Opportunities in H2020 (video conference)
Lieve Bos, Policy Officer, DG CONNECT, European Commission
HORIZON 2020 SUPPORT TO
INNOVATION PROCUREMENT
Public sector is faced with important challenges.
To tackle these challenges often public sector transformations are needed.
- In many cases, solutions are close to the market and would be
provided if clear requirements/sufficient demand expressed by market.
Incremental innovation (product adaptation, scaling up of production…)
or non-R&D innovation (e.g. service innovation) can deliver required
quality/price, so no need for R&D procurement. Public sector provides
seal of approval for innovative solution by acting as launching
customer/early adopter (PPI)
- In other cases, addressing the problem requires radical innovation,
there is no available solution 'on' or 'close to' the market yet. There are
different competing potential solution approaches but R&D still needed
to de-risk and compare different technological alternatives before
committing to large scale deployment. Procurer wants to induce step
change in market (e.g. moving from proprietary/vendor lock-in to better
open systems with multiple vendors incl. new players) (PCP)
Pre-commercial procurement (PCP) versus public procurement of
innovative solutions (PPI)
•
- PCP to steer the development of new solutions towards concrete public sector
needs, whilst comparing/validating alternative solution approaches from various
vendors and enabling new players to prove themselves against established ones
- PPI to act as launching customer / early adopter / first buyer of innovative
commercial end-solutions newly arriving on the market
Innovation Procurement = PCP + PPI / Complementarity
Growing impact at Member State level
2013 2014-152011
UK NHS and MOD PCPs and PPIs, NL launching customer (PPI)
201220092008
AT, NO, DK, IS, IT include innov. proc. in R&D&I strategy
ES (3%), NL and UK (2,5%) set expenditure target for innov. proc.
NO, FI, SE, DK, IS min. agreement on cross border innov.
proc. collaboration (including 2,5% target)
2010
FI, SE, ES, Flander (BE) include innov. Proc. in R&D&I strategy
PCP and PPI in ESIF: PL, FR,…
EE, LV develop innov. proc. strategy
DE, PL put innov. proc. in R&D&I strategy
IT (€ 150M), ES (€ 250M) to PCP/PPI struct funds
Baltics (LT, LV, EE) join Norden agreement
FR sets 2% target for innov proc.
FI, SE, ES, Flanders (BE) launch support program & competence center for procurers
Progress PCP implementation
Learn from first movers
PCPs projects on-going
or finished
Framework identified
and/or pilots
in preparation
Hungary
Belgium
Netherlands
Awareness Raising
Exploring possibilities
Denmark
Austria
Finland Sweden
Poland
Working on
framework
Germany
France
Luxembourg
Ireland
Cyprus
Romania
Slovenia
Slovakia
Bulgaria
Czech
Republic
Estonia
Greece
Latvia
LithuaniaMalta
Portugal
Spain
Norway
Switzerland
Italy
UK
Iceland
Pilots
started
Framework identified
and/or pilots
in preparation
Hungary Belgium
Netherlands
Awareness Raising
Exploring possibilities
Finland
Sweden
Poland
Working on
framework
Germany
France
Luxembourg
Ireland
Cyprus
Romania Slovenia
Slovakia
Bulgaria
Czech
Republic
Estonia
Greece
Latvia
LithuaniaMalta
Portugal
Spain
Norway
Switzerland
Italy
UK
Iceland
2007
2015
Austria
Denmark
Political encouragement
- Modernising public sector 'a priority'
Quality-efficiency improvement targets
e.g. Lombardia/IT, UK, Flanders/BE
- Target % proc budgets to innovation
Monitoring framework
e.g. UK, NL, ES, Nordics, FR
Implementation
- Innov Proc Competence center
Training / assisting procurers
(e.g. SE, FI, ES, Flanders/BE, DE)
- Innov Proc financial support program
(e.g. SE, FI, ES, Flanders/BE, DE)
Leverage EU funding
- Horizon 2020 Increased
- ESIF support for
- EIB loans innov proc
Encourage demand side to
meet supply side
- Early notification innov proc needs
- Open market consultations
Meet the buyers events
What can countries/regions do?
- Speed up public sector modernisation – improve quality
and efficiency of public services with breakthrough solutions
- Get better value for money through cooperation - enable
public sector around Europe to share cost + experience to buy
new solutions that can respond to concrete public needs
- Address issues of common interest together – e.g. where
interoperability and coherence of solutions across borders,
pooling of resources or market defragmentation is required
- Create growth and jobs in Europe – help innovators bring
European R&D to the market (the majority of R&D in H2020
funded PCPs should take place in Europe, ltd set of first test
products can be bought in the PPI from companies in the PCP)
Why European cooperation on PCP-PPI?
Overview EU funded projects doing PCPs (FP7)
More info on: http://ec.europa.eu/digital-agenda/en/eu-funded-projects
SILVER (PCP)
Robotics ageing well
DECIPHER (PCP)
Services mobile health data
CHARM (PCP)
Traffic Management
V-CON (PCP)
Virtual road infrastructure modelling
PRACE 3IP (PCP)
Smart Textiles ICT for fire fighters
SMART@FIRE (PCP)High Performance Computing
THALEA (PCP)
Cloud for Europe (PCP)
Cloud computing
PREFORMA (PCP)
Long term digital preservation
IMAILE (PCP)
Personalised learning needs
UNWIRED-HEALTH (PCP)
NYMPHA-MD (PCP)
Mobile care for vaccination & heart failure
Mental care for bipolar disordersTele-detection/care of ICU patients
HEALTH
AGEING
TRANSPORT
SUSTAINABILITY
E-GOV
EDUCATION
SAFETY
Human Brain project
PCP on supercomputing/brain modelling
Overview EU funded projects doing PPIs (CIP)
More info on: http://ec.europa.eu/digital-agenda/en/eu-funded-projects
ECOQUIP & LCB-HEALTHCARE (PPI)
Low carbon healthcare
SPEA (PPI)
HAPPI (PPI)
PRO-LITE (PPI)
Cities/Metro Lighting
Healthy Ageing
STOP AND GO (PPI)
Telecare for elderly with multiple conditions
HEALTH
AGEING
SUSTAINABILITY
INNOBUILD (PPI)
INNOBOOSTER (PPI)
Office Furniture & Lighting
Sustainable buildings
INNOCAT (PPI)
Sustainable catering
Sustainable buildings
TRANSPORT
SYNCRO (PPI)
Smart roads communicationVehicles Fire Fighters
FIRED-UP (PPI)
PAPIRUS (PPI)
Sustainable construction
PROBIS (PPI)
Sustainable construction
EU funded CSAs/Networks of procurers (FP7/CIP/H2020)
More info on: http://ec.europa.eu/digital-agenda/en/eu-funded-projects
HEALTH
AGEING
TRANSPORT
ICT
INSPIRE (Training PCP, link with VC)
E-health procurers
C4BI (networking)
Cities on healthcare
P4ITS (Preparing PPI)
Intelligent Transport Systems
TRANSFORM (Networking)
City/Regional transport
GREENS (prep PPI)
Energy agencies – CO2
SAEPP (preparing PCP)
Ambulance ICT
PRO4VIP (preparing PCP)
ICT for Visually impaired
EPP-eHealth (preparing PCP/PPI)
Cities on e-health
Cloud computing research cloud
PICSE (Preparing PCP/PPI)
Photonics broadband
COMPLETE (Preparing PPI)
SUSTAINABILITY
WATER PIPP
Water procurers
EURECA (prep PPI)
Green data centers
CEPPI 2 (prep PPI)
Cities – energy consumption
SPP regions (capacity building)
PPI – sustainability
InnProBio Forum (capacity building)
PPI – bio based products
BRODISE
Cities brown field
decontamination
PPI4WASTE
Authorities
Waste management
• Shortening of time-to-market: UK National Health service PCP
examples achieve reduction from several years to 18 months
• Attracting venture capital: Companies in UK NHS PCPs attract
significant VC investment, enabling them to grow faster
• Creating lead markets: Companies in UK ministry of defence PCPs
are selling now also to US department of defence
• Retaining lead market position: possible via sustained PCP/PPI
procurements (e.g. 60 ys of supercomputing PCPs -> IBM, Cray, HP)
• 20% cheaper products and higher product quality: evidence from
US defense multi competitor, multi phase PCP-PPI procurements
• Removal of supplier lock-in -> 20% cost reduction: outcome of
benchmarking of CHARM PCP on new traffic management centres
thanks to move towards open architecture via PCP
• Benefits on local economy: Estonia PPI buying Mitsubishi electric
vehicles increased local Estonian economic activity in related sectors
Evidence on impact from successful examples
More info - PCP impact study- on: https://ec.europa.eu/digital-
agenda/en/news/quantifying-impact-pcp-europe-study-smart2014-0009
Data collected from first 7 ongoing FP7 funded PCPs
• 7 FP7 funded PCPs in ICT so far awarded contracts
- 45 tenderers/consortia of tenderers have been awarded contracts in total
• Opening route-to-market for new players/SMEs
- 75,5% of contracts won by SMEs (SME lead bidder, bidding alone or with partners)
- Compared to 29% in public procurements across Europe
Mostly small young SMEs: 34,5% below 10 people, 81% below 50 people, 56% less than 10 years old
• Stimulating cross-border company growth
- 33% of contracts won by bidders that are not from a country of any of the
procurers in the buyers group (e.g. DE company working for UK+NL procurers)
- Compared to 1,26% in public procurements across Europe
• Relevance of PCPs also to universities
- 33% of winning contracts have university/R&D center partner in consortium
- Winning SMEs are also often university start-ups
• Encouraging wider market commercialisation
– Bidders offered on average 50% cheaper R&D price for keeping their IPRs (they
see IPR value/real market beyond the first potential buyers, the PCP procurers)
• Creating growth and jobs in Europe
– All bidders do 100% of R&D in Europe (except 1 doing 85% of R&D in Europe)
Geographic location winning bidders
(2)
(15)
(7)
(14)
(9)
(2)
(2)(3)
(7)
(2)
(4)
(4)
(2)
(1)
(1)
Companies in winning bids (nr/country)
Procurers
Still companies out there that don't know about these procurement opportunities.
Remaining 7 out of 14 FP7 PCPs will launch their call for tenders this year.
Who can help promote upcoming PCP/PPI call for tenders in their countries?
Overview on-going projects: http://ec.europa.eu/digital-agenda/en/eu-funded-projects
Universities in winning bids (nr/country)
(1)
(3)
(2)
(1)
(2)
(1)
(1)
H2020 support to
Innovation Procurement
in 2016-2017
PCP/PPI Actions +
Coordination and Support Actions (CSAs)
 Coordination and Support Actions (100% funding rate):
 Support only coordination activities e.g. preparation of a PCP or PPI by a
group of procurers (identifying common challenges, open market
consultation with industry before initiating a concrete PCP or PPI etc)
 CSAs do not provide EU co-financing for an actual PCP or PPI procurement
 PCP Actions (90% funding rate):
 Provide EU co-financing for an actual PCP procurement (one joint PCP
procurement per action) + for related coordination and networking
activities (e.g. to prepare, manage and follow-up the PCP call for tender)
 PPI Actions (35% funding rate):
 Provide EU co-financing for an actual PPI procurement (one joint PPI
procurement per action) + for related coordination and networking
activities (e.g. to prepare, manage and follow-up the PPI call for tender)
Forms of support
! New !
In addition, other entities can also participate
- In buyers group: also private/NGO procurers providing services of public interest
- In coordination/networking activities: any private/public type of entity (e.g.
experts, end-users, certification bodies that assist procurers) that has no conflict of
interest (no potential suppliers of solutions for the PCP/PPI)
Public procurers are contracting authorities or contracting entities as defined by
the EU public procurement directives
MS = Member States
AC = Countries Associated to Horizon 2020
Minimum 3 independent participants from
3 different MS or AC, of which minimum 2
public procurers (buyers group) from 2
different MS or AC
PCP and PPI actions – participation requirement
 Buyers group
 Beneficiaries that provide the financial commitments for the PCP or PPI.
 Min 2 public procurers from 2 different Member States or associated countries
 Shall represent the demand side for the innovations, a critical mass of
procurers that can trigger wide implementation of the innovations, shall aim
for ambitious quality/efficiency improvements in area of public interest.
 Lead procurer
 Public procurer in project appointed by the buyers group to lead and
coordinate the PCP or PPI. Can be part of buyers group or not.
 Subcontractors
 Successful tenderers, selected by the buyers group & lead procurer as result
of the PCP or PPI call for tender, to provide the R&D services (PCP) or
innovative solutions (PPI).
 They do 'NOT' enter the grant agreement with the EC.
PCP and PPI actions - Role different actors
PCP/PPI actions co-finance (1) + (2)
Preparation Execution
Stage Stage
Every project goes through a preparation stage and an execution stage
Following up progress suppliers
Validating, testing solutions
Dissemination activities
Standardisation, certification, etc
(2) Coordination & Networking Activities
(1) PCP/PPI procurement
PCP and PPI actions – What is covered
OpenMarket
Consultation,
preparation
tenderspec,etc
Evaluationresults
Preparingfollow-upPPI
Disseminationetc
In the proposal, the consortium shall already identify
• A concrete 'common challenge' on which the PCP/PPI will focus
(e.g. new solution needed to improve energy efficiency of data centres)
• KPIs (targeted quality/efficiency improvements) for the PCP/PPI
(e.g. target is energy efficiency improvement of min 30%)
• Illustrating how this challenge fits in the innovation strategy / plans of
the participating procurers that require innovative solutions
(e.g. city procurer a/b/x aims to upgrade x/y/z data centres by 2018)
• Requested budget per participant and plan for preparing and executing the
procurement + for the coordination and networking activities
Example proposal: contact IMAILE PCP project (www.imaile.eu)
Note this is an FP7 not H2020 proposal (differences in funding rates & proposal template)
Material Info day: Practical info how to find partners, how to prepare a
proposal etc (ppts + video)
Attractive success rates for proposers
PCP and PPI actions – Proposal preparation
 Preparation stage
 Preparation of one joint PCP or PPI procurement per action
 Open market consultation /verification of market readiness to meet
procurement need
 Outcome
 Agreed common tender specifications + Joint procurement agreement
 Confirmation of availability of financial commitments to start PCP/PPI
 Execution stage
 Joint procurement of the R&D services (PCP) or innovative solutions (PPI)
