SlideShare a Scribd company logo
1 of 3
Line to line sustained short circuit test
Table of Content:
1 Objective........................................................................................................
2 Scope.............................................................................................................
3 Referenced Documents.................................................................................
4 Definitions and abbreviations........................................................................
5 Line to line sustained short-circuit test..........................................................
5.1 Connection (see diagram) ......................................................................
5.2 Machine condition...................................................................................
5.3 Measured quantities ..............................................................................
5.4 Evaluation ..............................................................................................
5.5 Problems ................................................................................................
6 Proceeding in case of deviations..........................................................................
7 Copyright ...............................................................................................................
1 Objective
Determination of negative sequence reactance X2 and negative sequence resistance R2.
2 Scope
All synchronous machines of all kinds, tested in the work shop or at site.
3 Referenced Documents
IEC 34-4, 48-49
IEEE 115, 10.5.4 Method 3
EN 60034-4
4 Definitions and Abbreviations
None
5 Line to line sustained short-circuit test
5.1 Connection (see diagram)
Short-circuit any two line terminals by inserting ampere meter and wattmeter (current
circuit)
Note: It is recommendable to perform this test immediately after the three-phase sustained
short-circuit test, removing the short-circuit between two line terminals. Connect voltmeter
between open line terminal and one of the short-circuited terminals
5.2 Machine condition
Machine is driven at rated speed by turbine or motor resp.
Note: When a prime mover is not available, this test can also be performed by retardation
8/24/2005 7:36 a8/p8 Page 1 of 3
method, measuring when the decelerating machine passes through nominal speed. Set
excitation level to several values of the short-circuit current up to max. 0,3 In and take
readings.
5.3 Measured quantities
Short-circuit current (I) and field current (If) voltage between open line terminal and short
circuited terminals (U) active power of short-circuit (P)
Note: Measurement of reactive power (Q) is not considered necessary. A special VAr-
meter would be required for measuring Q.
5.4 Evaluation
5.5 Problems
- danger of overheating solid parts
should higher current levels than 0,3 In be stipulated in the contract restrict test duration
to time required for reading of instruments
- danger of excessive vibration
for non-salient pole machines limit armature current in any case to 0,5 In
6 Proceeding in case of deviations
Any nominal value, minimum value, maximum value, tolerance etc given in an instruction
intended to serve for quality control purposes only. In the case of deviations, a
nonconformity report has to be written according to PNG Power Standard.
8/24/2005 7:36 a8/p8 Page 2 of 3
7 Χοπψριγητ
This Document is properly of PNG Power internal use only and must neither be copied.
Neither is it to be handed over nor in other way communicated to a third party.
Infringement will lead to prosecution.
8/24/2005 7:36 a8/p8 Page 3 of 3

More Related Content

Similar to Line to-line sustained short-circuit test

Sudden three phase short-circuit test
Sudden three phase short-circuit testSudden three phase short-circuit test
Sudden three phase short-circuit testDonald Stephen
 
Open circuit saturation test
Open circuit saturation testOpen circuit saturation test
Open circuit saturation testDonald Stephen
 
Measurement of winding resistances
Measurement of winding resistancesMeasurement of winding resistances
Measurement of winding resistancesDonald Stephen
 
Determination of the transient open circuit time constant
Determination of the transient open circuit time constantDetermination of the transient open circuit time constant
Determination of the transient open circuit time constantDonald Stephen
 
Agilent impedance measurements handbook
Agilent impedance measurements handbookAgilent impedance measurements handbook
Agilent impedance measurements handbookMohammed Benlamlih
 
Electrical installation handbook part-2
Electrical installation handbook part-2Electrical installation handbook part-2
Electrical installation handbook part-2Souvik Dutta
 
Digital Control in Power Electronics - Buso & Mattavelli - 2006.pdf
Digital Control in Power Electronics - Buso & Mattavelli - 2006.pdfDigital Control in Power Electronics - Buso & Mattavelli - 2006.pdf
Digital Control in Power Electronics - Buso & Mattavelli - 2006.pdfGollapalli Sreenivasulu
 
