SlideShare une entreprise Scribd logo
1  sur  31
ALKAISER LEADING
PROJECT
MEP SPECIALIST CONTRACTOR
INDEX
1. INTRODUCTION
2. MISSION & VISION
3. CORE VALUE
4. OUR SERVICES
5. COMPANY REGISTRATION DOCUMENTS
6. HR PLAN, ORGANIZATION CHART
7. WORK FORCE
8. ADDITIONAL INFORMATION
9. SITE PHOTOGRAPHS
10. QUALITY POLICY
1. INTRODUCTION
Introduction of our Company for Electro-Mechanical Works
Dear Sir,
Greetings from Alkaiser Leading Projects LLC !
We take this opportunity to introduce ourselves as MEP of Alkaiser Leading Projects LLC, as engaged in
Electrical, Mechanical and Instrumentation contracts for industrial and infrastructure projects in the Sultanate
of Oman.
Alkaiser Leading Projects was established in the year 2013 by amalgamating various divisions of its parent
company, Alkaiser Leading Projects which was founded in 2007 to provide professional support services to the
different Sector.
From the very beginning we are adopting a unique approach toward our clients, catering to their specific needs
and delivering upon their expectation. Behind the name of Alkaiser Leading Projects LLC stands an
experienced professional team that work together to deliver and maintain the highest standards of MEP
services.
We have highly qualified Engineers as well as skilled professionals in respective discipline capable of
executing project from conceptual stages through detailed engineering tocommissioning.
Alkaiser Leading Projects LLC strives to deliver the highest standards of MEP installation, carefully paying
attention to our client’s ideas collaborating in the development of the right scope of work. We develop a unique
approach towards each client and each project is a never-ending responsibility for us. Our commitment, as well
as the commitment of our partners and clients, has contributed to the impressive accomplishment of the
company. Alkaiser Leading Projects LLC undertake all kinds of Mechanical, Electrical and Plumbing works for
the following premises.
Villas/ Hotel Apartments/ Warehouses/ Factories/ Residential Buildings/ Commercial Buildings and Offices/
Labour Accommodation/ Shopping Malls & Centers/ 11 KV Substations/ Cable Laying and Maintenance etc.
We are keen to participate in your prestigious projects and request you to kindly send your valuable enquiries
in future to enable us to provide you with a competitive bid.
Should you desire any further information regarding our company’s activities, please feel free to contact the
undersigned.
Thank you and look forward to a long & enduring business relationship.
Yours faithfully,
for AlKaiser Leading Projects LLC
Nasser Musallam Jedad
Chairman
2.VISION &
MISSION
VISION
We strive to become one of
the leading and most reliable
MEP contracting company in
the Middle East, continuously
forming to our ever-growing
professional and ethical
demeanor as well as quality
assurance standard to earn
the privilege of being your
contractor of choice.
MISSION
Guided by our vision we shall
deliver high-quality, cost-
effective works on schedule
and enhance our Clint’s
satisfaction through
continuous improvement of
our business practices in
terms of safety, quality,
services, delivery as well as
environmental protection
3.CORE VALUE
Service We understand, determine and deliver
highest standards of services.
Trust We build trust authentically by delivering
quality.
Relationship We believe in maintaining long-term
relationship and fairness in all our dealing
Integrity We are committed to keeping our word and
honouring our commitment
Value We create value in our work through
innovative thinking and ideas
Excellence We passionately pursue the highest
standards and strive to always excel
4. OUR SERVICES
ELECTRICAL
 Power Distribution Systems
 Lighting Control
 Power Generation
 Fire Detection & Alarms
 Building Management
Systems
 Central Battery Systems
 Low Current Systems
 Telephone & Data Systems
 SMATV Systems
 CCTV, P.A. Sound Systems
 Audio / Video Intercom
Systems
 Industrial Process Services
PLUMBING & PUBLIC
HEALTH ENGINEERING
 Hot & Cold water supply
systems
 Water filtration Systems
 Irrigation Systems
 Drainage
 Sanitation
 Rain Water
 Sewage Treatment
 LPG Systems
HVAC INSTALLATION & DUCTING
SYSTEMS
 G.I & P.I Ducting Installation
System
 Chilled Water Piping Systems
 Package units, DX units and
Fan Coil Unit Installation
 Ventilation Systems
 Kitchen hood exhaust and fresh
air system
 Chemical Flushing & Third party
Testing Reports
 Air balancing Testing and
Certifications
FIREFIGHTING & FIRE ALARM
INSTALLATION SYSTEM
 Fire Fighting – Sprinkler
Installation & Modification
Systems
 Fire Alarm – Installation &
Modification System
 FACP Programming, Testing &
Commissioning
 Emergency & Exit Lighting
Systems
 Civil Defence Approvals & EHS
Certifications
 Fire Suppuration Systems
5.CORE FIELDS OF SPECIALIZATION
Alkaiser has been providing a variety of services under one roof
in the following fields, independently or in collaboration with
other specialised professional
Following are the major services provided by the company,
MEP WORKS
The company specialized in MEP supply and installation works,
preparation of design and drawings and execution of turn-key
projects in the field of MEP.
COORDINATION & COOPERATION WITH GOVT.AUTHORITIES
Our company works according to the regulation and standards
prescribed by the following government authorities:
 Distribution Code Review Panel
 Muscat Electricity Distribution Company
 Mazoon Electricity Distribution Company
 Majan Electricity Distribution Company
 Civil Defences
 PAEW
 Muscat Municipality
 Haya
 Ooredoo
 Omantel
 Ministry of Housing
We specialize in obtaining MEDC Passing & Approval of
Commercial, Industrial and Domestic for temporary and
permanent Electrical Power supply
6. COMPANY REGISTRATION DOCUMENTS
7. HR PLAN, ORGANIZATION CHART
HR PLAN AND ORGANIZATION CHART
This document describes the Alkaiser project human resources plan. A more detailed, project
