Chapter 5 –
Project Scope Management
PMP
Trainer: Anand Bobade PMBOK 6th Edition, 2019, All rights reserved.
Validate Scope
SIXTH EDITION
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
5.5 Validate Scope
Overview
Validate Scope definition
Validate Scope - ITTO
Difference between validate scope & control quality?
What is Inspection?
What is Verified deliverables & Accepted Deliverables?
Review
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Scope Management processes
Plan scope
management
Collect
Requirements
Define Scope
Create WBS Validate Scope Control Scope
P P P
MC MCP
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Validate Scope -> Overview
You bought a flat & it is ready for handover?
What you do before signing handover papers?
You inspect Flooring, walls for cracks, Doors, Toilet fixtures,
Kitchen, built-in cupboards, electricity fittings etc.
What are you doing? You are validating everything before formally
signing handover documents.
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
• It is primarily concerned with
correctness of deliverables &
meeting quality requirements
specified for deliverables.
Control Quality
(Project Quality Manag.)
• This process is primarily
concerned with acceptance of
the deliverables.
Validate Scope
(Project Scope Manag.)
Control Quality is generally performed before Validate
Scope, although the two processes may be performed in
parallel but quality control will complete first.
The verified deliverables obtained from Control Quality
process are reviewed with customer & get formal
acceptance.
Validate Scope -> Relation with Quality Control
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Formalizing acceptance of completed project deliverable,
at the end of each phase or project.
Validate Scope -> Definition
It brings objectivity to acceptance process & increases
chance of final product, service, or result acceptance.
Verified by quality team
Formalizing acceptance
of deliverables
Deliverable Accepted Or
Change Request
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Validate Scope Process ->ITTO
Inspection
Decision Making
Project
Management plan
Project
documents
Verified
deliverables
Works
performance data
Accepted deliverables
Work Performance
Information
Change Request
Project Documents
updates
Inputs Tools & Techniques Outputs
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Validate Scope -> Input
Project Management
plan
Project documents Verified deliverables
Works performance
data
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project
Management plan
Validate Scope -> Input->Project Management plan
Scope Management plan
•Defines process for scope validation.
•How the formal acceptance of the completed
project deliverables will be obtained.
Requirements management plan
•Helps in tracing requirements from its origin
till delivery.
Scope Baseline
•Approved scope – Project Scope statement,
WBS & WBS dictionary
Following subsidiary plans & baseline will be guide business acceptance.
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project documents
Following Project documents can be useful.
Requirements Documentation:
• They are compared to the deliverables which fulfill these
requirements.
Req. Traceability Matrix:
• Contains information about how requirements are
validated.
Quality reports
• These are the findings from the Control Quality process
• Control quality process internally verifies quality of the
deliverables.
Lessons Learned Register
• Validate Scope is done throughout the project.
• Lessons learned on intermediate deliverables, can be
applied in latter phases.
Validate Scope -> Input->Project documents
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Verified deliverables
Project deliverables that are completed and checked for correctness
through the Control Quality process.
Validate Scope -> Input-> Verified deliverables
Direct and Manage
Project work Control Quality
Verified
deliverablesDeliverables
Elements of PMP
Requirements
documents
Completed
Product Signed Contract
Software
Component
Examples:
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Works performance
data
These observations and measurements can include
Validate Scope -> Input -> Works performance data
Degree of
compliance with
requirements
Number of
nonconformities
Severity of
nonconformities
Number of
validation cycles
performed.
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Validate Scope -> Tools and Techniques
Inspection Decision Making
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Inspections are sometimes called as reviews, product reviews, audits, and walkthroughs.
Includes activities such as measuring, examining, & validating to determine whether
work & deliverables meet acceptance criteria.
Factory Inspection
Final Vehicle inspection
at delivery bay
Project Audit
Validate Scope -> Tools and Techniques -> Inspection
Inspection
MeasureExamine
Validate
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Decision
Making
Group discuss & reaches conclusion after scope validation. This is done
against a acceptance criteria.
Unanimity Majority Plurality
Validate Scope -> Tools and Techniques -> Decision Making
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Validate Scope -> Outputs
Accepted
deliverables
Change Request
Work Performance
Information
Project Documents
updates
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Accepted
deliverables
Deliverables that meet the acceptance criteria are formally signed off & approved
by the Customer or sponsor.
These are used in Close Project or Phase process.
Validate Scope -> Outputs -> Accepted deliverables
•Follow the
process
•Escalate to
your Manager
No approval / No response:
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Change Request
Validate Scope -> Outputs -> Change Request
The completed deliverable that have not been formally accepted are
documented, along with reason for non-acceptance
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Work Performance
Information
It includes information about project progress, such as which deliverables that
have started, finished or which have been accepted
Validate Scope -> Outputs -> Work Performance Information
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project Documents
updates
Validate Scope -> Outputs -> Project Documents updates
Requirements Documentation (+RTM):
•Result of the Validate Scope process for the
requirements should be documented.
•Validated requirements are marked on RTM.
Lessons Learned Register
•The challenges encountered in the Validate Scope
process.
•Which approach worked well or failed?
These documents may get updated.
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
In both cases completed deliverables are
validated & accepted.
Validate Scope -> When project cancelled or terminated?
• Make sure efforts spent on
the projects are not lost.
Early Termination of
Project
• Document level of
completed deliverables.
Cancellation of Project
What to do during Project Cancellation or Termination
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Validate Scope -> Review
Overview
Validate Scope definition
Validate Scope - ITTO
Difference between validate scope & control quality?
What is Inspection?
What is Verified deliverables & Accepted Deliverables
Early termination & project cancellation
Chap 5.5 validate scope

