Timeline
 2004 – Decision was taken on Building of Moscow –
St.Petersburg toll motorway;
 2005 – Option 3 (passing through Khimki Forest, see map
below) was chosen behind the closed doors. Dummy “Public
Hearings” were arranged – as it was found out later, on a quit
different project. No proper information was made available to
the locals;
 2006 – the entire territory of the Khimki Forest park was
reserved for the placement of the motorway as well as of
“objects of transport infrastructure and capital construction”;
 2007 – Surveying works were carried out in the forest park.
Most people got aware of the project. A popular movement to
defend Khimki Forest was formed by locals.
New Forest Code forbade any construction works in forest
parks – so any works according to Option 3 became
completely illegal .
 2008 – First public rallies and other manifestations of public
discontent. A killing attempt against local journalist Mikhail
Beketov who wrote a lot about the problem. Preliminary works
on the project still went on despite the legal ban.
 2009 – A candidate of Movement to Defend Khmki Forest
participated in elections of Mayor of Khimki as an independent
candidate taking 16% of voices. Rulings on the placement of
the motorway as well as on the reservations of the forest lands
for the “infrastructure” were cancelled. New public hearings
showed negative public attitude toward the project.
Nevertheless, Prime Minister Putin transferred the forest lands
for the construction of the motorway. A bill was passed that
lifted the constraints on construction works in forest parks – but
only if no alternative options available, which was not true in
this case.
 Activists started to discuss the problem with representatives of
EBRD and EIB. A meeting with EBRD’s Board of Directors took
place in Moscow. EBRD promised to demand the
concessioner a “high level of public involvement” as a
mandatory condition of EBRD’s participation in the project.
Backgruond – available alternatives
Green text in the map designates planned specially protected natural
areas within the Khimki Forest park
Khimki Forest
View from the left bank of Moscow-Volga Canal
Alternatives – in brief
 Options 1, 2, 3 – were initially considered in 2004. All the three
options inflict serious damage to the oak groove of Khimki Forest
park, as well as to a protective forest strip on the left bank of the
Moscow-Volga canal. Only option 3 implies heavy fragmentation of
the forest. Unfortunately, Option 3 was chosen without any public
discussion.
 Option 4 – passes in a common transport corridor with
Oktyabrskaya railroad. It was proposed by activists in 2009 on the
basis of the plans for transport development in Moscow. If the
planned prolongation of the motorway within Moscow is ever to be
built it will be done along Oktyabrskaya railroad. Option 4 is just
the use of the same approach in case of Khimki.
 Option 5 – enlargement of existing M10 motorway within Khimki.
There is a line of shopping malls with large parking areas to the
south of the existing motorway. Those parking areas can be easily
used in transportation purpose. This option can be very effective in
a combination with environment-friendly modern electric public
transport. The latter is capable to reduce drastically the local traffic
between Khimki and Moscow –reducing , respectively,
requirements to the new motorway.
Structure behind the project
NWCC LLC
FGU “Dorogi Rossii”
, Rosavtodor
IFIs
Vinci
Russian
Shareholders
State
Investmen
t Fund (?)
Russian
Banks
Teplotekhnik
LLC
Subcontractors
Interests of various
structures close to
Ministry of Transportation
and Government of
Moscow District
Government of
Russia
“Ku Klux Klan”
Why we are against the project?
 Environmental issues: the forest will be severely
fragmented and cease to exist as an eco-system.
Today, the eco-system of Khimki Forest park is unique
for the area so close to Moscow. There are some species
enlisted into the local Red Book. The high environmental
value of the forest park is acknowledged by expert
assessments, including those of Greenpeace, and even
of the concessionary of the project – NWCC LLC.
All the three planned specially protected natural areas
within the Khimki Forest park will be destroyed directly
by the motorway if Option 3 will not be discarded.
The existing layout of the motorway allows further
seizure of forest lands for the placement of adjoining
infrastructure.
Oak groove is to be destroyed according to options 1, 2,3 if no
tunnel built
Red marks for the motorway near the trees which were eaten by
elks. One can see new and old bites on the trees – i.e., here is an
elks’ permanent habitat. Picture taken near the mesotrophic bog
(to be destroyed only if Option 3 is chosen)