Digital Control in Power Electronics.pdf
Digital Control in Power Electronics.pdfDigital Control in Power Electronics.pdf
Digital Control in Power Electronics.pdfGollapalli Sreenivasulu
 
Liquipoint t ftw31 32 endress+hauser datasheet-level limit switch for multipl...
Liquipoint t ftw31 32 endress+hauser datasheet-level limit switch for multipl...Liquipoint t ftw31 32 endress+hauser datasheet-level limit switch for multipl...
Liquipoint t ftw31 32 endress+hauser datasheet-level limit switch for multipl...ENVIMART
 
151 south africa cap bank-protection-baker-duly-2008
151 south africa cap bank-protection-baker-duly-2008151 south africa cap bank-protection-baker-duly-2008
151 south africa cap bank-protection-baker-duly-2008wmelis
 
Making of a PD Data Acqusition System
Making of a PD Data Acqusition SystemMaking of a PD Data Acqusition System
Making of a PD Data Acqusition SystemVishal Mathur
 
Gfm3211econtrolloopstability1572623823828
Gfm3211econtrolloopstability1572623823828Gfm3211econtrolloopstability1572623823828
Gfm3211econtrolloopstability1572623823828Hoopeer Hoopeer
 
Basic instrumentation
Basic instrumentationBasic instrumentation
Basic instrumentationss61
 
CB_IEC62133- 2500MAH
CB_IEC62133- 2500MAHCB_IEC62133- 2500MAH
CB_IEC62133- 2500MAHJames yan
 
Classification of electrical installations in healthcare facilities
Classification of electrical installations in healthcare facilitiesClassification of electrical installations in healthcare facilities
Classification of electrical installations in healthcare facilitiesLeonardo ENERGY
 

Similar to Line to-line sustained short-circuit test (20)

Sudden three phase short-circuit test
Sudden three phase short-circuit testSudden three phase short-circuit test
Sudden three phase short-circuit test
 
Open circuit saturation test
Open circuit saturation testOpen circuit saturation test
Open circuit saturation test
 
Measurement of winding resistances
Measurement of winding resistancesMeasurement of winding resistances
Measurement of winding resistances
 
Determination of the transient open circuit time constant
Determination of the transient open circuit time constantDetermination of the transient open circuit time constant
Determination of the transient open circuit time constant
 
Temperature rise test
Temperature rise testTemperature rise test
Temperature rise test
 
Service instructions
Service instructionsService instructions
Service instructions
 
Agilent impedance measurements handbook
Agilent impedance measurements handbookAgilent impedance measurements handbook
Agilent impedance measurements handbook
 
Electrical installation handbook part-2
Electrical installation handbook part-2Electrical installation handbook part-2
Electrical installation handbook part-2
 
Digital Control in Power Electronics - Buso & Mattavelli - 2006.pdf
Digital Control in Power Electronics - Buso & Mattavelli - 2006.pdfDigital Control in Power Electronics - Buso & Mattavelli - 2006.pdf
Digital Control in Power Electronics - Buso & Mattavelli - 2006.pdf
 
Digital Control in Power Electronics.pdf
Digital Control in Power Electronics.pdfDigital Control in Power Electronics.pdf
Digital Control in Power Electronics.pdf
 
Liquipoint t ftw31 32 endress+hauser datasheet-level limit switch for multipl...
Liquipoint t ftw31 32 endress+hauser datasheet-level limit switch for multipl...Liquipoint t ftw31 32 endress+hauser datasheet-level limit switch for multipl...
Liquipoint t ftw31 32 endress+hauser datasheet-level limit switch for multipl...
 
