SCOPING OF NEXT ENVIRONMENTAL ASSESSMENT OF
THE “COMPLEX (CONSOLIDATED) SAFETY UPGRADE
PROGRAM OF POWER UNITS OF NUCLEAR POWER
PLANTS OF UKRAINE”
GROUNDS
GROUNDS
Aim of next EA implementation
First assessment was performed in 2011 by an independent international team with the participation
of the experts from the company "Poyry" (Finland, France, Switzerland and Germany), the Ukrainian
Center of Environmental and Water Projects, and the company "AESKAR" (Ukraine). CCSUP EA was
carried out in accordance with the EBRD Environmental and Social Policy, environmental legislation of
the European Union, in particular EU Directive 2001/42/EU, and took into account the best world
practices.
Stakeholder Engagement Plan (SEP), Report on works scoping, Report on CCSUP EA and the corresponding Statement on the
environmental consequences of CCSUP implementation were published and remain available on the official web-site of the
State Enterprise "NNEGC "Energoatom" under the link: http://www.energoatom.kiev.ua/en/actvts/integrated_security_program
The AIM of the next CCSUP Ecological Assessment is the reassessment of the impact on the
environment during CCSUP implementation (with regard to modifications made in CCSUP in 2012 -
2015, its measures, completed during that period, as well as the actual changes in the environmental
situation and its monitoring procedures, which took place since the completion of the previous
CCSUP EA)
Schedule of the next EA implementation
Ecological Assessment should be finished until 1 April 2017.
Measure Start Finish
Public consultations regarding the scopes of the CCSUP EA June 2016 July 2016
Report publication regarding the scopes of the CCSUP EA July 2016
Implementation of the next CCSUP EA September 2016 December 2016
Publication of the Report draft on CCSUP EA December 2016
Public consultations on Report draft on CCSUP EA І quarter 2017 І quarter 2017
Publication of the public consultations report March 2017
Revision of the Report on CCSUP EA according public
consultations results (if necessary)
March 2017 March 2017
Transfer the Report on CCSUP EA to ecology expertise March 2017
The next CCSUP Ecological assessment will be
implemented according to requirements of the
document SOU NAEK 004:2011 “Environmental
Assessment of Power Units of Nuclear Power Plants.
General Requirements to the Scope and Content of the
Assessment Materials”, approved by the Ministry of
Ecology and Natural Resources of Ukraine
(the document is published and available by the link
http://energoatom.kiev.ua/files/file/sou_naek_004_2011_en_(1).pdf)
taking into account changes in the legislation, which
occur after first CCSUP EA.
Its planed, that scopes of the next CCSUP EA (analyzed
aspects, elements of the environment, sources, types
and factors of the impact, etc.) will correspond to
scopes of the first CCSUP EA.
A clear reference to the previous CCSUP EA Report
results dated 31.01.2012, is admissible in the part,
which does not require an adjustment, without its
materials’ duplication.
(the document is published and available by the link
http://energoatom.kiev.ua/en/actvts/integrated_security_program/
38707-zvt_pro_ekologchnu_otcnku_osnovniyi_zvt/)
CCSUP EA Report structure
Introduction
1 General Information
2 EA of CCSUP implementation results at the Zaporizhzhya NPP
2.1 General description of the NPP
2.2 Assessment of impact on natural environment
2.3 Assessment of impact on social environment
2.4 Assessment of impact on technogenic environment
2.5 Comprehensive measures to ensure standard state of environment and environmental security
2.6 Environmental impact change in the process of CCSUP implementation
3 EA of CCSUP implementation results at the Rivne NPP
4 EA of CCSUP implementation results at the Khmelnitskiy NPP
5 EA of CCSUP implementation results at the South-Ukraine NPP
6 Assessment of possible CCSUP transboundary impacts and measures aimed at informing
boundary states
7 Public consultations on implementation of CCSUP
8 Mitigation or optimizing measures
9 Conclusions
Annexes
Assessment of impact on natural environment will cover following components:
 climate and microclimate,
 air environment;
 geological environment;
 aquatic environment;
 soil and landscape;
 flora, fauna, reserves.
The next main types of impact will be analyzed during EA:
 Radiation impact, results from:
• Gaseous radioactive releases to the atmosphere;
• Discharges to the surface reservoirs;
• Solid radioactive wastes (SRW);
• Liquid radioactive wastes (LRW).
 Chemical impact at the atmosphere, water, or soil.
 Non-radiation physical impact , in particular:
• Thermal impact in connection with the normal operation of NPPs ;
• Humidity increase due to the emission of water into the atmosphere;
• Electromagnetic field (inside the NPP and in the vicinity of electric lines);
• Acoustic impact (inside the NPP only).
EA will include complex assessment of changes in the each NPP environmental impact under normal
operation and changes in ecological risks (in case of accident on NPP) as a result of CCSUP
implementation

Contenu connexe

Tendances

2004-09-21 Natural Aerosol Event Detection and Characterization
2004-09-21 Natural Aerosol Event Detection and Characterization2004-09-21 Natural Aerosol Event Detection and Characterization
2004-09-21 Natural Aerosol Event Detection and CharacterizationRudolf Husar
 
Hydraulic Fracturing - Myths and Maneuvers
Hydraulic Fracturing - Myths and Maneuvers Hydraulic Fracturing - Myths and Maneuvers
Hydraulic Fracturing - Myths and Maneuvers Cindy Bishop
 
Transboundary Modelling of Particulate Matter with REMOTE- Saji Varghese, NUIG
 Transboundary Modelling of Particulate Matter with REMOTE- Saji Varghese, NUIG Transboundary Modelling of Particulate Matter with REMOTE- Saji Varghese, NUIG
Transboundary Modelling of Particulate Matter with REMOTE- Saji Varghese, NUIGEnvironmental Protection Agency, Ireland
 
Integration of hydrological function into forest management plans
Integration of hydrological function into forest management plansIntegration of hydrological function into forest management plans
Integration of hydrological function into forest management plansUNDP Türkiye
 
Resilience of decarbonized energy systems to climate change - a research ques...
Resilience of decarbonized energy systems to climate change - a research ques...Resilience of decarbonized energy systems to climate change - a research ques...
Resilience of decarbonized energy systems to climate change - a research ques...IEA-ETSAP
 
