Semantic Technologies in
Business Process Management




    Gábor, András* – Szabó, Zoltán**
       *Corvinno Technology Transfer Center Ltd,
             **Corvinus University of Budapest
5th International Conference on Integrated Systems:
              Design and Technologies
           12-15 May 2012, Mallorca, Spain
Introduction
•   Organisations today try to survive in turbulent economic environment.
     –   Complexity, process orientation and process thinking
     –   Increasing competition, globalisation, deregulation and
     –   operational challenges: shorter product life-cycles, personalised customer needs
     –   Reengineering was one of the first options to answer these challenges.
•   Reengineering vs.Business Process Management (BPM)
     –   knowledge-intensive activities.
     –   Knowledge can be barrier in the implementation and long-term sustainability of process
         management.
     –   Knowledge management is a major facilitator of BPM initiatives.
•   BPM provides several benefits
     –   strategy-driven, transparent, traceable, flexible and responsive organization
     –   Improving the alignment between the business and IT.
     –   BPM focal points: cost, quality and time – the magic triangle of BPR.
•   Semantic technologies
     –   overall success and coverage of the Internet,
     –   demand for added value IT services.
     –   e-Commerce, e-government also brought closer the users’ community with the technology
     –   while technology is always smart, the usability depends on the positioning of the business process,
         task allocation, responsibilities
     –   advanced technology and advanced business process modelling go hand-in-hand.
•   What the connections are between process modelling and semantic technologies?
Semantic
technologies
   in BPM
Reengineering and Knowledge
•   BPR critical analysis and radical redesign of existing business processes to achieve breakthrough
    improvements in performance measures.
•   BPR know-how development : redesign must penetrate the company’s core organisational elements:
     –   roles and responsibilities, measurements and incentives, organisational structure, information technology,
         shared values and skills
     –   change management is critical part of BPR.
•   Process management is key success factor
     –   Speed
     –   exhaustive description of the processes, and the definition of the underlying and interrelating connections.
•   BPM Life cycle
     –   Business process strategy
     –   Process documentation
     –   Process analysis and design
     –   Implementation and change management
     –   Process operation
     –   Process controlling/monitoring
•   Recursive relationship between IT and BPM
•   BPM technologies : business process description/modelling and automation,
     –   workflow, groupware, BAM applications.
     –   wide range of technologies focusing on the knowledge aspect
     –   process mining, business rule mining, enterprise content management, semantic technologies.
Process           Business
        controlling/        process
        monitoring          strategy




 Process           Semantic          Process
operation        technologies     documentation
                    in BPM



       Implementatio        Process
        n and change      analysis and
        management          design
Knowledge Management Challenges in BPM
•   BPM : activities, input-output, organizational context, decision points, competencies, and
    infrastructural requirements
•   Necessary but not sufficient : harmonization of competencies, responsibilities, information
    flow and organization,
•   Optimization of process-structure along the conditions,
     –   the specification of up-to-date and innovative info-communication technologies
     –   savings will be realized on the expenditure side, and other non-pecunier objectives will be achieved
•   Management of information and knowledge move toward the efficient management of
    changes in the information and knowledge.
•   Existing approaches are inadequate for processes
     –   highly dynamic and volatile processes,
     –   steps cannot be planned in advance, and
     –   unanticipated “knowledge needs” frequently arise.
     –   fast adaptation of individuals and organization is a must
•   BPM knowledge management challenges
     –   Knowledge discovery and codification
     –   Knowledge transfer
     –   Knowledge sharing
     –   Knowledge utilization
     –   Knowledge renewal
•   Semantic technologies as facilitators of transforming process models to executable
    applications.
Knowledge
                  renewal

                                                            Knowledge
                                                            discovery &
                                                            codification
                        Process           Business
                      controlling/        process
                      monitoring          strategy




Knowledge      Process           Semantic          Process
utilization   operation        technologies     documentation
                                  in BPM



                     Implementatio
                                          Process
                      n and change
                                        analysis and
                      management
                                          design                Knowledge
                                                                transfer




                    Knowledge sharing
Business Process Modelling
•   BPM has four basic pillars:
     –   modelling activities
     –   Modelling information flow
     –   Organisational view
     –   BPM output and outcome.
•   Most frequent utilisation of BPM is the regulation
     –   optimization of processes,
     –   radical simplification of the process connectivity,
     –   simplification of decision,
     –   reporting routes, cutting through the useless iterations.
     –   information systems requirement specification
•   Outcomes of the BPM which are hardly investigated:
     –   how to use BPM for intra- and inter-organisational knowledge transfer and
     –   how to make use of matching the activity related and job role related competences.
     –   Opens the road to knowledge management – looking for semantic solutions.
Semantic Business Process Management

•   BPR and BPM is traditional tools that transforms business requirements to system
    specification.
•   BPM: integration of Business and IT architecture,
     – systematically aligning organization structure, process and technology.
     – the conceptual model facilitates the exploration, documentation, and validation of
       requirements.
     – due to implicit semantics has limitations in the automation of further processing
     – BPM is challenged to transform the traditional solution into development lifecycle, meaning
     – description, automation, monitoring and improvement as a part of continuous innovation.
•   Business process design based software development.
     – The main challenge is the continuous and seamless translation between the business
       requirements view and the IT systems and resources.
     – Semantic Business Process Management (SBPM) is a new approach, that can increase
       the level of automation in the translation between these two domains.
     – The two levels can be represented using ontology languages and automated translation.
SBPM: the “missing link” is the ontology
•   Due to the organic development of business processes and IT solutions, there is a significant
    gap between them. Narrow the gap, if
     –   technically executable processes, workflows were deducted from business process structures and a
         standardized repository of business
     –   automatic generation of workflow systems - based on BPM defined ontologies.
     –   The extended use of BPEL as modelling language,
     –   the BPMN as modelling notion
•   The enterprise architecture, the enterprise architect understands importance of the
    application of the seamless modelling methodology.
•   The “missing link” is the ontology,
     –  knowledge representation helps the architect to map business processes against the information
        processing technology.
     – The models are exported and annotated into ontology, and
     – the ontology already gives ample munitions to behave as input to the workflow modelling.
     – This is how the loop is closed.
•   There are big expectations, because the exisiting methods
     – are not sensitive enough to cope with every kind of business processes,
     – standardization, interoperability, or
     – ASP solutions may mean constraints.
Knowledge Transfer in BPM