 Follow-up of suppliers and validation of results
 PCP: Validation/comparison of the performance of the competing PCP
solutions against jointly defined criteria in real-life operational conditions
 PPI: Evaluation of results of deploying and operating the procured solutions
in real-life operating conditions
 Dissemination/exploitation of results
Other coordination/networking activities relevant to the action (e.g. preparation
of follow-up PPI, contribution to standardisation / regulation / certification)
PCP and PPI actions - Eligible activities
 Reimbursement rate direct costs: Max 90% respectively 35%
of eligible costs for PCP respectively PPI actions
 Eligible direct costs to carry out eligible activities defined in WP include:
- Price of the R&D services (PCP) or innovative solutions (PPI) procured (if
procurement conducted in compliance with requirements in Annex E WP)
- Eligible coordination and networking activities
- May include in-kind contributions (e.g. third parties putting resources at
disposal of beneficiaries e.g. for testing of solutions)
- VAT is an eligible cost unless for beneficiaries that can deduct it
 Requested reimbursement for coordination and networking activities can
comprise max 30% (for PCP) / max 50% (for PPI) of total requested grant
 Plus 25% for indirect costs. But, no indirect costs on the price of the
PCP/PPI procurement or on 3rd party resources not used at the beneficiary premises
 Pre-financing: Yes, 1st pre-financing at start project for costs for preparation
stage, 2nd pre-financing before execution stage for rest of costs (incl. call for tender)
PCP and PPI actions – EU contribution
OVERVIEW UPCOMING H2020 CALLS
ON INNOVATION PROCUREMENT
(PCP+PPI) IN 2016-2017
2016 (~40 M€)
• PCP actions
• E-health: 18 M€ (PM-12)
• ICT based solutions for any area
of public interest: 4 M€ (ICT-34)
• Earth observation: 3 M€ (EO-2)
• PPI actions
• ICTs Ageing: 10,5M€ (PM-13)
• CSA actions
• Urban transport deployment:
2M€ (MG-4.4)
• Climate – environment- raw
materials - resource efficiency:
part of larger call (SC5-27)
• Civil protection: 1,5M€ (2-DRS)
2016-2017 calls in support of PCP and PPI
From "draft WPs"
2017 (~84 M€)
• PCP actions
• Robotics smart cities: 7 M€ (ICT-27(d))
• Soil decontamination: 5 M€ (SC5-26)
• Broadband coms security: 10 M€ (4-DRS)
• Forensics: 10 M€ (9-FCT)
• Border control: 10 M€ (13-BES)
• PPI actions
• E-health standards: 8,26 M€ (PM-19)
• Supercomputing: 26 M€ (EINFRA-21)
• Energy efficiency: part of larger call (EE-19)
• CSA actions
• Competence centers & procurer networks
any area preparing PCP/PPIs: 4 M€ (ICT-33)
PCP actions: co-finance (90%) actual procurement cost for joint PCPs + coordination costs
PPI actions: co-finance (35%) actual procurement cost for joint PPIs + coordination costs
CSA actions: co-finance (100%) only coordination costs e.g. procurer networks preparing future PCPs/PPIs
• Health Work program
• PM-12: E-health innovation in empowering the patient (€ 18M; 16 Feb 2016)
• ICT Work Program
• ICT-34: Open to ICT based solutions for any area of public interest (€ 4M; 12 Apr 2016)
• ICT-27(d): Robotics based solutions for smart city applications (€ 7M; 25 Apr 2017)
• Space Work program
• EO-2: Downstream earth observation services for public sector (€ 3M; 3 Mar 2016)
• Climate Work program
• SC5-26: Soil decontamination (€ 5M; 7 Mar 2017)
• Security Work Program
• 4-DRS: Broadband communication systems for disaster resilience (€ 10M; 24 Aug 2017)
• 9-FCT: Forensic tools/techniques for fight against crime/terrorism (€ 10M; 24 Aug 2017)
• 13-BES: Next generation info systems for border/external security (€ 10M; 24 Aug 2017)
Calls for PCP actions
Call deadlines in red
• Health Work program
• PM-13: Deployment of ICT solutions for active/healthy ageing (€ 10,5M; 16 Feb 2016)
• PM-19: Uptake of standards for exchange of digital health records (€ 8,26M; 14 Ma 2017)
• Research infrastructure Work Program
• EINFRA-21: Deploying innovative High Performance computing systems – platform driven
e-infrastructure innovation (€ 26 M; 20 Sept 2016)
• Energy Work Program
• EE-19: Deploying innovative solutions for energy efficiency
(part of larger call of € 47M; 7 June 2017)
Calls for PPI actions
Call deadlines in red
• ICT Work Program
• ICT-33(a): European wide networks of public procurers preparing future PCPs or PPIs in
any area of public interest that requires ICT based solutions
• ICT-33(b): European wide networks of competence centers on innovation procurement
(€ 4M for ICT-33 (a) and (b) together; 25 Apr 2017)
• Transport Work Program
• MG-4.4: Facilitating PPI on sustainable transport and mobility solutions in urban areas
(€ 2M; 26 Jan 2016)
• Climate Work program
• SC5-27: Preparing PCPs and PPIs in climate action, environment, resource efficiency, raw
materials (part of a larger call of € 8,55 M; 8 Mar 2016)
• Security Work Program
• 2-DRS: Situational awareness systems to support civil protection preparation and
operational decision making for disaster resilience (€ 1,5 M; 25 Aug 2016)
Calls for Coordination and Support Actions
Call deadlines in red
Open call ICT- 34/33 for 'ICT based solutions'
ICT is pretty wide domain. ICT covers all Information and Communication
Technologies such as:
• Components and systems: embedded ICT systems, minituarisation / system
integration, advanced thin large organic and large area electronics
• Advanced computing (e.g. customised and low power computing)
• Future Internet (e.g. smart novel Internet architectures and experimentation
platforms,
• optical and wireless network technologies, cloud computing infrastructure and
services, tools and methods for software development, web entrepreneurship)
• Content technologies and information management (e.g. big data handling, content
handling and modelling, automatic learning language translation systems, creative
industries / social media ICTs, ICTs for learning / teaching and gaming, multimodal
natural computer interaction)
• Robotics
• Micro- and nano electronics, cross-cutting ICT KETs, photonics (e.g. (O)LED
lighting)
• High Performance computing
• Cybersecurity / trustworthy ICT
• Human-centric ICT solutions 27
What does eafip offer?
 Training across Europe
– 3 major events and 9 smaller workshops with procurers in different sectors
between 2015-2018 to provide information and training on PCP and PPI
Register here to the first major event in Paris, 27-28 October 2015!
 Toolkit and helpdesk
– Training is based on toolkit on why and how to implement PCP/PPI
– Helpdesk that will post replies to questions - FAQs online
Register here to stay up to date
 Free local assistance
– For public procurers starting concrete PCPs and PPIs for ICT based
solutions
– Includes legal assistance in the start-up and implementation of a PCP/PPI
Register here your interest in assistance before 10 November 2015
European Assistance for Innovation Procurement
eafip
What is eafip?
A service set up by the DG CNECT (led by Stella & Corvers)
- Horizon 2020 supports groups of procurers to do joint PCPs/PPIs together)
- eafip supports single procurers to start PCP/PPIs on their own nationally
www.eafip.eu
More info on Innovation Procurement:
 http://ec.europa.eu/digital-agenda/en/innovation-procurement
 Ongoing PCP/PPI projects in ICT (and other) domains:
 http://ec.europa.eu/digital-agenda/en/news/innovation-procurement-
power-public-purse
 More detailed info on modalities of PCP/PPI action instrument,
evaluation criteria etc in General Annexes to the H2020 Work Program:
 http://ec.europa.eu/research/participants/portal/desktop/en/funding/ref
erence_docs.html#h2020-work-programmes-2016-17
 Info about scope of each call topic, online drafting and submission of
proposals on H2020 participants portal (search per topic e.g. ICT-34).
Calls will be published when WPs are adopted (end October):
 http://ec.europa.eu/research/participants/portal/desktop/en/opportuniti
es/h2020/search/search_topics.html 29
Possible synergies between ESIF
and Horizon 2020 on
innovation procurement
Lieve Bos
Policy Officer Innovation Procurement
Innovation Unit (F2)
DG CNECT
European Commission
GENERAL RULE
IT IS NOT ALLOWED !!!!!!
- To use ESIF and H2020 funding accumulatively to
finance the same cost/expenditure item
- To finance the own contribution of the participant
from H2020 or ESIF
CATEGORIES OF POSSIBLE SYNERGIES
BETWEEN H2020 AND ESIF ON PCP/PPI
Joint or
simultaneous
use of funds
Sequential
funding
Additional
funding
Alternative
funding
A. JOINT OR SIMULTANEUS
USE OF FUNDS
Different funding sources in the same project.
This is only possible if the cost items (eligible and submitted)
are NOT the same.
Requires very strict financial management to separate the cost items clearly
from the conception phase of the project and will only work if the funding
decisions of H2020 and ESIF are synchronised.
The rules of both funding sources (ESIF – H2020) should be respected by all
beneficiaries even if they receive co-financing from only one funding source.
A partner who receives co-financing from ESIF to participate in a H2020 project should
also respect the H2020 rules and vice versa.
Possible scenario on PCP
 Preparation of the PCP procurement is supported by H2020 or ESIF
 In the framework of PCP action calls, some participants of the buyers group
may receive co-funding from the ESIF and others from H2020.
 This case is applicable only if there is a clear distinction between budgets
offered per OP and between expenditures co-funded by the ESIF (per OP) vs
expenditures co-funded by H2020.
Example - each R&D provider is paid pro rata by each procurer in the buyers group
according to the share of each procurer's contribution to the jointly committed budget.
Condition for success : synchronization between the ESIF calls and the
H2020 PCP action calls
Coordination, Preparatory
etc. activities are co-funded
by H2020 (CSAs)
CO-FUNDING RATE 100% +
25% for eligible indirect
costs EXECUTION OF A JOINT PCP
Coordination, Preparatory
etc. activities are co-funded
by the ESIF (ESIF OPs or
European Territorial
Cooperation Programs)
DIFFERENT CO-FUNDING
RATE PER PROGRAM
AND/OR PARTICIPANT
OR
PROCURER A (Less
developed Region)
CO-FUNDS HIS
CONTRIBUTION TO
THE JOINTLY
COMMITTED BUDGET
THROUGH THE ESIF
CO-FUNDING RATE
up to 85% (for his
contribution)
PROCURER B
(Transitional Region)
CO-FUNDS HIS
CONTRIBUTION TO
THE JOINTLY
COMMITTED BUDGET
THROUGH THE ESIF
CO-FUNDING RATE
up to 60%(for his
contribution)
PROCURER C
CO-FUNDS HIS
CONTRIBUTION TO
THE JOINTLY
COMMITTED BUDGET
THROUGH H2020
CO-FUNDING RATE
90%* + 25% for
eligible indirect costs
(for his contribution)
PROCURER D
CO-FUNDS HIS
CONTRIBUTION TO
THE JOINTLY
COMMITTED BUDGET
THROUGH H2020
CO-FUNDING RATE
90% + 25% for eligible
indirect costs(for his
contribution)
* New from 2016-2017 Horizon 2020 work programmes onward
Possible Scenario on PPI
Some procurers located in a less developed Region purchases the innovative
solution co-funded by the ESIF (up to 85% rate) and other procurers in
other MS are co-funded by H2020 (35% rate) to buy the innovative solution.
Preparation of the PPI may be co-funded either by the ESIF or by the H2020 (CSAs).
In case they haven't received co-financing for the preparatory activities these can be
co-funded by the PPI actions according to the rules applicable to these actions.
Applicable Scenario in cases:
 Under a joint Framework Contract/Agreement which provides the joint technical specifications
separate specific contracts (possibly with lots) are implemented by the individual procurers
according to their national law for the purchase of the innovative solutions they each
individually need. The procurers pay individually the invoices corresponding to the innovative
solutions each buys.
Or
 The lead procurer launches one procurement procedure, awards all the contracts and pays all
the invoices on behalf of the group of procurers
Coordination, Preparation
etc. activities are co-funded
by H2020 (CSA)
CO-FUNDING RATE 100% +
25% for eligible indirect
costs
EXECUTION OF ONE JOINT PPI
PROCURER A
purchases the
innovative solution
with the support of
H2020
CO-FUNDING RATE
35%* + 25% for
eligible indirect costs
(for his contribution)
PROCURER C
purchases the
innovative solution
with the support of
H2020
CO-FUNDING RATE
35 % + 25% for
eligible indirect costs
(for his contribution)
PROCURER B
(Less developed Region)
purchases the
innovative solution
with the support of the
ESIF in line with the
objectives of the
relevant O.P
CO-FUNDING RATE up to
85%(for his
contribution)
Coordination, Preparation
etc. activities are co-funded
by the ESIF
DIFFERENT CO-FUNDING
RATE PER PROGRAM
AND/OR PARTICIPANT
OR
PROCURER D
Less developed Region
purchases the
innovative solution
with the support of
the ESIF in line with
the objectives of the
relevant O.P
CO-FUNDING RATE up
to 85%(for his
contribution)
* New from 2016-2017 Horizon 2020 work programmes onward
Possible scenario for the coordination and networking
activities to prepare for PCP and PPI
In one project/consortium that prepares a future joint PCP or PPI,
Procurers A and B from less developed regions are co-funded by the
ESIF (up to 85% co-funding rate) and procurers B and C are co-
funded by H2020 (via CSAs – if there is a specific call with co-funding
rate 100% + 25% for eligible indirect costs)
 The execution of the joint PCP/PPI can follow one of the scenarios presented in the
previous slides.
 Minimum conditions for success:
- - Separate and distinguished cost/expenditure items even at project proposal level
- - Synchronization and coordination between ESIF MAs and H2020 Managing Bodies
-
EXECUTION
OF A JOINT
PCP
PROCURER A
(Less developed Region)
Coordination and
networking activities to
prepare for a PCP are
co-funded by the ESIF
CO-FUNDING RATE up
to 85% (for his
contribution)
PROCURER B
(Transitional Region)
Coordination and
networking activities to
prepare for a PCP are co-
funded by the ESIF
CO-FUNDING RATE up to
60% (for his
contribution)
PROCURER C
Coordination and
networking activities to
prepare for a PCP are
co-funded by H2020
(CSA)
CO-FUNDING RATE
100% + 25% for
eligible indirect costs
(for his contribution)
PROCURER D
Coordination and
networking activities to
prepare for a PCP are co-
funded by H2020 (CSA)
