DESIGN FEATURES:
Principles of force
transmission
Vertical forces:
from the body to the
bogie frame through
the secondary
suspension springs;
from the bogie frame
to the axles through
the primary
suspension springs
and frame - axle
bearing control arm.
Lateral forces:
from the body to
the bogie frame
through the
secondary
suspension
springs; from the
bogie frame to the
axles through the
elastic elements of
the frame - axle
bearing control
arm.
Longitudinal traction
efforts and braking
powers:
from the body to
bogie frame through
the traction centre
rods and the traction
lever; from the bogie
frame to the axles
through the frame axle bearing control
arm.
Curve negotiation:
An articulated control arm is connecting axle
bearing and side frame through elastic
connection, which will provide flexibility
between axle and side frame.
Wheel diameter
New wheel dia 915mm
worn wheel dia 845mm
Suspension elements:
Primary suspension consists of nested inner
and outer springs, dampers, top rubber pad
secondary suspension consists of nested
flexi-coils springs (inner and outer
springs),rubber spring, vertical dampers,
lateral dampers, anti-roll bars, anchor links.
Secondary rubber pad is inserted below and
above secondary springs provides flexible
ends of springs.
Speed limit
Upto 160KMPH without any modification
upto 200KMPH with minor modification
FIAT BOGIE

SUB-SYSTEMS
Wheel and Axles
On the bogie each axle
is fitted with two brake
disks (4), diameter 640
mm and width 110 mm.
In built slack adjusting
facilities in brake cylinder
fitted.
Two wheel disc of tread
dia 915 (New), 845
(worn).
Axle bearings
A taper roller cartridge
type bearing is used.
It is a pre-assembled
unit not required any
further intervention,
such as clearance
adjustments.
The axle bearings on
the bogie are fitted
with sensors for
detecting speed
BOGIE FRAME
The bogie frame is a solid welded frame made by
steel sheets and forged or cast parts.
The frame is made up of two longitudinal
components connected by two cross-beams (2)
which also support the brake units.
The various supports which connect the different
bogie components are welded to the
frame.
The bogie frame rests on the primary suspension
spring units and supports the vehicle body by
means of a bolster beam. The bolster beam is
connected to the bogie frame by secondary
suspension.
BOGIE FRAME
Primary suspension
Consisting of two coil springs, one vertical
damper, An articulated control arm fitted with
twin-layer elastic joints connecting the axle
bearing to the bogie frame
for curve negotiation.
SECONDARY
SUSPENSION
CONSISTS
NEST OF FLEXI-COIL SPRINGS INNER AND
OUTER, RUBBER SPRING
VERTICAL DAMPERS
LATERAL DAMPERS
YAW DAMPERS
ANTI-ROLL BAR
ANCHOR LINKS
SECONDARY
SUSPENSION
DISC BRAKE SYSTEM
AXLE MOUNTED
DISC BRAKE
TWO DISCS PER
AXLE OF DIA640
INBUILT SLACK
ADJUSTER IN
BRAKE
CYLINDERS
35mm BRAKE

More Related Content

What's hot

Northern railway
Northern railwayNorthern railway
Northern railwaysometech
 
Railway coaching depot report
Railway coaching depot reportRailway coaching depot report
Railway coaching depot reportAshutosh Khaitan
 
ICF Bogie Details by Yadvendu
ICF Bogie Details by YadvenduICF Bogie Details by Yadvendu
ICF Bogie Details by YadvenduJogendra Yadvendu
 
Presentation on Coach Care Complex
Presentation on Coach Care ComplexPresentation on Coach Care Complex
Presentation on Coach Care ComplexRitikBaghmar
 
SUMMER TRAINING PPT On Coach Care Centre (SICK LINE)
SUMMER TRAINING PPTOnCoach Care Centre (SICK LINE) SUMMER TRAINING PPTOnCoach Care Centre (SICK LINE)
SUMMER TRAINING PPT On Coach Care Centre (SICK LINE) Amit Verma
 
Study on Coach interior fittings of ICF and LHB coaches
Study on Coach interior fittings of ICF and LHB coachesStudy on Coach interior fittings of ICF and LHB coaches
Study on Coach interior fittings of ICF and LHB coachesrakeshmanthu
 
