MIT SOFTWARE TEST PLAN
1. [Doc. Number] Rev [Number]
[Day Month Year]
SOFTWARE TEST PLAN
for the
[PROJECT NAME]
Contract No. [Contract Number]
CDRL Sequence No. [CDRL Number]
[Day Month Year]
Prepared for:
[Contracting Agency Name]
[Address]
Code: [Department Code]
Prepared by:
The Charles Stark Draper Laboratory, Inc.
555 Technology Square
Cambridge, Massachusetts 02139
Cage Code: 51993
DISTRIBUTION STATEMENT [Distribution Statement Letter]
[Distribution Statement]
Total No. of Pages 14
2. [Doc. Number] Rev [Number]
[Day Month Year]
SOFTWARE TEST PLAN
for the
[PROJECT NAME]
Approved by:
Task Leader Date
Engineering Director/Associate Director Date
Quality Assurance Date
Technical Director Date
Program Manager Date
[Other] Date
2
3. [Doc. Number] Rev [Number]
[Day Month Year]
RECORD OF REVISIONS
Rev Result of Pages Affected Approval/Date
1 ECR xxxx Initial Release DD MMM YYYY
3
4. [Doc. Number] Rev [Number]
[Day Month Year]
TABLE OF CONTENTS
Section Page
1. SCOPE............................................................................................................................................1
1.1 Identification......................................................................................................................1
1.2 System overview................................................................................................................1
1.3 Document overview..........................................................................................................1
1.4 Relationship to other plans.............................................................................................1
2. REFERENCED DOCUMENTS..................................................................................................1
3. SOFTWARE TEST ENVIRONMENT......................................................................................2
3.x [Name of test site(s)].........................................................................................................2
3.x.1 Software items......................................................................................................2
3.x.2 Hardware and firmware items..........................................................................2
3.x.3 Other materials....................................................................................................3
3.x.4 Proprietary nature, acquirer's rights, and licensing.......................................3
3.x.5 Installation, testing, and control........................................................................3
3.x.6 Participating organizations................................................................................3
3.x.7 Personnel..............................................................................................................3
3.x.8 Orientation plan...................................................................................................4
3.x.9 Tests to be performed.........................................................................................4
4. TEST IDENTIFICATION...........................................................................................................4
4.1 General information.........................................................................................................4
4.1.1 Test levels..............................................................................................................4
4.1.2 Test classes............................................................................................................4
4.1.3 General test conditions.......................................................................................4
4.1.4 Test progression...................................................................................................5
4.1.5 Data recording, reduction, and analysis..........................................................5
4.2 Planned tests.......................................................................................................................5
4.2.x (Item(s) to be tested)............................................................................................5
4.2.x.y (Project-unique identifier of a test)................................................................5
5. TEST SCHEDULES......................................................................................................................5
6. REQUIREMENTS TRACEABILITY.........................................................................................6
4
6. [Doc. Number] Rev [Number]
[Day Month Year]
LIST OF FIGURES
Figure Page
LIST OF TABLES
Table Page
6
7. [Doc. Number] Rev [Number]
[Day Month Year]
1. SCOPE
1.1 Identification
1.2 System overview
1.3 Document overview
1.4 Relationship to other plans
2. REFERENCED DOCUMENTS
1
8. [Doc. Number] Rev [Number]
[Day Month Year]
3. SOFTWARE TEST ENVIRONMENT
3.x [Name of test site(s)]
3.x.1 Software items
3.x.2 Hardware and firmware items
2
9. [Doc. Number] Rev [Number]
[Day Month Year]
3.x.3 Other materials
3.x.4 Proprietary nature, acquirer's rights, and licensing
3.x.5 Installation, testing, and control
3.x.6 Participating organizations
3.x.7 Personnel
3
10. [Doc. Number] Rev [Number]
[Day Month Year]
3.x.8 Orientation plan
3.x.9 Tests to be performed
4. TEST IDENTIFICATION
4.1 General information
4.1.1 Test levels
4.1.2 Test classes
4.1.3 General test conditions
4
11. [Doc. Number] Rev [Number]
[Day Month Year]
4.1.4 Test progression
4.1.5 Data recording, reduction, and analysis
4.2 Planned tests
4.2.x (Item(s) to be tested)
4.2.x.y (Project-unique identifier of a test)
5. TEST SCHEDULES
5