Reflections on diesel exposures in professional drivers - a poorly quantified...
Reflections on diesel exposures in professional drivers - a poorly quantified...Reflections on diesel exposures in professional drivers - a poorly quantified...
Reflections on diesel exposures in professional drivers - a poorly quantified...IES / IAQM
 
Weather Modification and Geoengineering
Weather Modification and GeoengineeringWeather Modification and Geoengineering
Weather Modification and GeoengineeringUrbanSystemsCanada
 
WGI: Climate Change Projection
WGI: Climate Change ProjectionWGI: Climate Change Projection
WGI: Climate Change Projectionipcc-media
 
Update IAEA Assessment Fukushima Nuclear Accident Radiological Monitoring and...
Update IAEA Assessment Fukushima Nuclear Accident Radiological Monitoring and...Update IAEA Assessment Fukushima Nuclear Accident Radiological Monitoring and...
Update IAEA Assessment Fukushima Nuclear Accident Radiological Monitoring and...International Atomic Energy Agency
 
51 update on the fifth worldwide review international approaches for nuclear ...
51 update on the fifth worldwide review international approaches for nuclear ...51 update on the fifth worldwide review international approaches for nuclear ...
51 update on the fifth worldwide review international approaches for nuclear ...leann_mays
 
William Bloss (University of Birmingham) - WM-Air: West Midlands Air Quality ...
William Bloss (University of Birmingham) - WM-Air: West Midlands Air Quality ...William Bloss (University of Birmingham) - WM-Air: West Midlands Air Quality ...
William Bloss (University of Birmingham) - WM-Air: West Midlands Air Quality ...IES / IAQM
 

Tendances (14)

2004-09-21 Natural Aerosol Event Detection and Characterization
2004-09-21 Natural Aerosol Event Detection and Characterization2004-09-21 Natural Aerosol Event Detection and Characterization
2004-09-21 Natural Aerosol Event Detection and Characterization
 
Hydraulic Fracturing - Myths and Maneuvers
Hydraulic Fracturing - Myths and Maneuvers Hydraulic Fracturing - Myths and Maneuvers
Hydraulic Fracturing - Myths and Maneuvers
 
Transboundary Modelling of Particulate Matter with REMOTE- Saji Varghese, NUIG
 Transboundary Modelling of Particulate Matter with REMOTE- Saji Varghese, NUIG Transboundary Modelling of Particulate Matter with REMOTE- Saji Varghese, NUIG
Transboundary Modelling of Particulate Matter with REMOTE- Saji Varghese, NUIG
 
Third IDMP CEE workshop: IDMP CEE progress and plans by Sabina Bokal
Third IDMP CEE workshop: IDMP CEE progress and plans by Sabina BokalThird IDMP CEE workshop: IDMP CEE progress and plans by Sabina Bokal
Third IDMP CEE workshop: IDMP CEE progress and plans by Sabina Bokal
 
WGI: Overview
WGI: OverviewWGI: Overview
WGI: Overview
 
Integration of hydrological function into forest management plans
Integration of hydrological function into forest management plansIntegration of hydrological function into forest management plans
Integration of hydrological function into forest management plans
 
Resilience of decarbonized energy systems to climate change - a research ques...
Resilience of decarbonized energy systems to climate change - a research ques...Resilience of decarbonized energy systems to climate change - a research ques...
Resilience of decarbonized energy systems to climate change - a research ques...
 
Reflections on diesel exposures in professional drivers - a poorly quantified...
Reflections on diesel exposures in professional drivers - a poorly quantified...Reflections on diesel exposures in professional drivers - a poorly quantified...
Reflections on diesel exposures in professional drivers - a poorly quantified...
 
Weather Modification and Geoengineering
Weather Modification and GeoengineeringWeather Modification and Geoengineering
Weather Modification and Geoengineering
 
WGI: Climate Change Projection
WGI: Climate Change ProjectionWGI: Climate Change Projection
WGI: Climate Change Projection
 
My Project2
My Project2My Project2
My Project2
 
Update IAEA Assessment Fukushima Nuclear Accident Radiological Monitoring and...
Update IAEA Assessment Fukushima Nuclear Accident Radiological Monitoring and...Update IAEA Assessment Fukushima Nuclear Accident Radiological Monitoring and...
Update IAEA Assessment Fukushima Nuclear Accident Radiological Monitoring and...
 
51 update on the fifth worldwide review international approaches for nuclear ...
51 update on the fifth worldwide review international approaches for nuclear ...51 update on the fifth worldwide review international approaches for nuclear ...
51 update on the fifth worldwide review international approaches for nuclear ...
 
William Bloss (University of Birmingham) - WM-Air: West Midlands Air Quality ...
William Bloss (University of Birmingham) - WM-Air: West Midlands Air Quality ...William Bloss (University of Birmingham) - WM-Air: West Midlands Air Quality ...
William Bloss (University of Birmingham) - WM-Air: West Midlands Air Quality ...
 

En vedette

Commercial Nuclear Brochure (2009)
Commercial Nuclear Brochure (2009)Commercial Nuclear Brochure (2009)
Commercial Nuclear Brochure (2009)jeffreymarmstrong
 
Network Opposed to BNPP Combined Presentations
Network Opposed to BNPP Combined Presentations Network Opposed to BNPP Combined Presentations
Network Opposed to BNPP Combined Presentations gtapang
 
Michigan Energy Forum - December 6, 2012
Michigan Energy Forum - December 6, 2012Michigan Energy Forum - December 6, 2012
Michigan Energy Forum - December 6, 2012AnnArborSPARK
 
2010 - Offshore wind environmental impacts
2010 - Offshore wind environmental impacts2010 - Offshore wind environmental impacts
2010 - Offshore wind environmental impactsDavid Owain Clubb
 
Environmental Friendly Coal Power Plants
Environmental Friendly Coal Power PlantsEnvironmental Friendly Coal Power Plants
Environmental Friendly Coal Power PlantsAbdul Haseeb
 
Wind power ppt
Wind power pptWind power ppt
Wind power pptsrgirlsdk
 
Karachi nuclear power plant (kANUPP)
Karachi nuclear power plant (kANUPP)Karachi nuclear power plant (kANUPP)
Karachi nuclear power plant (kANUPP)Awais Ahmad
 