Air suspension in Railway coaches
Air suspension in Railway coachesAir suspension in Railway coaches
Air suspension in Railway coachesSrinivasaRao Guduru
 
Air brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railwaysAir brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railwaysApeksha Shrivastav
 
Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)Shikhar Gupta
 
Training report on railways (all workshop)
Training report on railways (all workshop)Training report on railways (all workshop)
Training report on railways (all workshop)anand prasad
 
Carriage and wagon
Carriage and wagonCarriage and wagon
Carriage and wagonAjeet Kumar
 
Air brake system of locomotive
Air brake system of locomotiveAir brake system of locomotive
Air brake system of locomotiveAkash Singh
 

What's hot (20)

Coach Care Complex,NWR Jaipur
Coach Care Complex,NWR JaipurCoach Care Complex,NWR Jaipur
Coach Care Complex,NWR Jaipur
 
Northern railway
Northern railwayNorthern railway
Northern railway
 
Railway coaching depot report
Railway coaching depot reportRailway coaching depot report
Railway coaching depot report
 
ICF Bogie Details by Yadvendu
ICF Bogie Details by YadvenduICF Bogie Details by Yadvendu
ICF Bogie Details by Yadvendu
 
Presentation on Coach Care Complex
Presentation on Coach Care ComplexPresentation on Coach Care Complex
Presentation on Coach Care Complex
 
Bogie assembly alco
Bogie assembly alcoBogie assembly alco
Bogie assembly alco
 
Hand book on C&W
Hand book on C&W Hand book on C&W
Hand book on C&W
 
SUMMER TRAINING PPT On Coach Care Centre (SICK LINE)
SUMMER TRAINING PPTOnCoach Care Centre (SICK LINE) SUMMER TRAINING PPTOnCoach Care Centre (SICK LINE)
SUMMER TRAINING PPT On Coach Care Centre (SICK LINE)
 
Bogie
BogieBogie
Bogie
 
Study on Coach interior fittings of ICF and LHB coaches
Study on Coach interior fittings of ICF and LHB coachesStudy on Coach interior fittings of ICF and LHB coaches
Study on Coach interior fittings of ICF and LHB coaches
 
Types of Axles
Types of AxlesTypes of Axles
Types of Axles
 
Air suspension in Railway coaches
Air suspension in Railway coachesAir suspension in Railway coaches
Air suspension in Railway coaches
 
Air brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railwaysAir brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railways
 
Casnub Bogies
Casnub BogiesCasnub Bogies
Casnub Bogies
 
Training report
Training reportTraining report
Training report
 
Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)
 
Training report on railways (all workshop)
Training report on railways (all workshop)Training report on railways (all workshop)
Training report on railways (all workshop)
 
Carriage and wagon
Carriage and wagonCarriage and wagon
Carriage and wagon
 
railway_plant_layout
railway_plant_layoutrailway_plant_layout
railway_plant_layout
 
Air brake system of locomotive
Air brake system of locomotiveAir brake system of locomotive
Air brake system of locomotive
 

Similar to Fiat bogie

Cimmco wagon mfg and suspension system
Cimmco wagon mfg and suspension systemCimmco wagon mfg and suspension system
Cimmco wagon mfg and suspension systemDeepak Solanki
 
Propeller shaft & universal joint
Propeller shaft & universal jointPropeller shaft & universal joint
Propeller shaft & universal jointdeep388
 
INTERNSHIP REPORT...LOWERPAREL CARRIAGE WORKSHOP
INTERNSHIP REPORT...LOWERPAREL CARRIAGE WORKSHOPINTERNSHIP REPORT...LOWERPAREL CARRIAGE WORKSHOP
INTERNSHIP REPORT...LOWERPAREL CARRIAGE WORKSHOPdineshmirjolkar
 
Suspension system - CSVTU Automobile Engg.
Suspension system - CSVTU Automobile Engg.Suspension system - CSVTU Automobile Engg.
Suspension system - CSVTU Automobile Engg.ManishRKSahu
 
differential gear mechanism BY ANUBHAV SINGH
differential gear mechanism BY ANUBHAV SINGHdifferential gear mechanism BY ANUBHAV SINGH
differential gear mechanism BY ANUBHAV SINGHAnubhav659
 
elpoh_bogie_ppt.pptx
elpoh_bogie_ppt.pptxelpoh_bogie_ppt.pptx
elpoh_bogie_ppt.pptxSudhirPatel46
 
