Challenges & Lessons Learned in
Implementing KM Program in a
Construction Company
By: Mustafa Abusalah, PhD
April 2012
CCC Pre KM
 WAN: Company headquarters, projects, offices and areas are connected
via WAN/VPN.
 Communications: Communication channel is mainly through email, IP
Telephony and TDM.
 Document and Content Management: CCC has an in house developed
Document Management System (VBC) which is the repository for all CCC
content.
 VBC Central: VBC central is the framework where projects, departments,
etc. Can create there own content management portals.
 One Repository: As VBC is the repository for all CCC content, all
applications running at CCC stores and retrieves documents to/from VBC.
This allowed different applications to work on the same content when
needed.
Why Knowledge Management (1)
 CCC operating platform for developing people and sharing knowledge
seems to be adequate in sustaining CCC’s operations pre 2002-03.
 Project managers and project teams could transfer knowledge to other projects and / or
develop staff within
 Formal procedures (QMPs) and “Method Statements” were created and informal
networks were effective in exchanging information.
 CCC established a niche in being able to execute difficult projects requiring mobilization
of significant resources.
Why Knowledge Management (2)
 Magnitude and Rate of Growth are causing “Cracks”
 Management time is being diverted from addressing strategic issues “to shoring up partners
and client’s concerns due to being behind schedule in up to 80% of our projects”.
 Inconsistencies are appearing within our operations and execution of projects.
 Roles, responsibilities, accountabilities, communications channels were becoming fragmented
across the group.

“Sheer volume of growth means we have less time to communicate”
“We discover mistakes too late in the game”
“We capture and share more lessons learned with partners than with
ourselves”
“Someone in the project needs to be responsible for lessons learned”
“Rework is occurring because people do not know what is available”
Why Knowledge Management (3)
Conclusions
Sharing the knowledge: Insights, experiences, contact details,
lessons learned, favourite documents, useful links, supplier
and other work related resources.
Collaboration platform: On bridging knowledge gaps, drafting
Corporate Knowledge
Corporate Knowledge
documents, developing new areas of practices, on bringing
Network
Network
innovation to market, on defining new approaches and
solutions to customer issues
People Directory (profiles): for locating experience, answering
questions, solving problems, make recommendations,
training, manuals, lessons learned
Definition of Knowledge Management

Knowledge management is the strategic backbone within CCC
that puts in place a supportive social and technical framework &
structure that encourages staff to contribute, share and innovate
knowledge for the benefit of CCC (employees, operations and
partners), which in exchange provides staff clearer with insights on
how and where they can develop through the application and
sharing of knowledge and improve the efficiency of the operations.
“Obtaining and creating the right knowledge to the right people
at the right time”
CCC KM Strategy
Blanket Initiatives: Initiatives that when
implemented cover all CoPs eg. Redesign/
reenergise Lessons Learned
Key:

Elemental Initiatives: Initiatives that are

Example Elemental
Initiatives

CoP D

CoP A
CoP C

“optional” for each CoP. Each of these initiatives
can also be done to varying degrees

CoP B

Knowledge
Process Design
eLearning
content

CoP N

CoPs: Groups of individuals with a common

Experience
database

purpose/ goals, supported by functionality
provided by Elemental Initiatives

Foundation Initiatives: Phase I – necessary to
implement prior to developing the CoPs as they
provide the core KM support structure for all
Elemental Initiatives
Phase II – provide the support KM structure for only
some of the Elemental Initiatives

Knowledge
Audit

Training &
development

• Incentives & Recognition framework
• Induction programme
• KM processes
•
•
•
•
•

KM Organisation
Knowledge Portal
KM Comms Programme
Knowledge Taxonomy
KM Scorecard

(Phase II)

Foundation
Initiatives
(Phase I)
KM & CoP Organisations

CCC Leadership

Community of Practice

Community Leader

PT

Head of KM

Knowledge Manager

SMEs

PT

Knowledge Captains

Community Members

PT

Knowledge Automation
Engineer (IS)

Knowledge Controllers

KM Organisation

Executive Assistant

Project Manager PT

PT

PT = Part Time
KM Organization Processes
Connecting: People to communities, people to experts,
people to KM tools, people to repositories
Enabling & Facilitating: Conversations, exchanges,
collaboration, questions, answers, contributions,
engagement and adoption
Monitoring & Reporting: On behaviours, contribution,
engagement, organisational dynamics, KM system health,
knowledge flows
What is a Community of Practice (CoP)?
 CoPs are either formal or informal groups of people with a
common purpose and common goals. A few characteristics of
CoPs are:
 The “members” share common pursuits and problems
 They share common practices and language – eg. They use the same
methodologies and express themselves in a similar fashion (eg.
technical jargon)
 They share similar interests
 Most people belong to more than one CoP
 Members of a CoP often have the same or similar roles but are not
located in the same location (or same project)

11
CoP Processes
Search: for answers, experts, knowledge, experience, lessons
learned, documents, images, perspectives
Collaborate: On bridging knowledge gaps, drafting
documents, developing new areas of practices, on bringing
innovation to market, on defining new approaches and
solutions to customer issues
Share: Insights, experiences, contact details, lessons learned,
favourite documents, useful links, supplier and other work
related resources
KM Portal
 Wiki Collaboration and Knowledge Sharing platform:
bridging knowledge gaps, drafting documents, developing new
areas of practices, bringing innovation to market, defining new
approaches and solutions to customer issues. Insights,
experiences, contact details, lessons learned, favourite
documents, useful links, supplier and other work related
resources.
People Directory (profiles): for locating experience, answering
questions, solving problems, make recommendations,
training, manuals, lessons learned.
VBC Repository: Formal Knowledge, KAudit
Community of Practice (CoP)
Planning Phase*
 Establish founding members
 Develop business case
 Establish Taxonomy Framework & high level breakdown
 Perform knowledge Audit: Content + People
 Build knowledge maps

*Source: American Productivity & Quality Center (APQC)
Community of Practice (CoP)
CoP - Design Phase*

 Design knowledge sharing processes/ workflows
 Identify roles and responsibilities
 Identify required IT capabilities
 Develop Initial learning and development plan and content
 Create measures, indicators, and scorecard
 Establish reward and recognition plans
 Develop change management plan ( Monthly newsletters,
announcements, surveys, Bulletin etc.)
*Source: American Productivity & Quality Center (APQC)
Meetings Highlights
 First Year: 6 Meetings were held with each CoP

 Meeting No. 1: Business Case Requirements
 Meeting No. 2: Business Case follow-up & KM Roll out plan
 Meeting No. 3: Founding Members’ CoP Kick-off Meeting
and agree on roles and responsibilities
 Meeting No. 4: Business Case Presentation to Top
Management
 Meeting No. 5: Review KAudit report, agree on launching
content, and membership guides.
 Meeting No. 6: Review new contributions, agree on future
contributions and presentations by invited speakers and
members.
 Then Two yearly follow up meetings are held.
“Connect & Collect” Knowledge Portal

“Connect & Collect”
Knowledge Portal?
Connect People

3. Share, Validate &
Harvest Learnings

KnowledgeBase
1. Do we
already know this?

