Washington Plaza
Culvert Repair
Hunter Mill District
Project No. SD-000034-036
Project Details
Description:
The Washington Plaza Culvert Repair project was substantially completed on June 24, 2013. This
project consisted of repairing a 21 foot section of damaged concrete culvert, which lies underneath
Washington Plaza, within the Historic District. The deteriorated culvert posed a danger both to the public
and to the historic structures surrounding it. The completion of this project will maximize use of the storm
culvert and provide protection for Washington Plaza.
Project Overview:
• Removal, storage, and replacement of brickwork
• Removal of damaged top and side sections of culvert
• Placement of new rigid piping for fountain’s leaking water lines
• Placement of rebar
• Water-proofing membrane placed on top of culvert to prevent deterioration.
DPWES Project Team:
Design Engineer: Bill Schell
Project Manager: Qais Bashir
Construction Engineer: Mannan Qureshi
Construction Inspector: Keith Ferrell
Project Location
Hunter Mill District - Tax Map No. 172-31-1609B
Pre-existing Conditions: Damaged Culvert
Temporary Formwork
Supporting Structure
Deteriorated Top
Wall with Exposed
Rebar
Formwork
Collecting
Debris and
Blocking
Water Flow
Construction: Damaged Sections Excavated.
New Rebar, New Piping, and Concrete Placed
New Rigid Piping New Rebar
High Strength
Concrete Being
Poured
Construction: Waterproofing & Replacement of
Brick Pavers
Waterproofing
Membrane Being
Placed
Careful Replacement of
Brick Pavers
Post-Construction: CCTV Showing Newly
Constructed Work
New Thickened
Section Top Wall
New Top Wall
New Side Wall
For additional Information, please call
Irene Haske, Public Information Officer
703-324-5821, TTY 711
www.fairfaxcounty.gov/dpwes

More Related Content

What's hot

CB_SeptOct_2015_bridges
CB_SeptOct_2015_bridgesCB_SeptOct_2015_bridges
CB_SeptOct_2015_bridges
Rebecca Abel
 
Jan 26 Waimanalo Gulch Storm Water Contingency Plan
Jan 26 Waimanalo Gulch Storm Water Contingency PlanJan 26 Waimanalo Gulch Storm Water Contingency Plan
Jan 26 Waimanalo Gulch Storm Water Contingency Plan
Honolulu Civil Beat
 
PS-1 SUMMARY NHAI
PS-1 SUMMARY NHAIPS-1 SUMMARY NHAI
PS-1 SUMMARY NHAI
Student
 

What's hot (20)

Wacker Drive Viaduct Reconstruction
Wacker Drive Viaduct ReconstructionWacker Drive Viaduct Reconstruction
Wacker Drive Viaduct Reconstruction
 
I-64 Kanawha River Bridge
I-64 Kanawha River BridgeI-64 Kanawha River Bridge
I-64 Kanawha River Bridge
 
Eglinton Crosstown Leaside Open House Presentation
Eglinton Crosstown Leaside Open House PresentationEglinton Crosstown Leaside Open House Presentation
Eglinton Crosstown Leaside Open House Presentation
 
Project Execution Plan for Bridge Construction
Project Execution Plan for Bridge ConstructionProject Execution Plan for Bridge Construction
Project Execution Plan for Bridge Construction
 
Veterans' Glass City Skyway Bridge
Veterans' Glass City Skyway BridgeVeterans' Glass City Skyway Bridge
Veterans' Glass City Skyway Bridge
 
CB_SeptOct_2015_bridges
CB_SeptOct_2015_bridgesCB_SeptOct_2015_bridges
CB_SeptOct_2015_bridges
 
Advancement in infrastructure
Advancement in infrastructureAdvancement in infrastructure
Advancement in infrastructure
 
Bangkok Mega Bridge Project Management 2007
Bangkok Mega Bridge Project Management 2007Bangkok Mega Bridge Project Management 2007
Bangkok Mega Bridge Project Management 2007
 
Vidalta Bridge
Vidalta BridgeVidalta Bridge
Vidalta Bridge
 
ANC 1C presentation-Kalorama Park Plaza-Dec 3 2014
ANC 1C presentation-Kalorama Park Plaza-Dec 3 2014ANC 1C presentation-Kalorama Park Plaza-Dec 3 2014
ANC 1C presentation-Kalorama Park Plaza-Dec 3 2014
 
Government Center Pond Retrofit - May 2013
Government Center Pond Retrofit - May 2013Government Center Pond Retrofit - May 2013
Government Center Pond Retrofit - May 2013
 
Burke View Court Emergency Sewer Repair
Burke View Court Emergency Sewer RepairBurke View Court Emergency Sewer Repair
Burke View Court Emergency Sewer Repair
 
Burke View Court Emergency Sewer Repair
Burke View Court Emergency Sewer RepairBurke View Court Emergency Sewer Repair
Burke View Court Emergency Sewer Repair
 
Jan 26 Waimanalo Gulch Storm Water Contingency Plan
Jan 26 Waimanalo Gulch Storm Water Contingency PlanJan 26 Waimanalo Gulch Storm Water Contingency Plan
Jan 26 Waimanalo Gulch Storm Water Contingency Plan
 
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Apr.19, 2012
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Apr.19, 2012FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Apr.19, 2012
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Apr.19, 2012
 
Construction Methods & Sequence
Construction  Methods & SequenceConstruction  Methods & Sequence
Construction Methods & Sequence
 
