Importance of
   Unbonded Field
Personnel Certification
             Neel Khosa
            AMSYSCO, Inc.
 Chair of PTI Unbonded PT Field Personnel
 Certification Committee (UFPC) (CRT-30)
Why should Structural Engineers want
     PTI-Certified personnel ???

  Satisfies ACI-318 Requirement


  Durability of Post-Tensioned Structure


  Better Value for the Owner
ACI-318 Building Code Requirement
For Structural Concrete
“Requires that post-tensioning installation be
performed by individuals certified by an independent
training and certification program.”
Recommended language for Project Specification

Installation shall be performed by individuals
holding a current certificate as a PTI Certified
Installer – Level 1 Unbonded Post-Tensioning Field
Installation, or approved equal.
Recommended language for Project Specification

All post-tensioning work shall be supervised by the
PT Installer’s superintendent, who shall have a
current Level 2 Unbonded Post-Tensioning
Ironworker certification, or approved equal.
Why should Contractors and Installers
 want PTI-Certified personnel ???
  Project Benefit

  • Quality Control
  • Improved Productivity
  • Improved Profitability

  Safety Benefit

  • Risk Reduction

  Individual Benefit

  • Earn Professional Development (PDH/CEUs)
  • Increased Knowledge
Value Proposition
Certifying a crew of 10 ironworkers (Level 2 UPT
Ironworker) costs $5,500.



Having a concrete blowout due to reverse
curvature could cost the project at least $16,000
(excluding schedule delay costs).
Testimonials

“PTI Certified Installers are critical to ensuring
project stakeholders a quality end product. The
training and certification of the installers is
paramount to the performance and safety of
post-tensioned concrete.”
- Dean Locher : Corna-Kokosing Construction
Testimonials
“Post-tensioning is a wonderful tool for
structural engineers but apprehension related to
installation challenges still remains in the
marketplace. Having PTI-certified installers on
our projects not only gives us the confidence
that our designs are implemented as
envisioned, but also that the intended durability
of our design is being provided.“
- Carl Schneeman, Walker Parking Consultants
Unbonded Post-Tensioning (UPT)
        Certification
Level 1 UPT – Field Installation


Level 1 & 2 UPT – Inspector


Level 1 & 2 UPT – Ironworker

• Accelerated Course

Slab-on-Ground Installer – Stressor
Level 1 UPT
              Field Installation
• Registration Prerequisites: None
• 2 Day Workshop
  – Intro to Unbonded PT (UPT) for Superstructures
  – Offered in English and Spanish
• Certification Requirements:
  – Workshop Attendance
  – Exam Score: 70% or better
  – Work Experience: None
Level 1 & 2 UPT
                  Inspector
• Registration Prerequisites: None
• 3 Day Workshop
  – 2 days of Level 1 UPT Field
  – 1 day of Inspector
• Certification Requirements:
  – Workshop Attendance
  – Exam Score: 80% or better
  – Work Experience: 500 Hours (inspect/install)
Level 1 & 2 UPT
                 Ironworker
• Registration Prerequisites:
  – Current Level 1 UPT Field certification
  – And 500 hours in last 5 years (50 hours stressing)
                        OR
  – 4000 hours work experience
  – Of which 200 hours of stressing
                        OR
  – 2000 hours work experience in last 5 years
  – Of which 100 hours of stressing
Level 1 & 2 UPT
                Ironworker
• 2 ½ Day Workshop
  – Accelerated Course
  – Hands-on Training
• Certification Requirements:
  – Workshop Attendance
  – Exam Score: 80% or better
  – Work Experience: 2000 hours in last 5 years
  – Valid Affidavit needed to prove experience
Slab-on-Ground Installer
                Stressor
• Registration Prerequisites: None
• 2 Day Workshop
  – Intro to Unbonded PT (UPT) for Slab-on-Ground
• Certification Requirements
  – Workshop Attendance
  – Exam Score: 70% or better
  – Work Experience: 500 Hours (inspect/install)
Online Renewal Exams
•   Go to http://post-tensioning.org/category/x_zEY2l3kPT/Online%20Re-Certification
•   Answer 60 questions.
•   Level 1 renewed if 70% answered correctly.
•   Level 2 renewed if 80% answered correctly.
•   If successful, then Certification extended by 4
    years.
Online Directory
• Certification lasts 4 years.
• Searchable Public Directory
• Individuals Information
  – Certification ID
  – Active Certifications
  – Expiration Dates

