Ce diaporama a bien été signalé.
Le téléchargement de votre SlideShare est en cours. ×

PMI Ireland Annual Conference 2012 - Agile First Steps

Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Chargement dans…3
×

Consultez-les par la suite

1 sur 34 Publicité

Plus De Contenu Connexe

Diaporamas pour vous (20)

Similaire à PMI Ireland Annual Conference 2012 - Agile First Steps (20)

Publicité

Plus récents (20)

Publicité

PMI Ireland Annual Conference 2012 - Agile First Steps

  1. 1. I’ll go up and find out what they need and the rest of you start coding! PMI  Ireland  2012   AGILE  –  FIRST  STEPS  
  2. 2. This  material  is  Copyright   Protected  under  the  following   Creative  Commons  License:     Attribution-­‐ShareAlike  3.0     Please  use  this  material  freely   and  derive  further  work  from  it.   BUT,  attribution  must  be  given   to  the  original  author,  and   these  same  rights  must  govern   all  derived  works.     Please  use  the  following   attribution:   “Colm  O’hEocha,   AgileInnovation  Ltd.  2012:   www.agileinnovation.eu”    
  3. 3. AgileInnovation   Copyright  ©  2012  AgileInnovation  
  4. 4. Process  Control  Models   OPEN-LOOP CLOSED-LOOP Analytical - Predictive Empirical - Adaptive Set  Target   Controller   Set  Target   Controller   Inspect   AIM  &  FIRE   FIRE  &  AIM   Copyright  ©  2010  AgileInnovation  
  5. 5. Copyright  ©  2010  AgileInnovation  
  6. 6. Sense  +  Act  -­‐>  Agility   •  Iteration  Plan   •  Team  Board   •  Daily  Stand-­‐Up…   Set  Target   Adapt   Controller   Inspect   •  Clean  Design  &  Code   •  Late  Elaboration  (e.g.  User  Stories)   •  Pair  Programming   •  Shared  Code  Ownership   •  Customer  Reviews  &   •  Test  Driven  Development…..   Feedback   •  Retrospectives   •  AutoTest…..   Copyright  ©  2011  AgileInnovation  
  7. 7. Flipping  the  Iron  Triangle   FIXED   Scope/   Resources   Requirements   Schedule   Value  Driven   Plan  Driven   ESTIMATED   Resources   Schedule   Scope/   Requirements   Quality Quality Copyright  ©  2010  AgileInnovation  
  8. 8. Copyright  ©  2010  AgileInnovation  
  9. 9. Software  Development  as  Sport   Copyright  ©  2011  AgileInnovation  
  10. 10. Scrumbut  vs.  Scrumbutt   Sure we do Scrum, but… Ø  We do ‘feature length’ sprints Ø  Our stories span several sprints Ø  We work from a requirements spec Ø  We don’t bother with retrospectives Ø  Our manager approves our estimates Ø  Our QA team is offshore Ø  “Iteration 0” or ”Pre-Sprint” Ø  “Hardening Sprints” Ø  … Copyright  2010  AgileInnovation  Limited  
  11. 11. First  Steps…   1.  Make  the  Work  Visible   2. Put  Roles  and  Teams  in  Place   3.  Establish  a  Flow  of  Work  
  12. 12. Make  the  Work  Visible  
  13. 13. “Radical  Transparency”  
  14. 14. Primary   Product  Owner   Portfolio   Management   Applications   Product  Owner   Product  Owner   Product  Owner   Architecture   Team   Platform   Segment  A   Segment  B   Customer  A   Customer  B  
  15. 15. Project  Manager   Scrum  Master   (Position  of  Authority)   (Servant-­‐Leader)   "   Plan  &  Coordinate   "   Facilitate  Practices   "   Staff  &  Assign   "   Enforce  Constraints   "   Track  &  Report   "   Remove  Impediments   "   Risk  &  Issue  Mgt   "   Block  Distractions   "   Evaluate  &  Reward   "   Carry  Food  &  Water   "   …   "   …   Copyright  ©  2010  AgileInnovation  
  16. 16. Align  Teams  with  Value  Flow   Product   Backlog   Product   Backlog   Product   Backlog   Product   Backlog   Product   Backlog  
  17. 17. Align  Teams  with  Value  Flow   Product   Backlog   Product   Backlog   Product   Backlog  
  18. 18. Communication  and  Co-­‐Location   Probability  of  Communicating  at  least  once  a  week   30%   25%   20%   15%   10%   5%   0%   0   20   40   60   80   100   0   Separation  Distance  (meters)   Copyright  ©  2010  AgileInnovation   Source:  Tom  Allen  
  19. 19. Flow  
  20. 20. Lessons  from  Queuing  Theory   Copyright  2010  AgileInnovation  Limited  
  21. 21. Copyright  2010  AgileInnovation  Limited  
  22. 22. Stop  Starting  –  Start  Finishing  
  23. 23. Effects  of  Multi-­‐Tasking   Psychological:   •  20%  Context  Switching  Loss   •  Distraction  Hangover   Systems:   •  Delayed  Feedback   •  Longer  Cycle  Times   Research  shows  that  drivers  using   mobile  phone  have  a  higher  accident   rate  than  anyone  except  very  drunk   drivers  
  24. 24. Out-­‐Learn  the  Competition   Information     Generation   •  Maximise  Information  Value   •  Minimise  Information  Cost   100%  Chance   100%  Chance   of  Success   Copyright  ©  2011  AgileInnovation   of  Failure  
  25. 25. Copyright  ©  2010  AgileInnovation  
  26. 26. Regular  Demos  
  27. 27. The  Agile  Adoption  Curve   The Agile Adoption Curve and ‘Chasms’ Consideration Investigation Routinization Awareness Acceptance Adaptation Adoption Infusion Pilot “We’re   “Fail  to   different”   Scale”   Initiation Adoption Assimilation Copyright  ©  2010  AgileInnovation  
  28. 28. Expect  Resistance   Enlist  Support:   •  Top-­‐Down:  Executive  Sponsor   •  Bottom-­‐Up:  Champions   •  Outside-­‐In:  Professional  Coach  
  29. 29. Evolutionary  Change  -­‐  PDCA   Plan  –  Do  –  Check  -­‐  Act   •  Decide  on  Small  Changes   •  Implement/Experiment   •  Inspect  the  Results   •  Optimise/Stabilise/Embed   •  Repeat   Copyright  ©  2010  AgileInnovation  
  30. 30. Training  is  necessary  but   insufficient…   ScrumAlliance  –  CSM,  CSD,  CST,  CSP…   Scrum.org  –  PSD,  PSM,  PST…   Copyright  ©  2010  AgileInnovation  
  31. 31. Facilitate   Feedback   Educate   Coach   Notice   Support   Copyright  ©  2010  AgileInnovation  
  32. 32. Approved  Supplier   Lean  Start   Up  to  €5000   to  Enterprise   LeanPlus   Up  to  50%  of  €70,000   Ireland  “Lean   LeanTransform   Up  to  50%  of  >€70,000   Competitiveness   Program”  
  33. 33. Colm  O’hEocha   AgileInnovation     Colm@agileinnovation.eu  
  34. 34. This  material  is  Copyright   Protected  under  the  following   Creative  Commons  License:     Attribution-­‐ShareAlike  3.0     Please  use  this  material  freely   and  derive  further  work  from  it.   BUT,  attribution  must  be  given   to  the  original  author,  and   these  same  rights  must  govern   all  derived  works.     Please  use  the  following   attribution:   “Colm  O’hEocha,   AgileInnovation  Ltd.  2012:   www.agileinnovation.eu”    

×