5. Legend
!
Areas of observed
liquefaction
Port Hills area
Approx Scale 1:50,000
0
Notes:
Low-resolution aerial photos sourced from Google Earth (Copyright: 2009).
High-resolution aerials provided by New Zealand Aerial Mapping (February 2011)
Property boundaries provided by Christchurch City Council
Canterbur
y
Earthquak
e
Recovery
DRAWN
DRAFTING CHECKED
APPROVED
1000
1500
2000
2500 (m)
CERA
CANTERBURY EARTHQUAKE RECOVERY
Land Damage Map
Land Damage After 4 September 2010
FILE :
.
APPROX. SCALE (AT A3 SIZE)
NTS
PROJECT No.
500
FIG. No.
REV.
0
6. Legend
!
Areas of observed
liquefaction
Port Hills area
Approx Scale 1:50,000
0
Notes:
Low-resolution aerial photos sourced from Google Earth (Copyright: 2009).
High-resolution aerials provided by New Zealand Aerial Mapping (February 2011)
Property boundaries provided by Christchurch City Council
Canterbur
y
Earthquak
e
Recovery
DRAWN
DRAFTING CHECKED
APPROVED
FILE :
.
APPROX. SCALE (AT A3 SIZE)
NTS
PROJECT No.
500
1000
1500
2000
2500 (m)
CERA
CANTERBURY EARTHQUAKE RECOVERY
Land Damage Map
Aggregated Land Damage After 22 February 2011
FIG. No.
REV.
0
7. Legend
!
Repairs > $100k (houses which had
significant damage but could be
economically repaired
Rebuilds (houses which are beyond
economic repair)
Confirmed rebuilds (houses which
were confirmed to be beyond
economic repair)
Approx Scale 1:50,000
0
Notes:
Low-resolution aerial photos sourced from Google Earth (Copyright: 2009).
High-resolution aerials provided by New Zealand Aerial Mapping (February 2011)
Property boundaries provided by Christchurch City Council
Building damage based on data provided by AMI, Ansvar, EQC, FMG, Housing New Zealand, IAG, Lumley,
MAS, Tower and Vero
Canterbur
y
Earthquak
e
Recovery
DRAWN
DRAFTING CHECKED
APPROVED
1000
1500
2000
2500 (m)
CERA
CANTERBURY EARTHQUAKE RECOVERY
Aggregated Building Damage Map
Building Damage After 4 September 2010
FILE :
.
APPROX. SCALE (AT A3 SIZE)
NTS
PROJECT No.
500
FIG. No.
REV.
0
8. Legend
!
Building Damage Ratio
(Repair cost estimate / replacement cost)
0% - 20%
20% - 40%
40% - 60%
60% - 80%
80% - 100%
100% (rebuild because it is
uneconomic to repair the building)
Approx Scale 1:50,000
0
Notes:
Low-resolution aerial photos sourced from Google Earth (Copyright: 2009).
High-resolution aerials provided by New Zealand Aerial Mapping (February 2011)
Property boundaries provided by Christchurch City Council
Building damage based on data provided by AMI, Ansvar, EQC, FMG, Housing New Zealand, IAG, Lumley,
MAS, Tower and Vero
Canterbur
y
Earthquak
e
Recovery
DRAWN
DRAFTING CHECKED
APPROVED
FILE :
.
APPROX. SCALE (AT A3 SIZE)
NTS
PROJECT No.
500
1000
1500
2000
2500 (m)
CERA
CANTERBURY EARTHQUAKE RECOVERY
Aggregated Building Damage Map
Aggregated Building Damage After 22 February 2011
FIG. No.
REV.
0
21. > 600,000 pieces
of medical
evidence
Two million pages
of text from
medical journals
and clinical trials
21
www.thinkbeyond.co.nz
22. Surgery
Minders
“People get bored, people get headaches. Computers don’t,” said Bill Herr, a lawyer
who used to work for a chemical company.
Telepresence Teachers
Prison guards
22
www.thinkbeyond.co.nz
23. ROBOT ETHICS CHARTER
Sec 2: Rights of Robots
Sec. 1: Responsibilities of Robots
Under Korean Law, Robots are
afforded the following fundamental
rights:
i) A robot may not injure a human
being or, through inaction, allow a
human being to come to harm.
i)The right to exist without fear of
injury or death.
ii) A robot must obey any orders
given to it by human beings, except
where such orders would conflict
with Part 3 Section 1 subsection “i”
of this Charter.
ii)The right to live an existence
free from systematic abuse.
iii) A robot must not deceive a
human being.
http://akikok012um1.wordpress.com/south-korean-robot-ethics-charter-2012
23
25. How possible is it
that teachers will
no longer be
required?
www.thinkbeyond.co.nz
26. Questions from Patrice
How can you support me in developing confidence in areas where I feel less comfortable?
How can you give me credit for doing advanced learning when what I really love is still looked
down upon as a non-academic or extra subject by some?
http://knowledgeworks.org/sites/default/files/100617-Patrice-LaCoste-dossier.pdf#
34. What will I focus on
in the next two
days, that moves
me closer to my
preferred future?
www.thinkbeyond.co.nz
35. It is important to ask, “What’s going to happen for us and for
our environment in the next 25 years?”
It is even more important to ask:
“What do we want to make happen?”
Vision is not figuring out what is going to change and
adapting to it. Vision is about deciding how we will change
the world.
www.thinkbeyond.co.nz
35
35