specific plan will be established after a project is awarded. The following sections are applicable to
all HOSS projects carried out in Oman unless otherwise specified.
1. Training and Staff Development:
a. Alkaiser shall insure all personnel are adequately trained and hold the correct
certifications required for respective tasks
b. All electricians working under Alkaiser (either under permanent or temporary
employment) will have undergone the required training in dealing with electrical
systems and will have a sound understanding of electrical hazards and incident
aversion
c. All mechanical technicians and laborers working under Alkaiser will have
undergone the required training regarding installation of pipe’s, ducts, tanks
etc..
d. HSE and Quality induction will happen prior to the commencement of any
projects to insure staff are adequately equipped and informed prior to work
2. Recruitment:
a. Most recruitment for a specific project will begin soon after a project is
awarded. The recruitment plan will consist of the following:
i. Determination of man power requirements to complete a project on
time and budget
ii. Establishment of a project specific organizational structure that will
comply with the man power requirements, client needs and regulations
iii. Identification of project requirements and list the required
tasks and responsibilities
iv. Distribution of tasks throughout the organizational structure and insure
adequate redundancy of each responsibility is achieved
v. Establishment of criteria and required qualifications for each vacant
position
vi. Recruitment process
b. Alkaiser will insure all personal meet or exceed the minimum technical
requirements as per the client needs and government regulations
1. Omanisation
a. Alkaiser will establish and maintain an omanisation plan so as to meet and
exceed the 30% quota and insure the HR system falls in line with government
regulations
2. Staff Redundancy
a. In the event that any staff member resigns or is terminated (with a 1 monthnotice),
Alkaiser will insure that this has a minimal impact on any ongoing projects
b. The employee that will be leaving the company will be required to handover all
project information to his/her replacement or superior
c. The Alkaiser general HR strategy insures redundancy is achieved so as to minimize
key man risk
9.ORGANIZATION CHART
CEO
( NASSER MUSALLAM JEDAD)
MEP HEAD
( SHAFFEK IBRAHIM )
BUSINESS DEVELOPMENT
MANAGER
( PRAVEEN)
MECHANICAL
DIVISION
ELECTRICAL
DIVISION
ADMINISTRATION
TRADING DIVISION GM
(ABDULLAH TANIRA)
SALES MANAGER
( SHEMEER IBRAHIM)
SALES EXECUTIVES
BUSINESS DEVELOPMENT
FINANCE
Sr.TECHNICAL ADVISOR
( Engr. IBRAHIM MOHAMMED )
8. SHARING THE EXPERIENCE
9. QUALITY ASSURANCE
QUALITY POLICY
We aim to attain business excellence in infrastructure
work by meeting and exceeding our customer’s
expectation in terms of quality, timely completion and
safety with absolute compliance to relevant regulatory
and obligatory requirements.
Adherence to the quality management system.
QUALITY OBJECTIVES
 Ensure continued satisfaction of our customers
review and enhancement of our system
effectiveness. Ensure that our service is cost
effective, reliable, timely and of the highest
quality.
 Enhance the skill and competence of our employees
in order to able to effectively respond to the ever-
changing requirements of the industry and our
clients.
10.HEALTH, SAFETY &ENVIRONMENTAL MANUAL
PERSONAL PROTECTIVE EQUIPMENT (PPE)
1) INTRODUCTION
The PPE Regulations require us to identify risks to the health and safety of all persons
likely to be affected by our undertakings.
Where unacceptable risks cannot be eliminated or controlled in any other way we
must:-
a. Provide our directly employed staff and operatives with appropriate PPE
b. Inform our sub-contractors, self-employed and regular visitors to our sites
(indirectly employed) of the identified risks and ensure they provide the
appropriate PPE to their own personnel.
2) PROVISION OF EQUIPMENT
Only in the most exceptional and emergency circumstances will any person in
category (b) above be issued with any PPE by us. On such an occasion, it is imperative
they are fully aware through the sub-contract order and at the time of issue that a
contra charge will be made. Occasionally, visitors will be provided with PPE should
there be a likelihood of them being exposed to a risk, but this must be returned
before they leave the site.
3) SCOPE OF PPE
Personal protective equipment applies to all areas of the body and includes such
items as footwear, wet weather gear, helmets, goggles, glasses, ear defenders,
gloves, etc
1) ISSUE OF PPE
PPE is issued as part of the risk assessment process and must be appropriate to guard
against the identified risk – it must always be considered as the last line of defence
when all other steps have been considered to remove or reduce the risk.
Hence, provision of PPE for our directly employed staff and operatives must be on
the basis of the risk assessment carried out on each project.
2) ORDERS AND RECORDS
An ordering and recording system is required to be established and maintained that
identifies :-
a. the name of each of our direct employed staff and operatives issued with PPE
and the date and location of issue,
b. any replacement made (including date) and the reason for replacing the PPE,
eg. : lost, worn-out, etc.
c. an acknowledgement, signed by the wearer, or proof of issue.
3) TRAINING
The law requires that persons issued with PPE should receive training in its correct
use.
It is equally important to ensure that all users are made aware of the reasons for its
issue and for selecting the particular type of PPE. This is in order that they fully
appreciate the appropriateness of the PPE and do not substitute if for an inferior
type that does not protect against the risk.
CONTACT US
Office Phone: 93950887
Email: shafeek@alkaiser.com
P.O.Box 1174, P.C 113
Alkhuwair, Sultanate of Oman
CEO
NASSER MUSALLAM JEDAD
Mobile +968 92402411
Email: nasser@alkaiser.com
Alkaiser Management

