SlideShare a Scribd company logo
1 of 21
Download to read offline
BIM for Temporary Works
22nd March 2018
2013 2015 2016 2017
Research
BIMshowLIVE
BIMObjects
BIMProjects
MajorProjects
DigitalEngineeringTeam
In-house
Development
BSIBIMLevel2Accreditation
Clientbespoketraining
MabeyUSAbespoketraining
BIMProjects
MabeyUKEngineeringTransition
Our BIM Journey
CNSpecialistAwards20162014 2018
StandardsEfficiency DevelopmentTraining
Internal and
External
Support
Digital Engineering Team established September 2016
to support Mabey’s digital transformation
The Digital Engineering Team
Overview
Digital Engineering team established with target of 4 key projects to be implemented in 2017:-
• Gain BSI BIM Level 2 accreditation
• Complete BIM Objects Library
• Develop Revit Training programme for internal and external clients
• Establish VR process for Design Review on Live Projects
PAS 1192-2:2013 Information Management for the Capital / Delivery Phase of Construction Projects Using Building
Information Modelling.
Tier 2 - Contractor including the design, supply & installation of temporary works systems & solutions to the
construction and associated industries complying with BIM Level 2 in accordance with PAS 1192-2:2013, BS1192-
4:2014 and BS 1192:2007.
Key positive elements observed during the assessment:
• BIM documentation is available to support the BIM processes
• The business has made significant investments in terms of people, systems / tools and processes, for example
the establishment of a BIM champions at regional offices.
• The level of knowledge displayed by staff who participated in the assessment.
• The commitment of senior management to BIM, as evidenced by the attendance and participation of the
Engineering Director during the whole of the assessment.
bsi. BIM Level 2 accreditation was gained on May 18th 2017
BIM Level 2 certification
Mabey Hire UK Engineering
45 Revit Users
Mabey USA Engineering
15 Revit Users
Digital Engineering Team providing Revit Training for internal Mabey Engineering teams
and external Temporary Works departments of our clients
Revit Training
2017-2018
New software implementation across all engineering teams,
with internal training for delivery of Propping, Groundworks, Formwork and Bridging projects
• BIM Object library
• Revisions control within templates
• Automated Schedules
• Clash Detection
• 4D Phasing
• Common Data Environment
• VR for design review
Improved Capabilities
“Integrating the coordinated Revit
model was a huge benefit for the team
on site at Westgate Oxford. We were
able to run a clash detection enabling
the engineers to effectively plan works
and inform our programme, and
communicate this to the wider team.”
Anna Louise Wylie MEng, BIM AP, Graduate
Digital Engineer
Laing O'Rourke
BIM Projects
Laing O’Rourke – Westgate Shopping Centre
Coordinated models enabling clash detection
BIM Projects
Laing O’Rourke – Westgate Shopping Centre
BIM Projects
Laing O’Rourke – Westgate Shopping Centre
Development
Digital
Prototype
Fabrication DeliveryTesting
Birdsmouth Swivel
Connector
BIM Projects
Laing O’Rourke – Westgate Shopping Centre
• Parametric Revit Family developed
from initial Digital Prototype
• Revit Family added to site model at
early stage, confirming product would
meet requirements
• BIM Object accurately represents
actual product, embedded with
accurate data
BIM Projects
Laing O’Rourke – Westgate Shopping Centre
Benefits on the project
• Clash Detection
• Requirements for special
fabrications defined early
• Models produced to show
construction sequencing and
phasing
BIM Projects
Laing O’Rourke – Westgate Shopping Centre
Virtual Reality Project Review
Digital Engineering team established a BIM to VR workflow for reviewing Live Projects:-
• Create 3D Revit model of our Temporary Works solution using Mabey BIM Objects
• Federate Temporary Works model with our clients structure model
• Run a clash interference check in Revit
• Export into the HTC Vive VR System using 3DS Max Interactive
• Review detected clashes and plan resolution
• Review other design considerations such as safety on site, access, phasing and buildability
• Update the Revit model for next issue
Virtual Reality Project Review
• Façade Restraint System in Glasgow,
on site for approximately 1 year
• Approximately 173 Tonnes of
Propping equipment to be used
• More than 4,500 individual propping
components in the installation
• Installation in 3 Phases over a period
of just 3 weeks
• 3D model of the Mabey Façade
Restraint System created in Revit
• Federated model produced showing
temporary propping with point cloud
• Clash detection report produced
• Model exported to Virtual Reality to
review and resolve clashes
• Amended model used to develop
Installation methodology
• Phasing sequence added to the BIM
model for 4D planning
BIM Projects
BAM Construction – Atlantic Square
Point Cloud
Survey
Existing
Façade model
Restraint system
model
Client
Client
Mabey
Collaboration
BIM Projects
BAM Construction – Atlantic Square
Clashes reviewed with VR
BIM Projects
BAM Construction – Atlantic Square
Benefits on the project
• Improved certainty and confidence in the complicated design and programme
• Design changes are quicker and more efficient
• Automated parts list generated saving engineering time
• Reduced risks on site with a clear view on installation methodology, aiding Health and Safety
• Less potential delays on site, minimizing additional costs and penalties
BIM Projects
BAM Construction – Atlantic Square
Bevil Mabey
“Always remember that in 25 years' time we won't be doing it this way.
If we are, we shall be facing extinction!”
Bevil Mabey CBE
Thank You
Any Questions?

