Well work-over
BY
ELIOT . S . WILLIAM
FINAL YEAR PETROLEUM ENGINEER
WORK OVER DEFINITION
 A workover is any operation done on, within, or
through the wellbore after the initial completion.
Although proper drilling, cementing, and
completion practices minimize the need, virtually
every well will need several workovers during its
lifetime to satisfactorily fulfill its purpose.
 If the reservoir still contains a reasonable amount
of hydrocarbon something has to be done to
improve the performance of the well or reservoir.
WORK OVER DEFINITION
 The term Work-over, is used to refer to a kind of
well intervention that is aimed at enhancing the
performance of a well. It involves recompleting
already completed well for improved performance.
 The process of performing major maintenance or
remedial treatments on an oil or gas well after initial
completion . In many cases, work-over implies the
removal and replacement of the production tubing
string after the well has been killed and a work-over
rig has been placed on location.
REASONS FOR WORKOVER
Workover operations are carried out for
mainly two reasons such as:
OTHER CAUSES FOR THE
WORKOVER
Unsatisfactory production or injection rates
Supplemental recovery project requirements
Regulatory requirements
Competitive drainage
Reservoir data gathering
Lease requirements
Abandonments
MECHANICAL PROBLEMS
Repair/Replacement of damaged equipment
Replace artificial lift equipment
Cement and Casing problems
RESERVOIR RELATED REASONS
Repair natural damage within the well
Zone transfer
Stimulation
Convert well from production to injection
Recompletion
ZONE TRANSFER
 One of the most common reason for a
Workover is to recomplete a well from
one zone to another
 Many wells are drilled to intentionally
penetrate many zones, but only one
zone at a time is produced. In some
wells, lower zones are produced first.
 When reservoir depleted, they are
recompleted (isolated) so that another
zone farther up can be produced.
RECOMPLETION
REPLACE ARTIFICIAL LIFT
EQUIPMENTWhen a reservoir does not have,or cannot
maintain, sufficient drive energy to produce at
an economical rate, assistance through artificial
lift is required. There are four basic types of
artificial lift:
1. Sucker rod pump
2. Hydraulic pump
3. Electric submersible pump (ESP).
4. Gas lift.
STIMULATION
 Stimulation is general term describing variety of
operations performed on a well to improve its
productivity.
 It plays a vital role in production operations
 Production in a damaged or low-producing
zone can be increased by some techniques as
follow:
 Acid Stimulation
 Hydraulic Fracturing
CONVERT WELL FROM
PRODUCTION TO INJECTION
 Workover are done to convert producing
well to injection well.In this type of workover
water , gas , Chemical etc can be injected
into the reservoir
 For example ,such a workover might involve
converting a producing well configured for
continuous or intermittent gas lift as shown
in the figure given on the right hand side of
a water injection well
WORKOVER TOOLS #1
 Workovers can be done with conventional rigs or
nonconventional systems.
 Conventional rigs can be equipped to handle
almost all types of work that may be required
 Nonconventional systems allow specific types of
work to be done without pulling the tubing,
disassembling the Christmas tree, or even killing
the well.
 This is accomplished by using lubricators and
packoff equipment at the surface and by running
the required equipment inside the production
tubing.
 Common types of nonconventional systems are
wireline units, coiled tubing units, and snubbing
units.
Work over rig(Nordic Gulf)
WORKOVER TOOLS-wireline units
 Wireline units use special equipment on a
solid wireline to gather data (pressure,
temperature, and depth) and to set,
manipulate, and/or retrieve tubing plugs,
sliding sleeves, flow regulators, gas lift valves,
safety valves, and wireline fishing tools.
 Wireline equipment can also be used to cut
paraffin and remove wellbore fill. Prior
planning, good operators, good equipment,
and reasonable well conditions are
prerequisites to the success of this method
Wireline equipment, (a) Lubricator, (b)
Typical string.
WORKOVER TOOLS-coiled tubing unit
 Coiled tubing units find application in cleanout work,
stimulation, plugback jobs, and unloading wells with
nitrogen.
 Coiled tubing units can have 10,000 to 15,000 ft of pipe
(usually 1-in. outside diameter) that can be reeled
continuously into the wellbore.
 The pipe can be used to pump into the well and circulate
fluids such as water, acid, or cement.
 The use of a dynadrill permits some drilling with coiled
tubing.
 Limitations of coiled tubing include the reduced strength
of the tubing and low pumping rates (high friction
pressure because of the diameter and length).
 Coiled tubing can be run into wells against pressures up
to 5000 psi. Coiled tubing unit.
WORKOVER TOOLS-snubbing tools
 Snubbing units use hydraulic pressure and
rams to introduce small, coupled tubing into
the well, if necessary, against pressures
above 5000 psi.
 The tubing is stronger and can be rotated so
that tougher cleanout or fishing jobs can be
accomplished.
 Snubbing units are used for the same type
of jobs as are coiled tubing units, but their
compactness is an advantage in offshore
work.
 They are slow and expensive, but in the right
applications, they are the more economical
way to accomplish the task. Snubbing unit.
CONCLUSION
 The profitability of a well as an investment venture depends on how
long it is on stream and on how much it produces. Its lifetime and
output are naturally due to the reservoir’s initial characteristics. However,
they are also dependent on keeping the well maintained in good
working order and adapting completion properly to the constantly
varying conditions prevailing in the reservoir and around the welIbore .
 Although proper drilling, cementing, and completion practices minimize
the need, virtually every well may need several workovers during its life
time to satisfactorily fullfil its purpose
Well work over
Well work over