4. Enrich the KBase

2. Who can I ask
for help?
CCC Knowledge Portal – Fanous

18
19

Communication & Awareness
Recognition of Best Contributors/ Projects

20
Members Behavior
 Knowledge Culture: contribute in the definition of the company’s
vision and strategy, contribute to innovative processes consider and
recognize members ideas and skills. Encourage members to play
challenging roles and tasks, which go beyond their current
capabilities. Encourage members to learn, knowing that they will
acquire new skills. And finally understand that the members want to
see the company’s values fit their own.
 Motivation: Recognition for best contributions, elitism could be
strong social motivation factor, providing members with challenging
and constantly changing tasks seems to be critical to increase their
motivation.
 Training & Workshops: Members training, running knowledge
capture session in projects, awards for best contributions per project.
Measuring & Monitoring
 Monitoring Investment: Time, money and effort (Department
budget, Meetings cost, Time spent in KM-related activities, etc.)
 Monitoring Adoption: whether or not the activity is being taken up
according to plan (Staff time invested in sharing activities, Frequency
of activity per division, etc.)
 Monitoring Health: KM System, repository, search, etc. (#
Knowledge assets created, Frequency of use of knowledge assets
created, etc.)
 Case studies of knowledge re-use. (Ex:
Guidelines For Fabrication Shop Equipment)
 Excavation simulation program
 Participants’ assessment of CoP value for work effectiveness
and/or knowledge development.
Knowledge Creation- Innovative Ideas
Project Mobilization Community
lead the development of a
comprehensive guideline for
camps construction. The
guideline includes several
innovative ideas intended to
reduce power and water
consumption, increase waste
recycling, and carbon emission
reduction. The guideline
emphasized on safety
requirements and residents
welfare.
23
Collecting & Connecting– Delivering Value
A project engineer in Kazakhstan inquired about best
practice for selection of compressors and dryers for
pressure testing. He found a guideline in Fanous
developed by an SME on the subject, based in Qatar. He
communicated with the SME on his project requirement.
The SME helped him in specifying the equipment. This
resulted on more than US$ 60,000 saving on direct
equipment cost.

24
Collecting & Connecting – Delivering Value
A project in Qatar experienced high repair rate of smallbore pipe socket welding. A senior welding engineer
searched Fanous for lessons learned from other projects.
He found several recommendations to use special spacer
rings during fit-up of such piping. The delivery time of
such rings is around 3-4 weeks. However, a project in
Kuwait built a machine to fabricate these spacer rings inhouse saving time and cost. The machine was
transferred to Qatar and was operational in days. Beside
time saving in rings delivery and cost of repairs, the Qatar
project realized at least US$ 180K in direct savings.

25
Challenges
 Working in remote locations in tough site conditions and poor
communication
 Variant workforce cultures
 Company business changes, type of projects is variant, Oil
and Gas vs. High quality buildings
 Computer literacy, some of the best knowledge holders lack
computer literacy.
 Reluctance to share knowledge. Need of recognition
 Construction is less based on codes so the context has great
impact on the best practice. (ex. Labor intinsives vs.
Automation)
Recommendations

 Support of the top management is instrumental, as senior and
middle management tend to resist
 Dedicated KM Organization.
 The KM organization shall drive the KM philosophy and the IT shall
give support and the implementation.
 Selection of CoP Leader is most critical and determent for the
success of the KM application.
 Importance of regular meetings.
 Attractive and rich content, reminders, change management/
elaborate communication plan.
 Evolving Technology & Content (Web 2 & Web 3).
 Start with 3 to 5 CoPs as some will fail. Plan to introduce new ones
every year.
Thank You Q&A
Discussion Thoughts
 Taxonomy and Ontology Construction (Experiences and per
community)
 Establish/share some benchmarks
 Good size of a community
 Community benchmarks
 Success measures

Contenu connexe

Tendances

Tips & Tricks for Your Lessons Learned Program
Tips & Tricks for Your Lessons Learned ProgramTips & Tricks for Your Lessons Learned Program
Tips & Tricks for Your Lessons Learned ProgramSIKM
 
Knowledge audit sikm leaders forum march 2019
Knowledge audit sikm leaders forum march 2019Knowledge audit sikm leaders forum march 2019
Knowledge audit sikm leaders forum march 2019plambe
 
KM & HPT: USCG 2010 HPT Conference
KM & HPT: USCG 2010 HPT ConferenceKM & HPT: USCG 2010 HPT Conference
KM & HPT: USCG 2010 HPT Conferencejcichelli
 
Surrounded by Geniuses: Knowledge Management Learning From Other Industries
Surrounded by Geniuses: Knowledge Management Learning From Other IndustriesSurrounded by Geniuses: Knowledge Management Learning From Other Industries
Surrounded by Geniuses: Knowledge Management Learning From Other IndustriesConnie Crosby
 
Colorado Community College System Digital Credential Taskforce meeting Octobe...
Colorado Community College System Digital Credential Taskforce meeting Octobe...Colorado Community College System Digital Credential Taskforce meeting Octobe...
Colorado Community College System Digital Credential Taskforce meeting Octobe...cccschamp
 
Lessons from the front line: next-generation knowledge management in the reso...
Lessons from the front line: next-generation knowledge management in the reso...Lessons from the front line: next-generation knowledge management in the reso...
Lessons from the front line: next-generation knowledge management in the reso...Velrada
 
ISO Knowledge Management standard
ISO Knowledge Management standardISO Knowledge Management standard
ISO Knowledge Management standardFernando Zeballos
 
Chartership for Knowledge Management
Chartership for Knowledge Management Chartership for Knowledge Management
Chartership for Knowledge Management CILIP
 
