Success Through
            Stakeholder Alignment


Lehman Brothers Conference
September 3-4, 2008
Safe Harbor
This material includes forward-looking statements that are subject to
certain risks, uncertainties and assumptions. Such forward-looking
statements include projected earnings, cash flows, capital
expenditures and other statements and are identified in this document
by the words “anticipate,” “estimate,” “expect,” “projected,”
“objective,” “outlook,” “possible,” “potential” and similar
expressions. Actual results may vary materially. Factors that could
cause actual results to differ materially include, but are not limited to:
general economic conditions, including the availability of credit,
actions of rating agencies and their impact on capital expenditures;
business conditions in the energy industry; competitive factors;
unusual weather; effects of geopolitical events, including war and acts
of terrorism; changes in federal or state legislation; regulation; actions
of accounting regulatory bodies; and other risk factors listed from
time to time by Xcel Energy in reports filed with the SEC, including
Exhibit 99.01 to Xcel Energy’s report on Form 10-K for year 2007.
Why We are Positioned for Success
  Ability to meet state RPS and environmental
  initiatives
  Well positioned for potential Federal climate
  policy
  Uniquely able to provide clean energy to
  customers and hedge against fuel price
  volatility
  Renewable portfolio extends the decision time
  horizon for new base load generation
  Geographic advantage
Addressing Public Policy
 State legislative mandates and goals
   Minnesota:     30% RPS mandate by 2020
                  30% carbon reduction goal by 2025
   Colorado:      20% RPS mandate by 2020
                  20% carbon reduction goal by 2020
   New Mexico:    20% RPS mandate by 2020
                  10% carbon reduction goal by 2020

 Expanding emphasis on DSM and conservation

 Emerging Federal climate policy
   If Lieberman Warner Bill had passed:
       • 21% carbon reduction by 2020
       • 31% carbon reduction by 2030
       • 75% carbon reduction by 2050
   Federal climate policy likely in the next administration
Projected Renewable Resources
Energy
            2007                                   2020
               Nuclear                   Nuclear
                11%                       13%             Renewables
Natural              Renewables                              24%
 Gas                    9%         Natural
 31%
                                    Gas
                                    17%
                      Coal                                   Coal
                      49%                                    46%

Capacity
           Wind Hydro Solar   Biomass RDF Landfill Geothermal
   MW
   2007    2,700 365    17      182   100   15         0
   2020    7,400 400   600      250    60   20        20
Wind Development

Minnesota
  Propose adding 2,600 MW by 2020
  in Resource Plan
  NSP 500 MW Wind RFP in progress
   • Issued December 2007
   • Bids received in March 2008
   • Currently negotiating with bidders
Colorado
  Propose adding 800 MW by 2015 in Resource Plan
  PSCo 100-150 Wind RFP in progress
Solar Development
Central Solar
  Alamosa Central Solar Plant      8.2 MW
  Resource Plan expands solar
     Current RFP                   75 MW
     Potential RFP’s              600 MW

Distributed Solar
  Solar*Rewards
     8.5 MW / 1,600+ installations
     Accepted additional 5 MW for 2009
  Resource Plan expands solar
     63.5 MW Customer-sited by 2015
Transmission Investment
   Net book value of $2.4 billion at year-end 2007
   17,619 miles of transmission pole lines
   #3 in total transmission pole miles
   232 miles of transmission pole lines added in 2007
Capital Expenditure in $millions
     $600
                                          $500
     $500
                                   $390
     $400
                         $325
              $300
     $300

     $200

     $100

       $0
              2008       2009      2010   2011
Capital Expenditures Forecast*
Dollars in millions
                           2008      2009      2010     2011
Elec Generation            $935      $480       $525     $745
Elec Transmission           300       325        390      500
Elec Distribution           355       345        355      360
Gas                         140       155        160      155
Nuclear Fuel                145       150        140      105
Common/Other                225       145        130      135
Potential Projects           50       300        300      350
Total                    $2,150    $1,900     $2,000   $2,350
* Capital forecast based on middle of range
Rate Base Growth Drives EPS*
  Dollars in billions

   CAGR = 7.3%
                                              $16.6
                                    $15.4
                         $14.5
                $13.7
    $12.5




    2007A     2008F     2009F      2010F       2011F
 * Growth based on middle of capital forecast range
Constructive Regulation
 Transmission riders – CO, MN, ND, SD
 Renewable riders – CO, MN
 MERP rider – MN
 Conservation/DSM riders – CO, MN
 Environmental riders – MN, ND, SD
 Capacity rider – CO
 Comanche 3 forward CWIP via general rate case – CO
 IGCC rider – CO
 Air quality improvement rider – CO
Projected Rider Revenue
      Dollars in millions
240
         Metro Emissions Reduction Project (MN)
         Air Quality Improvement Rider (CO)
                                                  $195
200      Renewable Energy Standard (MN)
         Transmission Rider (CO)         $166
         Transmission Rider (MN)
160


120                         $107

           $73
 80


 40


  0
           2006             2007        2008      2009
Recovery on Capital Expenditures*