   http://www.post-tensioning.org/cert_person.php
Online Directory
2012 Workshop Schedule
TYPE              DATE              LOCATION
L1 Field          May 5-6           Nashville, TN
                  June 9-10         Miami, FL
                  July 7-8          Seattle, WA
                  September 8-9     Memphis, TN
                  October 13-14     Ontario, California
                  November 10-11    Atlanta, GA
SOG Stressor      June 9-10         Ontario, California
L1+L2 Inspector   June 22-24        Denver, CO
                  July 27-29        Las Vegas, NV
                  September 21-23   Houston, TX
Special Request Workshop
•   Onsite training.
•   Eliminate travel expenses.
•   All UPT Certifications offered.
•   Contact PTI Certification Director
    for more info.
    – Miroslav Vejvoda
    – miroslav.vejvoda@post-tensioning.org
The Presenters…
Chuck Adams       Thomas Mathews
Jim Beicker       Clint Mueller
Thomas Helm       Douglas Schlegel
Larry Krauser     Charlie Skarbrevik
Kris Kriofske     Randy Spoon
                  Miroslav Vejvoda
THANK YOU

From your friends in CRT-30
            (UFPC)
Unbonded PT Field Personnel
   Certification Committee

Contenu connexe

Tendances

1.3 conjugate beam method problems1
1.3 conjugate beam method problems11.3 conjugate beam method problems1
1.3 conjugate beam method problems1Nilesh Baglekar
 
Multiframe intro
Multiframe introMultiframe intro
Multiframe introkmsu
 
Ejemplo de una escuela en etabs
Ejemplo de una escuela en etabsEjemplo de una escuela en etabs
Ejemplo de una escuela en etabsnilton689
 
Lecture 6 7 Rm Shear Walls
Lecture 6 7 Rm Shear WallsLecture 6 7 Rm Shear Walls
Lecture 6 7 Rm Shear WallsTeja Ande
 
Ingenieria calculo de estructuras de cimentacion
Ingenieria calculo de estructuras de cimentacionIngenieria calculo de estructuras de cimentacion
Ingenieria calculo de estructuras de cimentacionSantiago Paez Pachon
 
183710439 friction-from-meriam-pdf
183710439 friction-from-meriam-pdf183710439 friction-from-meriam-pdf
183710439 friction-from-meriam-pdfJasim Almuhandis
 
Diseño de losa nervada doblemente armada
Diseño de losa nervada doblemente armadaDiseño de losa nervada doblemente armada
Diseño de losa nervada doblemente armadajormanconcreto
 
Diseno de zapatas corridas bajo columnas (ing civil)
Diseno de zapatas corridas bajo columnas (ing civil)Diseno de zapatas corridas bajo columnas (ing civil)
Diseno de zapatas corridas bajo columnas (ing civil)Carlos Adrian Peraza Zaldivar
 
Moment of inertia of non symmetric object
Moment of inertia of non symmetric objectMoment of inertia of non symmetric object
Moment of inertia of non symmetric objectIntishar Rahman
 
Seismic analysis of multi storey reinforced concrete buildings frame”
Seismic analysis of multi storey reinforced concrete buildings frame”Seismic analysis of multi storey reinforced concrete buildings frame”
Seismic analysis of multi storey reinforced concrete buildings frame”ankialok
 

Tendances (20)

P&b m6
P&b m6P&b m6
P&b m6
 
Baseplate
BaseplateBaseplate
Baseplate
 
Design notes for seismic design of building accordance to Eurocode 8
Design notes for seismic design of building accordance to Eurocode 8 Design notes for seismic design of building accordance to Eurocode 8
Design notes for seismic design of building accordance to Eurocode 8
 
1.3 conjugate beam method problems1
1.3 conjugate beam method problems11.3 conjugate beam method problems1
1.3 conjugate beam method problems1
 
Multiframe intro
Multiframe introMultiframe intro
Multiframe intro
 
Ejemplo de una escuela en etabs
Ejemplo de una escuela en etabsEjemplo de una escuela en etabs
Ejemplo de una escuela en etabs
 
muros de contension
muros de contensionmuros de contension
muros de contension
 
PEER NGA-West2 Database
PEER NGA-West2 DatabasePEER NGA-West2 Database
PEER NGA-West2 Database
 
