SlideShare une entreprise Scribd logo
1  sur  9
<PROJECT NAME>
  BUSINESS IMPACT ANALYSIS
                                      Version <1.0>
                                     <mm/dd/yyyy>




[Insert appropriate disclaimer(s)]
<Project Name>


                            VERSION HISTORY
[Provide information on how the development and distribution of the Business Impact
Analysis was controlled and tracked. Use the table below to provide the version
number, the author implementing the version, the date of the version, the name of the
person approving the version, the date that particular version was approved, and a brief
description of the reason for creating the revised version.]
Versio    Implemented     Revision     Approved           Approval            Reason
 n#            By          Date           By                Date
 1.0     <Author name>   <mm/dd/yy>   <name>            <mm/dd/yy>   <reason>




                                                                     UP Template Version: 06/30/08




                                          Page 2 of 9
                               [Insert appropriate disclaimer(s)]
<Project Name>

                                  Note to the Author

[This document is a template of a Business Impact Analysis document for a project.
The template includes instructions to the author, boilerplate text, and fields that should
be replaced with the values specific to the project.

   •   Blue italicized text enclosed in square brackets ([text]) provides instructions to
       the document author, or describes the intent, assumptions and context for
       content included in this document.

   •   Blue italicized text enclosed in angle brackets (<text>) indicates a field that
       should be replaced with information specific to a particular project.

   •   Text and tables in black are provided as boilerplate examples of wording and
       formats that may be used or modified as appropriate to a specific project. These
       are offered only as suggestions to assist in developing project documents; they
       are not mandatory formats.

When using this template for your project document, it is recommended that you follow
these steps:
   1. Replace all text enclosed in angle brackets (e.g.,, <Project Name>) with the
       correct field values. These angle brackets appear in both the body of the
       document and in headers and footers. To customize fields in Microsoft Word
       (which display a gray background when selected):
          a. Select File>Properties>Summary and fill in the Title field with the
              Document Name and the Subject field with the Project Name.
          b. Select File>Properties>Custom and fill in the Last Modified, Status, and
             Version fields with the appropriate information for this document.
          c. After you click OK to close the dialog box, update the fields throughout the
             document with these values by selecting Edit>Select All (or Ctrl-A) and
             pressing F9. Or you can update an individual field by clicking on it and
             pressing F9. This must be done separately for Headers and Footers.
   2. Modify boilerplate text as appropriate to the specific project.
   3. To add any new sections to the document, ensure that the appropriate header
      and body text styles are maintained. Styles used for the Section Headings are
      Heading 1, Heading 2 and Heading 3. Style used for boilerplate text is Body
      Text.
   4. To update the Table of Contents, right-click and select “Update field” and choose
      the option- “Update entire table”
   5. Before submission of the first draft of this document, delete this “Notes to the
      Author” page and all instructions to the author, which appear throughout the
      document as blue italicized text enclosed in square brackets.]



                                            Page 3 of 9
                                 [Insert appropriate disclaimer(s)]
<Project Name>


                                         TABLE OF CONTENTS
1 INTRODUCTION......................................................................................................................5
    1.1 Purpose...............................................................................................................................5
2 SYSTEM INFORMATION.......................................................................................................5
    2.1 Points of Contact................................................................................................................5
    2.2 System Resources...............................................................................................................5
    2.3 Critical Contacts and Resources.........................................................................................6
    2.4 Disruption Impact...............................................................................................................6
    2.5 Resource Recovery Priority................................................................................................6
 APPENDIX A: BUSINESS IMPACT ANALYSIS APPROVAL.............................................7
 APPENDIX B: REFERENCES...................................................................................................8
 APPENDIX C: KEY TERMS......................................................................................................9
                      9




                                                              Page 4 of 9
                                                   [Insert appropriate disclaimer(s)]
<Project Name>

1 INTRODUCTION
1.1   PURPOSE
      The Business Impact Analysis (BIA) is an essential step in the development of a
      contingency/disaster recovery plan.
      [Enter purpose of this specific BIA]

2 SYSTEM INFORMATION
      Date: <Enter date BIA completed>
      Point of Contact (POC): <Enter BIA POC>

      Organization: <Enter Organization>
      System Name: <Enter name>
      System Manager: <Enter manager>
      System Description: <Enter description>
2.1   POINTS OF CONTACT
      [Enter the name and description of individuals, positions, offices, etc of points-of-
      contact related to the content contained within this BIA.]