 Social issues: the forest has great recreational
potential, especially the oak groove with its St.George’s
spring. It is the only wide green space in this polluted and
over-populated region, available for the citizens of Khimki
, especially for persons with limited mobility like elders,
families with small children, etc. 76% of the locals are
against the project
Khimki Forest belongs to the “protective forest belt”
around Moscow which protects the city against various
pollutions like the deadly smog in the summer 2010.
 The planned motorway destroys a protective forest strip
between a giant open dumping ground and a densely
populated area on the left bank of the canal . The
environmental situation there is disastrous even now. It
will be even more worse after the road is built. Taking
into account technical problems (see below) there will be
a permanent traffic jam with very high level of pollution
due to car exhausts.
A forest strip
between an open
dumping ground
(in the upper left
corner of the
picture), and a
residential area. It
is to be destroyed
according to
Options 1,2,3, if
no alteration is
made.
 Human Right issues: The
project is very unpopular
(according to public opinion
polls, 76% of residents in
Khimki, 67% in Moscow, 66%
in all Russia are against the
project. Instead of public
involvement - violence,
arrests, bans of public rallies
were used to implement the
project. The realization of the
project according to Option 3
would be a severe blow to
civic society in Russia
 Technical issues: No prolongation of the motorway within
Moscow is ready to implement. Without the prolongation, the
new 10-row motorway will merge with Moscow Ring Road
which is already overloaded. A traffic jam is guaranteed on
both the new motorway and the Moscow Ring Road. Only
Option 5 is free from this problem.
Existing motorway M10 is enlarged in Moscow up to 12-14
rows, but it passes into a 6-row “shopping street” in Khimki.
Therefore, there will be two sections of a modern motorway in
the same direction in the nearest future – but they will not
meet each other!
The curve of the planned road through Khimki Forest park has
such a complicated shape that speed requirements for an A1
class road are not met (speed decreases by 30 km/h). It will
decrease even more due to multiple exits to objects of
infrastructure which would inevitably appear instead of the
forest if the existing project (Option 3) is implemented.
 The new motorway is to be connected with North Rokada (planned along
Oktyabrskaya railroad in Moscow) – but no ready project still available.
 Corruption issues: Placement of the motorway with
maximum use of forest lands violates the Federal law which
allows to use forest lands only in case where no alternatives
available (Article 11 of Federal Law #172-FZ).
There are at least 4 other routings inflicting less damage to
the forest than the chosen one – or no damage at all, in
case of Options 4, 5. It is easy to understand the eagerness
of the lobbyists behind Option 3 if remember that one
hectare of forest lands costs RUR 4300 for the customer of
the project (little more than EUR 100!). The real market
value of lands in this region is about EUR 500,000 –
900,000 per a hectare.
An analysis by Transparency International (R) shows that
there are possible corruption motives behind the choice of
Option 3 linked to commercial interests of acting Minister of
Transportation Mr. Levitin. He is the Head of Board of
Directors of Sheremetyevo International Airport, which is
interested in approaching the motorway to airport’s lands.
 Strategy issues: The project implies in an implicit
way that automobiles will be the only modern mean
of transportation in this direction (at least, for local
traffic). That’s why the new motorway has 10 rows
near Khmki, and only 6 rows in its main section
between Moscow and St. Petersburg. Such a
solution is obviously environmentally damaging
regardless the routing of the motorway.
It is a step back even in comparison with the
transportation strategy of the Soviet Union where
trains, subways and other more environment-friendly
means of transportation were widespread for both
local and interregional traffic.
 This case creates a very dangerous precedent:
Future “Khimki Forests” of Moscow Region (according to
official plans of urbanization by the Government of Moscow
District ). Brown color designates forests planned for
clearing for projects of “development”– mainly along both
 2010, January – April. Environmentalists tried to
challenge Putin’s ruling in the Supreme Court. Not
surprisingly, it was not successful. The lawsuit was
passed to European Court on Human Rights.
A “Public Discussion” on the project was initiated by
NWCC LLC as required by IFIs. The procedure was