2014_Executive_Leadership_Conference_Summary
2014_Executive_Leadership_Conference_Summary2014_Executive_Leadership_Conference_Summary
2014_Executive_Leadership_Conference_SummaryChris Niedermayer
 
Let’s make a deal! Empowering Small and Mid Sized Universities to Participate...
Let’s make a deal! Empowering Small and Mid Sized Universities to Participate...Let’s make a deal! Empowering Small and Mid Sized Universities to Participate...
Let’s make a deal! Empowering Small and Mid Sized Universities to Participate...Alexis Smith Macklin, PhD
 
Protected Area Network Knowledge Management Framework (Needs Assessment and A...
Protected Area Network Knowledge Management Framework (Needs Assessment and A...Protected Area Network Knowledge Management Framework (Needs Assessment and A...
Protected Area Network Knowledge Management Framework (Needs Assessment and A...John Mauremootoo
 
Net-centric tacit knowledge management
Net-centric tacit knowledge managementNet-centric tacit knowledge management
Net-centric tacit knowledge managementSIKM
 
Strategic use of ICT and communication tools, Module 3.pdf
Strategic use of ICT and communication tools, Module 3.pdfStrategic use of ICT and communication tools, Module 3.pdf
Strategic use of ICT and communication tools, Module 3.pdfBrodoto
 
Strategic use of ICT and communication tools, Module 1.pdf
Strategic use of ICT and communication tools, Module 1.pdfStrategic use of ICT and communication tools, Module 1.pdf
Strategic use of ICT and communication tools, Module 1.pdfBrodoto
 
Aligning people process and technology in km sikm presentation
Aligning people process and technology in km sikm presentationAligning people process and technology in km sikm presentation
Aligning people process and technology in km sikm presentationStephanie Barnes
 

Tendances (20)

Tips & Tricks for Your Lessons Learned Program
Tips & Tricks for Your Lessons Learned ProgramTips & Tricks for Your Lessons Learned Program
Tips & Tricks for Your Lessons Learned Program
 
Knowledge audit sikm leaders forum march 2019
Knowledge audit sikm leaders forum march 2019Knowledge audit sikm leaders forum march 2019
Knowledge audit sikm leaders forum march 2019
 
KM & HPT: USCG 2010 HPT Conference
KM & HPT: USCG 2010 HPT ConferenceKM & HPT: USCG 2010 HPT Conference
KM & HPT: USCG 2010 HPT Conference
 
Surrounded by Geniuses: Knowledge Management Learning From Other Industries
Surrounded by Geniuses: Knowledge Management Learning From Other IndustriesSurrounded by Geniuses: Knowledge Management Learning From Other Industries
Surrounded by Geniuses: Knowledge Management Learning From Other Industries
 
Colorado Community College System Digital Credential Taskforce meeting Octobe...
Colorado Community College System Digital Credential Taskforce meeting Octobe...Colorado Community College System Digital Credential Taskforce meeting Octobe...
Colorado Community College System Digital Credential Taskforce meeting Octobe...
 
Lessons from the front line: next-generation knowledge management in the reso...
Lessons from the front line: next-generation knowledge management in the reso...Lessons from the front line: next-generation knowledge management in the reso...
Lessons from the front line: next-generation knowledge management in the reso...
 
Knowledge audit and diagnostics workbook
Knowledge audit and diagnostics workbook Knowledge audit and diagnostics workbook
Knowledge audit and diagnostics workbook
 
ISO Knowledge Management standard
ISO Knowledge Management standardISO Knowledge Management standard
ISO Knowledge Management standard
 
Chartership for Knowledge Management
Chartership for Knowledge Management Chartership for Knowledge Management
Chartership for Knowledge Management
 
2014_Executive_Leadership_Conference_Summary
2014_Executive_Leadership_Conference_Summary2014_Executive_Leadership_Conference_Summary
2014_Executive_Leadership_Conference_Summary
 
Let’s make a deal! Empowering Small and Mid Sized Universities to Participate...
Let’s make a deal! Empowering Small and Mid Sized Universities to Participate...Let’s make a deal! Empowering Small and Mid Sized Universities to Participate...
Let’s make a deal! Empowering Small and Mid Sized Universities to Participate...
 
Protected Area Network Knowledge Management Framework (Needs Assessment and A...
Protected Area Network Knowledge Management Framework (Needs Assessment and A...Protected Area Network Knowledge Management Framework (Needs Assessment and A...
Protected Area Network Knowledge Management Framework (Needs Assessment and A...
 
IAG review of progress
IAG   review of progressIAG   review of progress
IAG review of progress
 
Net-centric tacit knowledge management
Net-centric tacit knowledge managementNet-centric tacit knowledge management
Net-centric tacit knowledge management
 
Km in basf
Km in basfKm in basf
Km in basf
 
Strategic use of ICT and communication tools, Module 3.pdf
Strategic use of ICT and communication tools, Module 3.pdfStrategic use of ICT and communication tools, Module 3.pdf
Strategic use of ICT and communication tools, Module 3.pdf
 
Modul 2 knowledge management tools
Modul 2   knowledge management toolsModul 2   knowledge management tools
Modul 2 knowledge management tools
 
Strategic use of ICT and communication tools, Module 1.pdf
Strategic use of ICT and communication tools, Module 1.pdfStrategic use of ICT and communication tools, Module 1.pdf
Strategic use of ICT and communication tools, Module 1.pdf
 
Aligning people process and technology in km sikm presentation
Aligning people process and technology in km sikm presentationAligning people process and technology in km sikm presentation
Aligning people process and technology in km sikm presentation
 
ICT CAPABILITY BUILDING
ICT CAPABILITY BUILDINGICT CAPABILITY BUILDING
ICT CAPABILITY BUILDING
 

En vedette

10598 formato de_evaluación_-_alumno
10598 formato de_evaluación_-_alumno10598 formato de_evaluación_-_alumno
10598 formato de_evaluación_-_alumnoPriscila Bustamante
 
Bluetrace briefing-rta-9july-2012
Bluetrace briefing-rta-9july-2012Bluetrace briefing-rta-9july-2012
Bluetrace briefing-rta-9july-2012CarrierDigit
 
Gregory Coltbert Museo Nomada
Gregory Coltbert Museo NomadaGregory Coltbert Museo Nomada
Gregory Coltbert Museo NomadaPedro Villa Casas
 
Catch-up Industrialization and Growth Trajectory of Science and Technology: ...
Catch-up Industrialization and Growth Trajectory of Science and  Technology: ...Catch-up Industrialization and Growth Trajectory of Science and  Technology: ...
Catch-up Industrialization and Growth Trajectory of Science and Technology: ...iBoP Asia
 