      Internal Contacts
      •<Enter Name>: <Enter description of role as it relates to this BIA>
      •<Enter Name>: <Enter description of role as it relates to this BIA>
      •<Enter Name>: <Enter description of role as it relates to this BIA>

      External Contacts
      [Enter the name and description of individuals, positions, offices, etc of points-of-
      contact related to the content contained within this BIA.]
      •<Enter Name>: <Enter description of role as it relates to this BIA>
      •<Enter Name>: <Enter description of role as it relates to this BIA>
      •<Enter Name>: <Enter description of role as it relates to this BIA>
2.2   SYSTEM RESOURCES
      [Enter the category, name, and description of resources related to, referenced,
      and/or analyzed within as part of this BIA.]

      Hardware
      •<Enter Name>: <Enter description of resource>
      •<Enter Name>: <Enter description of resource>
      •<Enter Name>: <Enter description of resource>

      Software
      •<Enter Name>: <Enter description of resource>
      •<Enter Name>: <Enter description of resource>
      •<Enter Name>: <Enter description of resource>


                                            Page 5 of 9
                                 [Insert appropriate disclaimer(s)]
<Project Name>
      Other
      •<Enter Name>: <Enter description of resource>
      •<Enter Name>: <Enter description of resource>
      •<Enter Name>: <Enter description of resource>
2.3   CRITICAL CONTACTS AND RESOURCES
      [Relate critical contacts, their roles, and critical resources from the content entered
      into the previous two sections and relate them to each other.]
Critical Contacts/Roles                                        Critical Resources
<Enter Name>                                    •<Enter critical resource name>
                                                •<Enter critical resource name>
                                                •<Enter critical resource name>
                                                •
2.4   DISRUPTION IMPACT
     [Identify disruption impacts and allowable outage times. Characterize the impact
     on critical roles if a critical resource is unavailable. Identify the maximum
     acceptable period that the resource could be unavailable before unacceptable
     impacts resulted.]
Resource                            Outage Impact              Allowable Outage
<Enter Resource Name>        <Enter description of outage <Enter     description   of
                             impact>                      allowable outage time>


2.5   RESOURCE RECOVERY PRIORITY
     [List the order of recovery priority for all resources Identified earlier in this
     document. Identify and describe an appropriate priority scale such as high,
     medium, low; 1, 2, 3; etc.]
Priority                Resource                            Comments
<priority <Enter Resource Name>                <Enter additional comments >
   >




                                            Page 6 of 9
                                 [Insert appropriate disclaimer(s)]
<Project Name>

Appendix A: Business Impact Analysis Approval
    The undersigned acknowledge they have reviewed the <Project Name> Business
    Impact Analysis and agree with the approach it presents. Changes to this
    Business Impact Analysis will be coordinated with and approved by the
    undersigned or their designated representatives.
    [List the individuals whose signatures are desired. Examples of such individuals
    are Business Steward, Implementation Manager or Project Sponsor. Add
    additional lines for signature as necessary. Although signatures are desired, they
    are not always required to move forward with the practices outlined within this
    document.]