Atc 40
Atc 40Atc 40
Atc 40
 
Two way slab
Two way slabTwo way slab
Two way slab
 
Lecture 6 7 Rm Shear Walls
Lecture 6 7 Rm Shear WallsLecture 6 7 Rm Shear Walls
Lecture 6 7 Rm Shear Walls
 
Puente colgante analisis
Puente colgante analisisPuente colgante analisis
Puente colgante analisis
 
Ingenieria calculo de estructuras de cimentacion
Ingenieria calculo de estructuras de cimentacionIngenieria calculo de estructuras de cimentacion
Ingenieria calculo de estructuras de cimentacion
 
Footfall vibration analysis
Footfall vibration analysisFootfall vibration analysis
Footfall vibration analysis
 
183710439 friction-from-meriam-pdf
183710439 friction-from-meriam-pdf183710439 friction-from-meriam-pdf
183710439 friction-from-meriam-pdf
 
Diseño de losa nervada doblemente armada
Diseño de losa nervada doblemente armadaDiseño de losa nervada doblemente armada
Diseño de losa nervada doblemente armada
 
Diseno de zapatas corridas bajo columnas (ing civil)
Diseno de zapatas corridas bajo columnas (ing civil)Diseno de zapatas corridas bajo columnas (ing civil)
Diseno de zapatas corridas bajo columnas (ing civil)
 
7 columnas
7  columnas7  columnas
7 columnas
 
Moment of inertia of non symmetric object
Moment of inertia of non symmetric objectMoment of inertia of non symmetric object
Moment of inertia of non symmetric object
 
Seismic analysis of multi storey reinforced concrete buildings frame”
Seismic analysis of multi storey reinforced concrete buildings frame”Seismic analysis of multi storey reinforced concrete buildings frame”
Seismic analysis of multi storey reinforced concrete buildings frame”
 

En vedette

Working Like Fred Flintstone in a George Jetson World?
Working Like Fred Flintstone in a George Jetson World? Working Like Fred Flintstone in a George Jetson World?
Working Like Fred Flintstone in a George Jetson World? Michelle Scifers, MBA
 
Case Study - University of Colorado Parking Garage and Field
Case Study - University of Colorado Parking Garage and FieldCase Study - University of Colorado Parking Garage and Field
Case Study - University of Colorado Parking Garage and FieldAMSYSCO Inc.
 
Amsysco Presentation (Slideshare)
Amsysco Presentation (Slideshare)Amsysco Presentation (Slideshare)
Amsysco Presentation (Slideshare)AMSYSCO Inc.
 
What Could You Buy For $263 Trillion
What Could You Buy For $263 TrillionWhat Could You Buy For $263 Trillion
What Could You Buy For $263 TrillionAMSYSCO Inc.
 
Minnesota Twins Target Field & Post Tensioning
Minnesota Twins Target Field & Post TensioningMinnesota Twins Target Field & Post Tensioning
Minnesota Twins Target Field & Post TensioningAMSYSCO Inc.
 
Post formed holes-in_post-tensioned_slabs
Post formed holes-in_post-tensioned_slabsPost formed holes-in_post-tensioned_slabs
Post formed holes-in_post-tensioned_slabsCCL Concrete
 
Post Tensioning Review Session for Installers
Post Tensioning Review Session for InstallersPost Tensioning Review Session for Installers
Post Tensioning Review Session for InstallersAMSYSCO Inc.
 
CTBUH Innovation Award Nominee - Vertical Unbonded Post-Tensioning
CTBUH Innovation Award Nominee - Vertical Unbonded Post-TensioningCTBUH Innovation Award Nominee - Vertical Unbonded Post-Tensioning
CTBUH Innovation Award Nominee - Vertical Unbonded Post-TensioningAMSYSCO Inc.
 
Infrastructure and Unbonded Post Tensioning
Infrastructure and Unbonded Post TensioningInfrastructure and Unbonded Post Tensioning
Infrastructure and Unbonded Post TensioningAMSYSCO Inc.
 
OneEleven Tower - post tensioned transfer deck
OneEleven Tower - post tensioned transfer deckOneEleven Tower - post tensioned transfer deck
OneEleven Tower - post tensioned transfer deckAMSYSCO Inc.
 
