Status
• Phase 1
• Punchlist – Ongoing
• VDOT, WMATA, and Fairfax County
• Fairfax County 274 items, 81 closed
• Project Closeout continues until the end of
2015
• Task Order Contract to complete remaining
punch list items
• Contingency Remaining - $8.8M
• Not all claims finalized – Forecasted to be
completed on budget ($2.905B)
• Wiehle Garage – 85% parking utilization
• Ongoing work
• Old Meadow Road
• Art in Transit
• Phase 2
• Design Build Status
• Overall Project – 18%
• Design – 81%
• Construction – 11%
• Highlights
• Enabling work on Herndon and Innovation
Center Station 1st and 2nd quarter 2015
• Aerial Guideway at Dulles Airport under
construction
• Rail Yard at Dulles Airport in design
• Budget - $2.775B
• Total Contingency - $551.M (Remaining $533.5M)
County Activities
• Phase 2 Design Reviews
• County Coordination
• Town of Herndon
• Adjacent Land Owners
• Project Partners (MWAA, VDOT, DRPT, WMATA,
Loudoun County)
• Fairfax Connector
• Phase 1 Close Out and Punchlist
• SE and 2232 for Pavilion and TPSS 13 at Herndon
submitted to Fairfax County
• Community meetings held on Herndon Station (south side)
garage
• Phase 1 and Phase 2 Annual Dulles Rail Tax Advisory
meeting held in March 2015
1
March 17, 2015
County Activities
• Herndon & Innovation Center Station garages - DPWES lead for design/construction
• Innovation Center Station Garage ($57M)
• Rezoning was approved July 2014
• Gordon and HGA Architects have been selected as part of the project team
• Schematic design complete
• Progressing with value engineering at the end of March 2015
• Start of construction expected March 2016
• Continued coordination with Rocks and MWAA
• Completion April 2018
• Herndon Garage ($58.7M)
• 2232 application was approved June 2014
• Gordon and HGA Architects have been selected as part of the project team
• Schematic design complete
• Value engineering is scheduled for April 2015
• Start of construction expected April 2016
• Public presentation to the community March 9, 2015
• Ongoing coordination with MWAA over scope of work on-site and
construction activities
• Completion April 2018
• TIFIA
• Fairfax County Closed a $ 403.3M TIFIA Loan in December 2014
2
March 17, 2015

More Related Content

What's hot

What's hot (20)

Silver Line Update July 2016
Silver Line Update July 2016Silver Line Update July 2016
Silver Line Update July 2016
 
Silver Line Phase 1-Status Report: Feb. 4, 2014
Silver Line Phase 1-Status Report: Feb. 4, 2014Silver Line Phase 1-Status Report: Feb. 4, 2014
Silver Line Phase 1-Status Report: Feb. 4, 2014
 
Agenda Item 7: Silver Line Phase II Implementation
Agenda Item 7: Silver Line Phase II ImplementationAgenda Item 7: Silver Line Phase II Implementation
Agenda Item 7: Silver Line Phase II Implementation
 
Dulles Metrorail Silver Line Phase 2 Status and Funding Update
Dulles Metrorail Silver Line Phase 2 Status and Funding UpdateDulles Metrorail Silver Line Phase 2 Status and Funding Update
Dulles Metrorail Silver Line Phase 2 Status and Funding Update
 
Transportation Priorities Plan: Future Updates
Transportation Priorities Plan: Future UpdatesTransportation Priorities Plan: Future Updates
Transportation Priorities Plan: Future Updates
 
Silver Line Phase 1-Status Report
Silver Line Phase 1-Status ReportSilver Line Phase 1-Status Report
Silver Line Phase 1-Status Report
 
Silver Line Phase 1 Status Report-Sept. 16, 2014
Silver Line Phase 1 Status Report-Sept. 16, 2014Silver Line Phase 1 Status Report-Sept. 16, 2014
Silver Line Phase 1 Status Report-Sept. 16, 2014
 
Silver Line Update - Feb. 12, 2016
Silver Line Update - Feb. 12, 2016Silver Line Update - Feb. 12, 2016
Silver Line Update - Feb. 12, 2016
 
Reston Network Analysis Unmitigated Results: Jan.15, 2016
Reston Network Analysis Unmitigated Results: Jan.15, 2016Reston Network Analysis Unmitigated Results: Jan.15, 2016
Reston Network Analysis Unmitigated Results: Jan.15, 2016
 