    Signature:                                                     Date:
    Print Name:
    Title:
    Role:


    Signature:                                                     Date:
    Print Name:
    Title:
    Role:


    Signature:                                                     Date:
    Print Name:
    Title:
    Role:




                                         Page 7 of 9
                              [Insert appropriate disclaimer(s)]
<Project Name>

APPENDIX B: REFERENCES
   [Insert the name, version number, description, and physical location of any
   documents referenced in this document. Add rows to the table as necessary.]
   The following table summarizes the documents referenced in this document.
     Document              Description                           Location
     Name and
      Version
   <Document        [Provide description of the          <URL or Network path where
   Name and         document]                            document is located>
   Version
   Number>




                                       Page 8 of 9
                            [Insert appropriate disclaimer(s)]
<Project Name>

APPENDIX C: KEY TERMS
   [Insert terms and definitions used in this document. Add rows to the table as
   necessary. Follow the link below to for definitions of project management terms
   and acronyms used in this and other documents.
   http://www2.cdc.gov/cdcup/library/other/help.htm
   The following table provides definitions for terms relevant to this document.
    Term                     Definition
     [Insert Term]            [Provide definition of the term used in this document.]

     [Insert Term]            [Provide definition of the term used in this document.]

     [Insert Term]            [Provide definition of the term used in this document.]




                                         Page 9 of 9
                              [Insert appropriate disclaimer(s)]

Contenu connexe

Similaire à Cdc up business_impact_analysis_template

Impact Analysis Template
Impact Analysis TemplateImpact Analysis Template
Impact Analysis Templatevadapav123
 
Cdc up test_summary_report_template
Cdc up test_summary_report_templateCdc up test_summary_report_template
Cdc up test_summary_report_templateSunil Pandey
 
Project NameVersion 1.0 DraftProject NameP.docx
Project NameVersion 1.0 DraftProject NameP.docxProject NameVersion 1.0 DraftProject NameP.docx
Project NameVersion 1.0 DraftProject NameP.docxbriancrawford30935
 
Cdc up wbs_dictionary_template
Cdc up wbs_dictionary_templateCdc up wbs_dictionary_template
Cdc up wbs_dictionary_templateSreenivasan G
 
Gilead Requirements Template
Gilead Requirements TemplateGilead Requirements Template
Gilead Requirements TemplateRick Hall
 
Project Name Communications Management PlanVersion 1.0.docx
Project Name Communications Management PlanVersion 1.0.docxProject Name Communications Management PlanVersion 1.0.docx
Project Name Communications Management PlanVersion 1.0.docxwoodruffeloisa
 
Project Name Project Management PlanVersion 1.0 Draf.docx
Project Name Project Management PlanVersion 1.0 Draf.docxProject Name Project Management PlanVersion 1.0 Draf.docx
Project Name Project Management PlanVersion 1.0 Draf.docxbriancrawford30935
 
Adeptus Health InternationalProject Name Project Management .docx
Adeptus Health InternationalProject Name Project Management .docxAdeptus Health InternationalProject Name Project Management .docx
Adeptus Health InternationalProject Name Project Management .docxgalerussel59292
 
Adeptus Health InternationalProject Name Project Management .docx
Adeptus Health InternationalProject Name Project Management .docxAdeptus Health InternationalProject Name Project Management .docx
Adeptus Health InternationalProject Name Project Management .docxbobbywlane695641
 
Software development plan template
Software development plan templateSoftware development plan template
Software development plan templateRina Wijaya
 
Softwaredevelopmentplantemplate 170323125907
Softwaredevelopmentplantemplate 170323125907Softwaredevelopmentplantemplate 170323125907
Softwaredevelopmentplantemplate 170323125907ahmady
 
TopGear Corporation Project CharterProject NameProject De.docx
TopGear Corporation Project CharterProject NameProject De.docxTopGear Corporation Project CharterProject NameProject De.docx
TopGear Corporation Project CharterProject NameProject De.docxedwardmarivel
 
Project scope statement template v2.3
Project scope statement template v2.3Project scope statement template v2.3
Project scope statement template v2.3Aditya Pandey
 
Business Requirements Document Template
Business Requirements Document TemplateBusiness Requirements Document Template
Business Requirements Document TemplateEdmond Cheng
 
Functional specification document_template
Functional specification document_templateFunctional specification document_template
Functional specification document_templateIsabel Elaine Leong
 
