SlideShare a Scribd company logo
1 of 28
Download to read offline
tsx | orv
 REDISCOVERING ORVANA
C o r p o r a t e P r e s e n t a t i o n
December, 2015
R e d i s c o v e r i n g O r v a n a
tsx | orv
 REDISCOVERING ORVANA
FORWARD LOOKING STATEMENTS
1
All monetary amounts in U.S. dollars unless otherwise stated.
Certain statements in this information constitute forward-looking statements or forward-looking information within the meaning of applicable securities laws (“forward-
looking statements”). Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives,
assumptions, potentials, future events or performance (often, but not always, using words or phrases such as “believes”, “expects”, “plans”, “estimates” or “intends” or
stating that certain actions, events or results “may”, “could”, “would”, “might”, “will” or “are projected to” be taken or achieved) are not statements of historical fact, but
are forward-looking statements.
The forward-looking statements herein relate to, among other things, Orvana’s ability to achieve improvement in free cash flow; the potential to extend the mine life of
El Valle and Don Mario beyond their current life-of-mine estimates; Orvana’s ability to optimize its assets to deliver shareholder value; the Company’s ability to
optimize productivity at Don Mario and El Valle; estimates of future production, operating costs and capital expenditures; mineral resource and reserve estimates;
statements and information regarding future feasibility studies and their results; future transactions; future metal prices; the ability to achieve additional growth and
geographic diversification; future financial performance, including the ability to increase cash flow and profits; future financing requirements; and mine development
plans.
Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by the Company as of the date of
such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. The estimates and assumptions of the
Company contained or incorporated by reference in this information, which may prove to be incorrect, include, but are not limited to, the various assumptions set forth
herein and in Orvana’s most recently filed Management’s Discussion & Analysis and Annual Information Form (the “Company Disclosures”) or as otherwise expressly
incorporated herein by reference as well as: there being no significant disruptions affecting operations, whether due to labour disruptions, supply disruptions, power
disruptions, damage to equipment or otherwise; permitting, development, operations, expansion and acquisitions at El Valle and Don Mario being consistent with the
Company’s current expectations; political developments in any jurisdiction in which the Company operates being consistent with its current expectations; certain price
assumptions for gold, copper and silver; prices for key supplies being approximately consistent with current levels; production and cost of sales forecasts meeting
expectations; the accuracy of the Company’s current mineral reserve and mineral resource estimates; and labour and materials costs increasing on a basis
consistent with Orvana’s current expectations.
A variety of inherent risks, uncertainties and factors, many of which are beyond the Company’s control, affect the operations, performance and results of the
Company and its business, and could cause actual events or results to differ materially from estimated or anticipated events or results expressed or implied by
forward looking statements. Some of these risks, uncertainties and factors include fluctuations in the price of gold, silver and copper; the need to recalculate
estimates of resources based on actual production experience; the failure to achieve production estimates; variations in the grade of ore mined; variations in the cost
of operations; the availability of qualified personnel; the Company’s ability to obtain and maintain all necessary regulatory approvals and licenses; the Company’s
ability to use cyanide in its mining operations; risks generally associated with mineral exploration and development, including the Company’s ability to continue to
operate the El Valle and/or Don Mario and/or ability to resume operations at the Carlés Mine; the Company’s ability to acquire and develop mineral properties and to
successfully integrate such acquisitions; the Company’s ability to execute on its strategy; the Company’s ability to obtain financing when required on terms that are
acceptable to the Company; challenges to the Company’s interests in its property and mineral rights; current, pending and proposed legislative or regulatory
developments or changes in political, social or economic conditions in the countries in which the Company operates; general economic conditions worldwide; and the
risks identified in the Company’s Disclosures. This list is not exhaustive of the factors that may affect any of the Company’s forward-looking statements and reference
should also be made to the Company’s Disclosures for a description of additional risk factors.
The forward-looking statements made in this information with respect to the anticipated development and exploration of the Company’s mineral projects are intended
to provide an overview of management’s expectations with respect to certain future activities of the Company and may not be appropriate for other purposes.
Forward-looking statements are based on management’s current plans, estimates, projections, beliefs and opinions and, except as required by law, the Company
does not undertake any obligation to update forward-looking statements should assumptions related to these plans, estimates, projections, beliefs and opinions
change. Readers are cautioned not to put undue reliance on forward-looking statements.
tsx | orv
 REDISCOVERING ORVANA
INVESTMENT HIGHLIGHTS
Multi Mine - Au, Cu, Ag Producer
Focused on Europe/Americas
Strong Balance Sheet
Organic Growth
Trading Below 0.5 x EV / EBITDA
Toronto, Canada
Head Office
Asturias, Spain
ElValle Mines
Bolivia
Don Mario Mine
El Valle: Optimization
Increase LoM
Highly undervalued among peers
FY 2015 Prod’n – 132K Au Eq Oz
Repaid over USD$70M of debt
FY 2015 COC/AISC (by product) -
$949/$1,210
2
Don Mario: Mine life extension
Metallurgical work
CIL Refurbishment =
improved margins
tsx | orv
 REDISCOVERING ORVANA
COMPANY SNAPSHOT
OVERVIEW
Ticker TSX:ORV
Common Shares 136.6M
Options / Warrants (Dec 10/15) 1.9M / 1.2M
Market Capitalization (Dec 18/15) C$21.1M
OVERVIEW
Unrestricted Cash (Sept 30/15) $17.2M
Total Debt (Sept 30/15) $1.5M
Fiscal Year End Sept 30
Shareholder Breakdown
Fabulosa Insiders Institutions retail
All in US$ unless otherwise noted
Stock Chart
(1 year)
Retail
3
52wk hi-lo: $0.49-$0.12.5
tsx | orv
 REDISCOVERING ORVANA
OPERATING PERFORMANCE / 2016 GUIDANCE
Net revenue from Cu and Ag by-products represented approximately 46% of net revenue in fiscal 2015 YTD.
Guidance 2016 Low High Actual 2015
CAPEX $17M $19M $10.1M
4
Further details of the Company’s Operating Guidance can be found in the
Appendix of this presentation
2016 includes CIL recommissioning CAPEX of $6.4M
$629 $631
$771
$948
$850 - $950
$1,383
$950
$1,015
$1,210 $1,150 - $1,250
$-
$400
$800
$1,200
$1,600
FY 2012 FY 2013 FY 2014 FY 2015 Guidance-2015
COC/AISC per Au/oz sold, By-product
COC AISC
67,00055,929
80,541 84,084
72,817
75,000
-
25,000
50,000
75,000
100,000
FY 2012 FY 2013 FY 2014 FY 2015 Guidance
Gold Oz
Don Mario El Valle
15,500
15,366
17,303
21,057
22,600
17,000
-
5,000
10,000
15,000
20,000
25,000
FY 2012 FY 2013 FY 2014 FY 2015 Guidance
Copper lbs (thousands)
Don Mario El Valle
Guidance
tsx | orv
 REDISCOVERING ORVANA
KEY MILESTONES
To-Date
!  Strong cash position
!  Repaid over $70M in debt
!  Positive operating cash flow
!  Sale of Copperwood for up to $25M
!  Experienced management, board
!  Don Mario mine life extension
!  Met 2015 updated guidance
Ongoing Initiatives
"  Continue to optimize operations
"  Lower cash costs
"  Meet 2016 Guidance
"  Extend LoM of operations
"  Organic growth opportunities
"  Increase share price relative to EBITDA
"  Enhance CSR programs
REDISCOVERING ORVANA 5
tsx | orv
tsx | orv
 REDISCOVERING ORVANA
MANAGEMENT & DIRECTORS
SENIOR MANAGEMENT
Daniella Dimitrov
President, CEO & Director
•  Over 20 years of capital markets, commercial and operations experience. Executive roles including as CFO of
Orvana, Executive Vice-Chair of Baffinland Iron Mines and with Dundee Securities and Raymond James.
Jeffrey Hillis
Chief Financial Officer
•  Over 10 years of senior management and mining financial experience. Executive roles including as CFO of Potash
Ridge Corp., Iberian Minerals and Excellon Resources.
João Nunes
General Manager, El Valle
•  Over 18 years of experience in mine operations and development. Senior mine management roles in Europe with
Sociedade Mineira de Neves Corvo and Minas de Aguas Teñidas.
John Bracale
President, Don Mario
•  Over 30 years of senior mining management in Latin America, the Pacific Rim, and the U.S. Executive roles
including President, Country Manager for CGN Guatemala, a subsidiary of HudBay Minerals.
DIRECTORS
Jacques McMullen
Chairman
•  Over 20 years’ experience in the mining sector. Principal and non-executive director BBA, Member of the Advisory
Committee to Minera S.A. Formerly held senior positions at Barrick Gold.
Gordon Bogden
•  Over 30 years’ experience in the mining/finance sectors. Chair of NexGen Energy, Director of Camino Minerals
and Royal Gold. Formerly CEO of Alloycorp and held senior positions at Standard Chartered Bank, Gryphon
Partners and National Bank Financial.
Juan Gavidia
•  Over 20 years’ experience in the mining sector. Spearheaded business initiatives and provided operational support
for international mining projects. Consultant for Minera S.A. Formerly held positions with Newmont Mining.
Ed Guimaraes
•  Over 25 years’ experience in the mining sector. CFO of Sierra Metals, Director of Aldridge Minerals. Formerly held
senior management positions at Aur Resources	
Sara Magner
•  Over 15 years’ experience in corporate transactional, securities law. Corporate Council of Minera S.A.. Formerly
held positions at Greenberg Taurig and Siemens, Siemens AG.
Gordon Pridham
•  Over 25 years’ experience mining/finance sectors. Principal of Edgewater Capital, Director of Newalta Corp and
Chairman of Titanium Corp. Former Director of Roxgold and held senior positions in a number of finance
companies and has advised public companies across a broad range of industry sectors.
Audra Walsh
•  Over 20 years’ experience in the mining sector. Previously held senior positions at Sierra Metals, Minera S.A., A2Z,
Barrick and Newmont.
John Wilson
•  Over 30 years’ experience in the mining/finance sectors. Member of the Advisory Committee to Minera S.A.
Formerly held senior positions with IFC and World Bank Group.
6
tsx | orv
 REDISCOVERING ORVANA
$(2,263)
$33,276
$38,900 $37,923
$8,471
(5,000)
5,000
15,000
25,000
35,000
45,000
FY 2011 FY 2012 FY 2013 FY 2014 FY 2015
$72,160
$61,020
$25,978
$1,478
$-
$20,000
$40,000
$60,000
$80,000
FY 2012 FY 2013 FY 2014 FY 2015
El Valle Short-term Corporate Don Mario
SELECTED FINANCIALS
7
DECLINING DEBT
Financial Performance
(in 000’s except per share amounts)
FY
2015
FY
2014
Revenue $121,425 $142,407
Adjusted Gross Margin (loss) ($13,854) $9,268
Adjusted EBITBA $8,072 $44,172
Adjusted net income (loss) ($16,733) $1,779
Adjusted net income per share (basic/diluted) ($0.12) $0.01
Capital expenditures $10,118 $14,925
Refer to Orvana’s financial statements and MD&A for complete financial information.
OCF BEFORE NON-CASH WORKING CAPITAL CHANGES
FY 2012, FY 2013 and FY 2014 include realized gains/losses on settled derivatives instruments.
•  Adjusted EBITDA excludes non-cash impairment losses, asset de-recognition, M2M of
unrealized derivatives and loss from discontinued operations.
•  Adjusted EBITDA for FY 2012, FY 2013 and FY 2014 includes realized gains/losses on
settled derivative instruments.
$41,317
$50,328
$44,172
$8,072
-
15,000
30,000
45,000
60,000
FY 2012 FY 2013 FY 2014 FY 2015
ADJUSTED EBITDA FISCAL YEAR END
tsx | orv
 REDISCOVERING ORVANA
SPAIN: EL VALLE PRODUCING MINE
EL VALLE OVERVIEW
Ownership 100%
2015 Au / Cu Production 53,733 Au oz / 6,128,000 Cu lbs
2016 Guidance 43 - 48,000 Au oz / 4.5 - 5,000,000Cu lbs
2015 COC / AISC $1,077 / $1,308
2015 Plant Recoveries 92.6% Au / 81.4% Cu
Plant Capacity 2,000 tpd
2015 Grade 3.53 gpt Au / 0.67% Cu UG
El Valle
Au, Cu, Ag
SPAIN
REDISCOVERING ORVANA 8
Gijon
tsx | orv
 REDISCOVERING ORVANA
EL VALLE OVERVIEW
•  Underground operations commissioned
2011
•  Excellent regional infrastructure
•  Experienced operating team
•  Transitioned to owner/operator mining
of oxides in 2015
El Valle Hoist
REDISCOVERING ORVANA 9
tsx | orv
 REDISCOVERING ORVANA
EL VALLE PRODUCTION/COSTS
COC	
$884	
10
65,992 62,957
53,733
-
14,000
28,000
42,000
56,000
70,000
FY 2013 FY 2014 FY 2015
Gold Oz Production
6,658,000
5,626,000 6,128,000
-
1,500,000
3,000,000
4,500,000
6,000,000
7,500,000
FY 2013 FY 2014 FY 2015
Copper lbs Production
$803
$952
$1,077
$1,086
$1,160
$1,308
$-
$300
$600
$900
$1,200
$1,500
FY 2013 FY 2014 FY 2015
OroValle COC/AISC (By-Prodcut) per Oz Au Sold
COC AISC
tsx | orv
 REDISCOVERING ORVANA
EL VALLE MINING AREA
11
N
Boinas South
Boinas East
Black Skarn
A107
Charnela East Breccia
A208
Skarn
Oxides
Oxides
Oxides
Oxides
Z>205 = Oxides
Z<205 = Skarn
Oxides
Skarn
11
Mining Methods:
Oxides: Cut and Fill
Skarns: Long Hole Stoping
Currently Mining:
Black Skarn, Boinas East, A107
2016 Targeting:
Boinas South- Skarn
Black Skarn West- Skarn
East Breccia- Oxides
tsx | orv
 REDISCOVERING ORVANA
700000
700000
710000
710000
720000
720000
4790000
4790000
4800000
4800000
P.I.
LIDIA
P.I.
QUINTANA
P.I.
CAMPALCARRO
EL VALLE-BOINASEL VALLE-BOINAS
LA BRUEVALA BRUEVA
CARLESCARLES
ORTOSAORTOSA
GODANGODAN
Legend
MIN. RIGHTS
Exploitation concession
Investigation Permit granted
Oviedo
±
0 1 2 3 4 50.5
Kilometers
OROVALLE CONCESSION OVERVIEW
12
El Valle Located in the