Contenu connexe

Tendances

Natural Energy Field Services
Natural Energy Field ServicesNatural Energy Field Services
Natural Energy Field ServicesDaniel Neihoff
 
Praveen sadula cv 9th may 2015
Praveen sadula cv  9th may 2015Praveen sadula cv  9th may 2015
Praveen sadula cv 9th may 2015Praveen Sadula
 
Al-Tafaweq Co. LTD Aug-23-2015 red
Al-Tafaweq Co. LTD Aug-23-2015 redAl-Tafaweq Co. LTD Aug-23-2015 red
Al-Tafaweq Co. LTD Aug-23-2015 redAli Al-Rawi
 
Lakmals's CV 2015 Second Copy
Lakmals's CV 2015 Second CopyLakmals's CV 2015 Second Copy
Lakmals's CV 2015 Second Copydamith lakmal
 
Shawver Brochure 2013 (small)
Shawver Brochure 2013 (small)Shawver Brochure 2013 (small)
Shawver Brochure 2013 (small)Kyle Williamson
 
L-Con Inc Powerpoint EMAIL 12-3-2014
L-Con Inc Powerpoint EMAIL  12-3-2014L-Con Inc Powerpoint EMAIL  12-3-2014
L-Con Inc Powerpoint EMAIL 12-3-2014Rick Garcia
 
B2 Construction Concept Profile
B2 Construction Concept ProfileB2 Construction Concept Profile
B2 Construction Concept ProfileIamRecktor Chukwu
 
Hassan hunzai electrical engineer
Hassan hunzai electrical engineerHassan hunzai electrical engineer
Hassan hunzai electrical engineerHassan Hunzai
 