cancelled after some public opinion polls were carried out
by NWCC LLC. The results of the polls were not made
public.
Transparency International (Russia) found possible
corruption motives behind the choice of the motorway
routing through the Khimki Forest park
 May 2010. A representative of the activists Mrs. Evgenia
Chirikova met Board of Directors of EBRD. Decision on
participation of EBRD was delayed due to the need of
“additional study”
New events (January – October 2010)
 May – July 2010. Information appeared that Russian
financial groups are ready to be involved in the project.
Dorogi Rossii and Rosavtodor (the state-owned Russian
companies that are the main customers of the project)
hired another Russian company (Teplotekhnik LLC) to clear
Khimki Forest. The works started in July in extremely hot
and dry weather, neglecting fire safety rules, without proper
authorization.
 July 2010, 14. First clashes between activists, security
guards, and construction workers happened. Construction
workers failed to provide all necessary permissions for
cutting down of trees.
 July 2010 14 – 23. Construction works halted. An
environmentalists’ camp established to protect Khimki
Forest. Police force took neutral position first. The
construction company evaded any discussions with the
activists. An old tractor was burnt in the forest, perhaps as
a provocation which nearly yielded in a major forest fire.
First clashes in Khimki Forest. Security guards (in
blue T-shirts) attacked without warning.
A symbolic barricade at the entrance to the first activists’
camp. Construction machines (behind, in the clearing)
were abandoned by the workers
 July 22-23. Teplotekhnik LLC hired a new subcontractor
as well as new security guards. Nevertheless, the activists
still resisted their attempts to cut down trees.
 July 23. In the morning, the camp was invaded by
unknown masked men looking like ultra-right football fans
or Neo-Nazis. They confronted activists; the cutting down
of trees was immediately resumed under their protection.
The activists called police, which arrived but refused to
interfere or check who the “Ku Klux Klan” were. Some
activists blocked a police car to prevent it from leaving the
scene. Activists managed to stop works again despite the
resistance of the masked men. Then police reinforcement
arrived and arrested activists, as well as some journalists,
in a very brutal way. A journalist from “Novaya Gazeta”
who was covering the event got a damage of her cervical
vertebrae during the arrest.
July morning, 23 (6-00 A.M.). “We came to kill and
clear!”
A clash between activists and “Ku Klux Klan” near a
fresh clearing
Some activists tried to prevent a bloodbath by keeping police
force at place. Police were still not keen to interfere.
The girl was trying to stop cutting down of trees by
climbing the harvester.
Reinforcement arrived. The brave policemen arresting
Mrs. Margarita Popova - a mother of a 1,5 year child.
No “Ku Klux Klan” were arrested or interrogated
 August 23-28. A court ruled that the leader of the
activists Evgenia Chirikova who was arrested on
July, 23 was not guilty. The construction works were
temporarily stopped due to the interference of some
MPs, as well as of representatives of Public
Chamber, and Prosecutor Office.
Some activists and journalists were attacked again
by unknown thugs guarding the clearing. The thugs
had Nazi insignia on their clothes.
Lawyers of Greenpeace together with
representatives of our movement visited the office of
Teplotekhnik. There were no necessary permissions
found. Newertheless, cutting down of trees was
resumed soon.
Unknown militants (in dark T-shirts) attacking an
activist.
A militant from the previous picture near a policemen.
Pay attention to the insignia.
 July, 28. Head of “Teplotekhnik” Mr. Semchenko had
promised a meeting with locals but then suddenly refused
to arrive. Later this day, a group of Antifascist and
Anarchist youngsters apparently outraged by Neo-Nazi
support of the project, attacked administrative buildings in
Khimki. No one attacker was arrested there, but police
arrested all the activists in the forest camp, instead.
 Two public speakers of the antifascists (Gaskarov and
Solopov) were detained later despite lack of evidence
against them. They are still (October, 10) in jail.
Ecooborona condemned the antifascists’ tactics, but
blamed authorities’ refusal to take public opinion into
account as initial source of all the violence.
 July, 28 – August, 21. Cutting down of trees was
proceeding slowly under protection of OMON (police
special force) as well as of unknown thugs. Clashes
between them and activists took place, more people were
beaten or arrested. Public outrage about such a way of