Project manager project-plan-template-cm
Project manager project-plan-template-cmProject manager project-plan-template-cm
Project manager project-plan-template-cmPrasad Reddy
 
Daycare construction project
Daycare construction projectDaycare construction project
Daycare construction projectYOUBEJOSEPH
 

Similaire à Cdc up business_impact_analysis_template (20)

Impact Analysis Template
Impact Analysis TemplateImpact Analysis Template
Impact Analysis Template
 
Cdc up test_summary_report_template
Cdc up test_summary_report_templateCdc up test_summary_report_template
Cdc up test_summary_report_template
 
Project NameVersion 1.0 DraftProject NameP.docx
Project NameVersion 1.0 DraftProject NameP.docxProject NameVersion 1.0 DraftProject NameP.docx
Project NameVersion 1.0 DraftProject NameP.docx
 
Cdc up wbs_dictionary_template
Cdc up wbs_dictionary_templateCdc up wbs_dictionary_template
Cdc up wbs_dictionary_template
 
Gilead Requirements Template
Gilead Requirements TemplateGilead Requirements Template
Gilead Requirements Template
 
Project Name Communications Management PlanVersion 1.0.docx
Project Name Communications Management PlanVersion 1.0.docxProject Name Communications Management PlanVersion 1.0.docx
Project Name Communications Management PlanVersion 1.0.docx
 
Project Name Project Management PlanVersion 1.0 Draf.docx
Project Name Project Management PlanVersion 1.0 Draf.docxProject Name Project Management PlanVersion 1.0 Draf.docx
Project Name Project Management PlanVersion 1.0 Draf.docx
 
Adeptus Health InternationalProject Name Project Management .docx
Adeptus Health InternationalProject Name Project Management .docxAdeptus Health InternationalProject Name Project Management .docx
Adeptus Health InternationalProject Name Project Management .docx
 
Adeptus Health InternationalProject Name Project Management .docx
Adeptus Health InternationalProject Name Project Management .docxAdeptus Health InternationalProject Name Project Management .docx
Adeptus Health InternationalProject Name Project Management .docx
 
CDC Risk Mgmt Template
CDC Risk Mgmt TemplateCDC Risk Mgmt Template
CDC Risk Mgmt Template
 
Software development plan template
Software development plan templateSoftware development plan template
Software development plan template
 
Softwaredevelopmentplantemplate 170323125907
Softwaredevelopmentplantemplate 170323125907Softwaredevelopmentplantemplate 170323125907
Softwaredevelopmentplantemplate 170323125907
 
Project proposal request usa
Project proposal request usaProject proposal request usa
Project proposal request usa
 
TopGear Corporation Project CharterProject NameProject De.docx
TopGear Corporation Project CharterProject NameProject De.docxTopGear Corporation Project CharterProject NameProject De.docx
TopGear Corporation Project CharterProject NameProject De.docx
 
Project scope statement template v2.3
Project scope statement template v2.3Project scope statement template v2.3
Project scope statement template v2.3
 
Business Requirements Document Template
Business Requirements Document TemplateBusiness Requirements Document Template
Business Requirements Document Template
 
Functional specification document_template
Functional specification document_templateFunctional specification document_template
Functional specification document_template
 
Project manager project-plan-template-cm
Project manager project-plan-template-cmProject manager project-plan-template-cm
Project manager project-plan-template-cm
 
BRD Template
BRD Template BRD Template
BRD Template
 
Daycare construction project
Daycare construction projectDaycare construction project
Daycare construction project
 

Dernier

Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Scott Andery
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsRavi Sanghani
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...Wes McKinney
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Alkin Tezuysal
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersRaghuram Pandurangan
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality AssuranceInflectra
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPathCommunity
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfIngrid Airi González
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityIES VE
 
Data governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationData governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationKnoldus Inc.
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfNeo4j
 

Dernier (20)

Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and Insights
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information Developers
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to Hero
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdf
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a reality
 
Data governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationData governance with Unity Catalog Presentation
Data governance with Unity Catalog Presentation
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdf
 

