Electricity Industry in Saudi Arabia

     Starts in the 50`s 100% private utilities .
     Late 70`S consolidated into four major regional power
      companies (SCECO).
     In 2000 All operating entities merged in one company
         Saudi Electricity Company (SEC).
     SEC owns 85% of generation and 100% of transmission
      and distribution.
     The government involved as shareholder and regulator .

2
SAUDI power sector TODAY

     Largest electricity system in the region.
     Assets exceeds US$70 billions.
     Over 52,000 MW installed capacity.
     48,000 MW peak demand and 250MMWH.
     160,000 Miles of transmission& distribution lines
     Serving 6 million customers .
     Revenues 8.5 US$ bln with 7-8% annual growth .


3
GROWTH (2001 – 2011)

             No of customer   Peak load      Available    Transmission   Energy
     DATA                                                                (GWH)
               ( Million)      (MW)       generation (MW)    (KM)


    2001           3.6          23000        24000           30000       114000


    2011           6.2          47000        52000           48000       240000

    Growth
      (%)         72%           105%          102%            65%        101%




4
CHALLENGES

     High growth in demand ( will continue 7- 8%).
     High growth in fuel consumption.
     Low tariff for domestic (2.2 US cents/kwh) .
     Low average load factor (55%) seasonal.
     Inefficient old of generating units.
     High capital- investment.



5
Opportunities
       Replace all inefficient generating units.
       Build more capacity and more interconnection.
       Promote energy conservation initiatives.
       Load management programs (time of use tariff).
     Introduce smart grid and smart systems .
     Encourage and support renewable energy.



6
RECORDED & FORECASTED LOADS

       MW




7
FUTURE CAPITAL INVESTMENT

             Over the next 10 years:
    Generation expansion       US$ 40 billions
    Transmission expansion     US$ 24 billions
    Distribution expansion     US$ 16 billions
    Total capital investment    US$ 80 billions


9
major Future Generation projects


     Year            Project name          Capacity (MW) Date in Service
             Jeddah South PP (EPC) steam      2,600           2015
     2012
             Rabigh 2 PP( IPP) steam          1,200           2015
             Dheba PP (IPP) ccpp+steam        1,800           2015
     2013
             Gizan pp (EPC) steam             2,600           2016
             Ras Alkhair pp (IPP)             2,600           2016
     2014    Al-Shogaig 2 PP (? )             1,200           2017
             Duba 2 PP ( ? )                    800           2017
     2015    Alogair PP                       2,600           2018
             Ras Abigamis                     2,600           2019

            Total investment US$40 billions




10
Ipp program


       Private power production is a partnership .
       SEC partnership 20-50 % .
       Long term power -off take-purchase agreement.
       SEC provides the land and fuel .
     30- 40% of future generation will be IPP .
     20/80 equity/debt ratio.


6
SUCCESSFUL IPP PROJECTS
      Three IPP Projects under development:
        1. Rabigh Power Plant (Awarded July2009)
           • 1200 MW / HFO
           • INVESTMENT US$ 2.5 billion
           • IRR > 8.45%
        2. Riyadh Power Plant 11 (Awarded July 2010)
           • 1800 MW / CCPP/GAS
           • INVESTMENT US$2.1billion
           • IRR > 6%

        3. Gorayah IPP (Awarded Sep. 2011)
           • 4000 MW / CCPP /GAS
           • INVESTMENT US$ 3.5 billion
           • IRR > 7.5%



15
KINGDOM’S INTERCONNECTION STRATEGIC PLAN




11
Future 380KV transmission lines projects


     Year             Project              Length Miles   Date in Service
            BISHA_DAWASIR +2 substations      320              2015
     2012   5th 380 KV LINE TO CENTRAK        250              2015
            MADINAH-HAIL                      230              2015
            RIYADH-JEDDAH DC line             500              2016
     2013   TABUK-TABARGAL +2Substations      380              2016
            WEST _SOUTH 2ND LINE              320              2016
     2014   MADINAH-TABUK DC Line             380              2017




12
Future 380KV transmission /contd..


     Year                Project          Length Miles   Date in Service
            Tabuk-Tabarjal +Substations      200             2017
     2014
            Umluj-Wadjh +Substations         250             2017
            South-West 2nd line              300             2018
     2014
            Jouf-Tabarjal                    100             2018
     2015   Al-grayat- Tabarjal              160             2019
            capital cost US$25 Bln




13
BUSINESS OPPORTUNITIES

     As an EPC contractor.
     Material and Equipment supply.
     Local manufacturing and services.
     Participate in IPP projects .
     Opportunity in engineering services.
     Invest in new and renewable energy.