An Evaluation of EIA report of Norochcholai Coal Power Plant Sri Lanka
An Evaluation of EIA report of Norochcholai Coal Power Plant Sri LankaAn Evaluation of EIA report of Norochcholai Coal Power Plant Sri Lanka
An Evaluation of EIA report of Norochcholai Coal Power Plant Sri LankaPabasara Gunawardane
 
Environmental impacts of renewable energy production"
Environmental impacts of renewable energy production"Environmental impacts of renewable energy production"
Environmental impacts of renewable energy production"SERC at Carleton College
 
Environmental and Social Impacts of Hydro-Electric Dams in Chamba District o...
Environmental and Social Impacts of Hydro-Electric Dams  in Chamba District o...Environmental and Social Impacts of Hydro-Electric Dams  in Chamba District o...
Environmental and Social Impacts of Hydro-Electric Dams in Chamba District o...Hasrat Arjjumend
 
Jaitapur nuclear power plant ppt
Jaitapur nuclear power plant pptJaitapur nuclear power plant ppt
Jaitapur nuclear power plant pptNikita Bhinde
 
Ill effects of Thermal Power Plants
Ill effects of Thermal Power PlantsIll effects of Thermal Power Plants
Ill effects of Thermal Power Plantsguest1d7cce
 
Unit 7 eia and sd
Unit 7 eia and sd Unit 7 eia and sd
Unit 7 eia and sd Kumar
 
Safety health and environment aspects in thermal power plants
Safety health and environment aspects in thermal power plantsSafety health and environment aspects in thermal power plants
Safety health and environment aspects in thermal power plantsVudugundla Kodandapani
 
EIA thermal power plant
EIA thermal power plantEIA thermal power plant
EIA thermal power plantvandana bharti
 
Thermal pollution
Thermal pollutionThermal pollution
Thermal pollutionCarlo Roa
 

En vedette (20)

Commercial Nuclear Brochure (2009)
Commercial Nuclear Brochure (2009)Commercial Nuclear Brochure (2009)
Commercial Nuclear Brochure (2009)
 
Task 2
Task 2Task 2
Task 2
 
Network Opposed to BNPP Combined Presentations
Network Opposed to BNPP Combined Presentations Network Opposed to BNPP Combined Presentations
Network Opposed to BNPP Combined Presentations
 
Michigan Energy Forum - December 6, 2012
Michigan Energy Forum - December 6, 2012Michigan Energy Forum - December 6, 2012
Michigan Energy Forum - December 6, 2012
 
2010 - Offshore wind environmental impacts
2010 - Offshore wind environmental impacts2010 - Offshore wind environmental impacts
2010 - Offshore wind environmental impacts
 
Environmental Friendly Coal Power Plants
Environmental Friendly Coal Power PlantsEnvironmental Friendly Coal Power Plants
Environmental Friendly Coal Power Plants
 
Wind power ppt
Wind power pptWind power ppt
Wind power ppt
 
Karachi nuclear power plant (kANUPP)
Karachi nuclear power plant (kANUPP)Karachi nuclear power plant (kANUPP)
Karachi nuclear power plant (kANUPP)
 
An Evaluation of EIA report of Norochcholai Coal Power Plant Sri Lanka
An Evaluation of EIA report of Norochcholai Coal Power Plant Sri LankaAn Evaluation of EIA report of Norochcholai Coal Power Plant Sri Lanka
An Evaluation of EIA report of Norochcholai Coal Power Plant Sri Lanka
 
Environmental impacts of renewable energy production"
Environmental impacts of renewable energy production"Environmental impacts of renewable energy production"
Environmental impacts of renewable energy production"
 
Natural gas
Natural gasNatural gas
Natural gas
 
Environmental and Social Impacts of Hydro-Electric Dams in Chamba District o...
Environmental and Social Impacts of Hydro-Electric Dams  in Chamba District o...Environmental and Social Impacts of Hydro-Electric Dams  in Chamba District o...
Environmental and Social Impacts of Hydro-Electric Dams in Chamba District o...
 
Documentum Overview
Documentum OverviewDocumentum Overview
Documentum Overview
 
Jaitapur nuclear power plant ppt
Jaitapur nuclear power plant pptJaitapur nuclear power plant ppt
Jaitapur nuclear power plant ppt
 
Sandia 2014 Wind Turbine Blade Workshop- Zayas
Sandia 2014 Wind Turbine Blade Workshop- ZayasSandia 2014 Wind Turbine Blade Workshop- Zayas
Sandia 2014 Wind Turbine Blade Workshop- Zayas
 
Ill effects of Thermal Power Plants
Ill effects of Thermal Power PlantsIll effects of Thermal Power Plants
Ill effects of Thermal Power Plants
 
Unit 7 eia and sd
Unit 7 eia and sd Unit 7 eia and sd
Unit 7 eia and sd
 
Safety health and environment aspects in thermal power plants
Safety health and environment aspects in thermal power plantsSafety health and environment aspects in thermal power plants
Safety health and environment aspects in thermal power plants
 
EIA thermal power plant
EIA thermal power plantEIA thermal power plant
EIA thermal power plant
 
Thermal pollution
Thermal pollutionThermal pollution
Thermal pollution
 

Similaire à SCOPING OF NEXT ENVIRONMENTAL ASSESSMENT OF THE “COMPLEX (CONSOLIDATED) SAFETY UPGRADE PROGRAM OF POWER UNITS OF NUCLEAR POWER PLANTS OF UKRAINE”

Regulations on exploration and production of (unconventional) hydrocarbons i...
Regulations on exploration and production of (unconventional) hydrocarbons  i...Regulations on exploration and production of (unconventional) hydrocarbons  i...
Regulations on exploration and production of (unconventional) hydrocarbons i...kt-energy
 
Item 0a_Special Session on Ukraine_Introduction_Yevhenii Fedorenko.pdf
Item 0a_Special Session on Ukraine_Introduction_Yevhenii Fedorenko.pdfItem 0a_Special Session on Ukraine_Introduction_Yevhenii Fedorenko.pdf
Item 0a_Special Session on Ukraine_Introduction_Yevhenii Fedorenko.pdfOECD Environment
 
Technical engineering in industrial ippc as a key tool for ambient air qualit...
Technical engineering in industrial ippc as a key tool for ambient air qualit...Technical engineering in industrial ippc as a key tool for ambient air qualit...
Technical engineering in industrial ippc as a key tool for ambient air qualit...eSAT Publishing House
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)eAmbiente
 
