9. Facing south at the north end of the first floor with what will be the mechanical room in the foreground. The black stubs lead to geothermal heat-pump wells 300 feet beneath the floor.
10. Facing northeast out onto the plaza structure from the part of the first floor beneath the main building. This will be Amtrak’s future ticketing and baggage area.
19. The covered plaza deck is being marked for concrete pouring. The hole in the middle is a vent and in the foreground are the iron canopy supports for the north face of the station.