Valor Absoluto Sicav: Rentabilidad y Ratios a Octubre10
Valor Absoluto Sicav: Rentabilidad y Ratios a Octubre10Valor Absoluto Sicav: Rentabilidad y Ratios a Octubre10
Valor Absoluto Sicav: Rentabilidad y Ratios a Octubre10Luis Bononato
 
Intelligent Trending Content scales Engagement within Social Display Ads
Intelligent Trending Content scales Engagement within Social Display AdsIntelligent Trending Content scales Engagement within Social Display Ads
Intelligent Trending Content scales Engagement within Social Display AdsInfini Graph
 
Response analysis in food security crises: a 'road map'
Response analysis in food security crises: a 'road map'Response analysis in food security crises: a 'road map'
Response analysis in food security crises: a 'road map'ALNAP
 
Programación auditorio nacional ene 2013
Programación auditorio nacional ene 2013Programación auditorio nacional ene 2013
Programación auditorio nacional ene 2013juventudaytomadrid
 
Pets businesscards
Pets businesscardsPets businesscards
Pets businesscardslindy23
 
Fotos Aquí fem pinya 2013
Fotos Aquí fem pinya 2013Fotos Aquí fem pinya 2013
Fotos Aquí fem pinya 2013cdberga
 
Análisis del diseño de un reactor modular de alta temperatura enfriado por gas
Análisis del diseño de un reactor modular de alta temperatura enfriado por gasAnálisis del diseño de un reactor modular de alta temperatura enfriado por gas
Análisis del diseño de un reactor modular de alta temperatura enfriado por gasAcademia de Ingeniería de México
 
COMIT Dec 2016 - Knowledge Management in AEC
COMIT Dec 2016 - Knowledge Management in AECCOMIT Dec 2016 - Knowledge Management in AEC
COMIT Dec 2016 - Knowledge Management in AECComit Projects Ltd
 
Pp il·lusions perceptives
Pp il·lusions perceptivesPp il·lusions perceptives
Pp il·lusions perceptivesNimChimsky
 
Sales, Marketing and Operations Golf Clubs and Resorts | Antonio Gomez Cava
Sales, Marketing and Operations Golf Clubs and Resorts | Antonio Gomez CavaSales, Marketing and Operations Golf Clubs and Resorts | Antonio Gomez Cava
Sales, Marketing and Operations Golf Clubs and Resorts | Antonio Gomez CavaAntonio Gomez Cava
 

En vedette (20)

BSV_UV
BSV_UVBSV_UV
BSV_UV
 
10598 formato de_evaluación_-_alumno
10598 formato de_evaluación_-_alumno10598 formato de_evaluación_-_alumno
10598 formato de_evaluación_-_alumno
 
Touchpoints v3 with inv.
Touchpoints v3 with inv.Touchpoints v3 with inv.
Touchpoints v3 with inv.
 
Bluetrace briefing-rta-9july-2012
Bluetrace briefing-rta-9july-2012Bluetrace briefing-rta-9july-2012
Bluetrace briefing-rta-9july-2012
 
Conexion21 19Abril 14
Conexion21 19Abril 14Conexion21 19Abril 14
Conexion21 19Abril 14
 
Gregory Coltbert Museo Nomada
Gregory Coltbert Museo NomadaGregory Coltbert Museo Nomada
Gregory Coltbert Museo Nomada
 
Catch-up Industrialization and Growth Trajectory of Science and Technology: ...
Catch-up Industrialization and Growth Trajectory of Science and  Technology: ...Catch-up Industrialization and Growth Trajectory of Science and  Technology: ...
Catch-up Industrialization and Growth Trajectory of Science and Technology: ...
 
Masterclass de Spotify en el Master en Dirección de Marketing Digital y Comun...
Masterclass de Spotify en el Master en Dirección de Marketing Digital y Comun...Masterclass de Spotify en el Master en Dirección de Marketing Digital y Comun...
Masterclass de Spotify en el Master en Dirección de Marketing Digital y Comun...
 
Valor Absoluto Sicav: Rentabilidad y Ratios a Octubre10
Valor Absoluto Sicav: Rentabilidad y Ratios a Octubre10Valor Absoluto Sicav: Rentabilidad y Ratios a Octubre10
Valor Absoluto Sicav: Rentabilidad y Ratios a Octubre10
 
Intelligent Trending Content scales Engagement within Social Display Ads
Intelligent Trending Content scales Engagement within Social Display AdsIntelligent Trending Content scales Engagement within Social Display Ads
Intelligent Trending Content scales Engagement within Social Display Ads
 
Response analysis in food security crises: a 'road map'
Response analysis in food security crises: a 'road map'Response analysis in food security crises: a 'road map'
Response analysis in food security crises: a 'road map'
 
Programación auditorio nacional ene 2013
Programación auditorio nacional ene 2013Programación auditorio nacional ene 2013
Programación auditorio nacional ene 2013
 
Fase Planificación
Fase PlanificaciónFase Planificación
Fase Planificación
 
Pets businesscards
Pets businesscardsPets businesscards
Pets businesscards
 
Pizza
Pizza Pizza
Pizza
 
Fotos Aquí fem pinya 2013
Fotos Aquí fem pinya 2013Fotos Aquí fem pinya 2013
Fotos Aquí fem pinya 2013
 
Análisis del diseño de un reactor modular de alta temperatura enfriado por gas
Análisis del diseño de un reactor modular de alta temperatura enfriado por gasAnálisis del diseño de un reactor modular de alta temperatura enfriado por gas
Análisis del diseño de un reactor modular de alta temperatura enfriado por gas
 
COMIT Dec 2016 - Knowledge Management in AEC
COMIT Dec 2016 - Knowledge Management in AECCOMIT Dec 2016 - Knowledge Management in AEC
COMIT Dec 2016 - Knowledge Management in AEC
 
Pp il·lusions perceptives
Pp il·lusions perceptivesPp il·lusions perceptives
Pp il·lusions perceptives
 
Sales, Marketing and Operations Golf Clubs and Resorts | Antonio Gomez Cava
Sales, Marketing and Operations Golf Clubs and Resorts | Antonio Gomez CavaSales, Marketing and Operations Golf Clubs and Resorts | Antonio Gomez Cava
Sales, Marketing and Operations Golf Clubs and Resorts | Antonio Gomez Cava
 

