Tariff Based Competitive Bidding (TBCB) for Intra-State
Transmission Works
Compiled by Amitava Nag,
Regulatory Affairs Cell, WBSETCL
Summery
As per Para 5.3 of Tariff Policy 2016, intra-state transmission projects shall be developed by State Government
through competitive bidding process for projects costing above a threshold limit which shall be decided by the
SERCs. State has been given option either to use VGF based MTA document of Planning Commission or the
Standard Bidding Document of Ministry of Power for procurement of intra-state transmission services. For the
VGF based bidding, the unitary charges will require to be approved by SERC prior to bidding. The above said
guidelines are for procurement of transmission services to select transmission service provider for a new
transmission line. A transmission charges for providing transmission service and O&M required for the various
transmission elements shall formthe basis for bidding. Under the MTA, it has been decided that the prospective
bidders would be awarded projects on the basis of lowest grant sought or highest premiumoffered.
Guiding Principle
1. As per Para 5.3 of Tariff Policy 2016, intra-state transmission projects shall be developed by State
Government through competitive bidding process for projects costing above a threshold limit which shall
be decided by the SERCs.
2. STU/ Joint Venture Companies of STU are also eligible to participate in the Tariff based bidding.
3. Ministry of Power has evolved a Standard Bidding Document which has been used by some intra-state
transmission projects. At the same time, a VGF (Viability Gap Funding) model has been evolved for intra-
state transmission projects for which a MTA (Model Transmission Agreement) was developed by the
Planning Commission. State has been given option either to use VGF based MTA document or the
Standard Bidding Document for procurement of intra-state transmission services. For the VGF based
bidding, the unitary charges will require to be approved by SERC prior to bidding. The experience of VGF
based MTA is to be reviewed after three years.
4. The above said guidelines are for procurement of transmission services to select transmission service
provider for a new transmission line.
5. State Government shall constitute an Empowered Committee. The functions of the Empowered Committee
will be (a) To identify projects (b) To facilitate evaluation of bids and (c) To facilitate development of
projects.
6. Procurement of transmission services would include all activities related to survey, DPR (Detailed Project
Report)/PP (Project Profile) formulation, arranging finance, project management, obtaining transmission
license, obtaining RoW, necessary clearances, site identification, land compensation, design, engineering,
equipment, material, construction, erection, testing and commissioning, maintenance and operation of
transmission lines and/or substations and/or switching stations and/or HVDC links including terminal
stations and HVDC transmission line so that the facilities are available as per target availability fixed by
SERC.
7. State Government may notify any Organization/ State Public Sector Undertaking especially engaged for
this purpose or BPC notified by the Central Government to be the BPC (Bid Process Coordinator) for State.
8. BPC would be responsible for coordinating the bid process for procurement of required transmission
services for each intra-state transmission project to be implemented under tariff-based competitive bidding
in accordance with the guidelines.
9. The BPC shall prepare the bid documentation in accordance with those guidelines and obtain approval of
the SERC if any material deviation is proposed to be made from Standard Bid Documents. BPC shall
specify scheduled month of commercial operation and invite bids for the transmission charge.
10. The bidder shall submit Technical & Price bid (annual tariff payable after commissioning till expiry of
license period). CERC has advised GoI to ask bidders to quote bid for a period of 35 years. The selected
bidder should be obligated for extension of his license two years before the expiry of initial 25 years.
11. Tariff shall be designated in Indian Rupees only.
12. Tariff structure will have two components- one scalable and other non-scalable. Scalable component shall
not be more than 15% of the non-scalable component.
13. The successful bidder shall be designated as the TSP (Transmission Service Provider) after executing TSA
and acquiring Special Purpose Vehicle {SPV (Ref. Electricity Rules 2005)}.
14. TSP shall seek transmission license from SERC if it is not a deemed licensee.
15. TSP shall take-up execution, commissioning and operation of the project as per specified schedule in the
TSA.
16. Recovery of transmission charges from the users shall be as per the guidelines.
17. The final TSA along with the certification by the Bid Evaluation Committee shall be forwarded to SERC for
adaptation of Tariffs in terms of Section 63 of the Act.
Bidding Process
1. BPC shall intimate SERC about initiation of the bidding process.
2. The bidding shall necessarily be by way of ICB (International Competitive Bidding).
3. BPC shall publish the RFQ (Request for Qualification) which is the first stage of tender.
4. RFQ shall contain (i) Brief description of the project (ii) Commissioning milestones to be achieved by the
bidders (iii) Qualification requirements to be met by bidders including technical experience, minimum net-
worth, internal resource generation, conditions for license, etc with necessary proof of the same.
5. RFP (Request for Proposal) the 2nd stage of tender shall be issued to all bidders who have qualified at the
RFQ stage. In case the bidders seek any deviations and BPC finds those deviations are reasonable, the BPC
may agree to such deviations and with the approval of SERC BPC shall give the revised bidding document
to all who had sought RFP document.
6. RFP shall contain (i) Specified target dates for commissioning and commercial operations (ii) Proposed
TSA (iii) Discount factor (iv) Bid bond as well as Contract Performance Guarantee (v) Proposed
indemnification agreement between the TSP and the utilities (vi) Liquidated damages that would apply in
the event of providing the transmission services (vii) Technical, operational and safety criteria to be met by
bidder including the provisions under different rules/regulations under Act.
7. BPC may at its option adopt a single stage two envelope tender process combining the RFP and RFQ
processes instead of two-stage process.
8. A transmission charges for providing transmission service and O&M required for the various transmission
elements shall form the basis for bidding.
9. Under the MTA, it has been decided that the prospective bidders would be awarded projects on the basis of
lowest grant sought or highest premium offered. In these projects, the state electricity regulators will fix
base unitary charges that will determine the revenue stream for the project.
Evaluation of Bids
1. The State government shall constitute a Bid Evaluation Committee for evaluation of the bids.
2. The technical bids shall be examined to ensure that the bids submitted meet minimum eligibility criteria
set out in the bid documents on all technical evaluation parameters. Only the bids that meet all elements
of the minimum technical criteria set out in the bid documents shall be considered for further evaluation
on the transmission charges bids.
3. Transmission charge bid shall be rejected if it contains any deviation from the bid documents for
submission of the same.
4. Ratio of minimum and maximum transmission charge over the term of license shall not be less than 0.7
to avoid excessive front loading or back loading during the period of contract.
5. Foreign exchange risk, if any, shall be borne by the provider of transmission service.
6. The bidder, who has quoted the lowest levelised annual transmission charge as per evaluation procedure,
shall be considered for the award.
7. After selection and issue of LOI from the BPC, the selected bidder shall acquire the SPV, in accordance
with the terms and conditions as finalized in the bid document.
8. The TSP shall make an application for grant of transmission license to SERC within one month of
issuance of LOI or signing of TSA, whichever is later.
9. The TSA will be effective only upon grant of transmission license from SERC.
10. The final TSA along with the certification by the Bid Evaluation Committee shall be forwarded to the
SERC for adaptation of tariffs.
VGF (Viability Gap Funding) through PPP in Transmission Projects
1. GoI recognizes that there is significant deficit in the availability of physical infrastructure across different
sectors and that this is hindering economic development; whereas development of infrastructure requires
large investments that cannot be undertaken out of public financing alone, and that in order to attract
private capital as well as the techno-managerial efficiencies associated with it, the Government is
committed to promoting Public Private Partnerships (PPPs) in infrastructure development; GoI recognizes
that infrastructure projects may not always be financially viable because of long gestation periods and