Rio Narcea Gold Belt
•  Investigation permits granted and
pending in all belts
•  >4,298ha in Exploitation Concessions
•  >3,330ha in Investigative Permits
•  >28,588 pending Investigative Permits
•  Prolific mining history
•  Mined by Romans 2,000 years ago
•  Historical exploration
•  Barrick Gold
•  Rio Narcea Gold Mines
•  Anglo American
Ortosa Godan
Carlés
La Brueva
EL VALLE
I.P. Lidia
I.P. Quintana
I.P. Campalcarro
OroValle Concession
Area
ASTURIAS
tsx | orv
 REDISCOVERING ORVANA
CARLÉS
EL VALLE
Rio	Narcea	Belt	
EL VALLE
FY 2015 Plan
•  Exploration and drill program
•  Delineation drilling
•  Targeting new resources
•  Expansion of known resources
•  Production drilling
2016 Targets
•  Exploration activities underway
on other targets – drilling,
mapping, soil analysis,
geochem, geophysics
13
tsx | orv
 REDISCOVERING ORVANA
Don Mario Mine
Au, Cu, Ag
BOLIVIA: DON MARIO PRODUCING MINE
DON MARIO MINE OVERVIEW
Ownership 100%
2015 Au / Cu Prod’n 19,084 Au oz / 16,473,000 Cu lbs
2016 Guidance 24 - 27,000 Au oz / 11 - 12,000,000 Cu lbs
2015 COC/AISC
Au (co-product) per oz: $948 / $1,053
Cu (co-product) per lb: $2.22 / $2.45
2015 Recoveries 53.6% Au / 74.4% Cu
Plant Capacity 2,600 tpd
2015 Grade 1.32 gpt Au / 1.20% Cu OP
La Paz
Santa Cruz
REDISCOVERING ORVANA 14
O R V A N A . B O L I V I A
Arica
tsx | orv
 REDISCOVERING ORVANA
DON MARIO OVERVIEW
•  Operating for +12 years
•  New resource estimates and other initiatives to extend LoM
•  Two new NI 43 101 resources 2015
•  Potential CIL refurbishment in 2016 may improve economics
•  Met testing ongoing on stockpiled oxide ore
•  Experienced local operating team
REDISCOVERING ORVANA 15
tsx | orv
O R V A N A . B O L I V I A
tsx | orv
 REDISCOVERING ORVANA
DON MARIO PRODUCTION/COSTS
16
O R V A N A . B O L I V I A
14,549
21,127
19,084
-
6,000
12,000
18,000
24,000
FY 2013 FY 2014 FY 2015
Gold Oz Production
10,646,000
15,430,000 16,473,000
-
5,000,000
10,000,000
15,000,000
20,000,000
FY 2013 FY 2014 FY 2015
Copper lbs Production
$1,050
$862 $948
$1,159
$955
$1,053
$-
$350
$700
$1,050
$1,400
FY 2013 FY 2014 FY 2015
Don Mario COC/AISC (Co-Product) per Oz Au Sold
COC AISC
$2.31 $2.28 $2.22
$2.55 $2.50 $2.45
$-
$0.75
$1.50
$2.25
$3.00
FY 2013 FY 2014 FY 2015
Don Mario COC/AISC (Co-Product) per lb Cu Sold
COC AISC
tsx | orv
 REDISCOVERING ORVANA
DON MARIO GROWTH
Mine Life Extension Initiatives
LMZ Pit Optimization (Pushback)
•  Pit pushback into upper portion of LMZ – early 2016
•  Strip Ratio est 0.9:1
•  No CAPEX required
Cerro Felix Deposit
•  2009-2011 207,000 tonnes at 1.7 gpt Au processed
through CIL
•  No CAPEX required
•  Located 700m from LMZ
Potential Recommissioning of CIL Circuit
•  In operation from 2003-2011
•  Historical LMZ/Cerro Felix recoveries ~80%
•  Current met testing indicates recoveries higher
than historical rates
•  Doré will improve economics vs trucking
concentrate
•  Estimated CAPEX - $6.4M (includes $1.5M
owner’s cost)
•  +/- 35% with contingency
•  Project conditional on external financing
•  Expected construction date: late 2016
REDISCOVERING ORVANA 17
LMZ Pit Pushback
Don Mario Pit
Cerro Felix
tsx | orv
O R V A N A . B O L I V I A
tsx | orv
 REDISCOVERING ORVANA
DON MARIO GROWTH
O R V A N A . B O L I V I A
tsx | orv
Cerro Felix
REDISCOVERING ORVANA 18
tsx | orv
 REDISCOVERING ORVANA
DON MARIO
Mine Life Extension Initiatives
•  Continued oxide metallurgical testing
•  2.4 M tonnes of existing oxide stockpiles
•  153K oz Au, 93 million lbs copper
•  Au 1.96 gpt / Cu 1.74% / Ag 41.80 gpt
•  Extensive land package
•  >68,300ha in mineral concessions provide
opportunities for future exploration programs
19
LAS TOJAS
DEPOSIT
CERRO FELIX
DEPOSIT
DON MARIO MINE
O R V A N A . B O L I V I A
tsx | orv
 REDISCOVERING ORVANA
SUMMARY
Focused on Europe/Americas
Strong Balance Sheet
Multi Mine Producer - Gold, Copper, Silver
Trading at 0.5 x EV / EBIDTA
REDISCOVERING ORVANA 20
67 - 75K Au oz
15.5 - 17M Cu lbs
450 - 500K Ag oz
PRODUCTION / COST GUIDANCE 2016
COC/AISC - $850 - $950 / $1,150 - $1,250
CAPEX - $17M - $19M*
*2016 includes CIL recommissioning CAPEX of $6.4M
tsx | orv
 REDISCOVERING ORVANA
appendix
21
tsx | orv
 REDISCOVERING ORVANA 22
2016 GUIDANCE ORVANA
OROVALLE
(El Valle)
EMIPA
(Don Mario)
Low High
2015
Actual
Low High
2015
Actual
Low High
2015
Actual
Gold oz Production 67,000 75,000 72,817 43,000 48,000 53,733 24,000 27,000 19,084
Copper 000’s lbs
Production
15,500 17,000 22,600 4,500 5,000 6,100 11,000 12,000 16,500
Silver oz Production 540,000 500,000 598,039 120,000 130,000 166,744 330,000 370,000 431,295
COC $oz Au
(by product)
$850 $950 $949
AISC $oz Au
(by product)
$1,150 $1,250 $1,210
Capital
Expenditures
$17.0M $19.0M $10.1M
GUIDANCE 2016
tsx | orv
 REDISCOVERING ORVANA
EL VALLE RESERVES & RESOURCES
El Valle Mineral Reserve Estimates1, 2 – Sept. 30, 2015
Tonnes Grade Contained Metal
Category (000’s)
Au
(g/t)
Cu
(%)
Ag
(g/t)
Au Ounces
(000’s)
Cu Tonnes
(t)
Total Proven Reserves 1,017 2.61 0.64 14.19 85 6,544
Total Probable Reserves 2,103 3.43 0.42 9.31 232 8,728
Total P+P Reserves 3,119 3.16 0.49 10.90 317 15,273
1.  Mineral Resources are inclusive of Mineral Reserves.
2.  Notes to the Reserves & Resources can be found in the next slide of this presentation.
REDISCOVERING ORVANA 23
tsx | orv
El Valle Mineral Resource Estimates1, 2 – Sept. 30, 2015
Tonnes Grade Contained Metal
Category (000’s)
Au
(g/t)
Cu
(%)
Ag
(g/t)
Au Ounces
(000’s)
Cu Tonnes
(t)
Total Measured Resources 2,136 3.39 0.84 17.67 233 17,887
Total Indicated Resources 4,500 4.45 0.58 11.87 644 26,183
Total M+I Resources 6,636 4.11 0.66 13.74 877 44,070
Total Inferred Resources 6,149 5.07 0.48 8.97 1,001 29,527
tsx | orv
 REDISCOVERING ORVANA
24
Notes to the El Valle Mineral Reserve and Mineral Resource table:
•  Mineral Reserves and Mineral Resources have been stated as at September 30, 2015.
•  Mineral reserves are estimated using gold equivalent break-even cut-off grades by zone, consisting of 4.3 g/t AuEq for El Valle oxides, 2.3 g/t AuEq for
El Valle skarns, and 2.5 g/t AuEq for Carlés longhole stoping and 3.0 g/t AuEq for cut and fill in skarn. Gold equivalent cut-offs are based on recent
operating results for recoveries, off-site concentrate costs and on-site operating costs assuming additional cost savings planned in respect of fiscal 2016
and beyond.
•  Mineral Reserves are estimated using average long-term prices of US$1,100 per ounce gold, US$2.75 per lb copper, and US$16.50 per ounce silver. A
Euro/US$ exchange rate of 1/1.1 was used.
•  A minimum mining width of 4 m was used.
•  Certain incremental material (below break-even cut-off grade) was included in the estimated mineral reserves in order to maintain production levels.
•  Mineral Resources are inclusive of Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
•  Mineral Resources are estimated at a gold equivalent cut-off grade of 3.6 g/t for El Valle oxides, 2.0 g/t for El Valle skarns and 2.7 g/t for Carlés skarns.
Gold equivalent cut-offs are based on recent operating results for recoveries, off-site concentrate costs and on-site operating costs assuming additional
cost savings planned in respect of fiscal 2016 and beyond.
•  Mineral Resources are estimated using long-term prices of US$1,300 per ounce gold, US$3.00 per pound copper, and US$18.00 per ounce silver. A
Euro/US$ exchange rate of 1/1.15 was used.
•  A crown pillar of 50 m is excluded from the Mineral Resource below the El Valle open pit and a crown pillar of 25m is excluded from the Mineral
Resource below the El Valle open pit.
•  Unrecoverable material in exploited mining areas has been excluded from the Mineral Resource.
•  Mineral Resources and Mineral Reserves have been classified in accordance with Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) “CIM
Definition Standards – For Mineral Resources and Mineral Reserves” adopted by the CIM Council in accordance with the requirements of National
Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”), as is required by Canadian securities regulatory authorities. In addition,
while the terms “Measured”, “Indicated and “Inferred” Mineral Resources are required pursuant to NI 43-101, the SEC does not recognize such terms.
Canadian standards differ significantly from the requirements of the SEC, and mineral resource information contained herein is not comparable to similar
information regarding mineral reserves disclosed in accordance with the requirements of the SEC. Investors should understand that “Inferred” Mineral
Resources have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. In addition, investors
are cautioned not to assume that any part or all of Orvana’s Mineral Resources constitute or will be converted into Reserves.
•  Mineral Reserve and Resource tonnage and contained metal have been rounded to reflect accuracy of the estimate, and numbers may not add due to
rounding.
•  The scientific and technical information contained for the El Valle Reserve and Resource Estimates has been reviewed and approved (i) in respect of the
estimated mineral reserves by A. Harris, MAusIMM (CP), and (ii) in respect of the estimated mineral resources, by Guadalupe Collar Menéndez,
European Geologist. Both A. Harris and G. Collar are employees of OroValle and thus not independent of the company. Each of Messrs. Harris and
Collar is a Qualified Person within the meaning of NI 43-101.
•  For more details regarding the Mineral Reserve and Mineral Resource estimates please refer to the company’s fiscal year 2015 Annual Information Form
(“AIF”) filed on SEDAR.
24
NOTES TO EL VALLE RESERVES & RESOURCES
tsx | orv
 REDISCOVERING ORVANA
DON MARIO RESERVES & RESOURCES
In-Situ Don Mario Mineral Reserves & Mineral Resource Estimates1,2 – Sept. 30, 2015
Tonnes Grade Contained Metal
Category (000’s)
Au
(g/t)
Cu
(%)
Ag
(g/t)
Au Ounces
(000’s)
Cu Tonnes
(t)
Total Proven Reserves 433 0.66 0.82 24.58 9.2 3,535
Total Probable Reserves 0 0.00 0.00 0.00 0.0 0
Total P+P Reserves 433 0.66 0.82 24.58 9.2 3,535
Total Measured Resources 434 0.69 0.86 25.81 9.6 3,721
Total Indicated Resources 1,490 2.98 0.52 5.60 143.0 7,738
Total M+I Resources 1,924 2.47 0.60 10.16 152.6 11,460
Total Inferred Resources 81 3.11 0.16 3.46 8.0 128
1.  Mineral Resources are inclusive of Mineral Reserves and consist of UMZ, LMZ and Cerro Felix estimates.
2.  Notes to the Reserves & Resources can be found in the next slide of this presentation.
25
REDISCOVERING ORVANA 25
tsx | orv
O R V A N A . B O L I V I A
tsx | orv
 REDISCOVERING ORVANA
26
Notes to the Don Mario Mineral Reserve and Mineral Resource table:
•  Mineral Reserves and Mineral Resources have been stated as at September 30, 2015 and consist of in-situ material for the UMZ, LMZ and Cerro Felix
deposits.
•  Mineral Reserves are estimated using a copper equivalent cut-off grade of 1.0% CuEq. Copper equivalent cut-offs were calculated using recent
operating results for recoveries, off-site concentrate costs, and on-site operating costs.
•  Mineral Reserves are estimated using average long-term prices of US$1,100 per ounce gold, US$2.75 per lb copper, and US$16.50 per ounce silver.
•  Mineral Resources are inclusive of Mineral Reserves for UMZ and there are no stated Mineral Reserves for LMZ and Cerro Felix. Mineral Resources
that are not Mineral Reserves do not have demonstrated economic viability.
•  Mineral Resources are estimated at a copper equivalent cut-off grade of 0.85% CuEq for UMZ and a gold cut-off grade of 0.7 g/t Au for LMZ and Cerro
Felix, reflective of open-pit mining methods.
•  Mineral Resources are estimated using long-term prices of US$1,300 per ounce gold, US$3.00 per pound copper, and US$18.00 per ounce silver.
•  Mineral Resources and Mineral Reserves have been classified in accordance with Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) “CIM
Definition Standards – For Mineral Resources and Mineral Reserves” adopted by the CIM Council in accordance with the requirements of National
Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”), as is required by Canadian securities regulatory authorities. In addition,
while the terms “Measured”, “Indicated and “Inferred” Mineral Resources are required pursuant to NI 43-101, the SEC does not recognize such terms.
Canadian standards differ significantly from the requirements of the SEC, and mineral resource information contained herein is not comparable to similar
information regarding mineral reserves disclosed in accordance with the requirements of the SEC. Investors should understand that “Inferred” Mineral
Resources have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. In addition, investors
are cautioned not to assume that any part or all of Orvana’s Mineral Resources constitute or will be converted into Reserves.
•  Mineral Reserve and Resource tonnage and contained metal have been rounded to reflect accuracy of the estimate, and numbers may not add due to
rounding.
•  The scientific and technical information contained for the Don Mario Reserve and Resource Estimates has been reviewed and approved (i) in respect of
the estimated UMZ mineral reserves and mineral resources by G. Zandonai, CP, of DGCS SA, and (ii) in respect of the estimated LMZ and CF mineral
resources, by Michael P. Cullen, P.Geo., of Mercator Geological Services Limited (“Mercator”). Both DGCS SA and Mercator are independent mining
consulting firms and each of Messrs. Zandonai and Cullen is a Qualified Person within the meaning of NI 43-101.
•  For more details regarding the Mineral Reserve and Mineral Resource estimates please refer to the company’s fiscal year 2015 Annual Information Form
(“AIF”) filed on SEDAR.
26
NOTES TO DON MARIO RESERVES & RESOURCES
O R V A N A . B O L I V I A
tsx | orv
 REDISCOVERING ORVANA
R e d i s c o v e r i n g O r v a n a
Orvana Minerals Corp
Joanne C. Jobin
Investor Relations Officer
jjobin@orvana.com
CONTACT:
Daniella Dimitrov
President & CEO
ddimitrov@orvana.com181 University Avenue, Suite 1901
Toronto, Ontario Canada M5H 3M7
T 416-369-6275 W orvana.com