        Dollars in millions
2,800
                                              $2,350
2,400
           $2,150
                                 $2,000
                        $1,900
2,000
1,600
1,200
 800
 400
   0
            2008         2009     2010         2011
                                                   Depreciation
   Traditional Recovery Enhanced Recovery
  * Capital expenditure forecast based on middle of range
Pending Rate Cases
                        Requested               Status
New Mexico Electric     March 2008              Order Pending
                        $16.6 million           Fall 2008
                        10.7% ROE
North Dakota Electric   June 2008               Pending
                        $17.9 million           Fall 2008
                        10.75% ROE              Interim rates
SPS Wholesale           March 2008              Pending
                        $14.9 million           Fall 2008
                        12.2% ROE
Texas Electric          June 2008               Pending
                        $61.3 million overall   Qtr 1 2009
                        11.25% ROE
NSP-Wisconsin           August 2008             Pending
                        Limited Reopener        Qtr 4 2008
                        $47.1 million
Financial Execution
Delivering on 5 – 7% EPS Growth

           Guidance Range
       2005 – 2008 CAGR = 9.3%                 $1.45 – $1.55
                                    $1.43
                      $1.30
       $1.15




        2005          2006          2007           2008
      Ongoing*      Ongoing*      Ongoing*       Guidance
   * Ongoing EPS excludes the impacts of COLI and disc ops.
     A reconciliation to GAAP earnings is included in the appendix.
  ** Estimated CAGR is based on middle of 2008 guidance range
Financial Execution
Delivering 2 – 4% Dividend Growth*


   Annualized dividend per share
    2004 – 2008 CAGR = 3.4%
                                                 $0.95
                                      $0.92
                           $0.89
               $0.86
    $0.83




     2004       2005       2006       2007        2008
  * Xcel Energy increased the dividend by 3¢ on May 21, 2008
Value Proposition
 Low risk, fully regulated and integrated utility
 Constructive regulation with enhanced recovery
 of major capital projects
 Pipeline of investment opportunities
 Environmental leader, well–positioned
 for changing rules

  Attractive Total Return
    Sustainable annual EPS growth of 5% – 7%
    with upside potential
    Strong dividend yield of ~ 4.6%
    Sustainable annual dividend growth of 2% – 4%
Appendix
Company Profile
                                                        Traditional Regulation
                                 NSP-Wisconsin
                                                        Operate in 8 States
       NSP-Minnesota             6% of earnings *
      40% of earnings *
                                                        Combination Utility
                                                        Electric 85% of net income
                                                        Gas 15% of net income
     PSCo
49% of earnings *                                       Customers
                                                        3.3 million electric
                                                        1.8 million gas

            SPS                                         2007 Financial Statistics
      5% of earnings *                                  NI Ongoing: $612 million
                                                        NI GAAP: $577 million
         * Percentages based on 2007 Ongoing Earnings
                                                         Assets: $23 billion
                                                         Equity ratio: 43%
   2007 EPS Ongoing: $1.43; GAAP: $1.35
   2008 Dividend $0.95 per share annualized
Reconciliation –                                              Ongoing
   EPS to GAAP
   Dollars per share
                                                                        2007
                                            2005          2006
   Ongoing Earnings                          $1.15        $1.30         $1.43
   PSRI/COLI                                  0.05          0.05        (0.08)
   Continuing Operations                     $1.20        $1.35         $1.35
   Disc Ops                                   0.03          0.01           –
   GAAP Earnings                            $1.23         $1.36         $1.35
As a result of the termination of the COLI program, Xcel Energy’s management
                                                           Energy’s
believes that ongoing earnings provide a more meaningful comparison of earnings
                                                             comparison
results between different periods in which the COLI program was in place and is
more representative of Xcel Energy’s fundamental core earnings power.
                             Energy’s
Xcel Energy’s management uses ongoing earnings internally for financial planning
     Energy’s                                                                planning
and analysis, for reporting of results to the Board of Directors, in determining
                                                       Directors,
whether performance targets are met for performance-based compensation,
                                            performance-based
and when communicating its earnings outlook to analysts and investors.
                                                                  investors.
Earnings Guidance Range
Dollars per share
                        2007A        2008
Regulated Utility       $1.55     $1.61 – $1.71
Holding Company          (0.12)      (0.16)
Ongoing Earnings        $1.43     $1.45 – $1.55

PSRI/COLI               $(0.08)        –
Continuing Operations    1.35      1.45 – 1.55
Disc Ops                   –           –
GAAP Earnings           $1.35     $1.45 – $1.55
Capital Expenditure Forecast
                            Denotes enhanced recovery mechanism
Dollars in millions
                             2008      2009     2010    2011
Base & Other                $1,245   $1,285   $1,310   $1,300
MERP                           170       25      10        0
Comanche 3                     330       60      10        0
MN Wind Tran/CapX 2020          40       65     115      270
Sherco Upgrade                   5       20      75      230
MN Wind Generation             135        0       0        0
Nuclear Capacity/Life Ext       75      120     180      200
Fort St. Vrain CT              100       25       0        0
 Total Committed            $2,100   $1,600   $1,700   $2,000
Potential Projects            0-100 200-400 200-400 200-500
 Range                      $2,100- $1,800- $1,900- $2,200-
                             $2,200 $2,000 $2,100 $2,500
Capital Expenditures
by Operating Company*