• The knowledge management and BPM not always meet.
• Knowledge management has
     – human resource management view,
     – artificial intelligence view (how to solve a problem?) and
     – organisational, systems development (what is the problem solution?) view
• Organisational view:
     – the proper management of the intellectual capital,
     – saving the intellectual asset of an organisation.
•   Process modelling cannot be complete without the exact definition of the
    activities related competencies - the knowledge management option is there.
     –   The articulation of the organisational knowledge, and
     –   the representation of the related knowledge
     –   makes the knowledge transfer relatively easy, however
     –   the maintenance of the articulated and represented knowledge still a delicate
         issue.
Competence Matching as Knowledge Transfer

•   Competences are distingushed according to the source an d purpose
     –   Starting from the from the process view, the source is the activity and they are associated with the
         role,
     –   From HRM point of view the source is the employee and they are associated with the position
•   From HRM point of view the difference:
     –   recruitment/selections is done to fill an open position
     –   one position might contain more roles
•   Matching is a must, because the differences shows how adequate are the job role definitions
    (right people on the right places doing the right,…).
     –   The discrepancies are direct indications of in-house or other, formal, informal, non-formal training
         needs.
     –   The job role requirements hardly can be understood or interpreted without the process context, and
         BPM provides this context.
•   Competence as a term is often used in the sense of a meta-concept.
     –   the instance of the competence is the piece of concrete knowledge – a procedure, rule, etc.
     –   the abstraction enables the users to compare two structures, e.g two ontologies
     –   it is already a matter of properly chosen algorithm
Project Game as Proof of Evidence
• During the last two decades several applications developed by our team in
  national and EU projects.
• Project game: the projects are different and they depend on the ideas,
  underlying objectives of the funding agencies
• Long term a strategy to build up the “big picture” piece by piece.
• This “lego” type research strategy resulted the cases to be introduced
  next.
• Optimization                                             • Semi-automated
• Roles and responsibiities                                  implementation:
• Define structure for KBS                                   BPMN/BPEL/SOA
                                                           • Support training:
                                                           • Competence-based HR
                                                             development

                                              Implemen-
                                   Process    tation &
                                Modelling &
                                    Design    Change
                                              Management



                                   Process
                                 Controll &   Operations
                                Monitoring
• Evaluation and check of                                  • HR development: competence
  consistency                                                matching
• Enable process adaptiveness                              • Tratining focused on roles &
                                                             responsibilities:e-learning and
                                                             adaptive testing
                                                           • Flexible adaption of knowledge
                                                             base
Next…
     BPM         Knowledge extraction   Knowledge transfer




                   Text /Process
                      mining


                     Ontology                 Domain
                     building                 Ontology




                      Content                  Content
   Application                                repository
                    development
  development
Next…
     BPM                Knowledge extraction         Knowledge transfer




                          Text /Process
                 RACI        mining


                            Ontology         Ontology      Domain
             Process                      implementation   Ontology
             modell         building




                             Content         Content        Content
   Application                               delivery      repository
                           development
  development
Q&A
        Dr. Gábor András
     agabor@corvinno.hu

 Corvinno Technology Transfer Center
H-1093 Budapest, Közraktár utca 12/a.
       Tel/Fax: 06 1 210 80 62
      http://www.corvinno.com
STUDIO
• STUDIO is an e-learning platform.
• The main idea is
    –   to represent the basic concept hierarchy of a given domain in ontology and
    –   build up around the learning content and an engine
    –   which will test the user where are the knowledge gaps,
    –   And based upon the result customizes the learning material.
• The main benefits of this approach were twofold,
    – directly helps the learner to learn according to his/her learning style, pace, in
      an informal or non-formal learning style.
    – Indirectly, the system is domain specific, in the corporate environment the
      construction of the system is equal to knowledge articulation, knowledge
      elicitation, knowledge transfer.
• The evaluation on the basis of the statistics give a very detailed and fine
  picture about the learners’ activitiy, the learning habits, the relevance of
  the learning material.
E-learning

• A part of the reference process model addresses the student mobility
  questions – mainly aroused from the transition to the Bologna system.
• Another project, also under the Structural and Cohesion Fund
  umbrella in the cooperation of 12 universities tried to find solution.
• The problem what the consortium tried to solve how to homogenize
  the input competencies on master level if the students may come with
  any kind of bachelor degree.
• As a test laboratory, the business informatics master was chosen.
  Assumed the biggest mobility, the incoming students should have very
  different knowledge level, while the minimum requirement on the
  input side was known.
• The solution developed to handle the case was the discovery of
  knowledge gap individually and giving an individually customized
  learning material to the learner.
• The iterative use of the system resulted a sufficient and homogenous
  knowledge level.
HEI Reference Process Modell

