SlideShare a Scribd company logo
1 of 321
Copyright 2014 © DWI
Automotive Quality Management System
ISO/TS 16949:2009
THE
EXECUTIVE
BRIEFING
Copyright 2014 © DWI
WHAT WE WILL
PRESENT TO YOU?
Mengenal secara
garis besar
sistem manajemen mutu untuk
industri otomotif
dan rantai suplainya :
ISO/TS 16949:2009
Latar belakang, proses sertifikasi
serta persyaratan,
serta pengembangannya”
Copyright 2014© DWI
Copyright 2014 © DWI
Enjoy The showEnjoy The show
Tighten the seat belt, pleaseTighten the seat belt, please
Copyright 2014 © DWI
TENTANG INDUSTRI OTOMOTIF
About Automotive Industry worldwideAbout Automotive Industry worldwide
Copyright 2014© DWI
TOTAL REVENUE
TAHUN 2010 :
US$ 1,184.6
BILLIONS
TOTAL REVENUE
TAHUN 2015 :
US$ 1,563.7
BILLIONS
WITH CAGR :
6.9%
FOR 2010-2015
Copyright 2014© DWI
IF ALL OEM AND
THEIR SUPPPLY CHAIN
UNITED AND
DEVELOPED
COUNTRY –
IT COULD BE :
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014 © DWI
Key Regional Markets—BRI, MISTA (N5) and the Stan and Jan After the BRI
and MISTA economies, OEMs will focus on the Stan and Jan countries which
are considered the next frontier.
2.3%
4.9%
6.4%
16.1%
8.1%
10.2%
0.9%
4.1%
9.1%
3.9%
7.8%
2.3%
5.1%
11.8%
India
Brazil
Russia
Indonesia
S.Korea
Thailand
Mexico
Turkey
Argentina
Poland
Ukraine
Kazakhstan
Czech…
Slovakia
Brazil
India
Russia
S.Korea
Thailand
Indonesia
Mexico
Argentina
Turkey
Poland
Ukraine
Czech…
Kazakhstan
Slovakia
1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Note: All figures are rounded; the base year is 2013. Sources: LMC Automotive, Frost & Sullivan.
Light Vehicle Sales, BRI, MISTA, Stan and Jan, 2013 and 2020
3,573K
2,927K
2,762K
1,504K
1,278K
1,094K
1,067K
893K
834K
330K
229K
176K
159K
70K
7,225K
5,003K
3,604K
1,846K
1,604K
1,508K
1,403K
1,147K
1,051K
601K
501K
315K
269K
119K
Ranking
CAGR
‘13-’20
Copyright 2014© DWI
Copyright 2013 © DWI
The Outlook
INDONESIAINDONESIA
AUTOMOTIVEAUTOMOTIVE
INDUSTRYINDUSTRY
Copyright 2014© DWI
2010 • Manufacture of engine, transmission for MPV and Light
Commercial Truck.
• Supplier of component for MPV and Light Commercial Truck.
• MPV, Light Commercial Truck.
• 80% design of motor cycle.
• Manufacture of engine, transmission for Commercial Truck up to 24 ton, SUV and small economical
sedan .
• Supplier of component for Commercial Truck up to 24 ton, SUV and small size sedan.
•MPV, Commercial Truck s/d 24 ton, SUV and small
economical sedan.
• 80% design of 4W motor vehicle for MPV and Light
commercial truck.
• MPV, SUV, Small economical sedan,
Commercial truck > 24 ton, Medium
size sedan, Hybrid car.
• 80% design of 4W motor vehicle for sedan and SUV.
• Hybrid engine, ECU integration system.
• Commercial truck component > 24 ton, Medium size sedan, Hybrid car.
• MPV, SUV, Small economical sedan, Commercial truck > 24 ton,
Medium size sedan, Hybrid car and Luxury car.
• 80% design of 4W motor vehicle for medium size sedan.
• Manufacture of luxury car quality component.
• Supplier of luxury car quality component.
2025
2015
2020
Area of Cooperation :
1. Green Car Industry
2. Base Production for certain Model of Vehicle
Indonesia Automotive Industry Long Term Master Plan
sumber : KEBIJAKAN DAN STRATEGI PEMBANGUNAN INDUSTRI NASIONAL DALAM RANGKA
MENINGKATKAN DAYA SAING – MENTERI INDUSTRI – AGUSTUS 2011
Copyright 2014© DWI
The
players
Copyright 2014© DWI
OEM Platform
Etios /EFC 74,000 (started in Dec
2011)
66,000 (started in march 2013)
Small Low 108,000
(hatch/sedan)
Also Produced in India 120,000 (with Daihatsu : wait the
regulation only in year 2013)
Small Low 120,000 (with Toyota: wait the
regulation only in year 2013)
Brio/GSP 71,000 (Sept
2011)
73,000 (Sept 2011) 17,000 (SOP : Feb 2014)
Brio Satya
Mirage 148,000 (Jan
2012)
Swift 48,000 (Mar 2012) 164,000 (Aug 2011) 48,000 (Mar 2012)
Global small 72,000
(SOP : Jul 2013)
75,000 (sedan)
(SOP : Jan 2014)
24,000
(SOP : Jul 2013)
March/Micra
– A Platform
107,000
(Jan 2010 )
126,000
(Sept 2011)
19,000 (Sept 2010)
K2- datsun Go+ : 24,000 (SOP
2014)
Ke/B2-
Platform
16,000
(Jul-2014)
154,000
(Jan-2014)
Geographic Breadth
Low Cost Subcompact/Mini Cars –Launch of
common models
Copyright 2014© DWI
Copyright 2014© DWI
DOMESTIC AUTO
PRODUCTION
By Category : 2006 -2013
Source : Indonesia Automotive Industry: Report on 2013 Auto
Market – by Gaikindo : APEC 20th Automotive Dialogue Beijing, China 22-25 April 2014
2014 :
1,298,523 units
Increment : 8 %
Copyright 2014© DWI
DOMESTIC AUTO MARKET &
EXIM
By Category : 2006 -2013
Source : Indonesia Automotive Industry: Report on 2013 Auto
Market – by Gaikindo : APEC 20th Automotive Dialogue Beijing, China 22-25 April 2014
2014 :
1,208,019 units
REDUCE : 2 %
Copyright 2014© DWI
DOMESTIC MARKET AND
PRODUCTION
2013
Source : Indonesia Automotive Industry: Report on 2013 Auto
Market – by Gaikindo : APEC 20th Automotive Dialogue Beijing, China
22-25 April 2014
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
ASEAN Automotive Investment
Copyright 2014© DWI
DOMESTIC MARKET &
FORECAST
2013-2016
Source : Indonesia Automotive Industry: Report on 2013 Auto
Market – by Gaikindo : APEC 20th Automotive Dialogue Beijing, China 22-25 April 2014
Copyright 2014 © DWI
GREAT LEAP OF NEXT DECADEGREAT LEAP OF NEXT DECADE
ASEAN AUTOMOTIVE INDUSTRYASEAN AUTOMOTIVE INDUSTRY
OUTLOOKOUTLOOK
Copyright 2014© DWI
POTENSI ASEAN
DI INDUSTRI OTOMOTIF
“Great Leap of Next Decade”
for ASEAN Automotive Industry
Copyright 2014© DWI
Copyright 2014© DWI
Updated for year 2014
capacity installed : 1,998,131
Copyright 2014© DWI
Copyright 2014© DWI
“Great Leap of Next Decade”
for ASEAN Automotive Industry
Growth
Factors of
ASEAN
Market
Growth
Factors of
ASEAN
Market
Source: Automotive Summit ( TAPMA) as of June 20, 2013
Strong Cluster &
Supply Chain
Structure
Parts manufacturers (450,000 workers)
Supporting industries (100,000 workers)
SUPPORTING INDUSTRY
(Machinery, Equipment & Devices, Mold& Die, Jig & Fixture)
SERVICE
INDUSTRY
-Distribution
(W/H)
-Finance
-Testing
-Consulting
-Logistics
-Banking/
Leasing
SERVICE
INDUSTRY
-Distribution
(W/H)
-Finance
-Testing
-Consulting
-Logistics
-Banking/
Leasing
UPSTREAM INDUSTRY (Steel, Plastics, Rubber, Electronics, Glass,
Textiles, Leather, Chemicals, Oil, Coating, and Galvanized Metal)
POLICY&
SUPPORTING BODY
-Government
-Associations/
Institutes
-Universities/
Technical Colleges
POLICY&
SUPPORTING BODY
-Government
-Associations/
Institutes
-Universities/
Technical Colleges
Strong Network in ASEAN and ASEAN+6
Parts Sourcing for ASEAN+ Dialogue PartnerParts Sourcing for ASEAN+ Dialogue Partner
Source: ASEAN Automotive Federation(Automotive Summit 2013) as of June 24, 2013
Copyright 2014© DWI
ASEAN Automotive Industry Master Plan
FUTURE AUTOMOTIVE INDUSTRYFUTURE AUTOMOTIVE INDUSTRY
Copyright 2014© DWI
Copyright 2014 © DWI
CONSOLIDATION, THY NAME IS
THE GLOBAL AUTOMOTIVE INDUSTRY
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014 © DWI
Key 2014 Powertrain Market Trends Global emissions norms (Euro 6/7,
EPA, 2020 ACEA) and fuel economy standards (CAFE, CAFC)
constantly encouraging OEMs and the automotive value chain to
innovate and adopt varying global powertrain strategies
Turbo Engine
Downsizing
Alternative
Fuels
Powertrain
Modularity and
Lightweighting
High Speed
Transmissions
Dual Clutch
Transmissions
Powertrain
Electrification
Emission
reduction & Fuel
Efficient ICE
technologies
2- and 3-cylinder engines,
Reduced engine displacement,
Downspeeding
High speed DCT, 8/9/10-Speed
Aluminium, Modular
construction, parts
commonality
Wet and Dry clutch DCT PHEVs, Diesel hybrids,
transmission electrification,
EVs, Range Extenders
Ethanol, LPG, CNG, Hydrogen
Fuel Cell, gas plants
DI, VVT, SCR, EGR, LNT,
Start-Stop, Cylinder
Deactivation, GPF
Drivers: Euro6, ACEA,EPA,
CAFE
Fuels,
Lubricants and
Engine Oils
Low Viscous Oils – 0W
Low-SAPS
Enhanced Additives
Copyright 2014 © DWI
Copyright 2014© DWI
GLOBAL QUALITYGLOBAL QUALITY
FOR GLOBAL PROBLEM :FOR GLOBAL PROBLEM :
COULD BECOULD BE
ANYWHERE,ANYWHERE,
ANYPLACE,ANYPLACE,
ANYHOWANYHOW
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014 © DWI
The Automotive Supply Base
has changed dramatically
• Suppliers have responded to global competition and significant economic
challenges : Setiap pemasok harus siap menghadapi persaingan global dan perubahan
kondisi ekonomi sewaktu-waktu
• The global footprint reflects the dynamic changes : Secara global
perubahan terjadi secara dinamis
Copyright 2014 © DWI
ISO/TS 16949:2009
Automotive Quality Management System
Copyright 2013 © DWI
1994-19991994-1999 2000-20022000-2002 2008-20092008-2009
The Development of ISO/TS 16949:2009
Dipersiapkan oleh International Automotive Task Force (IATF) +
Japan Automobile Manufacturers Assoc. (JAMA)
2015?2015?
SMMT ANFIAFIEVIAOB VDA
NEW TS
Rule 4th
.,
Edition
1.4.20141.4.2014
Copyright 2014© DWI
IATF today –
refer to new TS rule 4th
., edition
Copyright 2014 © DWI
StrengtheningStrengthening
The value andThe value and
Credibility of TS 16949Credibility of TS 16949
“Raising the Bar”“Raising the Bar”
Dari produk yang dikirimkan ke
OEM serta pelaksanaan dari
sertifikasi ISO/TS
Dipertanyakan efektifitasDipertanyakan efektifitas
dari sistem sertifikasidari sistem sertifikasi
ISO/TS 16949ISO/TS 16949: Untuk bisa
diandalkan sebagai jaminan
kualiatas mata rantai suplai
industri otomotif
Copyright 2014© DWI
The IATF established five Oversight
offices, commonly referred to as
IATF Global Oversight, to implement
and manage its ISO/TS 16949
Certification Scheme.
IATF today –
refer to new TS rule 4th
., edition – 1.10.2013 is :
Copyright 2014© DWI
World distribution of ISO/TS 16949 certificates in 2013
Evolution of ISO/TS 16949
certificates in Indonesia
Copyright 2014© DWI
Copyright 2014© DWI
Tata cara sertifikasi
Harus dipatuhi oleh semua
yang terkait dalam sertifikasi
Bisa menjadi alasan memberikan temuan
(minor/major) dan membatalkan sertifikat
yang diberikan
Rules for achieving and maintaining
IATF recognition –
4th Edition for ISO/TS 16949
Copyright 2014© DWI
Customer specific requirements
Review, learnt and implemented
• Tanda penting pada gambar produk
• Persyaratan mutu dalam quality manual
untuk pemasok.
• Kebijakan pelanggan : just in time
delivery
• Hazardous material control
• Green Procurements
• Peraturan dan perundang-undangan
Market Drivers – OEM requirements
OEM ISO/TS 16949:2009 or ? Customer Specific Requirements
Audi/Volkswagen ISO/TS 16949:2009 or VDA 6 [ Quality Cap. Suppliers 4th
Ed ]
BMW Contact customer [ Supplied Parts Quality Mgmt ]
Mercedez Benz ISO/TS 16949:2009 [ Daimler Customer specific Requirements for use with ISO/TS
16949: 2009 ]
Chrysler ISO/TS 16949:2009 [ Chrysler Customer specific Requirements for use with ISO/TS
16949: 2009 ]
Ford Motor Co. ISO/TS 16949:2009 (QS 9000 / Q1) [ Ford Customer specific Requirements for use with ISO/TS 16949:
2009 ]
General Motors ISO/TS 16949:2009 [ GM Customer specific Requirements for use with ISO/TS 16949:
2009 ]
Honda Contact customer – some case request
ISO/TS 16949:2009
[ Honda Supplier Quality Manual ]
Isuzu Contact customer [ Supplier Quality Manual ]
Mazda Contact customer (Ford affiliate) Contact customer
Mitsubishi Contact customer (Mitsubishi Fuso
belong to Mercedez)
[ SMITQA-003 ]
Nissan Contact customer [ Supplier Quality Manual / Alliance Supplier Guide ]
PSA Peugeot-Citroën ISO/TS 16949:2002 Contact customer
Renault ISO/TS 16949:2002 Contact customer
Rover Contact customer [ RG2000 Supplier Management System ]
Saab Contact customer Contact customer
Subaru Contact customer [ Subaru Supplier Manual ]
Toyota Contact customer [ Supplier Quality Assurance Manual ]
Copyright 2014© DWI
The Customer Representative
Ditetapkan sebagai perwakilan pelanggan di perusahaan
• Memastikan semua syarat pelanggan
diterapkan
• Memastikan pelatihan apa saja yang
dibutuhkan untuk implementasi syarat
pelanggan
• Memastikan target perusahaan bersesuaian
dengan target pelanggan
• Memastikan tindakan terhadap keluhan
pelanggan yang terjadi
• Memastikan persiapan produksi dari produk
baru yang dikerjakan
Copyright 2014 © DWI
SKEMA SERTIFIKASI
ISO/TS 16949:2009
Copyright 2014© DWI
Taken from :
IATF Auditor Guide for ISO/TS 16949 First Edition April 2009
All rights reserved © 2009 ANFIA, © 2009 IATF France, © 2009 IAOB, © 2009 SMMT, © 2009 VDA.
Copyright 2014© DWI
Taken from :
IATF Auditor Guide for ISO/TS 16949 First Edition April 2009
All rights reserved © 2009 ANFIA, © 2009 IATF France, © 2009 IAOB, © 2009 SMMT, © 2009 VDA.
Copyright 2014 © DWI
EGIBILITY FOR TS
CERTIFICATION
“ISO/TS 16949 defines the quality management system
requirements for a client providing design and development,
production and, when relevant, assembly, installation, and
services of automotive-related products.”
• Pabrikan
• Pelayanan/services : Welding, Coating,
Painting, Heat treatment.
Copyright 2014 © DWI
"Automotive" shall be understood to include the following:
Passenger Cars, Light Commercial Vehicles, Heavy Trucks,
Buses, Motorcycles, and to exclude the following: Industrial,
Agricultural, Off-Highway (Mining, Forestry, Construction,
etc.). Aftermarket parts are excluded.
“Aftermarket parts” shall be understood as replacement
parts not procured or released by the OEM for service part
applications that may or may not be produced to original
equipment specifications. Sites manufacturing only aftermarket
parts are not eligible for ISO/TS 16949 certification.
Copyright 2014 © DWI
Strengthening The value and
Credibility of TS 16949
“Raising the Bar”
Two expected outcomes:
1. Supply Base
performance and TS
Certification are
aligned
2. Eliminate the
perception that
“Everyone gets a
Certificate”
Copyright 2014 © DWI
Pelanggan OEM harus memiliki
keyakinan bahwa TS kegiatan sertifikasi
16949 TS 16949 memenuhi kriteria untuk
membuat keputusan sourcing yang
mengurangi risiko yang berhubungan
dengan kemampuan sistem manajemen
mutu dan kinerja aktual dari produk
yang dikirimkan ke pelanggan (OEM
atau TIER)
• Confidence
• Reduces Risk
• Capable QMS System
• Meets Criteria
• Actual Performance
Strengthening The value and Credibility of TS 16949
“Raising the Bar”
Copyright 2014© DWI
ISO/TS
CERTIFICATION
STAGE 2 AUDIT
Copyright 2014 © DWI
standar internasional dan spesifikasi teknis
yang mengandung persyaratan untuk
membangun dan memelihara sistem
manajemen mutu untuk desain dan
pengembangan, produksi, dan ketika instalasi
dan pelayanan produk mobil terkait yang
relevan.
Spesifikasi teknis adalah semua syarat
pelanggan automotive yang disuplai
Standar international adalah semua syarat
dalam QMS – ISO 9001
SISTEM MANAJEMEN
MUTU OTOMOTIF
ISO/TS 16949
Copyright 2014 © DWI
Sasaran dari
sistem manajemen mutu ISO/TS
Pengembangan sistem Kualitas mendasar yang
menyediakan perbaikan terus-menerus,
menekankan pencegahan cacat dan pengurangan
variasi dan potensi serta timbulnya pemborosan
dalam rantai pasokan.
Copyright 2014 © DWI
AUDITAUDIT
OBJECTIVEOBJECTIVE
The objectives of this audit
were to confirm that the
management system:
•conforms with all the
requirements of
ISO/TS16949:2009
•Confirms with
applicable Customer
Specific Requirements –
Including their
satisfaction level
fulfilled
•of the organisation has
been effectively
implemented
•is capable of achieving the
organisation’s policy
objectives
“The goal of this specification is the development
of a quality management system that provides for;
•continual improvement,
•emphasizing defect prevention and
•the reduction of variation and waste in the
supply chain.”
Copyright 2014© DWI
Continual improvement
of the Quality Management System
Resource
management
Measurement,
analysis and
improvement
Management
responsibility
Product
Shareholders
Shareholders
Satisfaction
Shareholders
Shareholders
Requirements
Input Output
Product
realisation
Model of process-based QMS
Value adding activities
Information flow
Copyright 2014© DWI
Plan-Do-Check-Act cycle &
continual improvement
Act
• How to improve
next time?
Take actions to continually
improve process performance –
effectiveness and efficiency
Plan
• What to do
• How to do it
Establish objectives
necessary to deliver
results in accordance
with customer
requirements
and the organisation's
policies
Check
• Did things happen
according to plan?Monitor and measure
processes and product
against policies, objectives
and requirements
Do
• Do what was
planned
Implement the
processes
Copyright 2014© DWI
Plan-Do-Check-Act cycle
& continual
improvement
Copyright 2014© DWI
Plan-Do-
Check-Act
cycle
&
continual
improvement
Copyright 2014© DWI
Plan-Do-Check-Act cycle &
continual improvement
Copyright 2014© DWI
Typical network of
interrelated or
interacting processes
PDCA
Process A
PDCA
Process B
PDCA
Process C
PDCA
Internal
Customer
Process F
PDCA
Internal
Customer
Process D
PDCA
Process E
PDCA
Customers&stakeholdersCustomers&stakeholders
Customers&Customers&
stakeholdersstakeholders
Copyright 2014© DWI
Copyright 2014© DWI
Kontrol Proses
bukan Kontrol Produk
Copyright 2014© DWI
ISO 9004
Copyright 2014 © DWI
Automotive
Production Process Cycle
Copyright 2014© DWI
Copyright 2014 © DWI
DESIGN PRODUCT
RESPONSIBILITY
• All TS Requirements
shall be addressed in
Quality Mgt System
• Design Responsible
shall be defined by
customer or by
organization
Copyright 2014 © DWI
Outsourcing
Process Management
• Semua proses outsourcing
yang berpengaruh kepada
mutu produk harus
dikendalikan
• Pabrikan Supplier komponen
yang akan digunakan harus
tersertifikasi ISO 9001
• Evaluasi dengan kriteria wajib :
quality, pengiriman, premium
freight case serta kasus klaim
pelanggan yang timbul karena
part yang disuplai
Copyright 2014 © DWI
SERTIFIKASI
• Sertifikasi hanya untuk pabrikan
• Supporting remote site harus ikut dalam sertifikasi – meski demikian
sertifikasi hanya perlu sekali untuk scope supporting yang sama untuk
semua pabrikan yang disupport
Copyright 2014 © DWI
Automotive Process
Approach
Copyright 2014 © DWI
“MACHINE”
To create value
Activities
People
Resources
Information and material flow
Management
Deliverables
Contribution
to results
Customer
Shareholders
Personnel
Society
(strategic and operational
objectives)
Output >> shall be reflected of
customer satisfaction objectives
Internal customer satisfaction
objectives from the
departments/sections
If the process supplies the
right product at the first
time and at the right place
it is EFFECTIVE
If the process supplies the
right product at the first
time and at the right place
it is EFFECTIVE
If the right first time minimum cost
and/or used resources as a planned it
is EFFECIENT
If the right first time minimum cost
and/or used resources as a planned it
is EFFECIENT
MANAGING WITH INDICATORS
Copyright 2014 © DWI
TOP MANAGEMENT ROLES
Copyright 2014 © DWI
ENHANCE THE CUSTOMER
SATISFACTION
ISO/TS 16949:2009 : Top Management Roles
Copyright 2014 © DWI
Copyright 2014© DWI
Those concerned to
ensure the success
and longevity of the
company
Concern to develop,
motivation employment,
health and safety
Delight those whom value
is added and pay
Concerned to profitability,
company development, new
markets and the business
environment respect to statutory
and regulatory; beneficial
relationship
Copyright 2014© DWI
Business Plan and theirBusiness Plan and their
measurable objectivemeasurable objective
deploymentdeployment
Clear definition ofClear definition of
responsibilitiesresponsibilities
Enhance the customerEnhance the customer
satisfactionsatisfaction
Plant Lay out ReviewPlant Lay out Review
Quality Mgt System EffectivenessQuality Mgt System Effectiveness
Business Plan; Strategic
Plan and Their review
Top management involvement
including;
1. Define the business plan
2. Strategic management and their
deployment
3. Implementing a business plan
linked to defined measurable quality
objectives
4. Effectiveness Review
5. Continual Improved
Copyright 2014 © DWI
PERAN MANAJEMEN
Copyright 2014 © DWI
RISK IDENTIFIED, MITIGATED
AND CONTROLLED
Copyright 2014 © DWI
RISK IDENTIFIED, MITIGATED
AND CONTROLLED
Copyright 2014 © DWI
RISK MANAGEMENT THROUGH
FEASIBILITIES
MANUFACTURING STUDY
• Technical Risk
• Process capability Risk
• Capacity Risk
• Timing Risk
• Investment Risk
- and many more risk could be considered
Risk does not mean necessarily to be
avoided - but the risk is recognized from the
beginning to anticipate with appropriate
policies, strategy and effective plan
Copyright 2014 © DWI
RISK MANAGEMENT THROUGH
POTENTIAL FAILURE PROCESS
MAPPING AND PREVENTION
Risk does not mean necessarily to be
avoided - but the risk is recognized from the
beginning to anticipate with appropriate
policies, strategy and effective plan
Potential Failure of design and process that caused :
quality; environmental and safety shall be planned to be reviewed
and prevented for both :
• Internal process
• External process (sub contract process)
Copyright 2014 © DWI
RISK MANAGEMENT THROUGH
Delivery Contingency Plan
Effective plan to ensure delivery performance to customer for
following possible caused :
• Re-Call the product
• Material supplied problem
• Man Power Problem
• Production Facilities breakdown
• Force Major
Copyright 2014 © DWI
Tujuan
Review
Hasil Review
Waktu
Review
Agenda
Review
Copyright 2014 © DWI
Copyright 2014 © DWI
Copyright 2014 © DWI
Copyright 2014 © DWI
Copyright 2014 © DWI
Copyright 2014 © DWI
Tujuan Management Review:
PDCA mechanism cycle
Copyright 2014 © DWI
Management Review Agenda:
Input & Output Review
Copyright 2014 © DWI
Management Review Agenda:
Production process efficiency
Apparent Efficiency vs. True Efficiency