CO-FUNDING RATE 100%
+ 25% for eligible
indirect costs (for his
contribution)
EXECUTION
OF A JOINT
PPI
PROCURER A
(Less developed Region)
Coordination and
preparation etc.
activities for a PPI are
co-funded by the ESIF
CO-FUNDING RATE up
to 85% (for his
contribution)
PROCURER B
(Transitional Region)
Coordination and
preparation etc. activities
for a PPI are co-funded by
the ESIF
CO-FUNDING RATE up to
60% (for his
contribution)
PROCURER C
Coordination and
preparation etc.
activities for a PCP are
co-funded by H2020
(CSA)
FLAT CO-FUNDING
RATE 100% + 25% for
eligible indirect costs
(for his contribution)
PROCURER D
Coordination and
preparation etc. activities
for a PCP are co-funded
by H2020 (CSA)
FLAT CO-FUNDING RATE
100% + 25% for eligible
indirect costs (for his
contribution)
B. SEQUENTIAL FUNDING
Separate successive and legally/financially not linked
projects with alternating H2020 or ESIF support –
- First PCP and then PPI –
This is an easier way to combine funds with less risk
of (involuntarily) creating double co-funding
scenarios.
Sequential funding can go in both directions:
First ESIF and then H2020 or vice versa.
Possible Scenario
First PCP (H2020) to develop and test the innovative
solution and then PPI (ESIF)for the deployment of the
innovative solutions developed and tested through PCP
and vice versa (ESIF for PCP and H2020 for PPI)
Example:
A group of Public Procurers from different cities are looking for a new
sustainable public water supply system. It requires R&D. At
first they implement a PCP (Phases 1,2,3) with the support of H2020
and different solutions are developed and tested.
Thereafter they implement a PPI with the support of ESIF/ERDF to co-
fund the preparation of the call for tender and the purchase of these
new solutions (each MA for the territory covered by its OP).
C. ADDITIONAL/PARALLEL USE OF FUNDS
ESIF money is not linked to a H2020 project
(PCP/PPI), but a regional/national authority decides
to co-fund a regional/national project or beneficiaries
to enhance the H2020 project or programme in its
region.
This may be particularly relevant to skills development or capacity
building in innovation and cooperation
Example
Skills enhancement of the public procurer focused on the use of the
innovative product that is purchased in the framework of a PPI that is co-
funded by H2020
D. ALTERNATIVE FUNDING
 ESI Funds could be used for project proposals that
have received positive evaluation under H2020 and
could not be co-funded due to lack of H2020 funds
under the call.
 These proposals could be reoriented towards ESIF
requirements and submitted at national/regional level, if
this type and topic of project fits into the operational
programmes of the concerned territories.
Include innovation procurement in the RIS3 SWOT and policy
mix.
Build PCP/PPI references into OPs in every relevant thematic
objective.
 Ensure support of public demand driven innovation in the
framework of the European Territorial Cooperation.
Involve MA from the beginning to ensure availability of ESIF &
synchronisation.
CONDITIONS FOR SUCCESS
Thank you very much for your
attention
Lieve Bos
Policy Officer Innovation Procurement
Innovation Unit (F2)
DG CNECT
European Commission
• Get better and 20% cheaper products (US defense data)
• Use PPI also if no(more) R&D needed for procurement need
• Use a small budget PCP to de-risk a large budget PPI
• PPI spec can be 'completely rephrased' benefiting from PCP lessons learnt
• Use conditions that encourage job creation 'in Europe'
• Because PCP falls outside WTO rules
• Prevent foreclosing of competition & crowding out of
private investment in R&D
• Companies that are not financing their R&D via procurement/PCP (e.g. via
grants, own company resources) can still bid for deployment contracts/PPIs
• Facilitates access to procurement market for SMEs
• Gradually increasing contract sizes, tasks, required manpower
• Stringent financial guarantee/qualification requirements:'no' in PCP,'ltd' in PPI
… above not the case if R&D is procured as part of/inside large deployment contract
Why split between PCP and PPI
This enables to…
Examples EU funded transnational PCPs
Traffic Management
CHARM is a cooperation between 3 road authority procurers: Rijkswaterstaat (NL), Highways Agency (UK),
Department Mobility and Public Works - MOW (BE). Other Traffic management authorities (e.g.
Traffikverket (SE) associated to the project to follow-up its progress)
CHARM contracting authorities jointly procure R&D services via the PCP to move towards an open modular
traffic management architecture by getting modules developed that will optimise network performance,
increase road safety and reduce CO2 emissions by improving network management, incident prediction and
prevention and cooperative ITS.
CHARM
Project timing: Sept 2012 (48 months)
Value PCP: € 2,88M
Contact: ian.chalmers@highways.gsi.gov.uk
Project Website: tinyurl.com/CHARM-PCP
Examples EU funded transnational PCPs
Virtual Road Construction
V-CON is a cooperation between procurers in the domain of road administation:
Rijkswaterstaat (NL), Centre Scientifique et Technique du batiment (FR), Trafficverket (SE), TNO (NL)
The PCP undertaken by the V-CON contracting authorities focuses on R&D for virtual modelling of road
infrastructure.
V-con
Project Timing: Oct 2012 (48 months)
Value PCP: € 1,467M
Contact: benno.koehorst@rws.nl
Project Website:
www.rws.nl/en/highways/v_con
Examples EU funded transnational PCPs
Digital preservation
Procurers: Riksarkivet - National Archives(SE), Beeld en Geluid (NL), Koninklijk Instituut voor het
kunstpatrimonium (BE), Greek Film Center (GR), Local Government Management Agency - LGMA (IE),
Stiftung Preussischer Kulturbesitz (DE), Ayuntamiento de Girona (ES), Ministry of Culture - EVKM (EE),
Kungliga Biltioteket - National Library (SE)
Other partners: Packet Expertisecentrum Digitaal Erfgoed (BE), Promoter SRL (IT), Fraunhofer (DE),
University of Skövde (SE),University of Padua (IT),
The PREFORMA PCP addresses the challenge faced by memory institutions of increasing transfers of
electronic documents and other media content for long term preservation. PREFORM intends to establish a
long-term sustainable ecosystem of innovative tools and to provide a reference implementation of the most
common file format standards for the assessment and for the correction of the collections to be archived.
Project Timing: January 2014 (36 months)
Value PCP: € 2,136M
Contact: borje.justrell@riksarkivet.se
Project website: www.preforma-project.eu
Examples EU funded transnational PCPs
E-learning
IMAILE procurers are: Halmstads Kommune (SE) and Alexandersson University Institute Varberg
(SE),University of Magdeburg (DE), Municipality of Konnevesi (FI), City Council Viladecans (ES).
Other partners: Region Saxony Anhalt (DE), Oulu IT Center of Excellence (FI), INOVAMAIS (PT), ENTER
(Austria), INOVA Eszak-Alfold Regional Development and Innovation Agency (HU)
The IMAILE PCP will focus on new technologies and services for e-learning which address the challenge of
providing the next generation of Personal Learning Environments (PLE) for primary and secondary school.
This should address students within the topics of Science, Math and Technology, support different learning
styles in an individualized way and be accessible from any device including to bring your own device (BYOD).
Project Timing: February 2014 (42 months)
Value PCP: € 4,6M
Contact: Ellinor Wallin (ellinor@euprojektkonsult.se)
Project website: http://www.imaile.eu
Examples EU funded transnational PCPs
Telemedicine for ICU-patients at increased risk
Procurers: University Clinic Aachen (DE), University Hospital Maastricht (NL), Parc Tauli Sabadell University
Hospital (ES), Hospital East Limburg (BE), Northern Ostrobothnia Hospital District (FI)
Other Partners: Ministry for Research & Innovation North-Rhine Westphalia (DE), NLAgency (NL), AIAQS (ES)
Through the THALEA project, 5 hospitals from Germany, Netherlands, Spain, Belgium and Finland will
initiate a joint Pre-Commercial Procurement focusing on getting a highly interoperable telemedicine-
platform developed for detection of ICU-patients at increased risk.
Project Timing: February 2014 (42 months)
Value PCP: € 1,55M
Contact: Legewie Volker (vlegewie@ukaachen.de)
Project website: www.thalea-pcp.eu
For more info: http://lowcarbon-healthcare.eu/
National brand names for PPI:
Forward Commitment Procurement (FCP) in UK
Technology procurement in Nordics (e.g. Sweden NUTEK cases)
Low carbon healthcare PPI project started 2006
Introducing more energy efficient LEDs in
network of over 20 hospitals in 8 EU countries
• 30% energy consumption saving
• 88% maintenance savings
Total cost savings enable take-in +10% patients
Examples transnational PPI
Sustainability
Examples transnational PPI
Sustainability
Follow-up of LCB healthcare project
PPI procurement for more efficient and sustainable healthcare solutions
Procurers: Bologna university hospital Authority (IT)
Erasmus University Medical Centre (NL),
Nothingham univ hospital & Rotherham NHS trusts (UK)
Such Deskidzka hospital (PL)
Erasmus University Medical Center
Sustainable robotics based bed washing
procurement won European PPI award 2014
Cost reduction of 35%
CO2 footprint reduction of 65%
Project Timing: April 2012 (48 months)
Value project: € 2M
Contact: Gaynor Whyles (gaynor.whyles@jeraconsu
Project website: http://www.ecoquip.eu
Example transnational PPI
Health ageing
6 healthcare purchasing groups from FR, UK, IT, BE and LU launched on 30 September 2014 the first 'joint'
transnational PPI procurement in the healthcare domain in Europe: Resah-Idf (FR), NHS commercial
solutions (UK), SCR Piemonte (IT), Centrale de Marchés Mercure (BE), Entente des hôpitaux (LU).
The French lead procurer is procuring (establishing a framework agreement with several vendors under
French law) on behalf of the whole group of procurers to procure 5 different lots of equipment. All 6
purchasing groups can then setup specific contracts under their own national legislation to buy products
from any of the vendors selected under the framework agreement. (Similar as is possible in Horizon 2020)
Lot 1: Fall detection and alert system
Lot 2: Treadmill for rehabilitation and analysis of walking disorders
Lot 3: Walking course for preventing falls and maintaining independence
Lot 4: Bed thermoregulation system
Lot 5: Chair enabling users to maintain independence and reducing effort for aides
Project Timing: October 2012 (42 months)
Value project: € 4M
Contact: Dominique Legouge, Resah-Idf (d.legouge@resah-idf.com)
Project website: http://www.happi-project.eu
Example transnational PPI
Elderly Care
STOP AND GO contains 6 procurers: Regional Health Agency Campania (IT), Health agency province
Catanzaro (IT), Health agency Rome (IT), Eastern Cheshire Clinical Commissioning Group (UK), Health
procurement agency/Junta de Andalucia (ES), Gemeente Helmond (NL)
The €17,2M PPI aims to trigger the market to deliver ICT based telecare services that enable to care for
frail elderly that suffer from multiple conditions at the same time such as heart failure, diabetes, etc.
Project Timing: April 2014 (36 months)
Value PPI: € 17,2M
website: stopandgoproject.eu
Examples EU funded network of procurers
eHealth domain
PRO4VIP is a coordinating and networking project with partners: Agència de Qualitat i Avaluació Sanitàries
de Catalunya - AQuAS (ES), Barcelona Macula Foundation research for vision – BMF (ES), UCLPartners (UK),
Berufsförderungswerk - BWF (DE), Rittmeyer regional institute for the deaf - RITT (IT), University Salerno –
US (IT), Friuli Venezia Giulia region - FVG (IT), Trieste AREA (IT), European Blind Union – EBU (FR), ECRIN
European Research Infrastructure Network (FR), ZENIT (DE)
Low vision is globally increasing as a result of the ageing world population. The PRO4VIP network brings
together healthcare procurers that aim to develop a joint innovation procurement roadmap for novel cost-
effective ICT-based assistive technologies for visually impaired people and clinical tools that help physicians
with the early detection of such conditions.
Project Timing: February 2015 (22 months)
Contact: pmo.aquas@gencat.cat
Project website: www.pro4vip.eu
Examples EU funded network of procurers
eHealth domain
SAEPP is a coordinating and networking project with partners: NHS Commercial Solutions (UK), Ambulance
Today (UK), University Medical Center Groningen - UMCG (NL), Falck (DK), Region Zealand (DK), INEM (PT),
South Karelia Central Hospital (FI), BITECIC (UK), South East Coast Ambulance Service (UK), Yorkshire
Ambulance Service (UK), Royal College of Art (UK), University of Sheffield (UK), University of West England
(UK), Fibico (ES), TECNALIA (ES), Saimaa university of applied sciences (FI), Lappeenranta university of
technology (FI)
The SAEPP network of ambulance procurers and users is preparing the ground for a PCP to develop an ICT-
equipped ambulance of the future that enables a shift from a vehicles that services as a means of urgent
transport to an on-board mobile treatment space. The objective of the ambulance redesign is to enable pre-
hospital care in order to avoid unnecessary hospital admissions and the associated patient distress and
hospital costs.
Project Timing: January 2015 (8 months)
Contact: dexter.montgomery@nhs.net
Website: www.smartambulanceproject.eu
SAEPP
Examples EU funded network of procurers
eHealth domain
EPP eHealth is a coordinating and networking project with partners: Bravosolution (ES), Region Zealand
(DK), Servicio Andaluz de Salud – SAS (ES), Servicio Madrileno de Salud - SERMAS (ES), University Hospital
Krakow (PL), dane-ianalizy (PL), Optimat (UK)
The EPP eHealth consortium aims to transform the market for eHealth solutions through dialogue and
innovation procurement. The project will make progress towards this aim by creating a network of procuring
organisations that understand the opportunities that eHealth can offer. The project will create a critical
mass of procurers that will proactively develop forward looking procurement plans to create a coherent
demand for eHealth solutions.
Project Timing: January 2015 (24 months)
Contact: a.duran@bravosolution.es
Project website: www.innovationithospitals.com