Post-Tension Concrete - Info session for Contractors
Post-Tension Concrete - Info session for ContractorsPost-Tension Concrete - Info session for Contractors
Post-Tension Concrete - Info session for ContractorsAMSYSCO Inc.
 
post tensioning slabs
post tensioning slabspost tensioning slabs
post tensioning slabsgopichand's
 

En vedette (14)

Qa 2
Qa 2Qa 2
Qa 2
 
Working Like Fred Flintstone in a George Jetson World?
Working Like Fred Flintstone in a George Jetson World? Working Like Fred Flintstone in a George Jetson World?
Working Like Fred Flintstone in a George Jetson World?
 
Case Study - University of Colorado Parking Garage and Field
Case Study - University of Colorado Parking Garage and FieldCase Study - University of Colorado Parking Garage and Field
Case Study - University of Colorado Parking Garage and Field
 
Amsysco Presentation (Slideshare)
Amsysco Presentation (Slideshare)Amsysco Presentation (Slideshare)
Amsysco Presentation (Slideshare)
 
Build for You
Build for YouBuild for You
Build for You
 
What Could You Buy For $263 Trillion
What Could You Buy For $263 TrillionWhat Could You Buy For $263 Trillion
What Could You Buy For $263 Trillion
 
Minnesota Twins Target Field & Post Tensioning
Minnesota Twins Target Field & Post TensioningMinnesota Twins Target Field & Post Tensioning
Minnesota Twins Target Field & Post Tensioning
 
Post formed holes-in_post-tensioned_slabs
Post formed holes-in_post-tensioned_slabsPost formed holes-in_post-tensioned_slabs
Post formed holes-in_post-tensioned_slabs
 
Post Tensioning Review Session for Installers
Post Tensioning Review Session for InstallersPost Tensioning Review Session for Installers
Post Tensioning Review Session for Installers
 
CTBUH Innovation Award Nominee - Vertical Unbonded Post-Tensioning
CTBUH Innovation Award Nominee - Vertical Unbonded Post-TensioningCTBUH Innovation Award Nominee - Vertical Unbonded Post-Tensioning
CTBUH Innovation Award Nominee - Vertical Unbonded Post-Tensioning
 
Infrastructure and Unbonded Post Tensioning
Infrastructure and Unbonded Post TensioningInfrastructure and Unbonded Post Tensioning
Infrastructure and Unbonded Post Tensioning
 
OneEleven Tower - post tensioned transfer deck
OneEleven Tower - post tensioned transfer deckOneEleven Tower - post tensioned transfer deck
OneEleven Tower - post tensioned transfer deck
 
Post-Tension Concrete - Info session for Contractors
Post-Tension Concrete - Info session for ContractorsPost-Tension Concrete - Info session for Contractors
Post-Tension Concrete - Info session for Contractors
 
post tensioning slabs
post tensioning slabspost tensioning slabs
post tensioning slabs
 

Similaire à Importance of PTI Certification for Unbonded Post-Tensioning Projects

Similaire à Importance of PTI Certification for Unbonded Post-Tensioning Projects (20)

CV_Arvind Pandey
CV_Arvind PandeyCV_Arvind Pandey
CV_Arvind Pandey
 
Thiru.CV_Latest
Thiru.CV_LatestThiru.CV_Latest
Thiru.CV_Latest
 
Trinity N D T Training Brochure
Trinity  N D T  Training  BrochureTrinity  N D T  Training  Brochure
Trinity N D T Training Brochure
 
Trinity Ndt Training Brochure
Trinity Ndt Training BrochureTrinity Ndt Training Brochure
Trinity Ndt Training Brochure
 
Qa,qc
Qa,qcQa,qc
Qa,qc
 
Trinity NDT, India training courses institute brochure
Trinity NDT, India training courses institute brochureTrinity NDT, India training courses institute brochure
Trinity NDT, India training courses institute brochure
 
Mani cv
Mani   cvMani   cv
Mani cv
 
API 580 CERTIFICATION PREPARATION COURSE FOR ADVANCED RISK BASED INSPECTION
API 580 CERTIFICATION PREPARATION COURSE FOR ADVANCED RISK BASED INSPECTIONAPI 580 CERTIFICATION PREPARATION COURSE FOR ADVANCED RISK BASED INSPECTION
API 580 CERTIFICATION PREPARATION COURSE FOR ADVANCED RISK BASED INSPECTION
 
