RELATED COURSE WORK SUMMARY
Year 2
Detailing The “hole in the wall “ Project 1
 Examine the room layout and the location of where the
window openings should be placed to gain sun.
 Structure support to transport the load that will redirect
flow around the window opening
 Day lighting and ventilation analysis
 Location and orientation
Timber Frame Construction Community Hall Project 2
 The pros and cons of structural timbers and their
applications / systems.
 The various fabricated structural timber systems
and how they differ.
 The range of spans achievable using different
structural timber options.
 The different type of wall infill between the
structural columns and how the envelope
connects with the timber structure at the critical
points
 Different options for the external finish for the building design that would blend
into the surroundings
Site Layout Sustainable Housing Development Project 3
 Investigating site conditions such as drain and
entrance using the program (Auto Cad Civil 3D )
 Investigating site layout: integration of roads +
footpaths ,SUDs, landscaping, orientation and
clustering
 Choosing an appropriate layout based on good
research and analysis to illustrate the site layout
using sustainable principles
 Working out appropriate design options for the
site by using freehand drawing and Revit
Apartment building (concrete) Project 4
 Cross wall construction using precast concrete
floors and load bearing walls
 Exploration of concrete construction options
and its basic detailing
 Have a knowledge of the variety and
properties of possible envelope materials
 Know the value of detailing at a scale of 1/5
to resolve corners, junctions and roofs
 Further development of problem solving skills
using freehand drawing and Revit
 Introduction to specification writing and its
value
 Further develop presentation and
communications skill
Year 3 level 7
Innovation Fit-Out Jewellery Store Project 1
 Appropriate case studies of similar building Fit Out
 Principles of efficient and sustainable internal completion
 The application of the building Regulations to the building
fit out particularly part B and also part M
 Exploring the option of suspended ceiling of gypsum tiles
or plasterboard etc.
 Partition – different types
of option from the basic plasterboard to faced
timber frame etc.
 Raised Floor – various systems and different
finishes like polished granite and ventilation
system that distribution air and wiring feed
 Joinery – built in furniture , counter , shelves,
and display unit and glass screen partition
Existing Building Refurbishment & Upgrading Project 2
 Assessment of the current building energy
performance
 Appropriate building upgrade technologies based
on sustainable material and construction methods
for the refurbishment and the re use of the
Killeshin Centre these should be categorized
based on different approaches ie. Insulation
airtightness , service
 Case studies example and similar building
upgrade
 Building regulations and their application to a
building upgrade
 Model making constructing a scale model of the
proposed detailed upgrade
Thesis building Lessee Centre Swimming Pool Project 3
 Appropriate case studies of similar building design
 Construction technologies system (steel construction)
 Building regulation ( DAC FSC report and drawing)
 Model making to work out concept design for the building
 Sustainable design analysis of orientation and solar gain
 Group work with the engineer to work out the loadbearing
wall of the basement
Year 4 level 8
Thesis: dissertation
 the effective of stack on school building (12000 word report )
Conservation project Coolatin Stable Yard Project 1
 Research the history of the building fabric +
conservation principles
 Carry out applied research and analysis and photo
record to develop information to consider technical
solutions for the building
 Apply universal design principles (TGD M ,B, L ) to
protect the structure and future proof the building for
its new use
 Apply ‘Renewable Technologies to a protected
structure and its site
 Carry out a feasibility study for a proposal of a roof to
cover the court yard area for functions
 Specified the repairs needed to the brick and mortar pointing.
Thesis School of the Future Project 2
 Research a building type of medium complexity incorporating
specialist functions
 Carry out in depth research and analysis to develop informed and
appropriate technical design solutions for the school
 Utilise appropriate well-informed construction and building service
strategies in tandem to provide a low energy facility employing
sustainable materials and system
 In depth analysis and research on the site condition and what
renewable energies can be availed of to comply with a BREEAM
design
 Ability to clearly set out relevant information when preparing a
Disability Access Certificate and fire Safety Certificate.
 Carry out an Excel rating report on compliance for the BREEAM
building
 Write technical reports to professional standards

Contenu connexe

Similaire à Related Course Work Summary

Assignment sept 2011 aj
Assignment sept 2011 ajAssignment sept 2011 aj
Assignment sept 2011 ajNasir Noor
 