the “implementation of the project” was growing up both in
Russia and abroad.
Antifascists’ attack
in Khimki
Police failed to protect the
administrative buildings,
probably because their
force was concentrated
in the forest, near
environmentalists’ camp
It was much easier to arrest activists in the forest
 August, 21 Meeting between the French Greens (incl.
MEPs) and our activists. International pressure is
mounting against Vinci (who is one of the foreign
participants of the project) as well as against EIB and
EBRD since they still not refused to take part in the
project. About 30 thousand letters were sent to EIB and
EBRD from different countries around the globe asking
them to abandon the project.
 August, 22. A large rally in Moscow in support of the
Khimki Forest activists, from 3 to 5 thousand people
gathered in Pushkin Square in Moscow. Some celebrities
including an iconic rock-star Yuri Shevchuk came to
support the Khimki Forest. Moscow police as well as pro-
Kremlin movement “Nashi” tried to interfere with the rally.
Vans with sound equipment were attacked by unknown
motorbikers, the tires were punctured. Some people
including celebrities were banned from entering the
square. Despite all this, the rally became “the largest
opposition rally in the last ten years”, according to some
media.
 EIB and EBRD answered to the activists that they are
deeply concerned by the situation, and a thorough
analysis on the project would be done.
 August, 26 Surprisingly, President Medvedev as well as
the ruling party (United Russia) announced that they want
to halt the works on the project to allow more
“public&expert discussions”. Local authorities of Khimki
and Moscow District attempted to arrange quickly dummy
“hearings” in support of the existing project – by
summoning public workers and distributed false
information about mass demolition of houses in Khimki in
case if an alternative option is chosen. These “hearings”
were boycotted by activists and were mocked in media.
Latter, Presidential Administration appointed the Public
Chamber of Russia as the main ground for further
discussions on the project. EBRD supported this
development but underlined that they don’t take
responsibility for both transparency and outcome of the
process.
Mayor of Moscow Luzhkov tried to interfere with the
President’s decision – and was fired soon.
 September, 16. Hearings in Public Chamber on the
project. No solution was found due to inflexibility of
Russian authorities in transportation as well as local
authorities of Khimki and Moscow District. They
refused unconditionally to consider any other option
for the motorway placement except Option 3.
 Meanwhile, public support of the environmentalists
grew up. According to public opinion polls, 76% of
residents in Khimki, 67% in Moscow, and 66%
throughout Russia supported protesters. Only 9% in
Khimki and 11% in Moscow supported the existing
placement of the motorway.
 A coalition of environmental organizations and
movements was formed to protect the Khimki Forest as
well as other forests of Moscow District. It included
Greenpeace, WWF as well as 4 Russian members
including Ecooborona.
 September 16 – nowday. No further public discussion
was under way. According to some unofficial information,
there were talking on the problem in the Presidential
Administration, but no final decision was taken yet. The
coalition issued a statement to the Public Chamber
demanding honest and clear discussion on the project.
Street rallies against the project in its present state
resumed in Khimki in spite of further illegal works on the
project. It led to further conflicts between activists and
local authorities. A few people were arrested on October,
10
Illegal works were carried out despite the President’s
decision. They were stopped again by activists
Rally in Khimki,
October, 10
We kindly ask EC:
 Not to grant Community Guarantee to EIB for the Moscow –
St. Petersburg motorway project (at least, until the motorway
routing is changed so that the bulk of the Khimki Forest Park is
intact as well as the oak groove and the forest strip which
protects residential buildings from the dumping ground).
 To raise publicly its environmental concerns as well as to
recommend to choose a more environment-friendly option in
order to obtain European support for the project – because
today “interests of investors” are used by Russian supporters
of Option 3 to advocate its future implementation.
 Ask Russian Government to stop repression against those
activists who oppose the project – including the antifascists
who have been imprisoned now for more than 2 months –
without even enough proof of their involvement in the Khimki
attack.
Thank you for the attention!