Abb lv breakers working with trip curves
Abb lv breakers working with trip curvesAbb lv breakers working with trip curves
Abb lv breakers working with trip curves
 
151 south africa cap bank-protection-baker-duly-2008
151 south africa cap bank-protection-baker-duly-2008151 south africa cap bank-protection-baker-duly-2008
151 south africa cap bank-protection-baker-duly-2008
 
Making of a PD Data Acqusition System
Making of a PD Data Acqusition SystemMaking of a PD Data Acqusition System
Making of a PD Data Acqusition System
 
Gfm3211econtrolloopstability1572623823828
Gfm3211econtrolloopstability1572623823828Gfm3211econtrolloopstability1572623823828
Gfm3211econtrolloopstability1572623823828
 
Basic Instrument PID
Basic Instrument PID Basic Instrument PID
Basic Instrument PID
 
Basic instrumentation
Basic instrumentationBasic instrumentation
Basic instrumentation
 
Final paper0
Final paper0Final paper0
Final paper0
 
CB_IEC62133- 2500MAH
CB_IEC62133- 2500MAHCB_IEC62133- 2500MAH
CB_IEC62133- 2500MAH
 
Classification of electrical installations in healthcare facilities
Classification of electrical installations in healthcare facilitiesClassification of electrical installations in healthcare facilities
Classification of electrical installations in healthcare facilities
 

More from Donald Stephen

Tangent delta test report form
Tangent delta test report formTangent delta test report form
Tangent delta test report formDonald Stephen
 
Stator insulation test setup
Stator insulation test setupStator insulation test setup
Stator insulation test setupDonald Stephen
 
Stator core induction test
Stator core induction testStator core induction test
Stator core induction testDonald Stephen
 
Stator core compr test
Stator core compr testStator core compr test
Stator core compr testDonald Stephen
 
Rotor insul test setup
Rotor insul test setupRotor insul test setup
Rotor insul test setupDonald Stephen
 
Measurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearingsMeasurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearingsDonald Stephen
 
Measurement of partial discharges
Measurement of partial dischargesMeasurement of partial discharges
Measurement of partial dischargesDonald Stephen
 
Loss tangent delta test
Loss tangent delta testLoss tangent delta test
Loss tangent delta testDonald Stephen
 
Insulation resistance testing
Insulation resistance testingInsulation resistance testing
Insulation resistance testingDonald Stephen
 
Insulation resistance test
Insulation resistance testInsulation resistance test
Insulation resistance testDonald Stephen
 
Impedance measurement of field windings
Impedance measurement of field windingsImpedance measurement of field windings
Impedance measurement of field windingsDonald Stephen
 
Efficiency determination on hydrogenerators by calorimetric method
Efficiency determination on hydrogenerators by calorimetric methodEfficiency determination on hydrogenerators by calorimetric method
Efficiency determination on hydrogenerators by calorimetric methodDonald Stephen
 
Determination of inertia by load rejection
Determination of inertia by load rejectionDetermination of inertia by load rejection
Determination of inertia by load rejectionDonald Stephen
 
Future strategic-issues-and-warfare
Future strategic-issues-and-warfareFuture strategic-issues-and-warfare
Future strategic-issues-and-warfareDonald Stephen
 
Participants 2009 bilderberg meetings
Participants 2009   bilderberg meetingsParticipants 2009   bilderberg meetings
Participants 2009 bilderberg meetingsDonald Stephen
 

More from Donald Stephen (20)

Tangent delta test report form
Tangent delta test report formTangent delta test report form
Tangent delta test report form
 
Stator insulation test setup
Stator insulation test setupStator insulation test setup
Stator insulation test setup
 
Stator core induction test
Stator core induction testStator core induction test
Stator core induction test
 
Stator core compr test
Stator core compr testStator core compr test
Stator core compr test
 
Rotor insul test setup
Rotor insul test setupRotor insul test setup
Rotor insul test setup
 
Noise measurement
Noise measurementNoise measurement
Noise measurement
 
Measurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearingsMeasurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearings
 
Measurement of partial discharges
Measurement of partial dischargesMeasurement of partial discharges
Measurement of partial discharges
 
Loss tangent delta test
Loss tangent delta testLoss tangent delta test
Loss tangent delta test
 
Insulation resistance testing
Insulation resistance testingInsulation resistance testing
Insulation resistance testing
 