Taiichi Ohno illustrated the common confusion
between apparent efficiency and true efficiency
with an example of 10 people producing 100
units daily. If improvements to the process
boost output to 120 units daily, there is an
apparent 20 percent gain in efficiency. But this
is true only if demand also increases by 20
percent. If demand remains stable at 100 the
only way to increase the efficiency of the
process is to figure out how to produce the
same number of units with less effort and
capital. (Ohno 1988, p. 61.)
Total Efficiency vs. Local Efficiency
Toyota also commonly distinguishes between
total efficiency, involving the performance of an
entire production process or value stream, and
local efficiency, involving the performance of
one point or step within a production process or
value stream. It emphasizes achieving
efficiency in the former over the latter.
Copyright 2014 © DWI
Management Review
Agenda:
1.Potential Quality accident
2.Potential Safety accident
3.Potential Environment
accident
Copyright 2014 © DWI
Management Review Agenda:
Material movement – plant lay out
Copyright 2014 © DWI
Management Review:
Bisa terdiri dari berbagai jenis review dan laporan
Copyright 2014 © DWI
REVIEW TO EVALUATE THE
PRODUCTION EFFICIENCY
Copyright 2014 © DWI
Focus on potential quality, safety,
environment accidents
Copyright 2014 © DWI
Focus on Continual Improvement
and their review :
Copyright 2014 © DWI
Perusahaan/Organisasi memiliki
kemampuan untuk bisa
berkomunikasi sesuai dengan
permintaan/cara pelanggan
Copyright 2014 © DWI
MANAGING WITH INDICATORS
Copyright 2014 © DWI
RISK IDENTIFIED, MITIGATED
AND CONTROLLED
Copyright 2014 © DWI
QUALITY MANAGEMENT SYSTEM
PERFORMANCE
MASIH SESUAIKANSISTEMMANAJEMENMUTUUNTUKKONDISI
PERUSAHAANSAAT INIDANKEBUTUHANDIMASAMENDATANG?
Copyright 2014 © DWI
STANDARD
DOCUMENTATION
Copyright 2014 © DWI
7 Mandatory Procedures
Training
Internal Quality Audit
NC product Handling
Corrective Action
Document Control
Quality records Control
Preventive Action
Copyright 2014© DWI
Quality
Manual
Procedures
S O P
Form,
Checksheet,
Record
Company
Association
Chart
Departement
Association
Chart
Plant One
year policy
Quality
Objective
Quality
Objective
Quality
Policy
Departement
Activity Plant
Strategy
Plan
Long term
Business
Plan
Model Klasik
Keterkaitan
Policy Deployment
dengan
Sistem Mutu
Groups/Corporate
Company
Copyright 2014© DWI
FORM/
CHECK
SHEET
Pedoman operasi Sistem Manajemen
Mutu yang ditujukan bagi seluruh level
Penjabaran dari kebijakan dalam
Quality Manual, dalam bentuk
pemberian tanggung jawab dan
wewenang utk melaksanakan suatu
aktivitas.
kebijakan dalam Quality Manual
dibuat Prosedur.
Daftar Prosedur terdapat dalam
Lampiran Quality manual.
Penjelasan yang lebih detail tentang
suatu prosedur
Dalam melaksanakan prosedur atau
SOP, agar aktivitas yang dilakukan
dapat terdokumentasi dan
dipertanggungjawabkan disediakan
form atau checksheet.
QUALITY
MANUAL
PROSEDUR
S O P
ISO/TS 16949
FORM/ CHECK SHEET
S O P
PROSEDUR
QUALITY MANUAL
Model Jaminan Mutu
dalam Produksi,
Pemasangan dan
Pelayanan.
20 Pasal, terdiri dari 19
pokok persyaratan.
DOKUMENTASI
SISTEM MUTU
Copyright 2014© DWI
PENGENDALIAN DOKUMEN
• Menjamin kerahasiaan dokumen untuk kepentingan
bisnis internal dan pelanggan
• Pengendalian dokumen milik pelanggan
Copyright 2014© DWI
PENGENDALIAN DOKUMEN
• Format dokumen sesuai dengan persyaratan
pelanggan -
• Perubahan hanya bisa dilakukan atas persetujuan
pelanggan
Copyright 2014© DWI
PENGENDALIAN DOKUMEN
• Menentukan masa
simpan sesuai
dengan syarat
pelanggan
• Pengendalian
sesuai dengan sifat
dokumen : hard
copy atau elektronik
Copyright 2014© DWI
Penyediaan
Sumber daya
Copyright 2014 © DWI
Sumber daya
adalah
Kemampuan untuk
menghasilkan produk dan
servis seperti yang diminta
pelanggan
– Pra sarana poduksi
– Pra sarana pendukung
– Finansial
– Personel yang handal
– Manajemen support
Copyright 2014 © DWI
Organization
Knowledge
Keahlian
Organisasi
“ Organisasi harus
menetapkan keahlian
apa yang harus dimiliki
agar bisa memberikan
kepuasan kepada
pelanggan “
Copyright 2014 © DWI
Menjamin
kompetensi
personil
Copyright 2014 © DWI
Authority &
responsibility
• Quality Management Representative &
Customer Representative with concern to
– Quality management system maintenance &
development
– Customer requirements
– Managerial capabilities & Authorities
– Quality decision and quality product approval
Copyright 2014 © DWI
Authority & responsibility
• Clear definition of responsibilities including;
– Authority to stop production to correct
quality problems
– Setiap shift harus jelas siapa yang akan menjadi
pengambil keputusan apabila terdapat masalah
produksi/mutu
Copyright 2014 © DWI
Ahli desain produk
Menetapkan keahlian untuk mereka
yang akan melakukan desain
produk
Termasuk internal auditor yang
melakukan audit desain produk
Copyright 2014 © DWI
Ahli desain produk dan/atau proses
Menetapkan keahlian untuk mereka yang akan melakukan desain
proses
Termasuk internal auditor yang
melakukan audit desain proses
Copyright 2014 © DWI
On the job training
Copyright 2014 © DWI
On the job training
• The organization shall
provide on-the-job
training for personnel in
any new or modified job
affecting product quality,
including contract or
agency personnel.
• Karyawan baru mengikuti
standar pelatihan sebelum
melakukan pekerjaan di
jalur produksi – berlaku
untuk pekerja harian
dan/atau pekerja dari
pihak luar
http://www.bls.gov/green/electric_vehicles/image4.jpg
Copyright 2014 © DWI
Memetakan
kebutuhan
pelatihan
Merencanakan
pelatihan berdasarkan
kebutuhan untuk
membangun keahlian
dari organisasi untuk
memuaskan
pelanggan
Training Needs Analysis
Copyright 2014 © DWI
Training
Needs
Analysis
Copyright 2014 © DWI
Training Needs Analysis
Copyright 2014 © DWI
Setiap karyawan mengerti perannya untuk
mencapai target perusahaan
Pemberdayaan dan peningkatan
motivasi karyawan
Copyright 2014 © DWI
“ organisasi harus
memiliki program untuk
memberdayakan
karyawan serta
meningkatkan
motivasinya
Serta memiliki cara
bagaimana mengukur
keberhasilan program
tersebut“
Pemberdayaan dan peningkatan
motivasi karyawan
Copyright 2014 © DWI
Training is also part of improvement
Copyright 2014 © DWI
Effectiveness
evaluation of
Training
“ pelatihan adalah cara
organisasi
meningkatkan
kemampuannya untuk
menjamin kepuasan
pelanggan“
Training is also part of improvement
Copyright 2014 © DWI
Focus on Continual Improvement
and their review
Copyright 2014 © DWI
DESAIN PRODUK
Copyright 2014 © DWI
Copyright 2014 © DWI
Automotive Development
Process Cycle
Copyright 2014 © DWI
Product Design
Shall Controlled
• Bisa diabaikan
hanya jika dilakukan
oleh pelanggan.
• Design site bisa
menunjang lebih
dari 1 pabrikan –
dan hanya perlu
diaudit 1 kali dalam
proses sertifikasi
• Bisa dikerjakan oleh
pihak ke-3. tetapi
tetap harus
diaudit/termasuk
dalam sertifikasi
Copyright 2014 © DWI
Product
Design
Shall
Controlled
• Design Tooling bukan desain
produk
• Membuat sample bukan
berarti membuat prototype
Copyright 2014© DWI
PERSIAPAN
PRODUKSI MASSAL
Copyright 2014© DWI
PERSIAPAN
PRODUKSI
MASSAL
• Project Manajemen dengan multy
disiplin team/bagian/departemen
• Setiap OEM memiliki model
manajemen proyek yang unik/berbeda
satu-sama lain
• APQP : GM; Ford; Mercedez
• ANPQP : Nissan, Renault
Copyright 2014© DWI
PERSIAPAN
PRODUKSI
MASSAL
• Memiliki pola yang sama untuk
semua OEM/ATPM :
• Masukan/inputan persiapan
produksi
• Target
• Jadwal
• Standard dokumen
• Audit persiapan
• Pembuatan tooling dan pra
sarana produksi
• Pelatihan
• Pengendalian perubahan
• Pengujian
• Evaluasi kemampuan proses
dan stabilitas proses
• Sample untuk pengesahan
• Verifikasi dan Validasi
• Kontrol lot awal produksi
Copyright 2014© DWI
PERSIAPAN
PRODUKSI MASSAL
Copyright 2014© DWI
PERSIAPAN
PRODUKSI MASSAL
Copyright 2014© DWI
PERSIAPAN
PRODUKSI MASSAL
Copyright 2014© DWI
PERSIAPAN
PRODUKSI MASSAL
Copyright 2014© DWI
PERSIAPAN
PRODUKSI MASSAL
Copyright 2014© DWI
PERSIAPAN
PRODUKSI MASSAL
Copyright 2014© DWI
PERSIAPAN
PRODUKSI MASSAL
Copyright 2014© DWI
PERSIAPAN
PRODUKSI MASSAL
Copyright 2014© DWI
PERSIAPAN PRODUKSI MASSAL:
OBEYA : PROJECT MANAGEMENT VISUAL CONTROL
DARI TOYOTA
Copyright 2014© DWI
PERSIAPAN PRODUKSI MASSAL
NISSAN-RENAULT : ANPQP
Copyright 2014 © DWI
Product Quality Planning
since beginning
Copyright 2014 © DWI
PROSES YANG
NYARISNYARIS
SEMPURNA
UNTUK JAMINAN
PRODUK YANG
NYARISNYARIS
SEMPURNA PULA
Copyright 2014 © DWI
APQP’S WAY OF THINKING :
BEST IN-CLASS STRATEGIESBEST IN-CLASS STRATEGIES
Requirements Design Implem-
entation
Unit
Test
Test Release
NUMBER
OF
DEFECTS
DEFECT
PREVENTION
EARLY
DEFECT
DETECTION
(80-90% before Test)
• Reference: “A Software Quality Strategy for Demonstrating Early ROI”, Olson, 1995
Copyright 2014 © DWI
APQP’S WAY OF THINKING :
Early Defect Detection Shortens the Schedule
RESOURCES
$
Without Early Defect Detection
SCHEDULE
• Adapted from Fagan, M. “Advances in Software Inspections”, IEEE
Transactions on Software Engineering, July 1986
Requirements Design Implementation ReleaseTest
With Early Defect Detection
Copyright 2014 © DWI
MENGENDALIKAN PROSES :
MENYIAPKAN PROSES YANG BISA DIPREDIKSIMENYIAPKAN PROSES YANG BISA DIPREDIKSI
HASILNYAHASILNYA
Copyright 2014© DWI
MENGENDALIKAN PROSES :
MENYIAPKAN PROSES YANG BISA DIPREDIKSIMENYIAPKAN PROSES YANG BISA DIPREDIKSI
HASILNYAHASILNYA
Copyright 2014© DWI
MENGENDALIKAN PROSES :
MENYIAPKAN PROSES YANG BISA DIPREDIKSIMENYIAPKAN PROSES YANG BISA DIPREDIKSI
HASILNYAHASILNYA
Copyright 2014 © DWI
• Process capabilities
review and their
maintenance through
implementation Statistic
Process Control
– Internal process
– Supplier production
process
• Quality Product process
through Advanced Product
Quality Planning and Quality
Control
Copyright 2014 © DWI
Special Characteristics
Copyright 2014© DWI
PENGENDALIAN
PERUBAHANPERUBAHAN
PROSES
Copyright 2014© DWI
PENGENDALIAN
PERUBAHAN
PROSES
Setiap perubahan harus dipastikan
terlebih dahulu sebelum produksi
bisa diteruskan.
Perubahan proses bisa diperlukan
harus memberitahukan terlebih
dahulu kepada pelanggan untuk
mendapatkan pengesahan –
sebelum bisa dilakukan – sesuai
dengan persyaratan pelanggan
yang ditetapkan
Copyright 2014© DWI
PENGENDALIAN PERUBAHAN
PROSES
Copyright 2014© DWI
PENGENDALIAN
PERUBAHAN
PROSES
• Respon terhadap
pertanyaan mengenai
perubahan engineering dari
pelanggan harus dibawah
14 hari kerja.
• Pelaksanaan perubahan
engineering sesuai dengan
persyaratan pelanggan
• Perubahan dan
pembaharuan dari standard
harus dilakukan untuk
perubahan engineering yang
dilakukan
Copyright 2014 © DWI
“Improvements in quality always,
and automatically, results in cost
and lead time reduction, increase
productivity, increase market
shares, and hence increase profits.”
MR.W.Edwards Deming
As reference :
ISO 9004:2009
Clause : 8.2.1.1.; 8.2.3.1.; 8.2.4.1.; 8.2.2.
COST OF POOR
QUALITY,
COPQ
Copyright 2014 © DWI
“Improvements in quality always, and automatically, results in cost and lead time
reduction, increase productivity, increase market shares, and hence increase profits.
MR.W.Edwards Deming
COST OF POOR QUALITY
Copyright 2014 © DWI
“Improvements in quality always, and automatically, results in cost and lead time
reduction, increase productivity, increase market shares, and hence increase profits.
MR.W.Edwards Deming
COST OF POOR QUALITY
Copyright 2014 © DWI
“Improvements in quality always, and automatically, results in cost and lead time
reduction, increase productivity, increase market shares, and hence increase profits.
MR.W.Edwards Deming
COST OF POOR QUALITY
Copyright 2014 © DWI
I want my
money
back!
I want my
money
back!
Cost of Quality (COQ)Cost of Quality (COQ)
PreventionPrevention AppraisalAppraisal
Internal
Failure
Internal
Failure
External
Failure
External
Failure
$$
Copyright 2011 © DWI
Examples of Prevention Expense
 Quality Planning
 Training and Education
 Process Definition
 Customer Surveys
 Preproduction Reviews
 Technical Manuals
 Detailed Product
Engineering
 Early Approval of Product
 Specifications
 Purchase Cost Targets
 Process Capability
 Studies
 Preventive Maintenance
 Supplier Qualification
 Job Descriptions
 Housekeeping
 Zero-Defect Program
Copyright 2011 © DWI
 Supplier Certification
 Employee Surveys
 Security Checks
 Safety Checks
 Reviews:
– Operating Expenditures
– Product Costs
– Financial Reports
– Capital Expenditures
Examples of Appraisal Expense
 Test
 Inspection
 Process Controls
 Train QA Personnel
 Product Audits
 Quality Systems Audits
 Customer Satisfaction
 Surveys and Audits
 Prototype Inspection
 Accumulating Cost Data
Copyright 2011 © DWI
 Supplier Problems
– Scrap and rework
– Late deliveries
– Excess inventory
 Equipment Downtime
 Accidents, Injuries
 Absenteeism
 Unused Reports
 Missed Schedule Cost
 Lost Sales (any cause)
Examples of Internal Failure Costs
 Substandard Product
 Scrap or Rework
 Re-inspection
 Redesign/Engineering
Change
 Process Modifications
 Payroll Errors
 All Expediting Costs
 Off-Spec/Waiver
 Abandoned Programs
Copyright 2011 © DWI
Examples of External Failure Costs
 Product Recall
 Handling Complaints
 Customer Service
Caused by Errors
 Products Returned
 Analysis of Returns
 Evaluation of Field Stock
 Late Payments and
Bad Debts
 Lawsuits
 Reports
– Sales and service
– Returns and allowances
– Failure
Lost Sales Because of Customer Dissatisfaction!
Copyright 2014 © DWI
Non-value Added Work
• Common activities that provide no benefit to customers.
– Some result from internal or external failure
– Some are unnecessary inspection
 Examples
– Rarely used information systems
– Memos never read
– Financial reports not used
– Irrelevant procedures
– Meetings with no objectives or outcomes
Definition
Copyright 2014© DWI
NILAI BISANILAI BISA
DIRENCANAKANDIRENCANAKAN DANDAN DIHASILKANDIHASILKAN
TIDAK TIMBUL DENGAN SENDIRINYATIDAK TIMBUL DENGAN SENDIRINYA
Copyright 2013 © DWI
waste
value
HARDER
SMARTER
Working smarter and Working Harder
waste
value
value
More
work
waste
Copyright 2014© DWI
ApaApa
nilai tambahnilai tambah
Dari garis yang dibuatDari garis yang dibuat
tidak lurus?tidak lurus?
http://fijiboardexiles.yuku.com/topic/5345#.Tpz5rJsQj35
Copyright 2014© DWI
http://2.bp.blogspot.com/-O__O9QUFNrA/Tbwm-IXL_XI/AAAAAAAAAAQ/Ib4AGOA-GdE/s1600/IMG0423A.jpg
Boros bisa tidak terasa :Boros bisa tidak terasa :
Panjang antrean : 20 orang, setiap prosesPanjang antrean : 20 orang, setiap proses
butuh waktu 5 menit : maka waktu orang ke-20butuh waktu 5 menit : maka waktu orang ke-20
akan dilayani pada menitakan dilayani pada menit ke : 100ke : 100
BAGAIMANA BILA INI SETIAP HARI ?BAGAIMANA BILA INI SETIAP HARI ?
Copyright 2014© DWI
http://www.google.co.id/imgres?
q=tempat+kerja+berantakan&hl=id&sa=X&gbv=2&biw=1536&bih=801&tbm=is
ch&tbnid=UtfU67zN1dfuJM:&imgrefurl=http://jerman90.multiply.com/journal
%3F%26page_start%3D60&docid=FbWG0i4K5Zp
Boros dianggap biasa :Boros dianggap biasa :
Coba tanya ada apaCoba tanya ada apa
didalam kardus ?didalam kardus ?
Copyright 2014© DWI
AJI MUMPUNG:AJI MUMPUNG:
ADALAH PROSES YANG MENGUTAMAKANADALAH PROSES YANG MENGUTAMAKAN
NILAINILAI KETIMBANG PEMBOROSANKETIMBANG PEMBOROSAN
Copyright 2014 © DWI
The Hidden Organization
“Theoretical Cycle Time: The back-to-back process time
required for a single unit to complete all stages of a task
without waiting, stopping, or setups.”
Product
Step
1
Step
2
Floor SpaceFloor Space Floor SpaceFloor Space
Floor SpaceFloor Space
Value Added
Non-Value Added
Philip R. Thomas, Competitiveness
Through Total Cycle Time. McGraw-
Hill (1990)
The Hidden Factory
Analyze
Fix
Test
Analyze
Fix
Test
Copyright 2014© DWI
COPQ Process & Soft / Employee
Which supplier would you choose?
Supplier A
Price
2,30 USD
Price
2,30 USD
Supplier B
Price
2,45 USD
Price
2,45 USD
Supplier C
Price
1,99 USD
Price
1,99 USD
Copyright 2014© DWI
Cost of Poor Quality
Copyright 2014© DWI
COPQ Product
Example Module Production
ProductProduct
Customer returns (claims)
Inspection cost
Trouble shooting / analysis
Lack of producibility
Scrap
Repair & Rework
Cost for test
INCOMING INSPECTION
SCRAP
ASSEMBLY ASSEMBLY INSPECTIONTEST TEST
TROUBLE SHOOTING
REPAIR / REWORK
SMAAOI AOI INSPECTIONPRINTING
CUSTOMER
RETURNS
INTERNAL
CLAIMS
Copyright 2014 © DWI
TRADITIONAL COST OF POOR
QUALITY(4-5% of Sales)
When quality costs are initially determined, the categories
included are the visible ones as depicted in the iceberg
below.
Waste
Testing Costs
Rework
Customer Returns
Inspection Costs
Rejects
Recalls
Copyright 2014© DWI
Copyright 2014© DWI
Cost of Poor Quality
As an organization gains a broader definition of poor quality,
the hidden portion of the iceberg becomes apparent.
Late Paperwork High CostsPricing or
Billing Errors
Excessive Field
Services Expenses
Incorrectly Completed
Sales OrderLack of Follow-up
on Current Programs
Excessive
Employee Turnover Planning Delays Excess Inventory
Excessive
System CostsOverdue Receivables
Complaint
Handling
Unused Capacity
Time with
Dissatisfied Customer
Excessive Overtime
Waste
Testing Costs
Rework
Customer Returns
Inspection Costs
Rejects
Recalls
Development Cost of Failed Product
Hidden COPQ: The
costs incurred to
deal with these
chronic problems
Premium Freight Costs
Customer Allowances
COPQ ranges
from 15-25%
of Sales
Copyright 2014© DWI
PREMIUM FREIGHT = WASTE COST OF
DELIVERY
Copyright 2014 © DWI
Focus on Continual Improvement
and their review :
• Performance monitoring
(performance dashboard)
• Effectiveness improvement
evaluation
Copyright 2014 © DWI
Focus on Continual Improvement
and their review :
Copyright 2014 © DWI
Copyright 2014© DWI
Copyright 2014© DWI
5. Production
Performance
2. Maintenance
provision
Short term equipment
breakdown analysis
• Preventive
Maintenance
• Repair
• Predictive
maintenance
Long term equipment
breakdown analysis
3. Continual
Improvement
4. Design process
1.
Risk
Management
Maintenance
standard
(maintainability)
KPI
performance
setup
• Key equipments
• Spare parts
Copyright 2014 © DWI
• Clear Information and management of production planning – and
their related achievement control
• Clear problem information, and action planned including their
result and effectiveness evaluation
• Effective communication
Production
Shop Floor
Management
Copyright 2014© DWI
Perencanaan produksi
Perencanaan produksi dilakukan sesuai dengan
permintaan pelanggan – sanggup mengikuti metode
komunikasi dari pelanggan – termasuk untuk
permintaan produksi secara just in time
Copyright 2014© DWI
Shop Floor production management :
Planning and achievement monitoring
Copyright 2014© DWI
Lean Production System Way
of thinking
Copyright 2014© DWI
Lean Production System Way of thinking :
Production Lay out review for added value
creation
Copyright 2014© DWI
Shop Floor production management :
Clean lines & Tidiness
Copyright 2014© DWI
Shop Floor production management :
Clean lines & Tidiness
• Working Instruction
• Parameter setting standard
• Regular Checking standard
• 4M information
Copyright 2014© DWI
Shop Floor production management :
Production set-up
• Ensure all parameter
setting has been
confirmed against the
standard given
• Ensure all the
production equipment
and tools are ready to
be used
• Ensure all material and
component has been
used are confirmed
• Ensure the production
based on the 1st
.,
product result
Copyright 2014© DWI
Identifikasi produk:
Kemampu telusuran produk
• Mampu telusur dari kode produk akhir hingga sub komponen
yang digunakan untuk assembly serta material yang digunakan
untuk produksi part/komponen
• Identifikasi untuk memastikan FIFO dari material dan/atau
komponen yang digunakan
Copyright 2014© DWI
Identifikasi produk:
Kemampu telusuran produk
• Kode bersifat unik
– serta memiliki
ketahanan sesuai
dengan yang
dibutuhkan
Copyright 2014© DWI
Identifikasi produk:
Kemampu telusuran produk
• Produk yang ditemukan
tanda identitas akan
dianggap sebagai produk
tidak sesuai dengan
standard
Copyright 2013 © DWI
Supplier
Quality Management System
• Setiap harus telah tersertifikasi ISO 9001
• Kecuali mendapat kelonggaran dan
persetujuan dari pelanggan
Copyright 2013 © DWI
Incoming inspection
• Pemeriksaan dengan metoda sampling untuk kondisi
kontrol ketat, kontrol menengah hingga normal
• Pengolahan data dengan menggunakan metoda SPC
• Pelaksanaan audit supplier
• Pemeriksaan dengan metoda tertentu – sebelum
produk dikirimkan ke pabrikan
Copyright 2014 © DWI
The organization promote supplier monitoring
performance of their manufacturing processes..
•Delivered product quality;
•Customer disruptions including field returns;
•Delivery performance (including incidents of premium
freight);
•Special status customer notifications related to quality or
delivery issues.
Supplier monitoring
Copyright 2014 © DWI
Kemampuan proses produksi
pemasok harus dipastikan
dan senantiasa dievaluasi
berdasarkan :
•Evaluasi proses produksi supplier saat seleksi pemasok
•Menggunakan PFMEA sebagai potensi kegagalan proses dari
pemasok yang bisa memberikan dampak ke proses organisasi
•Evaluasi kemampuan proses saat persiapan produksi untuk
produk yang akan dibuat
•Evaluasi data dari pemeriksaan berkala saat penerimaan barang
datang dan/atau melalui pemeriksaan berkala yang disertakan saat
pengiriman dengan menggunakan SPC
Evaluasi serta senantiasa
memastikan kemampuan proses
produksi dari supplier
Copyright 2014 © DWI
Storage and inventory
• Pengendalian status dan
kondisi sediaan secara
berkala.
• Sistem
penyimpnan/Invento
ry management
system dilakukan