More Related Content

Recently uploaded

Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceDelhi Call girls
 
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxLorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxlorenzodemidio01
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...Axel Bruns
 
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docxkfjstone13
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxjohnandrewcarlos
 
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...Ismail Fahmi
 
How Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfHow Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfLorenzo Lemes
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docxkfjstone13
 
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadershipanjanibaddipudi1
 
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书Fi L
 
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct CommiteemenRoberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemenkfjstone13
 
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...narsireddynannuri1
 
29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Pakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfPakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfFahimUddin61
 
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's DevelopmentNara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Developmentnarsireddynannuri1
 
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docxkfjstone13
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKISHAN REDDY OFFICE
 

Recently uploaded (20)

Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
 
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxLorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
 
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
 
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
 
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
 
How Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfHow Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdf
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
 
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
 
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
 
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
 
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
 
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct CommiteemenRoberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemen
 
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
 
29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf
 
Pakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfPakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdf
 
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's DevelopmentNara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
 
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdf
 

Featured

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by HubspotMarius Sescu
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 

Featured (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

Presentation khimki forest 2

  • 1. Save Khimki Forest Mikhail Matveev Movement to Defend Khimki Forest (Ecooborona), Coalition for the protection of Moscow District’s Forests Khimki, Brussels 2010 jarawa4@gmail.com, ecmoru@gmail.com, www.ecmo.ru
  • 2. Timeline  2004 – Decision was taken on Building of Moscow – St.Petersburg toll motorway;  2005 – Option 3 (passing through Khimki Forest, see map below) was chosen behind the closed doors. Dummy “Public Hearings” were arranged – as it was found out later, on a quit different project. No proper information was made available to the locals;  2006 – the entire territory of the Khimki Forest park was reserved for the placement of the motorway as well as of “objects of transport infrastructure and capital construction”;  2007 – Surveying works were carried out in the forest park. Most people got aware of the project. A popular movement to defend Khimki Forest was formed by locals. New Forest Code forbade any construction works in forest parks – so any works according to Option 3 became completely illegal .
  • 3.  2008 – First public rallies and other manifestations of public discontent. A killing attempt against local journalist Mikhail Beketov who wrote a lot about the problem. Preliminary works on the project still went on despite the legal ban.  2009 – A candidate of Movement to Defend Khmki Forest participated in elections of Mayor of Khimki as an independent candidate taking 16% of voices. Rulings on the placement of the motorway as well as on the reservations of the forest lands for the “infrastructure” were cancelled. New public hearings showed negative public attitude toward the project. Nevertheless, Prime Minister Putin transferred the forest lands for the construction of the motorway. A bill was passed that lifted the constraints on construction works in forest parks – but only if no alternative options available, which was not true in this case.  Activists started to discuss the problem with representatives of EBRD and EIB. A meeting with EBRD’s Board of Directors took place in Moscow. EBRD promised to demand the concessioner a “high level of public involvement” as a mandatory condition of EBRD’s participation in the project.
  • 4. Backgruond – available alternatives Green text in the map designates planned specially protected natural areas within the Khimki Forest park
  • 5. Khimki Forest View from the left bank of Moscow-Volga Canal
