Status of County Oversight - Lorton Landfill Closure Activities
James Patteson, Director
John Kellas, Deputy Director
March 13, 2018
Recycling, Engineering, and Environmental Compliance
Solid Waste Management Program
Outline
• Introductions
• Quick Review of SCF Areas of Interest
• General Summary of Current Status
• Anticipated Closure Schedule
• Details
– Landfill Operations
– Buffering, Landscaping, Screening, etc.
– Restoration of Property
2
Recycling, Engineering, and Environmental Compliance
Solid Waste Management Program
Introductions
• James Patteson - Director, DPWES
• John Kellas – DPWES Solid Waste Management Program Lead
• William Marsh – Land Development Services
• Tom Faha – Virginia DEQ, Northern Regional Director
• Richard Doucette - Virginia DEQ, Solid Waste Management Program
• Doug Sawyers, P.E. – Sr. Vice-President, Arcadis
3
Recycling, Engineering, and Environmental Compliance
Solid Waste Management Program
Anticipated Closure Schedule
Throughout the following sequence, DPWES and DEQ will continue to actively regulate the site.
• Continue waste disposal until the end of 2018. Concurrently, areas not subject to further waste or cover
soil placement seeded and mulched.
• 2019 - “Final Closure” begins. Construction of final cap and remaining side-slopes cover, establish
vegetative cover, install SEA-required features, where possible. Environmental monitoring and controls
continue.
• 2019-2020 – licensed P.E. certifies that closure has been completed. Signs and access barriers are
installed. Notations on property deed. DEQ inspects the site and confirms that site can enter the “Post-
Closure Care” period.
• 2020-2030 (at least) – Post-Closure Care. Environmental monitoring and controls continue. Regrading to
address differential settlement as needed, as well as repairs and maintenance of structures, ponds, final
cover, fences, etc.
• 2030 or later – licensed P.E. certifies that Post-Closure Care has been completed. Certification must
include an assessment that there is no significant increased risk, should monitoring and maintenance stop.
DEQ conducts final inspection, and issues approval to terminate post-closure care. The property is no
longer regulated as a landfill
4
Closure Plan Review
– 2006 Plan
– Proposed amendments (August
2017)
– VDEQ requirements
– SEA requirements
Recycling, Engineering, and Environmental Compliance
Solid Waste Management Program
Recycling, Engineering, and Environmental Compliance
Solid Waste Management Program
Proposed Closure Plan - Elevations
Max. Fill El. (top of waste) = 412 ft. amsl
Max. Final El. (top of final cap) = 420 ft. amsl
Reference: Permit Drawings – Closure Plan, Lorton Landfill. August 2017. Prepared by Geosyntec Consultants
Recycling, Engineering, and Environmental Compliance
Solid Waste Management Program
Proposed Closure Sequence
2017 &
Prior
2018
2019-2020
Reference: Permit Drawings – Closure Plan, Lorton Landfill. August 2017. Prepared by Geosyntec Consultants
Recycling, Engineering, and Environmental Compliance
Solid Waste Management Program
Findings – Regulatory Review
• Proposed amendments generally in conformance with VDEQ
regulatory requirements
– Exception: Gas Management Plan (under review by VDEQ)
• Positive changes:
– Bench spacing reduced
– Additional up-gradient groundwater monitoring well
– Post-Closure Care/Maintenance – increased inspection frequency
Findings – SEA Review
• Proposed amendments conform to SEA requirements:
– Public use features maintained
– Modifications made to conform to closure geometry
– Exceptions:
• Gas venting layer (SEA requirement #23) and gas vents
• Alpine Hiking Trail (not identified on SEA Landscaping Plan)
Recycling, Engineering, and Environmental Compliance
Solid Waste Management Program
Recycling, Engineering, and Environmental Compliance
Solid Waste Management Program
Public Access Areas
Access Road
Parking Sculpture
Garden
Pavilion
Restrooms
Amphitheater
Overlook
Reference: Permit Drawings – Closure Plan, Lorton Landfill. August 2017. Prepared by Geosyntec Consultants
Not shown: gates, perimeter/interior trails,
picnic areas and certain other features.
Additional Information
For additional information, please contact
www.fairfaxcounty.gov/publicworks
Recycling, Engineering, and Environmental Compliance
Solid Waste Management Program 11
John Kellas
Department of Public Works and Environmental Services
Solid Waste Management Program
703.324.5230
John.Kellas@fairfaxcounty.gov