•   Under the Structural and Cohesion Fund umbrella a big, nationwide project were launched
    in 2004-2007.
•   The objective of the project was to create the reference process model of the HEI with the
    contribution of 13 universities (representing 42% of the total number of the students).
•   The reference model serves two purposes, one is the starting point for the individual
    institutions to develop their own localised and customized solution, second it is common
    platform of understanding between the institutions and the ministry to control the feasibility
    and effect of the planned measures.
•   The model contains over 400 processes in grouped into 14 main categories. It covers every
    aspects of university management from strategic planning to the detailed bookkeeping
    action, from student administration to facility management.
•   Apart from the professional experiences, the best and little bit surprising experience was the
    involvement of over 200 academics into process modelling who first understand how the
    world is working around them different than their strict academic interests. The common
    platform provided a solid base to the further developments –.
•   Later high level executive information systems, decision support systems were introduced
    using data warehouse technology, and several level and solution of business intelligence.
•   The concept of using reference process model fits to the most advanced enterprise
    architecture principles (e,g, TOGAF 9), and in 5 cases served directly as information systems
    requirement specification, Debrecen University used it for SAP implementation.
SAKE “Semantic enabled Agile
                    Knowledge-based E-government”
• SAKE project gave a unique opportunity to model output and outcome
  competencies in ontology, to embed it into an agile knowledge intensive
  groupware and decision support system.
• One part of the research project was devoted to the competence
  matching
• The test scenario we tried to follow was offering and looking for systems
  analysts.
• A well designed and customized intelligent groupware system can manage
  very well if there is an output from the competence matching.
• In combination with other techniques the time horizon gaps can be
  bridged over: the gap is between the demand is in the present, the output
  is in 3 or 5 years.
• The SAKE system could provide good environment to integrate other
  forecasting methods with economic growth assumptions, forecast of
  investment climate, etc.
„Wall-to-wall” design with SOA

• 3A layer architecture, the introduction of the SOA architecture opened
  a new horizon.
• The business and IT looked for jointly the “wall-to-wall” design,
   – starting the design procedure from high level, what
   – the business line can understand (and they also deliver the business
      logic)
   – to the automatic code generation.
• Several trials had been conducted with
   – Process modelling with ARIS and ADONIS to connect process model
      with ERP systems.
   – The trials through Webshpere was supported by IBM,
   – Microsoft and SAP products were tested from the connectivity point of
      view.
• The results of these tests proved the strength of the connectivity, it
  verified and validated the priority of the BPM modelling.
Empowering Business Ecosystems of Small
               Service Enterprises to face the economic crisis
•   BPM challenge : continuous translation between the business requirements and the IT
    systems and resources.
      – SBPM : using ontology languages and employ automated translation.
      – Business processes perform within the dynamic organizational environments.
      – Conceptual modeling captures the semantics of an application through the use of a
         formal notation, but the descriptions are intended to be used by humans
      – The semantics contained in these models are especially implicit and cannot be
         processed.
•   With semantic schema the creation and the use of the conceptual models can be improved,
    the implicit semantics having been contained in the models can be – partly - articulated and
    used for further processing.
•   eBest solution starts from the high level process model and through an ontology
    interpretation and the workflow is automatically generated.
      – The real benefit of the solution is not the first application but it can be “cashed” after
         the first modification.
      – workflow management and business process management is very often mixed up.
      – The end result is a work flow system, but since it is generated from a business process
         model, no contradiction at all.
Ontology based competency matching

• The comparison of output and outcome competences having earned in
  the education with the job role competences stayed longer in the focus
  of the research interests.
• In the OntoHR project the problem was analysed and tried to be
  solved from Human Resource Management point of view.
• Typical HR consulting firm: recruitment, selection and executive search
• Pre-selection has been proved to be the proper scope.
• Comparison between competence based job role requirements, and
  the individually have competencies became a crucial point.
• The job seekers’ competencies defined by the knowledge gap
  discovery, the solution is now marketed under the brand name of
  STUDIO.
• The comparison between the demand and supply is paired with the
  investigation of the mental ability of the job seekers. It gives more
  clues to conclude with the pre-selection.

Contenu connexe

Tendances

Introduction to Business Process Management
Introduction to Business Process ManagementIntroduction to Business Process Management
Introduction to Business Process ManagementAppian
 
Business Process Intelligence Keynote
Business Process Intelligence KeynoteBusiness Process Intelligence Keynote
Business Process Intelligence KeynoteMichael zur Muehlen
 
Business Process Management
Business Process ManagementBusiness Process Management
Business Process ManagementIBMGovernmentCA
 
Critical Success Factors in a BPM Implementation
Critical Success Factors in a BPM ImplementationCritical Success Factors in a BPM Implementation
Critical Success Factors in a BPM ImplementationNathaniel Palmer
 
BPM Courses and Certificates by Stevens Institute of Technology
BPM Courses and Certificates by Stevens Institute of TechnologyBPM Courses and Certificates by Stevens Institute of Technology
BPM Courses and Certificates by Stevens Institute of TechnologyMichael zur Muehlen
 
From Process Management to Process Innovation
From Process Management to Process InnovationFrom Process Management to Process Innovation
From Process Management to Process InnovationMichael zur Muehlen
 
Workflow and BPM in the New Enterprise Architecture
Workflow and BPM in the New Enterprise ArchitectureWorkflow and BPM in the New Enterprise Architecture
Workflow and BPM in the New Enterprise ArchitectureNathaniel Palmer
 
Process Modeling: What is used vs. What is useful
Process Modeling: What is used vs. What is usefulProcess Modeling: What is used vs. What is useful
Process Modeling: What is used vs. What is usefulMichael zur Muehlen
 
BPM Fundamentals: Develop Your Game Plan For BPM Success
BPM Fundamentals: Develop Your Game Plan For BPM SuccessBPM Fundamentals: Develop Your Game Plan For BPM Success
BPM Fundamentals: Develop Your Game Plan For BPM SuccessClay Richardson
 
Best Practices for Tracking Six Sigma Projects with BPM
Best Practices for Tracking Six Sigma Projects with BPMBest Practices for Tracking Six Sigma Projects with BPM
Best Practices for Tracking Six Sigma Projects with BPMBonitasoft
 
Business Process Management and Information Technology
Business Process Management and Information TechnologyBusiness Process Management and Information Technology
Business Process Management and Information TechnologyAshish Desai
 