More Related Content

What's hot

Third Quarter 2016 Results Presentation
Third Quarter 2016 Results PresentationThird Quarter 2016 Results Presentation
Third Quarter 2016 Results Presentationyamanagold2016
 
AMI June 2016 Corporate Update
AMI June 2016 Corporate Update AMI June 2016 Corporate Update
AMI June 2016 Corporate Update AuricoCorporate
 
PAAS investor presentation January 2022
PAAS investor presentation January 2022PAAS investor presentation January 2022
PAAS investor presentation January 2022SirenFisekci
 
Baml toronto september 2016 final3 (2)
Baml toronto september 2016   final3 (2)Baml toronto september 2016   final3 (2)
Baml toronto september 2016 final3 (2)RoyalGold
 
Q1 2015 Webcast Presentation
Q1 2015 Webcast PresentationQ1 2015 Webcast Presentation
Q1 2015 Webcast PresentationAuRico Gold
 
Pan american investor presentation june 2019.pptx
Pan american investor presentation june 2019.pptxPan american investor presentation june 2019.pptx
Pan american investor presentation june 2019.pptxcsandovalduran
 
Jan 2020 paas investor presentation revised
Jan 2020 paas investor presentation revisedJan 2020 paas investor presentation revised
Jan 2020 paas investor presentation revisedcsandovalduran
 
Corporate presentation march 2016
Corporate presentation   march 2016Corporate presentation   march 2016
Corporate presentation march 2016newgold2011
 
Alamos corp presentation sept 22 2017 final web
Alamos corp presentation sept 22 2017 final webAlamos corp presentation sept 22 2017 final web
Alamos corp presentation sept 22 2017 final webalamosgoldinc
 
05 29-14 toronto marketing
05 29-14 toronto marketing05 29-14 toronto marketing
05 29-14 toronto marketingAuRico Gold
 
Q2 fiscal 2016 slides final
Q2 fiscal 2016 slides   finalQ2 fiscal 2016 slides   final
Q2 fiscal 2016 slides finalRoyalGold
 
Paas investor presentation agm 2020
Paas investor presentation agm 2020Paas investor presentation agm 2020
Paas investor presentation agm 2020csandovalduran
 
First Quarter 2015 Conference Call and Webcast Presentation
First Quarter 2015 Conference Call and Webcast PresentationFirst Quarter 2015 Conference Call and Webcast Presentation
First Quarter 2015 Conference Call and Webcast Presentationyamanagold2015
 
Corporate presentation april 2016
Corporate presentation april 2016Corporate presentation april 2016
Corporate presentation april 2016NorthAmericanNickel
 
16 11-08 slw presentation final (for web &amp; print)
16 11-08 slw presentation final (for web &amp; print)16 11-08 slw presentation final (for web &amp; print)
16 11-08 slw presentation final (for web &amp; print)silverwheaton2016
 