Similaire à Challenges & Lessons Learned in Implementing KM Program in a Construction Company

Ll from over 200 projects presentation file
Ll from over 200 projects presentation fileLl from over 200 projects presentation file
Ll from over 200 projects presentation fileKMIRC PolyU
 
2008 sector-learning
2008 sector-learning2008 sector-learning
2008 sector-learningMyWASH
 
What's Your LMSs Status? Online Learning Conference 2014
What's Your LMSs Status? Online Learning Conference 2014What's Your LMSs Status? Online Learning Conference 2014
What's Your LMSs Status? Online Learning Conference 2014Brandon Williams
 
Communities of Practice
Communities of PracticeCommunities of Practice
Communities of PracticeNoel Hatch
 
Km 4.0 for gh workers 610705
Km 4.0 for gh workers 610705Km 4.0 for gh workers 610705
Km 4.0 for gh workers 610705Pattie Pattie
 
Tom Diederich portfolio presentation (updated Nov. 18, 2016)
Tom Diederich portfolio presentation (updated Nov. 18, 2016)Tom Diederich portfolio presentation (updated Nov. 18, 2016)
Tom Diederich portfolio presentation (updated Nov. 18, 2016)Tom Diederich
 
An introduction to km & its evolution in the last 2 decades
An introduction to km & its evolution in the last 2 decadesAn introduction to km & its evolution in the last 2 decades
An introduction to km & its evolution in the last 2 decades2016
 
Knowledge Management (KM) Strategy for Wipro Consulting
Knowledge Management (KM) Strategy for Wipro ConsultingKnowledge Management (KM) Strategy for Wipro Consulting
Knowledge Management (KM) Strategy for Wipro ConsultingRagesh Nair
 
2007 september 15 - Co-Creation Methodologies ...
2007 september 15 - Co-Creation Methodologies ...2007 september 15 - Co-Creation Methodologies ...
2007 september 15 - Co-Creation Methodologies ...Epistema
 
Kmm & c at tata
Kmm & c at tataKmm & c at tata
Kmm & c at tataniz73
 
Symposium 2015 : NASA and Talent Management: Close Encounters of the Three Kinds
Symposium 2015 : NASA and Talent Management: Close Encounters of the Three KindsSymposium 2015 : NASA and Talent Management: Close Encounters of the Three Kinds
Symposium 2015 : NASA and Talent Management: Close Encounters of the Three KindsPMI-Montréal
 
Internal Communications Manager
Internal Communications ManagerInternal Communications Manager
Internal Communications ManagerMitko Tsonev
 
Recognizing Knowledge and Skills in a Digital Age - Waterloo
Recognizing Knowledge and Skills in a Digital Age - WaterlooRecognizing Knowledge and Skills in a Digital Age - Waterloo
Recognizing Knowledge and Skills in a Digital Age - WaterlooDon Presant
 
M De C Malaysia
M De C MalaysiaM De C Malaysia
M De C Malaysiasudesh
 
From Content and Collection to Context and Connection
From Content and Collection to Context and ConnectionFrom Content and Collection to Context and Connection
From Content and Collection to Context and ConnectionDave Pollard
 
Knowledge Management and Collaboration at TATA Consulting Services
Knowledge Management and Collaboration at TATA Consulting ServicesKnowledge Management and Collaboration at TATA Consulting Services
Knowledge Management and Collaboration at TATA Consulting Servicesnhainisaini
 
Collaboration at GE
Collaboration at GECollaboration at GE
Collaboration at GESIKM
 
my km journey v9
my km journey v9my km journey v9
my km journey v9Lyn Murnane
 

Similaire à Challenges & Lessons Learned in Implementing KM Program in a Construction Company (20)

Ll from over 200 projects presentation file
Ll from over 200 projects presentation fileLl from over 200 projects presentation file
Ll from over 200 projects presentation file
 
2008 sector-learning
2008 sector-learning2008 sector-learning
2008 sector-learning
 
What's Your LMSs Status? Online Learning Conference 2014
What's Your LMSs Status? Online Learning Conference 2014What's Your LMSs Status? Online Learning Conference 2014
What's Your LMSs Status? Online Learning Conference 2014
 
Communities of Practice
Communities of PracticeCommunities of Practice
Communities of Practice
 
Km 4.0 for gh workers 610705
Km 4.0 for gh workers 610705Km 4.0 for gh workers 610705
Km 4.0 for gh workers 610705
 
Tom Diederich portfolio presentation (updated Nov. 18, 2016)
Tom Diederich portfolio presentation (updated Nov. 18, 2016)Tom Diederich portfolio presentation (updated Nov. 18, 2016)
Tom Diederich portfolio presentation (updated Nov. 18, 2016)
 
km.ppt
km.pptkm.ppt
km.ppt
 
An introduction to km & its evolution in the last 2 decades
An introduction to km & its evolution in the last 2 decadesAn introduction to km & its evolution in the last 2 decades
An introduction to km & its evolution in the last 2 decades
 
Knowledge Management (KM) Strategy for Wipro Consulting
Knowledge Management (KM) Strategy for Wipro ConsultingKnowledge Management (KM) Strategy for Wipro Consulting
Knowledge Management (KM) Strategy for Wipro Consulting
 
2007 september 15 - Co-Creation Methodologies ...
2007 september 15 - Co-Creation Methodologies ...2007 september 15 - Co-Creation Methodologies ...
2007 september 15 - Co-Creation Methodologies ...
 
Kmm & c at tata
Kmm & c at tataKmm & c at tata
Kmm & c at tata
 
Symposium 2015 : NASA and Talent Management: Close Encounters of the Three Kinds
Symposium 2015 : NASA and Talent Management: Close Encounters of the Three KindsSymposium 2015 : NASA and Talent Management: Close Encounters of the Three Kinds
Symposium 2015 : NASA and Talent Management: Close Encounters of the Three Kinds
 
Internal Communications Manager
Internal Communications ManagerInternal Communications Manager
Internal Communications Manager
 
Recognizing Knowledge and Skills in a Digital Age - Waterloo
Recognizing Knowledge and Skills in a Digital Age - WaterlooRecognizing Knowledge and Skills in a Digital Age - Waterloo
Recognizing Knowledge and Skills in a Digital Age - Waterloo
 
M De C Malaysia
M De C MalaysiaM De C Malaysia
M De C Malaysia
 
From Content and Collection to Context and Connection
From Content and Collection to Context and ConnectionFrom Content and Collection to Context and Connection
From Content and Collection to Context and Connection
 
