Project No. WW-000009-007
Mount Vernon District
March 29, 2018
Pohick Stream Stabilization Phase II – Areas 2 & 3
Pohick Stream Stabilization Phase II – Areas 2 & 3
Capital Facilities/Wastewater Design and Construction Division/Treatment Branch
Project Details
Pohick Stream Stabilization Phase II – Areas 2 & 3
Capital Facilities/Wastewater Design and Construction Division/Treatment Branch
Description:
This project included approximately 1,000 feet of stream work involving the stabilization of areas 2 & 3 of Pohick
Creek located along the southern and western perimeter of the Noman M. Cole Jr., Pollution Control Plant (NCPCP).
This portion of embankment was badly undermined and had been endangered of encroaching upon the NCPCP fence
line towards the equalization basins. This project was substantially complete on February 22, 2018.
Project Overview:
Area 2:
- Moving the embankment line away from the equalization basin (50 feet back from the original location)
- Installation of an imbricated rock wall on the north side embankment
- Installation of 4 rock veins
- Placement of Class II stone on the south embankment facing direct flow impact of the stream
- Re-grading and coir matting placement on the southern embankment
Area 3:
- Moving the Hogge Run tributary away from the equalization basin (10 feet back from the original location)
- Placement of Class I rock on the western toe
- Placement of coir matting on the east side of the stream
Project Team:
• Mohamed Madih, P.E., Wastewater Design and Construction Division
• Badana Mohamadi, Wastewater Design and Construction Division
• Chris Triolo, P.E., Utilities Design and Construction Branch
• Nikta Attar, Wastewater Treatment Division
• David Cooper, Resident Engineer Services
Pohick Stream Stabilization Phase II – Areas 2 & 3
Capital Facilities/Wastewater Design and Construction Division/Treatment Branch
Mount Vernon District, Tax Map No. 108-3
Area 2
Pohick Stream Stabilization Phase II – Areas 2 & 3
Capital Facilities/Wastewater Design and Construction Division/Treatment Branch
Installation of Class I Stone Along Hogge Run
Pohick Stream Stabilization Phase II – Areas 2 & 3
Capital Facilities/Wastewater Design and Construction Division/Treatment Branch
Placement of Coir Matting in Area 3
Pohick Stream Stabilization Phase II – Areas 2 & 3
Capital Facilities/Wastewater Design and Construction Division/Treatment Branch
Armoring Embankment Turn in Area 2
Pohick Stream Stabilization Phase II – Areas 2 & 3
Capital Facilities/Wastewater Design and Construction Division/Treatment Branch
Severe Undermining of North Side Embankment
Pohick Stream Stabilization Phase II – Areas 2 & 3
Capital Facilities/Wastewater Design and Construction Division/Treatment Branch
Imbricated Stone Wall Development
Capital Facilities/Wastewater Design and Construction Division/Treatment Branch
Pohick Stream Stabilization Phase II – Areas 2 & 3
Rock Weir Tie-in to the South Embankment
Pohick Stream Stabilization Phase II – Areas 2 & 3
Capital Facilities/Wastewater Design and Construction Division/Treatment Branch
Finished Rock Vein
Pohick Stream Stabilization Phase II – Areas 2 & 3
Capital Facilities/Wastewater Design and Construction Division/Treatment Branch
Regrading and Coir Matting Placement in South Side of Area 2
Before After
Capital Facilities/Wastewater Design and Construction Division/Treatment Branch
Pohick Stream Stabilization Phase II – Areas 2 & 3
Completed Planting Work
Additional Information
For additional Information, please call
www.fairfaxcounty.gov/dpwes
Pohick Stream Stabilization Phase II – Areas 2 & 3
Capital Facilities/Wastewater Design and Construction Division/Treatment Branch
Matthew Kaiser, Public Information Officer
703-324-8455, TTY 711
Matthew.Kaiser@fairfaxcounty.gov

Contenu connexe

Tendances

Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2Fairfax County
 
Slipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway DriveSlipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway DriveFairfax County
 
Paul Springs Segment 1 & 2 Stream Restoration
Paul Springs Segment 1 & 2 Stream RestorationPaul Springs Segment 1 & 2 Stream Restoration
Paul Springs Segment 1 & 2 Stream RestorationFairfax County
 