Water drainage
Water drainageWater drainage
Water drainage
 
Peppercorn Drive Outfall Restoration
Peppercorn Drive Outfall RestorationPeppercorn Drive Outfall Restoration
Peppercorn Drive Outfall Restoration
 
PS-1 SUMMARY NHAI
PS-1 SUMMARY NHAIPS-1 SUMMARY NHAI
PS-1 SUMMARY NHAI
 
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
 

Similar to Washington Plaza Culvert Repair

Similar to Washington Plaza Culvert Repair (20)

Reinforcement of Driscoll Bridge
Reinforcement of Driscoll BridgeReinforcement of Driscoll Bridge
Reinforcement of Driscoll Bridge
 
Great Passage Storm Sewer Improvement Project
Great Passage Storm Sewer Improvement ProjectGreat Passage Storm Sewer Improvement Project
Great Passage Storm Sewer Improvement Project
 
Graham Port Plaza Emergency Repair
Graham Port Plaza Emergency RepairGraham Port Plaza Emergency Repair
Graham Port Plaza Emergency Repair
 
Meadow Run Pond Improvement
Meadow Run Pond ImprovementMeadow Run Pond Improvement
Meadow Run Pond Improvement
 
Graham Port Plaza Emergency Repair
Graham Port Plaza Emergency RepairGraham Port Plaza Emergency Repair
Graham Port Plaza Emergency Repair
 
Graham Park Plaza Emergency Repair
Graham Park Plaza Emergency RepairGraham Park Plaza Emergency Repair
Graham Park Plaza Emergency Repair
 
Backlick Run Gravity Sewer Abandonment Project June 2020
Backlick Run Gravity Sewer Abandonment Project June 2020Backlick Run Gravity Sewer Abandonment Project June 2020
Backlick Run Gravity Sewer Abandonment Project June 2020
 
Bradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectBradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit Project
 
Slipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway DriveSlipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway Drive
 
Nancemond Street Outfall Stabilization
Nancemond Street Outfall StabilizationNancemond Street Outfall Stabilization
Nancemond Street Outfall Stabilization
 
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
 
9499 Beach Mill Road Channel Restoration Project
9499 Beach Mill Road Channel Restoration Project9499 Beach Mill Road Channel Restoration Project
9499 Beach Mill Road Channel Restoration Project
 
Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2
 
Rain Garden at Noman Cole Pollution Control Plant
Rain Garden at Noman Cole Pollution Control PlantRain Garden at Noman Cole Pollution Control Plant
Rain Garden at Noman Cole Pollution Control Plant
 
Midhill Place Outfall Restoration
Midhill Place Outfall RestorationMidhill Place Outfall Restoration
Midhill Place Outfall Restoration
 
Old Colchester Road Stream Stabilization Project January 2021
Old Colchester Road Stream Stabilization Project January 2021Old Colchester Road Stream Stabilization Project January 2021
Old Colchester Road Stream Stabilization Project January 2021
 
Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016
 
Jamie Resume
Jamie ResumeJamie Resume
Jamie Resume
 
Crestleigh Way Outfall Restoration
Crestleigh Way Outfall RestorationCrestleigh Way Outfall Restoration
Crestleigh Way Outfall Restoration
 
Dead Run Drive Outfall Restoration
Dead Run Drive Outfall RestorationDead Run Drive Outfall Restoration
Dead Run Drive Outfall Restoration
 

More from Fairfax County

More from Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Recently uploaded

THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
Faga1939
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
hyt3577
 

Recently uploaded (20)

04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf
 
Politician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full DetailsPolitician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full Details
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
 
declarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfdeclarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdf
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
 
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
 
422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf
 
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's DevelopmentNara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
 
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 

Washington Plaza Culvert Repair

  • 1. Washington Plaza Culvert Repair Hunter Mill District Project No. SD-000034-036
  • 2. Project Details Description: The Washington Plaza Culvert Repair project was substantially completed on June 24, 2013. This project consisted of repairing a 21 foot section of damaged concrete culvert, which lies underneath Washington Plaza, within the Historic District. The deteriorated culvert posed a danger both to the public and to the historic structures surrounding it. The completion of this project will maximize use of the storm culvert and provide protection for Washington Plaza. Project Overview: • Removal, storage, and replacement of brickwork • Removal of damaged top and side sections of culvert • Placement of new rigid piping for fountain’s leaking water lines • Placement of rebar • Water-proofing membrane placed on top of culvert to prevent deterioration. DPWES Project Team: Design Engineer: Bill Schell Project Manager: Qais Bashir Construction Engineer: Mannan Qureshi Construction Inspector: Keith Ferrell
  • 3. Project Location Hunter Mill District - Tax Map No. 172-31-1609B
  • 4. Pre-existing Conditions: Damaged Culvert Temporary Formwork Supporting Structure Deteriorated Top Wall with Exposed Rebar Formwork Collecting Debris and Blocking Water Flow
  • 5. Construction: Damaged Sections Excavated. New Rebar, New Piping, and Concrete Placed New Rigid Piping New Rebar High Strength Concrete Being Poured
  • 6. Construction: Waterproofing & Replacement of Brick Pavers Waterproofing Membrane Being Placed Careful Replacement of Brick Pavers
  • 7. Post-Construction: CCTV Showing Newly Constructed Work New Thickened Section Top Wall New Top Wall New Side Wall
  • 8. For additional Information, please call Irene Haske, Public Information Officer 703-324-5821, TTY 711 www.fairfaxcounty.gov/dpwes