Transportation Plan Map In County Comprehensive Plan-Completed Facilities
Transportation Plan Map In County Comprehensive Plan-Completed FacilitiesTransportation Plan Map In County Comprehensive Plan-Completed Facilities
Transportation Plan Map In County Comprehensive Plan-Completed Facilities
 
VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps
VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next StepsVDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps
VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps
 
Reston Network Analysis: 2050 2nd Tier Mitigation Results
Reston Network Analysis: 2050 2nd Tier Mitigation ResultsReston Network Analysis: 2050 2nd Tier Mitigation Results
Reston Network Analysis: 2050 2nd Tier Mitigation Results
 
Silver Line Update: Board Transportation Committee May 24, 2016
Silver Line Update: Board Transportation Committee May 24, 2016Silver Line Update: Board Transportation Committee May 24, 2016
Silver Line Update: Board Transportation Committee May 24, 2016
 
Dulles Rail Silver Line Phase 2 Status and Funding
Dulles Rail Silver Line Phase 2 Status and FundingDulles Rail Silver Line Phase 2 Status and Funding
Dulles Rail Silver Line Phase 2 Status and Funding
 
Transportation Funding: Implementing HB 2313, Funding Process, Benefit Cost A...
Transportation Funding: Implementing HB 2313, Funding Process, Benefit Cost A...Transportation Funding: Implementing HB 2313, Funding Process, Benefit Cost A...
Transportation Funding: Implementing HB 2313, Funding Process, Benefit Cost A...
 
I-66 Inside the Beltway Framework Document
I-66 Inside the Beltway Framework DocumentI-66 Inside the Beltway Framework Document
I-66 Inside the Beltway Framework Document
 
Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)
Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)
Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)
 
Reston Network Analysis: Community Meeting Tier 1 & Tier 2
Reston Network Analysis: Community Meeting Tier 1 & Tier 2Reston Network Analysis: Community Meeting Tier 1 & Tier 2
Reston Network Analysis: Community Meeting Tier 1 & Tier 2
 
I-395 Express Lanes Extension
I-395 Express Lanes ExtensionI-395 Express Lanes Extension
I-395 Express Lanes Extension
 
Fairfax County Parkway Trail at Dulles Toll Road EB Ramp Improvement Study
Fairfax County Parkway Trail at Dulles Toll Road EB Ramp Improvement StudyFairfax County Parkway Trail at Dulles Toll Road EB Ramp Improvement Study
Fairfax County Parkway Trail at Dulles Toll Road EB Ramp Improvement Study
 

Viewers also liked

Viewers also liked (20)

Requirements for Pedestrian Improvements on Road Projects in the Board's Six ...
Requirements for Pedestrian Improvements on Road Projects in the Board's Six ...Requirements for Pedestrian Improvements on Road Projects in the Board's Six ...
Requirements for Pedestrian Improvements on Road Projects in the Board's Six ...
 
Fairfax Connector Riders Advisory Committee (RAC)
Fairfax Connector Riders Advisory Committee (RAC)Fairfax Connector Riders Advisory Committee (RAC)
Fairfax Connector Riders Advisory Committee (RAC)
 
Herndon Metrorail Stations Access Management Study (HMSAMS)
Herndon Metrorail Stations Access Management Study (HMSAMS)Herndon Metrorail Stations Access Management Study (HMSAMS)
Herndon Metrorail Stations Access Management Study (HMSAMS)
 
Update on Route 1 Multimodal Alternatives Analysis
Update on Route 1 Multimodal Alternatives AnalysisUpdate on Route 1 Multimodal Alternatives Analysis
Update on Route 1 Multimodal Alternatives Analysis
 
I-66 Multimodal Improvements Inside the Beltway
I-66 Multimodal Improvements Inside the BeltwayI-66 Multimodal Improvements Inside the Beltway
I-66 Multimodal Improvements Inside the Beltway
 
Transform 66 Outside the Beltway: Multimodal Solutions- 495 to Haymarket
Transform 66 Outside the Beltway: Multimodal Solutions- 495 to HaymarketTransform 66 Outside the Beltway: Multimodal Solutions- 495 to Haymarket
Transform 66 Outside the Beltway: Multimodal Solutions- 495 to Haymarket
 
Snow Removal on Sidewalks
Snow Removal on SidewalksSnow Removal on Sidewalks
Snow Removal on Sidewalks
 
Silver Line Update: Board Transportation Committee May 24, 2016
Silver Line Update: Board Transportation Committee May 24, 2016Silver Line Update: Board Transportation Committee May 24, 2016
Silver Line Update: Board Transportation Committee May 24, 2016
 
Silver Line Phase 1-Status Report: Sept. 2013
Silver Line Phase 1-Status Report: Sept. 2013Silver Line Phase 1-Status Report: Sept. 2013
Silver Line Phase 1-Status Report: Sept. 2013
 
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
 
Student Free Fare Program Update and Recommendations: Board Transportation Co...
Student Free Fare Program Update and Recommendations: Board Transportation Co...Student Free Fare Program Update and Recommendations: Board Transportation Co...
Student Free Fare Program Update and Recommendations: Board Transportation Co...
 