Esia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.s
Esia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.sEsia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.s
Esia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.szubeditufail
 
Environmental impact assessment(EIA) For Thermal Power Plants.docx.pdf
Environmental impact assessment(EIA) For Thermal Power Plants.docx.pdfEnvironmental impact assessment(EIA) For Thermal Power Plants.docx.pdf
Environmental impact assessment(EIA) For Thermal Power Plants.docx.pdfJagriti Agarwal
 
Environmental impact assessment(EIA) For Thermal Power Plants.pdf
Environmental impact assessment(EIA) For Thermal Power Plants.pdfEnvironmental impact assessment(EIA) For Thermal Power Plants.pdf
Environmental impact assessment(EIA) For Thermal Power Plants.pdfJagriti Agarwal
 
Ukraine NPP Safety Upgrade Program
Ukraine NPP Safety Upgrade  ProgramUkraine NPP Safety Upgrade  Program
Ukraine NPP Safety Upgrade ProgramOleksandr Lisovec
 
Análisis económico de algunos impactos del cambio climático en Europa: un enf...
Análisis económico de algunos impactos del cambio climático en Europa: un enf...Análisis económico de algunos impactos del cambio climático en Europa: un enf...
Análisis económico de algunos impactos del cambio climático en Europa: un enf...EOI Escuela de Organización Industrial
 
Climate Change Impacts In Europe
Climate Change Impacts In EuropeClimate Change Impacts In Europe
Climate Change Impacts In Europercysostenibilidad
 
Briefing health-impacts-assessment-of-integrated-steel-plant-jsw-utkal-steel...
Briefing  health-impacts-assessment-of-integrated-steel-plant-jsw-utkal-steel...Briefing  health-impacts-assessment-of-integrated-steel-plant-jsw-utkal-steel...
Briefing health-impacts-assessment-of-integrated-steel-plant-jsw-utkal-steel...sabrangsabrang
 
Session 3 - Implementing SEA practice in Azerbaijan by Aysel Babayeva
Session 3 -  Implementing SEA practice in Azerbaijan by Aysel BabayevaSession 3 -  Implementing SEA practice in Azerbaijan by Aysel Babayeva
Session 3 - Implementing SEA practice in Azerbaijan by Aysel BabayevaOECD Environment
 
Copernicus Atmosphere Monitoring Service - An introduction
Copernicus Atmosphere Monitoring Service - An introductionCopernicus Atmosphere Monitoring Service - An introduction
Copernicus Atmosphere Monitoring Service - An introductionCopernicus ECMWF
 
Item 1.2 - Upgrading the water monitoring capacities for SW and GW bodies
Item 1.2 -	Upgrading the water monitoring capacities for SW and GW bodiesItem 1.2 -	Upgrading the water monitoring capacities for SW and GW bodies
Item 1.2 - Upgrading the water monitoring capacities for SW and GW bodiesOECD Environment
 
Prezentare citon energen 2021 1 in
Prezentare citon energen 2021 1 inPrezentare citon energen 2021 1 in
Prezentare citon energen 2021 1 inIulian NITA
 
D5.6 Assessment of the wind and solar energy potential, and improved policy f...
D5.6 Assessment of the wind and solar energy potential, and improved policy f...D5.6 Assessment of the wind and solar energy potential, and improved policy f...
D5.6 Assessment of the wind and solar energy potential, and improved policy f...envirogrids-blacksee
 
Imelda Winters Presentation Environmental Impact Assessment
Imelda Winters Presentation Environmental Impact AssessmentImelda Winters Presentation Environmental Impact Assessment
Imelda Winters Presentation Environmental Impact AssessmentImelda Winters
 
CAMS GA Climate forcings by Bellouin
CAMS GA   Climate forcings by BellouinCAMS GA   Climate forcings by Bellouin
CAMS GA Climate forcings by BellouinCopernicus ECMWF
 

Similaire à SCOPING OF NEXT ENVIRONMENTAL ASSESSMENT OF THE “COMPLEX (CONSOLIDATED) SAFETY UPGRADE PROGRAM OF POWER UNITS OF NUCLEAR POWER PLANTS OF UKRAINE” (20)

Regulations on exploration and production of (unconventional) hydrocarbons i...
Regulations on exploration and production of (unconventional) hydrocarbons  i...Regulations on exploration and production of (unconventional) hydrocarbons  i...
Regulations on exploration and production of (unconventional) hydrocarbons i...
 
Item 0a_Special Session on Ukraine_Introduction_Yevhenii Fedorenko.pdf
Item 0a_Special Session on Ukraine_Introduction_Yevhenii Fedorenko.pdfItem 0a_Special Session on Ukraine_Introduction_Yevhenii Fedorenko.pdf
Item 0a_Special Session on Ukraine_Introduction_Yevhenii Fedorenko.pdf
 
Technical engineering in industrial ippc as a key tool for ambient air qualit...
Technical engineering in industrial ippc as a key tool for ambient air qualit...Technical engineering in industrial ippc as a key tool for ambient air qualit...
Technical engineering in industrial ippc as a key tool for ambient air qualit...
 
FP7 activities in the Environment
FP7 activities in the EnvironmentFP7 activities in the Environment
FP7 activities in the Environment
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
 
Esia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.s
Esia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.sEsia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.s
Esia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.s
 
Environmental impact assessment(EIA) For Thermal Power Plants.docx.pdf
Environmental impact assessment(EIA) For Thermal Power Plants.docx.pdfEnvironmental impact assessment(EIA) For Thermal Power Plants.docx.pdf
Environmental impact assessment(EIA) For Thermal Power Plants.docx.pdf
 
Environmental impact assessment(EIA) For Thermal Power Plants.pdf
Environmental impact assessment(EIA) For Thermal Power Plants.pdfEnvironmental impact assessment(EIA) For Thermal Power Plants.pdf
Environmental impact assessment(EIA) For Thermal Power Plants.pdf
 
Ukraine NPP Safety Upgrade Program
Ukraine NPP Safety Upgrade  ProgramUkraine NPP Safety Upgrade  Program
Ukraine NPP Safety Upgrade Program
 
Eia for railway project
Eia for railway projectEia for railway project
Eia for railway project
 
Análisis económico de algunos impactos del cambio climático en Europa: un enf...
Análisis económico de algunos impactos del cambio climático en Europa: un enf...Análisis económico de algunos impactos del cambio climático en Europa: un enf...
Análisis económico de algunos impactos del cambio climático en Europa: un enf...
 