16
conclusion
      High growth in demand will continue 6-7%.
      75-80 billion US$ for capital investment.
      Good opportunities for U.S. companies.
      Investors have the opportunity .

         Yes, Big challenge, But great opportunities !!!




17
For more information you can visit
      Saudi Electricity Company web
      page at :

        www.se.com.sa
18
19
Generation Capacity
         generation capacity installed should meet the expected
        7% increase in peak demand and a reserve margin.

                                                              Generation capacity (GW)

    100000
                                                                                                                                                           90
    90000
                                                                                                                         74
    80000

    70000
                                                                                  59
    60000

    50000                      41
    40000

    30000

    20000

    10000

        0




             SEC Installed & new capacity   IWPP Installed capacity   IPP Installed capacity   SWCC Installed capacity        Peak Load   total capacity




8

More Related Content

What's hot

NGS Owners Initial Proposal 1 21-2011
NGS Owners Initial Proposal 1 21-2011NGS Owners Initial Proposal 1 21-2011
NGS Owners Initial Proposal 1 21-2011
en3pro
 
Renewable energy course#00
Renewable energy course#00Renewable energy course#00
Renewable energy course#00
Syed_Sajjad_Raza
 
Chuck MacFarlane
Chuck MacFarlaneChuck MacFarlane
Chuck MacFarlane
thestateof
 

What's hot (20)

Preparing for a post carbon future
Preparing for a post carbon futurePreparing for a post carbon future
Preparing for a post carbon future
 
New base energy news 24 november issue 1298 by khaled al awadi
New base energy news  24  november  issue   1298  by khaled al awadiNew base energy news  24  november  issue   1298  by khaled al awadi
New base energy news 24 november issue 1298 by khaled al awadi
 
NGS Owners Initial Proposal 1 21-2011
NGS Owners Initial Proposal 1 21-2011NGS Owners Initial Proposal 1 21-2011
NGS Owners Initial Proposal 1 21-2011
 
Ravi Manghani
Ravi ManghaniRavi Manghani
Ravi Manghani
 
Opportunities for wind energy in NSW
Opportunities for wind energy in NSWOpportunities for wind energy in NSW
Opportunities for wind energy in NSW
 
Mqbnav001
Mqbnav001Mqbnav001
Mqbnav001
 
New base march 10 2022 energy news issue - 1493 by khaled al awadi
New base march 10 2022  energy news issue - 1493  by khaled al awadiNew base march 10 2022  energy news issue - 1493  by khaled al awadi
New base march 10 2022 energy news issue - 1493 by khaled al awadi
 
New base energy news 11 febuary 2019 issue no 1230 by khaled al awadi
New base energy news 11 febuary 2019 issue no 1230  by khaled al awadiNew base energy news 11 febuary 2019 issue no 1230  by khaled al awadi
New base energy news 11 febuary 2019 issue no 1230 by khaled al awadi
 
New base energy news issue 950 dated 17 november 2016
New base energy news issue  950 dated 17 november 2016New base energy news issue  950 dated 17 november 2016
New base energy news issue 950 dated 17 november 2016
 
Renewable energy course#00
Renewable energy course#00Renewable energy course#00
Renewable energy course#00
 
Chuck MacFarlane
Chuck MacFarlaneChuck MacFarlane
Chuck MacFarlane
 
Major Trends in the Large Power Generation Equipment Market
Major Trends in the Large Power Generation Equipment MarketMajor Trends in the Large Power Generation Equipment Market
Major Trends in the Large Power Generation Equipment Market
 
Res evolution italy_gse
Res evolution italy_gseRes evolution italy_gse
Res evolution italy_gse
 
Prajit ghosh-keynote
Prajit ghosh-keynotePrajit ghosh-keynote
Prajit ghosh-keynote
 
Clean Energy Council (CEC) Annual Conference 2015 Compiled Presentations
Clean Energy Council (CEC) Annual Conference 2015 Compiled Presentations Clean Energy Council (CEC) Annual Conference 2015 Compiled Presentations
Clean Energy Council (CEC) Annual Conference 2015 Compiled Presentations
 
The State of Global Energy Storage Markets
The State of Global Energy Storage MarketsThe State of Global Energy Storage Markets
The State of Global Energy Storage Markets
 