Fairfax Commercial and Industrial Property Tax for Transportation
Fairfax Commercial and Industrial Property Tax for TransportationFairfax Commercial and Industrial Property Tax for Transportation
Fairfax Commercial and Industrial Property Tax for Transportation
 
Dulles Rail Phase 1-Status Report: June 21, 2013
Dulles Rail Phase 1-Status Report: June 21, 2013Dulles Rail Phase 1-Status Report: June 21, 2013
Dulles Rail Phase 1-Status Report: June 21, 2013
 
Fairfax County and the NVTA TransAction Update
Fairfax County and the NVTA TransAction UpdateFairfax County and the NVTA TransAction Update
Fairfax County and the NVTA TransAction Update
 
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages & WMATA ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages & WMATA ...Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages & WMATA ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages & WMATA ...
 
Mobile Food Vending within VDOT Right-of-Way: Board Transportation Committee ...
Mobile Food Vending within VDOT Right-of-Way: Board Transportation Committee ...Mobile Food Vending within VDOT Right-of-Way: Board Transportation Committee ...
Mobile Food Vending within VDOT Right-of-Way: Board Transportation Committee ...
 
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
 
Metrorail SafeTrack Overview and Mitigation
Metrorail SafeTrack Overview and MitigationMetrorail SafeTrack Overview and Mitigation
Metrorail SafeTrack Overview and Mitigation
 
Fairfax Connector Silver Line Bus Service
Fairfax Connector Silver Line Bus ServiceFairfax Connector Silver Line Bus Service
Fairfax Connector Silver Line Bus Service
 
Dulles Metrorail Silver Line Phase 2 Update
Dulles Metrorail Silver Line Phase 2 UpdateDulles Metrorail Silver Line Phase 2 Update
Dulles Metrorail Silver Line Phase 2 Update
 

Similar to Board Transportation Committee Update: March 17, 2015

Similar to Board Transportation Committee Update: March 17, 2015 (20)

Silver Line Update: December 1, 2015
Silver Line Update: December 1, 2015Silver Line Update: December 1, 2015
Silver Line Update: December 1, 2015
 
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationDulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
 
Clean Water Facility Update
Clean Water Facility UpdateClean Water Facility Update
Clean Water Facility Update
 
Dulles Corridor Metrorail Project: Board Transportation Committee Update- Jul...
Dulles Corridor Metrorail Project: Board Transportation Committee Update- Jul...Dulles Corridor Metrorail Project: Board Transportation Committee Update- Jul...
Dulles Corridor Metrorail Project: Board Transportation Committee Update- Jul...
 
Dulles Corridor Metrorail Project: Silver Line Phase 2 Implementation - BTC U...
Dulles Corridor Metrorail Project: Silver Line Phase 2 Implementation - BTC U...Dulles Corridor Metrorail Project: Silver Line Phase 2 Implementation - BTC U...
Dulles Corridor Metrorail Project: Silver Line Phase 2 Implementation - BTC U...
 
Pardon Our Dust meeting, March 9, 2016
Pardon Our Dust meeting, March 9, 2016Pardon Our Dust meeting, March 9, 2016
Pardon Our Dust meeting, March 9, 2016
 
Addison Capital Projects Update
Addison Capital Projects UpdateAddison Capital Projects Update
Addison Capital Projects Update
 
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...
 
Kirby Road Sidewalk - Citizens Information Meeting: Dec. 11, 2018
Kirby Road Sidewalk - Citizens Information Meeting: Dec. 11, 2018Kirby Road Sidewalk - Citizens Information Meeting: Dec. 11, 2018
Kirby Road Sidewalk - Citizens Information Meeting: Dec. 11, 2018
 
Kirby Road Sidewalk Presentation
Kirby Road Sidewalk PresentationKirby Road Sidewalk Presentation
Kirby Road Sidewalk Presentation
 
Silver Line Update: Board Transportation Committee: Feb. 7, 2017
Silver Line Update: Board Transportation Committee: Feb. 7, 2017Silver Line Update: Board Transportation Committee: Feb. 7, 2017
Silver Line Update: Board Transportation Committee: Feb. 7, 2017
 