27 klg-corp presentation-nbf canadian miners conf-london-09nov16
27 klg-corp presentation-nbf canadian miners conf-london-09nov1627 klg-corp presentation-nbf canadian miners conf-london-09nov16
27 klg-corp presentation-nbf canadian miners conf-london-09nov16kirklandlakegoldinc
 

What's hot (16)

Third Quarter 2016 Results Presentation
Third Quarter 2016 Results PresentationThird Quarter 2016 Results Presentation
Third Quarter 2016 Results Presentation
 
AMI June 2016 Corporate Update
AMI June 2016 Corporate Update AMI June 2016 Corporate Update
AMI June 2016 Corporate Update
 
PAAS investor presentation January 2022
PAAS investor presentation January 2022PAAS investor presentation January 2022
PAAS investor presentation January 2022
 
Baml toronto september 2016 final3 (2)
Baml toronto september 2016   final3 (2)Baml toronto september 2016   final3 (2)
Baml toronto september 2016 final3 (2)
 
Q1 2015 Webcast Presentation
Q1 2015 Webcast PresentationQ1 2015 Webcast Presentation
Q1 2015 Webcast Presentation
 
Pan american investor presentation june 2019.pptx
Pan american investor presentation june 2019.pptxPan american investor presentation june 2019.pptx
Pan american investor presentation june 2019.pptx
 
Jan 2020 paas investor presentation revised
Jan 2020 paas investor presentation revisedJan 2020 paas investor presentation revised
Jan 2020 paas investor presentation revised
 
Corporate presentation march 2016
Corporate presentation   march 2016Corporate presentation   march 2016
Corporate presentation march 2016
 
Alamos corp presentation sept 22 2017 final web
Alamos corp presentation sept 22 2017 final webAlamos corp presentation sept 22 2017 final web
Alamos corp presentation sept 22 2017 final web
 
05 29-14 toronto marketing
05 29-14 toronto marketing05 29-14 toronto marketing
05 29-14 toronto marketing
 
Q2 fiscal 2016 slides final
Q2 fiscal 2016 slides   finalQ2 fiscal 2016 slides   final
Q2 fiscal 2016 slides final
 
Paas investor presentation agm 2020
Paas investor presentation agm 2020Paas investor presentation agm 2020
Paas investor presentation agm 2020
 
First Quarter 2015 Conference Call and Webcast Presentation
First Quarter 2015 Conference Call and Webcast PresentationFirst Quarter 2015 Conference Call and Webcast Presentation
First Quarter 2015 Conference Call and Webcast Presentation
 
Corporate presentation april 2016
Corporate presentation april 2016Corporate presentation april 2016
Corporate presentation april 2016
 
16 11-08 slw presentation final (for web &amp; print)
16 11-08 slw presentation final (for web &amp; print)16 11-08 slw presentation final (for web &amp; print)
16 11-08 slw presentation final (for web &amp; print)
 
27 klg-corp presentation-nbf canadian miners conf-london-09nov16
27 klg-corp presentation-nbf canadian miners conf-london-09nov1627 klg-corp presentation-nbf canadian miners conf-london-09nov16
27 klg-corp presentation-nbf canadian miners conf-london-09nov16
 

Viewers also liked

EXPERT ROUND TABLE "MERCADO DE LOS METALES: OSCILACIÓN DE PRECIOS Y ESTRATEGI...
EXPERT ROUND TABLE "MERCADO DE LOS METALES: OSCILACIÓN DE PRECIOS Y ESTRATEGI...EXPERT ROUND TABLE "MERCADO DE LOS METALES: OSCILACIÓN DE PRECIOS Y ESTRATEGI...
EXPERT ROUND TABLE "MERCADO DE LOS METALES: OSCILACIÓN DE PRECIOS Y ESTRATEGI...Fernando Cabo Díaz
 
SAMPLE OF DEUTSCHE BANK Derivative (IRS) MARK-TO-MARKET/MARK-TO-MODEL CUSTOME...
SAMPLE OF DEUTSCHE BANK Derivative (IRS) MARK-TO-MARKET/MARK-TO-MODEL CUSTOME...SAMPLE OF DEUTSCHE BANK Derivative (IRS) MARK-TO-MARKET/MARK-TO-MODEL CUSTOME...
SAMPLE OF DEUTSCHE BANK Derivative (IRS) MARK-TO-MARKET/MARK-TO-MODEL CUSTOME...Fernando Cabo Díaz
 
GESTION DE PROYECTOS DE INNOVACION (Jornada III de 3)
GESTION DE PROYECTOS DE INNOVACION (Jornada III  de 3)GESTION DE PROYECTOS DE INNOVACION (Jornada III  de 3)
GESTION DE PROYECTOS DE INNOVACION (Jornada III de 3)Fernando Cabo Díaz
 
IV FORO METAL ASTURIAS - ROUNDTABLE MATERIAS PRIMAS
IV FORO METAL ASTURIAS - ROUNDTABLE MATERIAS PRIMASIV FORO METAL ASTURIAS - ROUNDTABLE MATERIAS PRIMAS
IV FORO METAL ASTURIAS - ROUNDTABLE MATERIAS PRIMASFernando Cabo Díaz
 
Arcelormittal presentation investors_roadshow
Arcelormittal presentation investors_roadshowArcelormittal presentation investors_roadshow
Arcelormittal presentation investors_roadshowFernando Cabo Díaz
 
FRACTURE PROBLEMS IN MILL ROLLS - CONGRESS Asturias April 2011
FRACTURE PROBLEMS IN MILL ROLLS - CONGRESS Asturias April 2011FRACTURE PROBLEMS IN MILL ROLLS - CONGRESS Asturias April 2011
FRACTURE PROBLEMS IN MILL ROLLS - CONGRESS Asturias April 2011Fernando Cabo Díaz
 
FISCALIDAD COMERCIO INTERNACIONAL
FISCALIDAD COMERCIO INTERNACIONALFISCALIDAD COMERCIO INTERNACIONAL
FISCALIDAD COMERCIO INTERNACIONALFernando Cabo Díaz
 
GESTION DE PROYECTOS DE INNOVACION (Jornada II de 3)
GESTION DE PROYECTOS DE INNOVACION (Jornada II  de 3)GESTION DE PROYECTOS DE INNOVACION (Jornada II  de 3)
GESTION DE PROYECTOS DE INNOVACION (Jornada II de 3)Fernando Cabo Díaz
 

Viewers also liked (12)

EXPERT ROUND TABLE "MERCADO DE LOS METALES: OSCILACIÓN DE PRECIOS Y ESTRATEGI...
EXPERT ROUND TABLE "MERCADO DE LOS METALES: OSCILACIÓN DE PRECIOS Y ESTRATEGI...EXPERT ROUND TABLE "MERCADO DE LOS METALES: OSCILACIÓN DE PRECIOS Y ESTRATEGI...
EXPERT ROUND TABLE "MERCADO DE LOS METALES: OSCILACIÓN DE PRECIOS Y ESTRATEGI...
 
SAMPLE OF DEUTSCHE BANK Derivative (IRS) MARK-TO-MARKET/MARK-TO-MODEL CUSTOME...
SAMPLE OF DEUTSCHE BANK Derivative (IRS) MARK-TO-MARKET/MARK-TO-MODEL CUSTOME...SAMPLE OF DEUTSCHE BANK Derivative (IRS) MARK-TO-MARKET/MARK-TO-MODEL CUSTOME...
SAMPLE OF DEUTSCHE BANK Derivative (IRS) MARK-TO-MARKET/MARK-TO-MODEL CUSTOME...
 
GESTION DE PROYECTOS DE INNOVACION (Jornada III de 3)
GESTION DE PROYECTOS DE INNOVACION (Jornada III  de 3)GESTION DE PROYECTOS DE INNOVACION (Jornada III  de 3)
GESTION DE PROYECTOS DE INNOVACION (Jornada III de 3)
 
IV FORO METAL ASTURIAS - ROUNDTABLE MATERIAS PRIMAS
IV FORO METAL ASTURIAS - ROUNDTABLE MATERIAS PRIMASIV FORO METAL ASTURIAS - ROUNDTABLE MATERIAS PRIMAS
IV FORO METAL ASTURIAS - ROUNDTABLE MATERIAS PRIMAS
 
Arcelormittal presentation investors_roadshow
Arcelormittal presentation investors_roadshowArcelormittal presentation investors_roadshow
Arcelormittal presentation investors_roadshow
 
Ims3 C
Ims3 CIms3 C
Ims3 C
 
Fnodular China Eoi Marzo 2011
Fnodular China Eoi Marzo 2011Fnodular China Eoi Marzo 2011
Fnodular China Eoi Marzo 2011
 
FRACTURE PROBLEMS IN MILL ROLLS - CONGRESS Asturias April 2011
FRACTURE PROBLEMS IN MILL ROLLS - CONGRESS Asturias April 2011FRACTURE PROBLEMS IN MILL ROLLS - CONGRESS Asturias April 2011
FRACTURE PROBLEMS IN MILL ROLLS - CONGRESS Asturias April 2011
 
FISCALIDAD COMERCIO INTERNACIONAL
FISCALIDAD COMERCIO INTERNACIONALFISCALIDAD COMERCIO INTERNACIONAL
FISCALIDAD COMERCIO INTERNACIONAL
 
GESTION DE PROYECTOS DE INNOVACION (Jornada II de 3)
GESTION DE PROYECTOS DE INNOVACION (Jornada II  de 3)GESTION DE PROYECTOS DE INNOVACION (Jornada II  de 3)
GESTION DE PROYECTOS DE INNOVACION (Jornada II de 3)
 
Finanzas Internacionales
Finanzas InternacionalesFinanzas Internacionales
Finanzas Internacionales
 
IFRS
IFRSIFRS
IFRS
 

Similar to Orvana dic2015

SilverCrest Mines | Corporate Presentation | June 2015
SilverCrest Mines | Corporate Presentation | June 2015SilverCrest Mines | Corporate Presentation | June 2015
SilverCrest Mines | Corporate Presentation | June 2015Fred Cooper
 
SilverCrest Mines | Corporate Presentation | September 2013
SilverCrest Mines | Corporate Presentation | September 2013SilverCrest Mines | Corporate Presentation | September 2013
SilverCrest Mines | Corporate Presentation | September 2013Silvercrestmines
 
SilverCrest Mines | Corporate Presentation | May 2015
SilverCrest Mines | Corporate Presentation | May 2015SilverCrest Mines | Corporate Presentation | May 2015
SilverCrest Mines | Corporate Presentation | May 2015Silvercrestmines
 
SilverCrest Mines | Corporate Presentation | June 2013
SilverCrest Mines | Corporate Presentation | June 2013SilverCrest Mines | Corporate Presentation | June 2013
SilverCrest Mines | Corporate Presentation | June 2013Silvercrestmines
 
SilverCrest Mines | Corporate Presentation | April 2015
SilverCrest Mines | Corporate Presentation | April 2015SilverCrest Mines | Corporate Presentation | April 2015
SilverCrest Mines | Corporate Presentation | April 2015Silvercrestmines
 