limited financial returns, and that financial viability of such projects can be improved through Government
support. GoI formulated Guidelines for Financial Support to PPPs for providing financial support to bridge
the viability gap of infrastructure projects undertaken through Public Private Partnerships.
2. VGF scheme, finalized by the finance ministry few years back to promote investment in the infrastructure
sector, involves central assistance in the form of grant for capital expenditure up to 20% of the project cos t,
while the state government being one of the owners could also provide a matching grant with a ceiling of
another 20% of the project cost.
3. All PPP (public-private partnership) projects in the power transmission sector, including intra-state
transmission networks, will now qualify for government grants under the VGF scheme, making them
attractive to private sector investors.
4. A VGF (Viability Gap Funding) model has been evolved for intra-state transmission projects for which a
MTA (Model Transmission Agreement) was developed by the Planning Commission.
5. The States also have the option to use VGF based MTA (Model Transmission Agreement) document of
Planning Commission for development of Transmission System in their States under PPP (Public Private
Partnership) mode. [Ref.No.15/1/2008-Trans GoI, MoP dated 2.5.2012]
6. Under the MTA, it has been decided that the prospective bidders would be awarded projects on the basis of
lowest quote for grant of VGF. In these projects, the state electricity regulators will fixbase unitary charges
that will determine the total transmission charges for the project. Then bids could be invited based on VGF.
The guidelines for determining base unitary charge could be revised by the power ministry from time to
time in consultation with the finance ministry and the Planning Commission to prevent misuse of the VGF
provisions. The entire mechanism would be reviewed after a period of three years.
7. This scheme will apply only if the contract/ concession agreement are awarded in favour of a private sector
company.
8. Contract or concession agreement will be between Government or statutory entity, Private sector company
& Lead financial institution.
9. Project cost does not include the cost of land incurred by the government/statutory entity.
VGF based MTA (Model Transmission Agreement) of Planning Commission
1. MTA provides the basis for optimal utilization of resources on the one hand and adoption of
international best practices on the other. The objective is to secure value for public money while
providing efficient and cost-effective services to the users.
2. Three elements determine the financial viability of transmission projects are (i) Concession period
(ii) Unitary charge and (iii) Capital costs
3. Concession period is required to be fixed as 25 years (as per Electricity Act 2003) plus 10 years
considering useful life (subject to regulatory approval).
4. Unitary charge is to be determined as per MTA (which is broadly in line with prevailing
transmission tariffs)
5. Capital cost is the variable that will determine the financial viability of a transmission sys tem.
Adoption of cost-effective specifications would, therefore, be essential for reducing capital costs
in order to improve viability.
6. The MTA suggests that the unitary charge should not be fixed at a level lower than 75% of the
total costs.
7. It has been stipulated that unitary charge subsequent to the first year of operation may be
determined by reducing the same to the extent of a pre-determined percentage in the band of 1 to 2
percent per annum.
8. The MTA provides for indexation of the unitary charge to the extent of 30% thereof linked to WPI
(Wholesale Price Index).
9. As an added incentive, the MTA allows the concessionaire to create additional capacity and
appropriate the transmission tariff from the users of such capacity.
10. Capital subsidies alone may not suffice in meeting the likely gap in viability. One of the options
can be to provide development rights over real estate for generating additional revenue to make
the project viable. Therefore, provision kept in MTA for real estate development. The MTA
provides 25% of revenue would be shared with the Project Authority.
11. Unlike the normal practice of focusing on construction specifications, the technical parameters
proposed in the MTA are based mainly on output specifications. Only the core requirements
design, construction, O&M have been specified, leaving enough room for the concessionaire to
innovate and add value. In sum, the MTA focuses on ‘what’ rather than ‘how’ in relation to the
delivery of services by the concessionaire.
12. The MTA identifies the KPI (Key Performance Indicators) relating to operation of the
transmission system and stipulates penalties for failure to achieve the requisite levels of
performance. Concessionaire is required to ensure the availability of systemcapacity at normative
levels. The number of forced outages in a year has been capped in order to ensure system
reliability. Transmission losses of the transformers must also remain within specified normative
levels.
13. The MTA stipulates stiff penalties in case of false declaration by the concessionaire.
14. For monitoring the KPI, monthly status reports and inspections by Independent Engineers have
been prescribed. The concessionaire is also required to maintain the requisite ISO certifications for
the transmission system.
15. Among the short listed bidders (based on parameters such as concession period, unitary charge,
technical parameters, performance standards etc.) who seeks the lowest grant or offers the highest
premium, as the case may be, shall win the contract.
16. The commercial and technical risks relating to construction, O&M are being allocated to the
concessionaire. Political risks are being assigned to the Project Authority. The MTA provides for
extension of the concession ofthe concession period in order to compensate the concessionaire for
specified events. In case extension cannot be granted, MTA provides for a pre-determined
monetary compensation to be paid to the concessionaire.
17. MTA stipulates a time limit of 180 days for achieving financial closure (extendable for another
120 days on payment of penalty), failing which bid security shall be forfeited.
18. Handing over possession of the land required for construction of sub-stations and obtaining of
environmental clearances are being proposed as conditions precedent to be satisfied by the Project
Authority before financial closure.
19. Procurement of a transmission license and other applicable permits has been proposed as a
conditions precedent to be satisfied by the concessionaire.
20. The MTA requires the concessionaire to procure and maintain right of way.
21. Additional works may be undertaken within a specified limit, but only if the entire cost thereof is
borne by the Project Authority.
22. Before commencing the commercial operation the concessionaire will be required to ensure
compliance with the specifications relating to safety and quality of service for the users. MTA
provides safety certification by the designated Electrical Inspector prior to COD and reviews at
regular intervals.
23. O&M is proposed to be governed by strict standards and any violations would attract stiff
penalties.
24. MTA provides substitution rights to lenders so that the concession can be transferred to another
company in the event of failure of the concessionaire to operate the project successfully.
25. MTA contains the requisite provisions for dealing with force majeure events.
26. Upon expiry of the specified concession period of 25 years, the concessionaire would be entitled
to a termination payment equal to 40 times the monthly unitary charge. However, the
concessionaire would have the right to seek an extension of 10 years in the concession period and
in such an event, no termination payment shall be due and payable after expiry of the extended
period.
27. MTA provides for appointment of additional or concurrent auditors to play a critical role in
ensuing financial discipline.
28. The MTA addresses otherimportant issues such as dispute resolution, suspension ofrights, change
in law, insurance, defects, liability, indemnity, redressed of public grievances and disclosure of
project documents.
References
1. Government of India’s (Ministry of Finance, Department of Economic Affairs) Scheme for support
to PPP in Infrastructure July’2005
2. Government of India’s (MoP) Tariff based Competitive bidding Guidelines for Transmission
Service dated 17.04.2006 as amended
3. Government of India’s (MoP) Guidelines for Encouraging Competition in Development of
Transmission Projects
4. Government of India’s (Ministry of Finance, Department of Economic Affairs) Guidelines for
forwarding proposals for financial support to PPP (Public Private Partnerships) in infrastructure
under the VGF (Viability Gap Funding) Scheme.
5. Planning Commission’s VGF based MTA (Model Transmission Agreement) for PPP in
Transmission System.
6. Tariff Policy of Government of India, MoP 2016
Links for further inputs
(i) htpp://cea.nic.in/reports/others/ps/pspa1/sbd_rfp.pdfhttp
(ii) http://cea.nic.in/reports/others/ps/pspa1/sbd_rfq.pdf
(iii) http://cea.nic.in/reports/others/ps/pspa1/sbd_isa.pdf