Dollars in millions

                2008       2009        2010    2011
NSPM            $935       $955      $1,060   $1,380
PSCo              945       650         680     750
SPS               170       205         180     140
NSPW              100        90          80      80
Total         $2,150     $1,900      $2,000   $2,350


* Capital forecast based on middle of range
Credit Ratings

                      Secured              Unsecured
              Fitch   Moody’s   S&P   Fitch   Moody’s   S&P

Holding Co.     –        –       –    BBB+     Baa1     BBB
NSPM           A+        A2      A     A        A3      BBB
NSPW           A+        A2      A     A        A3      BBB+
PSCo           A         A3      A     A–      Baa1     BBB
                                       A–
SPS            –         –       –    BBB+     Baa1     BBB+
Debt Maturities

         Dollars in millions
$1,200
                                                    SPS
$1,000                                              PSCo
                                                    NSPW
 $800
                                                    NSPM
 $600                                               Xcel Energy

 $400

 $200

   $0
          2008   2009   2010   2011   2012   2013   2014   2015
Strong Access to Credit Markets in 2008
  Hold Co - issued $400 million of retail hybrid securities
  with a 7.6% coupon in January
  NSP-Minnesota - issued $500 million of first mortgage bonds
  with 10 year maturity and 5.25% coupon in March
  PSCo - issued $600 million of first mortgage bonds in August:
     10 year tranche with a 5.8% coupon
     30 year tranche with a 6.5% coupon
  Potential debt issuances: 2nd half 2008
     NSP–Wisconsin: Up to $250 million of first mortgage bonds
     SPS: Up to $250 million of unsecured debt
Geographic Competitive Advantage
                                                          Biomass Resource

Wind Resource
           Source: National Renewable Energy Laboratory




                                                          Solar Resource

 Wind Density
        High

        Low



                            Xcel Energy
                            States Served
Reducing Carbon Dioxide Emissions*

      Millions of tons
 80


 75


 70


 65


 60
         2003        2004     2005       2006       2007

      * Owned–generation carbon dioxide emissions
Smart Grid Pilot Project
 Pilot project in Boulder, Colorado:
    Five major partners
    Total project cost ~ $100 million
    Xcel Energy portion ~ $15 million
    Build out completed in 2009
 Scope:
   Smart meters
   Real time, high speed, two–way communications
   Intelligent home/smart appliances
   Demand Side Management
   Distributed generation
   Renewable energy sector growth
   Energy storage devices
Regulatory Results

Rate relief granted 2006-2007: $400 million
  2006 Minnesota electric rate case: $131 million
  2006 Colorado electric rate case: $151 million
  2006 Wisconsin gas and electric rate cases: $47 million
  2007 Colorado gas rate case: $32 million
  Other: $39 million
2007 Rate Base and ROE
 Dollars in millions                        Weather Normalized
                              Rate Base        Earned ROE
 Minnesota Electric             $4,054              11.02%
 Minnesota Gas                     456               7.74
 North Dakota Electric             202               2.96
 North Dakota Gas                   44               7.66
 South Dakota Electric             251               9.28
 Colorado Electric               3,569              10.09
 Colorado Gas                    1,096              10.45
 Wisconsin Electric                554               8.33
 Wisconsin Gas                      77               8.59
 Texas Electric                    940               4.61*
 New Mexico Electric               276               2.24*
 Wholesale                         982         Not Reported
 Total Rate Base               $12,501
* Texas and New Mexico ROE’s are actual earned, not weather normalized
xcel energy  Lehman_Sept_2008-SEC

Contenu connexe

Tendances

xcel energy 2008 June_EurpopeanInvestor854
xcel energy  2008 June_EurpopeanInvestor854xcel energy  2008 June_EurpopeanInvestor854
xcel energy 2008 June_EurpopeanInvestor854finance26
 
xcel energy Canada_June_08_SEC
xcel energy  Canada_June_08_SECxcel energy  Canada_June_08_SEC
xcel energy Canada_June_08_SECfinance26
 
XEL_Fixed_Income_Presentation_February2008
XEL_Fixed_Income_Presentation_February2008XEL_Fixed_Income_Presentation_February2008
XEL_Fixed_Income_Presentation_February2008finance26
 
xcel energy BAC_Presentation_112007_Final
xcel energy  BAC_Presentation_112007_Finalxcel energy  BAC_Presentation_112007_Final
xcel energy BAC_Presentation_112007_Finalfinance26
 
xcel energy EEI_Pres_November_2007SEC
xcel energy  EEI_Pres_November_2007SECxcel energy  EEI_Pres_November_2007SEC
xcel energy EEI_Pres_November_2007SECfinance26
 
xcel energy 7258B9DD-EF98-40EE-97CF-0BFED2089B2B_0309_NEW4Texas-KCRoadshow
xcel energy  7258B9DD-EF98-40EE-97CF-0BFED2089B2B_0309_NEW4Texas-KCRoadshowxcel energy  7258B9DD-EF98-40EE-97CF-0BFED2089B2B_0309_NEW4Texas-KCRoadshow
xcel energy 7258B9DD-EF98-40EE-97CF-0BFED2089B2B_0309_NEW4Texas-KCRoadshowfinance26
 