Suspension system
Suspension systemSuspension system
Suspension systemMihir Patel
 
Automobile Engineering-Unit-III-Transmission system of Automobile
Automobile Engineering-Unit-III-Transmission system of Automobile    Automobile Engineering-Unit-III-Transmission system of Automobile
Automobile Engineering-Unit-III-Transmission system of Automobile Dr.S.SURESH
 
2b9fc module iii steering system_ part-ii (2)
2b9fc module iii steering system_ part-ii (2)2b9fc module iii steering system_ part-ii (2)
2b9fc module iii steering system_ part-ii (2)Tanvi Gautam
 
How differential works
How differential worksHow differential works
How differential worksDev Singh
 
Unit 1 Front Axle & Steering System
Unit 1 Front Axle & Steering SystemUnit 1 Front Axle & Steering System
Unit 1 Front Axle & Steering SystemVishal Niphade
 

Similar to Fiat bogie (20)

Siddharth%20ppt.pptx
Siddharth%20ppt.pptxSiddharth%20ppt.pptx
Siddharth%20ppt.pptx
 
Coach &amp
Coach &ampCoach &amp
Coach &amp
 
Cimmco wagon mfg and suspension system
Cimmco wagon mfg and suspension systemCimmco wagon mfg and suspension system
Cimmco wagon mfg and suspension system
 
Propeller shaft & universal joint
Propeller shaft & universal jointPropeller shaft & universal joint
Propeller shaft & universal joint
 
INTERNSHIP REPORT...LOWERPAREL CARRIAGE WORKSHOP
INTERNSHIP REPORT...LOWERPAREL CARRIAGE WORKSHOPINTERNSHIP REPORT...LOWERPAREL CARRIAGE WORKSHOP
INTERNSHIP REPORT...LOWERPAREL CARRIAGE WORKSHOP
 
Suspension system - CSVTU Automobile Engg.
Suspension system - CSVTU Automobile Engg.Suspension system - CSVTU Automobile Engg.
Suspension system - CSVTU Automobile Engg.
 
Propeller shaft
Propeller shaftPropeller shaft
Propeller shaft
 
differential gear mechanism BY ANUBHAV SINGH
differential gear mechanism BY ANUBHAV SINGHdifferential gear mechanism BY ANUBHAV SINGH
differential gear mechanism BY ANUBHAV SINGH
 
elpoh_bogie_ppt.pptx
elpoh_bogie_ppt.pptxelpoh_bogie_ppt.pptx
elpoh_bogie_ppt.pptx
 
Suspension system
Suspension systemSuspension system
Suspension system
 
Suspension system
Suspension systemSuspension system
Suspension system
 
unit 3 Steering System.pptx
unit 3 Steering System.pptxunit 3 Steering System.pptx
unit 3 Steering System.pptx
 
steering system
steering systemsteering system
steering system
 
Automobile Engineering-Unit-III-Transmission system of Automobile
Automobile Engineering-Unit-III-Transmission system of Automobile    Automobile Engineering-Unit-III-Transmission system of Automobile
Automobile Engineering-Unit-III-Transmission system of Automobile
 
2b9fc module iii steering system_ part-ii (2)
2b9fc module iii steering system_ part-ii (2)2b9fc module iii steering system_ part-ii (2)
2b9fc module iii steering system_ part-ii (2)
 
How differential works
How differential worksHow differential works
How differential works
 
Unit 1 Front Axle & Steering System
Unit 1 Front Axle & Steering SystemUnit 1 Front Axle & Steering System
Unit 1 Front Axle & Steering System
 
Steering system 7
Steering system 7Steering system 7
Steering system 7
 
3.steering.pptx
3.steering.pptx3.steering.pptx
3.steering.pptx
 
6 rear axle drives
6 rear axle drives6 rear axle drives
6 rear axle drives
 

More from Deepak Solanki

Ulttrasonic metal welding
Ulttrasonic metal weldingUlttrasonic metal welding
Ulttrasonic metal weldingDeepak Solanki
 