Knowledge Management and Collaboration at TATA Consulting Services
Knowledge Management and Collaboration at TATA Consulting ServicesKnowledge Management and Collaboration at TATA Consulting Services
Knowledge Management and Collaboration at TATA Consulting Services
 
JISC Create
JISC CreateJISC Create
JISC Create
 
Collaboration at GE
Collaboration at GECollaboration at GE
Collaboration at GE
 
my km journey v9
my km journey v9my km journey v9
my km journey v9
 

Plus de CCT International

BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together? BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together? CCT International
 
Digital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryDigital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryCCT International
 
6.0 CURT CII - Digital Transformation of Construction Industry
6.0 CURT CII  - Digital Transformation of Construction Industry6.0 CURT CII  - Digital Transformation of Construction Industry
6.0 CURT CII - Digital Transformation of Construction IndustryCCT International
 
Leveraging C3D® to Ensure Compliance of Site Execution Teams
Leveraging C3D® to Ensure Compliance of Site Execution TeamsLeveraging C3D® to Ensure Compliance of Site Execution Teams
Leveraging C3D® to Ensure Compliance of Site Execution TeamsCCT International
 
The Future is Now (5th BIM and Lean Conference 2017)
The Future is Now (5th BIM and Lean Conference 2017)The Future is Now (5th BIM and Lean Conference 2017)
The Future is Now (5th BIM and Lean Conference 2017)CCT International
 
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle EastO&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle EastCCT International
 
Roads, Infrastructure and BIM
Roads, Infrastructure and BIMRoads, Infrastructure and BIM
Roads, Infrastructure and BIMCCT International
 
Designing to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & MonitoringDesigning to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & MonitoringCCT International
 
Mandated BIM! Are you ready?
Mandated BIM! Are you ready?Mandated BIM! Are you ready?
Mandated BIM! Are you ready?CCT International
 
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...CCT International
 
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeFiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeCCT International
 
IBM Case Study of Maximo Implementation at CCC
IBM Case Study of Maximo Implementation at CCCIBM Case Study of Maximo Implementation at CCC
IBM Case Study of Maximo Implementation at CCCCCT International
 
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...CCT International
 
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...CCT International
 
Asset Management - Bridging Boundaries in Ongoing Asset Management
Asset Management - Bridging Boundaries in Ongoing Asset ManagementAsset Management - Bridging Boundaries in Ongoing Asset Management
Asset Management - Bridging Boundaries in Ongoing Asset ManagementCCT International
 

Plus de CCT International (20)

BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together? BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together?
 
Digital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryDigital Transformation of the Construction Industry
Digital Transformation of the Construction Industry
 
BIM In Practice Seminar
BIM In Practice Seminar BIM In Practice Seminar
BIM In Practice Seminar
 
6.0 CURT CII - Digital Transformation of Construction Industry
6.0 CURT CII  - Digital Transformation of Construction Industry6.0 CURT CII  - Digital Transformation of Construction Industry
6.0 CURT CII - Digital Transformation of Construction Industry
 
Adding Intelligence to AWP
Adding Intelligence to AWPAdding Intelligence to AWP
Adding Intelligence to AWP
 
BIM Based Project Controls
BIM Based Project ControlsBIM Based Project Controls
BIM Based Project Controls
 
Leveraging C3D® to Ensure Compliance of Site Execution Teams
Leveraging C3D® to Ensure Compliance of Site Execution TeamsLeveraging C3D® to Ensure Compliance of Site Execution Teams
Leveraging C3D® to Ensure Compliance of Site Execution Teams
 
The Future is Now (5th BIM and Lean Conference 2017)
The Future is Now (5th BIM and Lean Conference 2017)The Future is Now (5th BIM and Lean Conference 2017)
The Future is Now (5th BIM and Lean Conference 2017)
 
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle EastO&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
 
Roads, Infrastructure and BIM
Roads, Infrastructure and BIMRoads, Infrastructure and BIM
Roads, Infrastructure and BIM
 
Contractors: Get BIM Ready!
Contractors: Get BIM Ready!Contractors: Get BIM Ready!
Contractors: Get BIM Ready!
 
Designing to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & MonitoringDesigning to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & Monitoring
 
Mandated BIM! Are you ready?
Mandated BIM! Are you ready?Mandated BIM! Are you ready?
Mandated BIM! Are you ready?
 
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
 
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeFiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
 
Make BIM work for you
Make BIM work for youMake BIM work for you
Make BIM work for you
 
IBM Case Study of Maximo Implementation at CCC
IBM Case Study of Maximo Implementation at CCCIBM Case Study of Maximo Implementation at CCC
IBM Case Study of Maximo Implementation at CCC
 
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
 
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...
 
Asset Management - Bridging Boundaries in Ongoing Asset Management
Asset Management - Bridging Boundaries in Ongoing Asset ManagementAsset Management - Bridging Boundaries in Ongoing Asset Management
Asset Management - Bridging Boundaries in Ongoing Asset Management
 

Dernier

The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
What is Artificial Intelligence?????????
What is Artificial Intelligence?????????What is Artificial Intelligence?????????
What is Artificial Intelligence?????????blackmambaettijean
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersNicole Novielli
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESmohitsingh558521
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxBkGupta21
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 

Dernier (20)

The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
What is Artificial Intelligence?????????
What is Artificial Intelligence?????????What is Artificial Intelligence?????????
What is Artificial Intelligence?????????
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software Developers
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptx
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 

Challenges & Lessons Learned in Implementing KM Program in a Construction Company