New base 1043 special 15 june 2017 energy news
New base 1043 special 15 june 2017 energy newsNew base 1043 special 15 june 2017 energy news
New base 1043 special 15 june 2017 energy news
 
Stimulus bill energy opportunities
Stimulus bill energy opportunitiesStimulus bill energy opportunities
Stimulus bill energy opportunities
 
Brill Power
Brill Power Brill Power
Brill Power
 
Thermal power sector
Thermal power sectorThermal power sector
Thermal power sector
 

Viewers also liked

Dust and rubbish in the room
Dust and rubbish in the roomDust and rubbish in the room
Dust and rubbish in the room
miklt
 
Social media training slides 4 - google, facebook and the rest
Social media training slides   4 - google, facebook and the restSocial media training slides   4 - google, facebook and the rest
Social media training slides 4 - google, facebook and the rest
Michael Rose
 
Social media training slides 6 - building followers, fans, connections
Social media training slides   6 - building followers, fans, connectionsSocial media training slides   6 - building followers, fans, connections
Social media training slides 6 - building followers, fans, connections
Michael Rose
 
On Distance between Deep Syntax and Semantic Representation
On Distance between Deep Syntax and Semantic RepresentationOn Distance between Deep Syntax and Semantic Representation
On Distance between Deep Syntax and Semantic Representation
Václav Novák
 
Introduction to prebreeding component of CWR project
Introduction to prebreeding component of CWR project Introduction to prebreeding component of CWR project
Introduction to prebreeding component of CWR project
CWR Project
 
My fl aane lninx
My fl aane lninxMy fl aane lninx
My fl aane lninx
Margi Lacap
 
Social media training slides 3 - linked in (for beginners)
Social media training slides   3 - linked in (for beginners)Social media training slides   3 - linked in (for beginners)
Social media training slides 3 - linked in (for beginners)
Michael Rose
 
Rencana pelaksanaan pembelajaran
Rencana pelaksanaan pembelajaranRencana pelaksanaan pembelajaran
Rencana pelaksanaan pembelajaran
Margi Lacap
 
10x10 redesign
10x10 redesign10x10 redesign
10x10 redesign
ryu1218
 
Dust and rubbish in the room
Dust and rubbish in the roomDust and rubbish in the room
Dust and rubbish in the room
miklt
 
Yeseter: Přehled platformy
Yeseter: Přehled platformyYeseter: Přehled platformy
Yeseter: Přehled platformy
Václav Novák
 
Perspectives of Turning Prague Dependency Treebank into a Knowledge Base
Perspectives of Turning Prague Dependency Treebank into a Knowledge BasePerspectives of Turning Prague Dependency Treebank into a Knowledge Base
Perspectives of Turning Prague Dependency Treebank into a Knowledge Base
Václav Novák
 

Viewers also liked (20)

Chap 21
Chap 21Chap 21
Chap 21
 
Educacion especial
Educacion especialEducacion especial
Educacion especial
 
Programa Global de Conservacion de Recursos Geneticos SIRGEALC Quito 2011
Programa Global de Conservacion de Recursos Geneticos SIRGEALC Quito 2011Programa Global de Conservacion de Recursos Geneticos SIRGEALC Quito 2011
Programa Global de Conservacion de Recursos Geneticos SIRGEALC Quito 2011
 
Session 12 Tony Sandberg
Session 12 Tony SandbergSession 12 Tony Sandberg
Session 12 Tony Sandberg
 
Vizualizace blízkosti sledovaných témat
Vizualizace blízkosti sledovaných tématVizualizace blízkosti sledovaných témat
Vizualizace blízkosti sledovaných témat
 
Dust and rubbish in the room
Dust and rubbish in the roomDust and rubbish in the room
Dust and rubbish in the room
 
Social media training slides 4 - google, facebook and the rest
Social media training slides   4 - google, facebook and the restSocial media training slides   4 - google, facebook and the rest
Social media training slides 4 - google, facebook and the rest
 
Social media training slides 6 - building followers, fans, connections
Social media training slides   6 - building followers, fans, connectionsSocial media training slides   6 - building followers, fans, connections
Social media training slides 6 - building followers, fans, connections
 
On Distance between Deep Syntax and Semantic Representation
On Distance between Deep Syntax and Semantic RepresentationOn Distance between Deep Syntax and Semantic Representation
On Distance between Deep Syntax and Semantic Representation
 
Introduction to prebreeding component of CWR project
Introduction to prebreeding component of CWR project Introduction to prebreeding component of CWR project
Introduction to prebreeding component of CWR project
 