More Related Content

What's hot

Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India sanjeev jain
 
From centralised long-term planning to market-based access: Proposed change i...
From centralised long-term planning to market-based access: Proposed change i...From centralised long-term planning to market-based access: Proposed change i...
From centralised long-term planning to market-based access: Proposed change i...Amitava Nag
 
Competitive Bidding in the Power Sector : Is It Working?
Competitive Bidding in the Power Sector : Is It Working?Competitive Bidding in the Power Sector : Is It Working?
Competitive Bidding in the Power Sector : Is It Working?IPPAI
 
Power Sector Developments in India
Power Sector Developments in IndiaPower Sector Developments in India
Power Sector Developments in IndiaIndian Energy Sector
 
Introduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) MechanismIntroduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) MechanismSpark Network
 
Electricity laws and regulations
Electricity laws and regulationsElectricity laws and regulations
Electricity laws and regulationsAkshat Goel
 
Tariff structure & Cerc tariff regulation
Tariff structure & Cerc tariff regulationTariff structure & Cerc tariff regulation
Tariff structure & Cerc tariff regulationSushant Kumar Sinha
 
Presentation On Salient Features Of The Electricity Act , 2003
Presentation On Salient Features Of The Electricity Act , 2003Presentation On Salient Features Of The Electricity Act , 2003
Presentation On Salient Features Of The Electricity Act , 2003rapper44
 
Transmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesTransmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesMANTHAN CHAUHAN
 
Power Transmission and Distribution Sector in India
Power Transmission and Distribution Sector in IndiaPower Transmission and Distribution Sector in India
Power Transmission and Distribution Sector in IndiaAditya Goyal
 
Power Grid's Inter-State transmission charges in India
Power Grid's Inter-State transmission charges in IndiaPower Grid's Inter-State transmission charges in India
Power Grid's Inter-State transmission charges in IndiaAmitava Nag
 
Renewable Energy Certificate
Renewable Energy CertificateRenewable Energy Certificate
Renewable Energy CertificateJaspal Bhatia
 
Multi year tariffs and regulations
Multi year tariffs and regulationsMulti year tariffs and regulations
Multi year tariffs and regulationsNavajyoti Martha
 

What's hot (20)

Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India
 
From centralised long-term planning to market-based access: Proposed change i...
From centralised long-term planning to market-based access: Proposed change i...From centralised long-term planning to market-based access: Proposed change i...
From centralised long-term planning to market-based access: Proposed change i...
 
Competitive Bidding in the Power Sector : Is It Working?
Competitive Bidding in the Power Sector : Is It Working?Competitive Bidding in the Power Sector : Is It Working?
Competitive Bidding in the Power Sector : Is It Working?
 