dengan memastikan
untuk mensuplai material
sesuai dengan waktu
kedatangan (FIFO)
Copyright 2014 © DWI
Storage and inventory
Memastikan sediaan yang telah disimpan terlalu lama
dan/atau kadaluwarsa – sebagai produk yang telah tidak
sesuai dengan spesifikasi pelanggan
Copyright 2014 © DWI
• Conduct Tooling management (maintenance and
repair facilities, storage)
• Tooling set-up, change program for perishable
tools;
• Tool design modification documentation
(including engineering change level);
• Tool identification, defining the status, such as
production, repair or disposal. (Monitor these
tooling management activities if any work is
outsourced)
Tooling Management
Copyright 2014 © DWI
• Life time tooling –
serta pengesahan
ulang setelah target
masa pakai
terpenuhi
• Perawatan
berdasarkan jumlah
pemakaian
• Pemeriksaan
keausan
• Pembaharuan
• Pengesahan hasil
Modifikasi
• Riwayat perawatan
Tooling Management
Copyright 2014 © DWI
Pemeliharaan dan pemastian berkala
akurasi dari C/F fixture
Tooling Management
Copyright 2014 © DWI
• Pengendalian – juga mencakup pemeriksaan spesifikasi dengan
mesin/system.
• Pengendalian juga harus dilakukan untuk limit appearance sample
• Badan pelaksanan eksternal harus bersertiifikasi ISO17025.
• Harus ada keputusan berdasarkan hasil pemeriksaan apakah alat
ukur/pemeriksaa tersebut masih laik digunakan atau tidak
PENGENDALIAN
ALAT UKUR DAN
PEMERIKSAAN
Copyright 2014 © DWI
• Pengendalian secara internal harus dilengkapi dengan
instruksi kerja dan tenaga yang memiliki keahlian yang
memadai.
• Identitas pengendalian
• Standard tindakan apabila hasil pengendalian
menyatakan alat ukut memiliki penyimpangan yang
lebih dari yang diijinkan
PENGENDALIAN ALAT UKUR DAN PEMERIKSAAN
Copyright 2014 © DWI
QUALITY CONTROL PLAN
Copyright 2014 © DWI
Internal Quality Audit
• All process shall
be planned
annually
• Cover all
production shift
• Increasing the
audit frequency
against internal
and external
performance
Copyright 2014© DWI
Bagaimana
kemudian yang
selalu ditemukan
audit eksternal :
Terdapat
3 standard audit
mutu internal
yang berbeda
Betulkah ?
Copyright 2014 © DWI
Secara
Esensial
Audit
Internal
Tidak sama
dengan
Audit
Eksternal
AUDITOR/
ASSESSOR
MUTU
INTERNAL
AUDITOR/
ASSESSOR
MUTU
EKSTERNAL
Copyright 2014© DWI
• Assessor mutu eksternal :
• Melakukan evaluasi terhadap
kinerja system secara – dan
melaporkannya kepada
pihak manajemen secara
independent
• Memiliki kualifikasi yang
dijamin secara independent
• Assessor mutu internal :
– Bagian dari organisasi
– Melakukan evaluasi kinerja
sistem sebagaimana bagian
dari perbaikan secara
berkelanjutan
– Pelaporan hasil evaluasi
bersifat lokal
PERAN YANG
SUNGGUH BERBEDA
Copyright 2014 © DWI
Audit mutu InternalAudit mutu Internal
 Internal audit adalah
independen, obyektif jaminan
dan aktivitas konsultasi yang
dirancang untuk menambah nilai
dan meningkatkan operasi
organisasi.
 Ini membantu organisasi
mencapai tujuannya dengan
membawa sistematis, disiplin
pendekatan untuk mengevaluasi
dan meningkatkan efektivitas
manajemen risiko, pengendalian,
dan peningkatan proses
Copyright 2014© DWI
Beginilah yangBeginilah yang
kami temukankami temukan
selamaselama
melakukan auditmelakukan audit
eksternal :eksternal :
Copyright 2011 © DWI
Perencanaan IQA yang buruk, akan memberikan hasil yang tidak maksimal, termasuk diantaranya
kejelasan maksud dan tujuan dari IQA. Hasil IQA yang tidak maksimal juga bisa disebabkan dari
faktor IQA seperti ; buruknya perencanaan, sumber daya, metoda serta tindak lanjut
75%
INTERNAL AUDIT
SISTEM MANAJEMEN MUTU
DIJALANKAN KARENA MENJADI
PERSYARATAN BUKAN KARENA
MENJADI BUDAYA ORGANISASI
25%
LAINNYA, JUGA BELUM
MENDAPATKAN HASIL MAKSIMAL
Copyright 2014© DWI
SUDAHKAH AUDITOR INTERNAL
DIPERSIAPKAN DENGAN BAIK?
> 60%
INTERNAL AUDITOR
>75%
INTERNAL AUDITOR
DIANGGAP PEKERJAAN
Copyright 2013 © DWI
Betulkah selalu direncanakan dengan efektif ?
Persyaratan TS :
SEMUA PROSES HARUS DIRENCANAKAN UNTUK
DIAUDIT SETIAP 1 TAHUN DAN MENCAKUP SEMUA
SHIFT
> 85%
AUDIT INTERNAL
DIRENCANAKAN TANPA
PERTIMBANGAN YANG JELAS
SELAIN KARENA DIMINTA
SEBAGAI PERSYARATAN
> 50%
INTERNAL AUDIT
SUDAH HARUS DILAKUKAN
SEBELUM AUDIT EKSTERNAL
DILAKUKAN
> 80%
TIDAK
MEMPERTIMBANGKAN
PRIORITAS DALAM
MERENCANAKAN AUDIT
INTERNAL
<= 90%
MANAJEMEN
TIDAK PERNAH MEMINTA
INTERNAL QUALITY AUDIT
TAMBAHAN
Copyright 2014© DWI
ISO/TS 16949:2009 IQA Structure
Memastikan semua proses secara system artinya :
semua persyaratan ISO/TS terpenuhi sesuai dengan
prosedur dan instruksi kerja yang digunakan,
persyaratan pelanggan terkait serta terpenuhinya
konsep PDCA dari sistem manajemen mutu
8.2.2.1 Quality management system audit
The organization shall audit its quality management system to verify compliance with this Technical
Specification and any additional quality management system requirements.
8.2.2.2 Manufacturing process audit
The organization shall audit each manufacturing process to determine its effectiveness.
Memastikan semua proses Produksi apakah cukup
efektif dan efisien dalam memastikan produk akan
dibuat sesuai dengan persyaratan pelanggan
Copyright 2014© DWI
ISO/TS 16949:2009 IQA Structure
Copyright 2014© DWI
Copyright 2014© DWI
Process Internal AuditProcess Internal Audit
ISO/TS 16949:2009ISO/TS 16949:2009
 Dilakukan disemua shift
produksi yang berjalan
 Untuk semua proses
manufaktur yang
dijalankan
 Evaluasi : DFMEA,
PFMEA, Control Plan
serta standar proses yang
digunakan untuk
menghasilkan produk
 Implementasi perubahan
proses, tinjauan keluhan
pelanggan dan
perbaikannya
Copyright 2014© DWI
ISO/TS 16949:2009 IQA Structure
8.2.2.3 Product audit
The organization shall audit products at appropriate stages of production and delivery to verify
conformity to all specified requirements, such as product dimensions, functionality, packaging and
labelling, at a defined frequency.
Sebagai bukti riil bahwa proses secara system dan
proses produksi secara efektif dan efisien dijalankan
maka perlu bukti secara hasil proses itu sendiri yaitu :
Produk. Audit produk dilakukan untuk setiap hasil
tahapan produksi – bukan setelah proses produksi
selesai (hasil akhir) – kecuali untuk aspek yang hanya
bisa dievaluasi ketika produk selesai dibuat : pemberian
label dan pengemasan
Copyright 2014© DWI
Product Internal Audit
ISO/TS 16949:2009
 Memastikan pemenuhan syarat produk
yang akan dikirim
 Dilakukan untuk setiap hasil produk
setiap tahapan proses
 Sampling tidak 100% semua produk
 Memeriksa syarat kemasan yang
dipersyaratkan
 Memastikan proses pemberian label saat
produk akan dikirimkan
 Catatan :
 Mengacu ke syarat pelanggan (bila ada)
 Temuan audit terkait dengan NC product
handling
Copyright 2014© DWI
Pengembangan
Auditor Mutu Internal
 Memastikan Auditor Mutu
Internal untuk hal-hal beirkut
ini :
 Memiliki kapasitas yang
memadai untuk
melakukan audit
 Melakukan evaluasi
untuk pengembangan
auditor mutu internal
 Memberikan pelatihan
sebagai bagian dari
pengembangan tersebut
diatas
Copyright 2014© DWI
Evaluasi sistem manajemen
mutu melalui
Auditor Mutu Internal
Copyright 2014 © DWI
8.5.2.4
Rejected
product test/analysis
• Cycle time of processing shall be reviewed
and minimized
• Cycle complaint received for same customer
• Effective review against related PFMEA
documents standard
• Working instruction of repair shall be
made
Copyright 2014 © DWI
Layout inspection
and functional
testing
• Planning in Quality
control plan
• For all products
• all product dimensions
shown on the design
records.
Copyright 2014© DWI
Copyright 2014 © DWI
CORE TOOLS
ISO/TS 16949:2009
Copyright 2014 © DWI
PROCESS CONTROL IS FEEDBACK SYSTEM
PEOPLE
EQUIPMENT
MATERIAL
METHODS
MEASUREME
NT
ENVIROMENT
THE WAY WE
WORK/
BLENDING THE
RESOURCES
SHARE HOLDER
& CUSTOMER
PRODUCT
PROCESS
OUTPUT
VOICE OF
THE
PROCESS
IDENTIFYING
CHANGING NEED
AND
EXPECTATIONS
VOICE OF
THE
BUSINESS
VOICE OF THE
CUSTOMER
SUPPLIER-
INPUT
STATISTIC
AL
METHODS
Potential Failure
Process Mapping
and Analysis
Copyright 2014 © DWI
IMPLEMENTASI
MEASUREMENT SYSTEM
ANALYSIS
MENGAPA KITA
(PERLU)
MENGANALISA SISTEM
PENGUKURAN ..?
Copyright 2011 © DWI
Copyright 2014 © DWI
Copyright 2014 © DWI
FAILURE EFFECT
MODE ANALYSIS
I
264
FMEA
The aim of FMEA is to anticipate:
–what might fail
–what effect this failure would
have
–what might cause the failure
… and take action to correct it!
Copyright 2014© DWI
Copyright 2014© DWI
266
“Automotive Core Tools” is a general title used to describe several tools and methodologies developed,
published and required by most automotive OEMs. Implementation and usage of these core tools is
required by ISO/TS 16949:2009. Except for PPAP, the associated manuals used in the implementation of
these core tools are considered to be “reference” manuals. Although they shall be used by the
organization implementing them, they are considered guidance. Organizations have some flexibility in
how they use them. This flexibility is discussed in detail during all
courses and workshops. The core tools are:
• Advanced Product Quality Planning, (APQP)
• Failure Mode and Effects Analysis (FMEA)
• Statistical Process Control (SPC)
• Measurement Systems Analysis (MSA)
• Production Part Approval Process (PPAP)
Although it is recommended, organizations do not have to be compliant to ISO/TS 16949:2009 to use
these core tools. Some OEMs and Tier One suppliers require their suppliers to implement, and use, the
core tools regardless of their status of compliance to ISO/TS 16949:2009. Many sectors outside the
automotive industry are using these core tools as they realize the benefits of implementation
PENGANTAR CORE TOOLS
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2013 © DWI
STATISTICAL PROCESS
CONTROL
Copyright 2013 © DWI
STATISTICAL PROCESS
CONTROL
Copyright 2014© DWI
Common and Special Cause Variability
Common Cause
Variability
Special Cause
Variability
Copyright 2014© DWI
Variability Reduction Levels
Special Cause Variability
Reactive
Common Cause Variability
Proactive
Copyright 2014 © DWI
Special Cause Variation
If special causes of variation are present, the process output is not stable over time
and is not generally predictable; we cannot always use sampling and SPC to control
the process.
Size
Target line
Time
Predictable ?
Copyright 2014 © DWI
Common Cause Variation
If only common causes of variation are present, the output of a process
forms a distribution that is stable over time and is predictable; we can then
monitor the process using sampling and SPC charts
Size
Target line
Time
Copyright 2014 © DWI
Statistical Process Control
• _
• X – Range Control chart (AIAG SPC manual)
Copyright 2014© DWI
Process Improvement
Nominal
Common cause
variation reduced
Process improved
Special causes
present
Process out of control
- unpredictable
Special causes
eliminated
Process under control
- predictable
Then improve nominal
Copyright 2014© DWI
The IATF assigned work team will be seeking stakeholder inputs on potential
enhancements to the ISO/TS 16949 standard. Additionally, customer
requirements are being analyzed for potential inclusion in the future
standard. Completion of the revised quality management system standard is
targeted for Q4 2016.
ISO/TS 16949:2016
BY NEXT Q4- 2016
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
Kenapa ISOKenapa ISO
9001 tidak9001 tidak
merubahmerubah
organisasi kami?organisasi kami?
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
Copyright 2014© DWI
Apa yang harus kita persiapkan dan
lakukan untuk sertifikasi
ISO 9001:2015?
Copyright 2014© DWI
Apa yang harus kita persiapkan dan
lakukan untuk sertifikasi
ISO 9001:2015?
Copyright 2014© DWI
Apa yang harus kita persiapkan dan lakukan
untuk sertifikasi ISO 9001:2015?
Yang dibutuhkan adalah penyesuaianpenyesuaian – melakukan
rekayasa ulang sistem manajemen mutu agar sesuai
dengan persyaratan yangbaru : bukan membuat
kembali sistem manajemen mutu
Semua prosedur, instruksi kerja – dokumen dan
catatan mutu yang ada – tidak harus diganti –
bisa digunakan kembali.
Copyright 2014 © DWI
SGSSGS
ININ
BRIEFBRIEF
Copyright 2014 © DWI
SGS BUSINESS LINES
Agriculture Automotive EnvironmentalConsumer
Oil, Gas &
Chemicals
Systems and
Services
Certification
Minerals Life Science
Industrial
Trade
Assurance
Copyright 2014 © DWI
ADDED VALUE SERVICES IN SGS-AUTO WORLD
Global competitiveness for sustainable development
Copyright 2014© DWI
SOLUTIONS IN THE AUTOMOTIVE VALUE CHAIN
We will try to provide services within this automotive business context in order to help our
customers earn a return on investment, foster growth, innovation and value .
Distributor/Distributor/
Customers
Service Supplier
Engineering Supplier
DealerDealer
Supplier Tier 2
Supplier Tier 2
OEM
Supplier Tier 1
F&I
Aftermarket
ADDED VALUE
MANUFACTURINGMANUFACTURING
PROCESS
ADDED
VALUE
AFTERAFTER
SALESSALES
PROCESS
Copyright 2014© DWI
ENHANCING
YOUR VALUE
CHAIN
For any OEM, making sure this premium
service is experienced across a franchise
network is a difficult task that SGS can
help to solve. Our solutions for the
automotive industry enhance the value
chain from design, to lease return or used
car sale. We ensure your organization
and partners consistently implement the
highest quality standards in the
automotive industry. SGS- Customised
Automotive Audit Solutions
improve the delivery of your products and
services, safeguarding the customer
perception of your brand and keeping you
ahead of the competition.
4
Year2013Year2013
Year2015Year2015
Year2012Year2012
Year2012Year2012
75
Clients
90
Clients
155
Clients
200
Clients
42
Clients
Year2014
ISO/TS 16949:2009 CertificationISO/TS 16949:2009 Certification
ACHIEVEMENT OUTLOOKACHIEVEMENT OUTLOOK
Copyright 2014© DWI
OUR CUSTOMERS
Copyright 2011 © DWI
VEHICLE MANUFACTURERS:
MANAGEMENT SYSTEMS CERTIFICATIONS:
– RENAULT –VARIOUS COUNTRIES (ISO 9001+ ISO 14001)
– VAN HOOL – BELGIUM (ISO 9000+ISO 14001)
– RENAULT SAMSUNG MOTORS CO. –KOREA (Headquarter+11 plants-ISO 14001)
– NISSAN DIESEL MOTOR CO. –Production Division-Japan (Headquarter+2 plants-ISO 9001)
– NISSAN MEXICANA SA DE C.V.-MEXICO (ISO 9001+ISO 14001+OHSAS 18001)
– VOLKSWAGEN DE MEXICO SA DE C.V. –MEXICO (ISO 14001)
– DAEWOO COMMERCIAL VEHICLES CO.-KOREA (ISO 9001)
– GM DAEWOO AUTO & TECHNOLOGY COMPANY –KOREA (ISO 14001)
– UzDAEWOO – UZBEKISTAN – (Production plant) - (ISO 9001 + ISO 14001 + OHSAS 18001)
– GENERAL MOTORS KENYA LTD.-KENYA (ISO 14001)
– GENERAL MOTORS THAILAND LTD.-THAILAND (ISO 14001)
– ASTRA HONDA MOTOR –INDONESIA (Headquarter+3 plants-ISO 9001+ISO 14001)
– HONDA SUN CO. –JAPAN (Headquarter+10 plants-ISO 9001)
– HONDA –TAIWAN (ISO 9001 + ISO 14001)
– HYUNDAI-SLOVAKIA (ISO 9001)
– HYUNDAI POWERTECH –KOREA (ISO 14001)
– HYUNDAI DYMOS INC.-KOREA (ISO TS 16949)
– HYUNDAI POWERTECH CO.-KOREA (ISO TS 16949)
– PEUGEOT –HUNGARY + SLOVAKIA (ISO 9001)
AUTOMOTIVE : INTRODUCTION TO SERVICES
SGS MAIN PRESENT REFERENCES
Copyright 2011 © DWI
VEHICLE MANUFACTURERS:
MANAGEMENT SYSTEMS CERTIFICATIONS:
– FORD MOTOR COMPANY SA DE C.V. MEXICO (ISO 9001)
– FORD LI HO MOTOR COMPANY –TAIWAN (GHG)
– TOYOTA-POLAND (ISO 9001+ISO 14001)
– PACCAR DU CANADA LTEE –CANADA (ISO 9001)
– KING LONG UNITED AUTOMOTIVE INDUSTRY –CHINA (ISO 9001)
– SHANGHAI JMSTAR AUTOMOBILE CO. .CHINA (ISO 9001)
– NABI BUS INDUSTRY –HUNGARY (OHSAS 18001)
– PT ASTRA DAIHATSU MOTOR INDONESIA (- Headquarters, all 4 Plants and parts logistic -
ISO 9001+ISO 14001+OHSAS)
– PT KRAMA YUDHA RATU MOTOR -INDONESIA (ISO 14001)
– PT GAYA MOTOR -INDONESIA For BMW assembly , and Astra Multy Truck assembely
(ISO 9001 + 14001)
– PT SUZUKI INTERNATIONAL Motor (Headquarter+5 plants + Parts-ISO 9001+ISO 14001)
– PT ASTRA HONDA MOTOR Headquarter+5 plants +Parts -ISO 9001+ISO 14001+OHSAS
– PARS KHODRO –IRAN (ISO 14001)
– ORIENTAL ASSEMBLERS SDN –MALAYSIA (ISO 9001)
– SC AUTO INDUSTRIES PTE-SINGAPORE (ISO 9001)
– OTOYOL SANAYI AS-TURKEY (ISO 9001)
– SUZUKI MOTOR – TAIWAN (ISO 9001)
AUTOMOTIVE : INTRODUCTION TO SERVICES
SGS MAIN PRESENT REFERENCES
Copyright 2014 © DWI
AUTOMOTIVE : INTRODUCTION TO SERVICES
SGS MAIN PRESENT REFERENCES
VEHICLES MANUFACTURERS
MANAGEMENT SYSTEMS CERTIFICATION
– MERCEDES BENZ –EGYPT (ISO TS 16949+ISO 14001)
– CNH WORLDWIDE (28 plants+4 Engineering Centres-ISO 9001+ISO 14001)
– NISSAN – EGYPT (ISO 9001+ISO 14001)
– CITROEN – BULGARIA (ISO 9001)
– PEUGEOT- SLOVAKIA + SERBIA (ISO 9001)
– MASERATI DEALERSHIP NETWORK – SWITZERLAND (ISO 9001)
– HONDA FORMULA 1 TEAM – UK- (ISO 14001)
– MERCEDES MACLAREN – UK- (ISO 9001)
– PCA-SLOVAKIA (ISO 9001)
– IVECO –EUROPE (ISO 9001)
– FIAT GROUP WORLDWIDE (OHSAS 18001)
– Isuzu Astra Motor Indonesia (ISO 9001)
Copyright 2011 © DWI
TIER 1 SUPPLIERS:
– PIRELLI (ISO 14001-OHSAS 18001)- Worldwide contract + Verification of
Environmental Report
– PLASTIC OMNIUM (ISO 9001,ISO 14001)
– VALEO (ISO 9001, ISO 14001, ISO TS 16949, OHSAS 18001)-Worldwide contract
– FAURECIA (ISO TS 16949, ISO 14001, OHSAS 18001)-Worldwide contract
– HERMAN BECKER (ISO TS 16949, ISO 14001)
– MENZOLIT-FIBRON (ISO 9001, ISO 14001, OHSAS 18001)
– MICHELIN: Customized audits to sales/service network (Poland)
– PILKINGTON (ISO 14001, OHSAS 18001, SA8000)-Worldwide contract
– BOSCH (Standard and mystery audits on service dealership)-Worldwide contract
– MAGNETI MARELLI (ERGOM): ISO TS 16949
– DENSO Indonesia (ISO/TS 16949)
– ASMO indonesia (ISO.TS 16949; ISO 14001; ISO 18001)
AUTOMOTIVE : INTRODUCTION TO SERVICES
SGS MAIN PRESENT REFERENCES
Copyright 2011 © DWI
TIER 1 SUPPLIERS:
– AUTOLIV (ISO/TS 16949 )- Worldwide contract + Verification of Environmental
Report
– JVC-Kenwood (JK) Indonesia (ISO/TS 16949 & ISO 14001)
– NOK Indonesia ISO 14001, ISO TS 16949, OHSAS 18001)-Worldwide contract
– Hi-Lex Indonesia (ISO TS 16949, ISO 14001, OHSAS 18001)
– NSK Bearing Indonesia (ISO TS 16949, ISO 14001)
– Bando Indonesia (ISO 9001, ISO/TS 16949, ISO 14001, OHSAS 18001)
– Chemicon Indonesia - ISO 14001, ISO TS 16949, OHSAS 18001)-Worldwide
contract
– PT GKD (Gemala Kempa Daya ) (ISO 14001, OHSAS 18001, ISO/TS 16949)
– PT IGP (INTI GANDA PERDANA) (ISO 14001, OHSAS 18001, ISO/TS 16949)
– PT ADR (ISO/TS 16949)
– PT AT (Aisin Takaoka- Indonesia ) - (ISO/TS 16949)
– PT GS Battery Indonesia (ISO.TS 16949) –
– PT Tri Mega Baterindo (ISO/TS 16949)
AUTOMOTIVE : INTRODUCTION TO SERVICES
SGS MAIN PRESENT REFERENCES
Copyright 2011 © DWI
TIER 1 SUPPLIERS:
– PT Nichirin Indonesia (ISO/TS 16949 )
– PT Fuji Technica (ISO/TS 16949; ISO 9001:2008; ISO 14001)
– PT Karya Bahana Berlian (ISO TS 16949)
– PT Kotobukiya (ISO TS 16949, ISO 14001, OHSAS 18001)
– PT Meshindo (ISO TS 16949, ISO 14001)
– PT Excel Indonesia (ISO 9001, ISO/TS 16949, ISO 14001)
– PT TD Auto Compressor Indonesia (ISO/TS 16949)
– PT GKD (Gemala Kempa Daya ) (ISO 14001, OHSAS 18001, ISO/TS 16949)
– PT IGP (INTI GANDA PERDANA) (ISO 14001, OHSAS 18001, ISO/TS 16949)
– PT ADR (ISO/TS 16949)
– PT AT (Aisin Takaoka- Indonesia ) - (ISO/TS 16949)
– PT GS Battery Indonesia (ISO.TS 16949) –
– PT Alpha Industries (ISO/TS 16949)
– PT Aisin Indonesia (ISO/TS 16949:2009; ISO 14,001; ISO 18001)
AUTOMOTIVE : INTRODUCTION TO SERVICES
SGS MAIN PRESENT REFERENCES
Copyright 2011 © DWI
TIER 1 SUPPLIERS:
– PT Braja Mukti Cakra (ISO/TS 16949; ISO 14001 )
– PT Koito Indonesia (ISO/TS 16949; ISO 9001:2008; ISO 14001)
– PT Nitto Material (ISO TS 16949: 2009; ISO 14001)
– PT Polymatech Indonesia (ISO TS 16949, ISO 14001)
– PT Ginsa (ISO TS 16949, ISO 9001)
– PT IGP (ISO 9001, ISO/TS 16949: 2009, ISO 14001)
– PT NSK Bearing Indonesia (ISO/TS 16949; ISO 14001)
– PT Bando Indonesia (ISO 14001, OHSAS 18001, ISO/TS 16949)
– PT Atedja Multi Industri (ISO 14001, ISO/TS 16949; ISO 9001)
– PT Daido Metal (ISO/TS 16949; ISO 14001)
– PT Indonesia Chemi-con - (ISO/TS 16949; ISO 9001:2008; ISO 14001)
– PT Inti Pantja Press (ISO.TS 16949) –
– PT IRC Rubber Division (ISO/TS 16949:2009; ISO 14,001)
– PT IRC PU Division (ISO/TS 16949:2009; ISO 14,001)
AUTOMOTIVE : INTRODUCTION TO SERVICES
SGS MAIN PRESENT REFERENCES
Copyright 2011 © DWI
TIER 1 SUPPLIERS:
– PT Kyodamas (ISO/TS 16949; ISO 9001:2008)
– PT Kyokuni Technologi (ISO TS 16949: 2009;)
– PT Kyokuni Indonesia (ISO TS 16949)
– PT Muramoto Indonesia (ISO TS 16949, ISO 9001)
– PT Mushashi Autoparts (ISO 9001, ISO/TS 16949: 2009, ISO 14001)
– PT Progress Diecast (ISO/TS 16949:2009; ISO 14001)
– PT Kiriu Indonesia (ISO/TS 16949:2009)
– PT Tanashin (ISO/TS 16949; ISO 14001)
– PT Hamaden Indonesia - (ISO/TS 16949; ISO 9001:2008)
– PT Indosafety Sentosa Industry (ISO/TS 16949:2009; ISO 14,001)
– PT Great Microtama (ISO/TS 16949:2009; ISO 14,001; ISO 9001)
– PT Delta Hulane (ISO/TS 16949:2009;)
– PT PT Intermesindo Forging Prima (ISO/TS 16949:2009;)
AUTOMOTIVE : INTRODUCTION TO SERVICES
SGS MAIN PRESENT REFERENCES
Copyright 2011 © DWI
TIER 1 SUPPLIERS:
– PT Toyota Auto Compresor Indonesia (ISO/TS 16949)
– PT Takagai Sari Multy Utama (ISO/TS 16949; ISO 9001:2008)
– PT Sugity Creative(ISO TS 16949: 2009;)
– PT Karya Putra Sangkuriang (ISO/TS 16949:2009)
– PT Indonesia Thai Summit (ISO/TS 16949:2009)
– PT Honda Lock (ISO TS 16949; ISO 9001)
– PT TJETK INDONESIA (ISO TS 16949, ISO 9001)
– PT E-T-A Indonesia (ISO TS 16949, ISO 9001)
– PT Hanwa Steel Indonesia (ISO TS 16949, ISO 9001)
– PT Karya Putra Sangkuriang (ISO/TS 16949; ISO 14001)
– PT Indonesia Nippon Seiki (ISO/TS 16949; ISO 14001)
– PT Hitachi Powder Indonesia (ISO/TS 16949; ISO 14001)
– PT JFD INDONESIA (ISO/TS 16949; ISO 14001)
– PT Karawang Super Steel (ISO/TS 16949; ISO 14001)
AUTOMOTIVE : INTRODUCTION TO SERVICES
SGS MAIN PRESENT REFERENCES
Copyright 2014© DWI