Steering Operated Vehicle Illumination(Head Lighting) System
Steering Operated Vehicle Illumination(Head Lighting) SystemSteering Operated Vehicle Illumination(Head Lighting) System
Steering Operated Vehicle Illumination(Head Lighting) SystemDeepak Solanki
 
Indian Railway : An Introduction
Indian Railway : An IntroductionIndian Railway : An Introduction
Indian Railway : An IntroductionDeepak Solanki
 
Bogie and suspension e book
Bogie and suspension e bookBogie and suspension e book
Bogie and suspension e bookDeepak Solanki
 
Kota Super Thermal Power Station Training report
Kota Super Thermal Power Station Training reportKota Super Thermal Power Station Training report
Kota Super Thermal Power Station Training reportDeepak Solanki
 
Oops implemetation material
Oops implemetation materialOops implemetation material
Oops implemetation materialDeepak Solanki
 
Electromagnetic suspension-system
Electromagnetic suspension-systemElectromagnetic suspension-system
Electromagnetic suspension-systemDeepak Solanki
 
Bhel Pnuematic Braking System
Bhel Pnuematic Braking SystemBhel Pnuematic Braking System
Bhel Pnuematic Braking SystemDeepak Solanki
 
Object-Oriented Programming (OOPS) in C++
Object-Oriented Programming (OOPS) in C++Object-Oriented Programming (OOPS) in C++
Object-Oriented Programming (OOPS) in C++Deepak Solanki
 
Automobile fluid coupling and torque converter
Automobile fluid coupling and torque converterAutomobile fluid coupling and torque converter
Automobile fluid coupling and torque converterDeepak Solanki
 

More from Deepak Solanki (16)

Ulttrasonic metal welding
Ulttrasonic metal weldingUlttrasonic metal welding
Ulttrasonic metal welding
 
Steering Operated Vehicle Illumination(Head Lighting) System
Steering Operated Vehicle Illumination(Head Lighting) SystemSteering Operated Vehicle Illumination(Head Lighting) System
Steering Operated Vehicle Illumination(Head Lighting) System
 
Modified Fiat Bogie
Modified Fiat BogieModified Fiat Bogie
Modified Fiat Bogie
 
Loco workshop
Loco workshopLoco workshop
Loco workshop
 
Indian Railway : An Introduction
Indian Railway : An IntroductionIndian Railway : An Introduction
Indian Railway : An Introduction
 
Bogie and suspension e book
Bogie and suspension e bookBogie and suspension e book
Bogie and suspension e book
 
bio diesel
 bio diesel bio diesel
bio diesel
 
HMT training report
HMT training reportHMT training report
HMT training report
 
Kota Super Thermal Power Station Training report
Kota Super Thermal Power Station Training reportKota Super Thermal Power Station Training report
Kota Super Thermal Power Station Training report
 
Oops implemetation material
Oops implemetation materialOops implemetation material
Oops implemetation material
 
Electromagnetic suspension-system
Electromagnetic suspension-systemElectromagnetic suspension-system
Electromagnetic suspension-system
 
Suspension system
Suspension systemSuspension system
Suspension system
 
Bhel Pnuematic Braking System
Bhel Pnuematic Braking SystemBhel Pnuematic Braking System
Bhel Pnuematic Braking System
 
Object-Oriented Programming (OOPS) in C++
Object-Oriented Programming (OOPS) in C++Object-Oriented Programming (OOPS) in C++
Object-Oriented Programming (OOPS) in C++
 
Duarts
DuartsDuarts
Duarts
 
Automobile fluid coupling and torque converter
Automobile fluid coupling and torque converterAutomobile fluid coupling and torque converter
Automobile fluid coupling and torque converter
 

Recently uploaded

办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书zdzoqco
 
call girls in G.T.B. Nagar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  G.T.B. Nagar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  G.T.B. Nagar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in G.T.B. Nagar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
办理克莱姆森大学毕业证成绩单|购买美国文凭证书
办理克莱姆森大学毕业证成绩单|购买美国文凭证书办理克莱姆森大学毕业证成绩单|购买美国文凭证书
办理克莱姆森大学毕业证成绩单|购买美国文凭证书zdzoqco
 
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptUNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptDineshKumar4165
 
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样whjjkkk
 
办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书
办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书
办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书zdzoqco
 