Profile of Qualixa Turnkey Projects Pvt. Ltd.(1)
Profile of Qualixa Turnkey Projects Pvt. Ltd.(1)Profile of Qualixa Turnkey Projects Pvt. Ltd.(1)
Profile of Qualixa Turnkey Projects Pvt. Ltd.(1)Shailesh Salvi
 
Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer Rana Muhammad Zahid
 
Company Brochure-Prayaga
Company Brochure-PrayagaCompany Brochure-Prayaga
Company Brochure-PrayagaV. B Mukundan
 

Tendances (19)

Shahzad Ahmed CV
Shahzad Ahmed CVShahzad Ahmed CV
Shahzad Ahmed CV
 
Natural Energy Field Services
Natural Energy Field ServicesNatural Energy Field Services
Natural Energy Field Services
 
Praveen sadula cv 9th may 2015
Praveen sadula cv  9th may 2015Praveen sadula cv  9th may 2015
Praveen sadula cv 9th may 2015
 
Al-Tafaweq Co. LTD Aug-23-2015 red
Al-Tafaweq Co. LTD Aug-23-2015 redAl-Tafaweq Co. LTD Aug-23-2015 red
Al-Tafaweq Co. LTD Aug-23-2015 red
 
PBG Brochure
PBG BrochurePBG Brochure
PBG Brochure
 
G3E Brochure
G3E BrochureG3E Brochure
G3E Brochure
 
Richardson Company Profile
Richardson Company ProfileRichardson Company Profile
Richardson Company Profile
 
Vinay - HSE Manager
Vinay - HSE ManagerVinay - HSE Manager
Vinay - HSE Manager
 
Lakmals's CV 2015 Second Copy
Lakmals's CV 2015 Second CopyLakmals's CV 2015 Second Copy
Lakmals's CV 2015 Second Copy
 
Shawver Brochure 2013 (small)
Shawver Brochure 2013 (small)Shawver Brochure 2013 (small)
Shawver Brochure 2013 (small)
 
L-Con Inc Powerpoint EMAIL 12-3-2014
L-Con Inc Powerpoint EMAIL  12-3-2014L-Con Inc Powerpoint EMAIL  12-3-2014
L-Con Inc Powerpoint EMAIL 12-3-2014
 
B2 Construction Concept Profile
B2 Construction Concept ProfileB2 Construction Concept Profile
B2 Construction Concept Profile
 
COMPANY INTRODUCTION
COMPANY INTRODUCTIONCOMPANY INTRODUCTION
COMPANY INTRODUCTION
 
Hassan hunzai electrical engineer
Hassan hunzai electrical engineerHassan hunzai electrical engineer
Hassan hunzai electrical engineer
 
Profile of Qualixa Turnkey Projects Pvt. Ltd.(1)
Profile of Qualixa Turnkey Projects Pvt. Ltd.(1)Profile of Qualixa Turnkey Projects Pvt. Ltd.(1)
Profile of Qualixa Turnkey Projects Pvt. Ltd.(1)
 
Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer
 
Company Brochure-Prayaga
Company Brochure-PrayagaCompany Brochure-Prayaga
Company Brochure-Prayaga
 
Saj-CV
Saj-CVSaj-CV
Saj-CV
 
TakanahProfie2016
TakanahProfie2016TakanahProfie2016
TakanahProfie2016
 

Similaire à Alkaiser Leading Projects.

Max electromechanical
Max electromechanical Max electromechanical
Max electromechanical Maxemc
 
compony profile 2015
compony profile 2015compony profile 2015
compony profile 2015nikhil jain
 
KONARC PROFILE 2023.pdf
KONARC PROFILE 2023.pdfKONARC PROFILE 2023.pdf
KONARC PROFILE 2023.pdfSehrishSaif
 
Digital Connection Co.Ltd.
Digital Connection Co.Ltd.Digital Connection Co.Ltd.
Digital Connection Co.Ltd.Mohammed wahab
 
MEC Engineers Company Profiles f
MEC Engineers Company Profiles fMEC Engineers Company Profiles f
MEC Engineers Company Profiles fRAVICHANDER
 
Teknika Electrical & Instrumentation services.pdf
Teknika Electrical & Instrumentation services.pdfTeknika Electrical & Instrumentation services.pdf
Teknika Electrical & Instrumentation services.pdfMuhammad Tahir
 
Profile final 234567890@
Profile  final 234567890@Profile  final 234567890@
Profile final 234567890@SK ATABUL ISLAM
 