Cdc up business_impact_analysis_template

  • 1. <PROJECT NAME> BUSINESS IMPACT ANALYSIS Version <1.0> <mm/dd/yyyy> [Insert appropriate disclaimer(s)]
  • 2. <Project Name> VERSION HISTORY [Provide information on how the development and distribution of the Business Impact Analysis was controlled and tracked. Use the table below to provide the version number, the author implementing the version, the date of the version, the name of the person approving the version, the date that particular version was approved, and a brief description of the reason for creating the revised version.] Versio Implemented Revision Approved Approval Reason n# By Date By Date 1.0 <Author name> <mm/dd/yy> <name> <mm/dd/yy> <reason> UP Template Version: 06/30/08 Page 2 of 9 [Insert appropriate disclaimer(s)]
  • 3. <Project Name> Note to the Author [This document is a template of a Business Impact Analysis document for a project. The template includes instructions to the author, boilerplate text, and fields that should be replaced with the values specific to the project. • Blue italicized text enclosed in square brackets ([text]) provides instructions to the document author, or describes the intent, assumptions and context for content included in this document. • Blue italicized text enclosed in angle brackets (<text>) indicates a field that should be replaced with information specific to a particular project. • Text and tables in black are provided as boilerplate examples of wording and formats that may be used or modified as appropriate to a specific project. These are offered only as suggestions to assist in developing project documents; they are not mandatory formats. When using this template for your project document, it is recommended that you follow these steps: 1. Replace all text enclosed in angle brackets (e.g.,, <Project Name>) with the correct field values. These angle brackets appear in both the body of the document and in headers and footers. To customize fields in Microsoft Word (which display a gray background when selected): a. Select File>Properties>Summary and fill in the Title field with the Document Name and the Subject field with the Project Name. b. Select File>Properties>Custom and fill in the Last Modified, Status, and Version fields with the appropriate information for this document. c. After you click OK to close the dialog box, update the fields throughout the document with these values by selecting Edit>Select All (or Ctrl-A) and pressing F9. Or you can update an individual field by clicking on it and pressing F9. This must be done separately for Headers and Footers. 2. Modify boilerplate text as appropriate to the specific project. 3. To add any new sections to the document, ensure that the appropriate header and body text styles are maintained. Styles used for the Section Headings are Heading 1, Heading 2 and Heading 3. Style used for boilerplate text is Body Text. 4. To update the Table of Contents, right-click and select “Update field” and choose the option- “Update entire table” 5. Before submission of the first draft of this document, delete this “Notes to the Author” page and all instructions to the author, which appear throughout the document as blue italicized text enclosed in square brackets.] Page 3 of 9 [Insert appropriate disclaimer(s)]
  • 4. <Project Name> TABLE OF CONTENTS 1 INTRODUCTION......................................................................................................................5 1.1 Purpose...............................................................................................................................5 2 SYSTEM INFORMATION.......................................................................................................5 2.1 Points of Contact................................................................................................................5 2.2 System Resources...............................................................................................................5 2.3 Critical Contacts and Resources.........................................................................................6 2.4 Disruption Impact...............................................................................................................6 2.5 Resource Recovery Priority................................................................................................6 APPENDIX A: BUSINESS IMPACT ANALYSIS APPROVAL.............................................7 APPENDIX B: REFERENCES...................................................................................................8 APPENDIX C: KEY TERMS......................................................................................................9 9 Page 4 of 9 [Insert appropriate disclaimer(s)]
