SlideShare une entreprise Scribd logo
1  sur  6
ADDRESS:39/12, Chhoti Bhamori
Indore (M.P.) – 452011.
MO : 9179301218
E-mail: ashishkushwah143@yahoo.co.in
Ashish Kushwah
---------------------------------------------------------------------------------------------------------------------------------
CONSULTANT / ENGINEER - ELECTRICAL
TRANSMISSION & DISTRIBUTION
PROFILE:
 Initiative and dynamic competent profession with around more than Six years of expertise in
Consultancy & Project Handling for various projects Like R-APDRP Part-B in Power
distribution System, Reduction in AT&C Losses, RGGVY, Feeder Separation, ADB,
Erection, Testing and Commissioning of Power distribution system.
 Proactive professional with ability to design HVDS and SUB STATION for various projects
enhancing the Distribution System efficiency using CADIAN (AUTO-CAD).
 Suggesting necessary augmentation/renovation of 33/11kV PSS, bifurcation of existing
11kV feeders etc.
 Expertise in handling the techno-commercial aspects of the project achieved assigned
targets and delivered all projects within deadlines.
 Effective communicator with ability to manage the projects and execute them as per the
Client’s requirement.
 Perfect relations builder and coordinator having ability to establish perfect interaction with
all clients and team members to catalyze work execution upon their satisfaction.
 Expertise in the fields of Transmission & Distribution with Erection, Testing and
commissioning.
 Successfully completed R-APDRP project of Betul and Sarni.
 Acknowledged Engineer, team leader, trainer and a motivator with exceptional analytical
and troubleshooting skills. Key Strength Areas include:
Consultancy GPS Survey Designing
BOQ , BOM AT & C Losses Knowledge of Tendering
SAP Cadian , Auto- Cad Neplan
Team Management Material Planning PV Billing
1
 BS GROUP
SINCE APRIL 2013
ENGINEER
Holds the credential of successfully managing R-APDRP Part-B Project at Betul, RGGVY
Project at Bhind, Rewa, Betul and Panna, ADB project at Indore, Ujjain and Barwah
Division :
1. Execution of the Turnkey Project for Supply of Materials, Survey, Installation, Testing
and Commissioning of Power Distribution System aiming at up gradation of sub-
transmission and distribution system to curb down technical and commercial losses to
9% at 11KV under R-APDRP Part-B at Betul.
2. Execution of Rajiv Gandhi Project for Supply of Materials, Survey, Installation, Testing
& Commissioning of Power Distribution System and provide a electricity Below Poverty
Line Consumer under RGGVY at Bhind, Rewa, & Panna.
3. Execution of 132kv and 220kv line and Sub station for Supply of Materials, Survey,
Installation, Testing & Commissioning of Power Transmission System and upgrade the
system under ADB project at Indore, Ujjain and Barwah Division.
TASKS PERFORMED
 Scheduling for the Project.
 Estimation of BOQ, Cost Estimate & Technical Specification for Whole Project.
 Handle the survey team & maintain the data.
 Designing a whole system.
 Submission of Report for approval.
 Preparation of Erection & Supply Invoices.
 Preparation of PV Invoices.
 BOQ Proposal according LOA rate.
 Material Planning.
 Maintain a record of Material dismantles.
 Calculation of AT & C Losses.
 Transmission line and Sub station billing as per JMC.
 Total scope of work in Transmission and Sub station is Two SS of 220Kv and &
Seven SS of 132kv.
 MONTECARLO CONSTRUCTION LTD.
JUNE. 2011 to MARCH 2013
2
Professional Synpsosis:
ASST. ENGINEER
Holds the credential of successfully managing R-APDRP Part-B Project at Bhopal:
4. Execution of the Turnkey Project for Supply of Materials, Survey, Installation, Testing
and Commissioning of Power Distribution System aiming at up gradation of sub-
transmission and distribution system to curb down technical and commercial losses to
9% at 11KV under R-APDRP Part-B at Bhopal.
TASKS PERFORMED
 Scheduling for the Project.
 Estimation of BOQ, Cost Estimate & Technical Specification for Whole Project.
 Interaction with Clients (Madhya Pradesh Madhya Kshetra Vidyut Vitran
Company Ltd.) and their representatives such as CE, DE, AEN, JEN etc.
 Leading The Design Team For Reduces The AT&C Losses & Voltage
Regulation.
 To keep track of the survey team and Inspection of Site Work.
 Submission of Reports and getting approval.
 Designing The system For Reducing The Technical & Commercial Losses.
 Designing For HVDS System.
 Designing For Load Calculation, Cable Size Selection, Transformer Rating,
Conductor Size, Load Balancing etc.
 Designing of Sub Station.
 Erection Billing.
 Erection of New 11KV and 33KV line.
 Execution of 9 New Sub station, 4 Additional Sub station, 4 Augmentation, and
57 Renovation sub station.
 POWER SOLUTIONS
CONTRACTOR
Aug 2008 to May 2011
Work as a contractor have completed different project like as a HVDS, ADB, FSP,
RGGVY, R-APDRP,with mention the company.
 VOYANTS SOLUTION PVT. LMT.
 GENUS POWER
 SCHALTECH AUTOMATION
 GET POWER
 Agrawal Power Pvt. Ltd.
 Godrej & Boyce Mfg. Co. Ltd.
 Shreeji Infra Pvt. Ltd.
3
 L & T Construction.
 Sanfield (India) Limited.
TASKS PERFORMED
 Preparation of detail Project report (DPR).
 Calculation of Electrical Load.
 GPS Survey.
 Selection of Equipment (Transformer, Conductor, Cable etc.)
 Sub Station Design.
 Design of distribution system.
 Preparation of drawings & Layouts.
 Preparation of Cost estimate, BOQ & Technical Specification.
 Erection of 11kv & LT line
 Calculation a AT & C losses
 Client co-ordination
 Man Power Supply.
 Graduation
B.E. in Electrical & Electronics Engineering Department from Lakshmi Narain
College Of Technology, Indore
(Affiliated to R.G.P.V. Bhopal)
Aggregate: 69.97%
o Operating Systems: Windows XP
o Languages: C, C++.
o Drafting : AutoCAD (2D), Cadian
o Other: MS Office, Power Point, SAP,MS Project, Internet Explorer, GPS, BOQ, AT &
C Losses Analysis.
Name : Ashish Kushwah
Father’s Name : Mr. Manohar Kushwah
Date of Birth : May 3rd, 1986
4
PERSONAL INFORMATION
ACADEMIC QUALIFICATION
TECHNICAL SKILLS
Marital Status : Unmarried
Nationality : Indian
Languages : Hindi, English.
Current CTC : 3.15 Lacs Per Annum
Date: (Ashish
kushwah)
5
Marital Status : Unmarried
Nationality : Indian
Languages : Hindi, English.
Current CTC : 3.15 Lacs Per Annum
Date: (Ashish
kushwah)
5