More Related Content

Similar to Executive briefing 18.3.2015

Toronto future directions - 2015
Toronto   future directions - 2015Toronto   future directions - 2015
Toronto future directions - 2015Sam Cheng
 
Maruti Suzuki Alto -k10
Maruti Suzuki Alto -k10Maruti Suzuki Alto -k10
Maruti Suzuki Alto -k10Arup Bar
 
Marketing Startegy for Volkswagen EV
Marketing Startegy for Volkswagen EVMarketing Startegy for Volkswagen EV
Marketing Startegy for Volkswagen EVAbdullah Saghir Ahmad
 
Westport Corporate Overview
Westport Corporate OverviewWestport Corporate Overview
Westport Corporate OverviewWestport
 
Automobile Industry - Maruti Suzuki Company, Alto K10 Product
Automobile Industry - Maruti Suzuki Company, Alto K10 Product Automobile Industry - Maruti Suzuki Company, Alto K10 Product
Automobile Industry - Maruti Suzuki Company, Alto K10 Product Monu Tiwari
 
CV_Tech_paper_Oct2015
CV_Tech_paper_Oct2015CV_Tech_paper_Oct2015
CV_Tech_paper_Oct2015jeffry6666
 
Automobiles Industry in India
Automobiles Industry in IndiaAutomobiles Industry in India
Automobiles Industry in Indiavivekthapa123
 
PESTLE ANALYSIS ON AUTOMOBILE INDUSTRY IN INDIA-BY MANISH BADHIYE
PESTLE ANALYSIS ON AUTOMOBILE INDUSTRY IN INDIA-BY MANISH BADHIYEPESTLE ANALYSIS ON AUTOMOBILE INDUSTRY IN INDIA-BY MANISH BADHIYE
PESTLE ANALYSIS ON AUTOMOBILE INDUSTRY IN INDIA-BY MANISH BADHIYEManish Badhiye
 
daimler presentataion
daimler presentataiondaimler presentataion
daimler presentataionAnubhav goel
 
Auto Component Industry in India
Auto Component Industry in IndiaAuto Component Industry in India
Auto Component Industry in IndiaDr. Amit Kapoor
 
[729.HK] FDG Electric Vehicles Corporate Presentation
[729.HK] FDG Electric Vehicles Corporate Presentation[729.HK] FDG Electric Vehicles Corporate Presentation
[729.HK] FDG Electric Vehicles Corporate PresentationWinnie Lei
 
Precision components unit
Precision components unitPrecision components unit
Precision components unitsaurav kishor
 
Motorminds Automotive Solutions_Customer Copy
Motorminds Automotive Solutions_Customer CopyMotorminds Automotive Solutions_Customer Copy
Motorminds Automotive Solutions_Customer CopyRonak Jain
 
I-Bytes Automotive Industry
I-Bytes Automotive IndustryI-Bytes Automotive Industry
I-Bytes Automotive IndustryEGBG Services
 
I-Byte Automotive July 2021
I-Byte Automotive July 2021I-Byte Automotive July 2021
I-Byte Automotive July 2021EGBG Services
 
Indian Auto component industry - Exports
Indian Auto component industry - ExportsIndian Auto component industry - Exports
Indian Auto component industry - ExportsHarish Vangala
 

Similar to Executive briefing 18.3.2015 (20)

Toronto future directions - 2015
Toronto   future directions - 2015Toronto   future directions - 2015
Toronto future directions - 2015
 
Maruti Suzuki Alto -k10
Maruti Suzuki Alto -k10Maruti Suzuki Alto -k10
Maruti Suzuki Alto -k10
 
Marketing Startegy for Volkswagen EV
Marketing Startegy for Volkswagen EVMarketing Startegy for Volkswagen EV
Marketing Startegy for Volkswagen EV
 
Westport Corporate Overview
Westport Corporate OverviewWestport Corporate Overview
Westport Corporate Overview
 
Automobile Industry - Maruti Suzuki Company, Alto K10 Product
Automobile Industry - Maruti Suzuki Company, Alto K10 Product Automobile Industry - Maruti Suzuki Company, Alto K10 Product
Automobile Industry - Maruti Suzuki Company, Alto K10 Product
 
Automotive Motors
Automotive MotorsAutomotive Motors
Automotive Motors
 
CV_Tech_paper_Oct2015
CV_Tech_paper_Oct2015CV_Tech_paper_Oct2015
CV_Tech_paper_Oct2015
 
insignia report
insignia reportinsignia report
insignia report
 
Automobiles Industry in India
Automobiles Industry in IndiaAutomobiles Industry in India
Automobiles Industry in India
 
PESTLE ANALYSIS ON AUTOMOBILE INDUSTRY IN INDIA-BY MANISH BADHIYE
PESTLE ANALYSIS ON AUTOMOBILE INDUSTRY IN INDIA-BY MANISH BADHIYEPESTLE ANALYSIS ON AUTOMOBILE INDUSTRY IN INDIA-BY MANISH BADHIYE
PESTLE ANALYSIS ON AUTOMOBILE INDUSTRY IN INDIA-BY MANISH BADHIYE
 
16 omelchuk
16 omelchuk16 omelchuk
16 omelchuk
 
daimler presentataion
daimler presentataiondaimler presentataion
daimler presentataion
 
Auto Component Industry in India
Auto Component Industry in IndiaAuto Component Industry in India
Auto Component Industry in India
 
[729.HK] FDG Electric Vehicles Corporate Presentation
[729.HK] FDG Electric Vehicles Corporate Presentation[729.HK] FDG Electric Vehicles Corporate Presentation
[729.HK] FDG Electric Vehicles Corporate Presentation
 
ashok leyland
ashok leylandashok leyland
ashok leyland
 
Precision components unit
Precision components unitPrecision components unit
Precision components unit
 
Motorminds Automotive Solutions_Customer Copy
Motorminds Automotive Solutions_Customer CopyMotorminds Automotive Solutions_Customer Copy
Motorminds Automotive Solutions_Customer Copy
 
I-Bytes Automotive Industry
I-Bytes Automotive IndustryI-Bytes Automotive Industry
I-Bytes Automotive Industry
 
I-Byte Automotive July 2021
I-Byte Automotive July 2021I-Byte Automotive July 2021
I-Byte Automotive July 2021
 
Indian Auto component industry - Exports
Indian Auto component industry - ExportsIndian Auto component industry - Exports
Indian Auto component industry - Exports
 

More from DANANG WID

Inovasi bukan improvement
Inovasi bukan improvementInovasi bukan improvement
Inovasi bukan improvementDANANG WID
 
Antara qa dan qc
Antara qa dan qcAntara qa dan qc
Antara qa dan qcDANANG WID
 
Iatf waiver edisi ke 5
Iatf waiver edisi ke 5Iatf waiver edisi ke 5
Iatf waiver edisi ke 5DANANG WID
 
Presentation abc
Presentation abcPresentation abc
Presentation abcDANANG WID
 
Problem solving mitramatra
Problem solving mitramatraProblem solving mitramatra
Problem solving mitramatraDANANG WID
 
Lean manufacturing mitramatra
Lean manufacturing mitramatraLean manufacturing mitramatra
Lean manufacturing mitramatraDANANG WID
 
Mitramatra principles behind spc
Mitramatra principles behind spcMitramatra principles behind spc
Mitramatra principles behind spcDANANG WID
 
Mitra matra improvement presentation through story board
Mitra matra improvement presentation through story boardMitra matra improvement presentation through story board
Mitra matra improvement presentation through story boardDANANG WID
 
Mitra matra iatf 16949 honda module 7
Mitra matra iatf 16949 honda module 7Mitra matra iatf 16949 honda module 7
Mitra matra iatf 16949 honda module 7DANANG WID
 