More Related Content

What's hot

A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...tmhsweb
 
Well completion and stimulation
Well completion and stimulation Well completion and stimulation
Well completion and stimulation kaleem ullah
 
Petroleum Production Engineering - Perforation
Petroleum Production Engineering - PerforationPetroleum Production Engineering - Perforation
Petroleum Production Engineering - PerforationJames Craig
 
Completion equipment packer part #2
Completion equipment packer part #2Completion equipment packer part #2
Completion equipment packer part #2Elsayed Amer
 
Well control intro presentation
Well control intro presentationWell control intro presentation
Well control intro presentationamrhaggag
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreMohamed Abdelshafy Abozeima
 
Completion equipment packer part #1
Completion equipment packer part #1Completion equipment packer part #1
Completion equipment packer part #1Elsayed Amer
 
Well Completion Design.pdf
Well Completion Design.pdfWell Completion Design.pdf
Well Completion Design.pdfmmody4
 
1. completion sequance
1. completion sequance1. completion sequance
1. completion sequanceElsayed Amer
 
Side sliding door ssd
Side sliding door ssdSide sliding door ssd
Side sliding door ssdElsayed Amer
 
7'' liner running and cementing
7'' liner running and cementing7'' liner running and cementing
7'' liner running and cementingKamel Elsayed
 
perforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast jointperforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast jointElsayed Amer
 
Artificial lift technology
Artificial lift technologyArtificial lift technology
Artificial lift technologyjosepazv
 
Wellhead function, rating and selection
Wellhead function, rating and selectionWellhead function, rating and selection
Wellhead function, rating and selectionElsayed Amer
 
Completion equipment part 1
Completion equipment part 1Completion equipment part 1
Completion equipment part 1Elsayed Amer
 

What's hot (20)

A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
 
well control (1)
 well control (1) well control (1)
well control (1)
 
Well completion fundamentals
Well completion fundamentalsWell completion fundamentals
Well completion fundamentals
 
Well completion and stimulation
Well completion and stimulation Well completion and stimulation
Well completion and stimulation
 
Petroleum Production Engineering - Perforation
Petroleum Production Engineering - PerforationPetroleum Production Engineering - Perforation
Petroleum Production Engineering - Perforation
 
Completion equipment packer part #2
Completion equipment packer part #2Completion equipment packer part #2
Completion equipment packer part #2
 
Tubing string
Tubing stringTubing string
Tubing string
 
Well control intro presentation
Well control intro presentationWell control intro presentation
Well control intro presentation
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and more
 