SilverCrest Mines | Corporate Presentation | January 2015
SilverCrest Mines | Corporate Presentation | January 2015SilverCrest Mines | Corporate Presentation | January 2015
SilverCrest Mines | Corporate Presentation | January 2015Silvercrestmines
 
SilverCrest Mines | Corporate Presentation | March 2015
SilverCrest Mines | Corporate Presentation | March 2015SilverCrest Mines | Corporate Presentation | March 2015
SilverCrest Mines | Corporate Presentation | March 2015Silvercrestmines
 
Q4 2017 and Year End Results Presentation
Q4 2017 and Year End Results PresentationQ4 2017 and Year End Results Presentation
Q4 2017 and Year End Results Presentationyamanagold2016
 
SilverCrest Mines Inc | Corporate Presentation | June 2013 #2
SilverCrest Mines Inc | Corporate Presentation | June 2013 #2SilverCrest Mines Inc | Corporate Presentation | June 2013 #2
SilverCrest Mines Inc | Corporate Presentation | June 2013 #2Silvercrestmines
 
BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining ConferenceBMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conferenceyamanagold2015
 
Corporate Summary February 2016
Corporate Summary February 2016Corporate Summary February 2016
Corporate Summary February 2016yamanagold2016
 
05 12-15 agm slides final
05 12-15 agm slides final05 12-15 agm slides final
05 12-15 agm slides finalTeranga Gold
 
SilverCrest Mines | Corporate Presentation | April 2014
SilverCrest Mines | Corporate Presentation | April 2014SilverCrest Mines | Corporate Presentation | April 2014
SilverCrest Mines | Corporate Presentation | April 2014Silvercrestmines
 
SilverCrest Mines | Corporate Presentation | March 2014
SilverCrest Mines | Corporate Presentation | March 2014SilverCrest Mines | Corporate Presentation | March 2014
SilverCrest Mines | Corporate Presentation | March 2014Silvercrestmines
 
SilverCrest Mines | Corporate Presentation | May 2014
SilverCrest Mines | Corporate Presentation | May 2014SilverCrest Mines | Corporate Presentation | May 2014
SilverCrest Mines | Corporate Presentation | May 2014Silvercrestmines
 
Dgc 16 11_02 - corporate presentation
Dgc 16 11_02 - corporate presentationDgc 16 11_02 - corporate presentation
Dgc 16 11_02 - corporate presentationDetourGold
 
SilverCrest Mines | Corporate Presentation | July 2013
SilverCrest Mines | Corporate Presentation | July 2013SilverCrest Mines | Corporate Presentation | July 2013
SilverCrest Mines | Corporate Presentation | July 2013Silvercrestmines
 
March paas presentation pdf
March paas presentation pdfMarch paas presentation pdf
March paas presentation pdfcsandovalduran
 

Similar to Orvana dic2015 (20)

Agm presentation
Agm presentationAgm presentation
Agm presentation
 
SilverCrest Mines | Corporate Presentation | June 2015
SilverCrest Mines | Corporate Presentation | June 2015SilverCrest Mines | Corporate Presentation | June 2015
SilverCrest Mines | Corporate Presentation | June 2015
 
SilverCrest Mines | Corporate Presentation | September 2013
SilverCrest Mines | Corporate Presentation | September 2013SilverCrest Mines | Corporate Presentation | September 2013
SilverCrest Mines | Corporate Presentation | September 2013
 
SilverCrest Mines | Corporate Presentation | May 2015
SilverCrest Mines | Corporate Presentation | May 2015SilverCrest Mines | Corporate Presentation | May 2015
SilverCrest Mines | Corporate Presentation | May 2015
 
SilverCrest Mines | Corporate Presentation | June 2013
SilverCrest Mines | Corporate Presentation | June 2013SilverCrest Mines | Corporate Presentation | June 2013
SilverCrest Mines | Corporate Presentation | June 2013
 
Svl 2013 06 final
Svl 2013 06 finalSvl 2013 06 final
Svl 2013 06 final
 
SilverCrest Mines | Corporate Presentation | April 2015
SilverCrest Mines | Corporate Presentation | April 2015SilverCrest Mines | Corporate Presentation | April 2015
SilverCrest Mines | Corporate Presentation | April 2015
 
SilverCrest Mines | Corporate Presentation | January 2015
SilverCrest Mines | Corporate Presentation | January 2015SilverCrest Mines | Corporate Presentation | January 2015
SilverCrest Mines | Corporate Presentation | January 2015
 
SilverCrest Mines | Corporate Presentation | March 2015
SilverCrest Mines | Corporate Presentation | March 2015SilverCrest Mines | Corporate Presentation | March 2015
SilverCrest Mines | Corporate Presentation | March 2015
 
Q4 2017 and Year End Results Presentation
Q4 2017 and Year End Results PresentationQ4 2017 and Year End Results Presentation
Q4 2017 and Year End Results Presentation
 
SilverCrest Mines Inc | Corporate Presentation | June 2013 #2
SilverCrest Mines Inc | Corporate Presentation | June 2013 #2SilverCrest Mines Inc | Corporate Presentation | June 2013 #2
SilverCrest Mines Inc | Corporate Presentation | June 2013 #2
 
BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining ConferenceBMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference
 
Corporate Summary February 2016
Corporate Summary February 2016Corporate Summary February 2016
Corporate Summary February 2016
 
05 12-15 agm slides final
05 12-15 agm slides final05 12-15 agm slides final
05 12-15 agm slides final
 
SilverCrest Mines | Corporate Presentation | April 2014
SilverCrest Mines | Corporate Presentation | April 2014SilverCrest Mines | Corporate Presentation | April 2014
SilverCrest Mines | Corporate Presentation | April 2014
 
SilverCrest Mines | Corporate Presentation | March 2014
SilverCrest Mines | Corporate Presentation | March 2014SilverCrest Mines | Corporate Presentation | March 2014
SilverCrest Mines | Corporate Presentation | March 2014
 
SilverCrest Mines | Corporate Presentation | May 2014
SilverCrest Mines | Corporate Presentation | May 2014SilverCrest Mines | Corporate Presentation | May 2014
SilverCrest Mines | Corporate Presentation | May 2014
 
Dgc 16 11_02 - corporate presentation
Dgc 16 11_02 - corporate presentationDgc 16 11_02 - corporate presentation
Dgc 16 11_02 - corporate presentation
 
SilverCrest Mines | Corporate Presentation | July 2013
SilverCrest Mines | Corporate Presentation | July 2013SilverCrest Mines | Corporate Presentation | July 2013
SilverCrest Mines | Corporate Presentation | July 2013
 
March paas presentation pdf
March paas presentation pdfMarch paas presentation pdf
March paas presentation pdf
 

More from Fernando Cabo Díaz

GESTION DE PROYECTOS DE INNOVACION (3 Jornadas Presenciales)
GESTION DE PROYECTOS DE INNOVACION (3 Jornadas Presenciales)GESTION DE PROYECTOS DE INNOVACION (3 Jornadas Presenciales)
GESTION DE PROYECTOS DE INNOVACION (3 Jornadas Presenciales)Fernando Cabo Díaz
 
GESTION DE PROYECTOS DE INNOVACION (Jornada I de 3)
GESTION DE PROYECTOS DE INNOVACION (Jornada I  de 3)GESTION DE PROYECTOS DE INNOVACION (Jornada I  de 3)
GESTION DE PROYECTOS DE INNOVACION (Jornada I de 3)Fernando Cabo Díaz
 
Aspectos tributarios en la IMPOSICION INDIRECTA de la Internacionalización
Aspectos tributarios en la IMPOSICION INDIRECTA de la InternacionalizaciónAspectos tributarios en la IMPOSICION INDIRECTA de la Internacionalización
Aspectos tributarios en la IMPOSICION INDIRECTA de la InternacionalizaciónFernando Cabo Díaz
 
Aspectos tributarios en la Imposición Directa de la Internacionalización Empr...
Aspectos tributarios en la Imposición Directa de la Internacionalización Empr...Aspectos tributarios en la Imposición Directa de la Internacionalización Empr...
Aspectos tributarios en la Imposición Directa de la Internacionalización Empr...Fernando Cabo Díaz
 
Aspectos Tributarios relevantes en el marco de la Gestión del Personal Expatr...
Aspectos Tributarios relevantes en el marco de la Gestión del Personal Expatr...Aspectos Tributarios relevantes en el marco de la Gestión del Personal Expatr...
Aspectos Tributarios relevantes en el marco de la Gestión del Personal Expatr...Fernando Cabo Díaz
 
Aspectos laborales y de Seguridad Social de la internacionalización. Gestión ...
Aspectos laborales y de Seguridad Social de la internacionalización. Gestión ...Aspectos laborales y de Seguridad Social de la internacionalización. Gestión ...
Aspectos laborales y de Seguridad Social de la internacionalización. Gestión ...Fernando Cabo Díaz
 
INFORMACION Y GESTION OPERATIVA DE LA COMPRAVENTA INTERNACIONAL
INFORMACION Y GESTION OPERATIVA DE LA COMPRAVENTA INTERNACIONALINFORMACION Y GESTION OPERATIVA DE LA COMPRAVENTA INTERNACIONAL
INFORMACION Y GESTION OPERATIVA DE LA COMPRAVENTA INTERNACIONALFernando Cabo Díaz
 
BOE PLAN GENERAL CONTABILIDAD 2007 ESPAÑA
BOE PLAN GENERAL CONTABILIDAD 2007 ESPAÑABOE PLAN GENERAL CONTABILIDAD 2007 ESPAÑA
BOE PLAN GENERAL CONTABILIDAD 2007 ESPAÑAFernando Cabo Díaz
 
Saint gobain rapport_annuel_2011_fr
Saint gobain rapport_annuel_2011_frSaint gobain rapport_annuel_2011_fr
Saint gobain rapport_annuel_2011_frFernando Cabo Díaz
 
INFORME ANUAL 2011 FUNDICION NODULAR
INFORME ANUAL 2011 FUNDICION NODULARINFORME ANUAL 2011 FUNDICION NODULAR
INFORME ANUAL 2011 FUNDICION NODULARFernando Cabo Díaz
 
INFORME ANUAL 2007 FUNDICION NODULAR
INFORME ANUAL 2007 FUNDICION NODULARINFORME ANUAL 2007 FUNDICION NODULAR
INFORME ANUAL 2007 FUNDICION NODULARFernando Cabo Díaz
 
Financiacion En Tiempos De Crisis
Financiacion En Tiempos De CrisisFinanciacion En Tiempos De Crisis
Financiacion En Tiempos De CrisisFernando Cabo Díaz
 

More from Fernando Cabo Díaz (17)

GESTION DE PROYECTOS DE INNOVACION (3 Jornadas Presenciales)
GESTION DE PROYECTOS DE INNOVACION (3 Jornadas Presenciales)GESTION DE PROYECTOS DE INNOVACION (3 Jornadas Presenciales)
GESTION DE PROYECTOS DE INNOVACION (3 Jornadas Presenciales)
 
GESTION DE PROYECTOS DE INNOVACION (Jornada I de 3)
GESTION DE PROYECTOS DE INNOVACION (Jornada I  de 3)GESTION DE PROYECTOS DE INNOVACION (Jornada I  de 3)
GESTION DE PROYECTOS DE INNOVACION (Jornada I de 3)
 
Aspectos tributarios en la IMPOSICION INDIRECTA de la Internacionalización
Aspectos tributarios en la IMPOSICION INDIRECTA de la InternacionalizaciónAspectos tributarios en la IMPOSICION INDIRECTA de la Internacionalización
Aspectos tributarios en la IMPOSICION INDIRECTA de la Internacionalización
 
Aspectos tributarios en la Imposición Directa de la Internacionalización Empr...
Aspectos tributarios en la Imposición Directa de la Internacionalización Empr...Aspectos tributarios en la Imposición Directa de la Internacionalización Empr...
Aspectos tributarios en la Imposición Directa de la Internacionalización Empr...
 
