Shri ram centre of
performing arts
Mandi house, Delhi
introduction
• ADDRESS- 4, Safdar
Hashmi Marg,
Todermal Road Area,
Mandi House, New
Delhi, Delhi 11000
• SITE AREA- 0.25ha
site 2500 square
meter
• Ground coverage-
33% (825
square meter)
Building height-18m
21m in diameter
cylinder,30x30m size
rectangular box
• Architect- Shivnath
Prasad
Concept, History and activities
• HISTORY- founded in 1975
by Mrs. Panna Bharat Ram,
It can be regarded as an
example of work resulting
from the second phase of
Le Corbusier’s influence.
• ACTIVITY- dance, drama
and music ,exhibitions ,
workshop, seminar etc.
SITE PLAN OF ART CENTRE
KEY PLAN OF ART CENTRE
15m wide road
entry
Sangeet bharti
Triveni kala kendre
ACCESSIBILITY AND APPROACH
-16KM, DELHI
INTERNATIONAL
AIRPORT.
-6.4KM, NEW DELHI
RAILWAY STATION.
-220M, MANDI HOUSE
METRO STATION.
-600M, MANDI HOUSE BUS
STOP
.
N
INDRA GANDHI
INTERNATIONAL
AIRPORT
IGI AIRPORT
METRO STATION
TERMINAL (T3)
MANDI HOUSE
METRO
STATION
SHRI RAM
CENTER FOR
PERFOMING
ARTS
2 MIN WALK
(400M)
1 MIN WALK
(220M)
VIA NEW DELHI
METRO ATATION
(20 MIN)
NEW DELHI
RAILWAY
STATION
NEW DELHI
RAILWAY
STATION
BUS STOP
MANDI
HOUSE BUS
STOP
SHRI RAM
CENTER FOR
PERFOMING
ARTS
1 MIN WALK
(220M)
2 MIN
WALK
(300M)
10 MIN TRAVEL
(3KM)
FROM
AIRPORT
FROM RILWAY
STATION
N
- VEHICULAR CIRCULATION
- PADESTRIAN CIRCULATION
VEHICULAR AND PADESTRIAN CIRCULATION
N
• THE SITE IS LOCATED IN HIGHLY DENSE COLONY WHERE THE MOVEMENT OF
TRAFFIC IS MAJOR.
• THE COMPLEX FORM OF THE BUILDING ITSELF DIVIDED INTO LEVELS IN TERMS OF
HEIGHT AND ALSO DOESN’T MATCH ANOTHER FABRIC OF BUILDING STRUCTURE.
• PARKING SPACE PROVIDED FOR THE AUDITORIUM ARE NOT ACCORDING TO THE
NORMS PROVIDED.
• PARKING CONDITIONS ARE NOT SUITABLE FOR THE PERSON HAVING PHYSICAL
DISABILITY.
• N
N
N
• IN ARCHITECTURE, CIRCULATION MEANS THE
PATHWAYS THROUGH A FLOOR PLAN. THESE
PATHWAYS ARE HOW WE EXPERIENCE
ARCHITECTURE; THE DESIGN OF THESE
PATHWAYS HAS AN ENORMOUS EFFECT ON
THE SUCCESS OR FAILURE OF A PLAN.
• OBVIOUS PATHWAYS INCLUDE HALLWAYS
(HORIZONTAL CIRCULATION) AND
STAIRS/ELEVATORS (VERTICAL CIRCULATION).
• CIRCULATION ROUTES ARE THE PATHWAYS
PEOPLE TAKE THROUGH AND AROUND
BUILDINGS OR URBAN PLACES. CIRCULATION
IS OFTEN THOUGHT OF AS THE 'SPACE
BETWEEN THE SPACES', HAVING A
CONNECTIVE FUNCTION, BUT IT CAN BE MUCH
MORE THAN THAT.
• IT IS THE CONCEPT THAT CAPTURES THE
EXPERIENCE OF MOVING OUR BODIES
AROUND A BUILDING, THREEDIMENSIONALLY
AND THROUGH TIME.
Circulation in
architecture
COMPONENTS OF CIRCULATION
• EVERY SPACE A PERSON COULD ACCESS OR
OCCUPY FORMS PART OF THE CIRCULATION
SYSTEM OF A BUILDING.
• ARCHITECTS TYPICALLY DIVIDE THEIR THINKING
ACCORDING TO DIFFERENT TYPES OF
CIRCULATION, WHICH OVERLAY WITH ONE
ANOTHER AND THE OVERALL PLANNING. THE
TYPE AND EXTENT OF THESE DIVISIONS WILL
BE PROJECT DEPENDENT, BUT MIGHT INCLUDE:
• DIRECTION OF MOVEMENT: HORIZONTAL OR
VERTICAL
• TYPE OF USE: PUBLIC OR PRIVATE, FRONT OF
HOUSE OR BACK OF HOUSE
• FREQUENCY OF USE: COMMON OR
EMERGENCY
• TIME OF USE: MORNING, DAY, EVENING,
CONTINUOUS.
HORIZONTAL CIRCULATION
• HORIZONTAL CIRCULATION
MIGHT INCLUDE HALLWAYS,
ATRIA, PATHS, ENTRIES AND
EXITS. IT IS ALSO AFFECTED BY
THE FURNITURE LAYOUT, OR
OTHER OBJECTS IN THE SPACE
SUCH AS COLUMNS, TREES, OR
TOPOGRAPHIC CHANGES. THIS
IS WHY ARCHITECTS USUALLY
FURNITURE AS PART OF A
CONCEPT DESIGN, BECAUSE IT
IS CRITICALLY LINKED TO THE
FLOW, FUNCTION AND FEELING
OF THE SPACE.
VERTICAL
CIRCULATION
• VERTICAL CIRCULATION IS
HOW PEOPLE MOVE UP
AND DOWN WITHIN THE
BUILDING, SO INCLUDES
THINGS LIKE STAIRS,
LIFTS, RAMPS, LADDERS
AND ESCALATORS WHICH
ALLOW US TO MOVE FROM
ONE LEVEL TO ANOTHER.
PLAN & ZONNING
GROUND FLOOR PLAN
FIRST FLOOR PLAN
AUDITORIUM
CAPACITY-375 seats
COOLING SYSTEM-AC system
ACTIVITY-acting ,dance ,drama,
singing etc.
AUDITORIUM
AUDITORIUM
1. Solid wooden door for reducing sound.
2. Rubber is used on edge of the door for
absorbing /reduce sound.
3. R.C.C floor , mortar floor , carpet ,
wooden ramps used
4. Mainly walls are made up R.C.C. . Finishing
is done with wood board which is a
sound absorbing panel.
5. Glass wool is fill in between R.C.C. and
wood panels.
6. Green rooms are placed in separate block
on the back side of the main building and
connected through staircase
Art gallery
CLIMATE RESPONSIVE
DESIGN
1
TOPICS
NATURAL
VENTILATION
BUILDING
ORIENTATION
WIND
DIRECTION
SUN PATH
OPENING
SIZE AND
DIRECTION
LOCAL
TECHNIQUE
NET ZERO
ENERGY
BUILDING
NATURAL
VENTILATION
• WINDOWS ARE PLACED
IN ORDER TO WIND
DIRECTION I.E ON
NORTH AND SOUTH
FAÇADE.
• WINDOWS ARE GIVEN
ON EITHER SIDE OF
THE BUILDING FOR
CROSS VENTILATION.
• TREES ARE PLANTED
IN FRONT OF THE
OPENINGS TO GET
FRESH AND COOL AIR.
BUILDING
ORIENTAION
• THE BUILDING IS
EAST FACING.
• WEST SIDE IS
COMPRISES OF
FOOD CORNER I.E
CANTEEN AREA.
• SOUTH IS
COVERED WITH
LANDSCAPING
AND GARDEN.
• NORTH SIDE IS
USED AS
OFFICIAL AREA.
OPENING SIZE AND
DIRECTION
• MAIN ENTRANCE IS TOWARDS
THE 9MTR WIDE ROAD.
• PEDESTRIAN ENTRANCE IS
ELEVATED THROUGH STEPS
WHICH IS 1.5MTR WIDE.
• MAIN ENTRANCE IS 1 MTR
WIDE ONLY.
• ENTRANCE TO THE
AUDITORIUM IS 2.5MTR WIDE.
• 2 ENTRANCE AS WELL AS 2
EXITS WERE GIVEN IN