QA QC Inspector.doc 1
QA QC Inspector.doc 1QA QC Inspector.doc 1
QA QC Inspector.doc 1
 
HASSAN AWAN QC Welding Inspector CV
HASSAN AWAN QC Welding Inspector CVHASSAN AWAN QC Welding Inspector CV
HASSAN AWAN QC Welding Inspector CV
 
Resume-Welding inspector
Resume-Welding inspectorResume-Welding inspector
Resume-Welding inspector
 
vinu new cv p wp
vinu new cv p wpvinu new cv p wp
vinu new cv p wp
 
Certificate in Chemical Process Technology
Certificate in Chemical Process TechnologyCertificate in Chemical Process Technology
Certificate in Chemical Process Technology
 
Scheduled Appraisal System
Scheduled Appraisal SystemScheduled Appraisal System
Scheduled Appraisal System
 
Ashish jariwala -Resume
Ashish jariwala -ResumeAshish jariwala -Resume
Ashish jariwala -Resume
 
Muhammad Sajid (CV)
Muhammad Sajid (CV)Muhammad Sajid (CV)
Muhammad Sajid (CV)
 
CV
CVCV
CV
 
KrishnanUnni-CV
KrishnanUnni-CVKrishnanUnni-CV
KrishnanUnni-CV
 
Resume_ Arunkumar
Resume_ Arunkumar  Resume_ Arunkumar
Resume_ Arunkumar
 
Participants Recruitment Planning for Usability Testing
Participants Recruitment Planning for Usability TestingParticipants Recruitment Planning for Usability Testing
Participants Recruitment Planning for Usability Testing
 

Plus de AMSYSCO Inc.

Case Study - One Eleven Tower
Case Study - One Eleven TowerCase Study - One Eleven Tower
Case Study - One Eleven TowerAMSYSCO Inc.
 
Concrete International - Wayzata Bay Infrastructure
Concrete International - Wayzata Bay InfrastructureConcrete International - Wayzata Bay Infrastructure
Concrete International - Wayzata Bay InfrastructureAMSYSCO Inc.
 
AMSYSCO's resume of Tall Buildings
AMSYSCO's resume of Tall BuildingsAMSYSCO's resume of Tall Buildings
AMSYSCO's resume of Tall BuildingsAMSYSCO Inc.
 
PTI Journal : Buford Ave post-tensioned pavement
PTI Journal : Buford Ave post-tensioned pavementPTI Journal : Buford Ave post-tensioned pavement
PTI Journal : Buford Ave post-tensioned pavementAMSYSCO Inc.
 
One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)AMSYSCO Inc.
 
Case Study – Social Media Small Business
Case Study – Social Media Small BusinessCase Study – Social Media Small Business
Case Study – Social Media Small BusinessAMSYSCO Inc.
 
2009 PTI Legends & Fellow Awards
2009 PTI Legends & Fellow Awards2009 PTI Legends & Fellow Awards
2009 PTI Legends & Fellow AwardsAMSYSCO Inc.
 
2008 PTI Awards Booklet
2008 PTI Awards Booklet2008 PTI Awards Booklet
2008 PTI Awards BookletAMSYSCO Inc.
 
White paper - Encapsulated Post Tensioned Concrete
White paper -  Encapsulated Post Tensioned ConcreteWhite paper -  Encapsulated Post Tensioned Concrete
White paper - Encapsulated Post Tensioned ConcreteAMSYSCO Inc.
 
What Is Post Tensioning
What Is Post TensioningWhat Is Post Tensioning
What Is Post TensioningAMSYSCO Inc.
 
Parking Today article: Louisville Arena
Parking Today article: Louisville ArenaParking Today article: Louisville Arena
Parking Today article: Louisville ArenaAMSYSCO Inc.
 
ENR Article: 1620 S. Michigan Condos
ENR Article: 1620 S. Michigan CondosENR Article: 1620 S. Michigan Condos
ENR Article: 1620 S. Michigan CondosAMSYSCO Inc.
 
ENR Article; New Guthrie Theater & Garage
ENR Article;  New Guthrie Theater & GarageENR Article;  New Guthrie Theater & Garage
ENR Article; New Guthrie Theater & GarageAMSYSCO Inc.
 
PTI Journal Article: 340 On The Park
PTI Journal Article: 340 On The ParkPTI Journal Article: 340 On The Park
PTI Journal Article: 340 On The ParkAMSYSCO Inc.
 