Power Sector Developments in India
Power Sector Developments in IndiaPower Sector Developments in India
Power Sector Developments in India
 
Introduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) MechanismIntroduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) Mechanism
 
Restructuring of power grid
Restructuring of power gridRestructuring of power grid
Restructuring of power grid
 
Electricity laws and regulations
Electricity laws and regulationsElectricity laws and regulations
Electricity laws and regulations
 
Availability based tariff
Availability based tariffAvailability based tariff
Availability based tariff
 
Electricity act 2003
Electricity act 2003Electricity act 2003
Electricity act 2003
 
Tariff structure & Cerc tariff regulation
Tariff structure & Cerc tariff regulationTariff structure & Cerc tariff regulation
Tariff structure & Cerc tariff regulation
 
Presentation On Salient Features Of The Electricity Act , 2003
Presentation On Salient Features Of The Electricity Act , 2003Presentation On Salient Features Of The Electricity Act , 2003
Presentation On Salient Features Of The Electricity Act , 2003
 
Transmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesTransmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission Lines
 
Power Transmission and Distribution Sector in India
Power Transmission and Distribution Sector in IndiaPower Transmission and Distribution Sector in India
Power Transmission and Distribution Sector in India
 
Power Grid's Inter-State transmission charges in India
Power Grid's Inter-State transmission charges in IndiaPower Grid's Inter-State transmission charges in India
Power Grid's Inter-State transmission charges in India
 
Electric power grid
Electric power gridElectric power grid
Electric power grid
 
Demand side management: Demand response
Demand side management: Demand response Demand side management: Demand response
Demand side management: Demand response
 
Renewable Energy Certificate
Renewable Energy CertificateRenewable Energy Certificate
Renewable Energy Certificate
 
Indian Energy Sector
Indian Energy SectorIndian Energy Sector
Indian Energy Sector
 
Multi year tariffs and regulations
Multi year tariffs and regulationsMulti year tariffs and regulations
Multi year tariffs and regulations
 
Abt meter
Abt meterAbt meter
Abt meter
 

Similar to Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects

Navi mumbai metro new
Navi mumbai metro newNavi mumbai metro new
Navi mumbai metro newRashid Kaskar
 
Public consultation on access deficit contribution
Public consultation on access deficit contributionPublic consultation on access deficit contribution
Public consultation on access deficit contributiontraoman
 
Mode of Tendering.pptx
 Mode of Tendering.pptx Mode of Tendering.pptx
Mode of Tendering.pptxssuser4ae21a
 
CATOs-Opportunities-for-Onshore-Tranmission-final[1]
CATOs-Opportunities-for-Onshore-Tranmission-final[1]CATOs-Opportunities-for-Onshore-Tranmission-final[1]
CATOs-Opportunities-for-Onshore-Tranmission-final[1]Aditi Tulpule
 
DPP 2016 Chapter 2
DPP 2016 Chapter 2DPP 2016 Chapter 2
DPP 2016 Chapter 2Ankur Gupta
 
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...Joy Irman
 
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Harish Sharma
 
Formulation and Approval of Various Infrastructure Projects
Formulation and Approval of Various Infrastructure ProjectsFormulation and Approval of Various Infrastructure Projects
Formulation and Approval of Various Infrastructure ProjectsGAURAV. H .TANDON
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Harish Sharma
 
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)Gensol Engineering Limited
 
BD Telecom Policy (ETE 521 L4)
BD Telecom Policy (ETE 521 L4)BD Telecom Policy (ETE 521 L4)
BD Telecom Policy (ETE 521 L4)Nazirul Islam Zico
 
Procurement Management
Procurement ManagementProcurement Management
Procurement Managementlearnafren
 
Itt provision of wi fi network design and implementation services
Itt   provision of wi fi network design and implementation servicesItt   provision of wi fi network design and implementation services
Itt provision of wi fi network design and implementation servicesabenyeung1
 
Frequently-asked-questions-about-ra-9184
Frequently-asked-questions-about-ra-9184Frequently-asked-questions-about-ra-9184
Frequently-asked-questions-about-ra-9184june alapa
 
2021-10-13 Procurement Process-Day 01.pptx
2021-10-13 Procurement Process-Day 01.pptx2021-10-13 Procurement Process-Day 01.pptx
2021-10-13 Procurement Process-Day 01.pptxRiazMuhammad35
 
Licensing for SHP
Licensing for SHPLicensing for SHP
Licensing for SHPRAJ BAIRWA
 

Similar to Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects (20)

TBCB_29032019.pptx
TBCB_29032019.pptxTBCB_29032019.pptx
TBCB_29032019.pptx
 
Navi mumbai metro new
Navi mumbai metro newNavi mumbai metro new
Navi mumbai metro new
 
Public consultation on access deficit contribution
Public consultation on access deficit contributionPublic consultation on access deficit contribution
Public consultation on access deficit contribution
 
Mode of Tendering.pptx
 Mode of Tendering.pptx Mode of Tendering.pptx
Mode of Tendering.pptx
 
CATOs-Opportunities-for-Onshore-Tranmission-final[1]
CATOs-Opportunities-for-Onshore-Tranmission-final[1]CATOs-Opportunities-for-Onshore-Tranmission-final[1]
CATOs-Opportunities-for-Onshore-Tranmission-final[1]
 
DPP 2016 Chapter 2
DPP 2016 Chapter 2DPP 2016 Chapter 2
DPP 2016 Chapter 2
 
Document samples
Document samplesDocument samples
Document samples
 
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
 
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
 
Formulation and Approval of Various Infrastructure Projects
Formulation and Approval of Various Infrastructure ProjectsFormulation and Approval of Various Infrastructure Projects
Formulation and Approval of Various Infrastructure Projects
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
 
RFQ NRSS XXXVI
RFQ NRSS XXXVIRFQ NRSS XXXVI
RFQ NRSS XXXVI
 
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
 
BD Telecom Policy (ETE 521 L4)
BD Telecom Policy (ETE 521 L4)BD Telecom Policy (ETE 521 L4)
BD Telecom Policy (ETE 521 L4)
 
Procurement Management
Procurement ManagementProcurement Management
Procurement Management
 
AVAITION SANG QASP
AVAITION SANG QASPAVAITION SANG QASP
AVAITION SANG QASP
 
Itt provision of wi fi network design and implementation services
Itt   provision of wi fi network design and implementation servicesItt   provision of wi fi network design and implementation services
Itt provision of wi fi network design and implementation services
 