More Related Content

What's hot

Chap 7.2 Estimate Cost
Chap 7.2 Estimate CostChap 7.2 Estimate Cost
Chap 7.2 Estimate CostAnand Bobade
 
Chap 6.2 Define Activity
Chap 6.2 Define ActivityChap 6.2 Define Activity
Chap 6.2 Define ActivityAnand Bobade
 
Chap 7.3 Determine budget
Chap 7.3   Determine budgetChap 7.3   Determine budget
Chap 7.3 Determine budgetAnand Bobade
 
PMP Chap 7 - Project Cost Management - Part 1
PMP Chap 7 - Project Cost Management - Part 1PMP Chap 7 - Project Cost Management - Part 1
PMP Chap 7 - Project Cost Management - Part 1Anand Bobade
 
Chap 9.0 Project Resource Management overview
Chap 9.0   Project Resource Management overviewChap 9.0   Project Resource Management overview
Chap 9.0 Project Resource Management overviewAnand Bobade
 
Chap 9.5 Manage Team
Chap 9.5  Manage TeamChap 9.5  Manage Team
Chap 9.5 Manage TeamAnand Bobade
 
Chap 9.6 Control Resources
Chap 9.6  Control ResourcesChap 9.6  Control Resources
Chap 9.6 Control ResourcesAnand Bobade
 
Chap 4.7 Project or Phase Close
Chap 4.7 Project or Phase CloseChap 4.7 Project or Phase Close
Chap 4.7 Project or Phase CloseAnand Bobade
 
PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1Anand Bobade
 
5 phases of project management
5 phases of project management5 phases of project management
5 phases of project managementJared C. Powell
 
Chap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewChap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewAnand Bobade
 
PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2Anand Bobade
 
Chap 11.2 Identify Risks
Chap 11.2 Identify RisksChap 11.2 Identify Risks
Chap 11.2 Identify RisksAnand Bobade
 
Chap 8.3 Control Quality
Chap 8.3  Control QualityChap 8.3  Control Quality
Chap 8.3 Control QualityAnand Bobade
 
Chap 8.1 Plan quality management
Chap 8.1 Plan quality managementChap 8.1 Plan quality management
Chap 8.1 Plan quality managementAnand Bobade
 
PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2Anand Bobade
 
Chap 9.2 Estimate Activity Resource
Chap 9.2   Estimate Activity ResourceChap 9.2   Estimate Activity Resource
Chap 9.2 Estimate Activity ResourceAnand Bobade
 
Project Scope Management - PMBOK6
Project Scope Management - PMBOK6Project Scope Management - PMBOK6
Project Scope Management - PMBOK6Agus Suhanto
 