Tendances (6)

xcel energy 2008 June_EurpopeanInvestor854
xcel energy  2008 June_EurpopeanInvestor854xcel energy  2008 June_EurpopeanInvestor854
xcel energy 2008 June_EurpopeanInvestor854
 
xcel energy Canada_June_08_SEC
xcel energy  Canada_June_08_SECxcel energy  Canada_June_08_SEC
xcel energy Canada_June_08_SEC
 
XEL_Fixed_Income_Presentation_February2008
XEL_Fixed_Income_Presentation_February2008XEL_Fixed_Income_Presentation_February2008
XEL_Fixed_Income_Presentation_February2008
 
xcel energy BAC_Presentation_112007_Final
xcel energy  BAC_Presentation_112007_Finalxcel energy  BAC_Presentation_112007_Final
xcel energy BAC_Presentation_112007_Final
 
xcel energy EEI_Pres_November_2007SEC
xcel energy  EEI_Pres_November_2007SECxcel energy  EEI_Pres_November_2007SEC
xcel energy EEI_Pres_November_2007SEC
 
xcel energy 7258B9DD-EF98-40EE-97CF-0BFED2089B2B_0309_NEW4Texas-KCRoadshow
xcel energy  7258B9DD-EF98-40EE-97CF-0BFED2089B2B_0309_NEW4Texas-KCRoadshowxcel energy  7258B9DD-EF98-40EE-97CF-0BFED2089B2B_0309_NEW4Texas-KCRoadshow
xcel energy 7258B9DD-EF98-40EE-97CF-0BFED2089B2B_0309_NEW4Texas-KCRoadshow
 

Similaire à xcel energy Lehman_Sept_2008-SEC

xcel energy ML_Sept_2008
xcel energy  ML_Sept_2008xcel energy  ML_Sept_2008
xcel energy ML_Sept_2008finance26
 
xcel energy 09/30/08_Texas
xcel energy  09/30/08_Texasxcel energy  09/30/08_Texas
xcel energy 09/30/08_Texasfinance26
 
xcel energy AGA_Meeting_10-2-08
xcel energy  AGA_Meeting_10-2-08xcel energy  AGA_Meeting_10-2-08
xcel energy AGA_Meeting_10-2-08finance26
 
xcel energy West_Coast_Road
xcel energy  West_Coast_Roadxcel energy  West_Coast_Road
xcel energy West_Coast_Roadfinance26
 
xcel energy RBC_August_2008
xcel energy  RBC_August_2008xcel energy  RBC_August_2008
xcel energy RBC_August_2008finance26
 
xcel energy RBC_July_2008
xcel energy  RBC_July_2008xcel energy  RBC_July_2008
xcel energy RBC_July_2008finance26
 
xcel energy Berenson WSA_SECDec2007
xcel energy  Berenson WSA_SECDec2007xcel energy  Berenson WSA_SECDec2007
xcel energy Berenson WSA_SECDec2007finance26
 
XEL_Fixed_Income_Presentation_February2008
XEL_Fixed_Income_Presentation_February2008XEL_Fixed_Income_Presentation_February2008
XEL_Fixed_Income_Presentation_February2008finance26
 
xcel energy Better_Investing_April2008
xcel energy  Better_Investing_April2008xcel energy  Better_Investing_April2008
xcel energy Better_Investing_April2008finance26
 
xcel energy BAC_Presentation_112007_Final
xcel energy  BAC_Presentation_112007_Finalxcel energy  BAC_Presentation_112007_Final
xcel energy BAC_Presentation_112007_Finalfinance26
 
xcel energy EEI_Pres_November_2007SEC
xcel energy  EEI_Pres_November_2007SECxcel energy  EEI_Pres_November_2007SEC
xcel energy EEI_Pres_November_2007SECfinance26
 
xcel energy 2008 June_EurpopeanInvestor854
xcel energy  2008 June_EurpopeanInvestor854xcel energy  2008 June_EurpopeanInvestor854
xcel energy 2008 June_EurpopeanInvestor854finance26
 
xcel energy Canada_June_08_SEC
xcel energy  Canada_June_08_SECxcel energy  Canada_June_08_SEC
xcel energy Canada_June_08_SECfinance26
 
xcel energy AGA_May_2008
xcel energy  AGA_May_2008xcel energy  AGA_May_2008
xcel energy AGA_May_2008finance26
 
xcel energy AGA_May_2008
xcel energy  AGA_May_2008xcel energy  AGA_May_2008
xcel energy AGA_May_2008finance26
 
xcel energy 3-19-2008_Boston_Pres
xcel energy  3-19-2008_Boston_Presxcel energy  3-19-2008_Boston_Pres
xcel energy 3-19-2008_Boston_Presfinance26
 
xcel energy 3-19-2008_Boston_Pres
xcel energy  3-19-2008_Boston_Presxcel energy  3-19-2008_Boston_Pres
xcel energy 3-19-2008_Boston_Presfinance26
 
xcel energy 7258B9DD-EF98-40EE-97CF-0BFED2089B2B_0309_NEW4Texas-KCRoadshow
xcel energy  7258B9DD-EF98-40EE-97CF-0BFED2089B2B_0309_NEW4Texas-KCRoadshowxcel energy  7258B9DD-EF98-40EE-97CF-0BFED2089B2B_0309_NEW4Texas-KCRoadshow
xcel energy 7258B9DD-EF98-40EE-97CF-0BFED2089B2B_0309_NEW4Texas-KCRoadshowfinance26
 