Company Profile_2022_Proof (1).pdf
Company Profile_2022_Proof (1).pdfCompany Profile_2022_Proof (1).pdf
Company Profile_2022_Proof (1).pdfARULSANKARAN1
 
SELGO COMPANY PROFILE 2015
SELGO COMPANY PROFILE 2015SELGO COMPANY PROFILE 2015
SELGO COMPANY PROFILE 2015Eddie Ngari
 
Dss Brochure Ver 2 9
Dss Brochure Ver 2 9Dss Brochure Ver 2 9
Dss Brochure Ver 2 9tanu_12
 
Company profile-Electrical Contractors
Company profile-Electrical ContractorsCompany profile-Electrical Contractors
Company profile-Electrical ContractorsAnkush Arora
 
SKC ENGINEERING_Company Profile (Sep-2020).pptx
SKC ENGINEERING_Company Profile    (Sep-2020).pptxSKC ENGINEERING_Company Profile    (Sep-2020).pptx
SKC ENGINEERING_Company Profile (Sep-2020).pptxJyotiYadav916744
 
apbava new
apbava newapbava new
apbava newVC SHAFI
 
Corporate Company Presentation Blue Version
Corporate Company Presentation Blue VersionCorporate Company Presentation Blue Version
Corporate Company Presentation Blue VersionGhulam Mujtaba
 

Similaire à Alkaiser Leading Projects. (20)

Max electromechanical
Max electromechanical Max electromechanical
Max electromechanical
 
compony profile 2015
compony profile 2015compony profile 2015
compony profile 2015
 
JCC Company Profile
JCC Company ProfileJCC Company Profile
JCC Company Profile
 
ALAQ ALEZDEHAR1
ALAQ ALEZDEHAR1ALAQ ALEZDEHAR1
ALAQ ALEZDEHAR1
 
4M Engineering Group Pty Ltd
4M Engineering Group Pty Ltd4M Engineering Group Pty Ltd
4M Engineering Group Pty Ltd
 
KONARC PROFILE 2023.pdf
KONARC PROFILE 2023.pdfKONARC PROFILE 2023.pdf
KONARC PROFILE 2023.pdf
 
Digital Connection Co.Ltd.
Digital Connection Co.Ltd.Digital Connection Co.Ltd.
Digital Connection Co.Ltd.
 
MEC Engineers Company Profiles f
MEC Engineers Company Profiles fMEC Engineers Company Profiles f
MEC Engineers Company Profiles f
 
Teknika Electrical & Instrumentation services.pdf
Teknika Electrical & Instrumentation services.pdfTeknika Electrical & Instrumentation services.pdf
Teknika Electrical & Instrumentation services.pdf
 
LEM-PQD-10.ppsx
LEM-PQD-10.ppsxLEM-PQD-10.ppsx
LEM-PQD-10.ppsx
 
Profile final 234567890@
Profile  final 234567890@Profile  final 234567890@
Profile final 234567890@
 
Company Profile_2022_Proof (1).pdf
Company Profile_2022_Proof (1).pdfCompany Profile_2022_Proof (1).pdf
Company Profile_2022_Proof (1).pdf
 
SELGO COMPANY PROFILE 2015
SELGO COMPANY PROFILE 2015SELGO COMPANY PROFILE 2015
SELGO COMPANY PROFILE 2015
 
Dss Brochure Ver 2 9
Dss Brochure Ver 2 9Dss Brochure Ver 2 9
Dss Brochure Ver 2 9
 
Company profile-Electrical Contractors
Company profile-Electrical ContractorsCompany profile-Electrical Contractors
Company profile-Electrical Contractors
 
SKC ENGINEERING_Company Profile (Sep-2020).pptx
SKC ENGINEERING_Company Profile    (Sep-2020).pptxSKC ENGINEERING_Company Profile    (Sep-2020).pptx
SKC ENGINEERING_Company Profile (Sep-2020).pptx
 
Green line profile
Green line profile Green line profile
Green line profile
 
ESS Group Brochure
ESS Group BrochureESS Group Brochure
ESS Group Brochure
 
apbava new
apbava newapbava new
apbava new
 
Corporate Company Presentation Blue Version
Corporate Company Presentation Blue VersionCorporate Company Presentation Blue Version
Corporate Company Presentation Blue Version
 