Contenu connexe

Tendances

Crestmont circle outfall restoration
Crestmont circle outfall restorationCrestmont circle outfall restoration
Crestmont circle outfall restorationFairfax County
 
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design Review
Tucker Avenue Neighborhood  Stormwater Improvement Preliminary Design ReviewTucker Avenue Neighborhood  Stormwater Improvement Preliminary Design Review
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design ReviewFairfax County
 
Wakefield Park South Stream Restoration
Wakefield Park South Stream RestorationWakefield Park South Stream Restoration
Wakefield Park South Stream RestorationFairfax County
 
Dead Run Segment One Stream Restoration Project
Dead Run Segment One Stream Restoration ProjectDead Run Segment One Stream Restoration Project
Dead Run Segment One Stream Restoration ProjectFairfax County
 
Towlston Meadows Restoration Project
Towlston Meadows Restoration ProjectTowlston Meadows Restoration Project
Towlston Meadows Restoration ProjectFairfax County
 
Cameron Run Tributary at La Vista Drive Stream Restoration June 2020
Cameron Run Tributary at La Vista Drive Stream Restoration June 2020Cameron Run Tributary at La Vista Drive Stream Restoration June 2020
Cameron Run Tributary at La Vista Drive Stream Restoration June 2020Fairfax County
 
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public MeetingDraft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public MeetingFairfax County
 
Accotink Creek Watershed Project Wakefield Park North
Accotink Creek Watershed Project  Wakefield Park NorthAccotink Creek Watershed Project  Wakefield Park North
Accotink Creek Watershed Project Wakefield Park NorthFairfax County
 
Piney Run at Lake Werowance Stream Restoration Project
Piney Run at Lake Werowance Stream Restoration ProjectPiney Run at Lake Werowance Stream Restoration Project
Piney Run at Lake Werowance Stream Restoration ProjectFairfax County
 
Sunset Hills Road Drainage Improvement Project
Sunset Hills Road Drainage Improvement ProjectSunset Hills Road Drainage Improvement Project
Sunset Hills Road Drainage Improvement ProjectFairfax County
 
Leigh Meadow and Towlston Basin Pardon Our Dust October 2018
Leigh Meadow and Towlston Basin Pardon Our Dust October 2018Leigh Meadow and Towlston Basin Pardon Our Dust October 2018
Leigh Meadow and Towlston Basin Pardon Our Dust October 2018Fairfax County
 
Draft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public MeetingDraft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public MeetingFairfax County
 
Tucker Avenue Neighborhood - Community Meeting 3-11-2020
Tucker Avenue Neighborhood - Community Meeting 3-11-2020Tucker Avenue Neighborhood - Community Meeting 3-11-2020
Tucker Avenue Neighborhood - Community Meeting 3-11-2020Fairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Fairfax County
 
Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015Fairfax County
 
Peyton Run POD Presentation_5_12_21
 Peyton Run POD Presentation_5_12_21 Peyton Run POD Presentation_5_12_21
Peyton Run POD Presentation_5_12_21Fairfax County
 
Powerpoint tripps run at barrett road presentation website
Powerpoint   tripps run at barrett road presentation websitePowerpoint   tripps run at barrett road presentation website
Powerpoint tripps run at barrett road presentation websiteFairfax County
 
Paul Spring Branch Stream Restoration
Paul Spring Branch Stream RestorationPaul Spring Branch Stream Restoration
Paul Spring Branch Stream RestorationFairfax County
 
Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014Fairfax County
 
Colvin Run Phase I Lake Fairfax Park Stream Restoration Project
Colvin Run Phase I Lake Fairfax Park Stream Restoration ProjectColvin Run Phase I Lake Fairfax Park Stream Restoration Project
Colvin Run Phase I Lake Fairfax Park Stream Restoration ProjectFairfax County
 

Tendances (20)

Crestmont circle outfall restoration
Crestmont circle outfall restorationCrestmont circle outfall restoration
Crestmont circle outfall restoration
 
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design Review
Tucker Avenue Neighborhood  Stormwater Improvement Preliminary Design ReviewTucker Avenue Neighborhood  Stormwater Improvement Preliminary Design Review
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design Review
 
Wakefield Park South Stream Restoration
Wakefield Park South Stream RestorationWakefield Park South Stream Restoration
Wakefield Park South Stream Restoration
 