Dubai Call Girls Services Call 09900000000
Dubai Call Girls Services Call 09900000000Dubai Call Girls Services Call 09900000000
Dubai Call Girls Services Call 09900000000Komal Khan
 
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样gfghbihg
 
2024 WRC Hyundai World Rally Team’s i20 N Rally1 Hybrid
2024 WRC Hyundai World Rally Team’s i20 N Rally1 Hybrid2024 WRC Hyundai World Rally Team’s i20 N Rally1 Hybrid
2024 WRC Hyundai World Rally Team’s i20 N Rally1 HybridHyundai Motor Group
 
suspensionretardersystem-220726153321-060937ae.pptx
suspensionretardersystem-220726153321-060937ae.pptxsuspensionretardersystem-220726153321-060937ae.pptx
suspensionretardersystem-220726153321-060937ae.pptxbasant11731
 
What Could Cause A VW Tiguan's Radiator Fan To Stop Working
What Could Cause A VW Tiguan's Radiator Fan To Stop WorkingWhat Could Cause A VW Tiguan's Radiator Fan To Stop Working
What Could Cause A VW Tiguan's Radiator Fan To Stop WorkingEscondido German Auto
 
Digamma / CertiCon Company Presentation
Digamma / CertiCon Company  PresentationDigamma / CertiCon Company  Presentation
Digamma / CertiCon Company PresentationMihajloManjak
 
定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制
定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制
定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制miwhjk
 
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
办理阳光海岸大学毕业证成绩单原版一比一
办理阳光海岸大学毕业证成绩单原版一比一办理阳光海岸大学毕业证成绩单原版一比一
办理阳光海岸大学毕业证成绩单原版一比一F La
 
-The-Present-Simple-Tense.pdf english hh
-The-Present-Simple-Tense.pdf english hh-The-Present-Simple-Tense.pdf english hh
-The-Present-Simple-Tense.pdf english hhmhamadhawlery16
 
2.2 CLSS hydraulic Pumps on komatsu pc200 series
2.2 CLSS hydraulic Pumps on komatsu pc200 series2.2 CLSS hydraulic Pumps on komatsu pc200 series
2.2 CLSS hydraulic Pumps on komatsu pc200 seriesdatazaky
 
(Griffith毕业证)格里菲斯大学毕业证毕业证成绩单修改留信学历认证原版一比一
(Griffith毕业证)格里菲斯大学毕业证毕业证成绩单修改留信学历认证原版一比一(Griffith毕业证)格里菲斯大学毕业证毕业证成绩单修改留信学历认证原版一比一
(Griffith毕业证)格里菲斯大学毕业证毕业证成绩单修改留信学历认证原版一比一ejgeojhg
 
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一hnfusn
 

Recently uploaded (20)

办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书
 
call girls in G.T.B. Nagar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  G.T.B. Nagar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  G.T.B. Nagar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in G.T.B. Nagar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
办理克莱姆森大学毕业证成绩单|购买美国文凭证书
办理克莱姆森大学毕业证成绩单|购买美国文凭证书办理克莱姆森大学毕业证成绩单|购买美国文凭证书
办理克莱姆森大学毕业证成绩单|购买美国文凭证书
 
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptUNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
 
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
 
办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书
办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书
办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书
 
Dubai Call Girls Services Call 09900000000
Dubai Call Girls Services Call 09900000000Dubai Call Girls Services Call 09900000000
Dubai Call Girls Services Call 09900000000
 
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
 
2024 WRC Hyundai World Rally Team’s i20 N Rally1 Hybrid
2024 WRC Hyundai World Rally Team’s i20 N Rally1 Hybrid2024 WRC Hyundai World Rally Team’s i20 N Rally1 Hybrid
2024 WRC Hyundai World Rally Team’s i20 N Rally1 Hybrid
 
Hot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort Service
 
suspensionretardersystem-220726153321-060937ae.pptx
suspensionretardersystem-220726153321-060937ae.pptxsuspensionretardersystem-220726153321-060937ae.pptx
suspensionretardersystem-220726153321-060937ae.pptx
 
What Could Cause A VW Tiguan's Radiator Fan To Stop Working
What Could Cause A VW Tiguan's Radiator Fan To Stop WorkingWhat Could Cause A VW Tiguan's Radiator Fan To Stop Working
What Could Cause A VW Tiguan's Radiator Fan To Stop Working
 