Flatlick Branch Phase II Stream Restoration Project
Flatlick Branch Phase II Stream Restoration ProjectFlatlick Branch Phase II Stream Restoration Project
Flatlick Branch Phase II Stream Restoration ProjectFairfax County
 
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement Project
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement ProjectFranklin Park and Chesterbrook Neighborhood Stormwater Improvement Project
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement ProjectFairfax County
 
Accotink Creek at Wakefield Park Stream Restoration Project
Accotink Creek at Wakefield Park Stream Restoration ProjectAccotink Creek at Wakefield Park Stream Restoration Project
Accotink Creek at Wakefield Park Stream Restoration ProjectFairfax County
 
Old Keene Mill Emergency Gravity Sewer
Old Keene Mill Emergency Gravity SewerOld Keene Mill Emergency Gravity Sewer
Old Keene Mill Emergency Gravity SewerFairfax County
 
Historic Jail Roof Replacement
Historic Jail Roof ReplacementHistoric Jail Roof Replacement
Historic Jail Roof ReplacementFairfax County
 
Holmes Run Weir Diversion Structure February 2016
Holmes Run Weir Diversion Structure February 2016Holmes Run Weir Diversion Structure February 2016
Holmes Run Weir Diversion Structure February 2016Fairfax County
 
Pike Branch at Wilton Road Presentation
Pike Branch at Wilton Road PresentationPike Branch at Wilton Road Presentation
Pike Branch at Wilton Road PresentationFairfax County
 
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Fairfax County
 
Hunting Creek at Fairfield Stream Restoration
Hunting Creek at Fairfield Stream RestorationHunting Creek at Fairfield Stream Restoration
Hunting Creek at Fairfield Stream RestorationFairfax County
 
Pinecrest Golf Course Stream Restoration April 2016
Pinecrest Golf Course Stream Restoration April 2016Pinecrest Golf Course Stream Restoration April 2016
Pinecrest Golf Course Stream Restoration April 2016Fairfax County
 
Pohick Creek Restoration Project Phase I June 2016
Pohick Creek Restoration Project Phase I June 2016Pohick Creek Restoration Project Phase I June 2016
Pohick Creek Restoration Project Phase I June 2016Fairfax County
 
High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project
  High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project  High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project
High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations ProjectFairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
 
Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community MeetingSpringfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community MeetingFairfax County
 
Dead Run Stream Restoration Segment 2 – 3
Dead Run Stream Restoration Segment 2 – 3Dead Run Stream Restoration Segment 2 – 3
Dead Run Stream Restoration Segment 2 – 3Fairfax County
 
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementLong Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementFairfax County
 
Newington Commons Pond Improvement
Newington Commons Pond ImprovementNewington Commons Pond Improvement
Newington Commons Pond ImprovementFairfax County
 

Tendances (20)

Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2
 
Slipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway DriveSlipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway Drive
 
Paul Springs Segment 1 & 2 Stream Restoration
Paul Springs Segment 1 & 2 Stream RestorationPaul Springs Segment 1 & 2 Stream Restoration
Paul Springs Segment 1 & 2 Stream Restoration
 
Flatlick Branch Phase II Stream Restoration Project
Flatlick Branch Phase II Stream Restoration ProjectFlatlick Branch Phase II Stream Restoration Project
Flatlick Branch Phase II Stream Restoration Project
 
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement Project
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement ProjectFranklin Park and Chesterbrook Neighborhood Stormwater Improvement Project
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement Project
 
Accotink Creek at Wakefield Park Stream Restoration Project
Accotink Creek at Wakefield Park Stream Restoration ProjectAccotink Creek at Wakefield Park Stream Restoration Project
Accotink Creek at Wakefield Park Stream Restoration Project
 
Old Keene Mill Emergency Gravity Sewer
Old Keene Mill Emergency Gravity SewerOld Keene Mill Emergency Gravity Sewer
Old Keene Mill Emergency Gravity Sewer
 
Historic Jail Roof Replacement
Historic Jail Roof ReplacementHistoric Jail Roof Replacement
Historic Jail Roof Replacement
 