Dernier

The Satellite applications in telecommunication
The Satellite applications in telecommunicationThe Satellite applications in telecommunication
The Satellite applications in telecommunicationnovrain7111
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...Amil baba
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
10 AsymmetricKey Cryptography students.pptx
10 AsymmetricKey Cryptography students.pptx10 AsymmetricKey Cryptography students.pptx
10 AsymmetricKey Cryptography students.pptxAdityaGoogle
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier Fernández Muñoz
 
input buffering in lexical analysis in CD
input buffering in lexical analysis in CDinput buffering in lexical analysis in CD
input buffering in lexical analysis in CDHeadOfDepartmentComp1
 
Introduction of Object Oriented Programming Language using Java. .pptx
Introduction of Object Oriented Programming Language using Java. .pptxIntroduction of Object Oriented Programming Language using Java. .pptx
Introduction of Object Oriented Programming Language using Java. .pptxPoonam60376
 
Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...
Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...
Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...Ayisha586983
 
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...KrishnaveniKrishnara1
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxRomil Mishra
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organizationchnrketan
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
Substation Automation SCADA and Gateway Solutions by BRH
Substation Automation SCADA and Gateway Solutions by BRHSubstation Automation SCADA and Gateway Solutions by BRH
Substation Automation SCADA and Gateway Solutions by BRHbirinder2
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxStephen Sitton
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...gerogepatton
 
AntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptxAntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptxLina Kadam
 

Dernier (20)

The Satellite applications in telecommunication
The Satellite applications in telecommunicationThe Satellite applications in telecommunication
The Satellite applications in telecommunication
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
10 AsymmetricKey Cryptography students.pptx
10 AsymmetricKey Cryptography students.pptx10 AsymmetricKey Cryptography students.pptx
10 AsymmetricKey Cryptography students.pptx
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptx
 
input buffering in lexical analysis in CD
input buffering in lexical analysis in CDinput buffering in lexical analysis in CD
input buffering in lexical analysis in CD
 
Introduction of Object Oriented Programming Language using Java. .pptx
Introduction of Object Oriented Programming Language using Java. .pptxIntroduction of Object Oriented Programming Language using Java. .pptx
Introduction of Object Oriented Programming Language using Java. .pptx
 
Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...
Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...
Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...
 
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organization
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
Substation Automation SCADA and Gateway Solutions by BRH
Substation Automation SCADA and Gateway Solutions by BRHSubstation Automation SCADA and Gateway Solutions by BRH
Substation Automation SCADA and Gateway Solutions by BRH
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptx
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
 
AntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptxAntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptx
 

Alkaiser Leading Projects.