  • 1. Challenges & Lessons Learned in Implementing KM Program in a Construction Company By: Mustafa Abusalah, PhD April 2012
  • 2. CCC Pre KM  WAN: Company headquarters, projects, offices and areas are connected via WAN/VPN.  Communications: Communication channel is mainly through email, IP Telephony and TDM.  Document and Content Management: CCC has an in house developed Document Management System (VBC) which is the repository for all CCC content.  VBC Central: VBC central is the framework where projects, departments, etc. Can create there own content management portals.  One Repository: As VBC is the repository for all CCC content, all applications running at CCC stores and retrieves documents to/from VBC. This allowed different applications to work on the same content when needed.
  • 3.
  • 4. Why Knowledge Management (1)  CCC operating platform for developing people and sharing knowledge seems to be adequate in sustaining CCC’s operations pre 2002-03.  Project managers and project teams could transfer knowledge to other projects and / or develop staff within  Formal procedures (QMPs) and “Method Statements” were created and informal networks were effective in exchanging information.  CCC established a niche in being able to execute difficult projects requiring mobilization of significant resources.
  • 5. Why Knowledge Management (2)  Magnitude and Rate of Growth are causing “Cracks”  Management time is being diverted from addressing strategic issues “to shoring up partners and client’s concerns due to being behind schedule in up to 80% of our projects”.  Inconsistencies are appearing within our operations and execution of projects.  Roles, responsibilities, accountabilities, communications channels were becoming fragmented across the group. “Sheer volume of growth means we have less time to communicate” “We discover mistakes too late in the game” “We capture and share more lessons learned with partners than with ourselves” “Someone in the project needs to be responsible for lessons learned” “Rework is occurring because people do not know what is available”
  • 6. Why Knowledge Management (3) Conclusions Sharing the knowledge: Insights, experiences, contact details, lessons learned, favourite documents, useful links, supplier and other work related resources. Collaboration platform: On bridging knowledge gaps, drafting Corporate Knowledge Corporate Knowledge documents, developing new areas of practices, on bringing Network Network innovation to market, on defining new approaches and solutions to customer issues People Directory (profiles): for locating experience, answering questions, solving problems, make recommendations, training, manuals, lessons learned
  • 7. Definition of Knowledge Management Knowledge management is the strategic backbone within CCC that puts in place a supportive social and technical framework & structure that encourages staff to contribute, share and innovate knowledge for the benefit of CCC (employees, operations and partners), which in exchange provides staff clearer with insights on how and where they can develop through the application and sharing of knowledge and improve the efficiency of the operations. “Obtaining and creating the right knowledge to the right people at the right time”
  • 8. CCC KM Strategy Blanket Initiatives: Initiatives that when implemented cover all CoPs eg. Redesign/ reenergise Lessons Learned Key: Elemental Initiatives: Initiatives that are Example Elemental Initiatives CoP D CoP A CoP C “optional” for each CoP. Each of these initiatives can also be done to varying degrees CoP B Knowledge Process Design eLearning content CoP N CoPs: Groups of individuals with a common Experience database purpose/ goals, supported by functionality provided by Elemental Initiatives Foundation Initiatives: Phase I – necessary to implement prior to developing the CoPs as they provide the core KM support structure for all Elemental Initiatives Phase II – provide the support KM structure for only some of the Elemental Initiatives Knowledge Audit Training & development • Incentives & Recognition framework • Induction programme • KM processes • • • • • KM Organisation Knowledge Portal KM Comms Programme Knowledge Taxonomy KM Scorecard (Phase II) Foundation Initiatives (Phase I)
  • 9. KM & CoP Organisations CCC Leadership Community of Practice Community Leader PT Head of KM Knowledge Manager SMEs PT Knowledge Captains Community Members PT Knowledge Automation Engineer (IS) Knowledge Controllers KM Organisation Executive Assistant Project Manager PT PT PT = Part Time
  • 10. KM Organization Processes Connecting: People to communities, people to experts, people to KM tools, people to repositories Enabling & Facilitating: Conversations, exchanges, collaboration, questions, answers, contributions, engagement and adoption Monitoring & Reporting: On behaviours, contribution, engagement, organisational dynamics, KM system health, knowledge flows
  • 11. What is a Community of Practice (CoP)?  CoPs are either formal or informal groups of people with a common purpose and common goals. A few characteristics of CoPs are:  The “members” share common pursuits and problems  They share common practices and language – eg. They use the same methodologies and express themselves in a similar fashion (eg. technical jargon)  They share similar interests  Most people belong to more than one CoP  Members of a CoP often have the same or similar roles but are not located in the same location (or same project) 11
  • 12. CoP Processes Search: for answers, experts, knowledge, experience, lessons learned, documents, images, perspectives Collaborate: On bridging knowledge gaps, drafting documents, developing new areas of practices, on bringing innovation to market, on defining new approaches and solutions to customer issues Share: Insights, experiences, contact details, lessons learned, favourite documents, useful links, supplier and other work related resources
  • 13. KM Portal  Wiki Collaboration and Knowledge Sharing platform: bridging knowledge gaps, drafting documents, developing new areas of practices, bringing innovation to market, defining new approaches and solutions to customer issues. Insights, experiences, contact details, lessons learned, favourite documents, useful links, supplier and other work related resources. People Directory (profiles): for locating experience, answering questions, solving problems, make recommendations, training, manuals, lessons learned. VBC Repository: Formal Knowledge, KAudit
  • 14. Community of Practice (CoP) Planning Phase*  Establish founding members  Develop business case  Establish Taxonomy Framework & high level breakdown  Perform knowledge Audit: Content + People  Build knowledge maps *Source: American Productivity & Quality Center (APQC)
  • 15. Community of Practice (CoP) CoP - Design Phase*  Design knowledge sharing processes/ workflows  Identify roles and responsibilities  Identify required IT capabilities  Develop Initial learning and development plan and content  Create measures, indicators, and scorecard  Establish reward and recognition plans  Develop change management plan ( Monthly newsletters, announcements, surveys, Bulletin etc.) *Source: American Productivity & Quality Center (APQC)
  • 16. Meetings Highlights  First Year: 6 Meetings were held with each CoP  Meeting No. 1: Business Case Requirements  Meeting No. 2: Business Case follow-up & KM Roll out plan  Meeting No. 3: Founding Members’ CoP Kick-off Meeting and agree on roles and responsibilities  Meeting No. 4: Business Case Presentation to Top Management  Meeting No. 5: Review KAudit report, agree on launching content, and membership guides.  Meeting No. 6: Review new contributions, agree on future contributions and presentations by invited speakers and members.  Then Two yearly follow up meetings are held.
  • 17. “Connect & Collect” Knowledge Portal “Connect & Collect” Knowledge Portal? Connect People 3. Share, Validate & Harvest Learnings KnowledgeBase 1. Do we already know this? 4. Enrich the KBase 2. Who can I ask for help?
  • 18. CCC Knowledge Portal – Fanous 18
  • 20. Recognition of Best Contributors/ Projects 20
  • 21. Members Behavior  Knowledge Culture: contribute in the definition of the company’s vision and strategy, contribute to innovative processes consider and recognize members ideas and skills. Encourage members to play challenging roles and tasks, which go beyond their current capabilities. Encourage members to learn, knowing that they will acquire new skills. And finally understand that the members want to see the company’s values fit their own.  Motivation: Recognition for best contributions, elitism could be strong social motivation factor, providing members with challenging and constantly changing tasks seems to be critical to increase their motivation.  Training & Workshops: Members training, running knowledge capture session in projects, awards for best contributions per project.
  • 22. Measuring & Monitoring  Monitoring Investment: Time, money and effort (Department budget, Meetings cost, Time spent in KM-related activities, etc.)  Monitoring Adoption: whether or not the activity is being taken up according to plan (Staff time invested in sharing activities, Frequency of activity per division, etc.)  Monitoring Health: KM System, repository, search, etc. (# Knowledge assets created, Frequency of use of knowledge assets created, etc.)  Case studies of knowledge re-use. (Ex: Guidelines For Fabrication Shop Equipment)  Excavation simulation program  Participants’ assessment of CoP value for work effectiveness and/or knowledge development.
  • 23. Knowledge Creation- Innovative Ideas Project Mobilization Community lead the development of a comprehensive guideline for camps construction. The guideline includes several innovative ideas intended to reduce power and water consumption, increase waste recycling, and carbon emission reduction. The guideline emphasized on safety requirements and residents welfare. 23
  • 24. Collecting & Connecting– Delivering Value A project engineer in Kazakhstan inquired about best practice for selection of compressors and dryers for pressure testing. He found a guideline in Fanous developed by an SME on the subject, based in Qatar. He communicated with the SME on his project requirement. The SME helped him in specifying the equipment. This resulted on more than US$ 60,000 saving on direct equipment cost. 24
  • 25. Collecting & Connecting – Delivering Value A project in Qatar experienced high repair rate of smallbore pipe socket welding. A senior welding engineer searched Fanous for lessons learned from other projects. He found several recommendations to use special spacer rings during fit-up of such piping. The delivery time of such rings is around 3-4 weeks. However, a project in Kuwait built a machine to fabricate these spacer rings inhouse saving time and cost. The machine was transferred to Qatar and was operational in days. Beside time saving in rings delivery and cost of repairs, the Qatar project realized at least US$ 180K in direct savings. 25
  • 26. Challenges  Working in remote locations in tough site conditions and poor communication  Variant workforce cultures  Company business changes, type of projects is variant, Oil and Gas vs. High quality buildings  Computer literacy, some of the best knowledge holders lack computer literacy.  Reluctance to share knowledge. Need of recognition  Construction is less based on codes so the context has great impact on the best practice. (ex. Labor intinsives vs. Automation)
  • 27. Recommendations  Support of the top management is instrumental, as senior and middle management tend to resist  Dedicated KM Organization.  The KM organization shall drive the KM philosophy and the IT shall give support and the implementation.  Selection of CoP Leader is most critical and determent for the success of the KM application.  Importance of regular meetings.  Attractive and rich content, reminders, change management/ elaborate communication plan.  Evolving Technology & Content (Web 2 & Web 3).  Start with 3 to 5 CoPs as some will fail. Plan to introduce new ones every year.
  • 29. Discussion Thoughts  Taxonomy and Ontology Construction (Experiences and per community)  Establish/share some benchmarks  Good size of a community  Community benchmarks  Success measures