More Related Content

What's hot

Sean Burke, The SME Instrument Horizon2020 - Athlone June 5th
Sean Burke, The SME Instrument Horizon2020 - Athlone June 5thSean Burke, The SME Instrument Horizon2020 - Athlone June 5th
Sean Burke, The SME Instrument Horizon2020 - Athlone June 5thei_Midlands
 
Why and how to participate in Horizon 2020? Manual for organisations.
Why and how to participate in Horizon 2020? Manual for organisations.Why and how to participate in Horizon 2020? Manual for organisations.
Why and how to participate in Horizon 2020? Manual for organisations.Open Concept
 
Steve Bradley - FP7 Beta Technology Presentation
Steve Bradley - FP7 Beta Technology PresentationSteve Bradley - FP7 Beta Technology Presentation
Steve Bradley - FP7 Beta Technology PresentationCK Group
 
EU Startup Services Capital Week AMS presentation 25-9
EU Startup Services Capital Week AMS presentation 25-9EU Startup Services Capital Week AMS presentation 25-9
EU Startup Services Capital Week AMS presentation 25-9c*funds
 
c*funds Capital Week AMS presentation 25-9
 c*funds Capital Week AMS presentation 25-9 c*funds Capital Week AMS presentation 25-9
c*funds Capital Week AMS presentation 25-9c*funds
 
Innovation for SME Businesses- Fasttrack for Innovation - Horizon 2020 Funding
Innovation for SME Businesses- Fasttrack for Innovation - Horizon 2020 FundingInnovation for SME Businesses- Fasttrack for Innovation - Horizon 2020 Funding
Innovation for SME Businesses- Fasttrack for Innovation - Horizon 2020 FundingThe Pathway Group
 
Presentazione Ciaotech Andrea Rausa
Presentazione Ciaotech Andrea RausaPresentazione Ciaotech Andrea Rausa
Presentazione Ciaotech Andrea Rausaifoasapereutile
 
Unlocking service innovation potential of products zana smilga
Unlocking service innovation potential of products zana smilgaUnlocking service innovation potential of products zana smilga
Unlocking service innovation potential of products zana smilgaZane Smilga
 
Innovation Summit 18 August 2009
Innovation Summit   18 August 2009Innovation Summit   18 August 2009
Innovation Summit 18 August 2009Saine
 
Draft innovation strategy innov8 presentation v1
Draft innovation strategy innov8 presentation v1Draft innovation strategy innov8 presentation v1
Draft innovation strategy innov8 presentation v1Saine
 
140515 klagenf future of innovation
140515 klagenf future of innovation140515 klagenf future of innovation
140515 klagenf future of innovationMichele Missikoff
 
UK - Workshop Amsterdam - 3 October 2014
UK - Workshop Amsterdam - 3 October 2014UK - Workshop Amsterdam - 3 October 2014
UK - Workshop Amsterdam - 3 October 2014ECIAonline
 
BEinCPPS Webinar
BEinCPPS WebinarBEinCPPS Webinar
BEinCPPS WebinarI4MS_eu
 
Sme instrument workshop @impulse.brussels - 281113, Mr Bernd REICHERT
Sme instrument workshop @impulse.brussels - 281113, Mr Bernd REICHERT Sme instrument workshop @impulse.brussels - 281113, Mr Bernd REICHERT
Sme instrument workshop @impulse.brussels - 281113, Mr Bernd REICHERT Raffael3
 
Open Innovation Challenge MWC 2022
Open Innovation Challenge MWC 2022Open Innovation Challenge MWC 2022
Open Innovation Challenge MWC 2022Núria Soler Zurita
 

What's hot (20)

Sean Burke, The SME Instrument Horizon2020 - Athlone June 5th
Sean Burke, The SME Instrument Horizon2020 - Athlone June 5thSean Burke, The SME Instrument Horizon2020 - Athlone June 5th
Sean Burke, The SME Instrument Horizon2020 - Athlone June 5th
 
Why and how to participate in Horizon 2020? Manual for organisations.
Why and how to participate in Horizon 2020? Manual for organisations.Why and how to participate in Horizon 2020? Manual for organisations.
Why and how to participate in Horizon 2020? Manual for organisations.
 
Steve Bradley - FP7 Beta Technology Presentation
Steve Bradley - FP7 Beta Technology PresentationSteve Bradley - FP7 Beta Technology Presentation
Steve Bradley - FP7 Beta Technology Presentation
 
EU Startup Services Capital Week AMS presentation 25-9
EU Startup Services Capital Week AMS presentation 25-9EU Startup Services Capital Week AMS presentation 25-9
EU Startup Services Capital Week AMS presentation 25-9
 
03 Innovation Procurement in the General / e-Government sector – PCP case exa...
03 Innovation Procurement in the General / e-Government sector – PCP case exa...03 Innovation Procurement in the General / e-Government sector – PCP case exa...
03 Innovation Procurement in the General / e-Government sector – PCP case exa...
 
Innovation matters and so does how you measure it
Innovation matters and so does how you measure itInnovation matters and so does how you measure it
Innovation matters and so does how you measure it
 
c*funds Capital Week AMS presentation 25-9
 c*funds Capital Week AMS presentation 25-9 c*funds Capital Week AMS presentation 25-9
c*funds Capital Week AMS presentation 25-9
 
Innovation for SME Businesses- Fasttrack for Innovation - Horizon 2020 Funding
Innovation for SME Businesses- Fasttrack for Innovation - Horizon 2020 FundingInnovation for SME Businesses- Fasttrack for Innovation - Horizon 2020 Funding
Innovation for SME Businesses- Fasttrack for Innovation - Horizon 2020 Funding
 
Digital Business Briefing September 2018
Digital Business Briefing September 2018Digital Business Briefing September 2018
Digital Business Briefing September 2018
 
Presentazione Ciaotech Andrea Rausa
Presentazione Ciaotech Andrea RausaPresentazione Ciaotech Andrea Rausa
Presentazione Ciaotech Andrea Rausa
 
Unlocking service innovation potential of products zana smilga
Unlocking service innovation potential of products zana smilgaUnlocking service innovation potential of products zana smilga
Unlocking service innovation potential of products zana smilga
 
The future of SME finance
The future of SME financeThe future of SME finance
The future of SME finance
 
Innovation Summit 18 August 2009
Innovation Summit   18 August 2009Innovation Summit   18 August 2009
Innovation Summit 18 August 2009
 
Draft innovation strategy innov8 presentation v1
Draft innovation strategy innov8 presentation v1Draft innovation strategy innov8 presentation v1
Draft innovation strategy innov8 presentation v1
 
Innovating Enterprise Innovation
Innovating Enterprise InnovationInnovating Enterprise Innovation
Innovating Enterprise Innovation
 
140515 klagenf future of innovation
140515 klagenf future of innovation140515 klagenf future of innovation
140515 klagenf future of innovation
 
UK - Workshop Amsterdam - 3 October 2014
UK - Workshop Amsterdam - 3 October 2014UK - Workshop Amsterdam - 3 October 2014
UK - Workshop Amsterdam - 3 October 2014
 
BEinCPPS Webinar
BEinCPPS WebinarBEinCPPS Webinar
BEinCPPS Webinar
 
Sme instrument workshop @impulse.brussels - 281113, Mr Bernd REICHERT
Sme instrument workshop @impulse.brussels - 281113, Mr Bernd REICHERT Sme instrument workshop @impulse.brussels - 281113, Mr Bernd REICHERT
Sme instrument workshop @impulse.brussels - 281113, Mr Bernd REICHERT
 
Open Innovation Challenge MWC 2022
Open Innovation Challenge MWC 2022Open Innovation Challenge MWC 2022
Open Innovation Challenge MWC 2022
 

Viewers also liked (8)

Organismes Públics que han engegat processos de Compra Pública Innovadora
Organismes Públics que han engegat processos de Compra Pública Innovadora Organismes Públics que han engegat processos de Compra Pública Innovadora
Organismes Públics que han engegat processos de Compra Pública Innovadora
 
Oferta Innovadora d’empreses catalanes
Oferta Innovadora d’empreses catalanesOferta Innovadora d’empreses catalanes
Oferta Innovadora d’empreses catalanes
 
Què és la Compra Pública Innovadora, com començar i oportunitats a Catalunya
Què és la Compra Pública Innovadora, com començar i oportunitats a CatalunyaQuè és la Compra Pública Innovadora, com començar i oportunitats a Catalunya
Què és la Compra Pública Innovadora, com començar i oportunitats a Catalunya
 
Grupo Pulso. Knowledge in Health
Grupo Pulso. Knowledge in HealthGrupo Pulso. Knowledge in Health
Grupo Pulso. Knowledge in Health
 
Noves oportunitats de negoci associades a la Compra Pública d'Innovació
Noves oportunitats de negoci associades a la Compra Pública d'InnovacióNoves oportunitats de negoci associades a la Compra Pública d'Innovació
Noves oportunitats de negoci associades a la Compra Pública d'Innovació
 
Blue Room. Smart Digital Technologies
Blue Room. Smart Digital TechnologiesBlue Room. Smart Digital Technologies
Blue Room. Smart Digital Technologies
 
Bcndigitalroadmap
BcndigitalroadmapBcndigitalroadmap
Bcndigitalroadmap
 
Pla Barcelona Ciutat Digital
Pla Barcelona Ciutat DigitalPla Barcelona Ciutat Digital
Pla Barcelona Ciutat Digital
 

Similar to Oportunitats a Europa

MARIE - lieve bos_eos_udine_17.05.2013
MARIE - lieve bos_eos_udine_17.05.2013MARIE - lieve bos_eos_udine_17.05.2013
MARIE - lieve bos_eos_udine_17.05.2013AREA Science Park
 
Helix Nebula Science Cloud Pilot Phase, 6 February 2018, Bologna, Italy
Helix Nebula Science Cloud Pilot Phase, 6 February 2018, Bologna, ItalyHelix Nebula Science Cloud Pilot Phase, 6 February 2018, Bologna, Italy
Helix Nebula Science Cloud Pilot Phase, 6 February 2018, Bologna, ItalyHelix Nebula The Science Cloud
 
Eckhard Behrendt - id2market consulting
Eckhard Behrendt - id2market consultingEckhard Behrendt - id2market consulting
Eckhard Behrendt - id2market consultingVitor Pereira
 
The SME Innovation Instrument, Horizon2020 and Talent Europe. A discussion by...
The SME Innovation Instrument, Horizon2020 and Talent Europe. A discussion by...The SME Innovation Instrument, Horizon2020 and Talent Europe. A discussion by...
The SME Innovation Instrument, Horizon2020 and Talent Europe. A discussion by...Alberto Minin
 
Max Lemke, Head of Unit, Components and Systems, European Commission
Max Lemke, Head of Unit, Components and Systems, European CommissionMax Lemke, Head of Unit, Components and Systems, European Commission
Max Lemke, Head of Unit, Components and Systems, European CommissionI4MS_eu
 
#ISVwebinars n°1: SME Instrument - Antonio Carbone
#ISVwebinars n°1: SME Instrument - Antonio Carbone#ISVwebinars n°1: SME Instrument - Antonio Carbone
#ISVwebinars n°1: SME Instrument - Antonio Carboneitaliastartupvisa
 
Navigation - introduction to galileo call
Navigation - introduction to galileo callNavigation - introduction to galileo call
Navigation - introduction to galileo callSpace-Applications
 
20151029_Infoday H2020 Energía_Mª Luisa Revilla
20151029_Infoday H2020 Energía_Mª Luisa Revilla20151029_Infoday H2020 Energía_Mª Luisa Revilla
20151029_Infoday H2020 Energía_Mª Luisa RevillaRedit
 
Pcp final-ramboll-report-js2 en
Pcp final-ramboll-report-js2 enPcp final-ramboll-report-js2 en
Pcp final-ramboll-report-js2 enDr Lendy Spires
 
FP7 Specific Programme Capacities (March 2007)
FP7 Specific  Programme  Capacities (March 2007)FP7 Specific  Programme  Capacities (March 2007)
FP7 Specific Programme Capacities (March 2007)CPN_Africa
 
AFC Café STST - Bart De Moor (KU Leuven)
AFC Café STST - Bart De Moor (KU Leuven)AFC Café STST - Bart De Moor (KU Leuven)
AFC Café STST - Bart De Moor (KU Leuven)AFC Leuven
 
20141030_Taller ENV, EMB, TRA y LOG_Susana Álvarez
20141030_Taller ENV, EMB, TRA y LOG_Susana Álvarez20141030_Taller ENV, EMB, TRA y LOG_Susana Álvarez
20141030_Taller ENV, EMB, TRA y LOG_Susana ÁlvarezRedit
 
Interreg Sudoe TWIST - Launching interest group EIUIG
Interreg Sudoe TWIST - Launching interest group EIUIGInterreg Sudoe TWIST - Launching interest group EIUIG
Interreg Sudoe TWIST - Launching interest group EIUIGCENTA3
 
Research ppps-interima-assessment en
Research ppps-interima-assessment enResearch ppps-interima-assessment en
Research ppps-interima-assessment enanazatezaloschenk
 
Research ppps-interima-assessment en
Research ppps-interima-assessment enResearch ppps-interima-assessment en
Research ppps-interima-assessment enanazatezaloschenk
 
20061025 Current Research & Future Directions in Software Technologies
20061025 Current Research & Future Directions in Software Technologies20061025 Current Research & Future Directions in Software Technologies
20061025 Current Research & Future Directions in Software TechnologiesArian Zwegers
 
Horizon 2020 - Strumento PMI - Seminario Aster 21/10/2014
Horizon 2020 - Strumento PMI - Seminario Aster 21/10/2014Horizon 2020 - Strumento PMI - Seminario Aster 21/10/2014
Horizon 2020 - Strumento PMI - Seminario Aster 21/10/2014Parma Couture
 
EPA H2020 SC5 Info Day: Research and Innovation Needs and potential Impacts:...
 EPA H2020 SC5 Info Day: Research and Innovation Needs and potential Impacts:... EPA H2020 SC5 Info Day: Research and Innovation Needs and potential Impacts:...
EPA H2020 SC5 Info Day: Research and Innovation Needs and potential Impacts:...Environmental Protection Agency, Ireland
 
Peppol Introduction 20080419
Peppol Introduction 20080419Peppol Introduction 20080419
Peppol Introduction 20080419guest2bba20
 

Similar to Oportunitats a Europa (20)

MARIE - lieve bos_eos_udine_17.05.2013
MARIE - lieve bos_eos_udine_17.05.2013MARIE - lieve bos_eos_udine_17.05.2013
MARIE - lieve bos_eos_udine_17.05.2013
 
Helix Nebula Science Cloud Pilot Phase, 6 February 2018, Bologna, Italy
Helix Nebula Science Cloud Pilot Phase, 6 February 2018, Bologna, ItalyHelix Nebula Science Cloud Pilot Phase, 6 February 2018, Bologna, Italy
Helix Nebula Science Cloud Pilot Phase, 6 February 2018, Bologna, Italy
 
Eckhard Behrendt - id2market consulting
Eckhard Behrendt - id2market consultingEckhard Behrendt - id2market consulting
Eckhard Behrendt - id2market consulting
 
The SME Innovation Instrument, Horizon2020 and Talent Europe. A discussion by...
The SME Innovation Instrument, Horizon2020 and Talent Europe. A discussion by...The SME Innovation Instrument, Horizon2020 and Talent Europe. A discussion by...
The SME Innovation Instrument, Horizon2020 and Talent Europe. A discussion by...
 