Mitra matra iatf 16949 honda module 6
Mitra matra iatf 16949 honda module 6Mitra matra iatf 16949 honda module 6
Mitra matra iatf 16949 honda module 6DANANG WID
 
Mitra matra iatf 16949 honda module 5
Mitra matra iatf 16949 honda module 5Mitra matra iatf 16949 honda module 5
Mitra matra iatf 16949 honda module 5DANANG WID
 
Mitra matra iatf 16949 honda module 4
Mitra matra iatf 16949 honda module 4Mitra matra iatf 16949 honda module 4
Mitra matra iatf 16949 honda module 4DANANG WID
 
Mitramatra iatf 16949 honda volume 3
Mitramatra iatf 16949 honda volume 3Mitramatra iatf 16949 honda volume 3
Mitramatra iatf 16949 honda volume 3DANANG WID
 
Mitramatra just in time
Mitramatra just in timeMitramatra just in time
Mitramatra just in timeDANANG WID
 
Makanan itu faktor penting
Makanan itu faktor pentingMakanan itu faktor penting
Makanan itu faktor pentingDANANG WID
 
Iatf 16949 honda mitra matra volume 2
Iatf 16949 honda mitra matra volume 2Iatf 16949 honda mitra matra volume 2
Iatf 16949 honda mitra matra volume 2DANANG WID
 
Mitra matra iatf for honda volume 1
Mitra matra iatf for honda volume 1Mitra matra iatf for honda volume 1
Mitra matra iatf for honda volume 1DANANG WID
 
Manager and management mitramatra
Manager and management mitramatraManager and management mitramatra
Manager and management mitramatraDANANG WID
 

More from DANANG WID (20)

Inovasi bukan improvement
Inovasi bukan improvementInovasi bukan improvement
Inovasi bukan improvement
 
Antara qa dan qc
Antara qa dan qcAntara qa dan qc
Antara qa dan qc
 
Iatf waiver edisi ke 5
Iatf waiver edisi ke 5Iatf waiver edisi ke 5
Iatf waiver edisi ke 5
 
Presentation abc
Presentation abcPresentation abc
Presentation abc
 
Problem solving mitramatra
Problem solving mitramatraProblem solving mitramatra
Problem solving mitramatra
 
Mmogle
MmogleMmogle
Mmogle
 
Lean manufacturing mitramatra
Lean manufacturing mitramatraLean manufacturing mitramatra
Lean manufacturing mitramatra
 
Mitramatra principles behind spc
Mitramatra principles behind spcMitramatra principles behind spc
Mitramatra principles behind spc
 
Dpmo
DpmoDpmo
Dpmo
 
Mitra matra improvement presentation through story board
Mitra matra improvement presentation through story boardMitra matra improvement presentation through story board
Mitra matra improvement presentation through story board
 
Mitra matra iatf 16949 honda module 7
Mitra matra iatf 16949 honda module 7Mitra matra iatf 16949 honda module 7
Mitra matra iatf 16949 honda module 7
 
Mitra matra iatf 16949 honda module 6
Mitra matra iatf 16949 honda module 6Mitra matra iatf 16949 honda module 6
Mitra matra iatf 16949 honda module 6
 
Mitra matra iatf 16949 honda module 5
Mitra matra iatf 16949 honda module 5Mitra matra iatf 16949 honda module 5
Mitra matra iatf 16949 honda module 5
 
Mitra matra iatf 16949 honda module 4
Mitra matra iatf 16949 honda module 4Mitra matra iatf 16949 honda module 4
Mitra matra iatf 16949 honda module 4
 
Mitramatra iatf 16949 honda volume 3
Mitramatra iatf 16949 honda volume 3Mitramatra iatf 16949 honda volume 3
Mitramatra iatf 16949 honda volume 3
 
Mitramatra just in time
Mitramatra just in timeMitramatra just in time
Mitramatra just in time
 
Makanan itu faktor penting
Makanan itu faktor pentingMakanan itu faktor penting
Makanan itu faktor penting
 
Iatf 16949 honda mitra matra volume 2
Iatf 16949 honda mitra matra volume 2Iatf 16949 honda mitra matra volume 2
Iatf 16949 honda mitra matra volume 2
 
Mitra matra iatf for honda volume 1
Mitra matra iatf for honda volume 1Mitra matra iatf for honda volume 1
Mitra matra iatf for honda volume 1
 
Manager and management mitramatra
Manager and management mitramatraManager and management mitramatra
Manager and management mitramatra
 

Recently uploaded

UNIT-V-ELECTRIC AND HYBRID VEHICLES.pptx
UNIT-V-ELECTRIC AND HYBRID VEHICLES.pptxUNIT-V-ELECTRIC AND HYBRID VEHICLES.pptx
UNIT-V-ELECTRIC AND HYBRID VEHICLES.pptxDineshKumar4165
 
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGERUNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGERDineshKumar4165
 
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp NumberVip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Numberkumarajju5765
 
꧁ ୨⎯Call Girls In Ashok Vihar, New Delhi **✿❀7042364481❀✿**Escorts ServiCes C...
꧁ ୨⎯Call Girls In Ashok Vihar, New Delhi **✿❀7042364481❀✿**Escorts ServiCes C...꧁ ୨⎯Call Girls In Ashok Vihar, New Delhi **✿❀7042364481❀✿**Escorts ServiCes C...
꧁ ୨⎯Call Girls In Ashok Vihar, New Delhi **✿❀7042364481❀✿**Escorts ServiCes C...Hot Call Girls In Sector 58 (Noida)
 
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHER
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHERUNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHER
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHERunosafeads
 
Crash Vehicle Emergency Rescue Slideshow.ppt
Crash Vehicle Emergency Rescue Slideshow.pptCrash Vehicle Emergency Rescue Slideshow.ppt
Crash Vehicle Emergency Rescue Slideshow.pptVlademirGebDubouzet1
 
Rockwell Automation 2711R PanelView 800 HMI
Rockwell Automation 2711R PanelView 800 HMIRockwell Automation 2711R PanelView 800 HMI
Rockwell Automation 2711R PanelView 800 HMIAsteam Techno
 
BLUE VEHICLES the kids picture show 2024
BLUE VEHICLES the kids picture show 2024BLUE VEHICLES the kids picture show 2024
BLUE VEHICLES the kids picture show 2024AHOhOops1
 
The 10th anniversary, Hyundai World Rally Team's amazing journey
The 10th anniversary, Hyundai World Rally Team's amazing journeyThe 10th anniversary, Hyundai World Rally Team's amazing journey
The 10th anniversary, Hyundai World Rally Team's amazing journeyHyundai Motor Group
 
Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...
Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...
Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...shivangimorya083
 
Delhi Call Girls Mayur Vihar 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Mayur Vihar 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Mayur Vihar 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Mayur Vihar 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Callshivangimorya083
 
Electronic Vehicle (EV) Industry Challenges
Electronic Vehicle (EV) Industry ChallengesElectronic Vehicle (EV) Industry Challenges
Electronic Vehicle (EV) Industry Challengesmarketingmangosemi
 
What Causes BMW Chassis Stabilization Malfunction Warning To Appear
What Causes BMW Chassis Stabilization Malfunction Warning To AppearWhat Causes BMW Chassis Stabilization Malfunction Warning To Appear
What Causes BMW Chassis Stabilization Malfunction Warning To AppearJCL Automotive
 
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...shivangimorya083
 
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls  Size E6 (O525547819) Call Girls In DubaiDubai Call Girls  Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubaikojalkojal131
 
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111Sapana Sha
 
VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...
VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...
VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...Garima Khatri
 

Recently uploaded (20)

UNIT-V-ELECTRIC AND HYBRID VEHICLES.pptx
UNIT-V-ELECTRIC AND HYBRID VEHICLES.pptxUNIT-V-ELECTRIC AND HYBRID VEHICLES.pptx
UNIT-V-ELECTRIC AND HYBRID VEHICLES.pptx
 
Hotel Escorts Sushant Golf City - 9548273370 Call Girls Service in Lucknow, c...
Hotel Escorts Sushant Golf City - 9548273370 Call Girls Service in Lucknow, c...Hotel Escorts Sushant Golf City - 9548273370 Call Girls Service in Lucknow, c...
Hotel Escorts Sushant Golf City - 9548273370 Call Girls Service in Lucknow, c...
 
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGERUNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
 
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp NumberVip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
 
꧁ ୨⎯Call Girls In Ashok Vihar, New Delhi **✿❀7042364481❀✿**Escorts ServiCes C...
꧁ ୨⎯Call Girls In Ashok Vihar, New Delhi **✿❀7042364481❀✿**Escorts ServiCes C...꧁ ୨⎯Call Girls In Ashok Vihar, New Delhi **✿❀7042364481❀✿**Escorts ServiCes C...
꧁ ୨⎯Call Girls In Ashok Vihar, New Delhi **✿❀7042364481❀✿**Escorts ServiCes C...
 
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHER
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHERUNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHER
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHER
 
Crash Vehicle Emergency Rescue Slideshow.ppt
Crash Vehicle Emergency Rescue Slideshow.pptCrash Vehicle Emergency Rescue Slideshow.ppt
Crash Vehicle Emergency Rescue Slideshow.ppt
 
Rockwell Automation 2711R PanelView 800 HMI
Rockwell Automation 2711R PanelView 800 HMIRockwell Automation 2711R PanelView 800 HMI
Rockwell Automation 2711R PanelView 800 HMI
 
BLUE VEHICLES the kids picture show 2024
BLUE VEHICLES the kids picture show 2024BLUE VEHICLES the kids picture show 2024
BLUE VEHICLES the kids picture show 2024
 
Indian Downtown Call Girls # 00971528903066 # Indian Call Girls In Downtown D...
Indian Downtown Call Girls # 00971528903066 # Indian Call Girls In Downtown D...Indian Downtown Call Girls # 00971528903066 # Indian Call Girls In Downtown D...
Indian Downtown Call Girls # 00971528903066 # Indian Call Girls In Downtown D...
 
Call Girls In Kirti Nagar 7042364481 Escort Service 24x7 Delhi
Call Girls In Kirti Nagar 7042364481 Escort Service 24x7 DelhiCall Girls In Kirti Nagar 7042364481 Escort Service 24x7 Delhi
Call Girls In Kirti Nagar 7042364481 Escort Service 24x7 Delhi
 
The 10th anniversary, Hyundai World Rally Team's amazing journey
The 10th anniversary, Hyundai World Rally Team's amazing journeyThe 10th anniversary, Hyundai World Rally Team's amazing journey
The 10th anniversary, Hyundai World Rally Team's amazing journey
 
Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...
Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...
Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...
 
Delhi Call Girls Mayur Vihar 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Mayur Vihar 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Mayur Vihar 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Mayur Vihar 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
 
Electronic Vehicle (EV) Industry Challenges
Electronic Vehicle (EV) Industry ChallengesElectronic Vehicle (EV) Industry Challenges
Electronic Vehicle (EV) Industry Challenges
 
What Causes BMW Chassis Stabilization Malfunction Warning To Appear
What Causes BMW Chassis Stabilization Malfunction Warning To AppearWhat Causes BMW Chassis Stabilization Malfunction Warning To Appear
What Causes BMW Chassis Stabilization Malfunction Warning To Appear
 
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
 
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls  Size E6 (O525547819) Call Girls In DubaiDubai Call Girls  Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubai
 
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111
 
VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...
VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...
VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...
 