Green Studio Handbook - Part 2
Green Studio Handbook - Part 2Green Studio Handbook - Part 2
Green Studio Handbook - Part 2Galala University
 
Multidisciplinary workshop on building design
Multidisciplinary workshop on building designMultidisciplinary workshop on building design
Multidisciplinary workshop on building designDCEE2017
 
proposal of building project
proposal of building projectproposal of building project
proposal of building projectSandes Sigdel
 
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Poster
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element PosterCentre for the Creative Arts and Media (CCAM) | GMIT Individual Element Poster
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element PosterJonathan Flanagan
 
Ay32747751
Ay32747751Ay32747751
Ay32747751IJMER
 
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...Galala University
 
Riset Tematik dalam materi kuliah yang diselenggarakan dalam pertemuan
Riset Tematik dalam materi kuliah yang diselenggarakan dalam pertemuanRiset Tematik dalam materi kuliah yang diselenggarakan dalam pertemuan
Riset Tematik dalam materi kuliah yang diselenggarakan dalam pertemuanheru70830
 
Building of the gui'an innovation park
Building of the gui'an innovation parkBuilding of the gui'an innovation park
Building of the gui'an innovation parkİrfan Meriç
 
Air Cavity Wall-Abinash_Dev.pptx
Air Cavity Wall-Abinash_Dev.pptxAir Cavity Wall-Abinash_Dev.pptx
Air Cavity Wall-Abinash_Dev.pptxssusered4258
 
Precast Construction
Precast ConstructionPrecast Construction
Precast ConstructionVarun Nath
 
munjushreeshindepapaer.doc
munjushreeshindepapaer.docmunjushreeshindepapaer.doc
munjushreeshindepapaer.docff2403522
 
DProfiler Overview
DProfiler OverviewDProfiler Overview
DProfiler Overviewcoreysanders
 
DProfiler Overview
DProfiler OverviewDProfiler Overview
DProfiler Overviewandyonan
 

Similaire à Related Course Work Summary (20)

Assignment sept 2011 aj
Assignment sept 2011 ajAssignment sept 2011 aj
Assignment sept 2011 aj
 
Green Studio Handbook - Part 2
Green Studio Handbook - Part 2Green Studio Handbook - Part 2
Green Studio Handbook - Part 2
 
Multidisciplinary workshop on building design
Multidisciplinary workshop on building designMultidisciplinary workshop on building design
Multidisciplinary workshop on building design
 
NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014
 
proposal of building project
proposal of building projectproposal of building project
proposal of building project
 
Prefabricated
PrefabricatedPrefabricated
Prefabricated
 
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Poster
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element PosterCentre for the Creative Arts and Media (CCAM) | GMIT Individual Element Poster
Centre for the Creative Arts and Media (CCAM) | GMIT Individual Element Poster
 
Ay32747751
Ay32747751Ay32747751
Ay32747751
 
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...
 
Riset Tematik dalam materi kuliah yang diselenggarakan dalam pertemuan
Riset Tematik dalam materi kuliah yang diselenggarakan dalam pertemuanRiset Tematik dalam materi kuliah yang diselenggarakan dalam pertemuan
Riset Tematik dalam materi kuliah yang diselenggarakan dalam pertemuan
 
Building of the gui'an innovation park
Building of the gui'an innovation parkBuilding of the gui'an innovation park
Building of the gui'an innovation park
 
Mod. 1.pptx
Mod. 1.pptxMod. 1.pptx
Mod. 1.pptx
 
Air Cavity Wall-Abinash_Dev.pptx
Air Cavity Wall-Abinash_Dev.pptxAir Cavity Wall-Abinash_Dev.pptx
Air Cavity Wall-Abinash_Dev.pptx
 
Abc phd call 32b tutto
Abc phd call 32b tuttoAbc phd call 32b tutto
Abc phd call 32b tutto
 
Precast Construction
Precast ConstructionPrecast Construction
Precast Construction
 
munjushreeshindepapaer.doc
munjushreeshindepapaer.docmunjushreeshindepapaer.doc
munjushreeshindepapaer.doc
 