Backlick Road Walkway Citizens Information Meeting: Nov. 9, 2017
Backlick Road Walkway Citizens Information Meeting: Nov. 9, 2017Backlick Road Walkway Citizens Information Meeting: Nov. 9, 2017
Backlick Road Walkway Citizens Information Meeting: Nov. 9, 2017
 
Annual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDOAnnual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDO
 
Update on Reston Development and Transportation Projects
Update on Reston Development and Transportation ProjectsUpdate on Reston Development and Transportation Projects
Update on Reston Development and Transportation Projects
 
Transportation Priorities Plan Future Updates
Transportation Priorities Plan Future UpdatesTransportation Priorities Plan Future Updates
Transportation Priorities Plan Future Updates
 
Silver Line Update: Board Transportation Committee: Dec. 13, 2016
Silver Line Update: Board Transportation Committee: Dec. 13, 2016Silver Line Update: Board Transportation Committee: Dec. 13, 2016
Silver Line Update: Board Transportation Committee: Dec. 13, 2016
 
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationDulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
 
Dulles Corridor Metrorail Project: Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project: Silver Line Phase 2 ImplementationDulles Corridor Metrorail Project: Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project: Silver Line Phase 2 Implementation
 
Status Report on the Columbia Pike Streetcar and Preview of Upcoming Decisions
Status Report on the Columbia Pike Streetcar and Preview of Upcoming DecisionsStatus Report on the Columbia Pike Streetcar and Preview of Upcoming Decisions
Status Report on the Columbia Pike Streetcar and Preview of Upcoming Decisions
 
State of the City of Norman
State of the City of NormanState of the City of Norman
State of the City of Norman
 

More from Fairfax County

More from Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Recently uploaded

{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
hyt3577
 
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
PsychicRuben LoveSpells
 

Recently uploaded (20)

06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
 
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
 
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackVerified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
 
02052024_First India Newspaper Jaipur.pdf
02052024_First India Newspaper Jaipur.pdf02052024_First India Newspaper Jaipur.pdf
02052024_First India Newspaper Jaipur.pdf
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
 
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
 
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
 
Group_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeGroup_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the trade
 
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's DevelopmentNara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
 
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
 
04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf
 

Board Transportation Committee Update: March 17, 2015

  • 1. Status • Phase 1 • Punchlist – Ongoing • VDOT, WMATA, and Fairfax County • Fairfax County 274 items, 81 closed • Project Closeout continues until the end of 2015 • Task Order Contract to complete remaining punch list items • Contingency Remaining - $8.8M • Not all claims finalized – Forecasted to be completed on budget ($2.905B) • Wiehle Garage – 85% parking utilization • Ongoing work • Old Meadow Road • Art in Transit • Phase 2 • Design Build Status • Overall Project – 18% • Design – 81% • Construction – 11% • Highlights • Enabling work on Herndon and Innovation Center Station 1st and 2nd quarter 2015 • Aerial Guideway at Dulles Airport under construction • Rail Yard at Dulles Airport in design • Budget - $2.775B • Total Contingency - $551.M (Remaining $533.5M) County Activities • Phase 2 Design Reviews • County Coordination • Town of Herndon • Adjacent Land Owners • Project Partners (MWAA, VDOT, DRPT, WMATA, Loudoun County) • Fairfax Connector • Phase 1 Close Out and Punchlist • SE and 2232 for Pavilion and TPSS 13 at Herndon submitted to Fairfax County • Community meetings held on Herndon Station (south side) garage • Phase 1 and Phase 2 Annual Dulles Rail Tax Advisory meeting held in March 2015 1 March 17, 2015
  • 2. County Activities • Herndon & Innovation Center Station garages - DPWES lead for design/construction • Innovation Center Station Garage ($57M) • Rezoning was approved July 2014 • Gordon and HGA Architects have been selected as part of the project team • Schematic design complete • Progressing with value engineering at the end of March 2015 • Start of construction expected March 2016 • Continued coordination with Rocks and MWAA • Completion April 2018 • Herndon Garage ($58.7M) • 2232 application was approved June 2014 • Gordon and HGA Architects have been selected as part of the project team • Schematic design complete • Value engineering is scheduled for April 2015 • Start of construction expected April 2016 • Public presentation to the community March 9, 2015 • Ongoing coordination with MWAA over scope of work on-site and construction activities • Completion April 2018 • TIFIA • Fairfax County Closed a $ 403.3M TIFIA Loan in December 2014 2 March 17, 2015