INFORMATION TECHNOLOGIES AS THE BASE OF THE BUSINESS PROCESS MANAGEMENT IMPLE...
INFORMATION TECHNOLOGIES AS THE BASE OF THE BUSINESS PROCESS MANAGEMENT IMPLE...INFORMATION TECHNOLOGIES AS THE BASE OF THE BUSINESS PROCESS MANAGEMENT IMPLE...
INFORMATION TECHNOLOGIES AS THE BASE OF THE BUSINESS PROCESS MANAGEMENT IMPLE...Abzetdin Adamov
 
Business Process Re-engineering (BPR): Role of IT
Business Process Re-engineering (BPR): Role of ITBusiness Process Re-engineering (BPR): Role of IT
Business Process Re-engineering (BPR): Role of ITAbhinav Johnson
 
Business Process Management: Implementing Continuous Improvement in Your Orga...
Business Process Management: Implementing Continuous Improvement in Your Orga...Business Process Management: Implementing Continuous Improvement in Your Orga...
Business Process Management: Implementing Continuous Improvement in Your Orga...Henry Chandra
 

Tendances (20)

Introduction to Business Process Management
Introduction to Business Process ManagementIntroduction to Business Process Management
Introduction to Business Process Management
 
Business Process Intelligence Keynote
Business Process Intelligence KeynoteBusiness Process Intelligence Keynote
Business Process Intelligence Keynote
 
Introduction to BPM
Introduction to BPMIntroduction to BPM
Introduction to BPM
 
Business Process Management Training 1
Business Process Management Training 1Business Process Management Training 1
Business Process Management Training 1
 
resume.smrozMA
resume.smrozMAresume.smrozMA
resume.smrozMA
 
Business Process Management
Business Process ManagementBusiness Process Management
Business Process Management
 
Critical Success Factors in a BPM Implementation
Critical Success Factors in a BPM ImplementationCritical Success Factors in a BPM Implementation
Critical Success Factors in a BPM Implementation
 
BPM Courses and Certificates by Stevens Institute of Technology
BPM Courses and Certificates by Stevens Institute of TechnologyBPM Courses and Certificates by Stevens Institute of Technology
BPM Courses and Certificates by Stevens Institute of Technology
 
From Process Management to Process Innovation
From Process Management to Process InnovationFrom Process Management to Process Innovation
From Process Management to Process Innovation
 
Workflow and BPM in the New Enterprise Architecture
Workflow and BPM in the New Enterprise ArchitectureWorkflow and BPM in the New Enterprise Architecture
Workflow and BPM in the New Enterprise Architecture
 
Process Modeling: What is used vs. What is useful
Process Modeling: What is used vs. What is usefulProcess Modeling: What is used vs. What is useful
Process Modeling: What is used vs. What is useful
 
BPM Fundamentals: Develop Your Game Plan For BPM Success
BPM Fundamentals: Develop Your Game Plan For BPM SuccessBPM Fundamentals: Develop Your Game Plan For BPM Success
BPM Fundamentals: Develop Your Game Plan For BPM Success
 
Business Process Management Approach
Business Process Management Approach  Business Process Management Approach
Business Process Management Approach
 
Best Practices for Tracking Six Sigma Projects with BPM
Best Practices for Tracking Six Sigma Projects with BPMBest Practices for Tracking Six Sigma Projects with BPM
Best Practices for Tracking Six Sigma Projects with BPM
 
Business Process Management and Information Technology
Business Process Management and Information TechnologyBusiness Process Management and Information Technology
Business Process Management and Information Technology
 
INFORMATION TECHNOLOGIES AS THE BASE OF THE BUSINESS PROCESS MANAGEMENT IMPLE...
INFORMATION TECHNOLOGIES AS THE BASE OF THE BUSINESS PROCESS MANAGEMENT IMPLE...INFORMATION TECHNOLOGIES AS THE BASE OF THE BUSINESS PROCESS MANAGEMENT IMPLE...
INFORMATION TECHNOLOGIES AS THE BASE OF THE BUSINESS PROCESS MANAGEMENT IMPLE...
 
Business Process Re-engineering (BPR): Role of IT
Business Process Re-engineering (BPR): Role of ITBusiness Process Re-engineering (BPR): Role of IT
Business Process Re-engineering (BPR): Role of IT
 
Business Process Management: Implementing Continuous Improvement in Your Orga...
Business Process Management: Implementing Continuous Improvement in Your Orga...Business Process Management: Implementing Continuous Improvement in Your Orga...
Business Process Management: Implementing Continuous Improvement in Your Orga...
 
Bpr
BprBpr
Bpr
 
Business Process Management Training session 2
Business Process Management Training session 2Business Process Management Training session 2
Business Process Management Training session 2
 

Similaire à Semantic Technologies in Business Process Management

SAP Enterprise Modeling Applications (ARIS)
SAP Enterprise Modeling Applications (ARIS)SAP Enterprise Modeling Applications (ARIS)
SAP Enterprise Modeling Applications (ARIS)Palisade Corporation
 
Simplicity of Process Management
Simplicity of Process ManagementSimplicity of Process Management
Simplicity of Process ManagementJohann Koenigshofer
 
Master Global Project ManagementTorrens University Aus.docx
Master Global Project ManagementTorrens University Aus.docxMaster Global Project ManagementTorrens University Aus.docx
Master Global Project ManagementTorrens University Aus.docxendawalling
 
Business Process Management
Business Process ManagementBusiness Process Management
Business Process Managementtusp2000
 
BPM Governance (Imre Hegedus)
BPM Governance (Imre Hegedus)BPM Governance (Imre Hegedus)
BPM Governance (Imre Hegedus)BPM Link
 
Business Process Re-engineering (BPR)
Business Process Re-engineering (BPR)Business Process Re-engineering (BPR)
Business Process Re-engineering (BPR)Parth Shukla
 
Process Efficiency World Tour Houston presentation
Process Efficiency World Tour Houston presentationProcess Efficiency World Tour Houston presentation
Process Efficiency World Tour Houston presentationBonitasoft
 
