Standard costs are calculated by determining the expected direct labor costs based on wage rates and hours, direct material costs using expected raw material costs and units, and overhead costs as the expected fixed overhead plus variable overhead multiplied by expected production units. Standard unit cost is an estimated cost per unit that companies use as a baseline to calculate variances from actual costs for variance accounting and cost management.