Contenu connexe

Tendances

Sanjeev Randev Resume Electrical Engineer MBA-2014
Sanjeev Randev Resume Electrical Engineer MBA-2014Sanjeev Randev Resume Electrical Engineer MBA-2014
Sanjeev Randev Resume Electrical Engineer MBA-2014Srandev2014
 
CV Raza_Ali_Saleem
CV Raza_Ali_SaleemCV Raza_Ali_Saleem
CV Raza_Ali_SaleemRaza Khan
 
CV- Electrical Tech.& Design With 4+ years of exp.
CV- Electrical Tech.& Design With 4+ years of exp.CV- Electrical Tech.& Design With 4+ years of exp.
CV- Electrical Tech.& Design With 4+ years of exp.Maharshi Joshi
 
ELECTRICAL DESIGN ENGINEER - RESUME
ELECTRICAL DESIGN ENGINEER -  RESUMEELECTRICAL DESIGN ENGINEER -  RESUME
ELECTRICAL DESIGN ENGINEER - RESUMEVEERABHARATHI MUNI
 
MEP - Electrical Enginner
MEP - Electrical EnginnerMEP - Electrical Enginner
MEP - Electrical EnginnerNikhil Garde
 
AOCG 05-2016 Kazadi, Michel
AOCG 05-2016 Kazadi, MichelAOCG 05-2016 Kazadi, Michel
AOCG 05-2016 Kazadi, MichelMichel Kazadi
 