Climate Change Impacts In Europe
Climate Change Impacts In EuropeClimate Change Impacts In Europe
Climate Change Impacts In Europe
 
Briefing health-impacts-assessment-of-integrated-steel-plant-jsw-utkal-steel...
Briefing  health-impacts-assessment-of-integrated-steel-plant-jsw-utkal-steel...Briefing  health-impacts-assessment-of-integrated-steel-plant-jsw-utkal-steel...
Briefing health-impacts-assessment-of-integrated-steel-plant-jsw-utkal-steel...
 
Session 3 - Implementing SEA practice in Azerbaijan by Aysel Babayeva
Session 3 -  Implementing SEA practice in Azerbaijan by Aysel BabayevaSession 3 -  Implementing SEA practice in Azerbaijan by Aysel Babayeva
Session 3 - Implementing SEA practice in Azerbaijan by Aysel Babayeva
 
Copernicus Atmosphere Monitoring Service - An introduction
Copernicus Atmosphere Monitoring Service - An introductionCopernicus Atmosphere Monitoring Service - An introduction
Copernicus Atmosphere Monitoring Service - An introduction
 
Item 1.2 - Upgrading the water monitoring capacities for SW and GW bodies
Item 1.2 -	Upgrading the water monitoring capacities for SW and GW bodiesItem 1.2 -	Upgrading the water monitoring capacities for SW and GW bodies
Item 1.2 - Upgrading the water monitoring capacities for SW and GW bodies
 
Prezentare citon energen 2021 1 in
Prezentare citon energen 2021 1 inPrezentare citon energen 2021 1 in
Prezentare citon energen 2021 1 in
 
D5.6 Assessment of the wind and solar energy potential, and improved policy f...
D5.6 Assessment of the wind and solar energy potential, and improved policy f...D5.6 Assessment of the wind and solar energy potential, and improved policy f...
D5.6 Assessment of the wind and solar energy potential, and improved policy f...
 
Imelda Winters Presentation Environmental Impact Assessment
Imelda Winters Presentation Environmental Impact AssessmentImelda Winters Presentation Environmental Impact Assessment
Imelda Winters Presentation Environmental Impact Assessment
 
CAMS GA Climate forcings by Bellouin
CAMS GA   Climate forcings by BellouinCAMS GA   Climate forcings by Bellouin
CAMS GA Climate forcings by Bellouin
 

Plus de НАЕК «Енергоатом»

Підсумки роботи ДП «НАЕК «Енергоатом» за 5 місяці 2020 року
Підсумки роботи ДП «НАЕК «Енергоатом» за 5 місяці 2020 рокуПідсумки роботи ДП «НАЕК «Енергоатом» за 5 місяці 2020 року
Підсумки роботи ДП «НАЕК «Енергоатом» за 5 місяці 2020 рокуНАЕК «Енергоатом»
 
Підсумки роботи ДП «НАЕК «Енергоатом» за 4 місяці 2020 року
Підсумки роботи ДП «НАЕК «Енергоатом» за 4 місяці 2020 рокуПідсумки роботи ДП «НАЕК «Енергоатом» за 4 місяці 2020 року
Підсумки роботи ДП «НАЕК «Енергоатом» за 4 місяці 2020 рокуНАЕК «Енергоатом»
 
Антикорупційна програма ДП «НАЕК «Енергоатом»
Антикорупційна програма ДП «НАЕК «Енергоатом»Антикорупційна програма ДП «НАЕК «Енергоатом»
Антикорупційна програма ДП «НАЕК «Енергоатом»НАЕК «Енергоатом»
 
Підсумки роботи ДП «НАЕК «Енергоатом» за І квартал 2020 року
Підсумки роботи ДП «НАЕК «Енергоатом» за І квартал 2020 рокуПідсумки роботи ДП «НАЕК «Енергоатом» за І квартал 2020 року
Підсумки роботи ДП «НАЕК «Енергоатом» за І квартал 2020 рокуНАЕК «Енергоатом»
 
Журнал "Енергоатом України" №2 (49) 2020, серпень-лютий
Журнал "Енергоатом України" №2 (49) 2020, серпень-лютийЖурнал "Енергоатом України" №2 (49) 2020, серпень-лютий
Журнал "Енергоатом України" №2 (49) 2020, серпень-лютийНАЕК «Енергоатом»
 
Підсумки роботи ДП «НАЕК «Енергоатом» за 2 місяці 2020 року
Підсумки роботи ДП «НАЕК «Енергоатом» за 2 місяці 2020 рокуПідсумки роботи ДП «НАЕК «Енергоатом» за 2 місяці 2020 року
Підсумки роботи ДП «НАЕК «Енергоатом» за 2 місяці 2020 рокуНАЕК «Енергоатом»
 
Звіт про управління ДП «НАЕК «Енергоатом» за 2019 рік
Звіт про управління ДП «НАЕК «Енергоатом» за 2019 рікЗвіт про управління ДП «НАЕК «Енергоатом» за 2019 рік
Звіт про управління ДП «НАЕК «Енергоатом» за 2019 рікНАЕК «Енергоатом»
 
Підсумки роботи ДП «НАЕК «Енергоатом» за січень 2020 року
Підсумки роботи ДП «НАЕК «Енергоатом» за січень 2020 рокуПідсумки роботи ДП «НАЕК «Енергоатом» за січень 2020 року
Підсумки роботи ДП «НАЕК «Енергоатом» за січень 2020 рокуНАЕК «Енергоатом»
 
Підсумки роботи НАЕК «Енергоатом» за 2019 рік
Підсумки роботи НАЕК «Енергоатом» за 2019 рікПідсумки роботи НАЕК «Енергоатом» за 2019 рік
Підсумки роботи НАЕК «Енергоатом» за 2019 рікНАЕК «Енергоатом»
 
Підсумки роботи НАЕК «Енергоатом» за 11 місяців 2019 року
Підсумки роботи НАЕК «Енергоатом» за 11 місяців 2019 рокуПідсумки роботи НАЕК «Енергоатом» за 11 місяців 2019 року
Підсумки роботи НАЕК «Енергоатом» за 11 місяців 2019 рокуНАЕК «Енергоатом»
 