Frequently-asked-questions-about-ra-9184
Frequently-asked-questions-about-ra-9184Frequently-asked-questions-about-ra-9184
Frequently-asked-questions-about-ra-9184
 
2021-10-13 Procurement Process-Day 01.pptx
2021-10-13 Procurement Process-Day 01.pptx2021-10-13 Procurement Process-Day 01.pptx
2021-10-13 Procurement Process-Day 01.pptx
 
Licensing for SHP
Licensing for SHPLicensing for SHP
Licensing for SHP
 

More from Amitava Nag

Power procurement through TBCB for Bundle Generation
Power procurement through TBCB for Bundle GenerationPower procurement through TBCB for Bundle Generation
Power procurement through TBCB for Bundle GenerationAmitava Nag
 
IMPACT OF CERC'S SHARING OF TRANSMISSION CHARGES AND LOSSES REGULATIONS
IMPACT OF CERC'S SHARING OF TRANSMISSION CHARGES AND LOSSES REGULATIONS IMPACT OF CERC'S SHARING OF TRANSMISSION CHARGES AND LOSSES REGULATIONS
IMPACT OF CERC'S SHARING OF TRANSMISSION CHARGES AND LOSSES REGULATIONS Amitava Nag
 
Comments on CERC's sharing of inter-State transmission charges & losses regul...
Comments on CERC's sharing of inter-State transmission charges & losses regul...Comments on CERC's sharing of inter-State transmission charges & losses regul...
Comments on CERC's sharing of inter-State transmission charges & losses regul...Amitava Nag
 
Derivatives Contracts in Indian Electricity Market
Derivatives Contracts in Indian Electricity MarketDerivatives Contracts in Indian Electricity Market
Derivatives Contracts in Indian Electricity MarketAmitava Nag
 
Towards a whole sale electricity market in India
Towards a whole sale electricity market in IndiaTowards a whole sale electricity market in India
Towards a whole sale electricity market in IndiaAmitava Nag
 
Expert group constituted by CERC proposes draft IEGC 2020
Expert group constituted by CERC proposes draft IEGC 2020Expert group constituted by CERC proposes draft IEGC 2020
Expert group constituted by CERC proposes draft IEGC 2020Amitava Nag
 
Introduction of Real Time Electricity Martket in India
Introduction of Real Time Electricity Martket in IndiaIntroduction of Real Time Electricity Martket in India
Introduction of Real Time Electricity Martket in IndiaAmitava Nag
 
Comments on draft cerc sharing of transmission charges and losses regulations...
Comments on draft cerc sharing of transmission charges and losses regulations...Comments on draft cerc sharing of transmission charges and losses regulations...
Comments on draft cerc sharing of transmission charges and losses regulations...Amitava Nag
 
বিদ্যুত বিলের নিয়ম-কানুন ও বিল কমানোর কিছু উপায়
বিদ্যুত বিলের নিয়ম-কানুন ও বিল কমানোর কিছু উপায়বিদ্যুত বিলের নিয়ম-কানুন ও বিল কমানোর কিছু উপায়
বিদ্যুত বিলের নিয়ম-কানুন ও বিল কমানোর কিছু উপায়Amitava Nag
 
How you can get a higher pension from EPFO beyond ceiling limit?
How you can get a higher pension from EPFO beyond ceiling limit?How you can get a higher pension from EPFO beyond ceiling limit?
How you can get a higher pension from EPFO beyond ceiling limit?Amitava Nag
 
Chronology of Indian Power Sector's Development
Chronology of Indian Power Sector's DevelopmentChronology of Indian Power Sector's Development
Chronology of Indian Power Sector's DevelopmentAmitava Nag
 
Tariff policy of India: Salient Points
Tariff policy of India: Salient Points Tariff policy of India: Salient Points
Tariff policy of India: Salient Points Amitava Nag
 
Scope of solar generation in West Bengal (an Indian State)
Scope of solar generation in West Bengal (an Indian State)Scope of solar generation in West Bengal (an Indian State)
Scope of solar generation in West Bengal (an Indian State)Amitava Nag
 
Philosophy of sharing of inter-State transmission charges by PoC method
Philosophy of sharing of inter-State transmission charges by PoC methodPhilosophy of sharing of inter-State transmission charges by PoC method
Philosophy of sharing of inter-State transmission charges by PoC methodAmitava Nag
 

More from Amitava Nag (14)

Power procurement through TBCB for Bundle Generation
Power procurement through TBCB for Bundle GenerationPower procurement through TBCB for Bundle Generation
Power procurement through TBCB for Bundle Generation
 
IMPACT OF CERC'S SHARING OF TRANSMISSION CHARGES AND LOSSES REGULATIONS
IMPACT OF CERC'S SHARING OF TRANSMISSION CHARGES AND LOSSES REGULATIONS IMPACT OF CERC'S SHARING OF TRANSMISSION CHARGES AND LOSSES REGULATIONS
IMPACT OF CERC'S SHARING OF TRANSMISSION CHARGES AND LOSSES REGULATIONS
 
Comments on CERC's sharing of inter-State transmission charges & losses regul...
Comments on CERC's sharing of inter-State transmission charges & losses regul...Comments on CERC's sharing of inter-State transmission charges & losses regul...
Comments on CERC's sharing of inter-State transmission charges & losses regul...
 
Derivatives Contracts in Indian Electricity Market
Derivatives Contracts in Indian Electricity MarketDerivatives Contracts in Indian Electricity Market
Derivatives Contracts in Indian Electricity Market
 
Towards a whole sale electricity market in India
Towards a whole sale electricity market in IndiaTowards a whole sale electricity market in India
Towards a whole sale electricity market in India
 
Expert group constituted by CERC proposes draft IEGC 2020
Expert group constituted by CERC proposes draft IEGC 2020Expert group constituted by CERC proposes draft IEGC 2020
Expert group constituted by CERC proposes draft IEGC 2020
 
Introduction of Real Time Electricity Martket in India
Introduction of Real Time Electricity Martket in IndiaIntroduction of Real Time Electricity Martket in India
Introduction of Real Time Electricity Martket in India
 
Comments on draft cerc sharing of transmission charges and losses regulations...
Comments on draft cerc sharing of transmission charges and losses regulations...Comments on draft cerc sharing of transmission charges and losses regulations...
Comments on draft cerc sharing of transmission charges and losses regulations...
 