Dead Run Segment One Stream Restoration Project
Dead Run Segment One Stream Restoration ProjectDead Run Segment One Stream Restoration Project
Dead Run Segment One Stream Restoration Project
 
Towlston Meadows Restoration Project
Towlston Meadows Restoration ProjectTowlston Meadows Restoration Project
Towlston Meadows Restoration Project
 
Cameron Run Tributary at La Vista Drive Stream Restoration June 2020
Cameron Run Tributary at La Vista Drive Stream Restoration June 2020Cameron Run Tributary at La Vista Drive Stream Restoration June 2020
Cameron Run Tributary at La Vista Drive Stream Restoration June 2020
 
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public MeetingDraft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
 
Accotink Creek Watershed Project Wakefield Park North
Accotink Creek Watershed Project  Wakefield Park NorthAccotink Creek Watershed Project  Wakefield Park North
Accotink Creek Watershed Project Wakefield Park North
 
Piney Run at Lake Werowance Stream Restoration Project
Piney Run at Lake Werowance Stream Restoration ProjectPiney Run at Lake Werowance Stream Restoration Project
Piney Run at Lake Werowance Stream Restoration Project
 
Sunset Hills Road Drainage Improvement Project
Sunset Hills Road Drainage Improvement ProjectSunset Hills Road Drainage Improvement Project
Sunset Hills Road Drainage Improvement Project
 
Leigh Meadow and Towlston Basin Pardon Our Dust October 2018
Leigh Meadow and Towlston Basin Pardon Our Dust October 2018Leigh Meadow and Towlston Basin Pardon Our Dust October 2018
Leigh Meadow and Towlston Basin Pardon Our Dust October 2018
 
Draft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public MeetingDraft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public Meeting
 
Tucker Avenue Neighborhood - Community Meeting 3-11-2020
Tucker Avenue Neighborhood - Community Meeting 3-11-2020Tucker Avenue Neighborhood - Community Meeting 3-11-2020
Tucker Avenue Neighborhood - Community Meeting 3-11-2020
 
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
 
Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015
 
Peyton Run POD Presentation_5_12_21
 Peyton Run POD Presentation_5_12_21 Peyton Run POD Presentation_5_12_21
Peyton Run POD Presentation_5_12_21
 
Powerpoint tripps run at barrett road presentation website
Powerpoint   tripps run at barrett road presentation websitePowerpoint   tripps run at barrett road presentation website
Powerpoint tripps run at barrett road presentation website
 
Paul Spring Branch Stream Restoration
Paul Spring Branch Stream RestorationPaul Spring Branch Stream Restoration
Paul Spring Branch Stream Restoration
 
Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014
 
Colvin Run Phase I Lake Fairfax Park Stream Restoration Project
Colvin Run Phase I Lake Fairfax Park Stream Restoration ProjectColvin Run Phase I Lake Fairfax Park Stream Restoration Project
Colvin Run Phase I Lake Fairfax Park Stream Restoration Project
 

Similaire à Lorton Landfill Closure Status Update 3 13-18 SCF mtg

Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012Recycling and Resource Management Division
 
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018Fairfax County
 
EUCI Presentation: "Are You Prepared to Close Your Ash Ponds?" by Kent Nilsson
EUCI Presentation: "Are You Prepared to Close Your Ash Ponds?" by Kent NilssonEUCI Presentation: "Are You Prepared to Close Your Ash Ponds?" by Kent Nilsson
EUCI Presentation: "Are You Prepared to Close Your Ash Ponds?" by Kent NilssonTRC Companies, Inc.
 
Rick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther
 
Road development projects.
Road development projects.Road development projects.
Road development projects.Abhishek Rajput
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentSonikaPawar
 
TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016Travis Both
 
Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Difficult Run at Brittenford Drive Information Meeting May 17, 2017Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Difficult Run at Brittenford Drive Information Meeting May 17, 2017Fairfax County
 
I need someone to paraphrase these words just change it to dif.docx
I need someone to paraphrase these words  just change it to dif.docxI need someone to paraphrase these words  just change it to dif.docx
I need someone to paraphrase these words just change it to dif.docxwilcockiris
 
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...Fairfax County
 
Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015Fairfax County
 
Stormwater Wastewater Consolidation
Stormwater Wastewater ConsolidationStormwater Wastewater Consolidation
Stormwater Wastewater ConsolidationFairfax County
 