Holmes Run Weir Diversion Structure February 2016
Holmes Run Weir Diversion Structure February 2016Holmes Run Weir Diversion Structure February 2016
Holmes Run Weir Diversion Structure February 2016
 
Pike Branch at Wilton Road Presentation
Pike Branch at Wilton Road PresentationPike Branch at Wilton Road Presentation
Pike Branch at Wilton Road Presentation
 
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
 
Hunting Creek at Fairfield Stream Restoration
Hunting Creek at Fairfield Stream RestorationHunting Creek at Fairfield Stream Restoration
Hunting Creek at Fairfield Stream Restoration
 
Pinecrest Golf Course Stream Restoration April 2016
Pinecrest Golf Course Stream Restoration April 2016Pinecrest Golf Course Stream Restoration April 2016
Pinecrest Golf Course Stream Restoration April 2016
 
Pohick Creek Restoration Project Phase I June 2016
Pohick Creek Restoration Project Phase I June 2016Pohick Creek Restoration Project Phase I June 2016
Pohick Creek Restoration Project Phase I June 2016
 
High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project
  High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project  High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project
High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community MeetingSpringfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
 
Dead Run Stream Restoration Segment 2 – 3
Dead Run Stream Restoration Segment 2 – 3Dead Run Stream Restoration Segment 2 – 3
Dead Run Stream Restoration Segment 2 – 3
 
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementLong Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
 
Newington Commons Pond Improvement
Newington Commons Pond ImprovementNewington Commons Pond Improvement
Newington Commons Pond Improvement
 

Similaire à Pohick Stream Stabilization Phase II - Areas 2 and 3

Pohick Creek Restoration Project - Phase 1
Pohick Creek Restoration Project - Phase 1Pohick Creek Restoration Project - Phase 1
Pohick Creek Restoration Project - Phase 1Fairfax County
 
Flatlick Branch III Stream Restoration June 6, 2020
Flatlick Branch III Stream Restoration June 6, 2020Flatlick Branch III Stream Restoration June 6, 2020
Flatlick Branch III Stream Restoration June 6, 2020Fairfax County
 
Substantial completion flatlick branch iii stream restoration
Substantial completion   flatlick branch iii stream restorationSubstantial completion   flatlick branch iii stream restoration
Substantial completion flatlick branch iii stream restorationFairfax County
 
Backlick Run Gravity Sewer Abandonment Project June 2020
Backlick Run Gravity Sewer Abandonment Project June 2020Backlick Run Gravity Sewer Abandonment Project June 2020
Backlick Run Gravity Sewer Abandonment Project June 2020Fairfax County
 
Pohick Creek Tributary at Queen Victoria - Stream Restoration
Pohick Creek Tributary at Queen Victoria - Stream RestorationPohick Creek Tributary at Queen Victoria - Stream Restoration
Pohick Creek Tributary at Queen Victoria - Stream RestorationFairfax County
 
Dead Run Stream Restoration at McLean Central Park - Segments 2 and 3
Dead Run Stream Restoration at McLean Central Park - Segments 2 and 3Dead Run Stream Restoration at McLean Central Park - Segments 2 and 3
Dead Run Stream Restoration at McLean Central Park - Segments 2 and 3Fairfax County
 
Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020
Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020
Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020Fairfax County
 
Nancemond Street Outfall Stabilization
Nancemond Street Outfall StabilizationNancemond Street Outfall Stabilization
Nancemond Street Outfall StabilizationFairfax County
 
Oakton Community Park Phase 2A
Oakton Community Park Phase 2AOakton Community Park Phase 2A
Oakton Community Park Phase 2AFairfax County
 
Stone Mill Court Project Completion
Stone Mill Court Project CompletionStone Mill Court Project Completion
Stone Mill Court Project CompletionFairfax County
 
Big Rocky Run Phase II Stream Restoration
Big Rocky Run Phase II Stream RestorationBig Rocky Run Phase II Stream Restoration
Big Rocky Run Phase II Stream RestorationFairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
 
Sutton Oaks Pond Improvements
Sutton Oaks Pond ImprovementsSutton Oaks Pond Improvements
Sutton Oaks Pond ImprovementsFairfax County
 