  • 6. Alternatives – in brief  Options 1, 2, 3 – were initially considered in 2004. All the three options inflict serious damage to the oak groove of Khimki Forest park, as well as to a protective forest strip on the left bank of the Moscow-Volga canal. Only option 3 implies heavy fragmentation of the forest. Unfortunately, Option 3 was chosen without any public discussion.  Option 4 – passes in a common transport corridor with Oktyabrskaya railroad. It was proposed by activists in 2009 on the basis of the plans for transport development in Moscow. If the planned prolongation of the motorway within Moscow is ever to be built it will be done along Oktyabrskaya railroad. Option 4 is just the use of the same approach in case of Khimki.  Option 5 – enlargement of existing M10 motorway within Khimki. There is a line of shopping malls with large parking areas to the south of the existing motorway. Those parking areas can be easily used in transportation purpose. This option can be very effective in a combination with environment-friendly modern electric public transport. The latter is capable to reduce drastically the local traffic between Khimki and Moscow –reducing , respectively, requirements to the new motorway.
  • 7. Structure behind the project NWCC LLC FGU “Dorogi Rossii” , Rosavtodor IFIs Vinci Russian Shareholders State Investmen t Fund (?) Russian Banks Teplotekhnik LLC Subcontractors Interests of various structures close to Ministry of Transportation and Government of Moscow District Government of Russia “Ku Klux Klan”
  • 8. Why we are against the project?  Environmental issues: the forest will be severely fragmented and cease to exist as an eco-system. Today, the eco-system of Khimki Forest park is unique for the area so close to Moscow. There are some species enlisted into the local Red Book. The high environmental value of the forest park is acknowledged by expert assessments, including those of Greenpeace, and even of the concessionary of the project – NWCC LLC. All the three planned specially protected natural areas within the Khimki Forest park will be destroyed directly by the motorway if Option 3 will not be discarded. The existing layout of the motorway allows further seizure of forest lands for the placement of adjoining infrastructure.
  • 9. Oak groove is to be destroyed according to options 1, 2,3 if no tunnel built
  • 10. Red marks for the motorway near the trees which were eaten by elks. One can see new and old bites on the trees – i.e., here is an elks’ permanent habitat. Picture taken near the mesotrophic bog (to be destroyed only if Option 3 is chosen)
  • 11.  Social issues: the forest has great recreational potential, especially the oak groove with its St.George’s spring. It is the only wide green space in this polluted and over-populated region, available for the citizens of Khimki , especially for persons with limited mobility like elders, families with small children, etc. 76% of the locals are against the project Khimki Forest belongs to the “protective forest belt” around Moscow which protects the city against various pollutions like the deadly smog in the summer 2010.  The planned motorway destroys a protective forest strip between a giant open dumping ground and a densely populated area on the left bank of the canal . The environmental situation there is disastrous even now. It will be even more worse after the road is built. Taking into account technical problems (see below) there will be a permanent traffic jam with very high level of pollution due to car exhausts.
  • 12. A forest strip between an open dumping ground (in the upper left corner of the picture), and a residential area. It is to be destroyed according to Options 1,2,3, if no alteration is made.
  • 13.  Human Right issues: The project is very unpopular (according to public opinion polls, 76% of residents in Khimki, 67% in Moscow, 66% in all Russia are against the project. Instead of public involvement - violence, arrests, bans of public rallies were used to implement the project. The realization of the project according to Option 3 would be a severe blow to civic society in Russia
  • 14.  Technical issues: No prolongation of the motorway within Moscow is ready to implement. Without the prolongation, the new 10-row motorway will merge with Moscow Ring Road which is already overloaded. A traffic jam is guaranteed on both the new motorway and the Moscow Ring Road. Only Option 5 is free from this problem. Existing motorway M10 is enlarged in Moscow up to 12-14 rows, but it passes into a 6-row “shopping street” in Khimki. Therefore, there will be two sections of a modern motorway in the same direction in the nearest future – but they will not meet each other! The curve of the planned road through Khimki Forest park has such a complicated shape that speed requirements for an A1 class road are not met (speed decreases by 30 km/h). It will decrease even more due to multiple exits to objects of infrastructure which would inevitably appear instead of the forest if the existing project (Option 3) is implemented.
  • 15.  The new motorway is to be connected with North Rokada (planned along Oktyabrskaya railroad in Moscow) – but no ready project still available.
  • 16.  Corruption issues: Placement of the motorway with maximum use of forest lands violates the Federal law which allows to use forest lands only in case where no alternatives available (Article 11 of Federal Law #172-FZ). There are at least 4 other routings inflicting less damage to the forest than the chosen one – or no damage at all, in case of Options 4, 5. It is easy to understand the eagerness of the lobbyists behind Option 3 if remember that one hectare of forest lands costs RUR 4300 for the customer of the project (little more than EUR 100!). The real market value of lands in this region is about EUR 500,000 – 900,000 per a hectare. An analysis by Transparency International (R) shows that there are possible corruption motives behind the choice of Option 3 linked to commercial interests of acting Minister of Transportation Mr. Levitin. He is the Head of Board of Directors of Sheremetyevo International Airport, which is interested in approaching the motorway to airport’s lands.