Підсумки роботи НАЕК «Енергоатом» за 11 місяців 2019 року
Підсумки роботи НАЕК «Енергоатом» за 11 місяців 2019 рокуПідсумки роботи НАЕК «Енергоатом» за 11 місяців 2019 року
Підсумки роботи НАЕК «Енергоатом» за 11 місяців 2019 рокуНАЕК «Енергоатом»
 
Підсумки роботи НАЕК «Енергоатом» за 10 місяців 2019 року
Підсумки роботи НАЕК «Енергоатом» за 10 місяців 2019 рокуПідсумки роботи НАЕК «Енергоатом» за 10 місяців 2019 року
Підсумки роботи НАЕК «Енергоатом» за 10 місяців 2019 рокуНАЕК «Енергоатом»
 
Підсумки роботи НАЕК «Енергоатом» за 9 місяців 2019 року
Підсумки роботи НАЕК «Енергоатом» за 9 місяців 2019 рокуПідсумки роботи НАЕК «Енергоатом» за 9 місяців 2019 року
Підсумки роботи НАЕК «Енергоатом» за 9 місяців 2019 рокуНАЕК «Енергоатом»
 
Підсумки роботи НАЕК «Енергоатом» за 8 місяців 2019 року
Підсумки роботи НАЕК «Енергоатом» за 8 місяців 2019 рокуПідсумки роботи НАЕК «Енергоатом» за 8 місяців 2019 року
Підсумки роботи НАЕК «Енергоатом» за 8 місяців 2019 рокуНАЕК «Енергоатом»
 
Переможці та фіналісти дитячо-юнацького конкурсу творчості «Енергоатом: роби...
Переможці та фіналісти дитячо-юнацького конкурсу творчості «Енергоатом:  роби...Переможці та фіналісти дитячо-юнацького конкурсу творчості «Енергоатом:  роби...
Переможці та фіналісти дитячо-юнацького конкурсу творчості «Енергоатом: роби...НАЕК «Енергоатом»
 
Нефінансовий звіт НАЕК «Енергоатом» за 2018 рік
Нефінансовий звіт НАЕК «Енергоатом» за 2018 рікНефінансовий звіт НАЕК «Енергоатом» за 2018 рік
Нефінансовий звіт НАЕК «Енергоатом» за 2018 рікНАЕК «Енергоатом»
 
Як перемогти у тендері НАЕК «Енергоатом»: 17 практичних порад
Як перемогти у тендері НАЕК «Енергоатом»: 17 практичних порадЯк перемогти у тендері НАЕК «Енергоатом»: 17 практичних порад
Як перемогти у тендері НАЕК «Енергоатом»: 17 практичних порадНАЕК «Енергоатом»
 
How to Win a Tender of NNEGC "Energoatom": 17 practical advices
How to Win a Tender of NNEGC "Energoatom": 17 practical advicesHow to Win a Tender of NNEGC "Energoatom": 17 practical advices
How to Win a Tender of NNEGC "Energoatom": 17 practical advicesНАЕК «Енергоатом»
 
Підсумки роботи НАЕК «Енергоатом» за 7 місяців 2019 року
Підсумки роботи НАЕК «Енергоатом» за 7 місяців 2019 рокуПідсумки роботи НАЕК «Енергоатом» за 7 місяців 2019 року
Підсумки роботи НАЕК «Енергоатом» за 7 місяців 2019 рокуНАЕК «Енергоатом»
 
Підсумки роботи ДП «НАЕК «Енергоатом» за І півріччя 2019 року
Підсумки роботи ДП «НАЕК «Енергоатом» за І півріччя 2019 рокуПідсумки роботи ДП «НАЕК «Енергоатом» за І півріччя 2019 року
Підсумки роботи ДП «НАЕК «Енергоатом» за І півріччя 2019 рокуНАЕК «Енергоатом»
 

Plus de НАЕК «Енергоатом» (20)

Підсумки роботи ДП «НАЕК «Енергоатом» за 5 місяці 2020 року
Підсумки роботи ДП «НАЕК «Енергоатом» за 5 місяці 2020 рокуПідсумки роботи ДП «НАЕК «Енергоатом» за 5 місяці 2020 року
Підсумки роботи ДП «НАЕК «Енергоатом» за 5 місяці 2020 року
 
Підсумки роботи ДП «НАЕК «Енергоатом» за 4 місяці 2020 року
Підсумки роботи ДП «НАЕК «Енергоатом» за 4 місяці 2020 рокуПідсумки роботи ДП «НАЕК «Енергоатом» за 4 місяці 2020 року
Підсумки роботи ДП «НАЕК «Енергоатом» за 4 місяці 2020 року
 
Антикорупційна програма ДП «НАЕК «Енергоатом»
Антикорупційна програма ДП «НАЕК «Енергоатом»Антикорупційна програма ДП «НАЕК «Енергоатом»
Антикорупційна програма ДП «НАЕК «Енергоатом»
 
Підсумки роботи ДП «НАЕК «Енергоатом» за І квартал 2020 року
Підсумки роботи ДП «НАЕК «Енергоатом» за І квартал 2020 рокуПідсумки роботи ДП «НАЕК «Енергоатом» за І квартал 2020 року
Підсумки роботи ДП «НАЕК «Енергоатом» за І квартал 2020 року
 
Журнал "Енергоатом України" №2 (49) 2020, серпень-лютий
Журнал "Енергоатом України" №2 (49) 2020, серпень-лютийЖурнал "Енергоатом України" №2 (49) 2020, серпень-лютий
Журнал "Енергоатом України" №2 (49) 2020, серпень-лютий
 
Підсумки роботи ДП «НАЕК «Енергоатом» за 2 місяці 2020 року
Підсумки роботи ДП «НАЕК «Енергоатом» за 2 місяці 2020 рокуПідсумки роботи ДП «НАЕК «Енергоатом» за 2 місяці 2020 року
Підсумки роботи ДП «НАЕК «Енергоатом» за 2 місяці 2020 року
 
Звіт про управління ДП «НАЕК «Енергоатом» за 2019 рік
Звіт про управління ДП «НАЕК «Енергоатом» за 2019 рікЗвіт про управління ДП «НАЕК «Енергоатом» за 2019 рік
Звіт про управління ДП «НАЕК «Енергоатом» за 2019 рік
 