Insulation resistance test
Insulation resistance testInsulation resistance test
Insulation resistance test
 
Impedance measurement of field windings
Impedance measurement of field windingsImpedance measurement of field windings
Impedance measurement of field windings
 
High potential test
High potential testHigh potential test
High potential test
 
Efficiency determination on hydrogenerators by calorimetric method
Efficiency determination on hydrogenerators by calorimetric methodEfficiency determination on hydrogenerators by calorimetric method
Efficiency determination on hydrogenerators by calorimetric method
 
Determination of inertia by load rejection
Determination of inertia by load rejectionDetermination of inertia by load rejection
Determination of inertia by load rejection
 
Crack monitor
Crack monitorCrack monitor
Crack monitor
 
Core deffect detector
Core deffect detectorCore deffect detector
Core deffect detector
 
Check pole connector
Check pole connectorCheck pole connector
Check pole connector
 
Future strategic-issues-and-warfare
Future strategic-issues-and-warfareFuture strategic-issues-and-warfare
Future strategic-issues-and-warfare
 
Participants 2009 bilderberg meetings
Participants 2009   bilderberg meetingsParticipants 2009   bilderberg meetings
Participants 2009 bilderberg meetings
 

Recently uploaded

GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxchumtiyababu
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 

Recently uploaded (20)

GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 

Line to-line sustained short-circuit test

  • 1. Line to line sustained short circuit test Table of Content: 1 Objective........................................................................................................ 2 Scope............................................................................................................. 3 Referenced Documents................................................................................. 4 Definitions and abbreviations........................................................................ 5 Line to line sustained short-circuit test.......................................................... 5.1 Connection (see diagram) ...................................................................... 5.2 Machine condition................................................................................... 5.3 Measured quantities .............................................................................. 5.4 Evaluation .............................................................................................. 5.5 Problems ................................................................................................ 6 Proceeding in case of deviations.......................................................................... 7 Copyright ............................................................................................................... 1 Objective Determination of negative sequence reactance X2 and negative sequence resistance R2. 2 Scope All synchronous machines of all kinds, tested in the work shop or at site. 3 Referenced Documents IEC 34-4, 48-49 IEEE 115, 10.5.4 Method 3 EN 60034-4 4 Definitions and Abbreviations None 5 Line to line sustained short-circuit test 5.1 Connection (see diagram) Short-circuit any two line terminals by inserting ampere meter and wattmeter (current circuit) Note: It is recommendable to perform this test immediately after the three-phase sustained short-circuit test, removing the short-circuit between two line terminals. Connect voltmeter between open line terminal and one of the short-circuited terminals 5.2 Machine condition Machine is driven at rated speed by turbine or motor resp. Note: When a prime mover is not available, this test can also be performed by retardation 8/24/2005 7:36 a8/p8 Page 1 of 3
  • 2. method, measuring when the decelerating machine passes through nominal speed. Set excitation level to several values of the short-circuit current up to max. 0,3 In and take readings. 5.3 Measured quantities Short-circuit current (I) and field current (If) voltage between open line terminal and short circuited terminals (U) active power of short-circuit (P) Note: Measurement of reactive power (Q) is not considered necessary. A special VAr- meter would be required for measuring Q. 5.4 Evaluation 5.5 Problems - danger of overheating solid parts should higher current levels than 0,3 In be stipulated in the contract restrict test duration to time required for reading of instruments - danger of excessive vibration for non-salient pole machines limit armature current in any case to 0,5 In 6 Proceeding in case of deviations Any nominal value, minimum value, maximum value, tolerance etc given in an instruction intended to serve for quality control purposes only. In the case of deviations, a nonconformity report has to be written according to PNG Power Standard. 8/24/2005 7:36 a8/p8 Page 2 of 3
  • 3. 7 Χοπψριγητ This Document is properly of PNG Power internal use only and must neither be copied. Neither is it to be handed over nor in other way communicated to a third party. Infringement will lead to prosecution. 8/24/2005 7:36 a8/p8 Page 3 of 3