More Related Content

What's hot

5th Qatar BIM User Day, BIM Introduction
5th Qatar BIM User Day, BIM Introduction5th Qatar BIM User Day, BIM Introduction
5th Qatar BIM User Day, BIM IntroductionBIM User Day
 
Bim implementation qatar
Bim implementation qatarBim implementation qatar
Bim implementation qatarOmar Selim
 
4th Qatar BIM User Day, BIM in Contracts
4th Qatar BIM User Day, BIM in Contracts4th Qatar BIM User Day, BIM in Contracts
4th Qatar BIM User Day, BIM in ContractsBIM User Day
 
3rd Qatar BIM User Day - The BIM Manager within the Project Organisation
3rd Qatar BIM User Day - The BIM Manager within the Project Organisation3rd Qatar BIM User Day - The BIM Manager within the Project Organisation
3rd Qatar BIM User Day - The BIM Manager within the Project OrganisationBIM User Day
 
1st Qatar BIM User Day Business processes supported by BIM methodology, part 2
1st Qatar BIM User Day Business processes supported by BIM methodology, part 21st Qatar BIM User Day Business processes supported by BIM methodology, part 2
1st Qatar BIM User Day Business processes supported by BIM methodology, part 2BIM User Day
 
2nd Qatar BIM User Day Scheduling, QTO and Estimating Technology
2nd Qatar BIM User Day  Scheduling, QTO and Estimating Technology2nd Qatar BIM User Day  Scheduling, QTO and Estimating Technology
2nd Qatar BIM User Day Scheduling, QTO and Estimating TechnologyBIM User Day
 
4th Qatar BIM User Day, Market Outlook
4th Qatar BIM User Day, Market Outlook4th Qatar BIM User Day, Market Outlook
4th Qatar BIM User Day, Market OutlookBIM User Day
 
Learn essentials of job oriented autodesk revit mep fp course
Learn essentials of job oriented autodesk revit mep fp courseLearn essentials of job oriented autodesk revit mep fp course
Learn essentials of job oriented autodesk revit mep fp courseNI BT
 
Revit structure tutorial|structural engineering courses| NIBT eLearning
Revit structure tutorial|structural engineering courses| NIBT eLearningRevit structure tutorial|structural engineering courses| NIBT eLearning
Revit structure tutorial|structural engineering courses| NIBT eLearningNI BT
 
Advantages offered by 3D, 4D, 5D and 6D BIM modeling
Advantages offered by 3D, 4D, 5D and 6D BIM modelingAdvantages offered by 3D, 4D, 5D and 6D BIM modeling
Advantages offered by 3D, 4D, 5D and 6D BIM modelingbimservicesindia1
 
Jan 21st A360 Hangout: Collaboration for Revit Presentation
Jan 21st A360 Hangout: Collaboration for Revit PresentationJan 21st A360 Hangout: Collaboration for Revit Presentation
Jan 21st A360 Hangout: Collaboration for Revit PresentationAutodesk A360
 
Go beyond design with navisworks
Go beyond design with navisworksGo beyond design with navisworks
Go beyond design with navisworksNI BT
 

What's hot (20)

5th Qatar BIM User Day, BIM Introduction
5th Qatar BIM User Day, BIM Introduction5th Qatar BIM User Day, BIM Introduction
5th Qatar BIM User Day, BIM Introduction
 
Bim implementation qatar
Bim implementation qatarBim implementation qatar
Bim implementation qatar
 
4th Qatar BIM User Day, BIM in Contracts
4th Qatar BIM User Day, BIM in Contracts4th Qatar BIM User Day, BIM in Contracts
4th Qatar BIM User Day, BIM in Contracts
 
3rd Qatar BIM User Day - The BIM Manager within the Project Organisation
3rd Qatar BIM User Day - The BIM Manager within the Project Organisation3rd Qatar BIM User Day - The BIM Manager within the Project Organisation
3rd Qatar BIM User Day - The BIM Manager within the Project Organisation
 