Aspectos Tributarios relevantes en el marco de la Gestión del Personal Expatr...
Aspectos Tributarios relevantes en el marco de la Gestión del Personal Expatr...Aspectos Tributarios relevantes en el marco de la Gestión del Personal Expatr...
Aspectos Tributarios relevantes en el marco de la Gestión del Personal Expatr...
 
Aspectos laborales y de Seguridad Social de la internacionalización. Gestión ...
Aspectos laborales y de Seguridad Social de la internacionalización. Gestión ...Aspectos laborales y de Seguridad Social de la internacionalización. Gestión ...
Aspectos laborales y de Seguridad Social de la internacionalización. Gestión ...
 
INFORMACION Y GESTION OPERATIVA DE LA COMPRAVENTA INTERNACIONAL
INFORMACION Y GESTION OPERATIVA DE LA COMPRAVENTA INTERNACIONALINFORMACION Y GESTION OPERATIVA DE LA COMPRAVENTA INTERNACIONAL
INFORMACION Y GESTION OPERATIVA DE LA COMPRAVENTA INTERNACIONAL
 
BOE PLAN GENERAL CONTABILIDAD 2007 ESPAÑA
BOE PLAN GENERAL CONTABILIDAD 2007 ESPAÑABOE PLAN GENERAL CONTABILIDAD 2007 ESPAÑA
BOE PLAN GENERAL CONTABILIDAD 2007 ESPAÑA
 
Management report amgroup_2011
Management report amgroup_2011Management report amgroup_2011
Management report amgroup_2011
 
Saint gobain rapport_annuel_2011_fr
Saint gobain rapport_annuel_2011_frSaint gobain rapport_annuel_2011_fr
Saint gobain rapport_annuel_2011_fr
 
INFORME ANUAL 2011 FUNDICION NODULAR
INFORME ANUAL 2011 FUNDICION NODULARINFORME ANUAL 2011 FUNDICION NODULAR
INFORME ANUAL 2011 FUNDICION NODULAR
 
INFORME ANUAL 2007 FUNDICION NODULAR
INFORME ANUAL 2007 FUNDICION NODULARINFORME ANUAL 2007 FUNDICION NODULAR
INFORME ANUAL 2007 FUNDICION NODULAR
 
China New Wave of Exports
China New Wave of ExportsChina New Wave of Exports
China New Wave of Exports
 
FUNDICION NODULA 2010
FUNDICION NODULA 2010FUNDICION NODULA 2010
FUNDICION NODULA 2010
 
Financiacion En Tiempos De Crisis
Financiacion En Tiempos De CrisisFinanciacion En Tiempos De Crisis
Financiacion En Tiempos De Crisis
 
Incentivos Fiscales I+D Fade
Incentivos Fiscales I+D FadeIncentivos Fiscales I+D Fade
Incentivos Fiscales I+D Fade
 
Catalogo Fnodular
Catalogo FnodularCatalogo Fnodular
Catalogo Fnodular
 

Recently uploaded

Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceDamini Dixit
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...allensay1
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceDamini Dixit
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876dlhescort
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...lizamodels9
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 

Recently uploaded (20)

Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 

Orvana dic2015

  • 1. tsx | orv REDISCOVERING ORVANA C o r p o r a t e P r e s e n t a t i o n December, 2015 R e d i s c o v e r i n g O r v a n a
  • 2. tsx | orv REDISCOVERING ORVANA FORWARD LOOKING STATEMENTS 1 All monetary amounts in U.S. dollars unless otherwise stated. Certain statements in this information constitute forward-looking statements or forward-looking information within the meaning of applicable securities laws (“forward- looking statements”). Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, potentials, future events or performance (often, but not always, using words or phrases such as “believes”, “expects”, “plans”, “estimates” or “intends” or stating that certain actions, events or results “may”, “could”, “would”, “might”, “will” or “are projected to” be taken or achieved) are not statements of historical fact, but are forward-looking statements. The forward-looking statements herein relate to, among other things, Orvana’s ability to achieve improvement in free cash flow; the potential to extend the mine life of El Valle and Don Mario beyond their current life-of-mine estimates; Orvana’s ability to optimize its assets to deliver shareholder value; the Company’s ability to optimize productivity at Don Mario and El Valle; estimates of future production, operating costs and capital expenditures; mineral resource and reserve estimates; statements and information regarding future feasibility studies and their results; future transactions; future metal prices; the ability to achieve additional growth and geographic diversification; future financial performance, including the ability to increase cash flow and profits; future financing requirements; and mine development plans. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by the Company as of the date of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. The estimates and assumptions of the Company contained or incorporated by reference in this information, which may prove to be incorrect, include, but are not limited to, the various assumptions set forth herein and in Orvana’s most recently filed Management’s Discussion & Analysis and Annual Information Form (the “Company Disclosures”) or as otherwise expressly incorporated herein by reference as well as: there being no significant disruptions affecting operations, whether due to labour disruptions, supply disruptions, power disruptions, damage to equipment or otherwise; permitting, development, operations, expansion and acquisitions at El Valle and Don Mario being consistent with the Company’s current expectations; political developments in any jurisdiction in which the Company operates being consistent with its current expectations; certain price assumptions for gold, copper and silver; prices for key supplies being approximately consistent with current levels; production and cost of sales forecasts meeting expectations; the accuracy of the Company’s current mineral reserve and mineral resource estimates; and labour and materials costs increasing on a basis consistent with Orvana’s current expectations. A variety of inherent risks, uncertainties and factors, many of which are beyond the Company’s control, affect the operations, performance and results of the Company and its business, and could cause actual events or results to differ materially from estimated or anticipated events or results expressed or implied by forward looking statements. Some of these risks, uncertainties and factors include fluctuations in the price of gold, silver and copper; the need to recalculate estimates of resources based on actual production experience; the failure to achieve production estimates; variations in the grade of ore mined; variations in the cost of operations; the availability of qualified personnel; the Company’s ability to obtain and maintain all necessary regulatory approvals and licenses; the Company’s ability to use cyanide in its mining operations; risks generally associated with mineral exploration and development, including the Company’s ability to continue to operate the El Valle and/or Don Mario and/or ability to resume operations at the Carlés Mine; the Company’s ability to acquire and develop mineral properties and to successfully integrate such acquisitions; the Company’s ability to execute on its strategy; the Company’s ability to obtain financing when required on terms that are acceptable to the Company; challenges to the Company’s interests in its property and mineral rights; current, pending and proposed legislative or regulatory developments or changes in political, social or economic conditions in the countries in which the Company operates; general economic conditions worldwide; and the risks identified in the Company’s Disclosures. This list is not exhaustive of the factors that may affect any of the Company’s forward-looking statements and reference should also be made to the Company’s Disclosures for a description of additional risk factors. The forward-looking statements made in this information with respect to the anticipated development and exploration of the Company’s mineral projects are intended to provide an overview of management’s expectations with respect to certain future activities of the Company and may not be appropriate for other purposes. Forward-looking statements are based on management’s current plans, estimates, projections, beliefs and opinions and, except as required by law, the Company does not undertake any obligation to update forward-looking statements should assumptions related to these plans, estimates, projections, beliefs and opinions change. Readers are cautioned not to put undue reliance on forward-looking statements.
  • 3. tsx | orv REDISCOVERING ORVANA INVESTMENT HIGHLIGHTS Multi Mine - Au, Cu, Ag Producer Focused on Europe/Americas Strong Balance Sheet Organic Growth Trading Below 0.5 x EV / EBITDA Toronto, Canada Head Office Asturias, Spain ElValle Mines Bolivia Don Mario Mine El Valle: Optimization Increase LoM Highly undervalued among peers FY 2015 Prod’n – 132K Au Eq Oz Repaid over USD$70M of debt FY 2015 COC/AISC (by product) - $949/$1,210 2 Don Mario: Mine life extension Metallurgical work CIL Refurbishment = improved margins
  • 4. tsx | orv REDISCOVERING ORVANA COMPANY SNAPSHOT OVERVIEW Ticker TSX:ORV Common Shares 136.6M Options / Warrants (Dec 10/15) 1.9M / 1.2M Market Capitalization (Dec 18/15) C$21.1M OVERVIEW Unrestricted Cash (Sept 30/15) $17.2M Total Debt (Sept 30/15) $1.5M Fiscal Year End Sept 30 Shareholder Breakdown Fabulosa Insiders Institutions retail All in US$ unless otherwise noted Stock Chart (1 year) Retail 3 52wk hi-lo: $0.49-$0.12.5
  • 5. tsx | orv REDISCOVERING ORVANA OPERATING PERFORMANCE / 2016 GUIDANCE Net revenue from Cu and Ag by-products represented approximately 46% of net revenue in fiscal 2015 YTD. Guidance 2016 Low High Actual 2015 CAPEX $17M $19M $10.1M 4 Further details of the Company’s Operating Guidance can be found in the Appendix of this presentation 2016 includes CIL recommissioning CAPEX of $6.4M $629 $631 $771 $948 $850 - $950 $1,383 $950 $1,015 $1,210 $1,150 - $1,250 $- $400 $800 $1,200 $1,600 FY 2012 FY 2013 FY 2014 FY 2015 Guidance-2015 COC/AISC per Au/oz sold, By-product COC AISC 67,00055,929 80,541 84,084 72,817 75,000 - 25,000 50,000 75,000 100,000 FY 2012 FY 2013 FY 2014 FY 2015 Guidance Gold Oz Don Mario El Valle 15,500 15,366 17,303 21,057 22,600 17,000 - 5,000 10,000 15,000 20,000 25,000 FY 2012 FY 2013 FY 2014 FY 2015 Guidance Copper lbs (thousands) Don Mario El Valle Guidance
  • 6. tsx | orv REDISCOVERING ORVANA KEY MILESTONES To-Date !  Strong cash position !  Repaid over $70M in debt !  Positive operating cash flow !  Sale of Copperwood for up to $25M !  Experienced management, board !  Don Mario mine life extension !  Met 2015 updated guidance Ongoing Initiatives "  Continue to optimize operations "  Lower cash costs "  Meet 2016 Guidance "  Extend LoM of operations "  Organic growth opportunities "  Increase share price relative to EBITDA "  Enhance CSR programs REDISCOVERING ORVANA 5 tsx | orv
  • 7. tsx | orv REDISCOVERING ORVANA MANAGEMENT & DIRECTORS SENIOR MANAGEMENT Daniella Dimitrov President, CEO & Director •  Over 20 years of capital markets, commercial and operations experience. Executive roles including as CFO of Orvana, Executive Vice-Chair of Baffinland Iron Mines and with Dundee Securities and Raymond James. Jeffrey Hillis Chief Financial Officer •  Over 10 years of senior management and mining financial experience. Executive roles including as CFO of Potash Ridge Corp., Iberian Minerals and Excellon Resources. João Nunes General Manager, El Valle •  Over 18 years of experience in mine operations and development. Senior mine management roles in Europe with Sociedade Mineira de Neves Corvo and Minas de Aguas Teñidas. John Bracale President, Don Mario •  Over 30 years of senior mining management in Latin America, the Pacific Rim, and the U.S. Executive roles including President, Country Manager for CGN Guatemala, a subsidiary of HudBay Minerals. DIRECTORS Jacques McMullen Chairman •  Over 20 years’ experience in the mining sector. Principal and non-executive director BBA, Member of the Advisory Committee to Minera S.A. Formerly held senior positions at Barrick Gold. Gordon Bogden •  Over 30 years’ experience in the mining/finance sectors. Chair of NexGen Energy, Director of Camino Minerals and Royal Gold. Formerly CEO of Alloycorp and held senior positions at Standard Chartered Bank, Gryphon Partners and National Bank Financial. Juan Gavidia •  Over 20 years’ experience in the mining sector. Spearheaded business initiatives and provided operational support for international mining projects. Consultant for Minera S.A. Formerly held positions with Newmont Mining. Ed Guimaraes •  Over 25 years’ experience in the mining sector. CFO of Sierra Metals, Director of Aldridge Minerals. Formerly held senior management positions at Aur Resources Sara Magner •  Over 15 years’ experience in corporate transactional, securities law. Corporate Council of Minera S.A.. Formerly held positions at Greenberg Taurig and Siemens, Siemens AG. Gordon Pridham •  Over 25 years’ experience mining/finance sectors. Principal of Edgewater Capital, Director of Newalta Corp and Chairman of Titanium Corp. Former Director of Roxgold and held senior positions in a number of finance companies and has advised public companies across a broad range of industry sectors. Audra Walsh •  Over 20 years’ experience in the mining sector. Previously held senior positions at Sierra Metals, Minera S.A., A2Z, Barrick and Newmont. John Wilson •  Over 30 years’ experience in the mining/finance sectors. Member of the Advisory Committee to Minera S.A. Formerly held senior positions with IFC and World Bank Group. 6
  • 8. tsx | orv REDISCOVERING ORVANA $(2,263) $33,276 $38,900 $37,923 $8,471 (5,000) 5,000 15,000 25,000 35,000 45,000 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 $72,160 $61,020 $25,978 $1,478 $- $20,000 $40,000 $60,000 $80,000 FY 2012 FY 2013 FY 2014 FY 2015 El Valle Short-term Corporate Don Mario SELECTED FINANCIALS 7 DECLINING DEBT Financial Performance (in 000’s except per share amounts) FY 2015 FY 2014 Revenue $121,425 $142,407 Adjusted Gross Margin (loss) ($13,854) $9,268 Adjusted EBITBA $8,072 $44,172 Adjusted net income (loss) ($16,733) $1,779 Adjusted net income per share (basic/diluted) ($0.12) $0.01 Capital expenditures $10,118 $14,925 Refer to Orvana’s financial statements and MD&A for complete financial information. OCF BEFORE NON-CASH WORKING CAPITAL CHANGES FY 2012, FY 2013 and FY 2014 include realized gains/losses on settled derivatives instruments. •  Adjusted EBITDA excludes non-cash impairment losses, asset de-recognition, M2M of unrealized derivatives and loss from discontinued operations. •  Adjusted EBITDA for FY 2012, FY 2013 and FY 2014 includes realized gains/losses on settled derivative instruments. $41,317 $50,328 $44,172 $8,072 - 15,000 30,000 45,000 60,000 FY 2012 FY 2013 FY 2014 FY 2015 ADJUSTED EBITDA FISCAL YEAR END
  • 9. tsx | orv REDISCOVERING ORVANA SPAIN: EL VALLE PRODUCING MINE EL VALLE OVERVIEW Ownership 100% 2015 Au / Cu Production 53,733 Au oz / 6,128,000 Cu lbs 2016 Guidance 43 - 48,000 Au oz / 4.5 - 5,000,000Cu lbs 2015 COC / AISC $1,077 / $1,308 2015 Plant Recoveries 92.6% Au / 81.4% Cu Plant Capacity 2,000 tpd 2015 Grade 3.53 gpt Au / 0.67% Cu UG El Valle Au, Cu, Ag SPAIN REDISCOVERING ORVANA 8 Gijon
  • 10. tsx | orv REDISCOVERING ORVANA EL VALLE OVERVIEW •  Underground operations commissioned 2011 •  Excellent regional infrastructure •  Experienced operating team •  Transitioned to owner/operator mining of oxides in 2015 El Valle Hoist REDISCOVERING ORVANA 9
  • 11. tsx | orv REDISCOVERING ORVANA EL VALLE PRODUCTION/COSTS COC $884 10 65,992 62,957 53,733 - 14,000 28,000 42,000 56,000 70,000 FY 2013 FY 2014 FY 2015 Gold Oz Production 6,658,000 5,626,000 6,128,000 - 1,500,000 3,000,000 4,500,000 6,000,000 7,500,000 FY 2013 FY 2014 FY 2015 Copper lbs Production $803 $952 $1,077 $1,086 $1,160 $1,308 $- $300 $600 $900 $1,200 $1,500 FY 2013 FY 2014 FY 2015 OroValle COC/AISC (By-Prodcut) per Oz Au Sold COC AISC
  • 12. tsx | orv REDISCOVERING ORVANA EL VALLE MINING AREA 11 N Boinas South Boinas East Black Skarn A107 Charnela East Breccia A208 Skarn Oxides Oxides Oxides Oxides Z>205 = Oxides Z<205 = Skarn Oxides Skarn 11 Mining Methods: Oxides: Cut and Fill Skarns: Long Hole Stoping Currently Mining: Black Skarn, Boinas East, A107 2016 Targeting: Boinas South- Skarn Black Skarn West- Skarn East Breccia- Oxides
