SPAN
                         STRUCTURE




 GROUP MEMBERS
 M. DANIAL MAULA ABU BAKAR       - 2012617322
 AHMAD FAIZ BIN ABD KARIM        - 2012850668
 WAN NOOR AZEAN BT WAN MAHMUD    - 2012601764
 NURUL FARHANA BT NORROL AKHLA   - 2012469216
CABLE SYSTEM
 MAJOR SYSTEM
  Form active structure systems
  Non rigid, flexible matter shaped in a certain way and secured
  by fixed ends, support itself & span space. The transmit loads
  only through simple normal stresses, either tension or through
  compression.
 Two cables with different points of suspension tied together
  form a suspension system. A cable subject to external loads
  will deform in a way depending upon the magnitude and
  location of the external forces. The form acquired by the
  cable is called the FUNICULAR SHAPE of the cable.
   Form Active Structure Systems redirect external forces by
    simple normal stresses : the arch by compression, the
    suspension cable by tension. The bearing mechanism of form
    active systems vests essentially on the material form.
 The natural stress line of the form active tension system in the
  funicular tension line.
 Any change of loading or support conditions changes the
  form of the funicular curve.
MATERIAL
 Steel Cables : The high tensile strength of steel combined with
  the efficiency of simple tension, makes a steel cable the ideal
  structural element to span large distances.
 Nylon and plastics are suitable only
  for temporary structures,
  spanning small distances.
DYNAMIC EFFECTS OF WIND ON TYPICAL
        FLEXIBLE ROOF STRUCTURE :
       A critical problem in the design of any cable roof structure is
the dynamic effect of wind, which causes an undesirable fluttering
of the roof.
PREVENTIVE MEASURES :
There are only several fundamental ways to combat flutter.

• One is to simply increase the deal load on the roof.
• Another is to provide anchoring guy cables at periodic
  points to tie the structure to the ground.
• To use some sort of crossed cable on double-cable system.
The principal methods of providing stability
are the following:

Additional permanent load
supported on, or suspended from,
the roof, sufficient to neutralize the effects
of asymmetrical variable actions or uplift
Figure 14 a)

This arrangement has the drawback that it
eliminates the lightweight nature of the
structure, adding significant cost to the
entire structure.

(ii) Rigid members acting as beams, where
permanent load may not be adequate to
counteract uplift forces completely,
but where there is sufficient flexural
rigidity to deal with the net uplift forces,
whilst availing of cables to help resist effects
of gravity loading (Figure 14b).
CASE STUDY
                                  SINGLE-CURVATURE STRUCTURE
• The Akashi-Kaikyo Bridge also
known as the Pearl Bridge, has the
longest central span of any
suspension bridge in the world, at
1,991 metres (6,532 ft).




                                       • The bridge has three spans. The
                                       central span is 1,991 m
                                       (6,532 ft), and the two other
                                       sections are each 960 m (3,150 ft).
                                       The bridge is 3,911 m (12,831 ft)
                                       long overall.
• The steel cables have
300,000 kilometres
(190,000 mi) of wire: each
cable is 112 centimetres
(44 in) in diameter and
contains 36,830 strands of
wire.
                               Strands of wire                         Bridge girders


•The Akashi-Kaikyo bridge
has a total of 1,737
illumination lights: 1,084
for the main cables, 116 for
the main towers, 405 for the
girders and 132 for the
anchorages.
                                                 Illumination lights
DOUBLE-CABLE STRUCTURE
Bridge specifications
Overall Length:                     13.5 km (8.4 mi)
Length Over Water:                  8.4 km (5.2 mi)
Penang Island Viaduct & Approach:    1.5 km (0.93 mi)
Prai Approach:                       3.6 km (2.2 mi)




                                    Height of Tower Above Water: 101.5 m
                                    Height of Bridge Above Water: 33 m
                                    Main Span:                    225 m
                                    End Span:                     107.5 m
                                    Other Span:                   40 m
                                    Speed limit:                  80 km/h
                                    Maximum Gradient:             3.0%
CABLE STRUCTURE INFOMATION

More Related Content

What's hot

Long span structures
Long span structures  Long span structures
Long span structures Aroh Thombre
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildingsKarthik Suresh
 
Long span structures in Concrete and Steel
Long span structures in Concrete and SteelLong span structures in Concrete and Steel
Long span structures in Concrete and SteelRithika Ravishankar
 
steel roof truss
steel roof trusssteel roof truss
steel roof trussRohit Dutta
 
Cable strucutres(presentation)
Cable strucutres(presentation)Cable strucutres(presentation)
Cable strucutres(presentation)Waseem Akbar
 