Max Lemke, Head of Unit, Components and Systems, European Commission
Max Lemke, Head of Unit, Components and Systems, European CommissionMax Lemke, Head of Unit, Components and Systems, European Commission
Max Lemke, Head of Unit, Components and Systems, European Commission
 
#ISVwebinars n°1: SME Instrument - Antonio Carbone
#ISVwebinars n°1: SME Instrument - Antonio Carbone#ISVwebinars n°1: SME Instrument - Antonio Carbone
#ISVwebinars n°1: SME Instrument - Antonio Carbone
 
Navigation - introduction to galileo call
Navigation - introduction to galileo callNavigation - introduction to galileo call
Navigation - introduction to galileo call
 
20151029_Infoday H2020 Energía_Mª Luisa Revilla
20151029_Infoday H2020 Energía_Mª Luisa Revilla20151029_Infoday H2020 Energía_Mª Luisa Revilla
20151029_Infoday H2020 Energía_Mª Luisa Revilla
 
Pcp final-ramboll-report-js2 en
Pcp final-ramboll-report-js2 enPcp final-ramboll-report-js2 en
Pcp final-ramboll-report-js2 en
 
FP7 Specific Programme Capacities (March 2007)
FP7 Specific  Programme  Capacities (March 2007)FP7 Specific  Programme  Capacities (March 2007)
FP7 Specific Programme Capacities (March 2007)
 
AFC Café STST - Bart De Moor (KU Leuven)
AFC Café STST - Bart De Moor (KU Leuven)AFC Café STST - Bart De Moor (KU Leuven)
AFC Café STST - Bart De Moor (KU Leuven)
 
20141030_Taller ENV, EMB, TRA y LOG_Susana Álvarez
20141030_Taller ENV, EMB, TRA y LOG_Susana Álvarez20141030_Taller ENV, EMB, TRA y LOG_Susana Álvarez
20141030_Taller ENV, EMB, TRA y LOG_Susana Álvarez
 
Interreg Sudoe TWIST - Launching interest group EIUIG
Interreg Sudoe TWIST - Launching interest group EIUIGInterreg Sudoe TWIST - Launching interest group EIUIG
Interreg Sudoe TWIST - Launching interest group EIUIG
 
Research ppps-interima-assessment en
Research ppps-interima-assessment enResearch ppps-interima-assessment en
Research ppps-interima-assessment en
 
Research ppps-interima-assessment en
Research ppps-interima-assessment enResearch ppps-interima-assessment en
Research ppps-interima-assessment en
 
20061025 Current Research & Future Directions in Software Technologies
20061025 Current Research & Future Directions in Software Technologies20061025 Current Research & Future Directions in Software Technologies
20061025 Current Research & Future Directions in Software Technologies
 
ec_rtd_cl4-destination-4.pdf
ec_rtd_cl4-destination-4.pdfec_rtd_cl4-destination-4.pdf
ec_rtd_cl4-destination-4.pdf
 
Horizon 2020 - Strumento PMI - Seminario Aster 21/10/2014
Horizon 2020 - Strumento PMI - Seminario Aster 21/10/2014Horizon 2020 - Strumento PMI - Seminario Aster 21/10/2014
Horizon 2020 - Strumento PMI - Seminario Aster 21/10/2014
 
EPA H2020 SC5 Info Day: Research and Innovation Needs and potential Impacts:...
 EPA H2020 SC5 Info Day: Research and Innovation Needs and potential Impacts:... EPA H2020 SC5 Info Day: Research and Innovation Needs and potential Impacts:...
EPA H2020 SC5 Info Day: Research and Innovation Needs and potential Impacts:...
 
Peppol Introduction 20080419
Peppol Introduction 20080419Peppol Introduction 20080419
Peppol Introduction 20080419
 

More from Agència per a la Competitivitat de l'empresa - ACCIÓ

More from Agència per a la Competitivitat de l'empresa - ACCIÓ (20)

Guia de compra pública d'innovació
Guia de compra pública d'innovacióGuia de compra pública d'innovació
Guia de compra pública d'innovació
 
[Versió reduïda] Metodologia de Diagnòstic Avançat 4.0
[Versió reduïda] Metodologia de Diagnòstic Avançat 4.0[Versió reduïda] Metodologia de Diagnòstic Avançat 4.0
[Versió reduïda] Metodologia de Diagnòstic Avançat 4.0
 
El sector de l'automoció a Catalunya
El sector de l'automoció a CatalunyaEl sector de l'automoció a Catalunya
El sector de l'automoció a Catalunya
 
El Marroc exigeix una nova certificació per exportar
El Marroc exigeix una nova certificació per exportarEl Marroc exigeix una nova certificació per exportar
El Marroc exigeix una nova certificació per exportar
 
Fi als aranzels entre la UE i els EUA pel cas Boeing - Airbus
Fi als aranzels entre la UE i els EUA pel cas Boeing - AirbusFi als aranzels entre la UE i els EUA pel cas Boeing - Airbus
Fi als aranzels entre la UE i els EUA pel cas Boeing - Airbus
 
Increment de la morositat internacional
Increment de la morositat internacional Increment de la morositat internacional
Increment de la morositat internacional
 
Certificació de conformitat a la República Centreafricana
Certificació de conformitat a la República CentreafricanaCertificació de conformitat a la República Centreafricana
Certificació de conformitat a la República Centreafricana
 
L'economia circular a Catalunya
L'economia circular a CatalunyaL'economia circular a Catalunya
L'economia circular a Catalunya
 
Bloqueig a l’acord integral d’inversions (CAI) entre la UE i la Xina
Bloqueig a l’acord integral d’inversions (CAI) entre la UE i la XinaBloqueig a l’acord integral d’inversions (CAI) entre la UE i la Xina
Bloqueig a l’acord integral d’inversions (CAI) entre la UE i la Xina
 
El TIR electrònic entra en vigor a tot el món
El TIR electrònic entra en vigor a tot el mónEl TIR electrònic entra en vigor a tot el món
El TIR electrònic entra en vigor a tot el món
 
Variacions dels preus del transport terrestre
Variacions dels preus del transport terrestreVariacions dels preus del transport terrestre
Variacions dels preus del transport terrestre
 
Variacions dels preus del transport marítim
Variacions dels preus del transport marítimVariacions dels preus del transport marítim
Variacions dels preus del transport marítim
 
Variacions dels preus del transport ferroviari
Variacions dels preus del transport ferroviariVariacions dels preus del transport ferroviari
Variacions dels preus del transport ferroviari
 
Variacions en els preus del transport aeri
Variacions en els preus del transport aeriVariacions en els preus del transport aeri
Variacions en els preus del transport aeri
 
Previsions de morositat internacional pel 2022 - Recomanacions
Previsions de morositat internacional pel 2022 - RecomanacionsPrevisions de morositat internacional pel 2022 - Recomanacions
Previsions de morositat internacional pel 2022 - Recomanacions
 
Mèxic imposa noves normes d’etiquetatge a les importacions
Mèxic imposa noves normes d’etiquetatge a les importacionsMèxic imposa noves normes d’etiquetatge a les importacions
Mèxic imposa noves normes d’etiquetatge a les importacions
 
Catàleg de startups amb més projecció de Catalunya
Catàleg de startups amb més projecció de CatalunyaCatàleg de startups amb més projecció de Catalunya
Catàleg de startups amb més projecció de Catalunya
 
L'economia circular a Catalunya
L'economia circular a Catalunya L'economia circular a Catalunya
L'economia circular a Catalunya
 
La logística a Catalunya
La logística a CatalunyaLa logística a Catalunya
La logística a Catalunya
 
Catàleg de startups amb més projecció de Catalunya
Catàleg de startups amb més projecció de CatalunyaCatàleg de startups amb més projecció de Catalunya
Catàleg de startups amb més projecció de Catalunya
 

Recently uploaded

The AES Investment Code - the go-to counsel for the most well-informed, wise...
The AES Investment Code -  the go-to counsel for the most well-informed, wise...The AES Investment Code -  the go-to counsel for the most well-informed, wise...
The AES Investment Code - the go-to counsel for the most well-informed, wise...AES International
 
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证rjrjkk
 
GOODSANDSERVICETAX IN INDIAN ECONOMY IMPACT
GOODSANDSERVICETAX IN INDIAN ECONOMY IMPACTGOODSANDSERVICETAX IN INDIAN ECONOMY IMPACT
GOODSANDSERVICETAX IN INDIAN ECONOMY IMPACTharshitverma1762
 
Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...
Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...
Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...amilabibi1
 
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办fqiuho152
 
NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...
NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...
NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...Amil baba
 
Stock Market Brief Deck for "this does not happen often".pdf
Stock Market Brief Deck for "this does not happen often".pdfStock Market Brief Deck for "this does not happen often".pdf
Stock Market Brief Deck for "this does not happen often".pdfMichael Silva
 
Governor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraintGovernor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraintSuomen Pankki
 
Market Morning Updates for 16th April 2024
Market Morning Updates for 16th April 2024Market Morning Updates for 16th April 2024
Market Morning Updates for 16th April 2024Devarsh Vakil
 
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...Henry Tapper
 
The Inspirational Story of Julio Herrera Velutini - Global Finance Leader
The Inspirational Story of Julio Herrera Velutini - Global Finance LeaderThe Inspirational Story of Julio Herrera Velutini - Global Finance Leader
The Inspirational Story of Julio Herrera Velutini - Global Finance LeaderArianna Varetto
 
PMFBY , Pradhan Mantri Fasal bima yojna
PMFBY , Pradhan Mantri  Fasal bima yojnaPMFBY , Pradhan Mantri  Fasal bima yojna
PMFBY , Pradhan Mantri Fasal bima yojnaDharmendra Kumar
 
Economics, Commerce and Trade Management: An International Journal (ECTIJ)
Economics, Commerce and Trade Management: An International Journal (ECTIJ)Economics, Commerce and Trade Management: An International Journal (ECTIJ)
Economics, Commerce and Trade Management: An International Journal (ECTIJ)ECTIJ
 
NO1 Certified Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot,...
NO1 Certified Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot,...NO1 Certified Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot,...
NO1 Certified Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot,...Amil baba
 
Financial analysis on Risk and Return.ppt
Financial analysis on Risk and Return.pptFinancial analysis on Risk and Return.ppt
Financial analysis on Risk and Return.ppttadegebreyesus
 
Managing Finances in a Small Business (yes).pdf
Managing Finances  in a Small Business (yes).pdfManaging Finances  in a Small Business (yes).pdf
Managing Finances in a Small Business (yes).pdfmar yame
 
AnyConv.com__FSS Advance Retail & Distribution - 15.06.17.ppt
AnyConv.com__FSS Advance Retail & Distribution - 15.06.17.pptAnyConv.com__FSS Advance Retail & Distribution - 15.06.17.ppt
AnyConv.com__FSS Advance Retail & Distribution - 15.06.17.pptPriyankaSharma89719
 
Stock Market Brief Deck FOR 4/17 video.pdf
Stock Market Brief Deck FOR 4/17 video.pdfStock Market Brief Deck FOR 4/17 video.pdf
Stock Market Brief Deck FOR 4/17 video.pdfMichael Silva
 
SBP-Market-Operations and market managment
SBP-Market-Operations and market managmentSBP-Market-Operations and market managment
SBP-Market-Operations and market managmentfactical
 

Recently uploaded (20)

The AES Investment Code - the go-to counsel for the most well-informed, wise...
The AES Investment Code -  the go-to counsel for the most well-informed, wise...The AES Investment Code -  the go-to counsel for the most well-informed, wise...
The AES Investment Code - the go-to counsel for the most well-informed, wise...
 
Q1 2024 Newsletter | Financial Synergies Wealth Advisors
Q1 2024 Newsletter | Financial Synergies Wealth AdvisorsQ1 2024 Newsletter | Financial Synergies Wealth Advisors
Q1 2024 Newsletter | Financial Synergies Wealth Advisors
 
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
 
GOODSANDSERVICETAX IN INDIAN ECONOMY IMPACT
GOODSANDSERVICETAX IN INDIAN ECONOMY IMPACTGOODSANDSERVICETAX IN INDIAN ECONOMY IMPACT
GOODSANDSERVICETAX IN INDIAN ECONOMY IMPACT
 
Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...
Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...
Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...
 
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
 
NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...
NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...
NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...
 
Stock Market Brief Deck for "this does not happen often".pdf
Stock Market Brief Deck for "this does not happen often".pdfStock Market Brief Deck for "this does not happen often".pdf
Stock Market Brief Deck for "this does not happen often".pdf
 
Governor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraintGovernor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraint
 
Market Morning Updates for 16th April 2024
Market Morning Updates for 16th April 2024Market Morning Updates for 16th April 2024
Market Morning Updates for 16th April 2024
 
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
 
The Inspirational Story of Julio Herrera Velutini - Global Finance Leader
The Inspirational Story of Julio Herrera Velutini - Global Finance LeaderThe Inspirational Story of Julio Herrera Velutini - Global Finance Leader
The Inspirational Story of Julio Herrera Velutini - Global Finance Leader
 
PMFBY , Pradhan Mantri Fasal bima yojna
PMFBY , Pradhan Mantri  Fasal bima yojnaPMFBY , Pradhan Mantri  Fasal bima yojna
PMFBY , Pradhan Mantri Fasal bima yojna
 
Economics, Commerce and Trade Management: An International Journal (ECTIJ)
Economics, Commerce and Trade Management: An International Journal (ECTIJ)Economics, Commerce and Trade Management: An International Journal (ECTIJ)
Economics, Commerce and Trade Management: An International Journal (ECTIJ)
 
NO1 Certified Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot,...
NO1 Certified Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot,...NO1 Certified Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot,...
NO1 Certified Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot,...
 