My fl aane lninx
My fl aane lninxMy fl aane lninx
My fl aane lninx
 
Social media training slides 3 - linked in (for beginners)
Social media training slides   3 - linked in (for beginners)Social media training slides   3 - linked in (for beginners)
Social media training slides 3 - linked in (for beginners)
 
Designing Products for Everyone
Designing Products for EveryoneDesigning Products for Everyone
Designing Products for Everyone
 
Rencana pelaksanaan pembelajaran
Rencana pelaksanaan pembelajaranRencana pelaksanaan pembelajaran
Rencana pelaksanaan pembelajaran
 
10x10 redesign
10x10 redesign10x10 redesign
10x10 redesign
 
Dust and rubbish in the room
Dust and rubbish in the roomDust and rubbish in the room
Dust and rubbish in the room
 
Yeseter: Přehled platformy
Yeseter: Přehled platformyYeseter: Přehled platformy
Yeseter: Přehled platformy
 
Hazzaa
HazzaaHazzaa
Hazzaa
 
www.icdi.it
www.icdi.itwww.icdi.it
www.icdi.it
 
Perspectives of Turning Prague Dependency Treebank into a Knowledge Base
Perspectives of Turning Prague Dependency Treebank into a Knowledge BasePerspectives of Turning Prague Dependency Treebank into a Knowledge Base
Perspectives of Turning Prague Dependency Treebank into a Knowledge Base
 

Similar to Barrack

Pakistan wind-power- arif alauddin
Pakistan wind-power- arif alauddinPakistan wind-power- arif alauddin
Pakistan wind-power- arif alauddin
IPPAI
 
Small hydropower development in nepal iit roorkee
Small hydropower development in  nepal iit roorkeeSmall hydropower development in  nepal iit roorkee
Small hydropower development in nepal iit roorkee
Sanjeev Pokhrel
 
QLW C9 India Mr G M Pillai asdfggjjjkjjj
QLW C9 India Mr G M Pillai asdfggjjjkjjjQLW C9 India Mr G M Pillai asdfggjjjkjjj
QLW C9 India Mr G M Pillai asdfggjjjkjjj
bitseeeRandD
 
The role of energy storage in planning our energy needs in the UAE
The role of energy storage in planning our energy needs in the UAEThe role of energy storage in planning our energy needs in the UAE
The role of energy storage in planning our energy needs in the UAE
ReedExhibitionsMiddl
 
New Energy Conference-Mohammad Abu Zarour from NEPCO
New Energy Conference-Mohammad Abu Zarour from NEPCONew Energy Conference-Mohammad Abu Zarour from NEPCO
New Energy Conference-Mohammad Abu Zarour from NEPCO
EDAMA
 
BHEL Presentation DSP Merrill Lynch 08 Feb10
BHEL Presentation DSP Merrill Lynch 08 Feb10BHEL Presentation DSP Merrill Lynch 08 Feb10
BHEL Presentation DSP Merrill Lynch 08 Feb10
Ganesh Ramamoorthy
 
PROPOSAL FOR ABC POWER- A BUSINESS PLAN- FROM SAUDI ARABIA TO WORLD-
PROPOSAL FOR ABC POWER- A BUSINESS PLAN- FROM SAUDI ARABIA TO WORLD-PROPOSAL FOR ABC POWER- A BUSINESS PLAN- FROM SAUDI ARABIA TO WORLD-
PROPOSAL FOR ABC POWER- A BUSINESS PLAN- FROM SAUDI ARABIA TO WORLD-
Rupesh K. Sinha
 
Power Sector In Bangladesh
Power Sector In BangladeshPower Sector In Bangladesh
Power Sector In Bangladesh
Sayanton Vhaduri
 

Similar to Barrack (20)

Business Opportunities in Saudi Power Sector
Business Opportunities in Saudi Power SectorBusiness Opportunities in Saudi Power Sector
Business Opportunities in Saudi Power Sector
 
Pakistan wind-power- arif alauddin
Pakistan wind-power- arif alauddinPakistan wind-power- arif alauddin
Pakistan wind-power- arif alauddin
 
UBS Australian Utilities Conference
UBS Australian Utilities ConferenceUBS Australian Utilities Conference
UBS Australian Utilities Conference
 
Small hydropower development in nepal iit roorkee
Small hydropower development in  nepal iit roorkeeSmall hydropower development in  nepal iit roorkee
Small hydropower development in nepal iit roorkee
 