Підсумки роботи ДП «НАЕК «Енергоатом» за січень 2020 року
Підсумки роботи ДП «НАЕК «Енергоатом» за січень 2020 рокуПідсумки роботи ДП «НАЕК «Енергоатом» за січень 2020 року
Підсумки роботи ДП «НАЕК «Енергоатом» за січень 2020 року
 
Підсумки роботи НАЕК «Енергоатом» за 2019 рік
Підсумки роботи НАЕК «Енергоатом» за 2019 рікПідсумки роботи НАЕК «Енергоатом» за 2019 рік
Підсумки роботи НАЕК «Енергоатом» за 2019 рік
 
Підсумки роботи НАЕК «Енергоатом» за 11 місяців 2019 року
Підсумки роботи НАЕК «Енергоатом» за 11 місяців 2019 рокуПідсумки роботи НАЕК «Енергоатом» за 11 місяців 2019 року
Підсумки роботи НАЕК «Енергоатом» за 11 місяців 2019 року
 
Підсумки роботи НАЕК «Енергоатом» за 11 місяців 2019 року
Підсумки роботи НАЕК «Енергоатом» за 11 місяців 2019 рокуПідсумки роботи НАЕК «Енергоатом» за 11 місяців 2019 року
Підсумки роботи НАЕК «Енергоатом» за 11 місяців 2019 року
 
Підсумки роботи НАЕК «Енергоатом» за 10 місяців 2019 року
Підсумки роботи НАЕК «Енергоатом» за 10 місяців 2019 рокуПідсумки роботи НАЕК «Енергоатом» за 10 місяців 2019 року
Підсумки роботи НАЕК «Енергоатом» за 10 місяців 2019 року
 
Підсумки роботи НАЕК «Енергоатом» за 9 місяців 2019 року
Підсумки роботи НАЕК «Енергоатом» за 9 місяців 2019 рокуПідсумки роботи НАЕК «Енергоатом» за 9 місяців 2019 року
Підсумки роботи НАЕК «Енергоатом» за 9 місяців 2019 року
 
Підсумки роботи НАЕК «Енергоатом» за 8 місяців 2019 року
Підсумки роботи НАЕК «Енергоатом» за 8 місяців 2019 рокуПідсумки роботи НАЕК «Енергоатом» за 8 місяців 2019 року
Підсумки роботи НАЕК «Енергоатом» за 8 місяців 2019 року
 
Переможці та фіналісти дитячо-юнацького конкурсу творчості «Енергоатом: роби...
Переможці та фіналісти дитячо-юнацького конкурсу творчості «Енергоатом:  роби...Переможці та фіналісти дитячо-юнацького конкурсу творчості «Енергоатом:  роби...
Переможці та фіналісти дитячо-юнацького конкурсу творчості «Енергоатом: роби...
 
Нефінансовий звіт НАЕК «Енергоатом» за 2018 рік
Нефінансовий звіт НАЕК «Енергоатом» за 2018 рікНефінансовий звіт НАЕК «Енергоатом» за 2018 рік
Нефінансовий звіт НАЕК «Енергоатом» за 2018 рік
 
Як перемогти у тендері НАЕК «Енергоатом»: 17 практичних порад
Як перемогти у тендері НАЕК «Енергоатом»: 17 практичних порадЯк перемогти у тендері НАЕК «Енергоатом»: 17 практичних порад
Як перемогти у тендері НАЕК «Енергоатом»: 17 практичних порад
 
How to Win a Tender of NNEGC "Energoatom": 17 practical advices
How to Win a Tender of NNEGC "Energoatom": 17 practical advicesHow to Win a Tender of NNEGC "Energoatom": 17 practical advices
How to Win a Tender of NNEGC "Energoatom": 17 practical advices
 
Підсумки роботи НАЕК «Енергоатом» за 7 місяців 2019 року
Підсумки роботи НАЕК «Енергоатом» за 7 місяців 2019 рокуПідсумки роботи НАЕК «Енергоатом» за 7 місяців 2019 року
Підсумки роботи НАЕК «Енергоатом» за 7 місяців 2019 року
 
Підсумки роботи ДП «НАЕК «Енергоатом» за І півріччя 2019 року
Підсумки роботи ДП «НАЕК «Енергоатом» за І півріччя 2019 рокуПідсумки роботи ДП «НАЕК «Енергоатом» за І півріччя 2019 року
Підсумки роботи ДП «НАЕК «Енергоатом» за І півріччя 2019 року
 

Dernier

WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfJamesConcepcion7
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesAurelien Domont, MBA
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdfMintel Group
 
Paul Turovsky - Real Estate Professional
Paul Turovsky - Real Estate ProfessionalPaul Turovsky - Real Estate Professional
Paul Turovsky - Real Estate ProfessionalPaul Turovsky
 
Implementing Exponential Accelerators.pptx
Implementing Exponential Accelerators.pptxImplementing Exponential Accelerators.pptx
Implementing Exponential Accelerators.pptxRich Reba
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxRakhi Bazaar
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsKnowledgeSeed
 
Simplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansSimplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansNugget Global
 
14680-51-4.pdf Good quality CAS Good quality CAS
14680-51-4.pdf  Good  quality CAS Good  quality CAS14680-51-4.pdf  Good  quality CAS Good  quality CAS
14680-51-4.pdf Good quality CAS Good quality CAScathy664059
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 
Darshan Hiranandani (Son of Niranjan Hiranandani).pdf
Darshan Hiranandani (Son of Niranjan Hiranandani).pdfDarshan Hiranandani (Son of Niranjan Hiranandani).pdf
Darshan Hiranandani (Son of Niranjan Hiranandani).pdfShashank Mehta
 
MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024Chandresh Chudasama
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
Neha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and CareerNeha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and Careerr98588472
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverseSiemens
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...SOFTTECHHUB
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckHajeJanKamps
 
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh JiPsychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh Jiastral oracle
 
Rakhi sets symbolizing the bond of love.pptx
Rakhi sets symbolizing the bond of love.pptxRakhi sets symbolizing the bond of love.pptx
Rakhi sets symbolizing the bond of love.pptxRakhi Bazaar
 

Dernier (20)

WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdf
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and Templates
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
 
