Ce diaporama a bien été signalé.
Nous utilisons votre profil LinkedIn et vos données d’activité pour vous proposer des publicités personnalisées et pertinentes. Vous pouvez changer vos préférences de publicités à tout moment.
ACM-27
Section-IV | Group- IX
Awanish Shukla
Vision
To construct the nations’ metro rail services in most efficient
manner with the aim to be the largest company to do...
CERTIFICATE
 Company Started

:

Year 1980

 Current situation

:

EPC company

 Specialized in

:

Metro Rails construction

 Tot...
Human Resources

 15000 permanent employee.
 6000 qualified Engineers.
 200 Registered supplier, subcontractor, labour
...
Projects completed
 Phase 1 & 2 of Delhi Metro rail (Dec. 2002).

 Kolkata Metro (Oct.1984).

Projects in progress
 Riy...
Balance sheet for last five years
NSE
52 WK

BSE

LOW/HIGH 677.15/1138.33

LOW/HIGH 678.10/1138.33

Mar '13

Mar '12

Mar ...
Quotation for this Project

 10% profit of the approximate project
cost.
 Contract type – EPC contract Final
quotation w...
In Station Planning our company AAS C & T is core competent.
 The Stations being windows to the metro service are

tastef...
 The

layout of the stations is influenced by the track
geometry, operational requirements, predicted passenger flows,
RO...
 Security of the commuter is a major concern and focus has been to
provide advanced equipment for security of commuters s...
Signages are designed, with instant message transfer
to passengers, from street level guiding at concourse
level to platfo...
 Ticketing Counters/Booths have been provided at all Stations along
with Ticket Vending Machines making ticketing process...
 Our Company AAS_C & T Ltd. Is core competent
enough in this section of metro railway projects.
 Company is interested t...
Metro project
Metro project
Metro project
Prochain SlideShare
Chargement dans…5
×

0

Partager

Télécharger pour lire hors ligne

Metro project

Télécharger pour lire hors ligne

Livres associés

Gratuit avec un essai de 30 jours de Scribd

Tout voir
  • Soyez le premier à aimer ceci

Metro project

  1. 1. ACM-27 Section-IV | Group- IX Awanish Shukla
  2. 2. Vision To construct the nations’ metro rail services in most efficient manner with the aim to be the largest company to do such. Mission Providing construction in the metro rail arena with quality assurance and with the economic construction aim; the company seeks to be specialized in metro rail services.
  3. 3. CERTIFICATE
  4. 4.  Company Started : Year 1980  Current situation : EPC company  Specialized in : Metro Rails construction  Total Company value : INR 2000 crores  Assets status : 500 crores (Highest in India)  Head office : Mumbai
  5. 5. Human Resources  15000 permanent employee.  6000 qualified Engineers.  200 Registered supplier, subcontractor, labour contractors.
  6. 6. Projects completed  Phase 1 & 2 of Delhi Metro rail (Dec. 2002).  Kolkata Metro (Oct.1984). Projects in progress  Riyadh Metro.  Hyderabad Metro.  Banglore Metro.
  7. 7. Balance sheet for last five years NSE 52 WK BSE LOW/HIGH 677.15/1138.33 LOW/HIGH 678.10/1138.33 Mar '13 Mar '12 Mar '11 Mar '10 Mar '09 12 mths 12 mths 12 mths 12 mths 12 mths Total Share Capital 123.08 122.48 121.77 120.44 117.14 Equity Share Capital 123.08 122.48 121.77 120.44 117.14 Share Application Money 0.00 0.00 0.00 25.09 0.00 Preference Share Capital 0.00 0.00 0.00 0.00 0.00 25,100.54 21,724.49 18,142.82 ------------------- in Rs. Cr. ------------------- 12,317.96 Balance sheet for aas c&t In crores Sources Of Funds Reserves Balance Sheet of AAS Revaluation Reserves 29,019.64 0.00 0.00 0.00 23.29 24.59 29,142.72 25,223.02 21,846.26 18,311.64 12,459.69 Secured Loans 1,234.01 1,453.34 1,063.04 955.73 1,102.38 Unsecured Loans 6,771.55 6,813.44 5,268.54 5,845.10 5,453.65 Total Debt 8,005.56 8,266.78 6,331.58 6,800.83 6,556.03 37,148.28 33,489.80 28,177.84 25,112.47 19,015.72 Mar '13 Mar '12 Mar '11 Mar '10 Mar '09 Networth Total Liabilities
  8. 8. Quotation for this Project  10% profit of the approximate project cost.  Contract type – EPC contract Final quotation will be negotiable.
  9. 9. In Station Planning our company AAS C & T is core competent.  The Stations being windows to the metro service are tastefully designed reflecting local culture and flavour, functional aesthetics, user friendly, energy efficient and with a station architecture that is site specific and environmentally compatible.  The design identifies significant architectural features which should be taken into account. Along with a responsive design stations offer various facilities for the passengers.  Stations will be covered by an overlapping roofing system, open at sides, covering the platform, staircases & escalators designed based on architectural elements and functional aspects.
  10. 10.  The layout of the stations is influenced by the track geometry, operational requirements, predicted passenger flows, ROW availability and electrical & mechanical requirements.  The station is divided into public & non-public areas (areas where access is restricted).  Architectural planning, also indicates, State of art, Railway engineering equipment's installations at station concourse level for smooth Metro Rail operations and Passenger Safety.  Station Manager is located at convenient place with ease of access, if any passenger desire instant helps.
  11. 11.  Security of the commuter is a major concern and focus has been to provide advanced equipment for security of commuters shall be provided at each station like baggage screening devices, hand held devises, CCTV monitoring, access control system etc.  First aid medical assistance is being provided at concourse level at all stations.  Station planning is influenced by normal passenger flow and emergency evacuation scenario.  All required lifesaving facilities are being provided at stations, viz., fire protection, emergency lighting and signages, PA and PIDS, auto opening of ticketing gates, sizing of the staircases etc., as per relevant standards
  12. 12. Signages are designed, with instant message transfer to passengers, from street level guiding at concourse level to platform level.
  13. 13.  Ticketing Counters/Booths have been provided at all Stations along with Ticket Vending Machines making ticketing process simpler and faster.  Pedestrian facilities from the road to the concourse/car park and/or to the ticket counters and back shall have been provided to enable unhindered smooth flow of pedestrians using the Metro and making the commuting experience comfortable.  Toilets are provided separate for male and female and for disabled and normal passengers.  Facilities for disabled are provided.  Facility of vending mineral water, cool drinks, coffee and tea shall be provided at all Stations.
  14. 14.  Our Company AAS_C & T Ltd. Is core competent enough in this section of metro railway projects.  Company is interested to take the project given by client.

Vues

Nombre de vues

834

Sur Slideshare

0

À partir des intégrations

0

Nombre d'intégrations

6

Actions

Téléchargements

16

Partages

0

Commentaires

0

Mentions J'aime

0

×