Executive briefing 18.3.2015

  • 1. Copyright 2014 © DWI Automotive Quality Management System ISO/TS 16949:2009 THE EXECUTIVE BRIEFING
  • 2. Copyright 2014 © DWI WHAT WE WILL PRESENT TO YOU? Mengenal secara garis besar sistem manajemen mutu untuk industri otomotif dan rantai suplainya : ISO/TS 16949:2009 Latar belakang, proses sertifikasi serta persyaratan, serta pengembangannya”
  • 4. Copyright 2014 © DWI Enjoy The showEnjoy The show Tighten the seat belt, pleaseTighten the seat belt, please
  • 5. Copyright 2014 © DWI TENTANG INDUSTRI OTOMOTIF About Automotive Industry worldwideAbout Automotive Industry worldwide
  • 6. Copyright 2014© DWI TOTAL REVENUE TAHUN 2010 : US$ 1,184.6 BILLIONS TOTAL REVENUE TAHUN 2015 : US$ 1,563.7 BILLIONS WITH CAGR : 6.9% FOR 2010-2015
  • 7. Copyright 2014© DWI IF ALL OEM AND THEIR SUPPPLY CHAIN UNITED AND DEVELOPED COUNTRY – IT COULD BE :
  • 14. Copyright 2014 © DWI Key Regional Markets—BRI, MISTA (N5) and the Stan and Jan After the BRI and MISTA economies, OEMs will focus on the Stan and Jan countries which are considered the next frontier. 2.3% 4.9% 6.4% 16.1% 8.1% 10.2% 0.9% 4.1% 9.1% 3.9% 7.8% 2.3% 5.1% 11.8% India Brazil Russia Indonesia S.Korea Thailand Mexico Turkey Argentina Poland Ukraine Kazakhstan Czech… Slovakia Brazil India Russia S.Korea Thailand Indonesia Mexico Argentina Turkey Poland Ukraine Czech… Kazakhstan Slovakia 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Note: All figures are rounded; the base year is 2013. Sources: LMC Automotive, Frost & Sullivan. Light Vehicle Sales, BRI, MISTA, Stan and Jan, 2013 and 2020 3,573K 2,927K 2,762K 1,504K 1,278K 1,094K 1,067K 893K 834K 330K 229K 176K 159K 70K 7,225K 5,003K 3,604K 1,846K 1,604K 1,508K 1,403K 1,147K 1,051K 601K 501K 315K 269K 119K Ranking CAGR ‘13-’20
  • 16. Copyright 2013 © DWI The Outlook INDONESIAINDONESIA AUTOMOTIVEAUTOMOTIVE INDUSTRYINDUSTRY
  • 17. Copyright 2014© DWI 2010 • Manufacture of engine, transmission for MPV and Light Commercial Truck. • Supplier of component for MPV and Light Commercial Truck. • MPV, Light Commercial Truck. • 80% design of motor cycle. • Manufacture of engine, transmission for Commercial Truck up to 24 ton, SUV and small economical sedan . • Supplier of component for Commercial Truck up to 24 ton, SUV and small size sedan. •MPV, Commercial Truck s/d 24 ton, SUV and small economical sedan. • 80% design of 4W motor vehicle for MPV and Light commercial truck. • MPV, SUV, Small economical sedan, Commercial truck > 24 ton, Medium size sedan, Hybrid car. • 80% design of 4W motor vehicle for sedan and SUV. • Hybrid engine, ECU integration system. • Commercial truck component > 24 ton, Medium size sedan, Hybrid car. • MPV, SUV, Small economical sedan, Commercial truck > 24 ton, Medium size sedan, Hybrid car and Luxury car. • 80% design of 4W motor vehicle for medium size sedan. • Manufacture of luxury car quality component. • Supplier of luxury car quality component. 2025 2015 2020 Area of Cooperation : 1. Green Car Industry 2. Base Production for certain Model of Vehicle Indonesia Automotive Industry Long Term Master Plan sumber : KEBIJAKAN DAN STRATEGI PEMBANGUNAN INDUSTRI NASIONAL DALAM RANGKA MENINGKATKAN DAYA SAING – MENTERI INDUSTRI – AGUSTUS 2011
  • 19. Copyright 2014© DWI OEM Platform Etios /EFC 74,000 (started in Dec 2011) 66,000 (started in march 2013) Small Low 108,000 (hatch/sedan) Also Produced in India 120,000 (with Daihatsu : wait the regulation only in year 2013) Small Low 120,000 (with Toyota: wait the regulation only in year 2013) Brio/GSP 71,000 (Sept 2011) 73,000 (Sept 2011) 17,000 (SOP : Feb 2014) Brio Satya Mirage 148,000 (Jan 2012) Swift 48,000 (Mar 2012) 164,000 (Aug 2011) 48,000 (Mar 2012) Global small 72,000 (SOP : Jul 2013) 75,000 (sedan) (SOP : Jan 2014) 24,000 (SOP : Jul 2013) March/Micra – A Platform 107,000 (Jan 2010 ) 126,000 (Sept 2011) 19,000 (Sept 2010) K2- datsun Go+ : 24,000 (SOP 2014) Ke/B2- Platform 16,000 (Jul-2014) 154,000 (Jan-2014) Geographic Breadth Low Cost Subcompact/Mini Cars –Launch of common models
  • 21. Copyright 2014© DWI DOMESTIC AUTO PRODUCTION By Category : 2006 -2013 Source : Indonesia Automotive Industry: Report on 2013 Auto Market – by Gaikindo : APEC 20th Automotive Dialogue Beijing, China 22-25 April 2014 2014 : 1,298,523 units Increment : 8 %
  • 22. Copyright 2014© DWI DOMESTIC AUTO MARKET & EXIM By Category : 2006 -2013 Source : Indonesia Automotive Industry: Report on 2013 Auto Market – by Gaikindo : APEC 20th Automotive Dialogue Beijing, China 22-25 April 2014 2014 : 1,208,019 units REDUCE : 2 %
  • 23. Copyright 2014© DWI DOMESTIC MARKET AND PRODUCTION 2013 Source : Indonesia Automotive Industry: Report on 2013 Auto Market – by Gaikindo : APEC 20th Automotive Dialogue Beijing, China 22-25 April 2014
  • 29. Copyright 2014© DWI DOMESTIC MARKET & FORECAST 2013-2016 Source : Indonesia Automotive Industry: Report on 2013 Auto Market – by Gaikindo : APEC 20th Automotive Dialogue Beijing, China 22-25 April 2014
  • 30. Copyright 2014 © DWI GREAT LEAP OF NEXT DECADEGREAT LEAP OF NEXT DECADE ASEAN AUTOMOTIVE INDUSTRYASEAN AUTOMOTIVE INDUSTRY OUTLOOKOUTLOOK
  • 31. Copyright 2014© DWI POTENSI ASEAN DI INDUSTRI OTOMOTIF
  • 32. “Great Leap of Next Decade” for ASEAN Automotive Industry
  • 34. Copyright 2014© DWI Updated for year 2014 capacity installed : 1,998,131
  • 37. “Great Leap of Next Decade” for ASEAN Automotive Industry Growth Factors of ASEAN Market Growth Factors of ASEAN Market Source: Automotive Summit ( TAPMA) as of June 20, 2013
  • 38. Strong Cluster & Supply Chain Structure Parts manufacturers (450,000 workers) Supporting industries (100,000 workers) SUPPORTING INDUSTRY (Machinery, Equipment & Devices, Mold& Die, Jig & Fixture) SERVICE INDUSTRY -Distribution (W/H) -Finance -Testing -Consulting -Logistics -Banking/ Leasing SERVICE INDUSTRY -Distribution (W/H) -Finance -Testing -Consulting -Logistics -Banking/ Leasing UPSTREAM INDUSTRY (Steel, Plastics, Rubber, Electronics, Glass, Textiles, Leather, Chemicals, Oil, Coating, and Galvanized Metal) POLICY& SUPPORTING BODY -Government -Associations/ Institutes -Universities/ Technical Colleges POLICY& SUPPORTING BODY -Government -Associations/ Institutes -Universities/ Technical Colleges
  • 39. Strong Network in ASEAN and ASEAN+6 Parts Sourcing for ASEAN+ Dialogue PartnerParts Sourcing for ASEAN+ Dialogue Partner Source: ASEAN Automotive Federation(Automotive Summit 2013) as of June 24, 2013
  • 40. Copyright 2014© DWI ASEAN Automotive Industry Master Plan
  • 41. FUTURE AUTOMOTIVE INDUSTRYFUTURE AUTOMOTIVE INDUSTRY
  • 43. Copyright 2014 © DWI CONSOLIDATION, THY NAME IS THE GLOBAL AUTOMOTIVE INDUSTRY
  • 46. Copyright 2014 © DWI Key 2014 Powertrain Market Trends Global emissions norms (Euro 6/7, EPA, 2020 ACEA) and fuel economy standards (CAFE, CAFC) constantly encouraging OEMs and the automotive value chain to innovate and adopt varying global powertrain strategies Turbo Engine Downsizing Alternative Fuels Powertrain Modularity and Lightweighting High Speed Transmissions Dual Clutch Transmissions Powertrain Electrification Emission reduction & Fuel Efficient ICE technologies 2- and 3-cylinder engines, Reduced engine displacement, Downspeeding High speed DCT, 8/9/10-Speed Aluminium, Modular construction, parts commonality Wet and Dry clutch DCT PHEVs, Diesel hybrids, transmission electrification, EVs, Range Extenders Ethanol, LPG, CNG, Hydrogen Fuel Cell, gas plants DI, VVT, SCR, EGR, LNT, Start-Stop, Cylinder Deactivation, GPF Drivers: Euro6, ACEA,EPA, CAFE Fuels, Lubricants and Engine Oils Low Viscous Oils – 0W Low-SAPS Enhanced Additives
  • 47.
  • 49.
  • 50.
  • 51. Copyright 2014© DWI GLOBAL QUALITYGLOBAL QUALITY FOR GLOBAL PROBLEM :FOR GLOBAL PROBLEM : COULD BECOULD BE ANYWHERE,ANYWHERE, ANYPLACE,ANYPLACE, ANYHOWANYHOW
  • 52.
  • 55. Copyright 2014 © DWI The Automotive Supply Base has changed dramatically • Suppliers have responded to global competition and significant economic challenges : Setiap pemasok harus siap menghadapi persaingan global dan perubahan kondisi ekonomi sewaktu-waktu • The global footprint reflects the dynamic changes : Secara global perubahan terjadi secara dinamis
  • 56.
  • 57. Copyright 2014 © DWI ISO/TS 16949:2009 Automotive Quality Management System
  • 58. Copyright 2013 © DWI 1994-19991994-1999 2000-20022000-2002 2008-20092008-2009 The Development of ISO/TS 16949:2009 Dipersiapkan oleh International Automotive Task Force (IATF) + Japan Automobile Manufacturers Assoc. (JAMA) 2015?2015? SMMT ANFIAFIEVIAOB VDA NEW TS Rule 4th ., Edition 1.4.20141.4.2014
  • 59. Copyright 2014© DWI IATF today – refer to new TS rule 4th ., edition
  • 60. Copyright 2014 © DWI StrengtheningStrengthening The value andThe value and Credibility of TS 16949Credibility of TS 16949 “Raising the Bar”“Raising the Bar” Dari produk yang dikirimkan ke OEM serta pelaksanaan dari sertifikasi ISO/TS Dipertanyakan efektifitasDipertanyakan efektifitas dari sistem sertifikasidari sistem sertifikasi ISO/TS 16949ISO/TS 16949: Untuk bisa diandalkan sebagai jaminan kualiatas mata rantai suplai industri otomotif
  • 61. Copyright 2014© DWI The IATF established five Oversight offices, commonly referred to as IATF Global Oversight, to implement and manage its ISO/TS 16949 Certification Scheme. IATF today – refer to new TS rule 4th ., edition – 1.10.2013 is :
  • 62. Copyright 2014© DWI World distribution of ISO/TS 16949 certificates in 2013
  • 63.
  • 64.
  • 65.
  • 66. Evolution of ISO/TS 16949 certificates in Indonesia
  • 68. Copyright 2014© DWI Tata cara sertifikasi Harus dipatuhi oleh semua yang terkait dalam sertifikasi Bisa menjadi alasan memberikan temuan (minor/major) dan membatalkan sertifikat yang diberikan Rules for achieving and maintaining IATF recognition – 4th Edition for ISO/TS 16949
  • 69. Copyright 2014© DWI Customer specific requirements Review, learnt and implemented • Tanda penting pada gambar produk • Persyaratan mutu dalam quality manual untuk pemasok. • Kebijakan pelanggan : just in time delivery • Hazardous material control • Green Procurements • Peraturan dan perundang-undangan
  • 70. Market Drivers – OEM requirements OEM ISO/TS 16949:2009 or ? Customer Specific Requirements Audi/Volkswagen ISO/TS 16949:2009 or VDA 6 [ Quality Cap. Suppliers 4th Ed ] BMW Contact customer [ Supplied Parts Quality Mgmt ] Mercedez Benz ISO/TS 16949:2009 [ Daimler Customer specific Requirements for use with ISO/TS 16949: 2009 ] Chrysler ISO/TS 16949:2009 [ Chrysler Customer specific Requirements for use with ISO/TS 16949: 2009 ] Ford Motor Co. ISO/TS 16949:2009 (QS 9000 / Q1) [ Ford Customer specific Requirements for use with ISO/TS 16949: 2009 ] General Motors ISO/TS 16949:2009 [ GM Customer specific Requirements for use with ISO/TS 16949: 2009 ] Honda Contact customer – some case request ISO/TS 16949:2009 [ Honda Supplier Quality Manual ] Isuzu Contact customer [ Supplier Quality Manual ] Mazda Contact customer (Ford affiliate) Contact customer Mitsubishi Contact customer (Mitsubishi Fuso belong to Mercedez) [ SMITQA-003 ] Nissan Contact customer [ Supplier Quality Manual / Alliance Supplier Guide ] PSA Peugeot-Citroën ISO/TS 16949:2002 Contact customer Renault ISO/TS 16949:2002 Contact customer Rover Contact customer [ RG2000 Supplier Management System ] Saab Contact customer Contact customer Subaru Contact customer [ Subaru Supplier Manual ] Toyota Contact customer [ Supplier Quality Assurance Manual ]
  • 71. Copyright 2014© DWI The Customer Representative Ditetapkan sebagai perwakilan pelanggan di perusahaan • Memastikan semua syarat pelanggan diterapkan • Memastikan pelatihan apa saja yang dibutuhkan untuk implementasi syarat pelanggan • Memastikan target perusahaan bersesuaian dengan target pelanggan • Memastikan tindakan terhadap keluhan pelanggan yang terjadi • Memastikan persiapan produksi dari produk baru yang dikerjakan
  • 72. Copyright 2014 © DWI SKEMA SERTIFIKASI ISO/TS 16949:2009
  • 73. Copyright 2014© DWI Taken from : IATF Auditor Guide for ISO/TS 16949 First Edition April 2009 All rights reserved © 2009 ANFIA, © 2009 IATF France, © 2009 IAOB, © 2009 SMMT, © 2009 VDA.
  • 74. Copyright 2014© DWI Taken from : IATF Auditor Guide for ISO/TS 16949 First Edition April 2009 All rights reserved © 2009 ANFIA, © 2009 IATF France, © 2009 IAOB, © 2009 SMMT, © 2009 VDA.
  • 75. Copyright 2014 © DWI EGIBILITY FOR TS CERTIFICATION “ISO/TS 16949 defines the quality management system requirements for a client providing design and development, production and, when relevant, assembly, installation, and services of automotive-related products.” • Pabrikan • Pelayanan/services : Welding, Coating, Painting, Heat treatment.
  • 76. Copyright 2014 © DWI "Automotive" shall be understood to include the following: Passenger Cars, Light Commercial Vehicles, Heavy Trucks, Buses, Motorcycles, and to exclude the following: Industrial, Agricultural, Off-Highway (Mining, Forestry, Construction, etc.). Aftermarket parts are excluded. “Aftermarket parts” shall be understood as replacement parts not procured or released by the OEM for service part applications that may or may not be produced to original equipment specifications. Sites manufacturing only aftermarket parts are not eligible for ISO/TS 16949 certification.
  • 77. Copyright 2014 © DWI Strengthening The value and Credibility of TS 16949 “Raising the Bar” Two expected outcomes: 1. Supply Base performance and TS Certification are aligned 2. Eliminate the perception that “Everyone gets a Certificate”
  • 78. Copyright 2014 © DWI Pelanggan OEM harus memiliki keyakinan bahwa TS kegiatan sertifikasi 16949 TS 16949 memenuhi kriteria untuk membuat keputusan sourcing yang mengurangi risiko yang berhubungan dengan kemampuan sistem manajemen mutu dan kinerja aktual dari produk yang dikirimkan ke pelanggan (OEM atau TIER) • Confidence • Reduces Risk • Capable QMS System • Meets Criteria • Actual Performance Strengthening The value and Credibility of TS 16949 “Raising the Bar”
  • 80. Copyright 2014 © DWI standar internasional dan spesifikasi teknis yang mengandung persyaratan untuk membangun dan memelihara sistem manajemen mutu untuk desain dan pengembangan, produksi, dan ketika instalasi dan pelayanan produk mobil terkait yang relevan. Spesifikasi teknis adalah semua syarat pelanggan automotive yang disuplai Standar international adalah semua syarat dalam QMS – ISO 9001 SISTEM MANAJEMEN MUTU OTOMOTIF ISO/TS 16949
  • 81. Copyright 2014 © DWI Sasaran dari sistem manajemen mutu ISO/TS Pengembangan sistem Kualitas mendasar yang menyediakan perbaikan terus-menerus, menekankan pencegahan cacat dan pengurangan variasi dan potensi serta timbulnya pemborosan dalam rantai pasokan.
  • 82. Copyright 2014 © DWI AUDITAUDIT OBJECTIVEOBJECTIVE The objectives of this audit were to confirm that the management system: •conforms with all the requirements of ISO/TS16949:2009 •Confirms with applicable Customer Specific Requirements – Including their satisfaction level fulfilled •of the organisation has been effectively implemented •is capable of achieving the organisation’s policy objectives “The goal of this specification is the development of a quality management system that provides for; •continual improvement, •emphasizing defect prevention and •the reduction of variation and waste in the supply chain.”
  • 83. Copyright 2014© DWI Continual improvement of the Quality Management System Resource management Measurement, analysis and improvement Management responsibility Product Shareholders Shareholders Satisfaction Shareholders Shareholders Requirements Input Output Product realisation Model of process-based QMS Value adding activities Information flow
  • 84. Copyright 2014© DWI Plan-Do-Check-Act cycle & continual improvement Act • How to improve next time? Take actions to continually improve process performance – effectiveness and efficiency Plan • What to do • How to do it Establish objectives necessary to deliver results in accordance with customer requirements and the organisation's policies Check • Did things happen according to plan?Monitor and measure processes and product against policies, objectives and requirements Do • Do what was planned Implement the processes
  • 85. Copyright 2014© DWI Plan-Do-Check-Act cycle & continual improvement
  • 87. Copyright 2014© DWI Plan-Do-Check-Act cycle & continual improvement
  • 88. Copyright 2014© DWI Typical network of interrelated or interacting processes PDCA Process A PDCA Process B PDCA Process C PDCA Internal Customer Process F PDCA Internal Customer Process D PDCA Process E PDCA Customers&stakeholdersCustomers&stakeholders Customers&Customers& stakeholdersstakeholders
  • 90. Copyright 2014© DWI Kontrol Proses bukan Kontrol Produk
  • 92. Copyright 2014 © DWI Automotive Production Process Cycle
  • 94. Copyright 2014 © DWI DESIGN PRODUCT RESPONSIBILITY • All TS Requirements shall be addressed in Quality Mgt System • Design Responsible shall be defined by customer or by organization
  • 95. Copyright 2014 © DWI Outsourcing Process Management • Semua proses outsourcing yang berpengaruh kepada mutu produk harus dikendalikan • Pabrikan Supplier komponen yang akan digunakan harus tersertifikasi ISO 9001 • Evaluasi dengan kriteria wajib : quality, pengiriman, premium freight case serta kasus klaim pelanggan yang timbul karena part yang disuplai
  • 96. Copyright 2014 © DWI SERTIFIKASI • Sertifikasi hanya untuk pabrikan • Supporting remote site harus ikut dalam sertifikasi – meski demikian sertifikasi hanya perlu sekali untuk scope supporting yang sama untuk semua pabrikan yang disupport
  • 97. Copyright 2014 © DWI Automotive Process Approach
  • 98. Copyright 2014 © DWI “MACHINE” To create value Activities People Resources Information and material flow Management Deliverables Contribution to results Customer Shareholders Personnel Society (strategic and operational objectives) Output >> shall be reflected of customer satisfaction objectives Internal customer satisfaction objectives from the departments/sections If the process supplies the right product at the first time and at the right place it is EFFECTIVE If the process supplies the right product at the first time and at the right place it is EFFECTIVE If the right first time minimum cost and/or used resources as a planned it is EFFECIENT If the right first time minimum cost and/or used resources as a planned it is EFFECIENT MANAGING WITH INDICATORS
  • 99. Copyright 2014 © DWI TOP MANAGEMENT ROLES
  • 100. Copyright 2014 © DWI ENHANCE THE CUSTOMER SATISFACTION ISO/TS 16949:2009 : Top Management Roles
  • 102. Copyright 2014© DWI Those concerned to ensure the success and longevity of the company Concern to develop, motivation employment, health and safety Delight those whom value is added and pay Concerned to profitability, company development, new markets and the business environment respect to statutory and regulatory; beneficial relationship
  • 103. Copyright 2014© DWI Business Plan and theirBusiness Plan and their measurable objectivemeasurable objective deploymentdeployment Clear definition ofClear definition of responsibilitiesresponsibilities Enhance the customerEnhance the customer satisfactionsatisfaction Plant Lay out ReviewPlant Lay out Review Quality Mgt System EffectivenessQuality Mgt System Effectiveness
  • 104. Business Plan; Strategic Plan and Their review Top management involvement including; 1. Define the business plan 2. Strategic management and their deployment 3. Implementing a business plan linked to defined measurable quality objectives 4. Effectiveness Review 5. Continual Improved
  • 105. Copyright 2014 © DWI PERAN MANAJEMEN
  • 106. Copyright 2014 © DWI RISK IDENTIFIED, MITIGATED AND CONTROLLED
  • 107. Copyright 2014 © DWI RISK IDENTIFIED, MITIGATED AND CONTROLLED
  • 108. Copyright 2014 © DWI RISK MANAGEMENT THROUGH FEASIBILITIES MANUFACTURING STUDY • Technical Risk • Process capability Risk • Capacity Risk • Timing Risk • Investment Risk - and many more risk could be considered Risk does not mean necessarily to be avoided - but the risk is recognized from the beginning to anticipate with appropriate policies, strategy and effective plan
  • 109. Copyright 2014 © DWI RISK MANAGEMENT THROUGH POTENTIAL FAILURE PROCESS MAPPING AND PREVENTION Risk does not mean necessarily to be avoided - but the risk is recognized from the beginning to anticipate with appropriate policies, strategy and effective plan Potential Failure of design and process that caused : quality; environmental and safety shall be planned to be reviewed and prevented for both : • Internal process • External process (sub contract process)
  • 110. Copyright 2014 © DWI RISK MANAGEMENT THROUGH Delivery Contingency Plan Effective plan to ensure delivery performance to customer for following possible caused : • Re-Call the product • Material supplied problem • Man Power Problem • Production Facilities breakdown • Force Major
  • 111. Copyright 2014 © DWI Tujuan Review Hasil Review Waktu Review Agenda Review
  • 117. Copyright 2014 © DWI Tujuan Management Review: PDCA mechanism cycle
  • 118. Copyright 2014 © DWI Management Review Agenda: Input & Output Review