What's hot (20)

Chap 7.2 Estimate Cost
Chap 7.2 Estimate CostChap 7.2 Estimate Cost
Chap 7.2 Estimate Cost
 
Chap 6.2 Define Activity
Chap 6.2 Define ActivityChap 6.2 Define Activity
Chap 6.2 Define Activity
 
Chap 7.3 Determine budget
Chap 7.3   Determine budgetChap 7.3   Determine budget
Chap 7.3 Determine budget
 
PMP Chap 7 - Project Cost Management - Part 1
PMP Chap 7 - Project Cost Management - Part 1PMP Chap 7 - Project Cost Management - Part 1
PMP Chap 7 - Project Cost Management - Part 1
 
Chap 9.0 Project Resource Management overview
Chap 9.0   Project Resource Management overviewChap 9.0   Project Resource Management overview
Chap 9.0 Project Resource Management overview
 
Chap 9.5 Manage Team
Chap 9.5  Manage TeamChap 9.5  Manage Team
Chap 9.5 Manage Team
 
Chap 9.6 Control Resources
Chap 9.6  Control ResourcesChap 9.6  Control Resources
Chap 9.6 Control Resources
 
Chap 4.7 Project or Phase Close
Chap 4.7 Project or Phase CloseChap 4.7 Project or Phase Close
Chap 4.7 Project or Phase Close
 
PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1
 
PMP_Project Integration Management
PMP_Project Integration ManagementPMP_Project Integration Management
PMP_Project Integration Management
 
5 phases of project management
5 phases of project management5 phases of project management
5 phases of project management
 
Chap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewChap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management Overview
 
PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2
 
Chap 11.2 Identify Risks
Chap 11.2 Identify RisksChap 11.2 Identify Risks
Chap 11.2 Identify Risks
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
 
Chap 8.3 Control Quality
Chap 8.3  Control QualityChap 8.3  Control Quality
Chap 8.3 Control Quality
 
Chap 8.1 Plan quality management
Chap 8.1 Plan quality managementChap 8.1 Plan quality management
Chap 8.1 Plan quality management
 
PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2
 
Chap 9.2 Estimate Activity Resource
Chap 9.2   Estimate Activity ResourceChap 9.2   Estimate Activity Resource
Chap 9.2 Estimate Activity Resource
 
Project Scope Management - PMBOK6
Project Scope Management - PMBOK6Project Scope Management - PMBOK6
Project Scope Management - PMBOK6
 

Similar to Chap 5.5 validate scope

Chap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project workChap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project workAnand Bobade
 
Chap 5.3 define scope
Chap 5.3 define scopeChap 5.3 define scope
Chap 5.3 define scopeAnand Bobade
 
Chap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project WorkChap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project WorkAnand Bobade
 
Chap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change ControlChap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change ControlAnand Bobade
 
PMP Chap 5.0 Scope Management Overview
PMP Chap 5.0 Scope Management OverviewPMP Chap 5.0 Scope Management Overview
PMP Chap 5.0 Scope Management OverviewAnand Bobade
 
Chap 12.3 Control Procurement
Chap 12.3 Control ProcurementChap 12.3 Control Procurement
Chap 12.3 Control ProcurementAnand Bobade
 
Chap 6.3 Sequence Activity
Chap 6.3 Sequence ActivityChap 6.3 Sequence Activity
Chap 6.3 Sequence ActivityAnand Bobade
 
Chap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement ManagementChap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement ManagementAnand Bobade
 
Chap 5.1 Plan Scope Management
Chap 5.1 Plan Scope ManagementChap 5.1 Plan Scope Management
Chap 5.1 Plan Scope ManagementAnand Bobade
 
Chap 5.2 Collect requirements
Chap 5.2 Collect requirementsChap 5.2 Collect requirements
Chap 5.2 Collect requirementsAnand Bobade
 
PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2Anand Bobade
 
GP_Training_APQP-PPAP_RevAF.pptx
GP_Training_APQP-PPAP_RevAF.pptxGP_Training_APQP-PPAP_RevAF.pptx
GP_Training_APQP-PPAP_RevAF.pptxNonameNoname50
 