Digamma / CertiCon Company Presentation
Digamma / CertiCon Company  PresentationDigamma / CertiCon Company  Presentation
Digamma / CertiCon Company Presentation
 
定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制
定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制
定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制
 
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
办理阳光海岸大学毕业证成绩单原版一比一
办理阳光海岸大学毕业证成绩单原版一比一办理阳光海岸大学毕业证成绩单原版一比一
办理阳光海岸大学毕业证成绩单原版一比一
 
-The-Present-Simple-Tense.pdf english hh
-The-Present-Simple-Tense.pdf english hh-The-Present-Simple-Tense.pdf english hh
-The-Present-Simple-Tense.pdf english hh
 
2.2 CLSS hydraulic Pumps on komatsu pc200 series
2.2 CLSS hydraulic Pumps on komatsu pc200 series2.2 CLSS hydraulic Pumps on komatsu pc200 series
2.2 CLSS hydraulic Pumps on komatsu pc200 series
 
(Griffith毕业证)格里菲斯大学毕业证毕业证成绩单修改留信学历认证原版一比一
(Griffith毕业证)格里菲斯大学毕业证毕业证成绩单修改留信学历认证原版一比一(Griffith毕业证)格里菲斯大学毕业证毕业证成绩单修改留信学历认证原版一比一
(Griffith毕业证)格里菲斯大学毕业证毕业证成绩单修改留信学历认证原版一比一
 
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
 

Fiat bogie

  • 3.
  • 5. Principles of force transmission Vertical forces: from the body to the bogie frame through the secondary suspension springs; from the bogie frame to the axles through the primary suspension springs and frame - axle bearing control arm.
  • 6. Lateral forces: from the body to the bogie frame through the secondary suspension springs; from the bogie frame to the axles through the elastic elements of the frame - axle bearing control arm.
  • 7. Longitudinal traction efforts and braking powers: from the body to bogie frame through the traction centre rods and the traction lever; from the bogie frame to the axles through the frame axle bearing control arm.
  • 8. Curve negotiation: An articulated control arm is connecting axle bearing and side frame through elastic connection, which will provide flexibility between axle and side frame.
  • 9. Wheel diameter New wheel dia 915mm worn wheel dia 845mm
  • 10. Suspension elements: Primary suspension consists of nested inner and outer springs, dampers, top rubber pad secondary suspension consists of nested flexi-coils springs (inner and outer springs),rubber spring, vertical dampers, lateral dampers, anti-roll bars, anchor links. Secondary rubber pad is inserted below and above secondary springs provides flexible ends of springs.
  • 11. Speed limit Upto 160KMPH without any modification upto 200KMPH with minor modification
  • 13. Wheel and Axles On the bogie each axle is fitted with two brake disks (4), diameter 640 mm and width 110 mm. In built slack adjusting facilities in brake cylinder fitted. Two wheel disc of tread dia 915 (New), 845 (worn).
  • 14. Axle bearings A taper roller cartridge type bearing is used. It is a pre-assembled unit not required any further intervention, such as clearance adjustments. The axle bearings on the bogie are fitted with sensors for detecting speed
  • 15. BOGIE FRAME The bogie frame is a solid welded frame made by steel sheets and forged or cast parts. The frame is made up of two longitudinal components connected by two cross-beams (2) which also support the brake units. The various supports which connect the different bogie components are welded to the frame. The bogie frame rests on the primary suspension spring units and supports the vehicle body by means of a bolster beam. The bolster beam is connected to the bogie frame by secondary suspension.
  • 17. Primary suspension Consisting of two coil springs, one vertical damper, An articulated control arm fitted with twin-layer elastic joints connecting the axle bearing to the bogie frame for curve negotiation.
  • 18. SECONDARY SUSPENSION CONSISTS NEST OF FLEXI-COIL SPRINGS INNER AND OUTER, RUBBER SPRING VERTICAL DAMPERS LATERAL DAMPERS YAW DAMPERS ANTI-ROLL BAR ANCHOR LINKS
  • 20. DISC BRAKE SYSTEM AXLE MOUNTED DISC BRAKE TWO DISCS PER AXLE OF DIA640 INBUILT SLACK ADJUSTER IN BRAKE CYLINDERS 35mm BRAKE