BIM Case Study
BIM Case StudyBIM Case Study
BIM Case Study
 
1st Qatar BIM User Day Business processes supported by BIM methodology, part 2
1st Qatar BIM User Day Business processes supported by BIM methodology, part 21st Qatar BIM User Day Business processes supported by BIM methodology, part 2
1st Qatar BIM User Day Business processes supported by BIM methodology, part 2
 
2nd Qatar BIM User Day Scheduling, QTO and Estimating Technology
2nd Qatar BIM User Day  Scheduling, QTO and Estimating Technology2nd Qatar BIM User Day  Scheduling, QTO and Estimating Technology
2nd Qatar BIM User Day Scheduling, QTO and Estimating Technology
 
Revit Projects 1
Revit Projects 1Revit Projects 1
Revit Projects 1
 
4th Qatar BIM User Day, Market Outlook
4th Qatar BIM User Day, Market Outlook4th Qatar BIM User Day, Market Outlook
4th Qatar BIM User Day, Market Outlook
 
Learn essentials of job oriented autodesk revit mep fp course
Learn essentials of job oriented autodesk revit mep fp courseLearn essentials of job oriented autodesk revit mep fp course
Learn essentials of job oriented autodesk revit mep fp course
 
A New Development Platform Connecting BIM to Anything - Mr. Xiaodong LIANG Ch...
A New Development Platform Connecting BIM to Anything - Mr. Xiaodong LIANG Ch...A New Development Platform Connecting BIM to Anything - Mr. Xiaodong LIANG Ch...
A New Development Platform Connecting BIM to Anything - Mr. Xiaodong LIANG Ch...
 
Revit structure tutorial|structural engineering courses| NIBT eLearning
Revit structure tutorial|structural engineering courses| NIBT eLearningRevit structure tutorial|structural engineering courses| NIBT eLearning
Revit structure tutorial|structural engineering courses| NIBT eLearning
 
BIM Assessment
BIM AssessmentBIM Assessment
BIM Assessment
 
Data Templates - #BIM4M2help
Data Templates - #BIM4M2helpData Templates - #BIM4M2help
Data Templates - #BIM4M2help
 
Advantages offered by 3D, 4D, 5D and 6D BIM modeling
Advantages offered by 3D, 4D, 5D and 6D BIM modelingAdvantages offered by 3D, 4D, 5D and 6D BIM modeling
Advantages offered by 3D, 4D, 5D and 6D BIM modeling
 
BIM Networking Seminar: Documentation from BIM - Tips for GBP Submission to BD
BIM Networking Seminar: Documentation from BIM - Tips for GBP Submission to BDBIM Networking Seminar: Documentation from BIM - Tips for GBP Submission to BD
BIM Networking Seminar: Documentation from BIM - Tips for GBP Submission to BD
 
Jan 21st A360 Hangout: Collaboration for Revit Presentation
Jan 21st A360 Hangout: Collaboration for Revit PresentationJan 21st A360 Hangout: Collaboration for Revit Presentation
Jan 21st A360 Hangout: Collaboration for Revit Presentation
 
Go beyond design with navisworks
Go beyond design with navisworksGo beyond design with navisworks
Go beyond design with navisworks
 
MEP Outsourcing Services - SiliconInfo
MEP Outsourcing Services - SiliconInfoMEP Outsourcing Services - SiliconInfo
MEP Outsourcing Services - SiliconInfo
 
From BIM to iBIM - Dr. Jack CHENG Associate Professor Department of Civil and...
From BIM to iBIM - Dr. Jack CHENG Associate Professor Department of Civil and...From BIM to iBIM - Dr. Jack CHENG Associate Professor Department of Civil and...
From BIM to iBIM - Dr. Jack CHENG Associate Professor Department of Civil and...
 

Similar to NW BIM 2018 3 Mabey

COMIT Community Day Winter 2018 - Mabey Hire's Presentation
COMIT Community Day Winter 2018 - Mabey Hire's Presentation COMIT Community Day Winter 2018 - Mabey Hire's Presentation
COMIT Community Day Winter 2018 - Mabey Hire's Presentation Comit Projects Ltd
 
Citation- Enchanted Storybrook Castle2
Citation- Enchanted Storybrook Castle2Citation- Enchanted Storybrook Castle2
Citation- Enchanted Storybrook Castle2Christian Munoz
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectMANNU KUMAR
 