QLW C9 India Mr G M Pillai asdfggjjjkjjj
QLW C9 India Mr G M Pillai asdfggjjjkjjjQLW C9 India Mr G M Pillai asdfggjjjkjjj
QLW C9 India Mr G M Pillai asdfggjjjkjjj
 
XEL_092606
XEL_092606XEL_092606
XEL_092606
 
XEL_092606
XEL_092606XEL_092606
XEL_092606
 
XEL_092606
XEL_092606XEL_092606
XEL_092606
 
The role of energy storage in planning our energy needs in the UAE
The role of energy storage in planning our energy needs in the UAEThe role of energy storage in planning our energy needs in the UAE
The role of energy storage in planning our energy needs in the UAE
 
New Energy Conference-Mohammad Abu Zarour from NEPCO
New Energy Conference-Mohammad Abu Zarour from NEPCONew Energy Conference-Mohammad Abu Zarour from NEPCO
New Energy Conference-Mohammad Abu Zarour from NEPCO
 
CREO 2019 power sector outlook
CREO 2019 power sector outlookCREO 2019 power sector outlook
CREO 2019 power sector outlook
 
BHEL Presentation DSP Merrill Lynch 08 Feb10
BHEL Presentation DSP Merrill Lynch 08 Feb10BHEL Presentation DSP Merrill Lynch 08 Feb10
BHEL Presentation DSP Merrill Lynch 08 Feb10
 
PROPOSAL FOR ABC POWER- A BUSINESS PLAN- FROM SAUDI ARABIA TO WORLD-
PROPOSAL FOR ABC POWER- A BUSINESS PLAN- FROM SAUDI ARABIA TO WORLD-PROPOSAL FOR ABC POWER- A BUSINESS PLAN- FROM SAUDI ARABIA TO WORLD-
PROPOSAL FOR ABC POWER- A BUSINESS PLAN- FROM SAUDI ARABIA TO WORLD-
 
Amber kinetics intro non nda 06-16-2017
Amber kinetics intro non nda 06-16-2017Amber kinetics intro non nda 06-16-2017
Amber kinetics intro non nda 06-16-2017
 
The Computable General Equilibrium Analysis of Electricity Subsidies: The Per...
The Computable General Equilibrium Analysis of Electricity Subsidies: The Per...The Computable General Equilibrium Analysis of Electricity Subsidies: The Per...
The Computable General Equilibrium Analysis of Electricity Subsidies: The Per...
 
xel_091906
xel_091906xel_091906
xel_091906
 
xel_091906
xel_091906xel_091906
xel_091906
 
xel_091906
xel_091906xel_091906
xel_091906
 
Power Sector In Bangladesh
Power Sector In BangladeshPower Sector In Bangladesh
Power Sector In Bangladesh
 
Nepal Energy Scenario
Nepal Energy ScenarioNepal Energy Scenario
Nepal Energy Scenario
 

More from arabialink

More from arabialink (8)

Schlesinger
SchlesingerSchlesinger
Schlesinger
 
Hammouda
HammoudaHammouda
Hammouda
 
Kaec
KaecKaec
Kaec
 
Harkan
HarkanHarkan
Harkan
 
Khateeb
KhateebKhateeb
Khateeb
 
Alkholifey
AlkholifeyAlkholifey
Alkholifey
 
Wisnoski
WisnoskiWisnoski
Wisnoski
 
Rabiah
RabiahRabiah
Rabiah
 

Recently uploaded

Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Abortion pills in Kuwait Cytotec pills in Kuwait
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
DUBAI (+971)581248768 BUY ABORTION PILLS IN ABU dhabi...Qatar
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 

Recently uploaded (20)

Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
BeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfBeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdf
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' Slideshare
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance management
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 