Subhankar resumé-2016
Subhankar  resumé-2016Subhankar  resumé-2016
Subhankar resumé-2016subhankar saha
 
Enaia electrical design. engineer cv
Enaia electrical design. engineer  cvEnaia electrical design. engineer  cv
Enaia electrical design. engineer cvEnaia Kamel
 
Nakul bhatt c.v_(electrical_design_engineer)-4.11 years_exp
Nakul bhatt c.v_(electrical_design_engineer)-4.11 years_expNakul bhatt c.v_(electrical_design_engineer)-4.11 years_exp
Nakul bhatt c.v_(electrical_design_engineer)-4.11 years_expNakul Bhatt
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of expSubhash +966535838322
 
Electrical engineer rikshit
Electrical engineer rikshitElectrical engineer rikshit
Electrical engineer rikshitRixit Patel
 

Tendances (20)

Sanjeev Randev Resume Electrical Engineer MBA-2014
Sanjeev Randev Resume Electrical Engineer MBA-2014Sanjeev Randev Resume Electrical Engineer MBA-2014
Sanjeev Randev Resume Electrical Engineer MBA-2014
 
CV Raza_Ali_Saleem
CV Raza_Ali_SaleemCV Raza_Ali_Saleem
CV Raza_Ali_Saleem
 
CV- Electrical Tech.& Design With 4+ years of exp.
CV- Electrical Tech.& Design With 4+ years of exp.CV- Electrical Tech.& Design With 4+ years of exp.
CV- Electrical Tech.& Design With 4+ years of exp.
 
ELECTRICAL DESIGN ENGINEER - RESUME
ELECTRICAL DESIGN ENGINEER -  RESUMEELECTRICAL DESIGN ENGINEER -  RESUME
ELECTRICAL DESIGN ENGINEER - RESUME
 
MEP - Electrical Enginner
MEP - Electrical EnginnerMEP - Electrical Enginner
MEP - Electrical Enginner
 
AOCG 05-2016 Kazadi, Michel
AOCG 05-2016 Kazadi, MichelAOCG 05-2016 Kazadi, Michel
AOCG 05-2016 Kazadi, Michel
 
krishnaraj CV1
krishnaraj CV1krishnaraj CV1
krishnaraj CV1
 
Subhankar resumé-2016
Subhankar  resumé-2016Subhankar  resumé-2016
Subhankar resumé-2016
 
Enaia electrical design. engineer cv
Enaia electrical design. engineer  cvEnaia electrical design. engineer  cv
Enaia electrical design. engineer cv
 
Electrical Engineer C.V
Electrical Engineer C.VElectrical Engineer C.V
Electrical Engineer C.V
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
electrical engineer
electrical engineerelectrical engineer
electrical engineer
 
cv (2)
cv (2)cv (2)
cv (2)
 
Resume-RAKESH KUMAR
Resume-RAKESH KUMARResume-RAKESH KUMAR
Resume-RAKESH KUMAR
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
Resume-Sagar-1
Resume-Sagar-1Resume-Sagar-1
Resume-Sagar-1
 
Nakul bhatt c.v_(electrical_design_engineer)-4.11 years_exp
Nakul bhatt c.v_(electrical_design_engineer)-4.11 years_expNakul bhatt c.v_(electrical_design_engineer)-4.11 years_exp
Nakul bhatt c.v_(electrical_design_engineer)-4.11 years_exp
 
Cv electrical
Cv electricalCv electrical
Cv electrical
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of exp
 
Electrical engineer rikshit
Electrical engineer rikshitElectrical engineer rikshit
Electrical engineer rikshit
 

Similaire à Ashish Resume

Similaire à Ashish Resume (20)

RAJPAL @cv
RAJPAL @cvRAJPAL @cv
RAJPAL @cv
 
anand_IBS imp eng cv
anand_IBS imp eng cvanand_IBS imp eng cv
anand_IBS imp eng cv
 
Resume_Darpan Majumder1
Resume_Darpan Majumder1Resume_Darpan Majumder1
Resume_Darpan Majumder1
 
CV
CVCV
CV
 
Updated_CV
Updated_CVUpdated_CV
Updated_CV
 
CV Solar
CV SolarCV Solar
CV Solar
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15
 