AUDITORIUM.
TECHNIQUE
Solar shading louver systems are one of the
most effective ways to reduce air
conditioning loads, while offering designers
the opportunity for distinctive architectural
impact.
NET ZERO
ENERGY BUILDING
• A zero-energy building, also known
as a zero net energy (ZNE)
building, net-zero energy
building (NZEB), net zero building
or zero-carbon building is
a building with zero net energy
consumption, meaning the total
amount of energy used by the
building on an annual basis is
roughly equal to the amount
of renewable energy created on the
site
• BY USING LOUVERS ENERGY
CONSUMPTION IS LESS FOR
LIGHTNING AS WELL AS AIR.
• STAIRCASE IS USED IN PLACE OF
LIFT SERVICE.
SUMMER SHADOW ANALYSIS
SHADOW AT 7:00 O’CLOCK SHADOW AT 10:00 O’CLOCK SHADOW AT 1:00 O’CLOCK
SHADOW AT 4:00 O’CLOCK SHADOW AT 5:00 O’CLOCK
WINTER SHADOW ANALYSIS
SHADOW AT 9:00 O’CLOCK SHADOW AT 12:00 O’CLOCK SHADOW AT 2:00 O’CLOCK
SHADOW AT 4:00 O’CLOCK SHADOW AT 6:00 O’CLOCK
landscape
.
LANDSCAPING
PLANNING
• SMALL HOLLOW BLOCKS MADE
UP OF EXPOSED BRICKS ARE
MADE TO PLANT SHRUBS.
• TREES ARE PLANTED ON
FRONT FAÇADE OF THE
BUILDING ATTAINING SOUTH
SIDE IN ORDER TO GET COOL
WIND.
• TREES ARE PLANTED IN SUCH
A MANNER TO GET BOTH
SHADE AND SHADOW.
FLORA
Fish money plant
Morpankhi
Grass(dhob )
Gulmohar
Nagar champa
Ashok
Madhumati
Botanical name:-
Combretum indicum
Attracts to:- Hawkmoths,
flying bees and birds.
FAUNA
BUTTERFLY
SPARROW
BEES
BETTLE
KEVIN LYNCH’S FIVE ELEMENTS
PATH – Routes along which people moves throughout the canteen area and
in inside of the building.
EDGES – Boundaries and breaks in continuity of cultural centre in every
element.
DISTRICT – Areas characterised by common characteristics (canteen,
auditorium, rehearsal rooms).
NODES – Strategic focus points of orientation like squares and junction.
LANDMARK- external point of orientation usually a easily identified physical
object in urban landscaping. (canteen area with beautiful landscape.)
PATH
EDGES
.
DISTRICT
NODES
LANDMARK
Materials
which were
used in the
constructio
n of SHRI
RAM CENTRE
FOR
PERFORMING
ARTS are as
follows:-
CONCRETE
EXPOSED BRICKS
BRICK
WOOD BOARD
GLASS PANEL
MARBLE AND TILE
materials
Reason behind
concrete structure
• Concrete is a very dense material. When concrete
gets heated, it retains the heat for a very long
time. This heat is radiated into the rooms at night
when the surroundings are getting cool. Due to
the stillness of air below the roof, the air in the
room also becomes hot. The ceiling fan revolving
below the roof pushes the warm air down.
Needless to describe the discomfort.
• Avoid the roof getting heated
• Insulate the roof from above
• Insulate the roof from below
• Avoid the heat transfer from the roof to the room
• Cool the roof with some means
• Extract the hot air collected below the roof
• Extract the heat from the roof before it gets
transferred
VERNACULAR
TECHNIQUE
• Mainly walls are made up R.C.C.
• Finishing is done with wood
board which is a sound
absorbing pannel.
• Glass wool is fill in between
R.C.C. and wood pannels.
• R.C.C. COFFERED CEILING
WHICH DISTRIBUTE THE LOAD.
byelaws
BYELAWS FOR SOCIO- CULTURAL FACILITIES IN DELHI
s.no. category Maximum
Gr. FAR ht.
Cov
Other Controls
1. a. Multipurpose Community
Hall.
b. Banquet hall
30% 120 26m
30% 120 26m
1. Parking standard
@3.0ECS/100sq m
of floor area.
2. Other controls
related to
basements etc. are
given at end of this
chapter
2. a. Community Recreational
Club.
b. Recreational Club
30% 120 26m
35%
Parking standard
@2ECS/100sq.m of
floor area.
3. Socio- cultural activities such
as auditorium, music, dance
& drama centre/mediation
& spiritual centre etc.
35% 120 26m 1. Parking standard
@2ECS/100sq.m of
floor area.
2. A proper scheme
for visitors parking
and parking
adequacy statement
shall be prepared
taking into
consideration large
number of visitors.
4. Exhibition cum Fair Ground 20% 20 26m Subject to statutory
clearances
5. Science centre, 30% 120 NR Parking Standard
@2ECS
6. **International Convention
Centre
30% 120 appr
ove AAI, Fire
department
Parking Standard
@2ECS
Bye Laws for socio-cultural
facilities in Delhi
Notes:
i. In case of community recreational clubs, 50 FAR shall be admissible on the area beyond
2000 sqm. And below 5000 sqm. *The Recreational Clubs located in LBZ Area, Civil Lines
Bungalow Area, Recreational Use Zones and existing on Heritage Structures will be dealt on
case to case basis and Technical Committee of DDA will approve the Development Controls
norms based on the existing status.
ii. In case of recreational club, 50 FAR shall be admissible on the area beyond 5000 sqm.
And up to 10,000sqm.
iii. In the open area apart from outdoor games/sport facilities, swimming pool would be
permissible up to a area of 300sqm. Free from ground coverage.
iv. In case of banquet hall,
a) Basement within the ground envelope shall be allowed for parking, stilt floor for
parking is permissible.
b) 30% of basement area for services, storage shall not be counted in FAR.
v. **In case of International Convention Centre, maximum 10% ground coverage shall be