Good IT Project Management
Good IT Project Management Good IT Project Management
Good IT Project Management William Francis
 
Chap 12.2 Conduct Procurement
Chap 12.2 Conduct ProcurementChap 12.2 Conduct Procurement
Chap 12.2 Conduct ProcurementAnand Bobade
 
Chap 11.7 Monitor Risks
Chap 11.7 Monitor RisksChap 11.7 Monitor Risks
Chap 11.7 Monitor RisksAnand Bobade
 
2014 sdlc project and gate process rollout published v6
2014 sdlc project and gate process rollout   published v62014 sdlc project and gate process rollout   published v6
2014 sdlc project and gate process rollout published v6Jayne Edwards
 
PMP 47 process definitions
PMP 47 process definitionsPMP 47 process definitions
PMP 47 process definitionsAnand Bobade
 

Similar to Chap 5.5 validate scope (20)

Chap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project workChap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project work
 
Chap 5.3 define scope
Chap 5.3 define scopeChap 5.3 define scope
Chap 5.3 define scope
 
Chap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project WorkChap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project Work
 
Chap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change ControlChap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change Control
 
PMP Chap 5.0 Scope Management Overview
PMP Chap 5.0 Scope Management OverviewPMP Chap 5.0 Scope Management Overview
PMP Chap 5.0 Scope Management Overview
 
Chap 12.3 Control Procurement
Chap 12.3 Control ProcurementChap 12.3 Control Procurement
Chap 12.3 Control Procurement
 
Chap 6.3 Sequence Activity
Chap 6.3 Sequence ActivityChap 6.3 Sequence Activity
Chap 6.3 Sequence Activity
 
IT NPI Process
IT NPI ProcessIT NPI Process
IT NPI Process
 
Chap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement ManagementChap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement Management
 
Chap 5.1 Plan Scope Management
Chap 5.1 Plan Scope ManagementChap 5.1 Plan Scope Management
Chap 5.1 Plan Scope Management
 
Chap 5.2 Collect requirements
Chap 5.2 Collect requirementsChap 5.2 Collect requirements
Chap 5.2 Collect requirements
 
Module 12 Monitoring and Control I
Module 12 Monitoring and Control IModule 12 Monitoring and Control I
Module 12 Monitoring and Control I
 
Session 4 gdas pmp study group presentation
Session 4   gdas pmp study group presentationSession 4   gdas pmp study group presentation
Session 4 gdas pmp study group presentation
 
PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2
 
GP_Training_APQP-PPAP_RevAF.pptx
GP_Training_APQP-PPAP_RevAF.pptxGP_Training_APQP-PPAP_RevAF.pptx
GP_Training_APQP-PPAP_RevAF.pptx
 
Good IT Project Management
Good IT Project Management Good IT Project Management
Good IT Project Management
 
Chap 12.2 Conduct Procurement
Chap 12.2 Conduct ProcurementChap 12.2 Conduct Procurement
Chap 12.2 Conduct Procurement
 
Chap 11.7 Monitor Risks
Chap 11.7 Monitor RisksChap 11.7 Monitor Risks
Chap 11.7 Monitor Risks
 
2014 sdlc project and gate process rollout published v6
2014 sdlc project and gate process rollout   published v62014 sdlc project and gate process rollout   published v6
2014 sdlc project and gate process rollout published v6
 
PMP 47 process definitions
PMP 47 process definitionsPMP 47 process definitions
PMP 47 process definitions
 

More from Anand Bobade

PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...Anand Bobade
 
Chap 12.0 Procurement Management overview
Chap 12.0   Procurement Management overviewChap 12.0   Procurement Management overview
Chap 12.0 Procurement Management overviewAnand Bobade
 
Chap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationChap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationAnand Bobade
 
Chap 10.2 Manage Communication
Chap 10.2  Manage CommunicationChap 10.2  Manage Communication
Chap 10.2 Manage CommunicationAnand Bobade
 
Chap 10.1 Plan Communication Management
Chap 10.1  Plan Communication ManagementChap 10.1  Plan Communication Management
Chap 10.1 Plan Communication ManagementAnand Bobade
 