NIZAM UDDIN UPDATED CV
NIZAM UDDIN UPDATED CVNIZAM UDDIN UPDATED CV
NIZAM UDDIN UPDATED CV
 
Resume for Electrical design engineer
Resume for Electrical design engineerResume for Electrical design engineer
Resume for Electrical design engineer
 
Lakhdeep Singh CV
Lakhdeep Singh CVLakhdeep Singh CV
Lakhdeep Singh CV
 
Resume of Kaptan Singh new
Resume of Kaptan Singh newResume of Kaptan Singh new
Resume of Kaptan Singh new
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)
 
Ishantshrivastava resume
Ishantshrivastava resumeIshantshrivastava resume
Ishantshrivastava resume
 
CV-NITIN NIWARIYA _ Electrical _
CV-NITIN NIWARIYA _ Electrical _ CV-NITIN NIWARIYA _ Electrical _
CV-NITIN NIWARIYA _ Electrical _
 
JOVIN RESUME
JOVIN RESUMEJOVIN RESUME
JOVIN RESUME
 
Electronics & Communication_Engineer_resume
Electronics & Communication_Engineer_resumeElectronics & Communication_Engineer_resume
Electronics & Communication_Engineer_resume
 
Aizaz Ahmad Qatar
Aizaz Ahmad QatarAizaz Ahmad Qatar
Aizaz Ahmad Qatar
 
Vivek Mehta_Resume
Vivek Mehta_ResumeVivek Mehta_Resume
Vivek Mehta_Resume
 
CV_Krishnanand
CV_KrishnanandCV_Krishnanand
CV_Krishnanand
 

Ashish Resume

  • 1. ADDRESS:39/12, Chhoti Bhamori Indore (M.P.) – 452011. MO : 9179301218 E-mail: ashishkushwah143@yahoo.co.in Ashish Kushwah --------------------------------------------------------------------------------------------------------------------------------- CONSULTANT / ENGINEER - ELECTRICAL TRANSMISSION & DISTRIBUTION PROFILE:  Initiative and dynamic competent profession with around more than Six years of expertise in Consultancy & Project Handling for various projects Like R-APDRP Part-B in Power distribution System, Reduction in AT&C Losses, RGGVY, Feeder Separation, ADB, Erection, Testing and Commissioning of Power distribution system.  Proactive professional with ability to design HVDS and SUB STATION for various projects enhancing the Distribution System efficiency using CADIAN (AUTO-CAD).  Suggesting necessary augmentation/renovation of 33/11kV PSS, bifurcation of existing 11kV feeders etc.  Expertise in handling the techno-commercial aspects of the project achieved assigned targets and delivered all projects within deadlines.  Effective communicator with ability to manage the projects and execute them as per the Client’s requirement.  Perfect relations builder and coordinator having ability to establish perfect interaction with all clients and team members to catalyze work execution upon their satisfaction.  Expertise in the fields of Transmission & Distribution with Erection, Testing and commissioning.  Successfully completed R-APDRP project of Betul and Sarni.  Acknowledged Engineer, team leader, trainer and a motivator with exceptional analytical and troubleshooting skills. Key Strength Areas include: Consultancy GPS Survey Designing BOQ , BOM AT & C Losses Knowledge of Tendering SAP Cadian , Auto- Cad Neplan Team Management Material Planning PV Billing 1
  • 2.  BS GROUP SINCE APRIL 2013 ENGINEER Holds the credential of successfully managing R-APDRP Part-B Project at Betul, RGGVY Project at Bhind, Rewa, Betul and Panna, ADB project at Indore, Ujjain and Barwah Division : 1. Execution of the Turnkey Project for Supply of Materials, Survey, Installation, Testing and Commissioning of Power Distribution System aiming at up gradation of sub- transmission and distribution system to curb down technical and commercial losses to 9% at 11KV under R-APDRP Part-B at Betul. 2. Execution of Rajiv Gandhi Project for Supply of Materials, Survey, Installation, Testing & Commissioning of Power Distribution System and provide a electricity Below Poverty Line Consumer under RGGVY at Bhind, Rewa, & Panna. 