Dubai Burj-al-arab Hotel
By:
Lim Tze Hsing
1007P79406
Ong Chian Yee 0314519
Lim Yee Leng 0307767
Sim Wen Yi 0308610
Background of Burj al arab hotel
Meaning : Arabian Tower.
Location : sandy beach of Jumeirah,
Dubai.
• Built 280m offshore of private
island
Designed by Architect Tom Wright
Construction background
Construction began in 1994 and
completed on site in 1999.
Foundation built on sea.( took 3
years to complete and 5 years
construction period.)
321 meters high above the sea
level.
Design background
Designed to create an icon for
Dubai, which represents urban
revolution and to mimic the
shape of Arab Dhow, a type of
Arabian Vessel.
Shape of modern yacht sail to
reflect Dubai’s nautical heritage
combined with a modern aspect
moving towards the future as a
global tourists destination.
The types of structure
• High-rise
• atrium
• cantilever
• landing pad
• truss
V shape concrete tower
• reinforced concrete tower
• used steel bracing (Inner
Reinforced Concrete V) for
supporting.
• The front (shore-facing)
facade is the constructed of
two tiers of huge, steel ‘X’
trusses.
Steel exoskeleton
• Two main structure of the exoskeleton
is the diagonal truss and ‘Yacht’
structure
• The assembled segment were lifted
and erected in position using the tower
cranes from ground floor to top.
• Together the reinforced concrete and
the exoskeleton act as a composite and
provide the structure horizontal
stability in all directions
Steel exoskeleton (cont’d)
• The diagonal trusses on the side of the building
are as long as a football pitch and weigh as much
as 20 double-decker busses. They were built 15
KM from the site and brought by road to Dubai
on huge 80 wheel lorries which had to be
specially imported from South Africa. The highest
truss took a day to lift into place.
• If one man was to build the building himself it
would take about 8,000 years to finish.
Atrium
• The tallest atrium lobby in the
world at 180meters (590ft)
• It dominates the interior of the
hotel, and takes up over one-third
of the interior space.
• The screen that encloses the third
side of the atrium is made of 1mm
thick glass fiber fabric with a Teflon
coat to stop the dirt sticking.
Atrium (cont’d)
• The screen is the largest of its type and covers
an area of one and a half football pitch and it
is hung from the top of the building by over a
kilometer of 52mm cable.
The material
• carbon fiber
• reinforced concrete
• glass fiber
• Gold
• Steel
• Aluminium
• Marble
The Material(cont’d)
• The architectural materials of the
hotel consist of only a few mediums.
Outside the exterior facade consists
of 50,000m2 of glazed curtain wall of
35,000m2 aluminum cladding
designed by Al Abbar Group.
• Glass and steel make up the
remaining portions of the exterior.
The Steel structure was clad with
6mm composite aluminum panels.
The Material(cont’d)
• The design is able to with stand a
wind load of 9kPa and was
designed to drain water at each
horizontal joint.
• Inside the hotel the materials get
even more expensive than the
outside. The interior features
marble and 24 carat gold leaf.
• Like the exterior, the interior steel
structure is also clad with 6 mm
composite aluminum.
Industrialized building systems (IBS) implemented
during the construction
•IBS- the building components(wall, floor slab, beam, column, staircase)
are mass produced either in factory/ at site under strict quality control and
minimal on site activities.
•In order to reduce labors , improve construction's productivity, reduce
wasteful construction method, increase site safety, environmental friendly,
cost saving, speed up construction time.
•Recognized as the world’s only 7 star Burj-al-arab is not just a world-class
luxury hotel, but also one of the most successful project in Dubai which
had implemented IBS during the construction of the building.
•Main core area- using Cantilever’s Top Climbing Jump Form system.
Cantilever Pty Ltd designed and supplied 300 ton for the forming system.
•Wing walls & stair cores- using Doka’s SKE automatic-climbing form
system. Doka designed the forms such that only
two climbing brackets per form are required.
• Main floors-designed by Cantilever Pty Ltd.Designed as a flying
cable and supported by brackets attached to the walls.The frame for
the form was built with castellated steel beams and measured
18.3m long by 8.1m wide.
18.3m x 8.1m.
• Meinhardt international done the joint venture re-engineer
the slabs to a post tensioned design, it reduces the
labors on reinforcing steel and also time required
to get enough strength to strip the form.
How IBS helped in
construction
Can be classified into 5 main groups:
Pre-cast Concrete Framing, Panel and
Box Systems
~ most common IBS elements
~ e.g. precast concrete columns, beams, slabs, walls,
„3D‟ components, lightweight precast concrete and etc.
Steel Formwork Systems
~ considered as the “least prefabricated” IBS.
~ e.g. tunnel forms, tilt-up systems, permanent steel
formwork (metal decks) and etc.
Steel Framing Systems
~ commonly used with pre-cast concrete.
~ always been the popular choice in construction of
skyscrapers.
~ e.g. steel beams and columns, portal frames, roof
trusses and etc.
Prefabricated Timber Framing Systems
~ have their own niche market.
~ normally used in simple houses.
~ e.g. timber frames and roof trusses
and etc.
Block Work Systems
~ have been revolutionized to achieve more effective
works.
~ e.g. interlocking concrete masonry units (CMU) and
lightweight concrete blocks
Benefits of IBS:
 to achieve higher quality products with minimum
wastages.
 helps to reduce the usage of timber formwork and
props.
 a safer and clean construction site.
 faster the completion of the construction.
 minimize labour usage/ un-skilled workers.
 reduce overall construction budget.
END