  • 2. INDEX 1. INTRODUCTION 2. MISSION & VISION 3. CORE VALUE 4. OUR SERVICES 5. COMPANY REGISTRATION DOCUMENTS 6. HR PLAN, ORGANIZATION CHART 7. WORK FORCE 8. ADDITIONAL INFORMATION 9. SITE PHOTOGRAPHS 10. QUALITY POLICY
  • 4. Introduction of our Company for Electro-Mechanical Works Dear Sir, Greetings from Alkaiser Leading Projects LLC ! We take this opportunity to introduce ourselves as MEP of Alkaiser Leading Projects LLC, as engaged in Electrical, Mechanical and Instrumentation contracts for industrial and infrastructure projects in the Sultanate of Oman. Alkaiser Leading Projects was established in the year 2013 by amalgamating various divisions of its parent company, Alkaiser Leading Projects which was founded in 2007 to provide professional support services to the different Sector. From the very beginning we are adopting a unique approach toward our clients, catering to their specific needs and delivering upon their expectation. Behind the name of Alkaiser Leading Projects LLC stands an experienced professional team that work together to deliver and maintain the highest standards of MEP services. We have highly qualified Engineers as well as skilled professionals in respective discipline capable of executing project from conceptual stages through detailed engineering tocommissioning. Alkaiser Leading Projects LLC strives to deliver the highest standards of MEP installation, carefully paying attention to our client’s ideas collaborating in the development of the right scope of work. We develop a unique approach towards each client and each project is a never-ending responsibility for us. Our commitment, as well as the commitment of our partners and clients, has contributed to the impressive accomplishment of the company. Alkaiser Leading Projects LLC undertake all kinds of Mechanical, Electrical and Plumbing works for the following premises. Villas/ Hotel Apartments/ Warehouses/ Factories/ Residential Buildings/ Commercial Buildings and Offices/ Labour Accommodation/ Shopping Malls & Centers/ 11 KV Substations/ Cable Laying and Maintenance etc. We are keen to participate in your prestigious projects and request you to kindly send your valuable enquiries in future to enable us to provide you with a competitive bid. Should you desire any further information regarding our company’s activities, please feel free to contact the undersigned. Thank you and look forward to a long & enduring business relationship. Yours faithfully, for AlKaiser Leading Projects LLC Nasser Musallam Jedad Chairman
  • 6. VISION We strive to become one of the leading and most reliable MEP contracting company in the Middle East, continuously forming to our ever-growing professional and ethical demeanor as well as quality assurance standard to earn the privilege of being your contractor of choice. MISSION Guided by our vision we shall deliver high-quality, cost- effective works on schedule and enhance our Clint’s satisfaction through continuous improvement of our business practices in terms of safety, quality, services, delivery as well as environmental protection
  • 8. Service We understand, determine and deliver highest standards of services. Trust We build trust authentically by delivering quality. Relationship We believe in maintaining long-term relationship and fairness in all our dealing Integrity We are committed to keeping our word and honouring our commitment Value We create value in our work through innovative thinking and ideas Excellence We passionately pursue the highest standards and strive to always excel
  • 10. ELECTRICAL  Power Distribution Systems  Lighting Control  Power Generation  Fire Detection & Alarms  Building Management Systems  Central Battery Systems  Low Current Systems  Telephone & Data Systems  SMATV Systems  CCTV, P.A. Sound Systems  Audio / Video Intercom Systems  Industrial Process Services PLUMBING & PUBLIC HEALTH ENGINEERING  Hot & Cold water supply systems  Water filtration Systems  Irrigation Systems  Drainage  Sanitation  Rain Water  Sewage Treatment  LPG Systems
  • 11. HVAC INSTALLATION & DUCTING SYSTEMS  G.I & P.I Ducting Installation System  Chilled Water Piping Systems  Package units, DX units and Fan Coil Unit Installation  Ventilation Systems  Kitchen hood exhaust and fresh air system  Chemical Flushing & Third party Testing Reports  Air balancing Testing and Certifications FIREFIGHTING & FIRE ALARM INSTALLATION SYSTEM  Fire Fighting – Sprinkler Installation & Modification Systems  Fire Alarm – Installation & Modification System  FACP Programming, Testing & Commissioning  Emergency & Exit Lighting Systems  Civil Defence Approvals & EHS Certifications  Fire Suppuration Systems
  • 12. 5.CORE FIELDS OF SPECIALIZATION
  • 13. Alkaiser has been providing a variety of services under one roof in the following fields, independently or in collaboration with other specialised professional Following are the major services provided by the company, MEP WORKS The company specialized in MEP supply and installation works, preparation of design and drawings and execution of turn-key projects in the field of MEP. COORDINATION & COOPERATION WITH GOVT.AUTHORITIES Our company works according to the regulation and standards prescribed by the following government authorities:  Distribution Code Review Panel  Muscat Electricity Distribution Company  Mazoon Electricity Distribution Company  Majan Electricity Distribution Company  Civil Defences  PAEW  Muscat Municipality  Haya  Ooredoo  Omantel  Ministry of Housing We specialize in obtaining MEDC Passing & Approval of Commercial, Industrial and Domestic for temporary and permanent Electrical Power supply
  • 15. 7. HR PLAN, ORGANIZATION CHART
