Edsall Road Walkway Pedestrian Improvements

15 vues

Publié le

This pedestrian access improvement project connects the residential community from Timber Forest Drive to the Muslim American Society and Edsall Garden Apartments. It consisted of construction of approximately 700 linear feet of 5-foot-wide concrete sidewalk, four ADA curb ramps, storm drainage improvements, and installation of three pedestrian signals.

  • Soyez le premier à commenter

  • Soyez le premier à aimer ceci

Edsall Road Walkway Pedestrian Improvements

  1. 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Edsall Road Walkway Pedestrian Improvements Timber Forest Drive to Edsall Garden Apartments Task Order No. 69 Contract No. CN160266001 Project No. 5G25-060-024 Mason District Tax Map No. 81-1 October 7, 2019
  2. 2. Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Edsall Road Walkway Pedestrian Improvements
  3. 3. Project Details Edsall Road Walkway Pedestrian Improvements Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Description: The Edsall Road project was substantially completed on September 5, 2019. The scope of this project was the construction of concrete sidewalk, curb & gutter, curb ramp, pavement mill and overlay, pavement markings and signing, drainage improvements and the installation of pedestrian signals. Project Overview: The project is a pedestrian access improvement project to connect the residential community from Timber Forest Drive to Muslim American Society and Edsall Garden Apartment. It consisted of construction of approximately 700 LF of 5’ wide concrete sidewalk, four ADA curb ramps, storm drainage improvement, and three pedestrian signal installation. Project Team:  Design Manager, FCDOT – Masoud Hojatzadeh  Project Engineer, UDCD – Fasika Metafria  Project Inspector, UDCD – Kenneth Atkins and Abbas Eram  Land Survey Branch, UDCD – Gregory B. Harper and Christopher J. Jensen
  4. 4. Edsall Road Walkway Pedestrian Improvements Mason District , Tax Map 81-1 Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Project Location
  5. 5. Edsall Road Walkway Pedestrian Improvements Installation of Asphalt Paving Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
  6. 6. Edsall Road Walkway Pedestrian Improvements Installation of Concrete Sidewalk Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
  7. 7. Edsall Road Walkway Pedestrian Improvements Concrete Sidewalk and Curb Ramp Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
  8. 8. Edsall Road Walkway Pedestrian Improvements Installation of Pavement Markings Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
  9. 9. Edsall Road Walkway Pedestrian Improvements Installation of Pedestrian Signal Improvement Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
  10. 10. Before After Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Edsall Road Walkway Pedestrian Improvements
  11. 11. Additional Information For additional Information, please call www.fairfaxcounty.gov/publicworks Edsall Road Walkway Pedestrian Improvements Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Matthew Kaiser, Public Information Officer 703-324-8455, TTY 711 Matthew.kaiser@fairfaxcounty.gov

×