DProfiler Overview
DProfiler OverviewDProfiler Overview
DProfiler Overview
 
DProfiler Overview
DProfiler OverviewDProfiler Overview
DProfiler Overview
 
Natural Selection
Natural SelectionNatural Selection
Natural Selection
 
Cities Built For Change: Adaptable Built Form
Cities Built For Change: Adaptable Built FormCities Built For Change: Adaptable Built Form
Cities Built For Change: Adaptable Built Form
 

Related Course Work Summary

  • 1. RELATED COURSE WORK SUMMARY Year 2 Detailing The “hole in the wall “ Project 1  Examine the room layout and the location of where the window openings should be placed to gain sun.  Structure support to transport the load that will redirect flow around the window opening  Day lighting and ventilation analysis  Location and orientation Timber Frame Construction Community Hall Project 2  The pros and cons of structural timbers and their applications / systems.  The various fabricated structural timber systems and how they differ.  The range of spans achievable using different structural timber options.  The different type of wall infill between the structural columns and how the envelope connects with the timber structure at the critical points  Different options for the external finish for the building design that would blend into the surroundings Site Layout Sustainable Housing Development Project 3  Investigating site conditions such as drain and entrance using the program (Auto Cad Civil 3D )  Investigating site layout: integration of roads + footpaths ,SUDs, landscaping, orientation and clustering  Choosing an appropriate layout based on good research and analysis to illustrate the site layout using sustainable principles  Working out appropriate design options for the site by using freehand drawing and Revit
  • 2. Apartment building (concrete) Project 4  Cross wall construction using precast concrete floors and load bearing walls  Exploration of concrete construction options and its basic detailing  Have a knowledge of the variety and properties of possible envelope materials  Know the value of detailing at a scale of 1/5 to resolve corners, junctions and roofs  Further development of problem solving skills using freehand drawing and Revit  Introduction to specification writing and its value  Further develop presentation and communications skill Year 3 level 7 Innovation Fit-Out Jewellery Store Project 1  Appropriate case studies of similar building Fit Out  Principles of efficient and sustainable internal completion  The application of the building Regulations to the building fit out particularly part B and also part M  Exploring the option of suspended ceiling of gypsum tiles or plasterboard etc.  Partition – different types of option from the basic plasterboard to faced timber frame etc.  Raised Floor – various systems and different finishes like polished granite and ventilation system that distribution air and wiring feed  Joinery – built in furniture , counter , shelves, and display unit and glass screen partition
  • 3. Existing Building Refurbishment & Upgrading Project 2  Assessment of the current building energy performance  Appropriate building upgrade technologies based on sustainable material and construction methods for the refurbishment and the re use of the Killeshin Centre these should be categorized based on different approaches ie. Insulation airtightness , service  Case studies example and similar building upgrade  Building regulations and their application to a building upgrade  Model making constructing a scale model of the proposed detailed upgrade Thesis building Lessee Centre Swimming Pool Project 3  Appropriate case studies of similar building design  Construction technologies system (steel construction)  Building regulation ( DAC FSC report and drawing)  Model making to work out concept design for the building  Sustainable design analysis of orientation and solar gain  Group work with the engineer to work out the loadbearing wall of the basement
  • 4. Year 4 level 8 Thesis: dissertation  the effective of stack on school building (12000 word report ) Conservation project Coolatin Stable Yard Project 1  Research the history of the building fabric + conservation principles  Carry out applied research and analysis and photo record to develop information to consider technical solutions for the building  Apply universal design principles (TGD M ,B, L ) to protect the structure and future proof the building for its new use  Apply ‘Renewable Technologies to a protected structure and its site  Carry out a feasibility study for a proposal of a roof to cover the court yard area for functions  Specified the repairs needed to the brick and mortar pointing. Thesis School of the Future Project 2  Research a building type of medium complexity incorporating specialist functions  Carry out in depth research and analysis to develop informed and appropriate technical design solutions for the school  Utilise appropriate well-informed construction and building service strategies in tandem to provide a low energy facility employing sustainable materials and system  In depth analysis and research on the site condition and what renewable energies can be availed of to comply with a BREEAM design  Ability to clearly set out relevant information when preparing a Disability Access Certificate and fire Safety Certificate.  Carry out an Excel rating report on compliance for the BREEAM building  Write technical reports to professional standards