5_2 AGASEC 04/29 /2007
5_2 AGASEC 04/29 /20075_2 AGASEC 04/29 /2007
5_2 AGASEC 04/29 /2007finance26
 
xcel energy 5_2A GASEC04/29/2007
xcel energy  5_2A GASEC04/29/2007xcel energy  5_2A GASEC04/29/2007
xcel energy 5_2A GASEC04/29/2007finance26
 

Similaire à xcel energy Lehman_Sept_2008-SEC (20)

xcel energy ML_Sept_2008
xcel energy  ML_Sept_2008xcel energy  ML_Sept_2008
xcel energy ML_Sept_2008
 
xcel energy 09/30/08_Texas
xcel energy  09/30/08_Texasxcel energy  09/30/08_Texas
xcel energy 09/30/08_Texas
 
xcel energy AGA_Meeting_10-2-08
xcel energy  AGA_Meeting_10-2-08xcel energy  AGA_Meeting_10-2-08
xcel energy AGA_Meeting_10-2-08
 
xcel energy West_Coast_Road
xcel energy  West_Coast_Roadxcel energy  West_Coast_Road
xcel energy West_Coast_Road
 
xcel energy RBC_August_2008
xcel energy  RBC_August_2008xcel energy  RBC_August_2008
xcel energy RBC_August_2008
 
xcel energy RBC_July_2008
xcel energy  RBC_July_2008xcel energy  RBC_July_2008
xcel energy RBC_July_2008
 
xcel energy Berenson WSA_SECDec2007
xcel energy  Berenson WSA_SECDec2007xcel energy  Berenson WSA_SECDec2007
xcel energy Berenson WSA_SECDec2007
 
XEL_Fixed_Income_Presentation_February2008
XEL_Fixed_Income_Presentation_February2008XEL_Fixed_Income_Presentation_February2008
XEL_Fixed_Income_Presentation_February2008
 
xcel energy Better_Investing_April2008
xcel energy  Better_Investing_April2008xcel energy  Better_Investing_April2008
xcel energy Better_Investing_April2008
 
xcel energy BAC_Presentation_112007_Final
xcel energy  BAC_Presentation_112007_Finalxcel energy  BAC_Presentation_112007_Final
xcel energy BAC_Presentation_112007_Final
 
xcel energy EEI_Pres_November_2007SEC
xcel energy  EEI_Pres_November_2007SECxcel energy  EEI_Pres_November_2007SEC
xcel energy EEI_Pres_November_2007SEC
 
xcel energy 2008 June_EurpopeanInvestor854
xcel energy  2008 June_EurpopeanInvestor854xcel energy  2008 June_EurpopeanInvestor854
xcel energy 2008 June_EurpopeanInvestor854
 
xcel energy Canada_June_08_SEC
xcel energy  Canada_June_08_SECxcel energy  Canada_June_08_SEC
xcel energy Canada_June_08_SEC
 
xcel energy AGA_May_2008
xcel energy  AGA_May_2008xcel energy  AGA_May_2008
xcel energy AGA_May_2008
 
xcel energy AGA_May_2008
xcel energy  AGA_May_2008xcel energy  AGA_May_2008
xcel energy AGA_May_2008
 
xcel energy 3-19-2008_Boston_Pres
xcel energy  3-19-2008_Boston_Presxcel energy  3-19-2008_Boston_Pres
xcel energy 3-19-2008_Boston_Pres
 
xcel energy 3-19-2008_Boston_Pres
xcel energy  3-19-2008_Boston_Presxcel energy  3-19-2008_Boston_Pres
xcel energy 3-19-2008_Boston_Pres
 
xcel energy 7258B9DD-EF98-40EE-97CF-0BFED2089B2B_0309_NEW4Texas-KCRoadshow
xcel energy  7258B9DD-EF98-40EE-97CF-0BFED2089B2B_0309_NEW4Texas-KCRoadshowxcel energy  7258B9DD-EF98-40EE-97CF-0BFED2089B2B_0309_NEW4Texas-KCRoadshow
xcel energy 7258B9DD-EF98-40EE-97CF-0BFED2089B2B_0309_NEW4Texas-KCRoadshow
 
5_2 AGASEC 04/29 /2007
5_2 AGASEC 04/29 /20075_2 AGASEC 04/29 /2007
5_2 AGASEC 04/29 /2007
 
xcel energy 5_2A GASEC04/29/2007
xcel energy  5_2A GASEC04/29/2007xcel energy  5_2A GASEC04/29/2007
xcel energy 5_2A GASEC04/29/2007
 