More Related Content

What's hot

Construction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiConstruction of Burj Al Arab, Dubai
Construction of Burj Al Arab, Dubai
Ar. Md Shahroz Alam
 

What's hot (20)

Burj Al Arab, Tower Of The Arabs
Burj Al Arab, Tower Of The ArabsBurj Al Arab, Tower Of The Arabs
Burj Al Arab, Tower Of The Arabs
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
 
Burj khalifa-mode of construction
Burj khalifa-mode of constructionBurj khalifa-mode of construction
Burj khalifa-mode of construction
 
BurjAlArab.pdf
BurjAlArab.pdfBurjAlArab.pdf
BurjAlArab.pdf
 
Construction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiConstruction of Burj Al Arab, Dubai
Construction of Burj Al Arab, Dubai
 
Burj al arab (Cofferdam&Rigging)
Burj al arab (Cofferdam&Rigging)Burj al arab (Cofferdam&Rigging)
Burj al arab (Cofferdam&Rigging)
 
Burj al-arab
Burj al-arabBurj al-arab
Burj al-arab
 
Burj Al arab
Burj Al arabBurj Al arab
Burj Al arab
 
Capital Gate Abu Dhabhi - Case Study
Capital Gate Abu Dhabhi - Case Study Capital Gate Abu Dhabhi - Case Study
Capital Gate Abu Dhabhi - Case Study
 
PPT ON BURJ AL ARAB
PPT ON BURJ AL ARABPPT ON BURJ AL ARAB
PPT ON BURJ AL ARAB
 
Burj Khalifa Tower Project
Burj Khalifa Tower ProjectBurj Khalifa Tower Project
Burj Khalifa Tower Project
 
Taipei 101
Taipei 101Taipei 101
Taipei 101
 
Presentation on burj khalifa
Presentation on burj khalifaPresentation on burj khalifa
Presentation on burj khalifa
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Burj al arab-uae
Burj al arab-uaeBurj al arab-uae
Burj al arab-uae
 
Burj al-arab
Burj al-arabBurj al-arab
Burj al-arab
 
Burj khalifa Dubai
Burj khalifa DubaiBurj khalifa Dubai
Burj khalifa Dubai
 
Capital Gate
Capital GateCapital Gate
Capital Gate
 
The burj khalifa
The burj khalifaThe burj khalifa
The burj khalifa
 
Petronas tower - Malaysia (Theory of Structures)
Petronas tower - Malaysia  (Theory of Structures)Petronas tower - Malaysia  (Theory of Structures)
Petronas tower - Malaysia (Theory of Structures)
 

Viewers also liked

Burj al arab presentation
Burj al arab presentationBurj al arab presentation
Burj al arab presentation
Kat0412
 
Burj Al Arab Conceptos De Fuerza Original
Burj Al Arab Conceptos De Fuerza OriginalBurj Al Arab Conceptos De Fuerza Original
Burj Al Arab Conceptos De Fuerza Original
Municipalidad de Pirque
 
hotel in ho chi minh - tan hai long hotel
hotel in ho chi minh - tan hai long hotelhotel in ho chi minh - tan hai long hotel
hotel in ho chi minh - tan hai long hotel
tanhailong
 
Mardanpalace.com
Mardanpalace.comMardanpalace.com
Mardanpalace.com
marioesp
 
Burj Al Arab Dxb
Burj Al Arab DxbBurj Al Arab Dxb
Burj Al Arab Dxb
Tanzeel m
 
Top 10 hotel companies 2010
Top 10 hotel companies 2010Top 10 hotel companies 2010
Top 10 hotel companies 2010
Kirill Globov
 

Viewers also liked (18)

Burj al arab
Burj al arabBurj al arab
Burj al arab
 
Burj al arab presentation
Burj al arab presentationBurj al arab presentation
Burj al arab presentation
 