BPM for Manufacturing (Business Process-Centric Manufacturing) v4
BPM for Manufacturing (Business Process-Centric  Manufacturing) v4BPM for Manufacturing (Business Process-Centric  Manufacturing) v4
BPM for Manufacturing (Business Process-Centric Manufacturing) v4Sudhir(SMACI) Menon
 
CV__Jaleel_Hussain_Apr 2014
CV__Jaleel_Hussain_Apr 2014CV__Jaleel_Hussain_Apr 2014
CV__Jaleel_Hussain_Apr 2014Jaleel Hussain
 
Effective Development of IS Professionals
Effective Development of IS ProfessionalsEffective Development of IS Professionals
Effective Development of IS Professionalsdigiarchi
 
How to justify the investment in modernizing your marketing with the Executiv...
How to justify the investment in modernizing your marketing with the Executiv...How to justify the investment in modernizing your marketing with the Executiv...
How to justify the investment in modernizing your marketing with the Executiv...B2B Marketing Forum
 
Unit I Factors Responsible for Successful BI Project.pdf
Unit I Factors Responsible for Successful BI Project.pdfUnit I Factors Responsible for Successful BI Project.pdf
Unit I Factors Responsible for Successful BI Project.pdfShivarkarSandip
 
Bill Haser, Vice President & CIO at Tenneco - Managing the IT transformation
Bill Haser, Vice President & CIO at Tenneco - Managing the IT transformationBill Haser, Vice President & CIO at Tenneco - Managing the IT transformation
Bill Haser, Vice President & CIO at Tenneco - Managing the IT transformationGlobal Business Events
 
My vision on BPM - Olivier Rikken
My vision on BPM - Olivier RikkenMy vision on BPM - Olivier Rikken
My vision on BPM - Olivier RikkenOlivier Rikken
 
Bpm The promise
Bpm The promiseBpm The promise
Bpm The promisesaruman70
 
BPM - Insights, Practices and Emerging Themes; Melbourne 2010
BPM - Insights, Practices and Emerging Themes; Melbourne 2010BPM - Insights, Practices and Emerging Themes; Melbourne 2010
BPM - Insights, Practices and Emerging Themes; Melbourne 2010BPM Link
 
BPM - Insights, Practices and Emerging Themes; Adelaide 2010
BPM - Insights, Practices and Emerging Themes; Adelaide 2010BPM - Insights, Practices and Emerging Themes; Adelaide 2010
BPM - Insights, Practices and Emerging Themes; Adelaide 2010BPM Link
 
Introduction to Business Process Management
Introduction to Business Process ManagementIntroduction to Business Process Management
Introduction to Business Process ManagementAlan McSweeney
 
Introduction to business process management
Introduction to business process managementIntroduction to business process management
Introduction to business process managementHuu Nguyen Tat
 

Similaire à Semantic Technologies in Business Process Management (20)

SAP Enterprise Modeling Applications (ARIS)
SAP Enterprise Modeling Applications (ARIS)SAP Enterprise Modeling Applications (ARIS)
SAP Enterprise Modeling Applications (ARIS)
 
Simplicity of Process Management
Simplicity of Process ManagementSimplicity of Process Management
Simplicity of Process Management
 
Master Global Project ManagementTorrens University Aus.docx
Master Global Project ManagementTorrens University Aus.docxMaster Global Project ManagementTorrens University Aus.docx
Master Global Project ManagementTorrens University Aus.docx
 
Business Process Management
Business Process ManagementBusiness Process Management
Business Process Management
 
BPM Governance (Imre Hegedus)
BPM Governance (Imre Hegedus)BPM Governance (Imre Hegedus)
BPM Governance (Imre Hegedus)
 
Workflow tecnologies
Workflow tecnologiesWorkflow tecnologies
Workflow tecnologies
 
Business Process Re-engineering (BPR)
Business Process Re-engineering (BPR)Business Process Re-engineering (BPR)
Business Process Re-engineering (BPR)
 
Process Efficiency World Tour Houston presentation
Process Efficiency World Tour Houston presentationProcess Efficiency World Tour Houston presentation
Process Efficiency World Tour Houston presentation
 
BPM for Manufacturing (Business Process-Centric Manufacturing) v4
BPM for Manufacturing (Business Process-Centric  Manufacturing) v4BPM for Manufacturing (Business Process-Centric  Manufacturing) v4
BPM for Manufacturing (Business Process-Centric Manufacturing) v4
 
CV__Jaleel_Hussain_Apr 2014
CV__Jaleel_Hussain_Apr 2014CV__Jaleel_Hussain_Apr 2014
CV__Jaleel_Hussain_Apr 2014
 
Effective Development of IS Professionals
Effective Development of IS ProfessionalsEffective Development of IS Professionals
Effective Development of IS Professionals
 
How to justify the investment in modernizing your marketing with the Executiv...
How to justify the investment in modernizing your marketing with the Executiv...How to justify the investment in modernizing your marketing with the Executiv...
How to justify the investment in modernizing your marketing with the Executiv...
 
Unit I Factors Responsible for Successful BI Project.pdf
Unit I Factors Responsible for Successful BI Project.pdfUnit I Factors Responsible for Successful BI Project.pdf
Unit I Factors Responsible for Successful BI Project.pdf
 
Bill Haser, Vice President & CIO at Tenneco - Managing the IT transformation
Bill Haser, Vice President & CIO at Tenneco - Managing the IT transformationBill Haser, Vice President & CIO at Tenneco - Managing the IT transformation
Bill Haser, Vice President & CIO at Tenneco - Managing the IT transformation
 
My vision on BPM - Olivier Rikken
My vision on BPM - Olivier RikkenMy vision on BPM - Olivier Rikken
My vision on BPM - Olivier Rikken
 
Bpm The promise
Bpm The promiseBpm The promise
Bpm The promise
 
BPM - Insights, Practices and Emerging Themes; Melbourne 2010
BPM - Insights, Practices and Emerging Themes; Melbourne 2010BPM - Insights, Practices and Emerging Themes; Melbourne 2010
BPM - Insights, Practices and Emerging Themes; Melbourne 2010
 
BPM - Insights, Practices and Emerging Themes; Adelaide 2010
BPM - Insights, Practices and Emerging Themes; Adelaide 2010BPM - Insights, Practices and Emerging Themes; Adelaide 2010
BPM - Insights, Practices and Emerging Themes; Adelaide 2010
 
Introduction to Business Process Management
Introduction to Business Process ManagementIntroduction to Business Process Management
Introduction to Business Process Management
 
Introduction to business process management
Introduction to business process managementIntroduction to business process management
Introduction to business process management
 

Plus de Corvinno Technology Transfer Center Nonprofit Public Ltd.