বিদ্যুত বিলের নিয়ম-কানুন ও বিল কমানোর কিছু উপায়
বিদ্যুত বিলের নিয়ম-কানুন ও বিল কমানোর কিছু উপায়বিদ্যুত বিলের নিয়ম-কানুন ও বিল কমানোর কিছু উপায়
বিদ্যুত বিলের নিয়ম-কানুন ও বিল কমানোর কিছু উপায়
 
How you can get a higher pension from EPFO beyond ceiling limit?
How you can get a higher pension from EPFO beyond ceiling limit?How you can get a higher pension from EPFO beyond ceiling limit?
How you can get a higher pension from EPFO beyond ceiling limit?
 
Chronology of Indian Power Sector's Development
Chronology of Indian Power Sector's DevelopmentChronology of Indian Power Sector's Development
Chronology of Indian Power Sector's Development
 
Tariff policy of India: Salient Points
Tariff policy of India: Salient Points Tariff policy of India: Salient Points
Tariff policy of India: Salient Points
 
Scope of solar generation in West Bengal (an Indian State)
Scope of solar generation in West Bengal (an Indian State)Scope of solar generation in West Bengal (an Indian State)
Scope of solar generation in West Bengal (an Indian State)
 
Philosophy of sharing of inter-State transmission charges by PoC method
Philosophy of sharing of inter-State transmission charges by PoC methodPhilosophy of sharing of inter-State transmission charges by PoC method
Philosophy of sharing of inter-State transmission charges by PoC method
 

Recently uploaded

High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
The Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfThe Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfGale Pooley
 
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...ssifa0344
 
The Economic History of the U.S. Lecture 26.pdf
The Economic History of the U.S. Lecture 26.pdfThe Economic History of the U.S. Lecture 26.pdf
The Economic History of the U.S. Lecture 26.pdfGale Pooley
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceanilsa9823
 
The Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfThe Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfGale Pooley
 
The Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfThe Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfGale Pooley
 
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )Pooja Nehwal
 
Stock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfStock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfMichael Silva
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home DeliveryPooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home DeliveryPooja Nehwal
 
The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfGale Pooley
 
The Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdfThe Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdfGale Pooley
 
The Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfThe Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfGale Pooley
 
The Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfThe Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfGale Pooley
 
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...ssifa0344
 
00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptxFinTech Belgium
 

Recently uploaded (20)

High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
The Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfThe Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdf
 
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
 
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
 
The Economic History of the U.S. Lecture 26.pdf
The Economic History of the U.S. Lecture 26.pdfThe Economic History of the U.S. Lecture 26.pdf
The Economic History of the U.S. Lecture 26.pdf
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
 
The Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfThe Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdf
 
The Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfThe Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdf
 
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
 
Stock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfStock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdf
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
 
Veritas Interim Report 1 January–31 March 2024
Veritas Interim Report 1 January–31 March 2024Veritas Interim Report 1 January–31 March 2024
Veritas Interim Report 1 January–31 March 2024
 
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home DeliveryPooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
 
The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdf
 
The Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdfThe Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdf
 
The Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfThe Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdf
 
The Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfThe Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdf
 