Burj al arab
Burj al arabBurj al arab
Burj al arab
 
Burj Al Arab Conceptos De Fuerza Original
Burj Al Arab Conceptos De Fuerza OriginalBurj Al Arab Conceptos De Fuerza Original
Burj Al Arab Conceptos De Fuerza Original
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
 
Burj khalifa , its engineering as well as architectural features and facts.
Burj khalifa , its engineering as well as architectural features and facts.Burj khalifa , its engineering as well as architectural features and facts.
Burj khalifa , its engineering as well as architectural features and facts.
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
hotel in ho chi minh - tan hai long hotel
hotel in ho chi minh - tan hai long hotelhotel in ho chi minh - tan hai long hotel
hotel in ho chi minh - tan hai long hotel
 
Mardanpalace.com
Mardanpalace.comMardanpalace.com
Mardanpalace.com
 
Hotel burj al arab oficial
Hotel burj al arab oficialHotel burj al arab oficial
Hotel burj al arab oficial
 
Burj Al Arab Dxb
Burj Al Arab DxbBurj Al Arab Dxb
Burj Al Arab Dxb
 
10 Most Exotic Hotels Across the Globe
10 Most Exotic Hotels Across the Globe10 Most Exotic Hotels Across the Globe
10 Most Exotic Hotels Across the Globe
 
Burj al arab
Burj al arabBurj al arab
Burj al arab
 
Burj khalifa en dubai
Burj khalifa en dubaiBurj khalifa en dubai
Burj khalifa en dubai
 
El lado oscuro de Dubai, la ciudad de los lujos
El lado oscuro de Dubai, la ciudad de los lujosEl lado oscuro de Dubai, la ciudad de los lujos
El lado oscuro de Dubai, la ciudad de los lujos
 
Burj Khalifa: "El Titán"
Burj Khalifa: "El Titán"Burj Khalifa: "El Titán"
Burj Khalifa: "El Titán"
 
Top 10 hotel companies 2010
Top 10 hotel companies 2010Top 10 hotel companies 2010
Top 10 hotel companies 2010
 
Burj Dubai
Burj DubaiBurj Dubai
Burj Dubai
 

Similar to Dubai burj al-arab hotel2 copy

Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3
Yee Len Wan
 
115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)
hlksd
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
hlksd
 

Similar to Dubai burj al-arab hotel2 copy (20)

Capital gate abu dhabi
Capital gate abu dhabiCapital gate abu dhabi
Capital gate abu dhabi
 
Aldar Headquarters Dubai
Aldar Headquarters DubaiAldar Headquarters Dubai
Aldar Headquarters Dubai
 
Aldar Headqaurter
Aldar Headqaurter  Aldar Headqaurter
Aldar Headqaurter
 
Burj al arab
Burj al arabBurj al arab
Burj al arab
 
Pm burj case
Pm burj casePm burj case
Pm burj case
 
Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3
 
High rise building case study
High rise building case study High rise building case study
High rise building case study
 
foundation and structural system of the shard building
foundation and structural system  of the shard buildingfoundation and structural system  of the shard building
foundation and structural system of the shard building
 
Burj al-arab
Burj al-arabBurj al-arab
Burj al-arab
 
115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
 
steel roof truss
steel roof trusssteel roof truss
steel roof truss
 
simplex infrastructure
simplex infrastructure simplex infrastructure
simplex infrastructure
 
burj khalifa
burj khalifaburj khalifa
burj khalifa
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Type of high rise building
Type of high rise buildingType of high rise building
Type of high rise building
 
SA SEMINAR.pptx
SA SEMINAR.pptxSA SEMINAR.pptx
SA SEMINAR.pptx
 
burjkhalifa-160318164437.pdf
burjkhalifa-160318164437.pdfburjkhalifa-160318164437.pdf
burjkhalifa-160318164437.pdf
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
The petronas twin towers
The petronas twin towersThe petronas twin towers
The petronas twin towers
 

Recently uploaded

Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 

Recently uploaded (20)

Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 

Dubai burj al-arab hotel2 copy

  • 1. Dubai Burj-al-arab Hotel By: Lim Tze Hsing 1007P79406 Ong Chian Yee 0314519 Lim Yee Leng 0307767 Sim Wen Yi 0308610
  • 2. Background of Burj al arab hotel Meaning : Arabian Tower. Location : sandy beach of Jumeirah, Dubai. • Built 280m offshore of private island Designed by Architect Tom Wright
  • 3. Construction background Construction began in 1994 and completed on site in 1999. Foundation built on sea.( took 3 years to complete and 5 years construction period.) 321 meters high above the sea level.
  • 4. Design background Designed to create an icon for Dubai, which represents urban revolution and to mimic the shape of Arab Dhow, a type of Arabian Vessel. Shape of modern yacht sail to reflect Dubai’s nautical heritage combined with a modern aspect moving towards the future as a global tourists destination.
  • 5. The types of structure • High-rise • atrium • cantilever • landing pad • truss
  • 6. V shape concrete tower • reinforced concrete tower • used steel bracing (Inner Reinforced Concrete V) for supporting. • The front (shore-facing) facade is the constructed of two tiers of huge, steel ‘X’ trusses.
  • 7. Steel exoskeleton • Two main structure of the exoskeleton is the diagonal truss and ‘Yacht’ structure • The assembled segment were lifted and erected in position using the tower cranes from ground floor to top. • Together the reinforced concrete and the exoskeleton act as a composite and provide the structure horizontal stability in all directions
  • 8. Steel exoskeleton (cont’d) • The diagonal trusses on the side of the building are as long as a football pitch and weigh as much as 20 double-decker busses. They were built 15 KM from the site and brought by road to Dubai on huge 80 wheel lorries which had to be specially imported from South Africa. The highest truss took a day to lift into place. • If one man was to build the building himself it would take about 8,000 years to finish.
  • 9. Atrium • The tallest atrium lobby in the world at 180meters (590ft) • It dominates the interior of the hotel, and takes up over one-third of the interior space. • The screen that encloses the third side of the atrium is made of 1mm thick glass fiber fabric with a Teflon coat to stop the dirt sticking.
  • 10. Atrium (cont’d) • The screen is the largest of its type and covers an area of one and a half football pitch and it is hung from the top of the building by over a kilometer of 52mm cable.
  • 11. The material • carbon fiber • reinforced concrete • glass fiber • Gold • Steel • Aluminium • Marble
  • 12. The Material(cont’d) • The architectural materials of the hotel consist of only a few mediums. Outside the exterior facade consists of 50,000m2 of glazed curtain wall of 35,000m2 aluminum cladding designed by Al Abbar Group. • Glass and steel make up the remaining portions of the exterior. The Steel structure was clad with 6mm composite aluminum panels.
  • 13. The Material(cont’d) • The design is able to with stand a wind load of 9kPa and was designed to drain water at each horizontal joint. • Inside the hotel the materials get even more expensive than the outside. The interior features marble and 24 carat gold leaf. • Like the exterior, the interior steel structure is also clad with 6 mm composite aluminum.
  • 14. Industrialized building systems (IBS) implemented during the construction •IBS- the building components(wall, floor slab, beam, column, staircase) are mass produced either in factory/ at site under strict quality control and minimal on site activities. •In order to reduce labors , improve construction's productivity, reduce wasteful construction method, increase site safety, environmental friendly, cost saving, speed up construction time. •Recognized as the world’s only 7 star Burj-al-arab is not just a world-class luxury hotel, but also one of the most successful project in Dubai which had implemented IBS during the construction of the building. •Main core area- using Cantilever’s Top Climbing Jump Form system. Cantilever Pty Ltd designed and supplied 300 ton for the forming system. •Wing walls & stair cores- using Doka’s SKE automatic-climbing form system. Doka designed the forms such that only two climbing brackets per form are required.
  • 15. • Main floors-designed by Cantilever Pty Ltd.Designed as a flying cable and supported by brackets attached to the walls.The frame for the form was built with castellated steel beams and measured 18.3m long by 8.1m wide. 18.3m x 8.1m. • Meinhardt international done the joint venture re-engineer the slabs to a post tensioned design, it reduces the labors on reinforcing steel and also time required to get enough strength to strip the form.
  • 16. How IBS helped in construction
  • 17. Can be classified into 5 main groups: Pre-cast Concrete Framing, Panel and Box Systems ~ most common IBS elements ~ e.g. precast concrete columns, beams, slabs, walls, „3D‟ components, lightweight precast concrete and etc. Steel Formwork Systems ~ considered as the “least prefabricated” IBS. ~ e.g. tunnel forms, tilt-up systems, permanent steel formwork (metal decks) and etc.
  • 18. Steel Framing Systems ~ commonly used with pre-cast concrete. ~ always been the popular choice in construction of skyscrapers. ~ e.g. steel beams and columns, portal frames, roof trusses and etc. Prefabricated Timber Framing Systems ~ have their own niche market. ~ normally used in simple houses. ~ e.g. timber frames and roof trusses and etc.
  • 19. Block Work Systems ~ have been revolutionized to achieve more effective works. ~ e.g. interlocking concrete masonry units (CMU) and lightweight concrete blocks
  • 20. Benefits of IBS:  to achieve higher quality products with minimum wastages.  helps to reduce the usage of timber formwork and props.  a safer and clean construction site.  faster the completion of the construction.  minimize labour usage/ un-skilled workers.  reduce overall construction budget.
  • 21. END