Notes de l'éditeur

  1. These are comments by PMs based on survey prior to KM
  2. The Balanced Scorecard (BSC) is a performance management tool which began as a concept for measuring whether the smaller-scale operational activities of a company are aligned with its larger-scale objectives in terms of vision and strategy.
  3. This solution should provide an effective means to: From launch, encourage community members to contribute knowledge, experience and their network of contacts to the community Enable continuous review and fine tuning of the CoP’s behaviours and engagement levels Enable continuous review of knowledge contribution levels by CoP/Region/Project Integrate best practice elements: Notification of most recent contributions by knowledge type Profiling of frequency of contribution and number of members contribution Statistics recording individual CoP member contribution totals Track indicators of cross CoP sharing activities (Wave 3.) Measure and report on contribution rates and boundary sharing for by CoP/tool/knowledge object The ‘Enabling & Facilitating’ process presumes CoPs enjoy a vibrant and dynamic knowledge sharing culture, where members feel encouraged to discuss issues, share experiences, and network together – assisted by an easy-to-use knowledge infrastructure. The ‘Enabling & Facilitating’ process (Level 0) can be decomposed into three Level 1 sub-processes, which are: The Synthesize KM/CoP Enabling & Facilitating Criteria sub-process articulates the conditions required for an intervention from the KM Organization into a systematic format that can be used to establish the typical ‘Enabling & Facilitating’ context. It presumes the CoPs are open to receiving ‘Enabling & Facilitating’ type support from the KM Organization. The Develop KM/CoP Enabling & Facilitating Intervention Model sub-process integrates ‘Enabling & Facilitating’ behaviours from the prior sub-process into a simple, process capable of being adapted to a range of facilitation techniques such as Appreciative Enquiry, while being simple to implement by the KM Organization. 3. The Develop & Initiate KM/CoP Enabling & Facilitation Outcomes translates the second level activities of ‘Enabling & Facilitating’ into a derived answer or facilitated solution set. The objective of the KM ‘Monitoring & Reporting’ process is to ensure the KM Organization is effectively monitoring the health of KM system and the CoPs and is identifying issues and opportunities in a timely and efficient manner. This process also drives the KM Organization's routine management reporting activity and provides outputs for benchmarking.
  4. Regular meetings and newsletters for heavy left.
  5. VIA System KPIs and Surveys. Active communities (Mobilization) Not active (Stable Knowledge) Earthworks. Loyalty. Employees who worked for longtime they have more well to share , new employees reluctant to share. PM’s Encourage KM share produces more traffic. Earthwork (Simulation software) Tendering and projects in Oman/Saudi (Several hundreds of thousands of savings in each tender for the mix of equipments. Some tenders saved 0.5 million dollars (SAS Project) used different mix of equipment saved time and money. Hydrotest (General Procedures, pneumatic pressure) Rules of thumps changed the compressor and rather than working in two shifts now it is done in one shift based on certain equations. How long until I reach this pressure. Building: Postensioning concrete Middle east what are the (used to be done by subcontractors), precursiones were posted on the wiki and saved a lot of issues with subcontractors. Pipe Fabrication: Type of equipment in the fab shop. Mobilization: guideline for camps standard rooms furniture type of equipment, this helped people in estimation and helped in building new camps helped in power and water consumption and water treatment unit etc.