Plus de finance26

xcel energy merrill_09/16//03
xcel energy  merrill_09/16//03xcel energy  merrill_09/16//03
xcel energy merrill_09/16//03finance26
 
xcel energy merrill_09/16/03
xcel energy  merrill_09/16/03xcel energy  merrill_09/16/03
xcel energy merrill_09/16/03finance26
 
xcel energy merrill_09/16/03
xcel energy  merrill_09/16/03xcel energy  merrill_09/16/03
xcel energy merrill_09/16/03finance26
 
xcel energy BofA_09/16/03
xcel energy  BofA_09/16/03xcel energy  BofA_09/16/03
xcel energy BofA_09/16/03finance26
 
xcel energy BofA_09/16/03
xcel energy  BofA_09/16/03xcel energy  BofA_09/16/03
xcel energy BofA_09/16/03finance26
 
xcel energy BofA_09/16/03
xcel energy  BofA_09/16/03xcel energy  BofA_09/16/03
xcel energy BofA_09/16/03finance26
 

Plus de finance26 (20)

xcel energy merrill_09/16//03
xcel energy  merrill_09/16//03xcel energy  merrill_09/16//03
xcel energy merrill_09/16//03
 
xcel energy merrill_09/16/03
xcel energy  merrill_09/16/03xcel energy  merrill_09/16/03
xcel energy merrill_09/16/03
 
xcel energy merrill_09/16/03
xcel energy  merrill_09/16/03xcel energy  merrill_09/16/03
xcel energy merrill_09/16/03
 
xcel energy BofA_09/16/03
xcel energy  BofA_09/16/03xcel energy  BofA_09/16/03
xcel energy BofA_09/16/03
 
xcel energy BofA_09/16/03
xcel energy  BofA_09/16/03xcel energy  BofA_09/16/03
xcel energy BofA_09/16/03
 
xcel energy BofA_09/16/03
xcel energy  BofA_09/16/03xcel energy  BofA_09/16/03
xcel energy BofA_09/16/03
 
xel_102303b
xel_102303bxel_102303b
xel_102303b
 
xel_102303b
xel_102303bxel_102303b
xel_102303b
 
xel_102303b
xel_102303bxel_102303b
xel_102303b
 
xel_111403
xel_111403xel_111403
xel_111403
 
xel_111403
xel_111403xel_111403
xel_111403
 
xel_111403
xel_111403xel_111403
xel_111403
 
xel_021104
xel_021104xel_021104
xel_021104
 
xel_021104
xel_021104xel_021104
xel_021104
 
xel_021104
xel_021104xel_021104
xel_021104
 
xel_072804
xel_072804xel_072804
xel_072804
 
xel_090804
xel_090804xel_090804
xel_090804
 
xel_092404
xel_092404xel_092404
xel_092404
 
xel_092404
xel_092404xel_092404
xel_092404
 
xel_092404
xel_092404xel_092404
xel_092404
 

Dernier

Call Girls Near Me WhatsApp:+91-9833363713
Call Girls Near Me WhatsApp:+91-9833363713Call Girls Near Me WhatsApp:+91-9833363713
Call Girls Near Me WhatsApp:+91-9833363713Sonam Pathan
 
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一S SDS
 
212MTAMount Durham University Bachelor's Diploma in Technology
212MTAMount Durham University Bachelor's Diploma in Technology212MTAMount Durham University Bachelor's Diploma in Technology
212MTAMount Durham University Bachelor's Diploma in Technologyz xss
 
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办fqiuho152
 
AnyConv.com__FSS Advance Retail & Distribution - 15.06.17.ppt
AnyConv.com__FSS Advance Retail & Distribution - 15.06.17.pptAnyConv.com__FSS Advance Retail & Distribution - 15.06.17.ppt
AnyConv.com__FSS Advance Retail & Distribution - 15.06.17.pptPriyankaSharma89719
 
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfmagnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfHenry Tapper
 
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》rnrncn29
 
Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]Commonwealth
 
Role of Information and technology in banking and finance .pptx
Role of Information and technology in banking and finance .pptxRole of Information and technology in banking and finance .pptx
Role of Information and technology in banking and finance .pptxNarayaniTripathi2
 
GOODSANDSERVICETAX IN INDIAN ECONOMY IMPACT
GOODSANDSERVICETAX IN INDIAN ECONOMY IMPACTGOODSANDSERVICETAX IN INDIAN ECONOMY IMPACT
GOODSANDSERVICETAX IN INDIAN ECONOMY IMPACTharshitverma1762
 
Governor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraintGovernor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraintSuomen Pankki
 
Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...
Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...
Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...amilabibi1
 
The Inspirational Story of Julio Herrera Velutini - Global Finance Leader
The Inspirational Story of Julio Herrera Velutini - Global Finance LeaderThe Inspirational Story of Julio Herrera Velutini - Global Finance Leader
The Inspirational Story of Julio Herrera Velutini - Global Finance LeaderArianna Varetto
 
Financial analysis on Risk and Return.ppt
Financial analysis on Risk and Return.pptFinancial analysis on Risk and Return.ppt
Financial analysis on Risk and Return.ppttadegebreyesus
 