3. Execution of 132kv and 220kv line and Sub station for Supply of Materials, Survey, Installation, Testing & Commissioning of Power Transmission System and upgrade the system under ADB project at Indore, Ujjain and Barwah Division. TASKS PERFORMED  Scheduling for the Project.  Estimation of BOQ, Cost Estimate & Technical Specification for Whole Project.  Handle the survey team & maintain the data.  Designing a whole system.  Submission of Report for approval.  Preparation of Erection & Supply Invoices.  Preparation of PV Invoices.  BOQ Proposal according LOA rate.  Material Planning.  Maintain a record of Material dismantles.  Calculation of AT & C Losses.  Transmission line and Sub station billing as per JMC.  Total scope of work in Transmission and Sub station is Two SS of 220Kv and & Seven SS of 132kv.  MONTECARLO CONSTRUCTION LTD. JUNE. 2011 to MARCH 2013 2 Professional Synpsosis:
  • 3. ASST. ENGINEER Holds the credential of successfully managing R-APDRP Part-B Project at Bhopal: 4. Execution of the Turnkey Project for Supply of Materials, Survey, Installation, Testing and Commissioning of Power Distribution System aiming at up gradation of sub- transmission and distribution system to curb down technical and commercial losses to 9% at 11KV under R-APDRP Part-B at Bhopal. TASKS PERFORMED  Scheduling for the Project.  Estimation of BOQ, Cost Estimate & Technical Specification for Whole Project.  Interaction with Clients (Madhya Pradesh Madhya Kshetra Vidyut Vitran Company Ltd.) and their representatives such as CE, DE, AEN, JEN etc.  Leading The Design Team For Reduces The AT&C Losses & Voltage Regulation.  To keep track of the survey team and Inspection of Site Work.  Submission of Reports and getting approval.  Designing The system For Reducing The Technical & Commercial Losses.  Designing For HVDS System.  Designing For Load Calculation, Cable Size Selection, Transformer Rating, Conductor Size, Load Balancing etc.  Designing of Sub Station.  Erection Billing.  Erection of New 11KV and 33KV line.  Execution of 9 New Sub station, 4 Additional Sub station, 4 Augmentation, and 57 Renovation sub station.  POWER SOLUTIONS CONTRACTOR Aug 2008 to May 2011 Work as a contractor have completed different project like as a HVDS, ADB, FSP, RGGVY, R-APDRP,with mention the company.  VOYANTS SOLUTION PVT. LMT.  GENUS POWER  SCHALTECH AUTOMATION  GET POWER  Agrawal Power Pvt. Ltd.  Godrej & Boyce Mfg. Co. Ltd.  Shreeji Infra Pvt. Ltd. 3
  • 4.  L & T Construction.  Sanfield (India) Limited. TASKS PERFORMED  Preparation of detail Project report (DPR).  Calculation of Electrical Load.  GPS Survey.  Selection of Equipment (Transformer, Conductor, Cable etc.)  Sub Station Design.  Design of distribution system.  Preparation of drawings & Layouts.  Preparation of Cost estimate, BOQ & Technical Specification.  Erection of 11kv & LT line  Calculation a AT & C losses  Client co-ordination  Man Power Supply.  Graduation B.E. in Electrical & Electronics Engineering Department from Lakshmi Narain College Of Technology, Indore (Affiliated to R.G.P.V. Bhopal) Aggregate: 69.97% o Operating Systems: Windows XP o Languages: C, C++. o Drafting : AutoCAD (2D), Cadian o Other: MS Office, Power Point, SAP,MS Project, Internet Explorer, GPS, BOQ, AT & C Losses Analysis. Name : Ashish Kushwah Father’s Name : Mr. Manohar Kushwah Date of Birth : May 3rd, 1986 4 PERSONAL INFORMATION ACADEMIC QUALIFICATION TECHNICAL SKILLS
  • 5. Marital Status : Unmarried Nationality : Indian Languages : Hindi, English. Current CTC : 3.15 Lacs Per Annum Date: (Ashish kushwah) 5
  • 6. Marital Status : Unmarried Nationality : Indian Languages : Hindi, English. Current CTC : 3.15 Lacs Per Annum Date: (Ashish kushwah) 5