  • 17.  Strategy issues: The project implies in an implicit way that automobiles will be the only modern mean of transportation in this direction (at least, for local traffic). That’s why the new motorway has 10 rows near Khmki, and only 6 rows in its main section between Moscow and St. Petersburg. Such a solution is obviously environmentally damaging regardless the routing of the motorway. It is a step back even in comparison with the transportation strategy of the Soviet Union where trains, subways and other more environment-friendly means of transportation were widespread for both local and interregional traffic.
  • 18.  This case creates a very dangerous precedent: Future “Khimki Forests” of Moscow Region (according to official plans of urbanization by the Government of Moscow District ). Brown color designates forests planned for clearing for projects of “development”– mainly along both
  • 19.  2010, January – April. Environmentalists tried to challenge Putin’s ruling in the Supreme Court. Not surprisingly, it was not successful. The lawsuit was passed to European Court on Human Rights. A “Public Discussion” on the project was initiated by NWCC LLC as required by IFIs. The procedure was cancelled after some public opinion polls were carried out by NWCC LLC. The results of the polls were not made public. Transparency International (Russia) found possible corruption motives behind the choice of the motorway routing through the Khimki Forest park  May 2010. A representative of the activists Mrs. Evgenia Chirikova met Board of Directors of EBRD. Decision on participation of EBRD was delayed due to the need of “additional study” New events (January – October 2010)
  • 20.  May – July 2010. Information appeared that Russian financial groups are ready to be involved in the project. Dorogi Rossii and Rosavtodor (the state-owned Russian companies that are the main customers of the project) hired another Russian company (Teplotekhnik LLC) to clear Khimki Forest. The works started in July in extremely hot and dry weather, neglecting fire safety rules, without proper authorization.  July 2010, 14. First clashes between activists, security guards, and construction workers happened. Construction workers failed to provide all necessary permissions for cutting down of trees.  July 2010 14 – 23. Construction works halted. An environmentalists’ camp established to protect Khimki Forest. Police force took neutral position first. The construction company evaded any discussions with the activists. An old tractor was burnt in the forest, perhaps as a provocation which nearly yielded in a major forest fire.
  • 21. First clashes in Khimki Forest. Security guards (in blue T-shirts) attacked without warning.
  • 22. A symbolic barricade at the entrance to the first activists’ camp. Construction machines (behind, in the clearing) were abandoned by the workers
  • 23.  July 22-23. Teplotekhnik LLC hired a new subcontractor as well as new security guards. Nevertheless, the activists still resisted their attempts to cut down trees.  July 23. In the morning, the camp was invaded by unknown masked men looking like ultra-right football fans or Neo-Nazis. They confronted activists; the cutting down of trees was immediately resumed under their protection. The activists called police, which arrived but refused to interfere or check who the “Ku Klux Klan” were. Some activists blocked a police car to prevent it from leaving the scene. Activists managed to stop works again despite the resistance of the masked men. Then police reinforcement arrived and arrested activists, as well as some journalists, in a very brutal way. A journalist from “Novaya Gazeta” who was covering the event got a damage of her cervical vertebrae during the arrest.
  • 24. July morning, 23 (6-00 A.M.). “We came to kill and clear!”
  • 25. A clash between activists and “Ku Klux Klan” near a fresh clearing
  • 26. Some activists tried to prevent a bloodbath by keeping police force at place. Police were still not keen to interfere.
  • 27. The girl was trying to stop cutting down of trees by climbing the harvester.
  • 28. Reinforcement arrived. The brave policemen arresting Mrs. Margarita Popova - a mother of a 1,5 year child.
  • 29. No “Ku Klux Klan” were arrested or interrogated
  • 30.  August 23-28. A court ruled that the leader of the activists Evgenia Chirikova who was arrested on July, 23 was not guilty. The construction works were temporarily stopped due to the interference of some MPs, as well as of representatives of Public Chamber, and Prosecutor Office. Some activists and journalists were attacked again by unknown thugs guarding the clearing. The thugs had Nazi insignia on their clothes. Lawyers of Greenpeace together with representatives of our movement visited the office of Teplotekhnik. There were no necessary permissions found. Newertheless, cutting down of trees was resumed soon.
  • 31. Unknown militants (in dark T-shirts) attacking an activist.
  • 32. A militant from the previous picture near a policemen. Pay attention to the insignia.