High Rise Building Research Document
High Rise Building Research DocumentHigh Rise Building Research Document
High Rise Building Research DocumentNicholas Socrates
 
Vector active systems
Vector active systemsVector active systems
Vector active systemsDanishPathan7
 
Shell structures- advanced building construction
Shell structures- advanced building constructionShell structures- advanced building construction
Shell structures- advanced building constructionShweta Modi
 
Large span structures
Large span structuresLarge span structures
Large span structuresaduiti
 
Folded Plate structures
Folded Plate structures Folded Plate structures
Folded Plate structures rohan joshi
 
Space frames-modular construction technology
Space frames-modular construction technologySpace frames-modular construction technology
Space frames-modular construction technologyAnjith Augustine
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systemsAkshay Revekar
 

What's hot (20)

Long span structures
Long span structures  Long span structures
Long span structures
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildings
 
Form Active system
Form Active systemForm Active system
Form Active system
 
Space frame
Space frameSpace frame
Space frame
 
Long span structures in Concrete and Steel
Long span structures in Concrete and SteelLong span structures in Concrete and Steel
Long span structures in Concrete and Steel
 
steel roof truss
steel roof trusssteel roof truss
steel roof truss
 
Cable strucutres(presentation)
Cable strucutres(presentation)Cable strucutres(presentation)
Cable strucutres(presentation)
 
Folded plates
Folded platesFolded plates
Folded plates
 
High Rise Building Research Document
High Rise Building Research DocumentHigh Rise Building Research Document
High Rise Building Research Document
 
Vector active systems
Vector active systemsVector active systems
Vector active systems
 
Space frames!
Space frames!Space frames!
Space frames!
 
Shell structures- advanced building construction
Shell structures- advanced building constructionShell structures- advanced building construction
Shell structures- advanced building construction
 
Large span structures
Large span structuresLarge span structures
Large span structures
 
CONSTRUCTION OF DOMES
CONSTRUCTION OF DOMESCONSTRUCTION OF DOMES
CONSTRUCTION OF DOMES
 
Space frame
Space frameSpace frame
Space frame
 
Folded Plate structures
Folded Plate structures Folded Plate structures
Folded Plate structures
 
Space frames-modular construction technology
Space frames-modular construction technologySpace frames-modular construction technology
Space frames-modular construction technology
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
 
High rise building construction
High rise building constructionHigh rise building construction
High rise building construction
 
Shanghai tower
Shanghai towerShanghai tower
Shanghai tower
 

Viewers also liked

Portal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemPortal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemIan Toisa
 
Portal frame 1
Portal  frame 1Portal  frame 1
Portal frame 1Est
 
6 portal frames
6 portal frames6 portal frames
6 portal framesPrabhu mk
 
Base Structures Tensile Fabric Webinar 2: Realising your tensile fabric vision
Base Structures Tensile Fabric Webinar 2: Realising your tensile fabric visionBase Structures Tensile Fabric Webinar 2: Realising your tensile fabric vision
Base Structures Tensile Fabric Webinar 2: Realising your tensile fabric visionBase Structures Ltd
 
Building Construction 2 Project 2 Report
Building Construction 2 Project 2 ReportBuilding Construction 2 Project 2 Report
Building Construction 2 Project 2 ReportWilden How
 
Steel structures practical_design_studies_mac_ginley_2nd_ed
Steel structures practical_design_studies_mac_ginley_2nd_edSteel structures practical_design_studies_mac_ginley_2nd_ed
Steel structures practical_design_studies_mac_ginley_2nd_edThomas Britto
 
Millennium dome %28 pp%29
Millennium dome %28 pp%29Millennium dome %28 pp%29
Millennium dome %28 pp%29carodriguez21
 
O2 Arena Booklet
O2 Arena BookletO2 Arena Booklet
O2 Arena Bookleteileen_0692
 
TENSEGRITY - Smart Structures - G@T
TENSEGRITY - Smart Structures -  G@TTENSEGRITY - Smart Structures -  G@T
TENSEGRITY - Smart Structures - G@TTheerumalai Ga
 
TENSILE / FABRIC ARCHITECTURE SEMINAR
TENSILE / FABRIC ARCHITECTURE SEMINARTENSILE / FABRIC ARCHITECTURE SEMINAR
TENSILE / FABRIC ARCHITECTURE SEMINARAshita Choudhry
 
STUDY OF FAILED PROJECT ---- THE MILLENNIUM DOME
STUDY OF FAILED PROJECT ---- THE MILLENNIUM DOMESTUDY OF FAILED PROJECT ---- THE MILLENNIUM DOME
STUDY OF FAILED PROJECT ---- THE MILLENNIUM DOMEHaya Haroon
 