Similaire à Lorton Landfill Closure Status Update 3 13-18 SCF mtg (20)

The permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructureThe permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructure
 
Gude Landfill Remediation update
Gude Landfill Remediation updateGude Landfill Remediation update
Gude Landfill Remediation update
 
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012
 
Gude Landfill Remediation - June 15, 2017
Gude Landfill Remediation - June 15, 2017Gude Landfill Remediation - June 15, 2017
Gude Landfill Remediation - June 15, 2017
 
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
 
EUCI Presentation: "Are You Prepared to Close Your Ash Ponds?" by Kent Nilsson
EUCI Presentation: "Are You Prepared to Close Your Ash Ponds?" by Kent NilssonEUCI Presentation: "Are You Prepared to Close Your Ash Ponds?" by Kent Nilsson
EUCI Presentation: "Are You Prepared to Close Your Ash Ponds?" by Kent Nilsson
 
Rick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther Jr Resume
Rick Guenther Jr Resume
 
DOPWIC Program Year 2017 Applicant Workshop
DOPWIC Program Year 2017 Applicant WorkshopDOPWIC Program Year 2017 Applicant Workshop
DOPWIC Program Year 2017 Applicant Workshop
 
Gude landfill remediation 161019
Gude landfill remediation 161019Gude landfill remediation 161019
Gude landfill remediation 161019
 
Road development projects.
Road development projects.Road development projects.
Road development projects.
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016
 
Clean Ohio Program Year 2021 Applicant Workshop
Clean Ohio Program Year 2021 Applicant WorkshopClean Ohio Program Year 2021 Applicant Workshop
Clean Ohio Program Year 2021 Applicant Workshop
 
Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Difficult Run at Brittenford Drive Information Meeting May 17, 2017Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Difficult Run at Brittenford Drive Information Meeting May 17, 2017
 
I need someone to paraphrase these words just change it to dif.docx
I need someone to paraphrase these words  just change it to dif.docxI need someone to paraphrase these words  just change it to dif.docx
I need someone to paraphrase these words just change it to dif.docx
 
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
 
Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015
 
Stormwater Wastewater Consolidation
Stormwater Wastewater ConsolidationStormwater Wastewater Consolidation
Stormwater Wastewater Consolidation
 
ADBA Spring Regulatory Forum - May 2016
ADBA Spring Regulatory Forum - May 2016ADBA Spring Regulatory Forum - May 2016
ADBA Spring Regulatory Forum - May 2016
 
CV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - Copy
CV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - CopyCV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - Copy
CV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - Copy
 

Plus de Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS Fairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19 Fairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction ProgressFairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IVFairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxFairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilFairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap UpFairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
 

Plus de Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Dernier

Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170simranguptaxx69
 
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一z xss
 
التغيرات المناخية وتاثيرها على القطاع الزراعي المصري
التغيرات المناخية وتاثيرها على القطاع الزراعي المصريالتغيرات المناخية وتاثيرها على القطاع الزراعي المصري
التغيرات المناخية وتاثيرها على القطاع الزراعي المصريRawhyaShaheen
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for fooddrsk203
 
global trend Chapter 1.presentation power point
global trend Chapter 1.presentation power pointglobal trend Chapter 1.presentation power point
global trend Chapter 1.presentation power pointyohannisyohannis54
 
毕业文凭制作#回国入职#diploma#degree美国密苏里大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree美国密苏里大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree美国密苏里大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree美国密苏里大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree ttt fff
 
Title-Role of forestry in restoration of degraded lands.pptx
Title-Role of forestry in restoration of degraded lands.pptxTitle-Role of forestry in restoration of degraded lands.pptx
Title-Role of forestry in restoration of degraded lands.pptxSagar Chaudhary
 
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCRCall In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCRjennyeacort
 
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作f3774p8b
 
EMP (Environment Management Plan . .pptx
EMP (Environment Management Plan . .pptxEMP (Environment Management Plan . .pptx
EMP (Environment Management Plan . .pptxSarmad Naeem
 
LESSON 1- Eyong Pantahanan at Pangkabuhayan.pptx
LESSON 1- Eyong Pantahanan at Pangkabuhayan.pptxLESSON 1- Eyong Pantahanan at Pangkabuhayan.pptx
LESSON 1- Eyong Pantahanan at Pangkabuhayan.pptxPascualJaniceC
 
