3. AIRPORTS AUTHORITY OF INIDAAIRPORTS AUTHORITY OF INIDA
MISSIONMISSION
““To achieve highest standards of safetyTo achieve highest standards of safety
and quality in air traffic services andand quality in air traffic services and
airport management by providingairport management by providing
state-of-the-artstate-of-the-art infrastructure for totalinfrastructure for total
customer satisfaction, contributing tocustomer satisfaction, contributing to
economic growth and prosperity of theeconomic growth and prosperity of the
nation.”nation.”
4. AIRPORTS AUTHORITY OF INIDAAIRPORTS AUTHORITY OF INIDA
VISIONVISION
““To be world-class organizationTo be world-class organization
providing leadership in air trafficproviding leadership in air traffic
services and airport management &services and airport management &
making India a major hub in Asiamaking India a major hub in Asia
Pacific Region by 2016.”Pacific Region by 2016.”
5. AIRPORT TERMINAL BUILDING ISAIRPORT TERMINAL BUILDING IS
AN AMALGAMATION OFAN AMALGAMATION OF
•Infrastructure developmentInfrastructure development
•Building ConstructionBuilding Construction
•TransportationTransportation
•TourismTourism
•EnvironmentEnvironment
THEREFORE, IT’S ENTRYTHEREFORE, IT’S ENTRY
QUALIFIES IN THE COMPETITIONQUALIFIES IN THE COMPETITION
UNDER ALL THESE CATEGORIESUNDER ALL THESE CATEGORIES
6. AIRPORT TERMINAL IS AN INTERFACEAIRPORT TERMINAL IS AN INTERFACE
BETWEENBETWEEN
•Surface and air transportSurface and air transport
•Rail and air transportRail and air transport
•Sea and air transportSea and air transport
•Water ways and air transportWater ways and air transport
7. AIRPORT TERMINAL BUILDINGAIRPORT TERMINAL BUILDING
IS A GATEWAY OF:IS A GATEWAY OF:
•The NationThe Nation
•StateState
•Capital of a StateCapital of a State
•CityCity
8. AIRPORT TERMINAL BUILDING SPEAKSAIRPORT TERMINAL BUILDING SPEAKS
ABOUTABOUT
Development, culture, art and heritage of:Development, culture, art and heritage of:
• The NationThe Nation
• StateState
• CityCity
• AreaArea
9. AIRPORTS AUTHORITY OF INDIA ISAIRPORTS AUTHORITY OF INDIA IS
COMMITTED FORCOMMITTED FOR
•Development of the existing airport as well asDevelopment of the existing airport as well as
construction of new airports keeping in mindconstruction of new airports keeping in mind
all factors stated in the previous slides.all factors stated in the previous slides.
•Construction of New Expandable ModularConstruction of New Expandable Modular
Integrated Terminal Building at RaipurIntegrated Terminal Building at Raipur
Airport is one such Endeavour by AirportsAirport is one such Endeavour by Airports
Authority of India.Authority of India.
10. NEW EXPANDABLE MODULAR INTEGRATED TERMINALNEW EXPANDABLE MODULAR INTEGRATED TERMINAL
BUILDING AT SV AIRPORT, RAIPUR.BUILDING AT SV AIRPORT, RAIPUR.
11. SALIENT FEATURESSALIENT FEATURES
• ProjectProject Cost135.72 cr.Cost135.72 cr.
• Date of Inauguration7Date of Inauguration7thth
November 2012November 2012
• Date of commissioning11Date of commissioning11thth
November 2012November 2012
• Ground Floor Area 14000 sqm & First Floor Area 4500 sqm.Ground Floor Area 14000 sqm & First Floor Area 4500 sqm.
• Passengers Capacity – 500 Domestic & 200 InternationalPassengers Capacity – 500 Domestic & 200 International
• Car Park – 500 Cars and 10 BusesCar Park – 500 Cars and 10 Buses
• State of the art building consist of steel structure and glazing.State of the art building consist of steel structure and glazing.
• Wall Cladding with ACP and SSWall Cladding with ACP and SS
• Vitrified Tiles and granite FlooringVitrified Tiles and granite Flooring
• Perforated Metal Ceiling SystemPerforated Metal Ceiling System
• Tensile Structure for Cafeteria in Car ParkTensile Structure for Cafeteria in Car Park
• Hydro-pneumatic water supply systemHydro-pneumatic water supply system
• MBBR technology based STP 200 KLDMBBR technology based STP 200 KLD
• Water harvesting by creating artificial pond.Water harvesting by creating artificial pond.
Contd….Contd….
12. • 100 KWA solar power plant integrated with the main grid.100 KWA solar power plant integrated with the main grid.
• Centralized Air - conditioning with Building ManagementCentralized Air - conditioning with Building Management
System.System.
• 100 % Standby Power Supply100 % Standby Power Supply
• Provision of PBB, (2 at present + 2 in future)Provision of PBB, (2 at present + 2 in future)
• Provision of Lifts, Escalators, CCTV etc.Provision of Lifts, Escalators, CCTV etc.
• Provision of PA system with car calling facility.Provision of PA system with car calling facility.