Chap 9.3 Acquire Resources
Chap 9.3   Acquire ResourcesChap 9.3   Acquire Resources
Chap 9.3 Acquire ResourcesAnand Bobade
 
Chap 7.1 Plan Cost Management
Chap 7.1  Plan Cost ManagementChap 7.1  Plan Cost Management
Chap 7.1 Plan Cost ManagementAnand Bobade
 
Chap 6.6 Control Schedule
Chap 6.6 Control ScheduleChap 6.6 Control Schedule
Chap 6.6 Control ScheduleAnand Bobade
 
Chap 6.5 Define Schedule
Chap 6.5 Define ScheduleChap 6.5 Define Schedule
Chap 6.5 Define ScheduleAnand Bobade
 
Chap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity DurationChap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity DurationAnand Bobade
 
Chap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule ManagementChap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule ManagementAnand Bobade
 

More from Anand Bobade (11)

PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
 
Chap 12.0 Procurement Management overview
Chap 12.0   Procurement Management overviewChap 12.0   Procurement Management overview
Chap 12.0 Procurement Management overview
 
Chap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationChap 10.3 Monitor Communication
Chap 10.3 Monitor Communication
 
Chap 10.2 Manage Communication
Chap 10.2  Manage CommunicationChap 10.2  Manage Communication
Chap 10.2 Manage Communication
 
Chap 10.1 Plan Communication Management
Chap 10.1  Plan Communication ManagementChap 10.1  Plan Communication Management
Chap 10.1 Plan Communication Management
 
Chap 9.3 Acquire Resources
Chap 9.3   Acquire ResourcesChap 9.3   Acquire Resources
Chap 9.3 Acquire Resources
 
Chap 7.1 Plan Cost Management
Chap 7.1  Plan Cost ManagementChap 7.1  Plan Cost Management
Chap 7.1 Plan Cost Management
 
Chap 6.6 Control Schedule
Chap 6.6 Control ScheduleChap 6.6 Control Schedule
Chap 6.6 Control Schedule
 
Chap 6.5 Define Schedule
Chap 6.5 Define ScheduleChap 6.5 Define Schedule
Chap 6.5 Define Schedule
 
Chap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity DurationChap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity Duration
 
Chap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule ManagementChap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule Management
 

Recently uploaded

Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxalinstan901
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxSaqib Mansoor Ahmed
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girladitipandeya
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, MumbaiPooja Nehwal
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
situational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Ssituational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Smisbafathima9940
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Pooja Nehwal
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceanilsa9823
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Hedda Bird
 

Recently uploaded (20)

Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
Discover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdfDiscover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdf
 
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg PartnershipUnlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
 
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote SpeakerLeadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptx
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
situational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Ssituational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima S
 
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdfImagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
 
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
Empowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdfEmpowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdf
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
LoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner CircleLoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner Circle
 