  • 119. Copyright 2014 © DWI Management Review Agenda: Production process efficiency Apparent Efficiency vs. True Efficiency Taiichi Ohno illustrated the common confusion between apparent efficiency and true efficiency with an example of 10 people producing 100 units daily. If improvements to the process boost output to 120 units daily, there is an apparent 20 percent gain in efficiency. But this is true only if demand also increases by 20 percent. If demand remains stable at 100 the only way to increase the efficiency of the process is to figure out how to produce the same number of units with less effort and capital. (Ohno 1988, p. 61.) Total Efficiency vs. Local Efficiency Toyota also commonly distinguishes between total efficiency, involving the performance of an entire production process or value stream, and local efficiency, involving the performance of one point or step within a production process or value stream. It emphasizes achieving efficiency in the former over the latter.
  • 120. Copyright 2014 © DWI Management Review Agenda: 1.Potential Quality accident 2.Potential Safety accident 3.Potential Environment accident
  • 121. Copyright 2014 © DWI Management Review Agenda: Material movement – plant lay out
  • 122. Copyright 2014 © DWI Management Review: Bisa terdiri dari berbagai jenis review dan laporan
  • 123. Copyright 2014 © DWI REVIEW TO EVALUATE THE PRODUCTION EFFICIENCY
  • 124. Copyright 2014 © DWI Focus on potential quality, safety, environment accidents
  • 125. Copyright 2014 © DWI Focus on Continual Improvement and their review :
  • 126. Copyright 2014 © DWI Perusahaan/Organisasi memiliki kemampuan untuk bisa berkomunikasi sesuai dengan permintaan/cara pelanggan
  • 127. Copyright 2014 © DWI MANAGING WITH INDICATORS
  • 128. Copyright 2014 © DWI RISK IDENTIFIED, MITIGATED AND CONTROLLED
  • 129. Copyright 2014 © DWI QUALITY MANAGEMENT SYSTEM PERFORMANCE MASIH SESUAIKANSISTEMMANAJEMENMUTUUNTUKKONDISI PERUSAHAANSAAT INIDANKEBUTUHANDIMASAMENDATANG?
  • 130. Copyright 2014 © DWI STANDARD DOCUMENTATION
  • 131. Copyright 2014 © DWI 7 Mandatory Procedures Training Internal Quality Audit NC product Handling Corrective Action Document Control Quality records Control Preventive Action
  • 132. Copyright 2014© DWI Quality Manual Procedures S O P Form, Checksheet, Record Company Association Chart Departement Association Chart Plant One year policy Quality Objective Quality Objective Quality Policy Departement Activity Plant Strategy Plan Long term Business Plan Model Klasik Keterkaitan Policy Deployment dengan Sistem Mutu Groups/Corporate Company
  • 133. Copyright 2014© DWI FORM/ CHECK SHEET Pedoman operasi Sistem Manajemen Mutu yang ditujukan bagi seluruh level Penjabaran dari kebijakan dalam Quality Manual, dalam bentuk pemberian tanggung jawab dan wewenang utk melaksanakan suatu aktivitas. kebijakan dalam Quality Manual dibuat Prosedur. Daftar Prosedur terdapat dalam Lampiran Quality manual. Penjelasan yang lebih detail tentang suatu prosedur Dalam melaksanakan prosedur atau SOP, agar aktivitas yang dilakukan dapat terdokumentasi dan dipertanggungjawabkan disediakan form atau checksheet. QUALITY MANUAL PROSEDUR S O P ISO/TS 16949 FORM/ CHECK SHEET S O P PROSEDUR QUALITY MANUAL Model Jaminan Mutu dalam Produksi, Pemasangan dan Pelayanan. 20 Pasal, terdiri dari 19 pokok persyaratan. DOKUMENTASI SISTEM MUTU
  • 134. Copyright 2014© DWI PENGENDALIAN DOKUMEN • Menjamin kerahasiaan dokumen untuk kepentingan bisnis internal dan pelanggan • Pengendalian dokumen milik pelanggan
  • 135. Copyright 2014© DWI PENGENDALIAN DOKUMEN • Format dokumen sesuai dengan persyaratan pelanggan - • Perubahan hanya bisa dilakukan atas persetujuan pelanggan
  • 136. Copyright 2014© DWI PENGENDALIAN DOKUMEN • Menentukan masa simpan sesuai dengan syarat pelanggan • Pengendalian sesuai dengan sifat dokumen : hard copy atau elektronik
  • 138. Copyright 2014 © DWI Sumber daya adalah Kemampuan untuk menghasilkan produk dan servis seperti yang diminta pelanggan – Pra sarana poduksi – Pra sarana pendukung – Finansial – Personel yang handal – Manajemen support
  • 139. Copyright 2014 © DWI Organization Knowledge Keahlian Organisasi “ Organisasi harus menetapkan keahlian apa yang harus dimiliki agar bisa memberikan kepuasan kepada pelanggan “
  • 140. Copyright 2014 © DWI Menjamin kompetensi personil
  • 141. Copyright 2014 © DWI Authority & responsibility • Quality Management Representative & Customer Representative with concern to – Quality management system maintenance & development – Customer requirements – Managerial capabilities & Authorities – Quality decision and quality product approval
  • 142. Copyright 2014 © DWI Authority & responsibility • Clear definition of responsibilities including; – Authority to stop production to correct quality problems – Setiap shift harus jelas siapa yang akan menjadi pengambil keputusan apabila terdapat masalah produksi/mutu
  • 143. Copyright 2014 © DWI Ahli desain produk Menetapkan keahlian untuk mereka yang akan melakukan desain produk Termasuk internal auditor yang melakukan audit desain produk
  • 144. Copyright 2014 © DWI Ahli desain produk dan/atau proses Menetapkan keahlian untuk mereka yang akan melakukan desain proses Termasuk internal auditor yang melakukan audit desain proses
  • 145. Copyright 2014 © DWI On the job training
  • 146. Copyright 2014 © DWI On the job training • The organization shall provide on-the-job training for personnel in any new or modified job affecting product quality, including contract or agency personnel. • Karyawan baru mengikuti standar pelatihan sebelum melakukan pekerjaan di jalur produksi – berlaku untuk pekerja harian dan/atau pekerja dari pihak luar http://www.bls.gov/green/electric_vehicles/image4.jpg
  • 147. Copyright 2014 © DWI Memetakan kebutuhan pelatihan Merencanakan pelatihan berdasarkan kebutuhan untuk membangun keahlian dari organisasi untuk memuaskan pelanggan Training Needs Analysis
  • 148. Copyright 2014 © DWI Training Needs Analysis
  • 149. Copyright 2014 © DWI Training Needs Analysis
  • 150. Copyright 2014 © DWI Setiap karyawan mengerti perannya untuk mencapai target perusahaan Pemberdayaan dan peningkatan motivasi karyawan
  • 151. Copyright 2014 © DWI “ organisasi harus memiliki program untuk memberdayakan karyawan serta meningkatkan motivasinya Serta memiliki cara bagaimana mengukur keberhasilan program tersebut“ Pemberdayaan dan peningkatan motivasi karyawan
  • 152. Copyright 2014 © DWI Training is also part of improvement
  • 153. Copyright 2014 © DWI Effectiveness evaluation of Training “ pelatihan adalah cara organisasi meningkatkan kemampuannya untuk menjamin kepuasan pelanggan“ Training is also part of improvement
  • 154. Copyright 2014 © DWI Focus on Continual Improvement and their review
  • 155. Copyright 2014 © DWI DESAIN PRODUK
  • 157. Copyright 2014 © DWI Automotive Development Process Cycle
  • 158. Copyright 2014 © DWI Product Design Shall Controlled • Bisa diabaikan hanya jika dilakukan oleh pelanggan. • Design site bisa menunjang lebih dari 1 pabrikan – dan hanya perlu diaudit 1 kali dalam proses sertifikasi • Bisa dikerjakan oleh pihak ke-3. tetapi tetap harus diaudit/termasuk dalam sertifikasi
  • 159. Copyright 2014 © DWI Product Design Shall Controlled • Design Tooling bukan desain produk • Membuat sample bukan berarti membuat prototype
  • 161. Copyright 2014© DWI PERSIAPAN PRODUKSI MASSAL • Project Manajemen dengan multy disiplin team/bagian/departemen • Setiap OEM memiliki model manajemen proyek yang unik/berbeda satu-sama lain • APQP : GM; Ford; Mercedez • ANPQP : Nissan, Renault
  • 162. Copyright 2014© DWI PERSIAPAN PRODUKSI MASSAL • Memiliki pola yang sama untuk semua OEM/ATPM : • Masukan/inputan persiapan produksi • Target • Jadwal • Standard dokumen • Audit persiapan • Pembuatan tooling dan pra sarana produksi • Pelatihan • Pengendalian perubahan • Pengujian • Evaluasi kemampuan proses dan stabilitas proses • Sample untuk pengesahan • Verifikasi dan Validasi • Kontrol lot awal produksi
  • 171. Copyright 2014© DWI PERSIAPAN PRODUKSI MASSAL: OBEYA : PROJECT MANAGEMENT VISUAL CONTROL DARI TOYOTA
  • 172. Copyright 2014© DWI PERSIAPAN PRODUKSI MASSAL NISSAN-RENAULT : ANPQP
  • 173. Copyright 2014 © DWI Product Quality Planning since beginning
  • 174. Copyright 2014 © DWI PROSES YANG NYARISNYARIS SEMPURNA UNTUK JAMINAN PRODUK YANG NYARISNYARIS SEMPURNA PULA
  • 175. Copyright 2014 © DWI APQP’S WAY OF THINKING : BEST IN-CLASS STRATEGIESBEST IN-CLASS STRATEGIES Requirements Design Implem- entation Unit Test Test Release NUMBER OF DEFECTS DEFECT PREVENTION EARLY DEFECT DETECTION (80-90% before Test) • Reference: “A Software Quality Strategy for Demonstrating Early ROI”, Olson, 1995
  • 176. Copyright 2014 © DWI APQP’S WAY OF THINKING : Early Defect Detection Shortens the Schedule RESOURCES $ Without Early Defect Detection SCHEDULE • Adapted from Fagan, M. “Advances in Software Inspections”, IEEE Transactions on Software Engineering, July 1986 Requirements Design Implementation ReleaseTest With Early Defect Detection
  • 177. Copyright 2014 © DWI MENGENDALIKAN PROSES : MENYIAPKAN PROSES YANG BISA DIPREDIKSIMENYIAPKAN PROSES YANG BISA DIPREDIKSI HASILNYAHASILNYA
  • 178. Copyright 2014© DWI MENGENDALIKAN PROSES : MENYIAPKAN PROSES YANG BISA DIPREDIKSIMENYIAPKAN PROSES YANG BISA DIPREDIKSI HASILNYAHASILNYA
  • 179. Copyright 2014© DWI MENGENDALIKAN PROSES : MENYIAPKAN PROSES YANG BISA DIPREDIKSIMENYIAPKAN PROSES YANG BISA DIPREDIKSI HASILNYAHASILNYA
  • 180. Copyright 2014 © DWI • Process capabilities review and their maintenance through implementation Statistic Process Control – Internal process – Supplier production process • Quality Product process through Advanced Product Quality Planning and Quality Control
  • 181. Copyright 2014 © DWI Special Characteristics
  • 183. Copyright 2014© DWI PENGENDALIAN PERUBAHAN PROSES Setiap perubahan harus dipastikan terlebih dahulu sebelum produksi bisa diteruskan. Perubahan proses bisa diperlukan harus memberitahukan terlebih dahulu kepada pelanggan untuk mendapatkan pengesahan – sebelum bisa dilakukan – sesuai dengan persyaratan pelanggan yang ditetapkan
  • 185. Copyright 2014© DWI PENGENDALIAN PERUBAHAN PROSES • Respon terhadap pertanyaan mengenai perubahan engineering dari pelanggan harus dibawah 14 hari kerja. • Pelaksanaan perubahan engineering sesuai dengan persyaratan pelanggan • Perubahan dan pembaharuan dari standard harus dilakukan untuk perubahan engineering yang dilakukan
  • 186. Copyright 2014 © DWI “Improvements in quality always, and automatically, results in cost and lead time reduction, increase productivity, increase market shares, and hence increase profits.” MR.W.Edwards Deming As reference : ISO 9004:2009 Clause : 8.2.1.1.; 8.2.3.1.; 8.2.4.1.; 8.2.2. COST OF POOR QUALITY, COPQ
  • 187. Copyright 2014 © DWI “Improvements in quality always, and automatically, results in cost and lead time reduction, increase productivity, increase market shares, and hence increase profits. MR.W.Edwards Deming COST OF POOR QUALITY
  • 188. Copyright 2014 © DWI “Improvements in quality always, and automatically, results in cost and lead time reduction, increase productivity, increase market shares, and hence increase profits. MR.W.Edwards Deming COST OF POOR QUALITY
  • 189. Copyright 2014 © DWI “Improvements in quality always, and automatically, results in cost and lead time reduction, increase productivity, increase market shares, and hence increase profits. MR.W.Edwards Deming COST OF POOR QUALITY
  • 190. Copyright 2014 © DWI I want my money back! I want my money back! Cost of Quality (COQ)Cost of Quality (COQ) PreventionPrevention AppraisalAppraisal Internal Failure Internal Failure External Failure External Failure $$
  • 191. Copyright 2011 © DWI Examples of Prevention Expense  Quality Planning  Training and Education  Process Definition  Customer Surveys  Preproduction Reviews  Technical Manuals  Detailed Product Engineering  Early Approval of Product  Specifications  Purchase Cost Targets  Process Capability  Studies  Preventive Maintenance  Supplier Qualification  Job Descriptions  Housekeeping  Zero-Defect Program
  • 192. Copyright 2011 © DWI  Supplier Certification  Employee Surveys  Security Checks  Safety Checks  Reviews: – Operating Expenditures – Product Costs – Financial Reports – Capital Expenditures Examples of Appraisal Expense  Test  Inspection  Process Controls  Train QA Personnel  Product Audits  Quality Systems Audits  Customer Satisfaction  Surveys and Audits  Prototype Inspection  Accumulating Cost Data
  • 193. Copyright 2011 © DWI  Supplier Problems – Scrap and rework – Late deliveries – Excess inventory  Equipment Downtime  Accidents, Injuries  Absenteeism  Unused Reports  Missed Schedule Cost  Lost Sales (any cause) Examples of Internal Failure Costs  Substandard Product  Scrap or Rework  Re-inspection  Redesign/Engineering Change  Process Modifications  Payroll Errors  All Expediting Costs  Off-Spec/Waiver  Abandoned Programs
  • 194. Copyright 2011 © DWI Examples of External Failure Costs  Product Recall  Handling Complaints  Customer Service Caused by Errors  Products Returned  Analysis of Returns  Evaluation of Field Stock  Late Payments and Bad Debts  Lawsuits  Reports – Sales and service – Returns and allowances – Failure Lost Sales Because of Customer Dissatisfaction!
  • 195. Copyright 2014 © DWI Non-value Added Work • Common activities that provide no benefit to customers. – Some result from internal or external failure – Some are unnecessary inspection  Examples – Rarely used information systems – Memos never read – Financial reports not used – Irrelevant procedures – Meetings with no objectives or outcomes Definition
  • 196. Copyright 2014© DWI NILAI BISANILAI BISA DIRENCANAKANDIRENCANAKAN DANDAN DIHASILKANDIHASILKAN TIDAK TIMBUL DENGAN SENDIRINYATIDAK TIMBUL DENGAN SENDIRINYA
  • 197. Copyright 2013 © DWI waste value HARDER SMARTER Working smarter and Working Harder waste value value More work waste
  • 198. Copyright 2014© DWI ApaApa nilai tambahnilai tambah Dari garis yang dibuatDari garis yang dibuat tidak lurus?tidak lurus? http://fijiboardexiles.yuku.com/topic/5345#.Tpz5rJsQj35
  • 199. Copyright 2014© DWI http://2.bp.blogspot.com/-O__O9QUFNrA/Tbwm-IXL_XI/AAAAAAAAAAQ/Ib4AGOA-GdE/s1600/IMG0423A.jpg Boros bisa tidak terasa :Boros bisa tidak terasa : Panjang antrean : 20 orang, setiap prosesPanjang antrean : 20 orang, setiap proses butuh waktu 5 menit : maka waktu orang ke-20butuh waktu 5 menit : maka waktu orang ke-20 akan dilayani pada menitakan dilayani pada menit ke : 100ke : 100 BAGAIMANA BILA INI SETIAP HARI ?BAGAIMANA BILA INI SETIAP HARI ?
  • 201. Copyright 2014© DWI AJI MUMPUNG:AJI MUMPUNG: ADALAH PROSES YANG MENGUTAMAKANADALAH PROSES YANG MENGUTAMAKAN NILAINILAI KETIMBANG PEMBOROSANKETIMBANG PEMBOROSAN
  • 202. Copyright 2014 © DWI The Hidden Organization “Theoretical Cycle Time: The back-to-back process time required for a single unit to complete all stages of a task without waiting, stopping, or setups.” Product Step 1 Step 2 Floor SpaceFloor Space Floor SpaceFloor Space Floor SpaceFloor Space Value Added Non-Value Added Philip R. Thomas, Competitiveness Through Total Cycle Time. McGraw- Hill (1990) The Hidden Factory Analyze Fix Test Analyze Fix Test
  • 203. Copyright 2014© DWI COPQ Process & Soft / Employee Which supplier would you choose? Supplier A Price 2,30 USD Price 2,30 USD Supplier B Price 2,45 USD Price 2,45 USD Supplier C Price 1,99 USD Price 1,99 USD
  • 204. Copyright 2014© DWI Cost of Poor Quality
  • 205. Copyright 2014© DWI COPQ Product Example Module Production ProductProduct Customer returns (claims) Inspection cost Trouble shooting / analysis Lack of producibility Scrap Repair & Rework Cost for test INCOMING INSPECTION SCRAP ASSEMBLY ASSEMBLY INSPECTIONTEST TEST TROUBLE SHOOTING REPAIR / REWORK SMAAOI AOI INSPECTIONPRINTING CUSTOMER RETURNS INTERNAL CLAIMS
  • 206. Copyright 2014 © DWI TRADITIONAL COST OF POOR QUALITY(4-5% of Sales) When quality costs are initially determined, the categories included are the visible ones as depicted in the iceberg below. Waste Testing Costs Rework Customer Returns Inspection Costs Rejects Recalls
  • 208. Copyright 2014© DWI Cost of Poor Quality As an organization gains a broader definition of poor quality, the hidden portion of the iceberg becomes apparent. Late Paperwork High CostsPricing or Billing Errors Excessive Field Services Expenses Incorrectly Completed Sales OrderLack of Follow-up on Current Programs Excessive Employee Turnover Planning Delays Excess Inventory Excessive System CostsOverdue Receivables Complaint Handling Unused Capacity Time with Dissatisfied Customer Excessive Overtime Waste Testing Costs Rework Customer Returns Inspection Costs Rejects Recalls Development Cost of Failed Product Hidden COPQ: The costs incurred to deal with these chronic problems Premium Freight Costs Customer Allowances COPQ ranges from 15-25% of Sales
  • 209. Copyright 2014© DWI PREMIUM FREIGHT = WASTE COST OF DELIVERY
  • 210. Copyright 2014 © DWI Focus on Continual Improvement and their review : • Performance monitoring (performance dashboard) • Effectiveness improvement evaluation
  • 211. Copyright 2014 © DWI Focus on Continual Improvement and their review :
  • 214. Copyright 2014© DWI 5. Production Performance 2. Maintenance provision Short term equipment breakdown analysis • Preventive Maintenance • Repair • Predictive maintenance Long term equipment breakdown analysis 3. Continual Improvement 4. Design process 1. Risk Management Maintenance standard (maintainability) KPI performance setup • Key equipments • Spare parts
  • 215. Copyright 2014 © DWI • Clear Information and management of production planning – and their related achievement control • Clear problem information, and action planned including their result and effectiveness evaluation • Effective communication Production Shop Floor Management
  • 216. Copyright 2014© DWI Perencanaan produksi Perencanaan produksi dilakukan sesuai dengan permintaan pelanggan – sanggup mengikuti metode komunikasi dari pelanggan – termasuk untuk permintaan produksi secara just in time
  • 217. Copyright 2014© DWI Shop Floor production management : Planning and achievement monitoring
  • 218. Copyright 2014© DWI Lean Production System Way of thinking
  • 219. Copyright 2014© DWI Lean Production System Way of thinking : Production Lay out review for added value creation
  • 220. Copyright 2014© DWI Shop Floor production management : Clean lines & Tidiness
  • 221. Copyright 2014© DWI Shop Floor production management : Clean lines & Tidiness • Working Instruction • Parameter setting standard • Regular Checking standard • 4M information
  • 222. Copyright 2014© DWI Shop Floor production management : Production set-up • Ensure all parameter setting has been confirmed against the standard given • Ensure all the production equipment and tools are ready to be used • Ensure all material and component has been used are confirmed • Ensure the production based on the 1st ., product result
  • 223. Copyright 2014© DWI Identifikasi produk: Kemampu telusuran produk • Mampu telusur dari kode produk akhir hingga sub komponen yang digunakan untuk assembly serta material yang digunakan untuk produksi part/komponen • Identifikasi untuk memastikan FIFO dari material dan/atau komponen yang digunakan
  • 224. Copyright 2014© DWI Identifikasi produk: Kemampu telusuran produk • Kode bersifat unik – serta memiliki ketahanan sesuai dengan yang dibutuhkan
  • 225. Copyright 2014© DWI Identifikasi produk: Kemampu telusuran produk • Produk yang ditemukan tanda identitas akan dianggap sebagai produk tidak sesuai dengan standard
  • 226. Copyright 2013 © DWI Supplier Quality Management System • Setiap harus telah tersertifikasi ISO 9001 • Kecuali mendapat kelonggaran dan persetujuan dari pelanggan
  • 227. Copyright 2013 © DWI Incoming inspection • Pemeriksaan dengan metoda sampling untuk kondisi kontrol ketat, kontrol menengah hingga normal • Pengolahan data dengan menggunakan metoda SPC • Pelaksanaan audit supplier • Pemeriksaan dengan metoda tertentu – sebelum produk dikirimkan ke pabrikan
  • 228. Copyright 2014 © DWI The organization promote supplier monitoring performance of their manufacturing processes.. •Delivered product quality; •Customer disruptions including field returns; •Delivery performance (including incidents of premium freight); •Special status customer notifications related to quality or delivery issues. Supplier monitoring
  • 229. Copyright 2014 © DWI Kemampuan proses produksi pemasok harus dipastikan dan senantiasa dievaluasi berdasarkan : •Evaluasi proses produksi supplier saat seleksi pemasok •Menggunakan PFMEA sebagai potensi kegagalan proses dari pemasok yang bisa memberikan dampak ke proses organisasi •Evaluasi kemampuan proses saat persiapan produksi untuk produk yang akan dibuat •Evaluasi data dari pemeriksaan berkala saat penerimaan barang datang dan/atau melalui pemeriksaan berkala yang disertakan saat pengiriman dengan menggunakan SPC Evaluasi serta senantiasa memastikan kemampuan proses produksi dari supplier
  • 230. Copyright 2014 © DWI Storage and inventory • Pengendalian status dan kondisi sediaan secara berkala. • Sistem penyimpnan/Invento ry management system dilakukan dengan memastikan untuk mensuplai material sesuai dengan waktu kedatangan (FIFO)
  • 231. Copyright 2014 © DWI Storage and inventory Memastikan sediaan yang telah disimpan terlalu lama dan/atau kadaluwarsa – sebagai produk yang telah tidak sesuai dengan spesifikasi pelanggan
  • 232. Copyright 2014 © DWI • Conduct Tooling management (maintenance and repair facilities, storage) • Tooling set-up, change program for perishable tools; • Tool design modification documentation (including engineering change level); • Tool identification, defining the status, such as production, repair or disposal. (Monitor these tooling management activities if any work is outsourced) Tooling Management
