1. IRRIGATION & FLOOD CONTROL DEPARTMENT (IFCD), MANIPUR Estd. in May, 1976 Assured Irrigation in the state with Water Resource Projects Managing Flood Control Works Also creates Potential for: a. Raw Water for Water Supplies b . Hydel Power Committed for:
3. The hill and valley of Manipur are traversed by many rivers/streams of Manipur river basin and Barak river sub-basin. The undulating topography coupled with deforestation in the catchment area of the rivers lead to accelerated draining of water by the rivers thereby endangering the river bunds. The consequences are frequent devastation of Flood resulting heavy loses in terms of socio-economic value and even life. Flood in Manipur
6. ANTI-EROSION AND FLOOD CONTROL SCHEMES UNDER SPA District Number of schemes 2008-09 2009-10 2010-11 Total Imphal (E) 3 5 3 11 Imphal(W) 4 2 3 9 Thoubal 1 12 8 21 Bishnupur - 1 6 7 Senapati - 6 9 15 Ukhrul - 5 4 9 Chandel - 6 3 9 Churachandpur - 3 8 11 Tamenglong - 3 5 8 Total : 100 Total Cost: Rs. 120.00 Cr
7. ANTI-EROSION AND FLOOD CONTROL SCHEMES UNDER NEC District Number of scheme 2009-10 2010-11 Total Imphal (E) 1 - 1 Imphal(W) - - - Thoubal - 1 1 Bishnupur - - - Senapati - - - Ukhrul - - - Chandel - - - Churachandpur - 1 1 Tamenglong - - - Total : 3 Total Cost: Rs. 9.13 Cr
8. Schemes Under JnNURM Improvement of Nambul River Front Envisages beautification and channelisation of Nambul River from Khwai Hump Bridge to Keisampat Bridge. Estimated Cost:- Rs. 14.13 crore Date of Start:- 21-01- 2011. Physical Progress:- 49 % Finanial Progress:- Rs. 3.84 crore. Targetted Date of Completion:- 31 – 05 – 2012.