Lake Martin Tributary at Foxwood HOA Stream Restoration
Lake Martin Tributary at Foxwood HOA Stream RestorationLake Martin Tributary at Foxwood HOA Stream Restoration
Lake Martin Tributary at Foxwood HOA Stream RestorationFairfax County
 
Wellington ii Force Main Emergency Project Jan 8, 2021
Wellington ii Force Main Emergency Project Jan 8, 2021Wellington ii Force Main Emergency Project Jan 8, 2021
Wellington ii Force Main Emergency Project Jan 8, 2021Fairfax County
 
Green Hill Estates Emergency Sewer Repair
Green Hill Estates Emergency Sewer RepairGreen Hill Estates Emergency Sewer Repair
Green Hill Estates Emergency Sewer RepairFairfax County
 
Green Hill Estates Emergency Sewer Repair
Green Hill Estates Emergency Sewer RepairGreen Hill Estates Emergency Sewer Repair
Green Hill Estates Emergency Sewer RepairFairfax County
 
Merrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation ProjectMerrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation ProjectFairfax County
 
Peppercorn Drive Outfall Restoration
Peppercorn Drive Outfall RestorationPeppercorn Drive Outfall Restoration
Peppercorn Drive Outfall RestorationFairfax County
 
Brown's Chapel Property Pond and Outfall Improvement
Brown's Chapel Property Pond and Outfall ImprovementBrown's Chapel Property Pond and Outfall Improvement
Brown's Chapel Property Pond and Outfall ImprovementFairfax County
 

Similaire à Pohick Stream Stabilization Phase II - Areas 2 and 3 (20)

Pohick Creek Restoration Project - Phase 1
Pohick Creek Restoration Project - Phase 1Pohick Creek Restoration Project - Phase 1
Pohick Creek Restoration Project - Phase 1
 
Flatlick Branch III Stream Restoration June 6, 2020
Flatlick Branch III Stream Restoration June 6, 2020Flatlick Branch III Stream Restoration June 6, 2020
Flatlick Branch III Stream Restoration June 6, 2020
 
Substantial completion flatlick branch iii stream restoration
Substantial completion   flatlick branch iii stream restorationSubstantial completion   flatlick branch iii stream restoration
Substantial completion flatlick branch iii stream restoration
 
Backlick Run Gravity Sewer Abandonment Project June 2020
Backlick Run Gravity Sewer Abandonment Project June 2020Backlick Run Gravity Sewer Abandonment Project June 2020
Backlick Run Gravity Sewer Abandonment Project June 2020
 
Pohick Creek Tributary at Queen Victoria - Stream Restoration
Pohick Creek Tributary at Queen Victoria - Stream RestorationPohick Creek Tributary at Queen Victoria - Stream Restoration
Pohick Creek Tributary at Queen Victoria - Stream Restoration
 
Dead Run Stream Restoration at McLean Central Park - Segments 2 and 3
Dead Run Stream Restoration at McLean Central Park - Segments 2 and 3Dead Run Stream Restoration at McLean Central Park - Segments 2 and 3
Dead Run Stream Restoration at McLean Central Park - Segments 2 and 3
 
Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020
Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020
Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020
 
Nancemond Street Outfall Stabilization
Nancemond Street Outfall StabilizationNancemond Street Outfall Stabilization
Nancemond Street Outfall Stabilization
 
Oakton Community Park Phase 2A
Oakton Community Park Phase 2AOakton Community Park Phase 2A
Oakton Community Park Phase 2A
 
Stone Mill Court Project Completion
Stone Mill Court Project CompletionStone Mill Court Project Completion
Stone Mill Court Project Completion
 
Big Rocky Run Phase II Stream Restoration
Big Rocky Run Phase II Stream RestorationBig Rocky Run Phase II Stream Restoration
Big Rocky Run Phase II Stream Restoration
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sutton Oaks Pond Improvements
Sutton Oaks Pond ImprovementsSutton Oaks Pond Improvements
Sutton Oaks Pond Improvements
 
Lake Martin Tributary at Foxwood HOA Stream Restoration
Lake Martin Tributary at Foxwood HOA Stream RestorationLake Martin Tributary at Foxwood HOA Stream Restoration
Lake Martin Tributary at Foxwood HOA Stream Restoration
 