allowed for providing atrium. In case, the permissible additional ground coverage for
atrium is utilized, 25% of the utilized ground coverage shall be counted towards FAR.
SERVICES
• FIRE SAFETY
• ELECTRICITY
• RAIN WATER HARVESTING
• HVAC
• PASSIVE DESIGN
STAIR CASE:-
• Every high rise building Have minimum 2 number of Staircases.
• Width of staircases varies from 1 m. to 2 m.
• Out of 2 staircases, 1 can be used as a fire escape staircase.
• Width of fire escape should be minimum 0.75 meter.
• Number of staircases shall be given as per the travel distances
Section :- As per section 12.18 of part III, 8.5.1 (Table 24),
.6.2,8.9,8.10,8.13, 9.3.5(a),10.4.1,11.3.2 of part IV & appendix
D1.3,D1.4
of part of NBC.
• Shri ram art and culture centre has 2
staircase.
• Distance between the staircase is 25m.
• 1 Staircase is used for fire escape.
• Width of stair is 1.5 m.
Distance between the stairs are 25m.
Used as fire
escape staircase
ENTRANCE WIDTH & HEIGHT
CLEARANCE:-
Section:- As per section 4.6 (c) of part C
& 7.4.1(d) of part IV of N.B.C.
Every High rise building should have at least
2 means of access, one remote to the other,
of minimum width 4.5m. with height clearance
of 5m. This minimum width is essential to
facilitate free movement of fire units.
What Shree Ram Art and Culture Centre
has:-
Shree ram Art and Culture Centre has 3 mean
of access.
Main entrance is 5m and second entrance is 6m
which is essential to movement for fire tender.
ENTRANCE OF SHRI RAM CULTURE CENTER
LIFT :-
Section:- as per section 18 of part III & 6.18 & appendix A.15 of part IV of NBC.
a) Minimum 1 lift capable of carrying minimum 8 persons weighing 545 kgs. Shall
be provided for every high rise building.
b) Landing doors of lifts shall open to ventilated lobby & shall have a fire
resistance of 1 hour.
c)1 lift shall be designed as a “Fire Lift”
d)“Fireman Switch” shall be provided for each lift.
e)Lifts shall not be used as means of evacuation.
f)Collapsible gates shall not be provided for the lift.
g)If more than 1 lifts are installed the partition wall should be of minimum 2
hours fire resistance
LIFTS IN SHRI RAM ART AND CULTURE CENTRE:-
• Shri ram and art culture centre has two lift
• The lift are design for carrying 9 people weighing capacity 650 kg.
• The door of lift are not open in ventilated area .
• Both the lifts are designed as a “fire lift”
FIRE ESCAPE STAIRCASE IN
SHRI RAM ART AND
CULTURE CENTRE
FIRE SAFETY :-
• In the level of fire detection services Shriram center installed the smoke detectors
on the false ceiling of back seating.
• The accessories of the fire detection is installed main lobby, auditorium, green
room, service areas etc.
• The building is also installed fire escape doors to avoid the discrepancy in the fire
accidents
• Emergency fire alarm also installed there.
SMOKE DETECTOR FIRE ALARM SPRINKLES
Types of fire safety equipment required in building
whose height is 15 m and less than 30m
FIRE SAFETY :-
Type of installation As per N.B.C SHRI RAM ART AND CULTURE
CENTER
Fire extinguisher REQUIRED PERSENT
First aid hose REQUIRED PRESENT
Wet riser REQUIRED PRESENT
Down corner NOT REQUIRED NOT PRESENT
Yard hydrant NOT REQUIRED NOT PRESENT
Automatic sprinkler REQUIRED PRESENT
Manually operated electronic fire
Alarm system.
REQUIRED PRESENT
FIRE SAFTEY SYSTEM
Co2 FIRE
SUPPRESSION
SYSTEM
HOSE BOX OR
HOSE SYSTEM
UNDERGROUND WATER
TANK
HOSE PIPE
HOSE PIPE FITTING FIRE EXTINGUISHERS
HOSE PIPE
ELECTRICITY :-
OPEN WIRING ELECTRICITY BOARD
RAIN WATER HARVESTING :-
• Rain water harvesting was there.
• Capacity of underground tank is around 50,000 liters.
• Capacity of fire safety tank is 1,50,000 liters.
• They use rain water in fire safety or landscaping.
RAIN WATER HARVESTING TANK
HVAC:-
(A.C DUCTS)
A.C DUCTS
SIGNAGES
• SIGNAGE IS THE DESIGN OR USE
OF SIGNS AND SYMBOLS TO COMMUNICATE
A MESSAGE TO THE PUBLIC. SIGNS ARE
ANY KIND OF VISUAL GRAPHICS CREATED
TO DISPLAY INFORMATION TO A
PARTICULAR AUDIENCE.
• THE MAIN PURPOSE OF SIGNS IS TO
COMMUNICATE, TO CONVEY INFORMATION
DESIGNED TO ASSIST THE RECEIVER WITH
DECISION-MAKING BASED ON THE
INFORMATION PROVIDED. ALTERNATIVELY,
PROMOTIONAL SIGNAGE MAY BE DESIGNED
TO PERSUADE RECEIVERS OF THE MERITS
OF A GIVEN PRODUCT OR SERVICE.
SIGNAGE IS DISTINCT FROM LABELING,
WHICH CONVEYS INFORMATION ABOUT A
PARTICULAR PRODUCT OR SERVICE.
ROLE AND FUNCTION OF SIGNAGE
• INFORMATION-PROVISION: SIGNS CONVEYING INFORMATION
ABOUT SERVICES AND FACILITIES, SUCH AS MAPS,
DIRECTORIES, INSTRUCTIONAL SIGNS OR INTERPRETIVE
SIGNAGE USED IN MUSEUMS, GALLERIES, GARDENS,
EXHIBITIONS, TOURIST AND CULTURAL ATTRACTIONS THAT
ENHANCE THE CUSTOMER'S EXPERIENCE.
• PERSUASION: PROMOTIONAL SIGNAGE DESIGNED TO
PERSUADE USERS OF THE RELATIVE MERITS OF A
COMPANY, PRODUCT OR BRAND.
• DIRECTION/ NAVIGATION: SIGNS SHOWING THE LOCATION
OF SERVICES, FACILITIES, FUNCTIONAL SPACES AND KEY
AREAS, SUCH AS SIGN POSTS OR DIRECTIONAL ARROWS.
• SAFETY AND REGULATORY:-
• SIGNS GIVING WARNING
OR SAFETY INSTRUCTIONS,
SUCH AS WARNING
SIGNS, TRAFFIC
SIGNS, EXIT SIGNS, SIGNS
INDICATING WHAT TO DO IN
AN EMERGENCY OR
NATURAL DISASTER OR
SIGNS CONVEYING RULES
AND REGULATIONS.
THANK YOU