Financial analysis on Risk and Return.ppt
Financial analysis on Risk and Return.pptFinancial analysis on Risk and Return.ppt
Financial analysis on Risk and Return.ppt
 
Managing Finances in a Small Business (yes).pdf
Managing Finances  in a Small Business (yes).pdfManaging Finances  in a Small Business (yes).pdf
Managing Finances in a Small Business (yes).pdf
 
AnyConv.com__FSS Advance Retail & Distribution - 15.06.17.ppt
AnyConv.com__FSS Advance Retail & Distribution - 15.06.17.pptAnyConv.com__FSS Advance Retail & Distribution - 15.06.17.ppt
AnyConv.com__FSS Advance Retail & Distribution - 15.06.17.ppt
 
Stock Market Brief Deck FOR 4/17 video.pdf
Stock Market Brief Deck FOR 4/17 video.pdfStock Market Brief Deck FOR 4/17 video.pdf
Stock Market Brief Deck FOR 4/17 video.pdf
 
SBP-Market-Operations and market managment
SBP-Market-Operations and market managmentSBP-Market-Operations and market managment
SBP-Market-Operations and market managment
 

Oportunitats a Europa

  • 1. Opportunities in H2020 (video conference) Lieve Bos, Policy Officer, DG CONNECT, European Commission
  • 2. HORIZON 2020 SUPPORT TO INNOVATION PROCUREMENT
  • 3. Public sector is faced with important challenges. To tackle these challenges often public sector transformations are needed. - In many cases, solutions are close to the market and would be provided if clear requirements/sufficient demand expressed by market. Incremental innovation (product adaptation, scaling up of production…) or non-R&D innovation (e.g. service innovation) can deliver required quality/price, so no need for R&D procurement. Public sector provides seal of approval for innovative solution by acting as launching customer/early adopter (PPI) - In other cases, addressing the problem requires radical innovation, there is no available solution 'on' or 'close to' the market yet. There are different competing potential solution approaches but R&D still needed to de-risk and compare different technological alternatives before committing to large scale deployment. Procurer wants to induce step change in market (e.g. moving from proprietary/vendor lock-in to better open systems with multiple vendors incl. new players) (PCP) Pre-commercial procurement (PCP) versus public procurement of innovative solutions (PPI)
  • 4. • - PCP to steer the development of new solutions towards concrete public sector needs, whilst comparing/validating alternative solution approaches from various vendors and enabling new players to prove themselves against established ones - PPI to act as launching customer / early adopter / first buyer of innovative commercial end-solutions newly arriving on the market Innovation Procurement = PCP + PPI / Complementarity
  • 5. Growing impact at Member State level 2013 2014-152011 UK NHS and MOD PCPs and PPIs, NL launching customer (PPI) 201220092008 AT, NO, DK, IS, IT include innov. proc. in R&D&I strategy ES (3%), NL and UK (2,5%) set expenditure target for innov. proc. NO, FI, SE, DK, IS min. agreement on cross border innov. proc. collaboration (including 2,5% target) 2010 FI, SE, ES, Flander (BE) include innov. Proc. in R&D&I strategy PCP and PPI in ESIF: PL, FR,… EE, LV develop innov. proc. strategy DE, PL put innov. proc. in R&D&I strategy IT (€ 150M), ES (€ 250M) to PCP/PPI struct funds Baltics (LT, LV, EE) join Norden agreement FR sets 2% target for innov proc. FI, SE, ES, Flanders (BE) launch support program & competence center for procurers
  • 6. Progress PCP implementation Learn from first movers PCPs projects on-going or finished Framework identified and/or pilots in preparation Hungary Belgium Netherlands Awareness Raising Exploring possibilities Denmark Austria Finland Sweden Poland Working on framework Germany France Luxembourg Ireland Cyprus Romania Slovenia Slovakia Bulgaria Czech Republic Estonia Greece Latvia LithuaniaMalta Portugal Spain Norway Switzerland Italy UK Iceland Pilots started Framework identified and/or pilots in preparation Hungary Belgium Netherlands Awareness Raising Exploring possibilities Finland Sweden Poland Working on framework Germany France Luxembourg Ireland Cyprus Romania Slovenia Slovakia Bulgaria Czech Republic Estonia Greece Latvia LithuaniaMalta Portugal Spain Norway Switzerland Italy UK Iceland 2007 2015 Austria Denmark
  • 7. Political encouragement - Modernising public sector 'a priority' Quality-efficiency improvement targets e.g. Lombardia/IT, UK, Flanders/BE - Target % proc budgets to innovation Monitoring framework e.g. UK, NL, ES, Nordics, FR Implementation - Innov Proc Competence center Training / assisting procurers (e.g. SE, FI, ES, Flanders/BE, DE) - Innov Proc financial support program (e.g. SE, FI, ES, Flanders/BE, DE) Leverage EU funding - Horizon 2020 Increased - ESIF support for - EIB loans innov proc Encourage demand side to meet supply side - Early notification innov proc needs - Open market consultations Meet the buyers events What can countries/regions do?
  • 8. - Speed up public sector modernisation – improve quality and efficiency of public services with breakthrough solutions - Get better value for money through cooperation - enable public sector around Europe to share cost + experience to buy new solutions that can respond to concrete public needs - Address issues of common interest together – e.g. where interoperability and coherence of solutions across borders, pooling of resources or market defragmentation is required - Create growth and jobs in Europe – help innovators bring European R&D to the market (the majority of R&D in H2020 funded PCPs should take place in Europe, ltd set of first test products can be bought in the PPI from companies in the PCP) Why European cooperation on PCP-PPI?
  • 9. Overview EU funded projects doing PCPs (FP7) More info on: http://ec.europa.eu/digital-agenda/en/eu-funded-projects SILVER (PCP) Robotics ageing well DECIPHER (PCP) Services mobile health data CHARM (PCP) Traffic Management V-CON (PCP) Virtual road infrastructure modelling PRACE 3IP (PCP) Smart Textiles ICT for fire fighters SMART@FIRE (PCP)High Performance Computing THALEA (PCP) Cloud for Europe (PCP) Cloud computing PREFORMA (PCP) Long term digital preservation IMAILE (PCP) Personalised learning needs UNWIRED-HEALTH (PCP) NYMPHA-MD (PCP) Mobile care for vaccination & heart failure Mental care for bipolar disordersTele-detection/care of ICU patients HEALTH AGEING TRANSPORT SUSTAINABILITY E-GOV EDUCATION SAFETY Human Brain project PCP on supercomputing/brain modelling
  • 10. Overview EU funded projects doing PPIs (CIP) More info on: http://ec.europa.eu/digital-agenda/en/eu-funded-projects ECOQUIP & LCB-HEALTHCARE (PPI) Low carbon healthcare SPEA (PPI) HAPPI (PPI) PRO-LITE (PPI) Cities/Metro Lighting Healthy Ageing STOP AND GO (PPI) Telecare for elderly with multiple conditions HEALTH AGEING SUSTAINABILITY INNOBUILD (PPI) INNOBOOSTER (PPI) Office Furniture & Lighting Sustainable buildings INNOCAT (PPI) Sustainable catering Sustainable buildings TRANSPORT SYNCRO (PPI) Smart roads communicationVehicles Fire Fighters FIRED-UP (PPI) PAPIRUS (PPI) Sustainable construction PROBIS (PPI) Sustainable construction
  • 11. EU funded CSAs/Networks of procurers (FP7/CIP/H2020) More info on: http://ec.europa.eu/digital-agenda/en/eu-funded-projects HEALTH AGEING TRANSPORT ICT INSPIRE (Training PCP, link with VC) E-health procurers C4BI (networking) Cities on healthcare P4ITS (Preparing PPI) Intelligent Transport Systems TRANSFORM (Networking) City/Regional transport GREENS (prep PPI) Energy agencies – CO2 SAEPP (preparing PCP) Ambulance ICT PRO4VIP (preparing PCP) ICT for Visually impaired EPP-eHealth (preparing PCP/PPI) Cities on e-health Cloud computing research cloud PICSE (Preparing PCP/PPI) Photonics broadband COMPLETE (Preparing PPI) SUSTAINABILITY WATER PIPP Water procurers EURECA (prep PPI) Green data centers CEPPI 2 (prep PPI) Cities – energy consumption SPP regions (capacity building) PPI – sustainability InnProBio Forum (capacity building) PPI – bio based products BRODISE Cities brown field decontamination PPI4WASTE Authorities Waste management
  • 12. • Shortening of time-to-market: UK National Health service PCP examples achieve reduction from several years to 18 months • Attracting venture capital: Companies in UK NHS PCPs attract significant VC investment, enabling them to grow faster • Creating lead markets: Companies in UK ministry of defence PCPs are selling now also to US department of defence • Retaining lead market position: possible via sustained PCP/PPI procurements (e.g. 60 ys of supercomputing PCPs -> IBM, Cray, HP) • 20% cheaper products and higher product quality: evidence from US defense multi competitor, multi phase PCP-PPI procurements • Removal of supplier lock-in -> 20% cost reduction: outcome of benchmarking of CHARM PCP on new traffic management centres thanks to move towards open architecture via PCP • Benefits on local economy: Estonia PPI buying Mitsubishi electric vehicles increased local Estonian economic activity in related sectors Evidence on impact from successful examples More info - PCP impact study- on: https://ec.europa.eu/digital- agenda/en/news/quantifying-impact-pcp-europe-study-smart2014-0009
  • 13. Data collected from first 7 ongoing FP7 funded PCPs • 7 FP7 funded PCPs in ICT so far awarded contracts - 45 tenderers/consortia of tenderers have been awarded contracts in total • Opening route-to-market for new players/SMEs - 75,5% of contracts won by SMEs (SME lead bidder, bidding alone or with partners) - Compared to 29% in public procurements across Europe Mostly small young SMEs: 34,5% below 10 people, 81% below 50 people, 56% less than 10 years old • Stimulating cross-border company growth - 33% of contracts won by bidders that are not from a country of any of the procurers in the buyers group (e.g. DE company working for UK+NL procurers) - Compared to 1,26% in public procurements across Europe • Relevance of PCPs also to universities - 33% of winning contracts have university/R&D center partner in consortium - Winning SMEs are also often university start-ups • Encouraging wider market commercialisation – Bidders offered on average 50% cheaper R&D price for keeping their IPRs (they see IPR value/real market beyond the first potential buyers, the PCP procurers) • Creating growth and jobs in Europe – All bidders do 100% of R&D in Europe (except 1 doing 85% of R&D in Europe)
  • 14. Geographic location winning bidders (2) (15) (7) (14) (9) (2) (2)(3) (7) (2) (4) (4) (2) (1) (1) Companies in winning bids (nr/country) Procurers Still companies out there that don't know about these procurement opportunities. Remaining 7 out of 14 FP7 PCPs will launch their call for tenders this year. Who can help promote upcoming PCP/PPI call for tenders in their countries? Overview on-going projects: http://ec.europa.eu/digital-agenda/en/eu-funded-projects Universities in winning bids (nr/country) (1) (3) (2) (1) (2) (1) (1)
  • 15. H2020 support to Innovation Procurement in 2016-2017 PCP/PPI Actions + Coordination and Support Actions (CSAs)
  • 16.  Coordination and Support Actions (100% funding rate):  Support only coordination activities e.g. preparation of a PCP or PPI by a group of procurers (identifying common challenges, open market consultation with industry before initiating a concrete PCP or PPI etc)  CSAs do not provide EU co-financing for an actual PCP or PPI procurement  PCP Actions (90% funding rate):  Provide EU co-financing for an actual PCP procurement (one joint PCP procurement per action) + for related coordination and networking activities (e.g. to prepare, manage and follow-up the PCP call for tender)  PPI Actions (35% funding rate):  Provide EU co-financing for an actual PPI procurement (one joint PPI procurement per action) + for related coordination and networking activities (e.g. to prepare, manage and follow-up the PPI call for tender) Forms of support ! New !
  • 17. In addition, other entities can also participate - In buyers group: also private/NGO procurers providing services of public interest - In coordination/networking activities: any private/public type of entity (e.g. experts, end-users, certification bodies that assist procurers) that has no conflict of interest (no potential suppliers of solutions for the PCP/PPI) Public procurers are contracting authorities or contracting entities as defined by the EU public procurement directives MS = Member States AC = Countries Associated to Horizon 2020 Minimum 3 independent participants from 3 different MS or AC, of which minimum 2 public procurers (buyers group) from 2 different MS or AC PCP and PPI actions – participation requirement
  • 18.  Buyers group  Beneficiaries that provide the financial commitments for the PCP or PPI.  Min 2 public procurers from 2 different Member States or associated countries  Shall represent the demand side for the innovations, a critical mass of procurers that can trigger wide implementation of the innovations, shall aim for ambitious quality/efficiency improvements in area of public interest.  Lead procurer  Public procurer in project appointed by the buyers group to lead and coordinate the PCP or PPI. Can be part of buyers group or not.  Subcontractors  Successful tenderers, selected by the buyers group & lead procurer as result of the PCP or PPI call for tender, to provide the R&D services (PCP) or innovative solutions (PPI).  They do 'NOT' enter the grant agreement with the EC. PCP and PPI actions - Role different actors
  • 19. PCP/PPI actions co-finance (1) + (2) Preparation Execution Stage Stage Every project goes through a preparation stage and an execution stage Following up progress suppliers Validating, testing solutions Dissemination activities Standardisation, certification, etc (2) Coordination & Networking Activities (1) PCP/PPI procurement PCP and PPI actions – What is covered OpenMarket Consultation, preparation tenderspec,etc Evaluationresults Preparingfollow-upPPI Disseminationetc
  • 20. In the proposal, the consortium shall already identify • A concrete 'common challenge' on which the PCP/PPI will focus (e.g. new solution needed to improve energy efficiency of data centres) • KPIs (targeted quality/efficiency improvements) for the PCP/PPI (e.g. target is energy efficiency improvement of min 30%) • Illustrating how this challenge fits in the innovation strategy / plans of the participating procurers that require innovative solutions (e.g. city procurer a/b/x aims to upgrade x/y/z data centres by 2018) • Requested budget per participant and plan for preparing and executing the procurement + for the coordination and networking activities Example proposal: contact IMAILE PCP project (www.imaile.eu) Note this is an FP7 not H2020 proposal (differences in funding rates & proposal template) Material Info day: Practical info how to find partners, how to prepare a proposal etc (ppts + video) Attractive success rates for proposers PCP and PPI actions – Proposal preparation