  • 13. tsx | orv REDISCOVERING ORVANA 700000 700000 710000 710000 720000 720000 4790000 4790000 4800000 4800000 P.I. LIDIA P.I. QUINTANA P.I. CAMPALCARRO EL VALLE-BOINASEL VALLE-BOINAS LA BRUEVALA BRUEVA CARLESCARLES ORTOSAORTOSA GODANGODAN Legend MIN. RIGHTS Exploitation concession Investigation Permit granted Oviedo ± 0 1 2 3 4 50.5 Kilometers OROVALLE CONCESSION OVERVIEW 12 El Valle Located in the Rio Narcea Gold Belt •  Investigation permits granted and pending in all belts •  >4,298ha in Exploitation Concessions •  >3,330ha in Investigative Permits •  >28,588 pending Investigative Permits •  Prolific mining history •  Mined by Romans 2,000 years ago •  Historical exploration •  Barrick Gold •  Rio Narcea Gold Mines •  Anglo American Ortosa Godan Carlés La Brueva EL VALLE I.P. Lidia I.P. Quintana I.P. Campalcarro OroValle Concession Area ASTURIAS
  • 14. tsx | orv REDISCOVERING ORVANA CARLÉS EL VALLE Rio Narcea Belt EL VALLE FY 2015 Plan •  Exploration and drill program •  Delineation drilling •  Targeting new resources •  Expansion of known resources •  Production drilling 2016 Targets •  Exploration activities underway on other targets – drilling, mapping, soil analysis, geochem, geophysics 13
  • 15. tsx | orv REDISCOVERING ORVANA Don Mario Mine Au, Cu, Ag BOLIVIA: DON MARIO PRODUCING MINE DON MARIO MINE OVERVIEW Ownership 100% 2015 Au / Cu Prod’n 19,084 Au oz / 16,473,000 Cu lbs 2016 Guidance 24 - 27,000 Au oz / 11 - 12,000,000 Cu lbs 2015 COC/AISC Au (co-product) per oz: $948 / $1,053 Cu (co-product) per lb: $2.22 / $2.45 2015 Recoveries 53.6% Au / 74.4% Cu Plant Capacity 2,600 tpd 2015 Grade 1.32 gpt Au / 1.20% Cu OP La Paz Santa Cruz REDISCOVERING ORVANA 14 O R V A N A . B O L I V I A Arica
  • 16. tsx | orv REDISCOVERING ORVANA DON MARIO OVERVIEW •  Operating for +12 years •  New resource estimates and other initiatives to extend LoM •  Two new NI 43 101 resources 2015 •  Potential CIL refurbishment in 2016 may improve economics •  Met testing ongoing on stockpiled oxide ore •  Experienced local operating team REDISCOVERING ORVANA 15 tsx | orv O R V A N A . B O L I V I A
  • 17. tsx | orv REDISCOVERING ORVANA DON MARIO PRODUCTION/COSTS 16 O R V A N A . B O L I V I A 14,549 21,127 19,084 - 6,000 12,000 18,000 24,000 FY 2013 FY 2014 FY 2015 Gold Oz Production 10,646,000 15,430,000 16,473,000 - 5,000,000 10,000,000 15,000,000 20,000,000 FY 2013 FY 2014 FY 2015 Copper lbs Production $1,050 $862 $948 $1,159 $955 $1,053 $- $350 $700 $1,050 $1,400 FY 2013 FY 2014 FY 2015 Don Mario COC/AISC (Co-Product) per Oz Au Sold COC AISC $2.31 $2.28 $2.22 $2.55 $2.50 $2.45 $- $0.75 $1.50 $2.25 $3.00 FY 2013 FY 2014 FY 2015 Don Mario COC/AISC (Co-Product) per lb Cu Sold COC AISC
  • 18. tsx | orv REDISCOVERING ORVANA DON MARIO GROWTH Mine Life Extension Initiatives LMZ Pit Optimization (Pushback) •  Pit pushback into upper portion of LMZ – early 2016 •  Strip Ratio est 0.9:1 •  No CAPEX required Cerro Felix Deposit •  2009-2011 207,000 tonnes at 1.7 gpt Au processed through CIL •  No CAPEX required •  Located 700m from LMZ Potential Recommissioning of CIL Circuit •  In operation from 2003-2011 •  Historical LMZ/Cerro Felix recoveries ~80% •  Current met testing indicates recoveries higher than historical rates •  Doré will improve economics vs trucking concentrate •  Estimated CAPEX - $6.4M (includes $1.5M owner’s cost) •  +/- 35% with contingency •  Project conditional on external financing •  Expected construction date: late 2016 REDISCOVERING ORVANA 17 LMZ Pit Pushback Don Mario Pit Cerro Felix tsx | orv O R V A N A . B O L I V I A
  • 19. tsx | orv REDISCOVERING ORVANA DON MARIO GROWTH O R V A N A . B O L I V I A tsx | orv Cerro Felix REDISCOVERING ORVANA 18
  • 20. tsx | orv REDISCOVERING ORVANA DON MARIO Mine Life Extension Initiatives •  Continued oxide metallurgical testing •  2.4 M tonnes of existing oxide stockpiles •  153K oz Au, 93 million lbs copper •  Au 1.96 gpt / Cu 1.74% / Ag 41.80 gpt •  Extensive land package •  >68,300ha in mineral concessions provide opportunities for future exploration programs 19 LAS TOJAS DEPOSIT CERRO FELIX DEPOSIT DON MARIO MINE O R V A N A . B O L I V I A
  • 21. tsx | orv REDISCOVERING ORVANA SUMMARY Focused on Europe/Americas Strong Balance Sheet Multi Mine Producer - Gold, Copper, Silver Trading at 0.5 x EV / EBIDTA REDISCOVERING ORVANA 20 67 - 75K Au oz 15.5 - 17M Cu lbs 450 - 500K Ag oz PRODUCTION / COST GUIDANCE 2016 COC/AISC - $850 - $950 / $1,150 - $1,250 CAPEX - $17M - $19M* *2016 includes CIL recommissioning CAPEX of $6.4M
  • 22. tsx | orv REDISCOVERING ORVANA appendix 21
  • 23. tsx | orv REDISCOVERING ORVANA 22 2016 GUIDANCE ORVANA OROVALLE (El Valle) EMIPA (Don Mario) Low High 2015 Actual Low High 2015 Actual Low High 2015 Actual Gold oz Production 67,000 75,000 72,817 43,000 48,000 53,733 24,000 27,000 19,084 Copper 000’s lbs Production 15,500 17,000 22,600 4,500 5,000 6,100 11,000 12,000 16,500 Silver oz Production 540,000 500,000 598,039 120,000 130,000 166,744 330,000 370,000 431,295 COC $oz Au (by product) $850 $950 $949 AISC $oz Au (by product) $1,150 $1,250 $1,210 Capital Expenditures $17.0M $19.0M $10.1M GUIDANCE 2016
  • 24. tsx | orv REDISCOVERING ORVANA EL VALLE RESERVES & RESOURCES El Valle Mineral Reserve Estimates1, 2 – Sept. 30, 2015 Tonnes Grade Contained Metal Category (000’s) Au (g/t) Cu (%) Ag (g/t) Au Ounces (000’s) Cu Tonnes (t) Total Proven Reserves 1,017 2.61 0.64 14.19 85 6,544 Total Probable Reserves 2,103 3.43 0.42 9.31 232 8,728 Total P+P Reserves 3,119 3.16 0.49 10.90 317 15,273 1.  Mineral Resources are inclusive of Mineral Reserves. 2.  Notes to the Reserves & Resources can be found in the next slide of this presentation. REDISCOVERING ORVANA 23 tsx | orv El Valle Mineral Resource Estimates1, 2 – Sept. 30, 2015 Tonnes Grade Contained Metal Category (000’s) Au (g/t) Cu (%) Ag (g/t) Au Ounces (000’s) Cu Tonnes (t) Total Measured Resources 2,136 3.39 0.84 17.67 233 17,887 Total Indicated Resources 4,500 4.45 0.58 11.87 644 26,183 Total M+I Resources 6,636 4.11 0.66 13.74 877 44,070 Total Inferred Resources 6,149 5.07 0.48 8.97 1,001 29,527
  • 25. tsx | orv REDISCOVERING ORVANA 24 Notes to the El Valle Mineral Reserve and Mineral Resource table: •  Mineral Reserves and Mineral Resources have been stated as at September 30, 2015. •  Mineral reserves are estimated using gold equivalent break-even cut-off grades by zone, consisting of 4.3 g/t AuEq for El Valle oxides, 2.3 g/t AuEq for El Valle skarns, and 2.5 g/t AuEq for Carlés longhole stoping and 3.0 g/t AuEq for cut and fill in skarn. Gold equivalent cut-offs are based on recent operating results for recoveries, off-site concentrate costs and on-site operating costs assuming additional cost savings planned in respect of fiscal 2016 and beyond. •  Mineral Reserves are estimated using average long-term prices of US$1,100 per ounce gold, US$2.75 per lb copper, and US$16.50 per ounce silver. A Euro/US$ exchange rate of 1/1.1 was used. •  A minimum mining width of 4 m was used. •  Certain incremental material (below break-even cut-off grade) was included in the estimated mineral reserves in order to maintain production levels. •  Mineral Resources are inclusive of Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. •  Mineral Resources are estimated at a gold equivalent cut-off grade of 3.6 g/t for El Valle oxides, 2.0 g/t for El Valle skarns and 2.7 g/t for Carlés skarns. Gold equivalent cut-offs are based on recent operating results for recoveries, off-site concentrate costs and on-site operating costs assuming additional cost savings planned in respect of fiscal 2016 and beyond. •  Mineral Resources are estimated using long-term prices of US$1,300 per ounce gold, US$3.00 per pound copper, and US$18.00 per ounce silver. A Euro/US$ exchange rate of 1/1.15 was used. •  A crown pillar of 50 m is excluded from the Mineral Resource below the El Valle open pit and a crown pillar of 25m is excluded from the Mineral Resource below the El Valle open pit. •  Unrecoverable material in exploited mining areas has been excluded from the Mineral Resource. •  Mineral Resources and Mineral Reserves have been classified in accordance with Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) “CIM Definition Standards – For Mineral Resources and Mineral Reserves” adopted by the CIM Council in accordance with the requirements of National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”), as is required by Canadian securities regulatory authorities. In addition, while the terms “Measured”, “Indicated and “Inferred” Mineral Resources are required pursuant to NI 43-101, the SEC does not recognize such terms. Canadian standards differ significantly from the requirements of the SEC, and mineral resource information contained herein is not comparable to similar information regarding mineral reserves disclosed in accordance with the requirements of the SEC. Investors should understand that “Inferred” Mineral Resources have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. In addition, investors are cautioned not to assume that any part or all of Orvana’s Mineral Resources constitute or will be converted into Reserves. •  Mineral Reserve and Resource tonnage and contained metal have been rounded to reflect accuracy of the estimate, and numbers may not add due to rounding. •  The scientific and technical information contained for the El Valle Reserve and Resource Estimates has been reviewed and approved (i) in respect of the estimated mineral reserves by A. Harris, MAusIMM (CP), and (ii) in respect of the estimated mineral resources, by Guadalupe Collar Menéndez, European Geologist. Both A. Harris and G. Collar are employees of OroValle and thus not independent of the company. Each of Messrs. Harris and Collar is a Qualified Person within the meaning of NI 43-101. •  For more details regarding the Mineral Reserve and Mineral Resource estimates please refer to the company’s fiscal year 2015 Annual Information Form (“AIF”) filed on SEDAR. 24 NOTES TO EL VALLE RESERVES & RESOURCES
  • 26. tsx | orv REDISCOVERING ORVANA DON MARIO RESERVES & RESOURCES In-Situ Don Mario Mineral Reserves & Mineral Resource Estimates1,2 – Sept. 30, 2015 Tonnes Grade Contained Metal Category (000’s) Au (g/t) Cu (%) Ag (g/t) Au Ounces (000’s) Cu Tonnes (t) Total Proven Reserves 433 0.66 0.82 24.58 9.2 3,535 Total Probable Reserves 0 0.00 0.00 0.00 0.0 0 Total P+P Reserves 433 0.66 0.82 24.58 9.2 3,535 Total Measured Resources 434 0.69 0.86 25.81 9.6 3,721 Total Indicated Resources 1,490 2.98 0.52 5.60 143.0 7,738 Total M+I Resources 1,924 2.47 0.60 10.16 152.6 11,460 Total Inferred Resources 81 3.11 0.16 3.46 8.0 128 1.  Mineral Resources are inclusive of Mineral Reserves and consist of UMZ, LMZ and Cerro Felix estimates. 2.  Notes to the Reserves & Resources can be found in the next slide of this presentation. 25 REDISCOVERING ORVANA 25 tsx | orv O R V A N A . B O L I V I A
  • 27. tsx | orv REDISCOVERING ORVANA 26 Notes to the Don Mario Mineral Reserve and Mineral Resource table: •  Mineral Reserves and Mineral Resources have been stated as at September 30, 2015 and consist of in-situ material for the UMZ, LMZ and Cerro Felix deposits. •  Mineral Reserves are estimated using a copper equivalent cut-off grade of 1.0% CuEq. Copper equivalent cut-offs were calculated using recent operating results for recoveries, off-site concentrate costs, and on-site operating costs. •  Mineral Reserves are estimated using average long-term prices of US$1,100 per ounce gold, US$2.75 per lb copper, and US$16.50 per ounce silver. •  Mineral Resources are inclusive of Mineral Reserves for UMZ and there are no stated Mineral Reserves for LMZ and Cerro Felix. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. •  Mineral Resources are estimated at a copper equivalent cut-off grade of 0.85% CuEq for UMZ and a gold cut-off grade of 0.7 g/t Au for LMZ and Cerro Felix, reflective of open-pit mining methods. •  Mineral Resources are estimated using long-term prices of US$1,300 per ounce gold, US$3.00 per pound copper, and US$18.00 per ounce silver. •  Mineral Resources and Mineral Reserves have been classified in accordance with Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) “CIM Definition Standards – For Mineral Resources and Mineral Reserves” adopted by the CIM Council in accordance with the requirements of National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”), as is required by Canadian securities regulatory authorities. In addition, while the terms “Measured”, “Indicated and “Inferred” Mineral Resources are required pursuant to NI 43-101, the SEC does not recognize such terms. Canadian standards differ significantly from the requirements of the SEC, and mineral resource information contained herein is not comparable to similar information regarding mineral reserves disclosed in accordance with the requirements of the SEC. Investors should understand that “Inferred” Mineral Resources have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. In addition, investors are cautioned not to assume that any part or all of Orvana’s Mineral Resources constitute or will be converted into Reserves. •  Mineral Reserve and Resource tonnage and contained metal have been rounded to reflect accuracy of the estimate, and numbers may not add due to rounding. •  The scientific and technical information contained for the Don Mario Reserve and Resource Estimates has been reviewed and approved (i) in respect of the estimated UMZ mineral reserves and mineral resources by G. Zandonai, CP, of DGCS SA, and (ii) in respect of the estimated LMZ and CF mineral resources, by Michael P. Cullen, P.Geo., of Mercator Geological Services Limited (“Mercator”). Both DGCS SA and Mercator are independent mining consulting firms and each of Messrs. Zandonai and Cullen is a Qualified Person within the meaning of NI 43-101. •  For more details regarding the Mineral Reserve and Mineral Resource estimates please refer to the company’s fiscal year 2015 Annual Information Form (“AIF”) filed on SEDAR. 26 NOTES TO DON MARIO RESERVES & RESOURCES O R V A N A . B O L I V I A
  • 28. tsx | orv REDISCOVERING ORVANA R e d i s c o v e r i n g O r v a n a Orvana Minerals Corp Joanne C. Jobin Investor Relations Officer jjobin@orvana.com CONTACT: Daniella Dimitrov President & CEO ddimitrov@orvana.com181 University Avenue, Suite 1901 Toronto, Ontario Canada M5H 3M7 T 416-369-6275 W orvana.com