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
 
00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx
 

Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects

  • 1. Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission Works Compiled by Amitava Nag, Regulatory Affairs Cell, WBSETCL Summery As per Para 5.3 of Tariff Policy 2016, intra-state transmission projects shall be developed by State Government through competitive bidding process for projects costing above a threshold limit which shall be decided by the SERCs. State has been given option either to use VGF based MTA document of Planning Commission or the Standard Bidding Document of Ministry of Power for procurement of intra-state transmission services. For the VGF based bidding, the unitary charges will require to be approved by SERC prior to bidding. The above said guidelines are for procurement of transmission services to select transmission service provider for a new transmission line. A transmission charges for providing transmission service and O&M required for the various transmission elements shall formthe basis for bidding. Under the MTA, it has been decided that the prospective bidders would be awarded projects on the basis of lowest grant sought or highest premiumoffered. Guiding Principle 1. As per Para 5.3 of Tariff Policy 2016, intra-state transmission projects shall be developed by State Government through competitive bidding process for projects costing above a threshold limit which shall be decided by the SERCs. 2. STU/ Joint Venture Companies of STU are also eligible to participate in the Tariff based bidding. 3. Ministry of Power has evolved a Standard Bidding Document which has been used by some intra-state transmission projects. At the same time, a VGF (Viability Gap Funding) model has been evolved for intra- state transmission projects for which a MTA (Model Transmission Agreement) was developed by the Planning Commission. State has been given option either to use VGF based MTA document or the Standard Bidding Document for procurement of intra-state transmission services. For the VGF based bidding, the unitary charges will require to be approved by SERC prior to bidding. The experience of VGF based MTA is to be reviewed after three years. 4. The above said guidelines are for procurement of transmission services to select transmission service provider for a new transmission line. 5. State Government shall constitute an Empowered Committee. The functions of the Empowered Committee will be (a) To identify projects (b) To facilitate evaluation of bids and (c) To facilitate development of projects. 6. Procurement of transmission services would include all activities related to survey, DPR (Detailed Project Report)/PP (Project Profile) formulation, arranging finance, project management, obtaining transmission license, obtaining RoW, necessary clearances, site identification, land compensation, design, engineering, equipment, material, construction, erection, testing and commissioning, maintenance and operation of transmission lines and/or substations and/or switching stations and/or HVDC links including terminal stations and HVDC transmission line so that the facilities are available as per target availability fixed by SERC.
  • 2. 7. State Government may notify any Organization/ State Public Sector Undertaking especially engaged for this purpose or BPC notified by the Central Government to be the BPC (Bid Process Coordinator) for State. 8. BPC would be responsible for coordinating the bid process for procurement of required transmission services for each intra-state transmission project to be implemented under tariff-based competitive bidding in accordance with the guidelines. 9. The BPC shall prepare the bid documentation in accordance with those guidelines and obtain approval of the SERC if any material deviation is proposed to be made from Standard Bid Documents. BPC shall specify scheduled month of commercial operation and invite bids for the transmission charge. 10. The bidder shall submit Technical & Price bid (annual tariff payable after commissioning till expiry of license period). CERC has advised GoI to ask bidders to quote bid for a period of 35 years. The selected bidder should be obligated for extension of his license two years before the expiry of initial 25 years. 11. Tariff shall be designated in Indian Rupees only. 12. Tariff structure will have two components- one scalable and other non-scalable. Scalable component shall not be more than 15% of the non-scalable component. 13. The successful bidder shall be designated as the TSP (Transmission Service Provider) after executing TSA and acquiring Special Purpose Vehicle {SPV (Ref. Electricity Rules 2005)}. 14. TSP shall seek transmission license from SERC if it is not a deemed licensee. 15. TSP shall take-up execution, commissioning and operation of the project as per specified schedule in the TSA. 16. Recovery of transmission charges from the users shall be as per the guidelines. 17. The final TSA along with the certification by the Bid Evaluation Committee shall be forwarded to SERC for adaptation of Tariffs in terms of Section 63 of the Act. Bidding Process 1. BPC shall intimate SERC about initiation of the bidding process. 2. The bidding shall necessarily be by way of ICB (International Competitive Bidding). 3. BPC shall publish the RFQ (Request for Qualification) which is the first stage of tender. 4. RFQ shall contain (i) Brief description of the project (ii) Commissioning milestones to be achieved by the bidders (iii) Qualification requirements to be met by bidders including technical experience, minimum net- worth, internal resource generation, conditions for license, etc with necessary proof of the same. 5. RFP (Request for Proposal) the 2nd stage of tender shall be issued to all bidders who have qualified at the RFQ stage. In case the bidders seek any deviations and BPC finds those deviations are reasonable, the BPC may agree to such deviations and with the approval of SERC BPC shall give the revised bidding document to all who had sought RFP document. 6. RFP shall contain (i) Specified target dates for commissioning and commercial operations (ii) Proposed TSA (iii) Discount factor (iv) Bid bond as well as Contract Performance Guarantee (v) Proposed indemnification agreement between the TSP and the utilities (vi) Liquidated damages that would apply in the event of providing the transmission services (vii) Technical, operational and safety criteria to be met by bidder including the provisions under different rules/regulations under Act. 7. BPC may at its option adopt a single stage two envelope tender process combining the RFP and RFQ processes instead of two-stage process. 8. A transmission charges for providing transmission service and O&M required for the various transmission elements shall form the basis for bidding.
  • 3. 9. Under the MTA, it has been decided that the prospective bidders would be awarded projects on the basis of lowest grant sought or highest premium offered. In these projects, the state electricity regulators will fix base unitary charges that will determine the revenue stream for the project. Evaluation of Bids 1. The State government shall constitute a Bid Evaluation Committee for evaluation of the bids. 2. The technical bids shall be examined to ensure that the bids submitted meet minimum eligibility criteria set out in the bid documents on all technical evaluation parameters. Only the bids that meet all elements of the minimum technical criteria set out in the bid documents shall be considered for further evaluation on the transmission charges bids. 3. Transmission charge bid shall be rejected if it contains any deviation from the bid documents for submission of the same. 4. Ratio of minimum and maximum transmission charge over the term of license shall not be less than 0.7 to avoid excessive front loading or back loading during the period of contract. 5. Foreign exchange risk, if any, shall be borne by the provider of transmission service. 6. The bidder, who has quoted the lowest levelised annual transmission charge as per evaluation procedure, shall be considered for the award. 7. After selection and issue of LOI from the BPC, the selected bidder shall acquire the SPV, in accordance with the terms and conditions as finalized in the bid document. 8. The TSP shall make an application for grant of transmission license to SERC within one month of issuance of LOI or signing of TSA, whichever is later. 9. The TSA will be effective only upon grant of transmission license from SERC. 10. The final TSA along with the certification by the Bid Evaluation Committee shall be forwarded to the SERC for adaptation of tariffs. VGF (Viability Gap Funding) through PPP in Transmission Projects 1. GoI recognizes that there is significant deficit in the availability of physical infrastructure across different sectors and that this is hindering economic development; whereas development of infrastructure requires large investments that cannot be undertaken out of public financing alone, and that in order to attract private capital as well as the techno-managerial efficiencies associated with it, the Government is committed to promoting Public Private Partnerships (PPPs) in infrastructure development; GoI recognizes that infrastructure projects may not always be financially viable because of long gestation periods and limited financial returns, and that financial viability of such projects can be improved through Government support. GoI formulated Guidelines for Financial Support to PPPs for providing financial support to bridge the viability gap of infrastructure projects undertaken through Public Private Partnerships. 2. VGF scheme, finalized by the finance ministry few years back to promote investment in the infrastructure sector, involves central assistance in the form of grant for capital expenditure up to 20% of the project cos t, while the state government being one of the owners could also provide a matching grant with a ceiling of another 20% of the project cost. 3. All PPP (public-private partnership) projects in the power transmission sector, including intra-state transmission networks, will now qualify for government grants under the VGF scheme, making them attractive to private sector investors. 4. A VGF (Viability Gap Funding) model has been evolved for intra-state transmission projects for which a MTA (Model Transmission Agreement) was developed by the Planning Commission.