Al Jaddaf Housewife Call Girls +971509530047 Al Jaddaf Call Girls
Al Jaddaf Housewife Call Girls +971509530047 Al Jaddaf Call GirlsAl Jaddaf Housewife Call Girls +971509530047 Al Jaddaf Call Girls
Al Jaddaf Housewife Call Girls +971509530047 Al Jaddaf Call Girlstiril72860
 
Science, Technology and Nation Building.pptx
Science, Technology and Nation Building.pptxScience, Technology and Nation Building.pptx
Science, Technology and Nation Building.pptxgrandmarshall132
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"syalehistoricalreview
 
Uae-NO1 Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot, Sheik...
Uae-NO1 Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot, Sheik...Uae-NO1 Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot, Sheik...
Uae-NO1 Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot, Sheik...Amil baba
 
NO1 Certified Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil...
NO1 Certified Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil...NO1 Certified Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil...
NO1 Certified Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil...Amil baba
 
Group 4The Species of the Atlantic Forest.pdf
Group 4The Species of the Atlantic Forest.pdfGroup 4The Species of the Atlantic Forest.pdf
Group 4The Species of the Atlantic Forest.pdfs2015004
 

Dernier (20)

Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
 
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
 
التغيرات المناخية وتاثيرها على القطاع الزراعي المصري
التغيرات المناخية وتاثيرها على القطاع الزراعي المصريالتغيرات المناخية وتاثيرها على القطاع الزراعي المصري
التغيرات المناخية وتاثيرها على القطاع الزراعي المصري
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for food
 
global trend Chapter 1.presentation power point
global trend Chapter 1.presentation power pointglobal trend Chapter 1.presentation power point
global trend Chapter 1.presentation power point
 
毕业文凭制作#回国入职#diploma#degree美国密苏里大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree美国密苏里大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree美国密苏里大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree美国密苏里大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
Title-Role of forestry in restoration of degraded lands.pptx
Title-Role of forestry in restoration of degraded lands.pptxTitle-Role of forestry in restoration of degraded lands.pptx
Title-Role of forestry in restoration of degraded lands.pptx
 
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCRCall In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
 
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作
 
EMP (Environment Management Plan . .pptx
EMP (Environment Management Plan . .pptxEMP (Environment Management Plan . .pptx
EMP (Environment Management Plan . .pptx
 
young call girls in Janakpuri🔝 9953056974 🔝 escort Service
young call girls in Janakpuri🔝 9953056974 🔝 escort Serviceyoung call girls in Janakpuri🔝 9953056974 🔝 escort Service
young call girls in Janakpuri🔝 9953056974 🔝 escort Service
 
LESSON 1- Eyong Pantahanan at Pangkabuhayan.pptx
LESSON 1- Eyong Pantahanan at Pangkabuhayan.pptxLESSON 1- Eyong Pantahanan at Pangkabuhayan.pptx
LESSON 1- Eyong Pantahanan at Pangkabuhayan.pptx
 
Al Jaddaf Housewife Call Girls +971509530047 Al Jaddaf Call Girls
Al Jaddaf Housewife Call Girls +971509530047 Al Jaddaf Call GirlsAl Jaddaf Housewife Call Girls +971509530047 Al Jaddaf Call Girls
Al Jaddaf Housewife Call Girls +971509530047 Al Jaddaf Call Girls
 
Science, Technology and Nation Building.pptx
Science, Technology and Nation Building.pptxScience, Technology and Nation Building.pptx
Science, Technology and Nation Building.pptx
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"s
 
Uae-NO1 Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot, Sheik...
Uae-NO1 Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot, Sheik...Uae-NO1 Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot, Sheik...
Uae-NO1 Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot, Sheik...
 
Health Facility Electrification: State of Play
Health Facility Electrification: State of PlayHealth Facility Electrification: State of Play
Health Facility Electrification: State of Play
 
NO1 Certified Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil...
NO1 Certified Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil...NO1 Certified Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil...
NO1 Certified Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil...
 