  • 21.  Preparation stage  Preparation of one joint PCP or PPI procurement per action  Open market consultation /verification of market readiness to meet procurement need  Outcome  Agreed common tender specifications + Joint procurement agreement  Confirmation of availability of financial commitments to start PCP/PPI  Execution stage  Joint procurement of the R&D services (PCP) or innovative solutions (PPI)  Follow-up of suppliers and validation of results  PCP: Validation/comparison of the performance of the competing PCP solutions against jointly defined criteria in real-life operational conditions  PPI: Evaluation of results of deploying and operating the procured solutions in real-life operating conditions  Dissemination/exploitation of results Other coordination/networking activities relevant to the action (e.g. preparation of follow-up PPI, contribution to standardisation / regulation / certification) PCP and PPI actions - Eligible activities
  • 22.  Reimbursement rate direct costs: Max 90% respectively 35% of eligible costs for PCP respectively PPI actions  Eligible direct costs to carry out eligible activities defined in WP include: - Price of the R&D services (PCP) or innovative solutions (PPI) procured (if procurement conducted in compliance with requirements in Annex E WP) - Eligible coordination and networking activities - May include in-kind contributions (e.g. third parties putting resources at disposal of beneficiaries e.g. for testing of solutions) - VAT is an eligible cost unless for beneficiaries that can deduct it  Requested reimbursement for coordination and networking activities can comprise max 30% (for PCP) / max 50% (for PPI) of total requested grant  Plus 25% for indirect costs. But, no indirect costs on the price of the PCP/PPI procurement or on 3rd party resources not used at the beneficiary premises  Pre-financing: Yes, 1st pre-financing at start project for costs for preparation stage, 2nd pre-financing before execution stage for rest of costs (incl. call for tender) PCP and PPI actions – EU contribution
  • 23. OVERVIEW UPCOMING H2020 CALLS ON INNOVATION PROCUREMENT (PCP+PPI) IN 2016-2017
  • 24. 2016 (~40 M€) • PCP actions • E-health: 18 M€ (PM-12) • ICT based solutions for any area of public interest: 4 M€ (ICT-34) • Earth observation: 3 M€ (EO-2) • PPI actions • ICTs Ageing: 10,5M€ (PM-13) • CSA actions • Urban transport deployment: 2M€ (MG-4.4) • Climate – environment- raw materials - resource efficiency: part of larger call (SC5-27) • Civil protection: 1,5M€ (2-DRS) 2016-2017 calls in support of PCP and PPI From "draft WPs" 2017 (~84 M€) • PCP actions • Robotics smart cities: 7 M€ (ICT-27(d)) • Soil decontamination: 5 M€ (SC5-26) • Broadband coms security: 10 M€ (4-DRS) • Forensics: 10 M€ (9-FCT) • Border control: 10 M€ (13-BES) • PPI actions • E-health standards: 8,26 M€ (PM-19) • Supercomputing: 26 M€ (EINFRA-21) • Energy efficiency: part of larger call (EE-19) • CSA actions • Competence centers & procurer networks any area preparing PCP/PPIs: 4 M€ (ICT-33) PCP actions: co-finance (90%) actual procurement cost for joint PCPs + coordination costs PPI actions: co-finance (35%) actual procurement cost for joint PPIs + coordination costs CSA actions: co-finance (100%) only coordination costs e.g. procurer networks preparing future PCPs/PPIs
  • 25. • Health Work program • PM-12: E-health innovation in empowering the patient (€ 18M; 16 Feb 2016) • ICT Work Program • ICT-34: Open to ICT based solutions for any area of public interest (€ 4M; 12 Apr 2016) • ICT-27(d): Robotics based solutions for smart city applications (€ 7M; 25 Apr 2017) • Space Work program • EO-2: Downstream earth observation services for public sector (€ 3M; 3 Mar 2016) • Climate Work program • SC5-26: Soil decontamination (€ 5M; 7 Mar 2017) • Security Work Program • 4-DRS: Broadband communication systems for disaster resilience (€ 10M; 24 Aug 2017) • 9-FCT: Forensic tools/techniques for fight against crime/terrorism (€ 10M; 24 Aug 2017) • 13-BES: Next generation info systems for border/external security (€ 10M; 24 Aug 2017) Calls for PCP actions Call deadlines in red
  • 26. • Health Work program • PM-13: Deployment of ICT solutions for active/healthy ageing (€ 10,5M; 16 Feb 2016) • PM-19: Uptake of standards for exchange of digital health records (€ 8,26M; 14 Ma 2017) • Research infrastructure Work Program • EINFRA-21: Deploying innovative High Performance computing systems – platform driven e-infrastructure innovation (€ 26 M; 20 Sept 2016) • Energy Work Program • EE-19: Deploying innovative solutions for energy efficiency (part of larger call of € 47M; 7 June 2017) Calls for PPI actions Call deadlines in red
  • 27. • ICT Work Program • ICT-33(a): European wide networks of public procurers preparing future PCPs or PPIs in any area of public interest that requires ICT based solutions • ICT-33(b): European wide networks of competence centers on innovation procurement (€ 4M for ICT-33 (a) and (b) together; 25 Apr 2017) • Transport Work Program • MG-4.4: Facilitating PPI on sustainable transport and mobility solutions in urban areas (€ 2M; 26 Jan 2016) • Climate Work program • SC5-27: Preparing PCPs and PPIs in climate action, environment, resource efficiency, raw materials (part of a larger call of € 8,55 M; 8 Mar 2016) • Security Work Program • 2-DRS: Situational awareness systems to support civil protection preparation and operational decision making for disaster resilience (€ 1,5 M; 25 Aug 2016) Calls for Coordination and Support Actions Call deadlines in red
  • 28. Open call ICT- 34/33 for 'ICT based solutions' ICT is pretty wide domain. ICT covers all Information and Communication Technologies such as: • Components and systems: embedded ICT systems, minituarisation / system integration, advanced thin large organic and large area electronics • Advanced computing (e.g. customised and low power computing) • Future Internet (e.g. smart novel Internet architectures and experimentation platforms, • optical and wireless network technologies, cloud computing infrastructure and services, tools and methods for software development, web entrepreneurship) • Content technologies and information management (e.g. big data handling, content handling and modelling, automatic learning language translation systems, creative industries / social media ICTs, ICTs for learning / teaching and gaming, multimodal natural computer interaction) • Robotics • Micro- and nano electronics, cross-cutting ICT KETs, photonics (e.g. (O)LED lighting) • High Performance computing • Cybersecurity / trustworthy ICT • Human-centric ICT solutions 27
  • 29. What does eafip offer?  Training across Europe – 3 major events and 9 smaller workshops with procurers in different sectors between 2015-2018 to provide information and training on PCP and PPI Register here to the first major event in Paris, 27-28 October 2015!  Toolkit and helpdesk – Training is based on toolkit on why and how to implement PCP/PPI – Helpdesk that will post replies to questions - FAQs online Register here to stay up to date  Free local assistance – For public procurers starting concrete PCPs and PPIs for ICT based solutions – Includes legal assistance in the start-up and implementation of a PCP/PPI Register here your interest in assistance before 10 November 2015 European Assistance for Innovation Procurement eafip What is eafip? A service set up by the DG CNECT (led by Stella & Corvers) - Horizon 2020 supports groups of procurers to do joint PCPs/PPIs together) - eafip supports single procurers to start PCP/PPIs on their own nationally www.eafip.eu
  • 30. More info on Innovation Procurement:  http://ec.europa.eu/digital-agenda/en/innovation-procurement  Ongoing PCP/PPI projects in ICT (and other) domains:  http://ec.europa.eu/digital-agenda/en/news/innovation-procurement- power-public-purse  More detailed info on modalities of PCP/PPI action instrument, evaluation criteria etc in General Annexes to the H2020 Work Program:  http://ec.europa.eu/research/participants/portal/desktop/en/funding/ref erence_docs.html#h2020-work-programmes-2016-17  Info about scope of each call topic, online drafting and submission of proposals on H2020 participants portal (search per topic e.g. ICT-34). Calls will be published when WPs are adopted (end October):  http://ec.europa.eu/research/participants/portal/desktop/en/opportuniti es/h2020/search/search_topics.html 29
  • 31. Possible synergies between ESIF and Horizon 2020 on innovation procurement Lieve Bos Policy Officer Innovation Procurement Innovation Unit (F2) DG CNECT European Commission
  • 32. GENERAL RULE IT IS NOT ALLOWED !!!!!! - To use ESIF and H2020 funding accumulatively to finance the same cost/expenditure item - To finance the own contribution of the participant from H2020 or ESIF
  • 33. CATEGORIES OF POSSIBLE SYNERGIES BETWEEN H2020 AND ESIF ON PCP/PPI Joint or simultaneous use of funds Sequential funding Additional funding Alternative funding
  • 34. A. JOINT OR SIMULTANEUS USE OF FUNDS Different funding sources in the same project. This is only possible if the cost items (eligible and submitted) are NOT the same. Requires very strict financial management to separate the cost items clearly from the conception phase of the project and will only work if the funding decisions of H2020 and ESIF are synchronised. The rules of both funding sources (ESIF – H2020) should be respected by all beneficiaries even if they receive co-financing from only one funding source. A partner who receives co-financing from ESIF to participate in a H2020 project should also respect the H2020 rules and vice versa.
  • 35. Possible scenario on PCP  Preparation of the PCP procurement is supported by H2020 or ESIF  In the framework of PCP action calls, some participants of the buyers group may receive co-funding from the ESIF and others from H2020.  This case is applicable only if there is a clear distinction between budgets offered per OP and between expenditures co-funded by the ESIF (per OP) vs expenditures co-funded by H2020. Example - each R&D provider is paid pro rata by each procurer in the buyers group according to the share of each procurer's contribution to the jointly committed budget. Condition for success : synchronization between the ESIF calls and the H2020 PCP action calls
  • 36. Coordination, Preparatory etc. activities are co-funded by H2020 (CSAs) CO-FUNDING RATE 100% + 25% for eligible indirect costs EXECUTION OF A JOINT PCP Coordination, Preparatory etc. activities are co-funded by the ESIF (ESIF OPs or European Territorial Cooperation Programs) DIFFERENT CO-FUNDING RATE PER PROGRAM AND/OR PARTICIPANT OR PROCURER A (Less developed Region) CO-FUNDS HIS CONTRIBUTION TO THE JOINTLY COMMITTED BUDGET THROUGH THE ESIF CO-FUNDING RATE up to 85% (for his contribution) PROCURER B (Transitional Region) CO-FUNDS HIS CONTRIBUTION TO THE JOINTLY COMMITTED BUDGET THROUGH THE ESIF CO-FUNDING RATE up to 60%(for his contribution) PROCURER C CO-FUNDS HIS CONTRIBUTION TO THE JOINTLY COMMITTED BUDGET THROUGH H2020 CO-FUNDING RATE 90%* + 25% for eligible indirect costs (for his contribution) PROCURER D CO-FUNDS HIS CONTRIBUTION TO THE JOINTLY COMMITTED BUDGET THROUGH H2020 CO-FUNDING RATE 90% + 25% for eligible indirect costs(for his contribution) * New from 2016-2017 Horizon 2020 work programmes onward
  • 37. Possible Scenario on PPI Some procurers located in a less developed Region purchases the innovative solution co-funded by the ESIF (up to 85% rate) and other procurers in other MS are co-funded by H2020 (35% rate) to buy the innovative solution. Preparation of the PPI may be co-funded either by the ESIF or by the H2020 (CSAs). In case they haven't received co-financing for the preparatory activities these can be co-funded by the PPI actions according to the rules applicable to these actions. Applicable Scenario in cases:  Under a joint Framework Contract/Agreement which provides the joint technical specifications separate specific contracts (possibly with lots) are implemented by the individual procurers according to their national law for the purchase of the innovative solutions they each individually need. The procurers pay individually the invoices corresponding to the innovative solutions each buys. Or  The lead procurer launches one procurement procedure, awards all the contracts and pays all the invoices on behalf of the group of procurers
  • 38. Coordination, Preparation etc. activities are co-funded by H2020 (CSA) CO-FUNDING RATE 100% + 25% for eligible indirect costs EXECUTION OF ONE JOINT PPI PROCURER A purchases the innovative solution with the support of H2020 CO-FUNDING RATE 35%* + 25% for eligible indirect costs (for his contribution) PROCURER C purchases the innovative solution with the support of H2020 CO-FUNDING RATE 35 % + 25% for eligible indirect costs (for his contribution) PROCURER B (Less developed Region) purchases the innovative solution with the support of the ESIF in line with the objectives of the relevant O.P CO-FUNDING RATE up to 85%(for his contribution) Coordination, Preparation etc. activities are co-funded by the ESIF DIFFERENT CO-FUNDING RATE PER PROGRAM AND/OR PARTICIPANT OR PROCURER D Less developed Region purchases the innovative solution with the support of the ESIF in line with the objectives of the relevant O.P CO-FUNDING RATE up to 85%(for his contribution) * New from 2016-2017 Horizon 2020 work programmes onward
  • 39. Possible scenario for the coordination and networking activities to prepare for PCP and PPI In one project/consortium that prepares a future joint PCP or PPI, Procurers A and B from less developed regions are co-funded by the ESIF (up to 85% co-funding rate) and procurers B and C are co- funded by H2020 (via CSAs – if there is a specific call with co-funding rate 100% + 25% for eligible indirect costs)  The execution of the joint PCP/PPI can follow one of the scenarios presented in the previous slides.  Minimum conditions for success: - - Separate and distinguished cost/expenditure items even at project proposal level - - Synchronization and coordination between ESIF MAs and H2020 Managing Bodies -