Plus de Corvinno Technology Transfer Center Nonprofit Public Ltd. (20)

Iadis presentation
Iadis presentationIadis presentation
Iadis presentation
 
Ac erzekelohiba
Ac erzekelohibaAc erzekelohiba
Ac erzekelohiba
 
Ch21
Ch21Ch21
Ch21
 
Ch05
Ch05Ch05
Ch05
 
Ac inverter
Ac inverterAc inverter
Ac inverter
 
Ac hibajavitas
Ac hibajavitasAc hibajavitas
Ac hibajavitas
 
mLearning research at Corvinus University of Budapest
mLearning research at Corvinus University of BudapestmLearning research at Corvinus University of Budapest
mLearning research at Corvinus University of Budapest
 
Steps towards on Ontology based Learning Environment
Steps towards on Ontology based Learning EnvironmentSteps towards on Ontology based Learning Environment
Steps towards on Ontology based Learning Environment
 
Ontology Based Content Management in a Mobilized LearningEnvironment
Ontology Based Content Management in a Mobilized LearningEnvironmentOntology Based Content Management in a Mobilized LearningEnvironment
Ontology Based Content Management in a Mobilized LearningEnvironment
 
Mobile Learning in Higher Education: The Corvinus case
Mobile Learning in Higher Education: The Corvinus caseMobile Learning in Higher Education: The Corvinus case
Mobile Learning in Higher Education: The Corvinus case
 
HR meets eLearning: An Ontology based, adaptive selection and recruitment pr...
HR meets eLearning: An Ontology based, adaptive selection and  recruitment pr...HR meets eLearning: An Ontology based, adaptive selection and  recruitment pr...
HR meets eLearning: An Ontology based, adaptive selection and recruitment pr...
 
Flexilab: eLearning projekt eredmények hasznosítása nyílt innováció keretében
Flexilab: eLearning projekt eredmények hasznosítása nyílt innováció keretébenFlexilab: eLearning projekt eredmények hasznosítása nyílt innováció keretében
Flexilab: eLearning projekt eredmények hasznosítása nyílt innováció keretében
 
Mobile Learning@ the Corvinus University of Budapest
Mobile Learning@ the Corvinus University of BudapestMobile Learning@ the Corvinus University of Budapest
Mobile Learning@ the Corvinus University of Budapest
 
Ontology Driven E-Learning Environment
Ontology Driven E-Learning EnvironmentOntology Driven E-Learning Environment
Ontology Driven E-Learning Environment
 
ICT for Governance
 ICT for Governance ICT for Governance
ICT for Governance
 
Concept of complex quality management in the HEI strategy
Concept of complex quality management in the HEI strategyConcept of complex quality management in the HEI strategy
Concept of complex quality management in the HEI strategy
 
ICT for Governance and Policy Modelling
ICT for Governance and Policy Modelling ICT for Governance and Policy Modelling
ICT for Governance and Policy Modelling
 
Ontológia- és kompetencia alapú tanulás
Ontológia- és kompetencia alapú tanulásOntológia- és kompetencia alapú tanulás
Ontológia- és kompetencia alapú tanulás
 
LivingLabs and the Danube Region
LivingLabs and the Danube RegionLivingLabs and the Danube Region
LivingLabs and the Danube Region
 
Knowledge based institutional capacity building in the Hungarian Higher Educa...
Knowledge based institutional capacity building in the Hungarian Higher Educa...Knowledge based institutional capacity building in the Hungarian Higher Educa...
Knowledge based institutional capacity building in the Hungarian Higher Educa...
 