ETDP 2015 D2 Next Generation Bim - InEight
ETDP 2015 D2 Next Generation Bim - InEightETDP 2015 D2 Next Generation Bim - InEight
ETDP 2015 D2 Next Generation Bim - InEightComit Projects Ltd
 
BIM- Park in California
BIM- Park in CaliforniaBIM- Park in California
BIM- Park in CaliforniaGaurav Kumar
 
Best Converting Point Cloud to BIM and BIM Laser Scanning.pdf
Best Converting Point Cloud to BIM and BIM Laser Scanning.pdfBest Converting Point Cloud to BIM and BIM Laser Scanning.pdf
Best Converting Point Cloud to BIM and BIM Laser Scanning.pdfRvtcad
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modelingNI BT
 
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015Aconex
 
Foundation works norwich - 15th october 2012
Foundation works   norwich - 15th october 2012Foundation works   norwich - 15th october 2012
Foundation works norwich - 15th october 2012carolmcnulty
 
BIM Process & BIM Pilot Project
BIM Process & BIM Pilot ProjectBIM Process & BIM Pilot Project
BIM Process & BIM Pilot ProjectNguyen Manh Tuan
 
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdfNZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdfle canh
 
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015Aconex
 
Revit Online Training courses-BES.pdf
Revit Online Training courses-BES.pdfRevit Online Training courses-BES.pdf
Revit Online Training courses-BES.pdfirfanakram32
 
Building information modeling BIM
Building information modeling BIMBuilding information modeling BIM
Building information modeling BIMfitsum yonas
 
Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahem Naeem
 

Similar to NW BIM 2018 3 Mabey (20)

COMIT Community Day Winter 2018 - Mabey Hire's Presentation
COMIT Community Day Winter 2018 - Mabey Hire's Presentation COMIT Community Day Winter 2018 - Mabey Hire's Presentation
COMIT Community Day Winter 2018 - Mabey Hire's Presentation
 
Spar2010murphy
Spar2010murphySpar2010murphy
Spar2010murphy
 
Citation- Enchanted Storybrook Castle2
Citation- Enchanted Storybrook Castle2Citation- Enchanted Storybrook Castle2
Citation- Enchanted Storybrook Castle2
 
Innovation in practice presentation 10 06-15
Innovation in practice presentation 10 06-15Innovation in practice presentation 10 06-15
Innovation in practice presentation 10 06-15
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real project
 
ETDP 2015 D2 Next Generation Bim - InEight
ETDP 2015 D2 Next Generation Bim - InEightETDP 2015 D2 Next Generation Bim - InEight
ETDP 2015 D2 Next Generation Bim - InEight
 
BIM- Park in California
BIM- Park in CaliforniaBIM- Park in California
BIM- Park in California
 
Best Converting Point Cloud to BIM and BIM Laser Scanning.pdf
Best Converting Point Cloud to BIM and BIM Laser Scanning.pdfBest Converting Point Cloud to BIM and BIM Laser Scanning.pdf
Best Converting Point Cloud to BIM and BIM Laser Scanning.pdf
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modeling
 
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
 
Foundation works norwich - 15th october 2012
Foundation works   norwich - 15th october 2012Foundation works   norwich - 15th october 2012
Foundation works norwich - 15th october 2012
 
BIM Process & BIM Pilot Project
BIM Process & BIM Pilot ProjectBIM Process & BIM Pilot Project
BIM Process & BIM Pilot Project
 
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdfNZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
 
Why Manufacturers Need BIM - #BIM4M2help
Why Manufacturers Need BIM - #BIM4M2helpWhy Manufacturers Need BIM - #BIM4M2help
Why Manufacturers Need BIM - #BIM4M2help
 
MelBIM 190619
MelBIM 190619MelBIM 190619
MelBIM 190619
 
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
 
Revit Online Training courses-BES.pdf
Revit Online Training courses-BES.pdfRevit Online Training courses-BES.pdf
Revit Online Training courses-BES.pdf
 
Building information modeling BIM
Building information modeling BIMBuilding information modeling BIM
Building information modeling BIM
 
What is VICO ?
What is VICO ?What is VICO ?
What is VICO ?
 
Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio
 

Recently uploaded

Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stageAbc194748
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...Health
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfsmsksolar
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 

Recently uploaded (20)

Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 

NW BIM 2018 3 Mabey

  • 1. BIM for Temporary Works 22nd March 2018
  • 2. 2013 2015 2016 2017 Research BIMshowLIVE BIMObjects BIMProjects MajorProjects DigitalEngineeringTeam In-house Development BSIBIMLevel2Accreditation Clientbespoketraining MabeyUSAbespoketraining BIMProjects MabeyUKEngineeringTransition Our BIM Journey CNSpecialistAwards20162014 2018
  • 3. StandardsEfficiency DevelopmentTraining Internal and External Support Digital Engineering Team established September 2016 to support Mabey’s digital transformation The Digital Engineering Team
  • 4. Overview Digital Engineering team established with target of 4 key projects to be implemented in 2017:- • Gain BSI BIM Level 2 accreditation • Complete BIM Objects Library • Develop Revit Training programme for internal and external clients • Establish VR process for Design Review on Live Projects
  • 5. PAS 1192-2:2013 Information Management for the Capital / Delivery Phase of Construction Projects Using Building Information Modelling. Tier 2 - Contractor including the design, supply & installation of temporary works systems & solutions to the construction and associated industries complying with BIM Level 2 in accordance with PAS 1192-2:2013, BS1192- 4:2014 and BS 1192:2007. Key positive elements observed during the assessment: • BIM documentation is available to support the BIM processes • The business has made significant investments in terms of people, systems / tools and processes, for example the establishment of a BIM champions at regional offices. • The level of knowledge displayed by staff who participated in the assessment. • The commitment of senior management to BIM, as evidenced by the attendance and participation of the Engineering Director during the whole of the assessment. bsi. BIM Level 2 accreditation was gained on May 18th 2017 BIM Level 2 certification
  • 6. Mabey Hire UK Engineering 45 Revit Users Mabey USA Engineering 15 Revit Users Digital Engineering Team providing Revit Training for internal Mabey Engineering teams and external Temporary Works departments of our clients Revit Training 2017-2018 New software implementation across all engineering teams, with internal training for delivery of Propping, Groundworks, Formwork and Bridging projects
  • 7. • BIM Object library • Revisions control within templates • Automated Schedules • Clash Detection • 4D Phasing • Common Data Environment • VR for design review Improved Capabilities
  • 8. “Integrating the coordinated Revit model was a huge benefit for the team on site at Westgate Oxford. We were able to run a clash detection enabling the engineers to effectively plan works and inform our programme, and communicate this to the wider team.” Anna Louise Wylie MEng, BIM AP, Graduate Digital Engineer Laing O'Rourke BIM Projects Laing O’Rourke – Westgate Shopping Centre
  • 9. Coordinated models enabling clash detection BIM Projects Laing O’Rourke – Westgate Shopping Centre
  • 10. BIM Projects Laing O’Rourke – Westgate Shopping Centre
  • 12. • Parametric Revit Family developed from initial Digital Prototype • Revit Family added to site model at early stage, confirming product would meet requirements • BIM Object accurately represents actual product, embedded with accurate data BIM Projects Laing O’Rourke – Westgate Shopping Centre
  • 13. Benefits on the project • Clash Detection • Requirements for special fabrications defined early • Models produced to show construction sequencing and phasing BIM Projects Laing O’Rourke – Westgate Shopping Centre
  • 14. Virtual Reality Project Review Digital Engineering team established a BIM to VR workflow for reviewing Live Projects:- • Create 3D Revit model of our Temporary Works solution using Mabey BIM Objects • Federate Temporary Works model with our clients structure model • Run a clash interference check in Revit • Export into the HTC Vive VR System using 3DS Max Interactive • Review detected clashes and plan resolution • Review other design considerations such as safety on site, access, phasing and buildability • Update the Revit model for next issue
  • 16. • Façade Restraint System in Glasgow, on site for approximately 1 year • Approximately 173 Tonnes of Propping equipment to be used • More than 4,500 individual propping components in the installation • Installation in 3 Phases over a period of just 3 weeks • 3D model of the Mabey Façade Restraint System created in Revit • Federated model produced showing temporary propping with point cloud • Clash detection report produced • Model exported to Virtual Reality to review and resolve clashes • Amended model used to develop Installation methodology • Phasing sequence added to the BIM model for 4D planning BIM Projects BAM Construction – Atlantic Square
  • 17. Point Cloud Survey Existing Façade model Restraint system model Client Client Mabey Collaboration BIM Projects BAM Construction – Atlantic Square
  • 18. Clashes reviewed with VR BIM Projects BAM Construction – Atlantic Square
  • 19. Benefits on the project • Improved certainty and confidence in the complicated design and programme • Design changes are quicker and more efficient • Automated parts list generated saving engineering time • Reduced risks on site with a clear view on installation methodology, aiding Health and Safety • Less potential delays on site, minimizing additional costs and penalties BIM Projects BAM Construction – Atlantic Square
  • 20. Bevil Mabey “Always remember that in 25 years' time we won't be doing it this way. If we are, we shall be facing extinction!” Bevil Mabey CBE