Kempen ' UK DB Endgame Paper Apr 24 final3.pdf
Kempen ' UK DB Endgame Paper Apr 24 final3.pdfKempen ' UK DB Endgame Paper Apr 24 final3.pdf
Kempen ' UK DB Endgame Paper Apr 24 final3.pdfHenry Tapper
 
SBP-Market-Operations and market managment
SBP-Market-Operations and market managmentSBP-Market-Operations and market managment
SBP-Market-Operations and market managmentfactical
 
Overview of Inkel Unlisted Shares Price.
Overview of Inkel Unlisted Shares Price.Overview of Inkel Unlisted Shares Price.
Overview of Inkel Unlisted Shares Price.Precize Formely Leadoff
 
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...Amil baba
 

Dernier (20)

Call Girls Near Me WhatsApp:+91-9833363713
Call Girls Near Me WhatsApp:+91-9833363713Call Girls Near Me WhatsApp:+91-9833363713
Call Girls Near Me WhatsApp:+91-9833363713
 
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
 
🔝+919953056974 🔝young Delhi Escort service Pusa Road
🔝+919953056974 🔝young Delhi Escort service Pusa Road🔝+919953056974 🔝young Delhi Escort service Pusa Road
🔝+919953056974 🔝young Delhi Escort service Pusa Road
 
212MTAMount Durham University Bachelor's Diploma in Technology
212MTAMount Durham University Bachelor's Diploma in Technology212MTAMount Durham University Bachelor's Diploma in Technology
212MTAMount Durham University Bachelor's Diploma in Technology
 
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
 
AnyConv.com__FSS Advance Retail & Distribution - 15.06.17.ppt
AnyConv.com__FSS Advance Retail & Distribution - 15.06.17.pptAnyConv.com__FSS Advance Retail & Distribution - 15.06.17.ppt
AnyConv.com__FSS Advance Retail & Distribution - 15.06.17.ppt
 
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfmagnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
 
Q1 2024 Newsletter | Financial Synergies Wealth Advisors
Q1 2024 Newsletter | Financial Synergies Wealth AdvisorsQ1 2024 Newsletter | Financial Synergies Wealth Advisors
Q1 2024 Newsletter | Financial Synergies Wealth Advisors
 
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》
 
Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]
 
Role of Information and technology in banking and finance .pptx
Role of Information and technology in banking and finance .pptxRole of Information and technology in banking and finance .pptx
Role of Information and technology in banking and finance .pptx
 
GOODSANDSERVICETAX IN INDIAN ECONOMY IMPACT
GOODSANDSERVICETAX IN INDIAN ECONOMY IMPACTGOODSANDSERVICETAX IN INDIAN ECONOMY IMPACT
GOODSANDSERVICETAX IN INDIAN ECONOMY IMPACT
 
Governor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraintGovernor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraint
 
Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...
Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...
Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...
 
The Inspirational Story of Julio Herrera Velutini - Global Finance Leader
The Inspirational Story of Julio Herrera Velutini - Global Finance LeaderThe Inspirational Story of Julio Herrera Velutini - Global Finance Leader
The Inspirational Story of Julio Herrera Velutini - Global Finance Leader
 
Financial analysis on Risk and Return.ppt
Financial analysis on Risk and Return.pptFinancial analysis on Risk and Return.ppt
Financial analysis on Risk and Return.ppt
 
Kempen ' UK DB Endgame Paper Apr 24 final3.pdf
Kempen ' UK DB Endgame Paper Apr 24 final3.pdfKempen ' UK DB Endgame Paper Apr 24 final3.pdf
Kempen ' UK DB Endgame Paper Apr 24 final3.pdf
 
SBP-Market-Operations and market managment
SBP-Market-Operations and market managmentSBP-Market-Operations and market managment
SBP-Market-Operations and market managment
 
Overview of Inkel Unlisted Shares Price.
Overview of Inkel Unlisted Shares Price.Overview of Inkel Unlisted Shares Price.
Overview of Inkel Unlisted Shares Price.
 
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...
 