  • 40. EXECUTION OF A JOINT PCP PROCURER A (Less developed Region) Coordination and networking activities to prepare for a PCP are co-funded by the ESIF CO-FUNDING RATE up to 85% (for his contribution) PROCURER B (Transitional Region) Coordination and networking activities to prepare for a PCP are co- funded by the ESIF CO-FUNDING RATE up to 60% (for his contribution) PROCURER C Coordination and networking activities to prepare for a PCP are co-funded by H2020 (CSA) CO-FUNDING RATE 100% + 25% for eligible indirect costs (for his contribution) PROCURER D Coordination and networking activities to prepare for a PCP are co- funded by H2020 (CSA) CO-FUNDING RATE 100% + 25% for eligible indirect costs (for his contribution)
  • 41. EXECUTION OF A JOINT PPI PROCURER A (Less developed Region) Coordination and preparation etc. activities for a PPI are co-funded by the ESIF CO-FUNDING RATE up to 85% (for his contribution) PROCURER B (Transitional Region) Coordination and preparation etc. activities for a PPI are co-funded by the ESIF CO-FUNDING RATE up to 60% (for his contribution) PROCURER C Coordination and preparation etc. activities for a PCP are co-funded by H2020 (CSA) FLAT CO-FUNDING RATE 100% + 25% for eligible indirect costs (for his contribution) PROCURER D Coordination and preparation etc. activities for a PCP are co-funded by H2020 (CSA) FLAT CO-FUNDING RATE 100% + 25% for eligible indirect costs (for his contribution)
  • 42. B. SEQUENTIAL FUNDING Separate successive and legally/financially not linked projects with alternating H2020 or ESIF support – - First PCP and then PPI – This is an easier way to combine funds with less risk of (involuntarily) creating double co-funding scenarios. Sequential funding can go in both directions: First ESIF and then H2020 or vice versa.
  • 43. Possible Scenario First PCP (H2020) to develop and test the innovative solution and then PPI (ESIF)for the deployment of the innovative solutions developed and tested through PCP and vice versa (ESIF for PCP and H2020 for PPI) Example: A group of Public Procurers from different cities are looking for a new sustainable public water supply system. It requires R&D. At first they implement a PCP (Phases 1,2,3) with the support of H2020 and different solutions are developed and tested. Thereafter they implement a PPI with the support of ESIF/ERDF to co- fund the preparation of the call for tender and the purchase of these new solutions (each MA for the territory covered by its OP).
  • 44. C. ADDITIONAL/PARALLEL USE OF FUNDS ESIF money is not linked to a H2020 project (PCP/PPI), but a regional/national authority decides to co-fund a regional/national project or beneficiaries to enhance the H2020 project or programme in its region. This may be particularly relevant to skills development or capacity building in innovation and cooperation Example Skills enhancement of the public procurer focused on the use of the innovative product that is purchased in the framework of a PPI that is co- funded by H2020
  • 45. D. ALTERNATIVE FUNDING  ESI Funds could be used for project proposals that have received positive evaluation under H2020 and could not be co-funded due to lack of H2020 funds under the call.  These proposals could be reoriented towards ESIF requirements and submitted at national/regional level, if this type and topic of project fits into the operational programmes of the concerned territories.
  • 46. Include innovation procurement in the RIS3 SWOT and policy mix. Build PCP/PPI references into OPs in every relevant thematic objective.  Ensure support of public demand driven innovation in the framework of the European Territorial Cooperation. Involve MA from the beginning to ensure availability of ESIF & synchronisation. CONDITIONS FOR SUCCESS
  • 47. Thank you very much for your attention Lieve Bos Policy Officer Innovation Procurement Innovation Unit (F2) DG CNECT European Commission
  • 48. • Get better and 20% cheaper products (US defense data) • Use PPI also if no(more) R&D needed for procurement need • Use a small budget PCP to de-risk a large budget PPI • PPI spec can be 'completely rephrased' benefiting from PCP lessons learnt • Use conditions that encourage job creation 'in Europe' • Because PCP falls outside WTO rules • Prevent foreclosing of competition & crowding out of private investment in R&D • Companies that are not financing their R&D via procurement/PCP (e.g. via grants, own company resources) can still bid for deployment contracts/PPIs • Facilitates access to procurement market for SMEs • Gradually increasing contract sizes, tasks, required manpower • Stringent financial guarantee/qualification requirements:'no' in PCP,'ltd' in PPI … above not the case if R&D is procured as part of/inside large deployment contract Why split between PCP and PPI This enables to…
  • 49. Examples EU funded transnational PCPs Traffic Management CHARM is a cooperation between 3 road authority procurers: Rijkswaterstaat (NL), Highways Agency (UK), Department Mobility and Public Works - MOW (BE). Other Traffic management authorities (e.g. Traffikverket (SE) associated to the project to follow-up its progress) CHARM contracting authorities jointly procure R&D services via the PCP to move towards an open modular traffic management architecture by getting modules developed that will optimise network performance, increase road safety and reduce CO2 emissions by improving network management, incident prediction and prevention and cooperative ITS. CHARM Project timing: Sept 2012 (48 months) Value PCP: € 2,88M Contact: ian.chalmers@highways.gsi.gov.uk Project Website: tinyurl.com/CHARM-PCP
  • 50. Examples EU funded transnational PCPs Virtual Road Construction V-CON is a cooperation between procurers in the domain of road administation: Rijkswaterstaat (NL), Centre Scientifique et Technique du batiment (FR), Trafficverket (SE), TNO (NL) The PCP undertaken by the V-CON contracting authorities focuses on R&D for virtual modelling of road infrastructure. V-con Project Timing: Oct 2012 (48 months) Value PCP: € 1,467M Contact: benno.koehorst@rws.nl Project Website: www.rws.nl/en/highways/v_con
  • 51. Examples EU funded transnational PCPs Digital preservation Procurers: Riksarkivet - National Archives(SE), Beeld en Geluid (NL), Koninklijk Instituut voor het kunstpatrimonium (BE), Greek Film Center (GR), Local Government Management Agency - LGMA (IE), Stiftung Preussischer Kulturbesitz (DE), Ayuntamiento de Girona (ES), Ministry of Culture - EVKM (EE), Kungliga Biltioteket - National Library (SE) Other partners: Packet Expertisecentrum Digitaal Erfgoed (BE), Promoter SRL (IT), Fraunhofer (DE), University of Skövde (SE),University of Padua (IT), The PREFORMA PCP addresses the challenge faced by memory institutions of increasing transfers of electronic documents and other media content for long term preservation. PREFORM intends to establish a long-term sustainable ecosystem of innovative tools and to provide a reference implementation of the most common file format standards for the assessment and for the correction of the collections to be archived. Project Timing: January 2014 (36 months) Value PCP: € 2,136M Contact: borje.justrell@riksarkivet.se Project website: www.preforma-project.eu
  • 52. Examples EU funded transnational PCPs E-learning IMAILE procurers are: Halmstads Kommune (SE) and Alexandersson University Institute Varberg (SE),University of Magdeburg (DE), Municipality of Konnevesi (FI), City Council Viladecans (ES). Other partners: Region Saxony Anhalt (DE), Oulu IT Center of Excellence (FI), INOVAMAIS (PT), ENTER (Austria), INOVA Eszak-Alfold Regional Development and Innovation Agency (HU) The IMAILE PCP will focus on new technologies and services for e-learning which address the challenge of providing the next generation of Personal Learning Environments (PLE) for primary and secondary school. This should address students within the topics of Science, Math and Technology, support different learning styles in an individualized way and be accessible from any device including to bring your own device (BYOD). Project Timing: February 2014 (42 months) Value PCP: € 4,6M Contact: Ellinor Wallin (ellinor@euprojektkonsult.se) Project website: http://www.imaile.eu
  • 53. Examples EU funded transnational PCPs Telemedicine for ICU-patients at increased risk Procurers: University Clinic Aachen (DE), University Hospital Maastricht (NL), Parc Tauli Sabadell University Hospital (ES), Hospital East Limburg (BE), Northern Ostrobothnia Hospital District (FI) Other Partners: Ministry for Research & Innovation North-Rhine Westphalia (DE), NLAgency (NL), AIAQS (ES) Through the THALEA project, 5 hospitals from Germany, Netherlands, Spain, Belgium and Finland will initiate a joint Pre-Commercial Procurement focusing on getting a highly interoperable telemedicine- platform developed for detection of ICU-patients at increased risk. Project Timing: February 2014 (42 months) Value PCP: € 1,55M Contact: Legewie Volker (vlegewie@ukaachen.de) Project website: www.thalea-pcp.eu
  • 54. For more info: http://lowcarbon-healthcare.eu/ National brand names for PPI: Forward Commitment Procurement (FCP) in UK Technology procurement in Nordics (e.g. Sweden NUTEK cases) Low carbon healthcare PPI project started 2006 Introducing more energy efficient LEDs in network of over 20 hospitals in 8 EU countries • 30% energy consumption saving • 88% maintenance savings Total cost savings enable take-in +10% patients Examples transnational PPI Sustainability
  • 55. Examples transnational PPI Sustainability Follow-up of LCB healthcare project PPI procurement for more efficient and sustainable healthcare solutions Procurers: Bologna university hospital Authority (IT) Erasmus University Medical Centre (NL), Nothingham univ hospital & Rotherham NHS trusts (UK) Such Deskidzka hospital (PL) Erasmus University Medical Center Sustainable robotics based bed washing procurement won European PPI award 2014 Cost reduction of 35% CO2 footprint reduction of 65% Project Timing: April 2012 (48 months) Value project: € 2M Contact: Gaynor Whyles (gaynor.whyles@jeraconsu Project website: http://www.ecoquip.eu
  • 56. Example transnational PPI Health ageing 6 healthcare purchasing groups from FR, UK, IT, BE and LU launched on 30 September 2014 the first 'joint' transnational PPI procurement in the healthcare domain in Europe: Resah-Idf (FR), NHS commercial solutions (UK), SCR Piemonte (IT), Centrale de Marchés Mercure (BE), Entente des hôpitaux (LU). The French lead procurer is procuring (establishing a framework agreement with several vendors under French law) on behalf of the whole group of procurers to procure 5 different lots of equipment. All 6 purchasing groups can then setup specific contracts under their own national legislation to buy products from any of the vendors selected under the framework agreement. (Similar as is possible in Horizon 2020) Lot 1: Fall detection and alert system Lot 2: Treadmill for rehabilitation and analysis of walking disorders Lot 3: Walking course for preventing falls and maintaining independence Lot 4: Bed thermoregulation system Lot 5: Chair enabling users to maintain independence and reducing effort for aides Project Timing: October 2012 (42 months) Value project: € 4M Contact: Dominique Legouge, Resah-Idf (d.legouge@resah-idf.com) Project website: http://www.happi-project.eu
  • 57. Example transnational PPI Elderly Care STOP AND GO contains 6 procurers: Regional Health Agency Campania (IT), Health agency province Catanzaro (IT), Health agency Rome (IT), Eastern Cheshire Clinical Commissioning Group (UK), Health procurement agency/Junta de Andalucia (ES), Gemeente Helmond (NL) The €17,2M PPI aims to trigger the market to deliver ICT based telecare services that enable to care for frail elderly that suffer from multiple conditions at the same time such as heart failure, diabetes, etc. Project Timing: April 2014 (36 months) Value PPI: € 17,2M website: stopandgoproject.eu
  • 58. Examples EU funded network of procurers eHealth domain PRO4VIP is a coordinating and networking project with partners: Agència de Qualitat i Avaluació Sanitàries de Catalunya - AQuAS (ES), Barcelona Macula Foundation research for vision – BMF (ES), UCLPartners (UK), Berufsförderungswerk - BWF (DE), Rittmeyer regional institute for the deaf - RITT (IT), University Salerno – US (IT), Friuli Venezia Giulia region - FVG (IT), Trieste AREA (IT), European Blind Union – EBU (FR), ECRIN European Research Infrastructure Network (FR), ZENIT (DE) Low vision is globally increasing as a result of the ageing world population. The PRO4VIP network brings together healthcare procurers that aim to develop a joint innovation procurement roadmap for novel cost- effective ICT-based assistive technologies for visually impaired people and clinical tools that help physicians with the early detection of such conditions. Project Timing: February 2015 (22 months) Contact: pmo.aquas@gencat.cat Project website: www.pro4vip.eu
  • 59. Examples EU funded network of procurers eHealth domain SAEPP is a coordinating and networking project with partners: NHS Commercial Solutions (UK), Ambulance Today (UK), University Medical Center Groningen - UMCG (NL), Falck (DK), Region Zealand (DK), INEM (PT), South Karelia Central Hospital (FI), BITECIC (UK), South East Coast Ambulance Service (UK), Yorkshire Ambulance Service (UK), Royal College of Art (UK), University of Sheffield (UK), University of West England (UK), Fibico (ES), TECNALIA (ES), Saimaa university of applied sciences (FI), Lappeenranta university of technology (FI) The SAEPP network of ambulance procurers and users is preparing the ground for a PCP to develop an ICT- equipped ambulance of the future that enables a shift from a vehicles that services as a means of urgent transport to an on-board mobile treatment space. The objective of the ambulance redesign is to enable pre- hospital care in order to avoid unnecessary hospital admissions and the associated patient distress and hospital costs. Project Timing: January 2015 (8 months) Contact: dexter.montgomery@nhs.net Website: www.smartambulanceproject.eu SAEPP
  • 60. Examples EU funded network of procurers eHealth domain EPP eHealth is a coordinating and networking project with partners: Bravosolution (ES), Region Zealand (DK), Servicio Andaluz de Salud – SAS (ES), Servicio Madrileno de Salud - SERMAS (ES), University Hospital Krakow (PL), dane-ianalizy (PL), Optimat (UK) The EPP eHealth consortium aims to transform the market for eHealth solutions through dialogue and innovation procurement. The project will make progress towards this aim by creating a network of procuring organisations that understand the opportunities that eHealth can offer. The project will create a critical mass of procurers that will proactively develop forward looking procurement plans to create a coherent demand for eHealth solutions. Project Timing: January 2015 (24 months) Contact: a.duran@bravosolution.es Project website: www.innovationithospitals.com