• Flight Information Display SystemFlight Information Display System
• Fire Detection, Alarm & Aspiration SystemFire Detection, Alarm & Aspiration System
• Fire fighting system consists of Hydrants and SprinklersFire fighting system consists of Hydrants and Sprinklers
• State-of-art Baggage Handling System Compatible With In-State-of-art Baggage Handling System Compatible With In-
line X-ray Baggage System.line X-ray Baggage System.
SALIENT FEATURESSALIENT FEATURES
13. This project is eligible for
EEA 2013 because of
• Innovation
• Operational Excellence
• Self Reliance
• Impact
• Future Readiness
15. •Highly complex geometry of
primary roof trusses, having bi-
directional curvature, shaped
beautifully, with skylight throughout
the length provide extremely
beautiful view from inside.
17. The Challenge – A dynamic roof form
The Structure consists
of 14500 tubular
members
The multilayered roof
allows good amount
of daylight inside the
terminal
The roof emits light in
the sky which makes it
visible at night
•The curvilinear roof
form, spans 120 m.
•Maximum clear span
of 39 m and a 12 m
cantilever at airside
creating a unique
floating effect
19. •Its organic form deriving its
genesis from an “avian” is
conceived with a sliced dome at the
center and multiple wings elevating
the roof profile towards the sky
give the building a distinct beautiful
look.
25. •A green belt with a meanderings
water channel lined with glass tiles,
flowing water having turbulence
created by bubbles, plenty of art pieces
around, in the center of building
provides the passenger a mood
refreshing view.
29. •Outside greenery, beautiful
landscapes, waterfalls and water
fountains around the building, in car
parking area and along approach
roads, provide a perfect blend of
beauty of man made structure and
nature.
51. •The project cost has been maintained
within estimated cost by continuous
monitoring and taking timely cost
cutting measures but without
compromising aesthetics and functional
requirements.
•Lot of space and short travel distance
for circulation for the passengers.
57. •All required facilities for physically
challenged passengers & mothers with
small babies and World class mechanical
and electrical equipment.
•Use of sturdy and maintenance free
materials.
67. Structural Glazing
Structural Glazing with 24 mm thick double insulated glazing unit of approved
make comprising of two glass panel of 6 mm thick toughened NANO SKN 154
(Double silvered, highly neutral)+ 12 mm air gap by a metal spacer and
hermetically sealed + 6 mm clear float toughened glass on the inside as per
drawing in clear vision areas complete in all respect including periphery
sealing, providing smoke seals at floor termination level.
MAXIMISES DAYLIGHT
WHILE MINIMIZING HEAT
GAIN AND GLARE
Raipur Airport
Material Application
Glass
71. •Materials pallet has been optimized to use mostly locally available
materials.
•An Indian firm has executed the work with Indian expertise.
•The consultant is an Indian firm.
•Successful completion of marvelous building with most of Indian
materials and technologies will generate self confidence in Indian
organizations associated in such project in various ways. Even the
Indian manufacturers will be inspired to produce indigenous
materials which had to be imported.
•Display of local Indian arts inside terminal building will generate
interest among domestic / international tourists about Indian
handicrafts, which will boost local handicraft industry.
86. •It will add to development of economy of the region, improve connectivity and
promote tourism.
•It is a beautiful and intelligent building with lot of greenery / plantation inside
and outside. It will inspire others also to promote greenery around man made
structures.
•It is a green building using solar light through glazed walls and skylights to keep
the building lighted in day time. A solar power plant of 100 KW has been
established on roof of service block to generate solar power. Augmented the
natural depression of the site into a natural pond to collect rainwater for rain water
harvesting. Sewerage treatment plant for recycling treated water for horticulture
purpose has been established. All of these efforts contribute to use of
nonconventional means of power and preservation of water resources. Other
organizations also will be inspired to adopt such provisions.
•The terminal building has come up nicely and inspired State Govt. to make
additional land available for future expansion and focus on development of
airports in other cities of the state.
Successful completion of this project has highlighted the capacity of AAI as an
organization to deliver world class airport terminal at competitive cost.
87. The Site
The new expansion plan shall
facilitate an area of 25,000
sq.m and four gates catering
to the future expanding needs
by 2020.
New Integrated
Terminal
Old Terminal Building
88. The Site
Named as the Swami
Vivekananda airport, the
terminal currently, is in a
position to accommodate 1
million domestic and
international passengers
annually
The city side development
includes elaborate plans for
areas specifically dedicated to
a surface car park for 350
cars, 150 taxis,10 buses,
28 V.IP. cars at a distance
of 100m from the
terminal.
On arrival the terminal
flaunts a picturesque
panoramic lush green city
side
100. •It is a spacious building with about 26.5 sqm. plinth area per
passenger in peak hours. It provides scope to deal with increasing
traffic demand for next 10 -12 years or so.
•Currently there is no international operation but provisions have
been made to start the same without problem whenever demand
arises.
•Expansion possibilities through modular design.
•It is a structure with contemporary urban form. This will ensure
that building doesn’t look old fashioned in coming years.
•Generation of solar power, rain water harvesting, and use of
recycled sewage will help to tackle future needs of energy and
water.