Completion equipment packer part #1
Completion equipment packer part #1Completion equipment packer part #1
Completion equipment packer part #1
 
Well Completion Design.pdf
Well Completion Design.pdfWell Completion Design.pdf
Well Completion Design.pdf
 
Well Workover
Well Workover Well Workover
Well Workover
 
1. completion sequance
1. completion sequance1. completion sequance
1. completion sequance
 
Side sliding door ssd
Side sliding door ssdSide sliding door ssd
Side sliding door ssd
 
7'' liner running and cementing
7'' liner running and cementing7'' liner running and cementing
7'' liner running and cementing
 
perforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast jointperforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast joint
 
Artificial lift technology
Artificial lift technologyArtificial lift technology
Artificial lift technology
 
Wellhead function, rating and selection
Wellhead function, rating and selectionWellhead function, rating and selection
Wellhead function, rating and selection
 
2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
 
Completion equipment part 1
Completion equipment part 1Completion equipment part 1
Completion equipment part 1
 

Similar to Well work over

Exploring Tight Gas Reservoir Using Intelligent Well Technology
Exploring Tight Gas Reservoir Using Intelligent Well TechnologyExploring Tight Gas Reservoir Using Intelligent Well Technology
Exploring Tight Gas Reservoir Using Intelligent Well TechnologyAbhinav Bisht
 
Intelligent well completion
Intelligent well completionIntelligent well completion
Intelligent well completionAkshaya Mishra
 
Underbalance drilling equipment
Underbalance  drilling equipmentUnderbalance  drilling equipment
Underbalance drilling equipmentshivan abdalrahman
 
Well Complection - Basic-1.pptx
Well Complection - Basic-1.pptxWell Complection - Basic-1.pptx
Well Complection - Basic-1.pptx4twerdefwef
 
Chapter 01 Drilling Fluids Functions (1).pdf
Chapter 01 Drilling Fluids Functions (1).pdfChapter 01 Drilling Fluids Functions (1).pdf
Chapter 01 Drilling Fluids Functions (1).pdfAbdallahTayea99
 
Globe valves & industrial applications
Globe valves & industrial applicationsGlobe valves & industrial applications
Globe valves & industrial applicationsSowmiya Siva
 
Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15John Grover
 
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24Jean-Francois Saint-Marcoux
 
Offshore Riser Design
Offshore Riser DesignOffshore Riser Design
Offshore Riser DesignKon Aguek
 
Recovery_techniques__1674919213.pdf
Recovery_techniques__1674919213.pdfRecovery_techniques__1674919213.pdf
Recovery_techniques__1674919213.pdfAhmed133796
 
05 drilling methods
05  drilling methods05  drilling methods
05 drilling methodsgraham101231
 
Innovation Presentation
Innovation PresentationInnovation Presentation
Innovation PresentationIvan Kablar
 
SPE171748 Surface Safety System for ZADCO (4).pdf
SPE171748 Surface Safety System for ZADCO (4).pdfSPE171748 Surface Safety System for ZADCO (4).pdf
SPE171748 Surface Safety System for ZADCO (4).pdfJalal Neshat
 
Well Suspension Tools - Information Booklet Jan 28
Well Suspension Tools - Information Booklet Jan  28Well Suspension Tools - Information Booklet Jan  28
Well Suspension Tools - Information Booklet Jan 28Ken Gordey
 
Design of Common Header Line for Reduction of Process Time in Pump Testing
Design of Common Header Line for Reduction of Process Time in Pump TestingDesign of Common Header Line for Reduction of Process Time in Pump Testing
Design of Common Header Line for Reduction of Process Time in Pump TestingIRJET Journal
 
Key Process Considerations for Pipeline Design Basis
Key Process Considerations for Pipeline Design BasisKey Process Considerations for Pipeline Design Basis
Key Process Considerations for Pipeline Design BasisVijay Sarathy
 
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...John Grover
 
26-grover-john-draft
26-grover-john-draft26-grover-john-draft
26-grover-john-draftJohn Grover
 

Similar to Well work over (20)