Semantic Technologies in Business Process Management

  • 1. Semantic Technologies in Business Process Management Gábor, András* – Szabó, Zoltán** *Corvinno Technology Transfer Center Ltd, **Corvinus University of Budapest 5th International Conference on Integrated Systems: Design and Technologies 12-15 May 2012, Mallorca, Spain
  • 2. Introduction • Organisations today try to survive in turbulent economic environment. – Complexity, process orientation and process thinking – Increasing competition, globalisation, deregulation and – operational challenges: shorter product life-cycles, personalised customer needs – Reengineering was one of the first options to answer these challenges. • Reengineering vs.Business Process Management (BPM) – knowledge-intensive activities. – Knowledge can be barrier in the implementation and long-term sustainability of process management. – Knowledge management is a major facilitator of BPM initiatives. • BPM provides several benefits – strategy-driven, transparent, traceable, flexible and responsive organization – Improving the alignment between the business and IT. – BPM focal points: cost, quality and time – the magic triangle of BPR. • Semantic technologies – overall success and coverage of the Internet, – demand for added value IT services. – e-Commerce, e-government also brought closer the users’ community with the technology – while technology is always smart, the usability depends on the positioning of the business process, task allocation, responsibilities – advanced technology and advanced business process modelling go hand-in-hand. • What the connections are between process modelling and semantic technologies?
  • 4. Reengineering and Knowledge • BPR critical analysis and radical redesign of existing business processes to achieve breakthrough improvements in performance measures. • BPR know-how development : redesign must penetrate the company’s core organisational elements: – roles and responsibilities, measurements and incentives, organisational structure, information technology, shared values and skills – change management is critical part of BPR. • Process management is key success factor – Speed – exhaustive description of the processes, and the definition of the underlying and interrelating connections. • BPM Life cycle – Business process strategy – Process documentation – Process analysis and design – Implementation and change management – Process operation – Process controlling/monitoring • Recursive relationship between IT and BPM • BPM technologies : business process description/modelling and automation, – workflow, groupware, BAM applications. – wide range of technologies focusing on the knowledge aspect – process mining, business rule mining, enterprise content management, semantic technologies.
  • 5. Process Business controlling/ process monitoring strategy Process Semantic Process operation technologies documentation in BPM Implementatio Process n and change analysis and management design
  • 6. Knowledge Management Challenges in BPM • BPM : activities, input-output, organizational context, decision points, competencies, and infrastructural requirements • Necessary but not sufficient : harmonization of competencies, responsibilities, information flow and organization, • Optimization of process-structure along the conditions, – the specification of up-to-date and innovative info-communication technologies – savings will be realized on the expenditure side, and other non-pecunier objectives will be achieved • Management of information and knowledge move toward the efficient management of changes in the information and knowledge. • Existing approaches are inadequate for processes – highly dynamic and volatile processes, – steps cannot be planned in advance, and – unanticipated “knowledge needs” frequently arise. – fast adaptation of individuals and organization is a must • BPM knowledge management challenges – Knowledge discovery and codification – Knowledge transfer – Knowledge sharing – Knowledge utilization – Knowledge renewal • Semantic technologies as facilitators of transforming process models to executable applications.
  • 7. Knowledge renewal Knowledge discovery & codification Process Business controlling/ process monitoring strategy Knowledge Process Semantic Process utilization operation technologies documentation in BPM Implementatio Process n and change analysis and management design Knowledge transfer Knowledge sharing
  • 8. Business Process Modelling • BPM has four basic pillars: – modelling activities – Modelling information flow – Organisational view – BPM output and outcome. • Most frequent utilisation of BPM is the regulation – optimization of processes, – radical simplification of the process connectivity, – simplification of decision, – reporting routes, cutting through the useless iterations. – information systems requirement specification • Outcomes of the BPM which are hardly investigated: – how to use BPM for intra- and inter-organisational knowledge transfer and – how to make use of matching the activity related and job role related competences. – Opens the road to knowledge management – looking for semantic solutions.
  • 9. Semantic Business Process Management • BPR and BPM is traditional tools that transforms business requirements to system specification. • BPM: integration of Business and IT architecture, – systematically aligning organization structure, process and technology. – the conceptual model facilitates the exploration, documentation, and validation of requirements. – due to implicit semantics has limitations in the automation of further processing – BPM is challenged to transform the traditional solution into development lifecycle, meaning – description, automation, monitoring and improvement as a part of continuous innovation. • Business process design based software development. – The main challenge is the continuous and seamless translation between the business requirements view and the IT systems and resources. – Semantic Business Process Management (SBPM) is a new approach, that can increase the level of automation in the translation between these two domains. – The two levels can be represented using ontology languages and automated translation.
  • 10. SBPM: the “missing link” is the ontology • Due to the organic development of business processes and IT solutions, there is a significant gap between them. Narrow the gap, if – technically executable processes, workflows were deducted from business process structures and a standardized repository of business – automatic generation of workflow systems - based on BPM defined ontologies. – The extended use of BPEL as modelling language, – the BPMN as modelling notion • The enterprise architecture, the enterprise architect understands importance of the application of the seamless modelling methodology. • The “missing link” is the ontology, – knowledge representation helps the architect to map business processes against the information processing technology. – The models are exported and annotated into ontology, and – the ontology already gives ample munitions to behave as input to the workflow modelling. – This is how the loop is closed. • There are big expectations, because the exisiting methods – are not sensitive enough to cope with every kind of business processes, – standardization, interoperability, or – ASP solutions may mean constraints.
  • 11. Knowledge Transfer in BPM • The knowledge management and BPM not always meet. • Knowledge management has – human resource management view, – artificial intelligence view (how to solve a problem?) and – organisational, systems development (what is the problem solution?) view • Organisational view: – the proper management of the intellectual capital, – saving the intellectual asset of an organisation. • Process modelling cannot be complete without the exact definition of the activities related competencies - the knowledge management option is there. – The articulation of the organisational knowledge, and – the representation of the related knowledge – makes the knowledge transfer relatively easy, however – the maintenance of the articulated and represented knowledge still a delicate issue.
  • 12. Competence Matching as Knowledge Transfer • Competences are distingushed according to the source an d purpose – Starting from the from the process view, the source is the activity and they are associated with the role, – From HRM point of view the source is the employee and they are associated with the position • From HRM point of view the difference: – recruitment/selections is done to fill an open position – one position might contain more roles • Matching is a must, because the differences shows how adequate are the job role definitions (right people on the right places doing the right,…). – The discrepancies are direct indications of in-house or other, formal, informal, non-formal training needs. – The job role requirements hardly can be understood or interpreted without the process context, and BPM provides this context. • Competence as a term is often used in the sense of a meta-concept. – the instance of the competence is the piece of concrete knowledge – a procedure, rule, etc. – the abstraction enables the users to compare two structures, e.g two ontologies – it is already a matter of properly chosen algorithm