  • 233. Copyright 2014 © DWI • Life time tooling – serta pengesahan ulang setelah target masa pakai terpenuhi • Perawatan berdasarkan jumlah pemakaian • Pemeriksaan keausan • Pembaharuan • Pengesahan hasil Modifikasi • Riwayat perawatan Tooling Management
  • 234. Copyright 2014 © DWI Pemeliharaan dan pemastian berkala akurasi dari C/F fixture Tooling Management
  • 235. Copyright 2014 © DWI • Pengendalian – juga mencakup pemeriksaan spesifikasi dengan mesin/system. • Pengendalian juga harus dilakukan untuk limit appearance sample • Badan pelaksanan eksternal harus bersertiifikasi ISO17025. • Harus ada keputusan berdasarkan hasil pemeriksaan apakah alat ukur/pemeriksaa tersebut masih laik digunakan atau tidak PENGENDALIAN ALAT UKUR DAN PEMERIKSAAN
  • 236. Copyright 2014 © DWI • Pengendalian secara internal harus dilengkapi dengan instruksi kerja dan tenaga yang memiliki keahlian yang memadai. • Identitas pengendalian • Standard tindakan apabila hasil pengendalian menyatakan alat ukut memiliki penyimpangan yang lebih dari yang diijinkan PENGENDALIAN ALAT UKUR DAN PEMERIKSAAN
  • 237. Copyright 2014 © DWI QUALITY CONTROL PLAN
  • 238. Copyright 2014 © DWI Internal Quality Audit • All process shall be planned annually • Cover all production shift • Increasing the audit frequency against internal and external performance
  • 239. Copyright 2014© DWI Bagaimana kemudian yang selalu ditemukan audit eksternal : Terdapat 3 standard audit mutu internal yang berbeda Betulkah ?
  • 240. Copyright 2014 © DWI Secara Esensial Audit Internal Tidak sama dengan Audit Eksternal AUDITOR/ ASSESSOR MUTU INTERNAL AUDITOR/ ASSESSOR MUTU EKSTERNAL
  • 241. Copyright 2014© DWI • Assessor mutu eksternal : • Melakukan evaluasi terhadap kinerja system secara – dan melaporkannya kepada pihak manajemen secara independent • Memiliki kualifikasi yang dijamin secara independent • Assessor mutu internal : – Bagian dari organisasi – Melakukan evaluasi kinerja sistem sebagaimana bagian dari perbaikan secara berkelanjutan – Pelaporan hasil evaluasi bersifat lokal PERAN YANG SUNGGUH BERBEDA
  • 242. Copyright 2014 © DWI Audit mutu InternalAudit mutu Internal  Internal audit adalah independen, obyektif jaminan dan aktivitas konsultasi yang dirancang untuk menambah nilai dan meningkatkan operasi organisasi.  Ini membantu organisasi mencapai tujuannya dengan membawa sistematis, disiplin pendekatan untuk mengevaluasi dan meningkatkan efektivitas manajemen risiko, pengendalian, dan peningkatan proses
  • 243. Copyright 2014© DWI Beginilah yangBeginilah yang kami temukankami temukan selamaselama melakukan auditmelakukan audit eksternal :eksternal :
  • 244. Copyright 2011 © DWI Perencanaan IQA yang buruk, akan memberikan hasil yang tidak maksimal, termasuk diantaranya kejelasan maksud dan tujuan dari IQA. Hasil IQA yang tidak maksimal juga bisa disebabkan dari faktor IQA seperti ; buruknya perencanaan, sumber daya, metoda serta tindak lanjut 75% INTERNAL AUDIT SISTEM MANAJEMEN MUTU DIJALANKAN KARENA MENJADI PERSYARATAN BUKAN KARENA MENJADI BUDAYA ORGANISASI 25% LAINNYA, JUGA BELUM MENDAPATKAN HASIL MAKSIMAL
  • 245. Copyright 2014© DWI SUDAHKAH AUDITOR INTERNAL DIPERSIAPKAN DENGAN BAIK? > 60% INTERNAL AUDITOR >75% INTERNAL AUDITOR DIANGGAP PEKERJAAN
  • 246. Copyright 2013 © DWI Betulkah selalu direncanakan dengan efektif ? Persyaratan TS : SEMUA PROSES HARUS DIRENCANAKAN UNTUK DIAUDIT SETIAP 1 TAHUN DAN MENCAKUP SEMUA SHIFT > 85% AUDIT INTERNAL DIRENCANAKAN TANPA PERTIMBANGAN YANG JELAS SELAIN KARENA DIMINTA SEBAGAI PERSYARATAN > 50% INTERNAL AUDIT SUDAH HARUS DILAKUKAN SEBELUM AUDIT EKSTERNAL DILAKUKAN > 80% TIDAK MEMPERTIMBANGKAN PRIORITAS DALAM MERENCANAKAN AUDIT INTERNAL <= 90% MANAJEMEN TIDAK PERNAH MEMINTA INTERNAL QUALITY AUDIT TAMBAHAN
  • 247. Copyright 2014© DWI ISO/TS 16949:2009 IQA Structure Memastikan semua proses secara system artinya : semua persyaratan ISO/TS terpenuhi sesuai dengan prosedur dan instruksi kerja yang digunakan, persyaratan pelanggan terkait serta terpenuhinya konsep PDCA dari sistem manajemen mutu 8.2.2.1 Quality management system audit The organization shall audit its quality management system to verify compliance with this Technical Specification and any additional quality management system requirements. 8.2.2.2 Manufacturing process audit The organization shall audit each manufacturing process to determine its effectiveness. Memastikan semua proses Produksi apakah cukup efektif dan efisien dalam memastikan produk akan dibuat sesuai dengan persyaratan pelanggan
  • 248. Copyright 2014© DWI ISO/TS 16949:2009 IQA Structure
  • 250. Copyright 2014© DWI Process Internal AuditProcess Internal Audit ISO/TS 16949:2009ISO/TS 16949:2009  Dilakukan disemua shift produksi yang berjalan  Untuk semua proses manufaktur yang dijalankan  Evaluasi : DFMEA, PFMEA, Control Plan serta standar proses yang digunakan untuk menghasilkan produk  Implementasi perubahan proses, tinjauan keluhan pelanggan dan perbaikannya
  • 251. Copyright 2014© DWI ISO/TS 16949:2009 IQA Structure 8.2.2.3 Product audit The organization shall audit products at appropriate stages of production and delivery to verify conformity to all specified requirements, such as product dimensions, functionality, packaging and labelling, at a defined frequency. Sebagai bukti riil bahwa proses secara system dan proses produksi secara efektif dan efisien dijalankan maka perlu bukti secara hasil proses itu sendiri yaitu : Produk. Audit produk dilakukan untuk setiap hasil tahapan produksi – bukan setelah proses produksi selesai (hasil akhir) – kecuali untuk aspek yang hanya bisa dievaluasi ketika produk selesai dibuat : pemberian label dan pengemasan
  • 252. Copyright 2014© DWI Product Internal Audit ISO/TS 16949:2009  Memastikan pemenuhan syarat produk yang akan dikirim  Dilakukan untuk setiap hasil produk setiap tahapan proses  Sampling tidak 100% semua produk  Memeriksa syarat kemasan yang dipersyaratkan  Memastikan proses pemberian label saat produk akan dikirimkan  Catatan :  Mengacu ke syarat pelanggan (bila ada)  Temuan audit terkait dengan NC product handling
  • 253. Copyright 2014© DWI Pengembangan Auditor Mutu Internal  Memastikan Auditor Mutu Internal untuk hal-hal beirkut ini :  Memiliki kapasitas yang memadai untuk melakukan audit  Melakukan evaluasi untuk pengembangan auditor mutu internal  Memberikan pelatihan sebagai bagian dari pengembangan tersebut diatas
  • 254. Copyright 2014© DWI Evaluasi sistem manajemen mutu melalui Auditor Mutu Internal
  • 255. Copyright 2014 © DWI 8.5.2.4 Rejected product test/analysis • Cycle time of processing shall be reviewed and minimized • Cycle complaint received for same customer • Effective review against related PFMEA documents standard • Working instruction of repair shall be made
  • 256. Copyright 2014 © DWI Layout inspection and functional testing • Planning in Quality control plan • For all products • all product dimensions shown on the design records.
  • 258. Copyright 2014 © DWI CORE TOOLS ISO/TS 16949:2009
  • 259. Copyright 2014 © DWI PROCESS CONTROL IS FEEDBACK SYSTEM PEOPLE EQUIPMENT MATERIAL METHODS MEASUREME NT ENVIROMENT THE WAY WE WORK/ BLENDING THE RESOURCES SHARE HOLDER & CUSTOMER PRODUCT PROCESS OUTPUT VOICE OF THE PROCESS IDENTIFYING CHANGING NEED AND EXPECTATIONS VOICE OF THE BUSINESS VOICE OF THE CUSTOMER SUPPLIER- INPUT STATISTIC AL METHODS Potential Failure Process Mapping and Analysis
  • 260. Copyright 2014 © DWI IMPLEMENTASI MEASUREMENT SYSTEM ANALYSIS MENGAPA KITA (PERLU) MENGANALISA SISTEM PENGUKURAN ..?
  • 263. Copyright 2014 © DWI FAILURE EFFECT MODE ANALYSIS I
  • 264. 264 FMEA The aim of FMEA is to anticipate: –what might fail –what effect this failure would have –what might cause the failure … and take action to correct it!
  • 266. Copyright 2014© DWI 266 “Automotive Core Tools” is a general title used to describe several tools and methodologies developed, published and required by most automotive OEMs. Implementation and usage of these core tools is required by ISO/TS 16949:2009. Except for PPAP, the associated manuals used in the implementation of these core tools are considered to be “reference” manuals. Although they shall be used by the organization implementing them, they are considered guidance. Organizations have some flexibility in how they use them. This flexibility is discussed in detail during all courses and workshops. The core tools are: • Advanced Product Quality Planning, (APQP) • Failure Mode and Effects Analysis (FMEA) • Statistical Process Control (SPC) • Measurement Systems Analysis (MSA) • Production Part Approval Process (PPAP) Although it is recommended, organizations do not have to be compliant to ISO/TS 16949:2009 to use these core tools. Some OEMs and Tier One suppliers require their suppliers to implement, and use, the core tools regardless of their status of compliance to ISO/TS 16949:2009. Many sectors outside the automotive industry are using these core tools as they realize the benefits of implementation PENGANTAR CORE TOOLS
  • 271. Copyright 2013 © DWI STATISTICAL PROCESS CONTROL
  • 272. Copyright 2013 © DWI STATISTICAL PROCESS CONTROL
  • 273. Copyright 2014© DWI Common and Special Cause Variability Common Cause Variability Special Cause Variability
  • 274. Copyright 2014© DWI Variability Reduction Levels Special Cause Variability Reactive Common Cause Variability Proactive
  • 275. Copyright 2014 © DWI Special Cause Variation If special causes of variation are present, the process output is not stable over time and is not generally predictable; we cannot always use sampling and SPC to control the process. Size Target line Time Predictable ?
  • 276. Copyright 2014 © DWI Common Cause Variation If only common causes of variation are present, the output of a process forms a distribution that is stable over time and is predictable; we can then monitor the process using sampling and SPC charts Size Target line Time
  • 277. Copyright 2014 © DWI Statistical Process Control • _ • X – Range Control chart (AIAG SPC manual)
  • 278. Copyright 2014© DWI Process Improvement Nominal Common cause variation reduced Process improved Special causes present Process out of control - unpredictable Special causes eliminated Process under control - predictable Then improve nominal
  • 279. Copyright 2014© DWI The IATF assigned work team will be seeking stakeholder inputs on potential enhancements to the ISO/TS 16949 standard. Additionally, customer requirements are being analyzed for potential inclusion in the future standard. Completion of the revised quality management system standard is targeted for Q4 2016. ISO/TS 16949:2016 BY NEXT Q4- 2016
  • 280.
  • 284. Copyright 2014© DWI Kenapa ISOKenapa ISO 9001 tidak9001 tidak merubahmerubah organisasi kami?organisasi kami?
  • 302. Copyright 2014© DWI Apa yang harus kita persiapkan dan lakukan untuk sertifikasi ISO 9001:2015?
  • 303. Copyright 2014© DWI Apa yang harus kita persiapkan dan lakukan untuk sertifikasi ISO 9001:2015?
  • 304. Copyright 2014© DWI Apa yang harus kita persiapkan dan lakukan untuk sertifikasi ISO 9001:2015? Yang dibutuhkan adalah penyesuaianpenyesuaian – melakukan rekayasa ulang sistem manajemen mutu agar sesuai dengan persyaratan yangbaru : bukan membuat kembali sistem manajemen mutu Semua prosedur, instruksi kerja – dokumen dan catatan mutu yang ada – tidak harus diganti – bisa digunakan kembali.
  • 305. Copyright 2014 © DWI SGSSGS ININ BRIEFBRIEF
  • 306. Copyright 2014 © DWI SGS BUSINESS LINES Agriculture Automotive EnvironmentalConsumer Oil, Gas & Chemicals Systems and Services Certification Minerals Life Science Industrial Trade Assurance
  • 307. Copyright 2014 © DWI ADDED VALUE SERVICES IN SGS-AUTO WORLD Global competitiveness for sustainable development
  • 308. Copyright 2014© DWI SOLUTIONS IN THE AUTOMOTIVE VALUE CHAIN We will try to provide services within this automotive business context in order to help our customers earn a return on investment, foster growth, innovation and value . Distributor/Distributor/ Customers Service Supplier Engineering Supplier DealerDealer Supplier Tier 2 Supplier Tier 2 OEM Supplier Tier 1 F&I Aftermarket ADDED VALUE MANUFACTURINGMANUFACTURING PROCESS ADDED VALUE AFTERAFTER SALESSALES PROCESS
  • 309. Copyright 2014© DWI ENHANCING YOUR VALUE CHAIN For any OEM, making sure this premium service is experienced across a franchise network is a difficult task that SGS can help to solve. Our solutions for the automotive industry enhance the value chain from design, to lease return or used car sale. We ensure your organization and partners consistently implement the highest quality standards in the automotive industry. SGS- Customised Automotive Audit Solutions improve the delivery of your products and services, safeguarding the customer perception of your brand and keeping you ahead of the competition.
  • 312. Copyright 2011 © DWI VEHICLE MANUFACTURERS: MANAGEMENT SYSTEMS CERTIFICATIONS: – RENAULT –VARIOUS COUNTRIES (ISO 9001+ ISO 14001) – VAN HOOL – BELGIUM (ISO 9000+ISO 14001) – RENAULT SAMSUNG MOTORS CO. –KOREA (Headquarter+11 plants-ISO 14001) – NISSAN DIESEL MOTOR CO. –Production Division-Japan (Headquarter+2 plants-ISO 9001) – NISSAN MEXICANA SA DE C.V.-MEXICO (ISO 9001+ISO 14001+OHSAS 18001) – VOLKSWAGEN DE MEXICO SA DE C.V. –MEXICO (ISO 14001) – DAEWOO COMMERCIAL VEHICLES CO.-KOREA (ISO 9001) – GM DAEWOO AUTO & TECHNOLOGY COMPANY –KOREA (ISO 14001) – UzDAEWOO – UZBEKISTAN – (Production plant) - (ISO 9001 + ISO 14001 + OHSAS 18001) – GENERAL MOTORS KENYA LTD.-KENYA (ISO 14001) – GENERAL MOTORS THAILAND LTD.-THAILAND (ISO 14001) – ASTRA HONDA MOTOR –INDONESIA (Headquarter+3 plants-ISO 9001+ISO 14001) – HONDA SUN CO. –JAPAN (Headquarter+10 plants-ISO 9001) – HONDA –TAIWAN (ISO 9001 + ISO 14001) – HYUNDAI-SLOVAKIA (ISO 9001) – HYUNDAI POWERTECH –KOREA (ISO 14001) – HYUNDAI DYMOS INC.-KOREA (ISO TS 16949) – HYUNDAI POWERTECH CO.-KOREA (ISO TS 16949) – PEUGEOT –HUNGARY + SLOVAKIA (ISO 9001) AUTOMOTIVE : INTRODUCTION TO SERVICES SGS MAIN PRESENT REFERENCES
  • 313. Copyright 2011 © DWI VEHICLE MANUFACTURERS: MANAGEMENT SYSTEMS CERTIFICATIONS: – FORD MOTOR COMPANY SA DE C.V. MEXICO (ISO 9001) – FORD LI HO MOTOR COMPANY –TAIWAN (GHG) – TOYOTA-POLAND (ISO 9001+ISO 14001) – PACCAR DU CANADA LTEE –CANADA (ISO 9001) – KING LONG UNITED AUTOMOTIVE INDUSTRY –CHINA (ISO 9001) – SHANGHAI JMSTAR AUTOMOBILE CO. .CHINA (ISO 9001) – NABI BUS INDUSTRY –HUNGARY (OHSAS 18001) – PT ASTRA DAIHATSU MOTOR INDONESIA (- Headquarters, all 4 Plants and parts logistic - ISO 9001+ISO 14001+OHSAS) – PT KRAMA YUDHA RATU MOTOR -INDONESIA (ISO 14001) – PT GAYA MOTOR -INDONESIA For BMW assembly , and Astra Multy Truck assembely (ISO 9001 + 14001) – PT SUZUKI INTERNATIONAL Motor (Headquarter+5 plants + Parts-ISO 9001+ISO 14001) – PT ASTRA HONDA MOTOR Headquarter+5 plants +Parts -ISO 9001+ISO 14001+OHSAS – PARS KHODRO –IRAN (ISO 14001) – ORIENTAL ASSEMBLERS SDN –MALAYSIA (ISO 9001) – SC AUTO INDUSTRIES PTE-SINGAPORE (ISO 9001) – OTOYOL SANAYI AS-TURKEY (ISO 9001) – SUZUKI MOTOR – TAIWAN (ISO 9001) AUTOMOTIVE : INTRODUCTION TO SERVICES SGS MAIN PRESENT REFERENCES
  • 314. Copyright 2014 © DWI AUTOMOTIVE : INTRODUCTION TO SERVICES SGS MAIN PRESENT REFERENCES VEHICLES MANUFACTURERS MANAGEMENT SYSTEMS CERTIFICATION – MERCEDES BENZ –EGYPT (ISO TS 16949+ISO 14001) – CNH WORLDWIDE (28 plants+4 Engineering Centres-ISO 9001+ISO 14001) – NISSAN – EGYPT (ISO 9001+ISO 14001) – CITROEN – BULGARIA (ISO 9001) – PEUGEOT- SLOVAKIA + SERBIA (ISO 9001) – MASERATI DEALERSHIP NETWORK – SWITZERLAND (ISO 9001) – HONDA FORMULA 1 TEAM – UK- (ISO 14001) – MERCEDES MACLAREN – UK- (ISO 9001) – PCA-SLOVAKIA (ISO 9001) – IVECO –EUROPE (ISO 9001) – FIAT GROUP WORLDWIDE (OHSAS 18001) – Isuzu Astra Motor Indonesia (ISO 9001)
  • 315. Copyright 2011 © DWI TIER 1 SUPPLIERS: – PIRELLI (ISO 14001-OHSAS 18001)- Worldwide contract + Verification of Environmental Report – PLASTIC OMNIUM (ISO 9001,ISO 14001) – VALEO (ISO 9001, ISO 14001, ISO TS 16949, OHSAS 18001)-Worldwide contract – FAURECIA (ISO TS 16949, ISO 14001, OHSAS 18001)-Worldwide contract – HERMAN BECKER (ISO TS 16949, ISO 14001) – MENZOLIT-FIBRON (ISO 9001, ISO 14001, OHSAS 18001) – MICHELIN: Customized audits to sales/service network (Poland) – PILKINGTON (ISO 14001, OHSAS 18001, SA8000)-Worldwide contract – BOSCH (Standard and mystery audits on service dealership)-Worldwide contract – MAGNETI MARELLI (ERGOM): ISO TS 16949 – DENSO Indonesia (ISO/TS 16949) – ASMO indonesia (ISO.TS 16949; ISO 14001; ISO 18001) AUTOMOTIVE : INTRODUCTION TO SERVICES SGS MAIN PRESENT REFERENCES
  • 316. Copyright 2011 © DWI TIER 1 SUPPLIERS: – AUTOLIV (ISO/TS 16949 )- Worldwide contract + Verification of Environmental Report – JVC-Kenwood (JK) Indonesia (ISO/TS 16949 & ISO 14001) – NOK Indonesia ISO 14001, ISO TS 16949, OHSAS 18001)-Worldwide contract – Hi-Lex Indonesia (ISO TS 16949, ISO 14001, OHSAS 18001) – NSK Bearing Indonesia (ISO TS 16949, ISO 14001) – Bando Indonesia (ISO 9001, ISO/TS 16949, ISO 14001, OHSAS 18001) – Chemicon Indonesia - ISO 14001, ISO TS 16949, OHSAS 18001)-Worldwide contract – PT GKD (Gemala Kempa Daya ) (ISO 14001, OHSAS 18001, ISO/TS 16949) – PT IGP (INTI GANDA PERDANA) (ISO 14001, OHSAS 18001, ISO/TS 16949) – PT ADR (ISO/TS 16949) – PT AT (Aisin Takaoka- Indonesia ) - (ISO/TS 16949) – PT GS Battery Indonesia (ISO.TS 16949) – – PT Tri Mega Baterindo (ISO/TS 16949) AUTOMOTIVE : INTRODUCTION TO SERVICES SGS MAIN PRESENT REFERENCES
  • 317. Copyright 2011 © DWI TIER 1 SUPPLIERS: – PT Nichirin Indonesia (ISO/TS 16949 ) – PT Fuji Technica (ISO/TS 16949; ISO 9001:2008; ISO 14001) – PT Karya Bahana Berlian (ISO TS 16949) – PT Kotobukiya (ISO TS 16949, ISO 14001, OHSAS 18001) – PT Meshindo (ISO TS 16949, ISO 14001) – PT Excel Indonesia (ISO 9001, ISO/TS 16949, ISO 14001) – PT TD Auto Compressor Indonesia (ISO/TS 16949) – PT GKD (Gemala Kempa Daya ) (ISO 14001, OHSAS 18001, ISO/TS 16949) – PT IGP (INTI GANDA PERDANA) (ISO 14001, OHSAS 18001, ISO/TS 16949) – PT ADR (ISO/TS 16949) – PT AT (Aisin Takaoka- Indonesia ) - (ISO/TS 16949) – PT GS Battery Indonesia (ISO.TS 16949) – – PT Alpha Industries (ISO/TS 16949) – PT Aisin Indonesia (ISO/TS 16949:2009; ISO 14,001; ISO 18001) AUTOMOTIVE : INTRODUCTION TO SERVICES SGS MAIN PRESENT REFERENCES
  • 318. Copyright 2011 © DWI TIER 1 SUPPLIERS: – PT Braja Mukti Cakra (ISO/TS 16949; ISO 14001 ) – PT Koito Indonesia (ISO/TS 16949; ISO 9001:2008; ISO 14001) – PT Nitto Material (ISO TS 16949: 2009; ISO 14001) – PT Polymatech Indonesia (ISO TS 16949, ISO 14001) – PT Ginsa (ISO TS 16949, ISO 9001) – PT IGP (ISO 9001, ISO/TS 16949: 2009, ISO 14001) – PT NSK Bearing Indonesia (ISO/TS 16949; ISO 14001) – PT Bando Indonesia (ISO 14001, OHSAS 18001, ISO/TS 16949) – PT Atedja Multi Industri (ISO 14001, ISO/TS 16949; ISO 9001) – PT Daido Metal (ISO/TS 16949; ISO 14001) – PT Indonesia Chemi-con - (ISO/TS 16949; ISO 9001:2008; ISO 14001) – PT Inti Pantja Press (ISO.TS 16949) – – PT IRC Rubber Division (ISO/TS 16949:2009; ISO 14,001) – PT IRC PU Division (ISO/TS 16949:2009; ISO 14,001) AUTOMOTIVE : INTRODUCTION TO SERVICES SGS MAIN PRESENT REFERENCES
  • 319. Copyright 2011 © DWI TIER 1 SUPPLIERS: – PT Kyodamas (ISO/TS 16949; ISO 9001:2008) – PT Kyokuni Technologi (ISO TS 16949: 2009;) – PT Kyokuni Indonesia (ISO TS 16949) – PT Muramoto Indonesia (ISO TS 16949, ISO 9001) – PT Mushashi Autoparts (ISO 9001, ISO/TS 16949: 2009, ISO 14001) – PT Progress Diecast (ISO/TS 16949:2009; ISO 14001) – PT Kiriu Indonesia (ISO/TS 16949:2009) – PT Tanashin (ISO/TS 16949; ISO 14001) – PT Hamaden Indonesia - (ISO/TS 16949; ISO 9001:2008) – PT Indosafety Sentosa Industry (ISO/TS 16949:2009; ISO 14,001) – PT Great Microtama (ISO/TS 16949:2009; ISO 14,001; ISO 9001) – PT Delta Hulane (ISO/TS 16949:2009;) – PT PT Intermesindo Forging Prima (ISO/TS 16949:2009;) AUTOMOTIVE : INTRODUCTION TO SERVICES SGS MAIN PRESENT REFERENCES
  • 320. Copyright 2011 © DWI TIER 1 SUPPLIERS: – PT Toyota Auto Compresor Indonesia (ISO/TS 16949) – PT Takagai Sari Multy Utama (ISO/TS 16949; ISO 9001:2008) – PT Sugity Creative(ISO TS 16949: 2009;) – PT Karya Putra Sangkuriang (ISO/TS 16949:2009) – PT Indonesia Thai Summit (ISO/TS 16949:2009) – PT Honda Lock (ISO TS 16949; ISO 9001) – PT TJETK INDONESIA (ISO TS 16949, ISO 9001) – PT E-T-A Indonesia (ISO TS 16949, ISO 9001) – PT Hanwa Steel Indonesia (ISO TS 16949, ISO 9001) – PT Karya Putra Sangkuriang (ISO/TS 16949; ISO 14001) – PT Indonesia Nippon Seiki (ISO/TS 16949; ISO 14001) – PT Hitachi Powder Indonesia (ISO/TS 16949; ISO 14001) – PT JFD INDONESIA (ISO/TS 16949; ISO 14001) – PT Karawang Super Steel (ISO/TS 16949; ISO 14001) AUTOMOTIVE : INTRODUCTION TO SERVICES SGS MAIN PRESENT REFERENCES

Editor's Notes

  1. kelly
  2. Source: ASEAN Automotive Federation(Automotive Summit 2013) as of June 24, 2013
  3. Delegate’s Notes 
  4. Evolution of ISO/TS 16949 certificates in Indonesia
  5. Delegate’s Notes 
  6. Delegate’s Notes 
  7. Delegate’s Notes 
  8. Delegate’s Notes 
  9. Delegate’s Notes 
  10. Delegate’s Notes 
  11. Delegate’s Notes 
  12. Delegate’s Notes 
  13. Delegate’s Notes 
  14. Delegate’s Notes 
  15. Delegate’s Notes 
  16. Delegate’s Notes 
  17. Delegate’s Notes 
  18. Delegate’s Notes 
  19. Delegate’s Notes 
  20. Delegate’s Notes 
  21. Delegate’s Notes 
  22. Delegate’s Notes 
  23. Delegate’s Notes 
  24. Black = value adding Red = non value adding =&amp;gt; COPQ
  25. Delegate’s Notes 
  26. Delegate’s Notes 
  27. Delegate’s Notes 
  28. This six-sigma process will do an even better job of meeting specification.
  29. This six-sigma process will do an even better job of meeting specification.
  30. Delegate’s Notes 
  31. Delegate’s Notes 