ENR Article: Minneapolis St. Paul Airport Garage
ENR Article: Minneapolis St. Paul Airport GarageENR Article: Minneapolis St. Paul Airport Garage
ENR Article: Minneapolis St. Paul Airport GarageAMSYSCO Inc.
 

Plus de AMSYSCO Inc. (16)

Case Study - One Eleven Tower
Case Study - One Eleven TowerCase Study - One Eleven Tower
Case Study - One Eleven Tower
 
Concrete International - Wayzata Bay Infrastructure
Concrete International - Wayzata Bay InfrastructureConcrete International - Wayzata Bay Infrastructure
Concrete International - Wayzata Bay Infrastructure
 
AMSYSCO's resume of Tall Buildings
AMSYSCO's resume of Tall BuildingsAMSYSCO's resume of Tall Buildings
AMSYSCO's resume of Tall Buildings
 
PTI Journal : Buford Ave post-tensioned pavement
PTI Journal : Buford Ave post-tensioned pavementPTI Journal : Buford Ave post-tensioned pavement
PTI Journal : Buford Ave post-tensioned pavement
 
One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)
 
Case Study – Social Media Small Business
Case Study – Social Media Small BusinessCase Study – Social Media Small Business
Case Study – Social Media Small Business
 
2009 PTI Legends & Fellow Awards
2009 PTI Legends & Fellow Awards2009 PTI Legends & Fellow Awards
2009 PTI Legends & Fellow Awards
 
2008 PTI Awards Booklet
2008 PTI Awards Booklet2008 PTI Awards Booklet
2008 PTI Awards Booklet
 
White paper - Encapsulated Post Tensioned Concrete
White paper -  Encapsulated Post Tensioned ConcreteWhite paper -  Encapsulated Post Tensioned Concrete
White paper - Encapsulated Post Tensioned Concrete
 
What Is Post Tensioning
What Is Post TensioningWhat Is Post Tensioning
What Is Post Tensioning
 
Parking Today article: Louisville Arena
Parking Today article: Louisville ArenaParking Today article: Louisville Arena
Parking Today article: Louisville Arena
 
ENR Article: 1620 S. Michigan Condos
ENR Article: 1620 S. Michigan CondosENR Article: 1620 S. Michigan Condos
ENR Article: 1620 S. Michigan Condos
 
ENR Article; New Guthrie Theater & Garage
ENR Article;  New Guthrie Theater & GarageENR Article;  New Guthrie Theater & Garage
ENR Article; New Guthrie Theater & Garage
 
PTI Journal Article: 340 On The Park
PTI Journal Article: 340 On The ParkPTI Journal Article: 340 On The Park
PTI Journal Article: 340 On The Park
 
ENR Article: Minneapolis St. Paul Airport Garage
ENR Article: Minneapolis St. Paul Airport GarageENR Article: Minneapolis St. Paul Airport Garage
ENR Article: Minneapolis St. Paul Airport Garage
 
Amsysco Brochure
Amsysco BrochureAmsysco Brochure
Amsysco Brochure
 

Dernier

Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataBabyAnnMotar
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...JojoEDelaCruz
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxRosabel UA
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 

Dernier (20)

Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped data
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptx
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 