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
 
Group 4The Species of the Atlantic Forest.pdf
Group 4The Species of the Atlantic Forest.pdfGroup 4The Species of the Atlantic Forest.pdf
Group 4The Species of the Atlantic Forest.pdf
 

Lorton Landfill Closure Status Update 3 13-18 SCF mtg

  • 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Status of County Oversight - Lorton Landfill Closure Activities James Patteson, Director John Kellas, Deputy Director March 13, 2018
  • 2. Recycling, Engineering, and Environmental Compliance Solid Waste Management Program Outline • Introductions • Quick Review of SCF Areas of Interest • General Summary of Current Status • Anticipated Closure Schedule • Details – Landfill Operations – Buffering, Landscaping, Screening, etc. – Restoration of Property 2
  • 3. Recycling, Engineering, and Environmental Compliance Solid Waste Management Program Introductions • James Patteson - Director, DPWES • John Kellas – DPWES Solid Waste Management Program Lead • William Marsh – Land Development Services • Tom Faha – Virginia DEQ, Northern Regional Director • Richard Doucette - Virginia DEQ, Solid Waste Management Program • Doug Sawyers, P.E. – Sr. Vice-President, Arcadis 3
  • 4. Recycling, Engineering, and Environmental Compliance Solid Waste Management Program Anticipated Closure Schedule Throughout the following sequence, DPWES and DEQ will continue to actively regulate the site. • Continue waste disposal until the end of 2018. Concurrently, areas not subject to further waste or cover soil placement seeded and mulched. • 2019 - “Final Closure” begins. Construction of final cap and remaining side-slopes cover, establish vegetative cover, install SEA-required features, where possible. Environmental monitoring and controls continue. • 2019-2020 – licensed P.E. certifies that closure has been completed. Signs and access barriers are installed. Notations on property deed. DEQ inspects the site and confirms that site can enter the “Post- Closure Care” period. • 2020-2030 (at least) – Post-Closure Care. Environmental monitoring and controls continue. Regrading to address differential settlement as needed, as well as repairs and maintenance of structures, ponds, final cover, fences, etc. • 2030 or later – licensed P.E. certifies that Post-Closure Care has been completed. Certification must include an assessment that there is no significant increased risk, should monitoring and maintenance stop. DEQ conducts final inspection, and issues approval to terminate post-closure care. The property is no longer regulated as a landfill 4
  • 5. Closure Plan Review – 2006 Plan – Proposed amendments (August 2017) – VDEQ requirements – SEA requirements Recycling, Engineering, and Environmental Compliance Solid Waste Management Program
  • 6. Recycling, Engineering, and Environmental Compliance Solid Waste Management Program Proposed Closure Plan - Elevations Max. Fill El. (top of waste) = 412 ft. amsl Max. Final El. (top of final cap) = 420 ft. amsl Reference: Permit Drawings – Closure Plan, Lorton Landfill. August 2017. Prepared by Geosyntec Consultants
  • 7. Recycling, Engineering, and Environmental Compliance Solid Waste Management Program Proposed Closure Sequence 2017 & Prior 2018 2019-2020 Reference: Permit Drawings – Closure Plan, Lorton Landfill. August 2017. Prepared by Geosyntec Consultants
  • 8. Recycling, Engineering, and Environmental Compliance Solid Waste Management Program Findings – Regulatory Review • Proposed amendments generally in conformance with VDEQ regulatory requirements – Exception: Gas Management Plan (under review by VDEQ) • Positive changes: – Bench spacing reduced – Additional up-gradient groundwater monitoring well – Post-Closure Care/Maintenance – increased inspection frequency
  • 9. Findings – SEA Review • Proposed amendments conform to SEA requirements: – Public use features maintained – Modifications made to conform to closure geometry – Exceptions: • Gas venting layer (SEA requirement #23) and gas vents • Alpine Hiking Trail (not identified on SEA Landscaping Plan) Recycling, Engineering, and Environmental Compliance Solid Waste Management Program
  • 10. Recycling, Engineering, and Environmental Compliance Solid Waste Management Program Public Access Areas Access Road Parking Sculpture Garden Pavilion Restrooms Amphitheater Overlook Reference: Permit Drawings – Closure Plan, Lorton Landfill. August 2017. Prepared by Geosyntec Consultants Not shown: gates, perimeter/interior trails, picnic areas and certain other features.
  • 11. Additional Information For additional information, please contact www.fairfaxcounty.gov/publicworks Recycling, Engineering, and Environmental Compliance Solid Waste Management Program 11 John Kellas Department of Public Works and Environmental Services Solid Waste Management Program 703.324.5230 John.Kellas@fairfaxcounty.gov