Barrack

  • 1. BUSINESS OPPORTUNITIES IN SAUDI POWER SECTOR U.S. – Saudi Business Opportunities Forum 5-7 December 2011 Atlanta-U.S.A 1
  • 2. Electricity Industry in Saudi Arabia  Starts in the 50`s 100% private utilities .  Late 70`S consolidated into four major regional power companies (SCECO).  In 2000 All operating entities merged in one company Saudi Electricity Company (SEC).  SEC owns 85% of generation and 100% of transmission and distribution.  The government involved as shareholder and regulator . 2
  • 3. SAUDI power sector TODAY  Largest electricity system in the region.  Assets exceeds US$70 billions.  Over 52,000 MW installed capacity.  48,000 MW peak demand and 250MMWH.  160,000 Miles of transmission& distribution lines  Serving 6 million customers .  Revenues 8.5 US$ bln with 7-8% annual growth . 3
  • 4. GROWTH (2001 – 2011) No of customer Peak load Available Transmission Energy DATA (GWH) ( Million) (MW) generation (MW) (KM) 2001 3.6 23000 24000 30000 114000 2011 6.2 47000 52000 48000 240000 Growth (%) 72% 105% 102% 65% 101% 4
  • 5. CHALLENGES  High growth in demand ( will continue 7- 8%).  High growth in fuel consumption.  Low tariff for domestic (2.2 US cents/kwh) .  Low average load factor (55%) seasonal.  Inefficient old of generating units.  High capital- investment. 5
  • 6. Opportunities  Replace all inefficient generating units.  Build more capacity and more interconnection.  Promote energy conservation initiatives.  Load management programs (time of use tariff).  Introduce smart grid and smart systems .  Encourage and support renewable energy. 6
  • 8. FUTURE CAPITAL INVESTMENT Over the next 10 years: Generation expansion US$ 40 billions Transmission expansion US$ 24 billions Distribution expansion US$ 16 billions Total capital investment US$ 80 billions 9
  • 9. major Future Generation projects Year Project name Capacity (MW) Date in Service Jeddah South PP (EPC) steam 2,600 2015 2012 Rabigh 2 PP( IPP) steam 1,200 2015 Dheba PP (IPP) ccpp+steam 1,800 2015 2013 Gizan pp (EPC) steam 2,600 2016 Ras Alkhair pp (IPP) 2,600 2016 2014 Al-Shogaig 2 PP (? ) 1,200 2017 Duba 2 PP ( ? ) 800 2017 2015 Alogair PP 2,600 2018 Ras Abigamis 2,600 2019 Total investment US$40 billions 10
  • 10. Ipp program  Private power production is a partnership .  SEC partnership 20-50 % .  Long term power -off take-purchase agreement.  SEC provides the land and fuel .  30- 40% of future generation will be IPP .  20/80 equity/debt ratio. 6
  • 11. SUCCESSFUL IPP PROJECTS  Three IPP Projects under development: 1. Rabigh Power Plant (Awarded July2009) • 1200 MW / HFO • INVESTMENT US$ 2.5 billion • IRR > 8.45% 2. Riyadh Power Plant 11 (Awarded July 2010) • 1800 MW / CCPP/GAS • INVESTMENT US$2.1billion • IRR > 6% 3. Gorayah IPP (Awarded Sep. 2011) • 4000 MW / CCPP /GAS • INVESTMENT US$ 3.5 billion • IRR > 7.5% 15
  • 13. Future 380KV transmission lines projects Year Project Length Miles Date in Service BISHA_DAWASIR +2 substations 320 2015 2012 5th 380 KV LINE TO CENTRAK 250 2015 MADINAH-HAIL 230 2015 RIYADH-JEDDAH DC line 500 2016 2013 TABUK-TABARGAL +2Substations 380 2016 WEST _SOUTH 2ND LINE 320 2016 2014 MADINAH-TABUK DC Line 380 2017 12
  • 14. Future 380KV transmission /contd.. Year Project Length Miles Date in Service Tabuk-Tabarjal +Substations 200 2017 2014 Umluj-Wadjh +Substations 250 2017 South-West 2nd line 300 2018 2014 Jouf-Tabarjal 100 2018 2015 Al-grayat- Tabarjal 160 2019 capital cost US$25 Bln 13
  • 15. BUSINESS OPPORTUNITIES As an EPC contractor. Material and Equipment supply. Local manufacturing and services. Participate in IPP projects . Opportunity in engineering services. Invest in new and renewable energy. 16
  • 16. conclusion  High growth in demand will continue 6-7%.  75-80 billion US$ for capital investment.  Good opportunities for U.S. companies.  Investors have the opportunity . Yes, Big challenge, But great opportunities !!! 17
  • 17. For more information you can visit Saudi Electricity Company web page at : www.se.com.sa 18
  • 18. 19
  • 19. Generation Capacity generation capacity installed should meet the expected 7% increase in peak demand and a reserve margin. Generation capacity (GW) 100000 90 90000 74 80000 70000 59 60000 50000 41 40000 30000 20000 10000 0 SEC Installed & new capacity IWPP Installed capacity IPP Installed capacity SWCC Installed capacity Peak Load total capacity 8