Wellington ii Force Main Emergency Project Jan 8, 2021
Wellington ii Force Main Emergency Project Jan 8, 2021Wellington ii Force Main Emergency Project Jan 8, 2021
Wellington ii Force Main Emergency Project Jan 8, 2021
 
Green Hill Estates Emergency Sewer Repair
Green Hill Estates Emergency Sewer RepairGreen Hill Estates Emergency Sewer Repair
Green Hill Estates Emergency Sewer Repair
 
Green Hill Estates Emergency Sewer Repair
Green Hill Estates Emergency Sewer RepairGreen Hill Estates Emergency Sewer Repair
Green Hill Estates Emergency Sewer Repair
 
Merrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation ProjectMerrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation Project
 
Peppercorn Drive Outfall Restoration
Peppercorn Drive Outfall RestorationPeppercorn Drive Outfall Restoration
Peppercorn Drive Outfall Restoration
 
Brown's Chapel Property Pond and Outfall Improvement
Brown's Chapel Property Pond and Outfall ImprovementBrown's Chapel Property Pond and Outfall Improvement
Brown's Chapel Property Pond and Outfall Improvement
 

Plus de Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS Fairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19 Fairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction ProgressFairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IVFairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxFairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilFairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap UpFairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
 
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Fairfax County
 
Reston Fire Station #25
Reston Fire Station #25Reston Fire Station #25
Reston Fire Station #25Fairfax County
 
Reston Arts Center Community Meeting 02-28-22
Reston Arts Center Community Meeting 02-28-22Reston Arts Center Community Meeting 02-28-22
Reston Arts Center Community Meeting 02-28-22Fairfax County
 

Plus de Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
 
Reston Fire Station #25
Reston Fire Station #25Reston Fire Station #25
Reston Fire Station #25
 
Reston Arts Center Community Meeting 02-28-22
Reston Arts Center Community Meeting 02-28-22Reston Arts Center Community Meeting 02-28-22
Reston Arts Center Community Meeting 02-28-22
 

Dernier

Mohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptxMohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptxKISHAN KUMAR
 
Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)Bahzad5
 
Multicomponent Spiral Wound Membrane Separation Model.pdf
Multicomponent Spiral Wound Membrane Separation Model.pdfMulticomponent Spiral Wound Membrane Separation Model.pdf
Multicomponent Spiral Wound Membrane Separation Model.pdfGiovanaGhasary1
 
Test of Significance of Large Samples for Mean = µ.pptx
Test of Significance of Large Samples for Mean = µ.pptxTest of Significance of Large Samples for Mean = µ.pptx
Test of Significance of Large Samples for Mean = µ.pptxHome
 
Technology Features of Apollo HDD Machine, Its Technical Specification with C...
Technology Features of Apollo HDD Machine, Its Technical Specification with C...Technology Features of Apollo HDD Machine, Its Technical Specification with C...
Technology Features of Apollo HDD Machine, Its Technical Specification with C...Apollo Techno Industries Pvt Ltd
 
IT3401-WEB ESSENTIALS PRESENTATIONS.pptx
IT3401-WEB ESSENTIALS PRESENTATIONS.pptxIT3401-WEB ESSENTIALS PRESENTATIONS.pptx
IT3401-WEB ESSENTIALS PRESENTATIONS.pptxSAJITHABANUS
 
ASME BPVC 2023 Section I para leer y entender
ASME BPVC 2023 Section I para leer y entenderASME BPVC 2023 Section I para leer y entender
ASME BPVC 2023 Section I para leer y entenderjuancarlos286641
 
Modelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovationsModelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovationsYusuf Yıldız
 
Phase noise transfer functions.pptx
Phase noise transfer      functions.pptxPhase noise transfer      functions.pptx
Phase noise transfer functions.pptxSaiGouthamSunkara
 
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdf
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdfRenewable Energy & Entrepreneurship Workshop_21Feb2024.pdf
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdfodunowoeminence2019
 