More Related Content

What's hot

Kala academy, goa
Kala academy, goaKala academy, goa
Kala academy, goaAkthar
 
Case study (JAWAHAR KALA KENDRA & SFMOMA SAN FRANSISCO)
Case study (JAWAHAR KALA KENDRA & SFMOMA SAN FRANSISCO)Case study (JAWAHAR KALA KENDRA & SFMOMA SAN FRANSISCO)
Case study (JAWAHAR KALA KENDRA & SFMOMA SAN FRANSISCO)Akshit Charan
 
Nehru science centre , mumbai
Nehru science centre , mumbaiNehru science centre , mumbai
Nehru science centre , mumbaiSandhya Singh
 
Performing Arts Centre final
Performing Arts Centre finalPerforming Arts Centre final
Performing Arts Centre finalJYOTSNA MISHRA
 
shah auditorium Case study
shah auditorium Case study  shah auditorium Case study
shah auditorium Case study sonali parashar
 
case study ART GALLERY
case study ART GALLERY case study ART GALLERY
case study ART GALLERY Nitin Johari
 
Museum case study by Sarthak
Museum case study by SarthakMuseum case study by Sarthak
Museum case study by SarthakSarthak Kaura
 
School Of Architecture And Planning vijayawada , Case study sheets and Liter...
School Of Architecture And Planning vijayawada ,  Case study sheets and Liter...School Of Architecture And Planning vijayawada ,  Case study sheets and Liter...
School Of Architecture And Planning vijayawada , Case study sheets and Liter...UdayGotetiStudios
 
Indian habitat centre (6)
Indian habitat centre (6)Indian habitat centre (6)
Indian habitat centre (6)tivar rose
 
Joseph allen stein
Joseph allen steinJoseph allen stein
Joseph allen steingaurav bhatt
 
Ihc case study ppt a3
Ihc case study ppt a3Ihc case study ppt a3
Ihc case study ppt a3Rohit Arora
 
Case study about auditorium
Case study about auditoriumCase study about auditorium
Case study about auditoriumNilanjana Pal
 
Sanskar Kendra casestudy, ahmedabad, india casestudy
Sanskar Kendra casestudy, ahmedabad, india casestudySanskar Kendra casestudy, ahmedabad, india casestudy
Sanskar Kendra casestudy, ahmedabad, india casestudymanoj chauhan
 

What's hot (20)

Kala academy, goa
Kala academy, goaKala academy, goa
Kala academy, goa
 
NCPA , MUMBAI
  NCPA , MUMBAI   NCPA , MUMBAI
NCPA , MUMBAI
 
Case study (JAWAHAR KALA KENDRA & SFMOMA SAN FRANSISCO)
Case study (JAWAHAR KALA KENDRA & SFMOMA SAN FRANSISCO)Case study (JAWAHAR KALA KENDRA & SFMOMA SAN FRANSISCO)
Case study (JAWAHAR KALA KENDRA & SFMOMA SAN FRANSISCO)
 
Cept Case study
Cept Case studyCept Case study
Cept Case study
 
tribal art museum-bhopal
tribal art museum-bhopaltribal art museum-bhopal
tribal art museum-bhopal
 
site & case study
site & case studysite & case study
site & case study
 
Nehru science centre , mumbai
Nehru science centre , mumbaiNehru science centre , mumbai
Nehru science centre , mumbai
 
Performing Arts Centre final
Performing Arts Centre finalPerforming Arts Centre final
Performing Arts Centre final
 
shah auditorium Case study
shah auditorium Case study  shah auditorium Case study
shah auditorium Case study
 
case study ART GALLERY
case study ART GALLERY case study ART GALLERY
case study ART GALLERY
 
Sanskriti Kendra
Sanskriti KendraSanskriti Kendra
Sanskriti Kendra
 
CASE STUDY.pdf
CASE STUDY.pdfCASE STUDY.pdf
CASE STUDY.pdf
 
Museum case study by Sarthak
Museum case study by SarthakMuseum case study by Sarthak
Museum case study by Sarthak
 
Charles correa
Charles correa Charles correa
Charles correa
 
School Of Architecture And Planning vijayawada , Case study sheets and Liter...
School Of Architecture And Planning vijayawada ,  Case study sheets and Liter...School Of Architecture And Planning vijayawada ,  Case study sheets and Liter...
School Of Architecture And Planning vijayawada , Case study sheets and Liter...
 
Indian habitat centre (6)
Indian habitat centre (6)Indian habitat centre (6)
Indian habitat centre (6)
 
Joseph allen stein
Joseph allen steinJoseph allen stein
Joseph allen stein
 
Ihc case study ppt a3
Ihc case study ppt a3Ihc case study ppt a3
Ihc case study ppt a3
 
Case study about auditorium
Case study about auditoriumCase study about auditorium
Case study about auditorium
 
Sanskar Kendra casestudy, ahmedabad, india casestudy
Sanskar Kendra casestudy, ahmedabad, india casestudySanskar Kendra casestudy, ahmedabad, india casestudy
Sanskar Kendra casestudy, ahmedabad, india casestudy
 

Similar to Shri ram center of performing arts,delhi

NEHRU SCIENCE CENTER MUMBAI and Dr. Kallam anji reddy memorial
NEHRU SCIENCE CENTER MUMBAI  and    Dr. Kallam anji reddy memorialNEHRU SCIENCE CENTER MUMBAI  and    Dr. Kallam anji reddy memorial
NEHRU SCIENCE CENTER MUMBAI and Dr. Kallam anji reddy memorialHarshit Jain
 
The India Habitat Centre and HANNOVER EXHIBITION CENTER, GERMANY
The India Habitat Centre and HANNOVER EXHIBITION CENTER, GERMANYThe India Habitat Centre and HANNOVER EXHIBITION CENTER, GERMANY
The India Habitat Centre and HANNOVER EXHIBITION CENTER, GERMANYInsiya Ratlamwala
 
India habitat centre, New Delhi.
India habitat centre, New Delhi.India habitat centre, New Delhi.
India habitat centre, New Delhi.Mayur Waghulde
 
nift-hyderbad case study
 nift-hyderbad case study nift-hyderbad case study
nift-hyderbad case studyPavaniKaja
 
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...DhvaniR2
 
Dezyneecolian Madhvi Sharma,Residential Designer ,Diploma Programme
Dezyneecolian Madhvi Sharma,Residential Designer ,Diploma ProgrammeDezyneecolian Madhvi Sharma,Residential Designer ,Diploma Programme
Dezyneecolian Madhvi Sharma,Residential Designer ,Diploma ProgrammeDezyne
 
Madhvi Sharma Residential Designer
Madhvi Sharma Residential DesignerMadhvi Sharma Residential Designer
Madhvi Sharma Residential Designerdezyneecole
 
Nid & CEPT ahmedabad primary case study
Nid & CEPT ahmedabad primary case studyNid & CEPT ahmedabad primary case study
Nid & CEPT ahmedabad primary case studyYash Kotgirwar
 