Chap 5.5 validate scope

  • 1. Chapter 5 – Project Scope Management PMP Trainer: Anand Bobade PMBOK 6th Edition, 2019, All rights reserved. Validate Scope SIXTH EDITION
  • 2. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) 5.5 Validate Scope Overview Validate Scope definition Validate Scope - ITTO Difference between validate scope & control quality? What is Inspection? What is Verified deliverables & Accepted Deliverables? Review
  • 3. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Scope Management processes Plan scope management Collect Requirements Define Scope Create WBS Validate Scope Control Scope P P P MC MCP
  • 4. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Validate Scope -> Overview You bought a flat & it is ready for handover? What you do before signing handover papers? You inspect Flooring, walls for cracks, Doors, Toilet fixtures, Kitchen, built-in cupboards, electricity fittings etc. What are you doing? You are validating everything before formally signing handover documents.
  • 5. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) • It is primarily concerned with correctness of deliverables & meeting quality requirements specified for deliverables. Control Quality (Project Quality Manag.) • This process is primarily concerned with acceptance of the deliverables. Validate Scope (Project Scope Manag.) Control Quality is generally performed before Validate Scope, although the two processes may be performed in parallel but quality control will complete first. The verified deliverables obtained from Control Quality process are reviewed with customer & get formal acceptance. Validate Scope -> Relation with Quality Control
  • 6. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Formalizing acceptance of completed project deliverable, at the end of each phase or project. Validate Scope -> Definition It brings objectivity to acceptance process & increases chance of final product, service, or result acceptance. Verified by quality team Formalizing acceptance of deliverables Deliverable Accepted Or Change Request
  • 7. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Validate Scope Process ->ITTO Inspection Decision Making Project Management plan Project documents Verified deliverables Works performance data Accepted deliverables Work Performance Information Change Request Project Documents updates Inputs Tools & Techniques Outputs
  • 8. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Validate Scope -> Input Project Management plan Project documents Verified deliverables Works performance data
  • 9. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project Management plan Validate Scope -> Input->Project Management plan Scope Management plan •Defines process for scope validation. •How the formal acceptance of the completed project deliverables will be obtained. Requirements management plan •Helps in tracing requirements from its origin till delivery. Scope Baseline •Approved scope – Project Scope statement, WBS & WBS dictionary Following subsidiary plans & baseline will be guide business acceptance.
  • 10. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project documents Following Project documents can be useful. Requirements Documentation: • They are compared to the deliverables which fulfill these requirements. Req. Traceability Matrix: • Contains information about how requirements are validated. Quality reports • These are the findings from the Control Quality process • Control quality process internally verifies quality of the deliverables. Lessons Learned Register • Validate Scope is done throughout the project. • Lessons learned on intermediate deliverables, can be applied in latter phases. Validate Scope -> Input->Project documents
  • 11. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Verified deliverables Project deliverables that are completed and checked for correctness through the Control Quality process. Validate Scope -> Input-> Verified deliverables Direct and Manage Project work Control Quality Verified deliverablesDeliverables Elements of PMP Requirements documents Completed Product Signed Contract Software Component Examples:
  • 12. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Works performance data These observations and measurements can include Validate Scope -> Input -> Works performance data Degree of compliance with requirements Number of nonconformities Severity of nonconformities Number of validation cycles performed.
  • 13. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Validate Scope -> Tools and Techniques Inspection Decision Making
  • 14. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Inspections are sometimes called as reviews, product reviews, audits, and walkthroughs. Includes activities such as measuring, examining, & validating to determine whether work & deliverables meet acceptance criteria. Factory Inspection Final Vehicle inspection at delivery bay Project Audit Validate Scope -> Tools and Techniques -> Inspection Inspection MeasureExamine Validate
  • 15. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Decision Making Group discuss & reaches conclusion after scope validation. This is done against a acceptance criteria. Unanimity Majority Plurality Validate Scope -> Tools and Techniques -> Decision Making
  • 16. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Validate Scope -> Outputs Accepted deliverables Change Request Work Performance Information Project Documents updates
  • 17. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Accepted deliverables Deliverables that meet the acceptance criteria are formally signed off & approved by the Customer or sponsor. These are used in Close Project or Phase process. Validate Scope -> Outputs -> Accepted deliverables •Follow the process •Escalate to your Manager No approval / No response:
  • 18. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Change Request Validate Scope -> Outputs -> Change Request The completed deliverable that have not been formally accepted are documented, along with reason for non-acceptance
  • 19. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Work Performance Information It includes information about project progress, such as which deliverables that have started, finished or which have been accepted Validate Scope -> Outputs -> Work Performance Information
  • 20. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project Documents updates Validate Scope -> Outputs -> Project Documents updates Requirements Documentation (+RTM): •Result of the Validate Scope process for the requirements should be documented. •Validated requirements are marked on RTM. Lessons Learned Register •The challenges encountered in the Validate Scope process. •Which approach worked well or failed? These documents may get updated.
  • 21. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) In both cases completed deliverables are validated & accepted. Validate Scope -> When project cancelled or terminated? • Make sure efforts spent on the projects are not lost. Early Termination of Project • Document level of completed deliverables. Cancellation of Project What to do during Project Cancellation or Termination
  • 22. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Validate Scope -> Review Overview Validate Scope definition Validate Scope - ITTO Difference between validate scope & control quality? What is Inspection? What is Verified deliverables & Accepted Deliverables Early termination & project cancellation