  • 16. HR PLAN AND ORGANIZATION CHART This document describes the Alkaiser project human resources plan. A more detailed, project specific plan will be established after a project is awarded. The following sections are applicable to all HOSS projects carried out in Oman unless otherwise specified. 1. Training and Staff Development: a. Alkaiser shall insure all personnel are adequately trained and hold the correct certifications required for respective tasks b. All electricians working under Alkaiser (either under permanent or temporary employment) will have undergone the required training in dealing with electrical systems and will have a sound understanding of electrical hazards and incident aversion c. All mechanical technicians and laborers working under Alkaiser will have undergone the required training regarding installation of pipe’s, ducts, tanks etc.. d. HSE and Quality induction will happen prior to the commencement of any projects to insure staff are adequately equipped and informed prior to work 2. Recruitment: a. Most recruitment for a specific project will begin soon after a project is awarded. The recruitment plan will consist of the following: i. Determination of man power requirements to complete a project on time and budget ii. Establishment of a project specific organizational structure that will comply with the man power requirements, client needs and regulations iii. Identification of project requirements and list the required tasks and responsibilities iv. Distribution of tasks throughout the organizational structure and insure adequate redundancy of each responsibility is achieved v. Establishment of criteria and required qualifications for each vacant position vi. Recruitment process b. Alkaiser will insure all personal meet or exceed the minimum technical requirements as per the client needs and government regulations
  • 17. 1. Omanisation a. Alkaiser will establish and maintain an omanisation plan so as to meet and exceed the 30% quota and insure the HR system falls in line with government regulations 2. Staff Redundancy a. In the event that any staff member resigns or is terminated (with a 1 monthnotice), Alkaiser will insure that this has a minimal impact on any ongoing projects b. The employee that will be leaving the company will be required to handover all project information to his/her replacement or superior c. The Alkaiser general HR strategy insures redundancy is achieved so as to minimize key man risk
  • 19. CEO ( NASSER MUSALLAM JEDAD) MEP HEAD ( SHAFFEK IBRAHIM ) BUSINESS DEVELOPMENT MANAGER ( PRAVEEN) MECHANICAL DIVISION ELECTRICAL DIVISION ADMINISTRATION TRADING DIVISION GM (ABDULLAH TANIRA) SALES MANAGER ( SHEMEER IBRAHIM) SALES EXECUTIVES BUSINESS DEVELOPMENT FINANCE Sr.TECHNICAL ADVISOR ( Engr. IBRAHIM MOHAMMED )
  • 20. 8. SHARING THE EXPERIENCE
  • 21.
  • 22.
  • 23.
  • 24.
  • 26. QUALITY POLICY We aim to attain business excellence in infrastructure work by meeting and exceeding our customer’s expectation in terms of quality, timely completion and safety with absolute compliance to relevant regulatory and obligatory requirements. Adherence to the quality management system. QUALITY OBJECTIVES  Ensure continued satisfaction of our customers review and enhancement of our system effectiveness. Ensure that our service is cost effective, reliable, timely and of the highest quality.  Enhance the skill and competence of our employees in order to able to effectively respond to the ever- changing requirements of the industry and our clients.
  • 28. PERSONAL PROTECTIVE EQUIPMENT (PPE) 1) INTRODUCTION The PPE Regulations require us to identify risks to the health and safety of all persons likely to be affected by our undertakings. Where unacceptable risks cannot be eliminated or controlled in any other way we must:- a. Provide our directly employed staff and operatives with appropriate PPE b. Inform our sub-contractors, self-employed and regular visitors to our sites (indirectly employed) of the identified risks and ensure they provide the appropriate PPE to their own personnel. 2) PROVISION OF EQUIPMENT Only in the most exceptional and emergency circumstances will any person in category (b) above be issued with any PPE by us. On such an occasion, it is imperative they are fully aware through the sub-contract order and at the time of issue that a contra charge will be made. Occasionally, visitors will be provided with PPE should there be a likelihood of them being exposed to a risk, but this must be returned before they leave the site. 3) SCOPE OF PPE Personal protective equipment applies to all areas of the body and includes such items as footwear, wet weather gear, helmets, goggles, glasses, ear defenders, gloves, etc
  • 29. 1) ISSUE OF PPE PPE is issued as part of the risk assessment process and must be appropriate to guard against the identified risk – it must always be considered as the last line of defence when all other steps have been considered to remove or reduce the risk. Hence, provision of PPE for our directly employed staff and operatives must be on the basis of the risk assessment carried out on each project. 2) ORDERS AND RECORDS An ordering and recording system is required to be established and maintained that identifies :- a. the name of each of our direct employed staff and operatives issued with PPE and the date and location of issue, b. any replacement made (including date) and the reason for replacing the PPE, eg. : lost, worn-out, etc. c. an acknowledgement, signed by the wearer, or proof of issue. 3) TRAINING The law requires that persons issued with PPE should receive training in its correct use. It is equally important to ensure that all users are made aware of the reasons for its issue and for selecting the particular type of PPE. This is in order that they fully appreciate the appropriateness of the PPE and do not substitute if for an inferior type that does not protect against the risk.
  • 30. CONTACT US Office Phone: 93950887 Email: shafeek@alkaiser.com P.O.Box 1174, P.C 113 Alkhuwair, Sultanate of Oman CEO NASSER MUSALLAM JEDAD Mobile +968 92402411 Email: nasser@alkaiser.com