CAE Conference - Luca Romano - 21 october 2013
CAE Conference - Luca Romano - 21 october 2013CAE Conference - Luca Romano - 21 october 2013
CAE Conference - Luca Romano - 21 october 2013Franco Bontempi
 
Understanding Gridshell Structures - Mannheim Multihalle Case Study
Understanding Gridshell Structures - Mannheim Multihalle Case StudyUnderstanding Gridshell Structures - Mannheim Multihalle Case Study
Understanding Gridshell Structures - Mannheim Multihalle Case StudyAbhimanyu Singhal
 
BRIHADEESWARAR TEMPLE - An Ancient Architectural marvel
BRIHADEESWARAR TEMPLE - An Ancient Architectural marvelBRIHADEESWARAR TEMPLE - An Ancient Architectural marvel
BRIHADEESWARAR TEMPLE - An Ancient Architectural marvelTheerumalai Ga
 
Stucture large span area
Stucture large span areaStucture large span area
Stucture large span areaAbhishek Mewada
 

Viewers also liked (20)

Portal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemPortal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building System
 
Portal frame 1
Portal  frame 1Portal  frame 1
Portal frame 1
 
6 portal frames
6 portal frames6 portal frames
6 portal frames
 
Trusses
TrussesTrusses
Trusses
 
PPT OF TRUSSES
PPT OF TRUSSESPPT OF TRUSSES
PPT OF TRUSSES
 
Trusses
TrussesTrusses
Trusses
 
Types roof trusses
Types roof trussesTypes roof trusses
Types roof trusses
 
Base Structures Tensile Fabric Webinar 2: Realising your tensile fabric vision
Base Structures Tensile Fabric Webinar 2: Realising your tensile fabric visionBase Structures Tensile Fabric Webinar 2: Realising your tensile fabric vision
Base Structures Tensile Fabric Webinar 2: Realising your tensile fabric vision
 
Structure as Architecture
Structure as ArchitectureStructure as Architecture
Structure as Architecture
 
Building Construction 2 Project 2 Report
Building Construction 2 Project 2 ReportBuilding Construction 2 Project 2 Report
Building Construction 2 Project 2 Report
 
Steel structures practical_design_studies_mac_ginley_2nd_ed
Steel structures practical_design_studies_mac_ginley_2nd_edSteel structures practical_design_studies_mac_ginley_2nd_ed
Steel structures practical_design_studies_mac_ginley_2nd_ed
 
Millennium dome %28 pp%29
Millennium dome %28 pp%29Millennium dome %28 pp%29
Millennium dome %28 pp%29
 
O2 Arena Booklet
O2 Arena BookletO2 Arena Booklet
O2 Arena Booklet
 
TENSEGRITY - Smart Structures - G@T
TENSEGRITY - Smart Structures -  G@TTENSEGRITY - Smart Structures -  G@T
TENSEGRITY - Smart Structures - G@T
 
TENSILE / FABRIC ARCHITECTURE SEMINAR
TENSILE / FABRIC ARCHITECTURE SEMINARTENSILE / FABRIC ARCHITECTURE SEMINAR
TENSILE / FABRIC ARCHITECTURE SEMINAR
 
STUDY OF FAILED PROJECT ---- THE MILLENNIUM DOME
STUDY OF FAILED PROJECT ---- THE MILLENNIUM DOMESTUDY OF FAILED PROJECT ---- THE MILLENNIUM DOME
STUDY OF FAILED PROJECT ---- THE MILLENNIUM DOME
 
CAE Conference - Luca Romano - 21 october 2013
CAE Conference - Luca Romano - 21 october 2013CAE Conference - Luca Romano - 21 october 2013
CAE Conference - Luca Romano - 21 october 2013
 
Understanding Gridshell Structures - Mannheim Multihalle Case Study
Understanding Gridshell Structures - Mannheim Multihalle Case StudyUnderstanding Gridshell Structures - Mannheim Multihalle Case Study
Understanding Gridshell Structures - Mannheim Multihalle Case Study
 
BRIHADEESWARAR TEMPLE - An Ancient Architectural marvel
BRIHADEESWARAR TEMPLE - An Ancient Architectural marvelBRIHADEESWARAR TEMPLE - An Ancient Architectural marvel
BRIHADEESWARAR TEMPLE - An Ancient Architectural marvel
 
Stucture large span area
Stucture large span areaStucture large span area
Stucture large span area
 

Similar to Long span cable

Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Rajesh Prasad
 
Calculation Note Final
Calculation Note FinalCalculation Note Final
Calculation Note FinalMohamed Elfike
 
