datasheet – Defined user standards wizard – Online simulation – Creating Setup for SMT • Simple – Graphic display – Friendly interface – Based on component library