Importance of PTI Certification for Unbonded Post-Tensioning Projects

  • 1. Importance of Unbonded Field Personnel Certification Neel Khosa AMSYSCO, Inc. Chair of PTI Unbonded PT Field Personnel Certification Committee (UFPC) (CRT-30)
  • 2. Why should Structural Engineers want PTI-Certified personnel ??? Satisfies ACI-318 Requirement Durability of Post-Tensioned Structure Better Value for the Owner
  • 3. ACI-318 Building Code Requirement For Structural Concrete “Requires that post-tensioning installation be performed by individuals certified by an independent training and certification program.”
  • 4. Recommended language for Project Specification Installation shall be performed by individuals holding a current certificate as a PTI Certified Installer – Level 1 Unbonded Post-Tensioning Field Installation, or approved equal.
  • 5. Recommended language for Project Specification All post-tensioning work shall be supervised by the PT Installer’s superintendent, who shall have a current Level 2 Unbonded Post-Tensioning Ironworker certification, or approved equal.
  • 6. Why should Contractors and Installers want PTI-Certified personnel ??? Project Benefit • Quality Control • Improved Productivity • Improved Profitability Safety Benefit • Risk Reduction Individual Benefit • Earn Professional Development (PDH/CEUs) • Increased Knowledge
  • 7. Value Proposition Certifying a crew of 10 ironworkers (Level 2 UPT Ironworker) costs $5,500. Having a concrete blowout due to reverse curvature could cost the project at least $16,000 (excluding schedule delay costs).
  • 8. Testimonials “PTI Certified Installers are critical to ensuring project stakeholders a quality end product. The training and certification of the installers is paramount to the performance and safety of post-tensioned concrete.” - Dean Locher : Corna-Kokosing Construction
  • 9. Testimonials “Post-tensioning is a wonderful tool for structural engineers but apprehension related to installation challenges still remains in the marketplace. Having PTI-certified installers on our projects not only gives us the confidence that our designs are implemented as envisioned, but also that the intended durability of our design is being provided.“ - Carl Schneeman, Walker Parking Consultants
  • 10. Unbonded Post-Tensioning (UPT) Certification Level 1 UPT – Field Installation Level 1 & 2 UPT – Inspector Level 1 & 2 UPT – Ironworker • Accelerated Course Slab-on-Ground Installer – Stressor
  • 11. Level 1 UPT Field Installation • Registration Prerequisites: None • 2 Day Workshop – Intro to Unbonded PT (UPT) for Superstructures – Offered in English and Spanish • Certification Requirements: – Workshop Attendance – Exam Score: 70% or better – Work Experience: None
  • 12. Level 1 & 2 UPT Inspector • Registration Prerequisites: None • 3 Day Workshop – 2 days of Level 1 UPT Field – 1 day of Inspector • Certification Requirements: – Workshop Attendance – Exam Score: 80% or better – Work Experience: 500 Hours (inspect/install)
  • 13. Level 1 & 2 UPT Ironworker • Registration Prerequisites: – Current Level 1 UPT Field certification – And 500 hours in last 5 years (50 hours stressing) OR – 4000 hours work experience – Of which 200 hours of stressing OR – 2000 hours work experience in last 5 years – Of which 100 hours of stressing
  • 14. Level 1 & 2 UPT Ironworker • 2 ½ Day Workshop – Accelerated Course – Hands-on Training • Certification Requirements: – Workshop Attendance – Exam Score: 80% or better – Work Experience: 2000 hours in last 5 years – Valid Affidavit needed to prove experience
  • 15. Slab-on-Ground Installer Stressor • Registration Prerequisites: None • 2 Day Workshop – Intro to Unbonded PT (UPT) for Slab-on-Ground • Certification Requirements – Workshop Attendance – Exam Score: 70% or better – Work Experience: 500 Hours (inspect/install)
  • 16. Online Renewal Exams • Go to http://post-tensioning.org/category/x_zEY2l3kPT/Online%20Re-Certification • Answer 60 questions. • Level 1 renewed if 70% answered correctly. • Level 2 renewed if 80% answered correctly. • If successful, then Certification extended by 4 years.
  • 17.
  • 18. Online Directory • Certification lasts 4 years. • Searchable Public Directory • Individuals Information – Certification ID – Active Certifications – Expiration Dates http://www.post-tensioning.org/cert_person.php
  • 20. 2012 Workshop Schedule TYPE DATE LOCATION L1 Field May 5-6 Nashville, TN June 9-10 Miami, FL July 7-8 Seattle, WA September 8-9 Memphis, TN October 13-14 Ontario, California November 10-11 Atlanta, GA SOG Stressor June 9-10 Ontario, California L1+L2 Inspector June 22-24 Denver, CO July 27-29 Las Vegas, NV September 21-23 Houston, TX
  • 21. Special Request Workshop • Onsite training. • Eliminate travel expenses. • All UPT Certifications offered. • Contact PTI Certification Director for more info. – Miroslav Vejvoda – miroslav.vejvoda@post-tensioning.org
  • 22. The Presenters… Chuck Adams Thomas Mathews Jim Beicker Clint Mueller Thomas Helm Douglas Schlegel Larry Krauser Charlie Skarbrevik Kris Kriofske Randy Spoon Miroslav Vejvoda
  • 23. THANK YOU From your friends in CRT-30 (UFPC) Unbonded PT Field Personnel Certification Committee