  • 4. 5. The States also have the option to use VGF based MTA (Model Transmission Agreement) document of Planning Commission for development of Transmission System in their States under PPP (Public Private Partnership) mode. [Ref.No.15/1/2008-Trans GoI, MoP dated 2.5.2012] 6. Under the MTA, it has been decided that the prospective bidders would be awarded projects on the basis of lowest quote for grant of VGF. In these projects, the state electricity regulators will fixbase unitary charges that will determine the total transmission charges for the project. Then bids could be invited based on VGF. The guidelines for determining base unitary charge could be revised by the power ministry from time to time in consultation with the finance ministry and the Planning Commission to prevent misuse of the VGF provisions. The entire mechanism would be reviewed after a period of three years. 7. This scheme will apply only if the contract/ concession agreement are awarded in favour of a private sector company. 8. Contract or concession agreement will be between Government or statutory entity, Private sector company & Lead financial institution. 9. Project cost does not include the cost of land incurred by the government/statutory entity. VGF based MTA (Model Transmission Agreement) of Planning Commission 1. MTA provides the basis for optimal utilization of resources on the one hand and adoption of international best practices on the other. The objective is to secure value for public money while providing efficient and cost-effective services to the users. 2. Three elements determine the financial viability of transmission projects are (i) Concession period (ii) Unitary charge and (iii) Capital costs 3. Concession period is required to be fixed as 25 years (as per Electricity Act 2003) plus 10 years considering useful life (subject to regulatory approval). 4. Unitary charge is to be determined as per MTA (which is broadly in line with prevailing transmission tariffs) 5. Capital cost is the variable that will determine the financial viability of a transmission sys tem. Adoption of cost-effective specifications would, therefore, be essential for reducing capital costs in order to improve viability. 6. The MTA suggests that the unitary charge should not be fixed at a level lower than 75% of the total costs. 7. It has been stipulated that unitary charge subsequent to the first year of operation may be determined by reducing the same to the extent of a pre-determined percentage in the band of 1 to 2 percent per annum. 8. The MTA provides for indexation of the unitary charge to the extent of 30% thereof linked to WPI (Wholesale Price Index). 9. As an added incentive, the MTA allows the concessionaire to create additional capacity and appropriate the transmission tariff from the users of such capacity. 10. Capital subsidies alone may not suffice in meeting the likely gap in viability. One of the options can be to provide development rights over real estate for generating additional revenue to make the project viable. Therefore, provision kept in MTA for real estate development. The MTA provides 25% of revenue would be shared with the Project Authority. 11. Unlike the normal practice of focusing on construction specifications, the technical parameters proposed in the MTA are based mainly on output specifications. Only the core requirements design, construction, O&M have been specified, leaving enough room for the concessionaire to innovate and add value. In sum, the MTA focuses on ‘what’ rather than ‘how’ in relation to the delivery of services by the concessionaire.
  • 5. 12. The MTA identifies the KPI (Key Performance Indicators) relating to operation of the transmission system and stipulates penalties for failure to achieve the requisite levels of performance. Concessionaire is required to ensure the availability of systemcapacity at normative levels. The number of forced outages in a year has been capped in order to ensure system reliability. Transmission losses of the transformers must also remain within specified normative levels. 13. The MTA stipulates stiff penalties in case of false declaration by the concessionaire. 14. For monitoring the KPI, monthly status reports and inspections by Independent Engineers have been prescribed. The concessionaire is also required to maintain the requisite ISO certifications for the transmission system. 15. Among the short listed bidders (based on parameters such as concession period, unitary charge, technical parameters, performance standards etc.) who seeks the lowest grant or offers the highest premium, as the case may be, shall win the contract. 16. The commercial and technical risks relating to construction, O&M are being allocated to the concessionaire. Political risks are being assigned to the Project Authority. The MTA provides for extension of the concession ofthe concession period in order to compensate the concessionaire for specified events. In case extension cannot be granted, MTA provides for a pre-determined monetary compensation to be paid to the concessionaire. 17. MTA stipulates a time limit of 180 days for achieving financial closure (extendable for another 120 days on payment of penalty), failing which bid security shall be forfeited. 18. Handing over possession of the land required for construction of sub-stations and obtaining of environmental clearances are being proposed as conditions precedent to be satisfied by the Project Authority before financial closure. 19. Procurement of a transmission license and other applicable permits has been proposed as a conditions precedent to be satisfied by the concessionaire. 20. The MTA requires the concessionaire to procure and maintain right of way. 21. Additional works may be undertaken within a specified limit, but only if the entire cost thereof is borne by the Project Authority. 22. Before commencing the commercial operation the concessionaire will be required to ensure compliance with the specifications relating to safety and quality of service for the users. MTA provides safety certification by the designated Electrical Inspector prior to COD and reviews at regular intervals. 23. O&M is proposed to be governed by strict standards and any violations would attract stiff penalties. 24. MTA provides substitution rights to lenders so that the concession can be transferred to another company in the event of failure of the concessionaire to operate the project successfully. 25. MTA contains the requisite provisions for dealing with force majeure events. 26. Upon expiry of the specified concession period of 25 years, the concessionaire would be entitled to a termination payment equal to 40 times the monthly unitary charge. However, the concessionaire would have the right to seek an extension of 10 years in the concession period and in such an event, no termination payment shall be due and payable after expiry of the extended period. 27. MTA provides for appointment of additional or concurrent auditors to play a critical role in ensuing financial discipline. 28. The MTA addresses otherimportant issues such as dispute resolution, suspension ofrights, change in law, insurance, defects, liability, indemnity, redressed of public grievances and disclosure of project documents.
  • 6. References 1. Government of India’s (Ministry of Finance, Department of Economic Affairs) Scheme for support to PPP in Infrastructure July’2005 2. Government of India’s (MoP) Tariff based Competitive bidding Guidelines for Transmission Service dated 17.04.2006 as amended 3. Government of India’s (MoP) Guidelines for Encouraging Competition in Development of Transmission Projects 4. Government of India’s (Ministry of Finance, Department of Economic Affairs) Guidelines for forwarding proposals for financial support to PPP (Public Private Partnerships) in infrastructure under the VGF (Viability Gap Funding) Scheme. 5. Planning Commission’s VGF based MTA (Model Transmission Agreement) for PPP in Transmission System. 6. Tariff Policy of Government of India, MoP 2016 Links for further inputs (i) htpp://cea.nic.in/reports/others/ps/pspa1/sbd_rfp.pdfhttp (ii) http://cea.nic.in/reports/others/ps/pspa1/sbd_rfq.pdf (iii) http://cea.nic.in/reports/others/ps/pspa1/sbd_isa.pdf