  • 33.  July, 28. Head of “Teplotekhnik” Mr. Semchenko had promised a meeting with locals but then suddenly refused to arrive. Later this day, a group of Antifascist and Anarchist youngsters apparently outraged by Neo-Nazi support of the project, attacked administrative buildings in Khimki. No one attacker was arrested there, but police arrested all the activists in the forest camp, instead.  Two public speakers of the antifascists (Gaskarov and Solopov) were detained later despite lack of evidence against them. They are still (October, 10) in jail. Ecooborona condemned the antifascists’ tactics, but blamed authorities’ refusal to take public opinion into account as initial source of all the violence.  July, 28 – August, 21. Cutting down of trees was proceeding slowly under protection of OMON (police special force) as well as of unknown thugs. Clashes between them and activists took place, more people were beaten or arrested. Public outrage about such a way of the “implementation of the project” was growing up both in Russia and abroad.
  • 34. Antifascists’ attack in Khimki Police failed to protect the administrative buildings, probably because their force was concentrated in the forest, near environmentalists’ camp
  • 35. It was much easier to arrest activists in the forest
  • 36.  August, 21 Meeting between the French Greens (incl. MEPs) and our activists. International pressure is mounting against Vinci (who is one of the foreign participants of the project) as well as against EIB and EBRD since they still not refused to take part in the project. About 30 thousand letters were sent to EIB and EBRD from different countries around the globe asking them to abandon the project.
  • 37.  August, 22. A large rally in Moscow in support of the Khimki Forest activists, from 3 to 5 thousand people gathered in Pushkin Square in Moscow. Some celebrities including an iconic rock-star Yuri Shevchuk came to support the Khimki Forest. Moscow police as well as pro- Kremlin movement “Nashi” tried to interfere with the rally. Vans with sound equipment were attacked by unknown motorbikers, the tires were punctured. Some people including celebrities were banned from entering the square. Despite all this, the rally became “the largest opposition rally in the last ten years”, according to some media.  EIB and EBRD answered to the activists that they are deeply concerned by the situation, and a thorough analysis on the project would be done.
  • 38.
  • 39.  August, 26 Surprisingly, President Medvedev as well as the ruling party (United Russia) announced that they want to halt the works on the project to allow more “public&expert discussions”. Local authorities of Khimki and Moscow District attempted to arrange quickly dummy “hearings” in support of the existing project – by summoning public workers and distributed false information about mass demolition of houses in Khimki in case if an alternative option is chosen. These “hearings” were boycotted by activists and were mocked in media. Latter, Presidential Administration appointed the Public Chamber of Russia as the main ground for further discussions on the project. EBRD supported this development but underlined that they don’t take responsibility for both transparency and outcome of the process. Mayor of Moscow Luzhkov tried to interfere with the President’s decision – and was fired soon.
  • 40.  September, 16. Hearings in Public Chamber on the project. No solution was found due to inflexibility of Russian authorities in transportation as well as local authorities of Khimki and Moscow District. They refused unconditionally to consider any other option for the motorway placement except Option 3.  Meanwhile, public support of the environmentalists grew up. According to public opinion polls, 76% of residents in Khimki, 67% in Moscow, and 66% throughout Russia supported protesters. Only 9% in Khimki and 11% in Moscow supported the existing placement of the motorway.
  • 41.  A coalition of environmental organizations and movements was formed to protect the Khimki Forest as well as other forests of Moscow District. It included Greenpeace, WWF as well as 4 Russian members including Ecooborona.  September 16 – nowday. No further public discussion was under way. According to some unofficial information, there were talking on the problem in the Presidential Administration, but no final decision was taken yet. The coalition issued a statement to the Public Chamber demanding honest and clear discussion on the project. Street rallies against the project in its present state resumed in Khimki in spite of further illegal works on the project. It led to further conflicts between activists and local authorities. A few people were arrested on October, 10
  • 42. Illegal works were carried out despite the President’s decision. They were stopped again by activists
  • 44. We kindly ask EC:  Not to grant Community Guarantee to EIB for the Moscow – St. Petersburg motorway project (at least, until the motorway routing is changed so that the bulk of the Khimki Forest Park is intact as well as the oak groove and the forest strip which protects residential buildings from the dumping ground).  To raise publicly its environmental concerns as well as to recommend to choose a more environment-friendly option in order to obtain European support for the project – because today “interests of investors” are used by Russian supporters of Option 3 to advocate its future implementation.  Ask Russian Government to stop repression against those activists who oppose the project – including the antifascists who have been imprisoned now for more than 2 months – without even enough proof of their involvement in the Khimki attack.
  • 45. Thank you for the attention!