Court of justice-Chandigarh
Court of justice-ChandigarhCourt of justice-Chandigarh
Court of justice-ChandigarhPriyank Mathur
 
CASE STUDY 1.pptx#element#ineteractive#about the designs
CASE STUDY 1.pptx#element#ineteractive#about the designsCASE STUDY 1.pptx#element#ineteractive#about the designs
CASE STUDY 1.pptx#element#ineteractive#about the designsDeeshaKhamar1
 
ARANYA HOUSING, INDORE
ARANYA HOUSING, INDOREARANYA HOUSING, INDORE
ARANYA HOUSING, INDOREMadhu Sagar
 
MASTER PLAN OF GGSIPU Shrikant
MASTER PLAN OF GGSIPU  ShrikantMASTER PLAN OF GGSIPU  Shrikant
MASTER PLAN OF GGSIPU ShrikantShriKant49
 
LANDSCAPE FOR INSTITUTION: CIDCO EXHIBITION CENTRE AND CHRISTCHURCH CONVENTION
LANDSCAPE FOR INSTITUTION: CIDCO EXHIBITION CENTRE AND CHRISTCHURCH CONVENTIONLANDSCAPE FOR INSTITUTION: CIDCO EXHIBITION CENTRE AND CHRISTCHURCH CONVENTION
LANDSCAPE FOR INSTITUTION: CIDCO EXHIBITION CENTRE AND CHRISTCHURCH CONVENTIONMansi Jain
 
Low Cost Housing India
Low Cost Housing IndiaLow Cost Housing India
Low Cost Housing IndiaRohan Zagade
 
Swa architects - landscape architects
Swa architects - landscape architectsSwa architects - landscape architects
Swa architects - landscape architectsanjali s
 

Similar to Shri ram center of performing arts,delhi (20)

NEHRU SCIENCE CENTER MUMBAI and Dr. Kallam anji reddy memorial
NEHRU SCIENCE CENTER MUMBAI  and    Dr. Kallam anji reddy memorialNEHRU SCIENCE CENTER MUMBAI  and    Dr. Kallam anji reddy memorial
NEHRU SCIENCE CENTER MUMBAI and Dr. Kallam anji reddy memorial
 
The India Habitat Centre and HANNOVER EXHIBITION CENTER, GERMANY
The India Habitat Centre and HANNOVER EXHIBITION CENTER, GERMANYThe India Habitat Centre and HANNOVER EXHIBITION CENTER, GERMANY
The India Habitat Centre and HANNOVER EXHIBITION CENTER, GERMANY
 
India habitat centre, New Delhi.
India habitat centre, New Delhi.India habitat centre, New Delhi.
India habitat centre, New Delhi.
 
CASE STUDY.pptx
CASE STUDY.pptxCASE STUDY.pptx
CASE STUDY.pptx
 
Vm house,DENMARK, NORTH EUROPE
Vm house,DENMARK, NORTH EUROPEVm house,DENMARK, NORTH EUROPE
Vm house,DENMARK, NORTH EUROPE
 
nift-hyderbad case study
 nift-hyderbad case study nift-hyderbad case study
nift-hyderbad case study
 
ISB HYDERABAD
ISB HYDERABADISB HYDERABAD
ISB HYDERABAD
 
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
 
Dezyneecolian Madhvi Sharma,Residential Designer ,Diploma Programme
Dezyneecolian Madhvi Sharma,Residential Designer ,Diploma ProgrammeDezyneecolian Madhvi Sharma,Residential Designer ,Diploma Programme
Dezyneecolian Madhvi Sharma,Residential Designer ,Diploma Programme
 
Madhvi Sharma Residential Designer
Madhvi Sharma Residential DesignerMadhvi Sharma Residential Designer
Madhvi Sharma Residential Designer
 
Nid & CEPT ahmedabad primary case study
Nid & CEPT ahmedabad primary case studyNid & CEPT ahmedabad primary case study
Nid & CEPT ahmedabad primary case study
 
Court of justice-Chandigarh
Court of justice-ChandigarhCourt of justice-Chandigarh
Court of justice-Chandigarh
 
CASE STUDY 1.pptx#element#ineteractive#about the designs
CASE STUDY 1.pptx#element#ineteractive#about the designsCASE STUDY 1.pptx#element#ineteractive#about the designs
CASE STUDY 1.pptx#element#ineteractive#about the designs
 
ARANYA HOUSING, INDORE
ARANYA HOUSING, INDOREARANYA HOUSING, INDORE
ARANYA HOUSING, INDORE
 
Aranaya housing
Aranaya housingAranaya housing
Aranaya housing
 
MASTER PLAN OF GGSIPU Shrikant
MASTER PLAN OF GGSIPU  ShrikantMASTER PLAN OF GGSIPU  Shrikant
MASTER PLAN OF GGSIPU Shrikant
 
LANDSCAPE FOR INSTITUTION: CIDCO EXHIBITION CENTRE AND CHRISTCHURCH CONVENTION
LANDSCAPE FOR INSTITUTION: CIDCO EXHIBITION CENTRE AND CHRISTCHURCH CONVENTIONLANDSCAPE FOR INSTITUTION: CIDCO EXHIBITION CENTRE AND CHRISTCHURCH CONVENTION
LANDSCAPE FOR INSTITUTION: CIDCO EXHIBITION CENTRE AND CHRISTCHURCH CONVENTION
 
Raj rewal
Raj rewalRaj rewal
Raj rewal
 
Low Cost Housing India
Low Cost Housing IndiaLow Cost Housing India
Low Cost Housing India
 
Swa architects - landscape architects
Swa architects - landscape architectsSwa architects - landscape architects
Swa architects - landscape architects
 

More from chandar prakash suthar

More from chandar prakash suthar (8)

PUNE BYE LAWS
PUNE BYE LAWSPUNE BYE LAWS
PUNE BYE LAWS
 
English garden landscape design
English garden landscape design English garden landscape design
English garden landscape design
 
5tree,5shrubs,5ground cover,5creepers
5tree,5shrubs,5ground cover,5creepers5tree,5shrubs,5ground cover,5creepers
5tree,5shrubs,5ground cover,5creepers
 
twelfth five Year Plan & NITI AAYOG
twelfth five Year Plan  &  NITI AAYOGtwelfth five Year Plan  &  NITI AAYOG
twelfth five Year Plan & NITI AAYOG
 
Aqualily mahindra world city, Chennai
Aqualily mahindra world city, Chennai Aqualily mahindra world city, Chennai
Aqualily mahindra world city, Chennai
 
project management report
project management reportproject management report
project management report
 
naturopathy Centre, Rishikesh, Uttarakhand
naturopathy Centre, Rishikesh, Uttarakhandnaturopathy Centre, Rishikesh, Uttarakhand
naturopathy Centre, Rishikesh, Uttarakhand
 
Umaid bhawan palace, jodhpur
Umaid bhawan palace, jodhpurUmaid bhawan palace, jodhpur
Umaid bhawan palace, jodhpur
 

Recently uploaded

怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证eeanqy
 
Simple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptxSimple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptxbalqisyamutia
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...instagramfab782445
 