Paul Turovsky - Real Estate Professional
Paul Turovsky - Real Estate ProfessionalPaul Turovsky - Real Estate Professional
Paul Turovsky - Real Estate Professional
 
Implementing Exponential Accelerators.pptx
Implementing Exponential Accelerators.pptxImplementing Exponential Accelerators.pptx
Implementing Exponential Accelerators.pptx
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applications
 
Simplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansSimplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business Loans
 
14680-51-4.pdf Good quality CAS Good quality CAS
14680-51-4.pdf  Good  quality CAS Good  quality CAS14680-51-4.pdf  Good  quality CAS Good  quality CAS
14680-51-4.pdf Good quality CAS Good quality CAS
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 
Darshan Hiranandani (Son of Niranjan Hiranandani).pdf
Darshan Hiranandani (Son of Niranjan Hiranandani).pdfDarshan Hiranandani (Son of Niranjan Hiranandani).pdf
Darshan Hiranandani (Son of Niranjan Hiranandani).pdf
 
MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
Neha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and CareerNeha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and Career
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverse
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deck
 
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh JiPsychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
 
Rakhi sets symbolizing the bond of love.pptx
Rakhi sets symbolizing the bond of love.pptxRakhi sets symbolizing the bond of love.pptx
Rakhi sets symbolizing the bond of love.pptx
 

SCOPING OF NEXT ENVIRONMENTAL ASSESSMENT OF THE “COMPLEX (CONSOLIDATED) SAFETY UPGRADE PROGRAM OF POWER UNITS OF NUCLEAR POWER PLANTS OF UKRAINE”

  • 1. SCOPING OF NEXT ENVIRONMENTAL ASSESSMENT OF THE “COMPLEX (CONSOLIDATED) SAFETY UPGRADE PROGRAM OF POWER UNITS OF NUCLEAR POWER PLANTS OF UKRAINE”
  • 4. Aim of next EA implementation First assessment was performed in 2011 by an independent international team with the participation of the experts from the company "Poyry" (Finland, France, Switzerland and Germany), the Ukrainian Center of Environmental and Water Projects, and the company "AESKAR" (Ukraine). CCSUP EA was carried out in accordance with the EBRD Environmental and Social Policy, environmental legislation of the European Union, in particular EU Directive 2001/42/EU, and took into account the best world practices. Stakeholder Engagement Plan (SEP), Report on works scoping, Report on CCSUP EA and the corresponding Statement on the environmental consequences of CCSUP implementation were published and remain available on the official web-site of the State Enterprise "NNEGC "Energoatom" under the link: http://www.energoatom.kiev.ua/en/actvts/integrated_security_program The AIM of the next CCSUP Ecological Assessment is the reassessment of the impact on the environment during CCSUP implementation (with regard to modifications made in CCSUP in 2012 - 2015, its measures, completed during that period, as well as the actual changes in the environmental situation and its monitoring procedures, which took place since the completion of the previous CCSUP EA)
  • 5. Schedule of the next EA implementation Ecological Assessment should be finished until 1 April 2017. Measure Start Finish Public consultations regarding the scopes of the CCSUP EA June 2016 July 2016 Report publication regarding the scopes of the CCSUP EA July 2016 Implementation of the next CCSUP EA September 2016 December 2016 Publication of the Report draft on CCSUP EA December 2016 Public consultations on Report draft on CCSUP EA І quarter 2017 І quarter 2017 Publication of the public consultations report March 2017 Revision of the Report on CCSUP EA according public consultations results (if necessary) March 2017 March 2017 Transfer the Report on CCSUP EA to ecology expertise March 2017
  • 6. The next CCSUP Ecological assessment will be implemented according to requirements of the document SOU NAEK 004:2011 “Environmental Assessment of Power Units of Nuclear Power Plants. General Requirements to the Scope and Content of the Assessment Materials”, approved by the Ministry of Ecology and Natural Resources of Ukraine (the document is published and available by the link http://energoatom.kiev.ua/files/file/sou_naek_004_2011_en_(1).pdf) taking into account changes in the legislation, which occur after first CCSUP EA.
  • 7. Its planed, that scopes of the next CCSUP EA (analyzed aspects, elements of the environment, sources, types and factors of the impact, etc.) will correspond to scopes of the first CCSUP EA. A clear reference to the previous CCSUP EA Report results dated 31.01.2012, is admissible in the part, which does not require an adjustment, without its materials’ duplication. (the document is published and available by the link http://energoatom.kiev.ua/en/actvts/integrated_security_program/ 38707-zvt_pro_ekologchnu_otcnku_osnovniyi_zvt/)
  • 8. CCSUP EA Report structure Introduction 1 General Information 2 EA of CCSUP implementation results at the Zaporizhzhya NPP 2.1 General description of the NPP 2.2 Assessment of impact on natural environment 2.3 Assessment of impact on social environment 2.4 Assessment of impact on technogenic environment 2.5 Comprehensive measures to ensure standard state of environment and environmental security 2.6 Environmental impact change in the process of CCSUP implementation 3 EA of CCSUP implementation results at the Rivne NPP 4 EA of CCSUP implementation results at the Khmelnitskiy NPP 5 EA of CCSUP implementation results at the South-Ukraine NPP 6 Assessment of possible CCSUP transboundary impacts and measures aimed at informing boundary states 7 Public consultations on implementation of CCSUP 8 Mitigation or optimizing measures 9 Conclusions Annexes
  • 9. Assessment of impact on natural environment will cover following components:  climate and microclimate,  air environment;  geological environment;  aquatic environment;  soil and landscape;  flora, fauna, reserves. The next main types of impact will be analyzed during EA:  Radiation impact, results from: • Gaseous radioactive releases to the atmosphere; • Discharges to the surface reservoirs; • Solid radioactive wastes (SRW); • Liquid radioactive wastes (LRW).  Chemical impact at the atmosphere, water, or soil.  Non-radiation physical impact , in particular: • Thermal impact in connection with the normal operation of NPPs ; • Humidity increase due to the emission of water into the atmosphere; • Electromagnetic field (inside the NPP and in the vicinity of electric lines); • Acoustic impact (inside the NPP only). EA will include complex assessment of changes in the each NPP environmental impact under normal operation and changes in ecological risks (in case of accident on NPP) as a result of CCSUP implementation