Exploring Tight Gas Reservoir Using Intelligent Well Technology
Exploring Tight Gas Reservoir Using Intelligent Well TechnologyExploring Tight Gas Reservoir Using Intelligent Well Technology
Exploring Tight Gas Reservoir Using Intelligent Well Technology
 
Intelligent well completion
Intelligent well completionIntelligent well completion
Intelligent well completion
 
Underbalance drilling equipment
Underbalance  drilling equipmentUnderbalance  drilling equipment
Underbalance drilling equipment
 
Well Complection - Basic-1.pptx
Well Complection - Basic-1.pptxWell Complection - Basic-1.pptx
Well Complection - Basic-1.pptx
 
Chapter 01 Drilling Fluids Functions (1).pdf
Chapter 01 Drilling Fluids Functions (1).pdfChapter 01 Drilling Fluids Functions (1).pdf
Chapter 01 Drilling Fluids Functions (1).pdf
 
Globe valves & industrial applications
Globe valves & industrial applicationsGlobe valves & industrial applications
Globe valves & industrial applications
 
Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15
 
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
 
Offshore Riser Design
Offshore Riser DesignOffshore Riser Design
Offshore Riser Design
 
Recovery_techniques__1674919213.pdf
Recovery_techniques__1674919213.pdfRecovery_techniques__1674919213.pdf
Recovery_techniques__1674919213.pdf
 
05 drilling methods
05  drilling methods05  drilling methods
05 drilling methods
 
Innovation Presentation
Innovation PresentationInnovation Presentation
Innovation Presentation
 
SPE171748 Surface Safety System for ZADCO (4).pdf
SPE171748 Surface Safety System for ZADCO (4).pdfSPE171748 Surface Safety System for ZADCO (4).pdf
SPE171748 Surface Safety System for ZADCO (4).pdf
 
Well Suspension Tools - Information Booklet Jan 28
Well Suspension Tools - Information Booklet Jan  28Well Suspension Tools - Information Booklet Jan  28
Well Suspension Tools - Information Booklet Jan 28
 
Design of Common Header Line for Reduction of Process Time in Pump Testing
Design of Common Header Line for Reduction of Process Time in Pump TestingDesign of Common Header Line for Reduction of Process Time in Pump Testing
Design of Common Header Line for Reduction of Process Time in Pump Testing
 
Key Process Considerations for Pipeline Design Basis
Key Process Considerations for Pipeline Design BasisKey Process Considerations for Pipeline Design Basis
Key Process Considerations for Pipeline Design Basis
 
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
 
Descon Presentation
Descon PresentationDescon Presentation
Descon Presentation
 
26-grover-john-draft
26-grover-john-draft26-grover-john-draft
26-grover-john-draft
 
Oil production
Oil productionOil production
Oil production
 

Recently uploaded

Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfrs7054576148
 

Recently uploaded (20)

Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 

Well work over

  • 1.
  • 2. Well work-over BY ELIOT . S . WILLIAM FINAL YEAR PETROLEUM ENGINEER
  • 3. WORK OVER DEFINITION  A workover is any operation done on, within, or through the wellbore after the initial completion. Although proper drilling, cementing, and completion practices minimize the need, virtually every well will need several workovers during its lifetime to satisfactorily fulfill its purpose.  If the reservoir still contains a reasonable amount of hydrocarbon something has to be done to improve the performance of the well or reservoir.
  • 4. WORK OVER DEFINITION  The term Work-over, is used to refer to a kind of well intervention that is aimed at enhancing the performance of a well. It involves recompleting already completed well for improved performance.  The process of performing major maintenance or remedial treatments on an oil or gas well after initial completion . In many cases, work-over implies the removal and replacement of the production tubing string after the well has been killed and a work-over rig has been placed on location.
  • 5. REASONS FOR WORKOVER Workover operations are carried out for mainly two reasons such as:
  • 6. OTHER CAUSES FOR THE WORKOVER Unsatisfactory production or injection rates Supplemental recovery project requirements Regulatory requirements Competitive drainage Reservoir data gathering Lease requirements Abandonments
  • 7. MECHANICAL PROBLEMS Repair/Replacement of damaged equipment Replace artificial lift equipment Cement and Casing problems
  • 8. RESERVOIR RELATED REASONS Repair natural damage within the well Zone transfer Stimulation Convert well from production to injection Recompletion
  • 9. ZONE TRANSFER  One of the most common reason for a Workover is to recomplete a well from one zone to another  Many wells are drilled to intentionally penetrate many zones, but only one zone at a time is produced. In some wells, lower zones are produced first.  When reservoir depleted, they are recompleted (isolated) so that another zone farther up can be produced.
  • 11. REPLACE ARTIFICIAL LIFT EQUIPMENTWhen a reservoir does not have,or cannot maintain, sufficient drive energy to produce at an economical rate, assistance through artificial lift is required. There are four basic types of artificial lift: 1. Sucker rod pump 2. Hydraulic pump 3. Electric submersible pump (ESP). 4. Gas lift.
  • 12. STIMULATION  Stimulation is general term describing variety of operations performed on a well to improve its productivity.  It plays a vital role in production operations  Production in a damaged or low-producing zone can be increased by some techniques as follow:  Acid Stimulation  Hydraulic Fracturing
  • 13. CONVERT WELL FROM PRODUCTION TO INJECTION  Workover are done to convert producing well to injection well.In this type of workover water , gas , Chemical etc can be injected into the reservoir  For example ,such a workover might involve converting a producing well configured for continuous or intermittent gas lift as shown in the figure given on the right hand side of a water injection well
  • 14. WORKOVER TOOLS #1  Workovers can be done with conventional rigs or nonconventional systems.  Conventional rigs can be equipped to handle almost all types of work that may be required  Nonconventional systems allow specific types of work to be done without pulling the tubing, disassembling the Christmas tree, or even killing the well.  This is accomplished by using lubricators and packoff equipment at the surface and by running the required equipment inside the production tubing.  Common types of nonconventional systems are wireline units, coiled tubing units, and snubbing units. Work over rig(Nordic Gulf)
  • 15. WORKOVER TOOLS-wireline units  Wireline units use special equipment on a solid wireline to gather data (pressure, temperature, and depth) and to set, manipulate, and/or retrieve tubing plugs, sliding sleeves, flow regulators, gas lift valves, safety valves, and wireline fishing tools.  Wireline equipment can also be used to cut paraffin and remove wellbore fill. Prior planning, good operators, good equipment, and reasonable well conditions are prerequisites to the success of this method Wireline equipment, (a) Lubricator, (b) Typical string.
  • 16. WORKOVER TOOLS-coiled tubing unit  Coiled tubing units find application in cleanout work, stimulation, plugback jobs, and unloading wells with nitrogen.  Coiled tubing units can have 10,000 to 15,000 ft of pipe (usually 1-in. outside diameter) that can be reeled continuously into the wellbore.  The pipe can be used to pump into the well and circulate fluids such as water, acid, or cement.  The use of a dynadrill permits some drilling with coiled tubing.  Limitations of coiled tubing include the reduced strength of the tubing and low pumping rates (high friction pressure because of the diameter and length).  Coiled tubing can be run into wells against pressures up to 5000 psi. Coiled tubing unit.
  • 17. WORKOVER TOOLS-snubbing tools  Snubbing units use hydraulic pressure and rams to introduce small, coupled tubing into the well, if necessary, against pressures above 5000 psi.  The tubing is stronger and can be rotated so that tougher cleanout or fishing jobs can be accomplished.  Snubbing units are used for the same type of jobs as are coiled tubing units, but their compactness is an advantage in offshore work.  They are slow and expensive, but in the right applications, they are the more economical way to accomplish the task. Snubbing unit.
  • 18. CONCLUSION  The profitability of a well as an investment venture depends on how long it is on stream and on how much it produces. Its lifetime and output are naturally due to the reservoir’s initial characteristics. However, they are also dependent on keeping the well maintained in good working order and adapting completion properly to the constantly varying conditions prevailing in the reservoir and around the welIbore .  Although proper drilling, cementing, and completion practices minimize the need, virtually every well may need several workovers during its life time to satisfactorily fullfil its purpose