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...gajnagarg
 
Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxbingyichin04
 
Gamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad IbrahimGamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad Ibrahimamgadibrahim92
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationZenSeloveres
 
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样yhavx
 
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEKLANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEKMarekMitek1
 
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789CristineGraceAcuyan
 
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证eqaqen
 
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfJordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfamanda2495
 
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...gajnagarg
 
Design-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyDesign-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyIsadora Agency
 
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证eeanqy
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样awasv46j
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...gajnagarg
 
How to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdfHow to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdfOffice Furniture Plus - Irving
 
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for FriendshipRaebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for FriendshipNitya salvi
 
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service AvailableCall Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service AvailableNitya salvi
 

Recently uploaded (20)

怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
 
Simple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptxSimple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptx
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
 
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
 
Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptx
 
Gamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad IbrahimGamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad Ibrahim
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentation
 
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
 
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEKLANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
 
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
 
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
 
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfJordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
 
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
 
Design-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyDesign-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora Agency
 
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
 
How to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdfHow to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdf
 
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for FriendshipRaebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
 
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service AvailableCall Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
 

Shri ram center of performing arts,delhi

  • 1. Shri ram centre of performing arts Mandi house, Delhi
  • 2. introduction • ADDRESS- 4, Safdar Hashmi Marg, Todermal Road Area, Mandi House, New Delhi, Delhi 11000 • SITE AREA- 0.25ha site 2500 square meter • Ground coverage- 33% (825 square meter) Building height-18m 21m in diameter cylinder,30x30m size rectangular box • Architect- Shivnath Prasad
  • 3. Concept, History and activities • HISTORY- founded in 1975 by Mrs. Panna Bharat Ram, It can be regarded as an example of work resulting from the second phase of Le Corbusier’s influence. • ACTIVITY- dance, drama and music ,exhibitions , workshop, seminar etc.
  • 4. SITE PLAN OF ART CENTRE KEY PLAN OF ART CENTRE 15m wide road entry Sangeet bharti Triveni kala kendre
  • 5. ACCESSIBILITY AND APPROACH -16KM, DELHI INTERNATIONAL AIRPORT. -6.4KM, NEW DELHI RAILWAY STATION. -220M, MANDI HOUSE METRO STATION. -600M, MANDI HOUSE BUS STOP . N
  • 6. INDRA GANDHI INTERNATIONAL AIRPORT IGI AIRPORT METRO STATION TERMINAL (T3) MANDI HOUSE METRO STATION SHRI RAM CENTER FOR PERFOMING ARTS 2 MIN WALK (400M) 1 MIN WALK (220M) VIA NEW DELHI METRO ATATION (20 MIN) NEW DELHI RAILWAY STATION NEW DELHI RAILWAY STATION BUS STOP MANDI HOUSE BUS STOP SHRI RAM CENTER FOR PERFOMING ARTS 1 MIN WALK (220M) 2 MIN WALK (300M) 10 MIN TRAVEL (3KM) FROM AIRPORT FROM RILWAY STATION N
  • 7. - VEHICULAR CIRCULATION - PADESTRIAN CIRCULATION VEHICULAR AND PADESTRIAN CIRCULATION N
  • 8. • THE SITE IS LOCATED IN HIGHLY DENSE COLONY WHERE THE MOVEMENT OF TRAFFIC IS MAJOR. • THE COMPLEX FORM OF THE BUILDING ITSELF DIVIDED INTO LEVELS IN TERMS OF HEIGHT AND ALSO DOESN’T MATCH ANOTHER FABRIC OF BUILDING STRUCTURE. • PARKING SPACE PROVIDED FOR THE AUDITORIUM ARE NOT ACCORDING TO THE NORMS PROVIDED. • PARKING CONDITIONS ARE NOT SUITABLE FOR THE PERSON HAVING PHYSICAL DISABILITY. • N N N
  • 9. • IN ARCHITECTURE, CIRCULATION MEANS THE PATHWAYS THROUGH A FLOOR PLAN. THESE PATHWAYS ARE HOW WE EXPERIENCE ARCHITECTURE; THE DESIGN OF THESE PATHWAYS HAS AN ENORMOUS EFFECT ON THE SUCCESS OR FAILURE OF A PLAN. • OBVIOUS PATHWAYS INCLUDE HALLWAYS (HORIZONTAL CIRCULATION) AND STAIRS/ELEVATORS (VERTICAL CIRCULATION). • CIRCULATION ROUTES ARE THE PATHWAYS PEOPLE TAKE THROUGH AND AROUND BUILDINGS OR URBAN PLACES. CIRCULATION IS OFTEN THOUGHT OF AS THE 'SPACE BETWEEN THE SPACES', HAVING A CONNECTIVE FUNCTION, BUT IT CAN BE MUCH MORE THAN THAT. • IT IS THE CONCEPT THAT CAPTURES THE EXPERIENCE OF MOVING OUR BODIES AROUND A BUILDING, THREEDIMENSIONALLY AND THROUGH TIME. Circulation in architecture
  • 10. COMPONENTS OF CIRCULATION • EVERY SPACE A PERSON COULD ACCESS OR OCCUPY FORMS PART OF THE CIRCULATION SYSTEM OF A BUILDING. • ARCHITECTS TYPICALLY DIVIDE THEIR THINKING ACCORDING TO DIFFERENT TYPES OF CIRCULATION, WHICH OVERLAY WITH ONE ANOTHER AND THE OVERALL PLANNING. THE TYPE AND EXTENT OF THESE DIVISIONS WILL BE PROJECT DEPENDENT, BUT MIGHT INCLUDE: • DIRECTION OF MOVEMENT: HORIZONTAL OR VERTICAL • TYPE OF USE: PUBLIC OR PRIVATE, FRONT OF HOUSE OR BACK OF HOUSE • FREQUENCY OF USE: COMMON OR EMERGENCY • TIME OF USE: MORNING, DAY, EVENING, CONTINUOUS.