Chalmer G. Galido powerpoint present pptx
Chalmer G. Galido powerpoint present pptxChalmer G. Galido powerpoint present pptx
Chalmer G. Galido powerpoint present pptxJustineSales1
 
Calculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeCalculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeMohammed Abdelkawy
 
Modeling procedure and Case study of ‘Gocheok Sky Dome’
Modeling procedure and Case study of  ‘Gocheok Sky Dome’Modeling procedure and Case study of  ‘Gocheok Sky Dome’
Modeling procedure and Case study of ‘Gocheok Sky Dome’chandrashekhar lakavath
 
Presentation on OHE.pptx Seminar presentation in 4th semester
Presentation on OHE.pptx Seminar presentation in 4th semesterPresentation on OHE.pptx Seminar presentation in 4th semester
Presentation on OHE.pptx Seminar presentation in 4th semesterkrishnamahur2
 
ELECTRICAL POWER TRANSMISSION-3.pptx
ELECTRICAL POWER TRANSMISSION-3.pptxELECTRICAL POWER TRANSMISSION-3.pptx
ELECTRICAL POWER TRANSMISSION-3.pptxamitpandey509058
 
Chenab Bridge.pdf
Chenab Bridge.pdfChenab Bridge.pdf
Chenab Bridge.pdfPpt Creater
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 
Bandra Worli sea link
Bandra Worli sea linkBandra Worli sea link
Bandra Worli sea linkKAVYA H
 
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONatchitect and design
 
UNIT - 06 TRANSMISSION LINES AND SUBSTATIONS
UNIT - 06 TRANSMISSION LINES AND SUBSTATIONSUNIT - 06 TRANSMISSION LINES AND SUBSTATIONS
UNIT - 06 TRANSMISSION LINES AND SUBSTATIONSPremanandDesai
 
A mini project on the transmission tower
A mini project on the transmission towerA mini project on the transmission tower
A mini project on the transmission towernaqeeb04
 

Similar to Long span cable (20)

Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...
 
Calculation Note Final
Calculation Note FinalCalculation Note Final
Calculation Note Final
 
Chalmer G. Galido powerpoint present pptx
Chalmer G. Galido powerpoint present pptxChalmer G. Galido powerpoint present pptx
Chalmer G. Galido powerpoint present pptx
 
Calculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeCalculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridge
 
the millau viaduct
the millau viaductthe millau viaduct
the millau viaduct
 
Cables in civil engineering
Cables in civil engineeringCables in civil engineering
Cables in civil engineering
 
Modeling procedure and Case study of ‘Gocheok Sky Dome’
Modeling procedure and Case study of  ‘Gocheok Sky Dome’Modeling procedure and Case study of  ‘Gocheok Sky Dome’
Modeling procedure and Case study of ‘Gocheok Sky Dome’
 
Presentation on OHE.pptx Seminar presentation in 4th semester
Presentation on OHE.pptx Seminar presentation in 4th semesterPresentation on OHE.pptx Seminar presentation in 4th semester
Presentation on OHE.pptx Seminar presentation in 4th semester
 
Cable stayed bridge
Cable stayed bridgeCable stayed bridge
Cable stayed bridge
 
ELECTRICAL POWER TRANSMISSION-3.pptx
ELECTRICAL POWER TRANSMISSION-3.pptxELECTRICAL POWER TRANSMISSION-3.pptx
ELECTRICAL POWER TRANSMISSION-3.pptx
 
Chenab Bridge.pdf
Chenab Bridge.pdfChenab Bridge.pdf
Chenab Bridge.pdf
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
Zubrin nov99
Zubrin nov99Zubrin nov99
Zubrin nov99
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
Tensegrity structure
Tensegrity structureTensegrity structure
Tensegrity structure
 
Bandra Worli sea link
Bandra Worli sea linkBandra Worli sea link
Bandra Worli sea link
 
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
 
UNIT - 06 TRANSMISSION LINES AND SUBSTATIONS
UNIT - 06 TRANSMISSION LINES AND SUBSTATIONSUNIT - 06 TRANSMISSION LINES AND SUBSTATIONS
UNIT - 06 TRANSMISSION LINES AND SUBSTATIONS
 
Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridge
 
A mini project on the transmission tower
A mini project on the transmission towerA mini project on the transmission tower
A mini project on the transmission tower
 

More from Musahiddin Md Zainal (10)

Steel formwork
Steel formworkSteel formwork
Steel formwork
 
Islamic Center of UiTM Perak (Lighting & Acoustic)
Islamic Center of UiTM Perak (Lighting & Acoustic)Islamic Center of UiTM Perak (Lighting & Acoustic)
Islamic Center of UiTM Perak (Lighting & Acoustic)
 