ChatGPT-and-Generative-AI-Landscape Working of generative ai search
ChatGPT-and-Generative-AI-Landscape Working of generative ai searchChatGPT-and-Generative-AI-Landscape Working of generative ai search
ChatGPT-and-Generative-AI-Landscape Working of generative ai searchrohitcse52
 
Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...
Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...
Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...Amil baba
 
Basic Principle of Electrochemical Sensor
Basic Principle of  Electrochemical SensorBasic Principle of  Electrochemical Sensor
Basic Principle of Electrochemical SensorTanvir Moin
 
UNIT4_ESD_wfffffggggggggggggith_ARM.pptx
UNIT4_ESD_wfffffggggggggggggith_ARM.pptxUNIT4_ESD_wfffffggggggggggggith_ARM.pptx
UNIT4_ESD_wfffffggggggggggggith_ARM.pptxrealme6igamerr
 
Transforming Process Safety Management: Challenges, Benefits, and Transition ...
Transforming Process Safety Management: Challenges, Benefits, and Transition ...Transforming Process Safety Management: Challenges, Benefits, and Transition ...
Transforming Process Safety Management: Challenges, Benefits, and Transition ...soginsider
 
Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...
Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...
Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...Amil baba
 
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docx
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docxSUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docx
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docxNaveenVerma126
 
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS Bahzad5
 

Dernier (20)

Lecture 2 .pptx
Lecture 2                            .pptxLecture 2                            .pptx
Lecture 2 .pptx
 
Mohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptxMohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptx
 
Lecture 4 .pdf
Lecture 4                              .pdfLecture 4                              .pdf
Lecture 4 .pdf
 
Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)
 
Multicomponent Spiral Wound Membrane Separation Model.pdf
Multicomponent Spiral Wound Membrane Separation Model.pdfMulticomponent Spiral Wound Membrane Separation Model.pdf
Multicomponent Spiral Wound Membrane Separation Model.pdf
 
Test of Significance of Large Samples for Mean = µ.pptx
Test of Significance of Large Samples for Mean = µ.pptxTest of Significance of Large Samples for Mean = µ.pptx
Test of Significance of Large Samples for Mean = µ.pptx
 
Technology Features of Apollo HDD Machine, Its Technical Specification with C...
Technology Features of Apollo HDD Machine, Its Technical Specification with C...Technology Features of Apollo HDD Machine, Its Technical Specification with C...
Technology Features of Apollo HDD Machine, Its Technical Specification with C...
 
IT3401-WEB ESSENTIALS PRESENTATIONS.pptx
IT3401-WEB ESSENTIALS PRESENTATIONS.pptxIT3401-WEB ESSENTIALS PRESENTATIONS.pptx
IT3401-WEB ESSENTIALS PRESENTATIONS.pptx
 
ASME BPVC 2023 Section I para leer y entender
ASME BPVC 2023 Section I para leer y entenderASME BPVC 2023 Section I para leer y entender
ASME BPVC 2023 Section I para leer y entender
 
Modelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovationsModelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovations
 
Phase noise transfer functions.pptx
Phase noise transfer      functions.pptxPhase noise transfer      functions.pptx
Phase noise transfer functions.pptx
 
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdf
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdfRenewable Energy & Entrepreneurship Workshop_21Feb2024.pdf
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdf
 
ChatGPT-and-Generative-AI-Landscape Working of generative ai search
ChatGPT-and-Generative-AI-Landscape Working of generative ai searchChatGPT-and-Generative-AI-Landscape Working of generative ai search
ChatGPT-and-Generative-AI-Landscape Working of generative ai search
 
Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...
Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...
Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...
 
Basic Principle of Electrochemical Sensor
Basic Principle of  Electrochemical SensorBasic Principle of  Electrochemical Sensor
Basic Principle of Electrochemical Sensor
 
UNIT4_ESD_wfffffggggggggggggith_ARM.pptx
UNIT4_ESD_wfffffggggggggggggith_ARM.pptxUNIT4_ESD_wfffffggggggggggggith_ARM.pptx
UNIT4_ESD_wfffffggggggggggggith_ARM.pptx
 
Transforming Process Safety Management: Challenges, Benefits, and Transition ...
Transforming Process Safety Management: Challenges, Benefits, and Transition ...Transforming Process Safety Management: Challenges, Benefits, and Transition ...
Transforming Process Safety Management: Challenges, Benefits, and Transition ...
 
Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...
Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...
Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...
 
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docx
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docxSUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docx
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docx
 
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
 

Pohick Stream Stabilization Phase II - Areas 2 and 3

  • 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Project No. WW-000009-007 Mount Vernon District March 29, 2018 Pohick Stream Stabilization Phase II – Areas 2 & 3
  • 2. Pohick Stream Stabilization Phase II – Areas 2 & 3 Capital Facilities/Wastewater Design and Construction Division/Treatment Branch
  • 3. Project Details Pohick Stream Stabilization Phase II – Areas 2 & 3 Capital Facilities/Wastewater Design and Construction Division/Treatment Branch Description: This project included approximately 1,000 feet of stream work involving the stabilization of areas 2 & 3 of Pohick Creek located along the southern and western perimeter of the Noman M. Cole Jr., Pollution Control Plant (NCPCP). This portion of embankment was badly undermined and had been endangered of encroaching upon the NCPCP fence line towards the equalization basins. This project was substantially complete on February 22, 2018. Project Overview: Area 2: - Moving the embankment line away from the equalization basin (50 feet back from the original location) - Installation of an imbricated rock wall on the north side embankment - Installation of 4 rock veins - Placement of Class II stone on the south embankment facing direct flow impact of the stream - Re-grading and coir matting placement on the southern embankment Area 3: - Moving the Hogge Run tributary away from the equalization basin (10 feet back from the original location) - Placement of Class I rock on the western toe - Placement of coir matting on the east side of the stream Project Team: • Mohamed Madih, P.E., Wastewater Design and Construction Division • Badana Mohamadi, Wastewater Design and Construction Division • Chris Triolo, P.E., Utilities Design and Construction Branch • Nikta Attar, Wastewater Treatment Division • David Cooper, Resident Engineer Services
  • 4. Pohick Stream Stabilization Phase II – Areas 2 & 3 Capital Facilities/Wastewater Design and Construction Division/Treatment Branch Mount Vernon District, Tax Map No. 108-3 Area 2
  • 5. Pohick Stream Stabilization Phase II – Areas 2 & 3 Capital Facilities/Wastewater Design and Construction Division/Treatment Branch Installation of Class I Stone Along Hogge Run
  • 6. Pohick Stream Stabilization Phase II – Areas 2 & 3 Capital Facilities/Wastewater Design and Construction Division/Treatment Branch Placement of Coir Matting in Area 3
  • 7. Pohick Stream Stabilization Phase II – Areas 2 & 3 Capital Facilities/Wastewater Design and Construction Division/Treatment Branch Armoring Embankment Turn in Area 2
  • 8. Pohick Stream Stabilization Phase II – Areas 2 & 3 Capital Facilities/Wastewater Design and Construction Division/Treatment Branch Severe Undermining of North Side Embankment
  • 9. Pohick Stream Stabilization Phase II – Areas 2 & 3 Capital Facilities/Wastewater Design and Construction Division/Treatment Branch Imbricated Stone Wall Development
  • 10. Capital Facilities/Wastewater Design and Construction Division/Treatment Branch Pohick Stream Stabilization Phase II – Areas 2 & 3 Rock Weir Tie-in to the South Embankment
  • 11. Pohick Stream Stabilization Phase II – Areas 2 & 3 Capital Facilities/Wastewater Design and Construction Division/Treatment Branch Finished Rock Vein
  • 12. Pohick Stream Stabilization Phase II – Areas 2 & 3 Capital Facilities/Wastewater Design and Construction Division/Treatment Branch Regrading and Coir Matting Placement in South Side of Area 2
  • 13. Before After Capital Facilities/Wastewater Design and Construction Division/Treatment Branch Pohick Stream Stabilization Phase II – Areas 2 & 3 Completed Planting Work
  • 14. Additional Information For additional Information, please call www.fairfaxcounty.gov/dpwes Pohick Stream Stabilization Phase II – Areas 2 & 3 Capital Facilities/Wastewater Design and Construction Division/Treatment Branch Matthew Kaiser, Public Information Officer 703-324-8455, TTY 711 Matthew.Kaiser@fairfaxcounty.gov