  • 11. HORIZONTAL CIRCULATION • HORIZONTAL CIRCULATION MIGHT INCLUDE HALLWAYS, ATRIA, PATHS, ENTRIES AND EXITS. IT IS ALSO AFFECTED BY THE FURNITURE LAYOUT, OR OTHER OBJECTS IN THE SPACE SUCH AS COLUMNS, TREES, OR TOPOGRAPHIC CHANGES. THIS IS WHY ARCHITECTS USUALLY FURNITURE AS PART OF A CONCEPT DESIGN, BECAUSE IT IS CRITICALLY LINKED TO THE FLOW, FUNCTION AND FEELING OF THE SPACE.
  • 12. VERTICAL CIRCULATION • VERTICAL CIRCULATION IS HOW PEOPLE MOVE UP AND DOWN WITHIN THE BUILDING, SO INCLUDES THINGS LIKE STAIRS, LIFTS, RAMPS, LADDERS AND ESCALATORS WHICH ALLOW US TO MOVE FROM ONE LEVEL TO ANOTHER.
  • 13. PLAN & ZONNING GROUND FLOOR PLAN
  • 14. FIRST FLOOR PLAN AUDITORIUM CAPACITY-375 seats COOLING SYSTEM-AC system ACTIVITY-acting ,dance ,drama, singing etc.
  • 16. AUDITORIUM 1. Solid wooden door for reducing sound. 2. Rubber is used on edge of the door for absorbing /reduce sound. 3. R.C.C floor , mortar floor , carpet , wooden ramps used 4. Mainly walls are made up R.C.C. . Finishing is done with wood board which is a sound absorbing panel. 5. Glass wool is fill in between R.C.C. and wood panels. 6. Green rooms are placed in separate block on the back side of the main building and connected through staircase
  • 20. NATURAL VENTILATION • WINDOWS ARE PLACED IN ORDER TO WIND DIRECTION I.E ON NORTH AND SOUTH FAÇADE. • WINDOWS ARE GIVEN ON EITHER SIDE OF THE BUILDING FOR CROSS VENTILATION. • TREES ARE PLANTED IN FRONT OF THE OPENINGS TO GET FRESH AND COOL AIR.
  • 21. BUILDING ORIENTAION • THE BUILDING IS EAST FACING. • WEST SIDE IS COMPRISES OF FOOD CORNER I.E CANTEEN AREA. • SOUTH IS COVERED WITH LANDSCAPING AND GARDEN. • NORTH SIDE IS USED AS OFFICIAL AREA.
  • 22. OPENING SIZE AND DIRECTION • MAIN ENTRANCE IS TOWARDS THE 9MTR WIDE ROAD. • PEDESTRIAN ENTRANCE IS ELEVATED THROUGH STEPS WHICH IS 1.5MTR WIDE. • MAIN ENTRANCE IS 1 MTR WIDE ONLY. • ENTRANCE TO THE AUDITORIUM IS 2.5MTR WIDE. • 2 ENTRANCE AS WELL AS 2 EXITS WERE GIVEN IN AUDITORIUM.
  • 23. TECHNIQUE Solar shading louver systems are one of the most effective ways to reduce air conditioning loads, while offering designers the opportunity for distinctive architectural impact.
  • 24. NET ZERO ENERGY BUILDING • A zero-energy building, also known as a zero net energy (ZNE) building, net-zero energy building (NZEB), net zero building or zero-carbon building is a building with zero net energy consumption, meaning the total amount of energy used by the building on an annual basis is roughly equal to the amount of renewable energy created on the site • BY USING LOUVERS ENERGY CONSUMPTION IS LESS FOR LIGHTNING AS WELL AS AIR. • STAIRCASE IS USED IN PLACE OF LIFT SERVICE.
  • 25. SUMMER SHADOW ANALYSIS SHADOW AT 7:00 O’CLOCK SHADOW AT 10:00 O’CLOCK SHADOW AT 1:00 O’CLOCK SHADOW AT 4:00 O’CLOCK SHADOW AT 5:00 O’CLOCK
  • 26. WINTER SHADOW ANALYSIS SHADOW AT 9:00 O’CLOCK SHADOW AT 12:00 O’CLOCK SHADOW AT 2:00 O’CLOCK SHADOW AT 4:00 O’CLOCK SHADOW AT 6:00 O’CLOCK
  • 28. .
  • 29. LANDSCAPING PLANNING • SMALL HOLLOW BLOCKS MADE UP OF EXPOSED BRICKS ARE MADE TO PLANT SHRUBS. • TREES ARE PLANTED ON FRONT FAÇADE OF THE BUILDING ATTAINING SOUTH SIDE IN ORDER TO GET COOL WIND. • TREES ARE PLANTED IN SUCH A MANNER TO GET BOTH SHADE AND SHADOW.
  • 30. FLORA Fish money plant Morpankhi Grass(dhob ) Gulmohar Nagar champa Ashok
  • 31. Madhumati Botanical name:- Combretum indicum Attracts to:- Hawkmoths, flying bees and birds.
  • 33. KEVIN LYNCH’S FIVE ELEMENTS PATH – Routes along which people moves throughout the canteen area and in inside of the building. EDGES – Boundaries and breaks in continuity of cultural centre in every element. DISTRICT – Areas characterised by common characteristics (canteen, auditorium, rehearsal rooms). NODES – Strategic focus points of orientation like squares and junction. LANDMARK- external point of orientation usually a easily identified physical object in urban landscaping. (canteen area with beautiful landscape.)
  • 34. PATH
  • 37. NODES
  • 39. Materials which were used in the constructio n of SHRI RAM CENTRE FOR PERFORMING ARTS are as follows:- CONCRETE EXPOSED BRICKS BRICK WOOD BOARD GLASS PANEL MARBLE AND TILE
  • 41. Reason behind concrete structure • Concrete is a very dense material. When concrete gets heated, it retains the heat for a very long time. This heat is radiated into the rooms at night when the surroundings are getting cool. Due to the stillness of air below the roof, the air in the room also becomes hot. The ceiling fan revolving below the roof pushes the warm air down. Needless to describe the discomfort. • Avoid the roof getting heated • Insulate the roof from above • Insulate the roof from below • Avoid the heat transfer from the roof to the room • Cool the roof with some means • Extract the hot air collected below the roof • Extract the heat from the roof before it gets transferred
  • 42. VERNACULAR TECHNIQUE • Mainly walls are made up R.C.C. • Finishing is done with wood board which is a sound absorbing pannel. • Glass wool is fill in between R.C.C. and wood pannels. • R.C.C. COFFERED CEILING WHICH DISTRIBUTE THE LOAD.
  • 44. BYELAWS FOR SOCIO- CULTURAL FACILITIES IN DELHI s.no. category Maximum Gr. FAR ht. Cov Other Controls 1. a. Multipurpose Community Hall. b. Banquet hall 30% 120 26m 30% 120 26m 1. Parking standard @3.0ECS/100sq m of floor area. 2. Other controls related to basements etc. are given at end of this chapter 2. a. Community Recreational Club. b. Recreational Club 30% 120 26m 35% Parking standard @2ECS/100sq.m of floor area. 3. Socio- cultural activities such as auditorium, music, dance & drama centre/mediation & spiritual centre etc. 35% 120 26m 1. Parking standard @2ECS/100sq.m of floor area. 2. A proper scheme for visitors parking and parking adequacy statement shall be prepared taking into consideration large number of visitors. 4. Exhibition cum Fair Ground 20% 20 26m Subject to statutory clearances 5. Science centre, 30% 120 NR Parking Standard @2ECS 6. **International Convention Centre 30% 120 appr ove AAI, Fire department Parking Standard @2ECS Bye Laws for socio-cultural facilities in Delhi