Steel material
Steel materialSteel material
Steel material
 
Timber material
Timber materialTimber material
Timber material
 
Glass structure
Glass structureGlass structure
Glass structure
 
Concrete structure
Concrete structureConcrete structure
Concrete structure
 
Concrete material
Concrete materialConcrete material
Concrete material
 
Timber structure
Timber structureTimber structure
Timber structure
 
Malay folk song and melodies
Malay folk song and melodiesMalay folk song and melodies
Malay folk song and melodies
 
The emperial katsura palace, kyoto, japan
The emperial katsura palace, kyoto, japanThe emperial katsura palace, kyoto, japan
The emperial katsura palace, kyoto, japan
 

Recently uploaded

Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.MateoGardella
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterMateoGardella
 

Recently uploaded (20)

Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 

Long span cable

  • 1. SPAN STRUCTURE GROUP MEMBERS M. DANIAL MAULA ABU BAKAR - 2012617322 AHMAD FAIZ BIN ABD KARIM - 2012850668 WAN NOOR AZEAN BT WAN MAHMUD - 2012601764 NURUL FARHANA BT NORROL AKHLA - 2012469216
  • 2. CABLE SYSTEM  MAJOR SYSTEM Form active structure systems Non rigid, flexible matter shaped in a certain way and secured by fixed ends, support itself & span space. The transmit loads only through simple normal stresses, either tension or through compression.  Two cables with different points of suspension tied together form a suspension system. A cable subject to external loads will deform in a way depending upon the magnitude and location of the external forces. The form acquired by the cable is called the FUNICULAR SHAPE of the cable.
  • 3. Form Active Structure Systems redirect external forces by simple normal stresses : the arch by compression, the suspension cable by tension. The bearing mechanism of form active systems vests essentially on the material form.
  • 4.  The natural stress line of the form active tension system in the funicular tension line.  Any change of loading or support conditions changes the form of the funicular curve.
  • 5. MATERIAL  Steel Cables : The high tensile strength of steel combined with the efficiency of simple tension, makes a steel cable the ideal structural element to span large distances.  Nylon and plastics are suitable only for temporary structures, spanning small distances.
  • 6. DYNAMIC EFFECTS OF WIND ON TYPICAL FLEXIBLE ROOF STRUCTURE : A critical problem in the design of any cable roof structure is the dynamic effect of wind, which causes an undesirable fluttering of the roof.
  • 7. PREVENTIVE MEASURES : There are only several fundamental ways to combat flutter. • One is to simply increase the deal load on the roof. • Another is to provide anchoring guy cables at periodic points to tie the structure to the ground. • To use some sort of crossed cable on double-cable system.
  • 8. The principal methods of providing stability are the following: Additional permanent load supported on, or suspended from, the roof, sufficient to neutralize the effects of asymmetrical variable actions or uplift Figure 14 a) This arrangement has the drawback that it eliminates the lightweight nature of the structure, adding significant cost to the entire structure. (ii) Rigid members acting as beams, where permanent load may not be adequate to counteract uplift forces completely, but where there is sufficient flexural rigidity to deal with the net uplift forces, whilst availing of cables to help resist effects of gravity loading (Figure 14b).
  • 9.
  • 10. CASE STUDY SINGLE-CURVATURE STRUCTURE • The Akashi-Kaikyo Bridge also known as the Pearl Bridge, has the longest central span of any suspension bridge in the world, at 1,991 metres (6,532 ft). • The bridge has three spans. The central span is 1,991 m (6,532 ft), and the two other sections are each 960 m (3,150 ft). The bridge is 3,911 m (12,831 ft) long overall.
  • 11. • The steel cables have 300,000 kilometres (190,000 mi) of wire: each cable is 112 centimetres (44 in) in diameter and contains 36,830 strands of wire. Strands of wire Bridge girders •The Akashi-Kaikyo bridge has a total of 1,737 illumination lights: 1,084 for the main cables, 116 for the main towers, 405 for the girders and 132 for the anchorages. Illumination lights
  • 12. DOUBLE-CABLE STRUCTURE Bridge specifications Overall Length: 13.5 km (8.4 mi) Length Over Water: 8.4 km (5.2 mi) Penang Island Viaduct & Approach: 1.5 km (0.93 mi) Prai Approach: 3.6 km (2.2 mi) Height of Tower Above Water: 101.5 m Height of Bridge Above Water: 33 m Main Span: 225 m End Span: 107.5 m Other Span: 40 m Speed limit: 80 km/h Maximum Gradient: 3.0%