  • 13. Project Game as Proof of Evidence • During the last two decades several applications developed by our team in national and EU projects. • Project game: the projects are different and they depend on the ideas, underlying objectives of the funding agencies • Long term a strategy to build up the “big picture” piece by piece. • This “lego” type research strategy resulted the cases to be introduced next.
  • 14. • Optimization • Semi-automated • Roles and responsibiities implementation: • Define structure for KBS BPMN/BPEL/SOA • Support training: • Competence-based HR development Implemen- Process tation & Modelling & Design Change Management Process Controll & Operations Monitoring • Evaluation and check of • HR development: competence consistency matching • Enable process adaptiveness • Tratining focused on roles & responsibilities:e-learning and adaptive testing • Flexible adaption of knowledge base
  • 15. Next… BPM Knowledge extraction Knowledge transfer Text /Process mining Ontology Domain building Ontology Content Content Application repository development development
  • 16. Next… BPM Knowledge extraction Knowledge transfer Text /Process RACI mining Ontology Ontology Domain Process implementation Ontology modell building Content Content Content Application delivery repository development development
  • 17. Q&A Dr. Gábor András agabor@corvinno.hu Corvinno Technology Transfer Center H-1093 Budapest, Közraktár utca 12/a. Tel/Fax: 06 1 210 80 62 http://www.corvinno.com
  • 18. STUDIO • STUDIO is an e-learning platform. • The main idea is – to represent the basic concept hierarchy of a given domain in ontology and – build up around the learning content and an engine – which will test the user where are the knowledge gaps, – And based upon the result customizes the learning material. • The main benefits of this approach were twofold, – directly helps the learner to learn according to his/her learning style, pace, in an informal or non-formal learning style. – Indirectly, the system is domain specific, in the corporate environment the construction of the system is equal to knowledge articulation, knowledge elicitation, knowledge transfer. • The evaluation on the basis of the statistics give a very detailed and fine picture about the learners’ activitiy, the learning habits, the relevance of the learning material.
  • 19. E-learning • A part of the reference process model addresses the student mobility questions – mainly aroused from the transition to the Bologna system. • Another project, also under the Structural and Cohesion Fund umbrella in the cooperation of 12 universities tried to find solution. • The problem what the consortium tried to solve how to homogenize the input competencies on master level if the students may come with any kind of bachelor degree. • As a test laboratory, the business informatics master was chosen. Assumed the biggest mobility, the incoming students should have very different knowledge level, while the minimum requirement on the input side was known. • The solution developed to handle the case was the discovery of knowledge gap individually and giving an individually customized learning material to the learner. • The iterative use of the system resulted a sufficient and homogenous knowledge level.
  • 20. HEI Reference Process Modell • Under the Structural and Cohesion Fund umbrella a big, nationwide project were launched in 2004-2007. • The objective of the project was to create the reference process model of the HEI with the contribution of 13 universities (representing 42% of the total number of the students). • The reference model serves two purposes, one is the starting point for the individual institutions to develop their own localised and customized solution, second it is common platform of understanding between the institutions and the ministry to control the feasibility and effect of the planned measures. • The model contains over 400 processes in grouped into 14 main categories. It covers every aspects of university management from strategic planning to the detailed bookkeeping action, from student administration to facility management. • Apart from the professional experiences, the best and little bit surprising experience was the involvement of over 200 academics into process modelling who first understand how the world is working around them different than their strict academic interests. The common platform provided a solid base to the further developments –. • Later high level executive information systems, decision support systems were introduced using data warehouse technology, and several level and solution of business intelligence. • The concept of using reference process model fits to the most advanced enterprise architecture principles (e,g, TOGAF 9), and in 5 cases served directly as information systems requirement specification, Debrecen University used it for SAP implementation.
  • 21. SAKE “Semantic enabled Agile Knowledge-based E-government” • SAKE project gave a unique opportunity to model output and outcome competencies in ontology, to embed it into an agile knowledge intensive groupware and decision support system. • One part of the research project was devoted to the competence matching • The test scenario we tried to follow was offering and looking for systems analysts. • A well designed and customized intelligent groupware system can manage very well if there is an output from the competence matching. • In combination with other techniques the time horizon gaps can be bridged over: the gap is between the demand is in the present, the output is in 3 or 5 years. • The SAKE system could provide good environment to integrate other forecasting methods with economic growth assumptions, forecast of investment climate, etc.
  • 22. „Wall-to-wall” design with SOA • 3A layer architecture, the introduction of the SOA architecture opened a new horizon. • The business and IT looked for jointly the “wall-to-wall” design, – starting the design procedure from high level, what – the business line can understand (and they also deliver the business logic) – to the automatic code generation. • Several trials had been conducted with – Process modelling with ARIS and ADONIS to connect process model with ERP systems. – The trials through Webshpere was supported by IBM, – Microsoft and SAP products were tested from the connectivity point of view. • The results of these tests proved the strength of the connectivity, it verified and validated the priority of the BPM modelling.
  • 23. Empowering Business Ecosystems of Small Service Enterprises to face the economic crisis • BPM challenge : continuous translation between the business requirements and the IT systems and resources. – SBPM : using ontology languages and employ automated translation. – Business processes perform within the dynamic organizational environments. – Conceptual modeling captures the semantics of an application through the use of a formal notation, but the descriptions are intended to be used by humans – The semantics contained in these models are especially implicit and cannot be processed. • With semantic schema the creation and the use of the conceptual models can be improved, the implicit semantics having been contained in the models can be – partly - articulated and used for further processing. • eBest solution starts from the high level process model and through an ontology interpretation and the workflow is automatically generated. – The real benefit of the solution is not the first application but it can be “cashed” after the first modification. – workflow management and business process management is very often mixed up. – The end result is a work flow system, but since it is generated from a business process model, no contradiction at all.
  • 24. Ontology based competency matching • The comparison of output and outcome competences having earned in the education with the job role competences stayed longer in the focus of the research interests. • In the OntoHR project the problem was analysed and tried to be solved from Human Resource Management point of view. • Typical HR consulting firm: recruitment, selection and executive search • Pre-selection has been proved to be the proper scope. • Comparison between competence based job role requirements, and the individually have competencies became a crucial point. • The job seekers’ competencies defined by the knowledge gap discovery, the solution is now marketed under the brand name of STUDIO. • The comparison between the demand and supply is paired with the investigation of the mental ability of the job seekers. It gives more clues to conclude with the pre-selection.