This document provides details about pedestrian improvement projects completed at Elm Street and Dolley Madison Boulevard in Fairfax County, VA. The project included construction of brick walkways, curb ramps, handrails, signs, and pavement markings. A project team led by the Department of Transportation and Utilities Design and Construction Division completed the work, which was finished in July 2016. Before and after photos show the upgrades to the brick walkway. Contact information is provided for additional details.
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
Elm Street at Dolley Madison Boulevard Pedestrian Improvements
1. A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Elm Street at Dolley Madison Boulevard Pedestrian
Improvements
Project No. 5G25-063-006
Task Order No. 2
Dranesville District
August 5, 2016
2. Elm Street at Dolley Madison Boulevard Pedestrian Improvements
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
3. Project Details
Elm Street at Dolley Madison Boulevard Pedestrian Improvements
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Description:
The Elm Street at Dolley Madison Boulevard Pedestrian Improvements project was substantially
completed on July 22, 2016. The scope of this improvement included construction of brick
walkways and curb ramps, updated pavement markings, new signs, and asphalt work.
Project Overview:
• Construction of 4 curb ramps, 1 median ramp.
• Grade improvements to brick walkway with an addition of 35 feet of handrail.
• Selective clearing for better sight distance.
• New signage, asphalt paving, and pavement markings.
Project Team:
• Department of Transportation – Max Hojatzadeh
• Utilities Design and Construction Division (UDCD) – Qais Bashir
• Project Inspector, UDCD – Jack Schambach
• Survey Analyst, UDCD – Gregory Harper
4. Elm Street at Dolley Madison Boulevard Pedestrian Improvements
Dranesville District, Tax Map #30-2
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
PROJECT SITE
5. Elm Street at Dolley Madison Boulevard Pedestrian Improvements
Construction of Brick Walkway
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
6. Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Elm Street at Dolley Madison Boulevard Pedestrian Improvements
Brick Walkway Complete
7. Before After
Elm Street at Dolley Madison Boulevard Pedestrian
Improvements
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
8. Additional Information
For additional Information, please call
www.fairfaxcounty.gov/dpwes
Pedestrian and Transit Improvements - Nutley Street at Barrick Street, Bus Sites 6226 & 6227
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Matthew Kaiser, Public Information Officer