  • 5. <Project Name> 1 INTRODUCTION 1.1 PURPOSE The Business Impact Analysis (BIA) is an essential step in the development of a contingency/disaster recovery plan. [Enter purpose of this specific BIA] 2 SYSTEM INFORMATION Date: <Enter date BIA completed> Point of Contact (POC): <Enter BIA POC> Organization: <Enter Organization> System Name: <Enter name> System Manager: <Enter manager> System Description: <Enter description> 2.1 POINTS OF CONTACT [Enter the name and description of individuals, positions, offices, etc of points-of- contact related to the content contained within this BIA.] Internal Contacts •<Enter Name>: <Enter description of role as it relates to this BIA> •<Enter Name>: <Enter description of role as it relates to this BIA> •<Enter Name>: <Enter description of role as it relates to this BIA> External Contacts [Enter the name and description of individuals, positions, offices, etc of points-of- contact related to the content contained within this BIA.] •<Enter Name>: <Enter description of role as it relates to this BIA> •<Enter Name>: <Enter description of role as it relates to this BIA> •<Enter Name>: <Enter description of role as it relates to this BIA> 2.2 SYSTEM RESOURCES [Enter the category, name, and description of resources related to, referenced, and/or analyzed within as part of this BIA.] Hardware •<Enter Name>: <Enter description of resource> •<Enter Name>: <Enter description of resource> •<Enter Name>: <Enter description of resource> Software •<Enter Name>: <Enter description of resource> •<Enter Name>: <Enter description of resource> •<Enter Name>: <Enter description of resource> Page 5 of 9 [Insert appropriate disclaimer(s)]
  • 6. <Project Name> Other •<Enter Name>: <Enter description of resource> •<Enter Name>: <Enter description of resource> •<Enter Name>: <Enter description of resource> 2.3 CRITICAL CONTACTS AND RESOURCES [Relate critical contacts, their roles, and critical resources from the content entered into the previous two sections and relate them to each other.] Critical Contacts/Roles Critical Resources <Enter Name> •<Enter critical resource name> •<Enter critical resource name> •<Enter critical resource name> • 2.4 DISRUPTION IMPACT [Identify disruption impacts and allowable outage times. Characterize the impact on critical roles if a critical resource is unavailable. Identify the maximum acceptable period that the resource could be unavailable before unacceptable impacts resulted.] Resource Outage Impact Allowable Outage <Enter Resource Name> <Enter description of outage <Enter description of impact> allowable outage time> 2.5 RESOURCE RECOVERY PRIORITY [List the order of recovery priority for all resources Identified earlier in this document. Identify and describe an appropriate priority scale such as high, medium, low; 1, 2, 3; etc.] Priority Resource Comments <priority <Enter Resource Name> <Enter additional comments > > Page 6 of 9 [Insert appropriate disclaimer(s)]
  • 7. <Project Name> Appendix A: Business Impact Analysis Approval The undersigned acknowledge they have reviewed the <Project Name> Business Impact Analysis and agree with the approach it presents. Changes to this Business Impact Analysis will be coordinated with and approved by the undersigned or their designated representatives. [List the individuals whose signatures are desired. Examples of such individuals are Business Steward, Implementation Manager or Project Sponsor. Add additional lines for signature as necessary. Although signatures are desired, they are not always required to move forward with the practices outlined within this document.] Signature: Date: Print Name: Title: Role: Signature: Date: Print Name: Title: Role: Signature: Date: Print Name: Title: Role: Page 7 of 9 [Insert appropriate disclaimer(s)]
  • 8. <Project Name> APPENDIX B: REFERENCES [Insert the name, version number, description, and physical location of any documents referenced in this document. Add rows to the table as necessary.] The following table summarizes the documents referenced in this document. Document Description Location Name and Version <Document [Provide description of the <URL or Network path where Name and document] document is located> Version Number> Page 8 of 9 [Insert appropriate disclaimer(s)]
  • 9. <Project Name> APPENDIX C: KEY TERMS [Insert terms and definitions used in this document. Add rows to the table as necessary. Follow the link below to for definitions of project management terms and acronyms used in this and other documents. http://www2.cdc.gov/cdcup/library/other/help.htm The following table provides definitions for terms relevant to this document. Term Definition [Insert Term] [Provide definition of the term used in this document.] [Insert Term] [Provide definition of the term used in this document.] [Insert Term] [Provide definition of the term used in this document.] Page 9 of 9 [Insert appropriate disclaimer(s)]