  • 45. Notes: i. In case of community recreational clubs, 50 FAR shall be admissible on the area beyond 2000 sqm. And below 5000 sqm. *The Recreational Clubs located in LBZ Area, Civil Lines Bungalow Area, Recreational Use Zones and existing on Heritage Structures will be dealt on case to case basis and Technical Committee of DDA will approve the Development Controls norms based on the existing status. ii. In case of recreational club, 50 FAR shall be admissible on the area beyond 5000 sqm. And up to 10,000sqm. iii. In the open area apart from outdoor games/sport facilities, swimming pool would be permissible up to a area of 300sqm. Free from ground coverage. iv. In case of banquet hall, a) Basement within the ground envelope shall be allowed for parking, stilt floor for parking is permissible. b) 30% of basement area for services, storage shall not be counted in FAR. v. **In case of International Convention Centre, maximum 10% ground coverage shall be allowed for providing atrium. In case, the permissible additional ground coverage for atrium is utilized, 25% of the utilized ground coverage shall be counted towards FAR.
  • 46. SERVICES • FIRE SAFETY • ELECTRICITY • RAIN WATER HARVESTING • HVAC • PASSIVE DESIGN
  • 47. STAIR CASE:- • Every high rise building Have minimum 2 number of Staircases. • Width of staircases varies from 1 m. to 2 m. • Out of 2 staircases, 1 can be used as a fire escape staircase. • Width of fire escape should be minimum 0.75 meter. • Number of staircases shall be given as per the travel distances Section :- As per section 12.18 of part III, 8.5.1 (Table 24), .6.2,8.9,8.10,8.13, 9.3.5(a),10.4.1,11.3.2 of part IV & appendix D1.3,D1.4 of part of NBC.
  • 48. • Shri ram art and culture centre has 2 staircase. • Distance between the staircase is 25m. • 1 Staircase is used for fire escape. • Width of stair is 1.5 m. Distance between the stairs are 25m. Used as fire escape staircase
  • 49. ENTRANCE WIDTH & HEIGHT CLEARANCE:- Section:- As per section 4.6 (c) of part C & 7.4.1(d) of part IV of N.B.C. Every High rise building should have at least 2 means of access, one remote to the other, of minimum width 4.5m. with height clearance of 5m. This minimum width is essential to facilitate free movement of fire units. What Shree Ram Art and Culture Centre has:- Shree ram Art and Culture Centre has 3 mean of access. Main entrance is 5m and second entrance is 6m which is essential to movement for fire tender. ENTRANCE OF SHRI RAM CULTURE CENTER
  • 50. LIFT :- Section:- as per section 18 of part III & 6.18 & appendix A.15 of part IV of NBC. a) Minimum 1 lift capable of carrying minimum 8 persons weighing 545 kgs. Shall be provided for every high rise building. b) Landing doors of lifts shall open to ventilated lobby & shall have a fire resistance of 1 hour. c)1 lift shall be designed as a “Fire Lift” d)“Fireman Switch” shall be provided for each lift. e)Lifts shall not be used as means of evacuation. f)Collapsible gates shall not be provided for the lift. g)If more than 1 lifts are installed the partition wall should be of minimum 2 hours fire resistance
  • 51. LIFTS IN SHRI RAM ART AND CULTURE CENTRE:- • Shri ram and art culture centre has two lift • The lift are design for carrying 9 people weighing capacity 650 kg. • The door of lift are not open in ventilated area . • Both the lifts are designed as a “fire lift” FIRE ESCAPE STAIRCASE IN SHRI RAM ART AND CULTURE CENTRE
  • 52. FIRE SAFETY :- • In the level of fire detection services Shriram center installed the smoke detectors on the false ceiling of back seating. • The accessories of the fire detection is installed main lobby, auditorium, green room, service areas etc. • The building is also installed fire escape doors to avoid the discrepancy in the fire accidents • Emergency fire alarm also installed there. SMOKE DETECTOR FIRE ALARM SPRINKLES
  • 53. Types of fire safety equipment required in building whose height is 15 m and less than 30m FIRE SAFETY :-
  • 54. Type of installation As per N.B.C SHRI RAM ART AND CULTURE CENTER Fire extinguisher REQUIRED PERSENT First aid hose REQUIRED PRESENT Wet riser REQUIRED PRESENT Down corner NOT REQUIRED NOT PRESENT Yard hydrant NOT REQUIRED NOT PRESENT Automatic sprinkler REQUIRED PRESENT Manually operated electronic fire Alarm system. REQUIRED PRESENT
  • 55. FIRE SAFTEY SYSTEM Co2 FIRE SUPPRESSION SYSTEM HOSE BOX OR HOSE SYSTEM UNDERGROUND WATER TANK HOSE PIPE
  • 56. HOSE PIPE FITTING FIRE EXTINGUISHERS HOSE PIPE
  • 57. ELECTRICITY :- OPEN WIRING ELECTRICITY BOARD
  • 58. RAIN WATER HARVESTING :- • Rain water harvesting was there. • Capacity of underground tank is around 50,000 liters. • Capacity of fire safety tank is 1,50,000 liters. • They use rain water in fire safety or landscaping. RAIN WATER HARVESTING TANK
  • 60. SIGNAGES • SIGNAGE IS THE DESIGN OR USE OF SIGNS AND SYMBOLS TO COMMUNICATE A MESSAGE TO THE PUBLIC. SIGNS ARE ANY KIND OF VISUAL GRAPHICS CREATED TO DISPLAY INFORMATION TO A PARTICULAR AUDIENCE. • THE MAIN PURPOSE OF SIGNS IS TO COMMUNICATE, TO CONVEY INFORMATION DESIGNED TO ASSIST THE RECEIVER WITH DECISION-MAKING BASED ON THE INFORMATION PROVIDED. ALTERNATIVELY, PROMOTIONAL SIGNAGE MAY BE DESIGNED TO PERSUADE RECEIVERS OF THE MERITS OF A GIVEN PRODUCT OR SERVICE. SIGNAGE IS DISTINCT FROM LABELING, WHICH CONVEYS INFORMATION ABOUT A PARTICULAR PRODUCT OR SERVICE.
  • 61. ROLE AND FUNCTION OF SIGNAGE • INFORMATION-PROVISION: SIGNS CONVEYING INFORMATION ABOUT SERVICES AND FACILITIES, SUCH AS MAPS, DIRECTORIES, INSTRUCTIONAL SIGNS OR INTERPRETIVE SIGNAGE USED IN MUSEUMS, GALLERIES, GARDENS, EXHIBITIONS, TOURIST AND CULTURAL ATTRACTIONS THAT ENHANCE THE CUSTOMER'S EXPERIENCE.
  • 62. • PERSUASION: PROMOTIONAL SIGNAGE DESIGNED TO PERSUADE USERS OF THE RELATIVE MERITS OF A COMPANY, PRODUCT OR BRAND.
  • 63. • DIRECTION/ NAVIGATION: SIGNS SHOWING THE LOCATION OF SERVICES, FACILITIES, FUNCTIONAL SPACES AND KEY AREAS, SUCH AS SIGN POSTS OR DIRECTIONAL ARROWS.
  • 64. • SAFETY AND REGULATORY:- • SIGNS GIVING WARNING OR SAFETY INSTRUCTIONS, SUCH AS WARNING SIGNS, TRAFFIC SIGNS, EXIT SIGNS, SIGNS INDICATING WHAT TO DO IN AN EMERGENCY OR NATURAL DISASTER OR SIGNS CONVEYING RULES AND REGULATIONS.