xcel energy Lehman_Sept_2008-SEC

  • 1. Success Through Stakeholder Alignment Lehman Brothers Conference September 3-4, 2008
  • 2. Safe Harbor This material includes forward-looking statements that are subject to certain risks, uncertainties and assumptions. Such forward-looking statements include projected earnings, cash flows, capital expenditures and other statements and are identified in this document by the words “anticipate,” “estimate,” “expect,” “projected,” “objective,” “outlook,” “possible,” “potential” and similar expressions. Actual results may vary materially. Factors that could cause actual results to differ materially include, but are not limited to: general economic conditions, including the availability of credit, actions of rating agencies and their impact on capital expenditures; business conditions in the energy industry; competitive factors; unusual weather; effects of geopolitical events, including war and acts of terrorism; changes in federal or state legislation; regulation; actions of accounting regulatory bodies; and other risk factors listed from time to time by Xcel Energy in reports filed with the SEC, including Exhibit 99.01 to Xcel Energy’s report on Form 10-K for year 2007.
  • 3. Why We are Positioned for Success Ability to meet state RPS and environmental initiatives Well positioned for potential Federal climate policy Uniquely able to provide clean energy to customers and hedge against fuel price volatility Renewable portfolio extends the decision time horizon for new base load generation Geographic advantage
  • 4. Addressing Public Policy State legislative mandates and goals Minnesota: 30% RPS mandate by 2020 30% carbon reduction goal by 2025 Colorado: 20% RPS mandate by 2020 20% carbon reduction goal by 2020 New Mexico: 20% RPS mandate by 2020 10% carbon reduction goal by 2020 Expanding emphasis on DSM and conservation Emerging Federal climate policy If Lieberman Warner Bill had passed: • 21% carbon reduction by 2020 • 31% carbon reduction by 2030 • 75% carbon reduction by 2050 Federal climate policy likely in the next administration
  • 5. Projected Renewable Resources Energy 2007 2020 Nuclear Nuclear 11% 13% Renewables Natural Renewables 24% Gas 9% Natural 31% Gas 17% Coal Coal 49% 46% Capacity Wind Hydro Solar Biomass RDF Landfill Geothermal MW 2007 2,700 365 17 182 100 15 0 2020 7,400 400 600 250 60 20 20
  • 6. Wind Development Minnesota Propose adding 2,600 MW by 2020 in Resource Plan NSP 500 MW Wind RFP in progress • Issued December 2007 • Bids received in March 2008 • Currently negotiating with bidders Colorado Propose adding 800 MW by 2015 in Resource Plan PSCo 100-150 Wind RFP in progress
  • 7. Solar Development Central Solar Alamosa Central Solar Plant 8.2 MW Resource Plan expands solar Current RFP 75 MW Potential RFP’s 600 MW Distributed Solar Solar*Rewards 8.5 MW / 1,600+ installations Accepted additional 5 MW for 2009 Resource Plan expands solar 63.5 MW Customer-sited by 2015
  • 8. Transmission Investment Net book value of $2.4 billion at year-end 2007 17,619 miles of transmission pole lines #3 in total transmission pole miles 232 miles of transmission pole lines added in 2007 Capital Expenditure in $millions $600 $500 $500 $390 $400 $325 $300 $300 $200 $100 $0 2008 2009 2010 2011
  • 9. Capital Expenditures Forecast* Dollars in millions 2008 2009 2010 2011 Elec Generation $935 $480 $525 $745 Elec Transmission 300 325 390 500 Elec Distribution 355 345 355 360 Gas 140 155 160 155 Nuclear Fuel 145 150 140 105 Common/Other 225 145 130 135 Potential Projects 50 300 300 350 Total $2,150 $1,900 $2,000 $2,350 * Capital forecast based on middle of range
  • 10. Rate Base Growth Drives EPS* Dollars in billions CAGR = 7.3% $16.6 $15.4 $14.5 $13.7 $12.5 2007A 2008F 2009F 2010F 2011F * Growth based on middle of capital forecast range
  • 11. Constructive Regulation Transmission riders – CO, MN, ND, SD Renewable riders – CO, MN MERP rider – MN Conservation/DSM riders – CO, MN Environmental riders – MN, ND, SD Capacity rider – CO Comanche 3 forward CWIP via general rate case – CO IGCC rider – CO Air quality improvement rider – CO
  • 12. Projected Rider Revenue Dollars in millions 240 Metro Emissions Reduction Project (MN) Air Quality Improvement Rider (CO) $195 200 Renewable Energy Standard (MN) Transmission Rider (CO) $166 Transmission Rider (MN) 160 120 $107 $73 80 40 0 2006 2007 2008 2009
  • 13. Recovery on Capital Expenditures* Dollars in millions 2,800 $2,350 2,400 $2,150 $2,000 $1,900 2,000 1,600 1,200 800 400 0 2008 2009 2010 2011 Depreciation Traditional Recovery Enhanced Recovery * Capital expenditure forecast based on middle of range
  • 14. Pending Rate Cases Requested Status New Mexico Electric March 2008 Order Pending $16.6 million Fall 2008 10.7% ROE North Dakota Electric June 2008 Pending $17.9 million Fall 2008 10.75% ROE Interim rates SPS Wholesale March 2008 Pending $14.9 million Fall 2008 12.2% ROE Texas Electric June 2008 Pending $61.3 million overall Qtr 1 2009 11.25% ROE NSP-Wisconsin August 2008 Pending Limited Reopener Qtr 4 2008 $47.1 million
  • 15. Financial Execution Delivering on 5 – 7% EPS Growth Guidance Range 2005 – 2008 CAGR = 9.3% $1.45 – $1.55 $1.43 $1.30 $1.15 2005 2006 2007 2008 Ongoing* Ongoing* Ongoing* Guidance * Ongoing EPS excludes the impacts of COLI and disc ops. A reconciliation to GAAP earnings is included in the appendix. ** Estimated CAGR is based on middle of 2008 guidance range
  • 16. Financial Execution Delivering 2 – 4% Dividend Growth* Annualized dividend per share 2004 – 2008 CAGR = 3.4% $0.95 $0.92 $0.89 $0.86 $0.83 2004 2005 2006 2007 2008 * Xcel Energy increased the dividend by 3¢ on May 21, 2008
  • 17. Value Proposition Low risk, fully regulated and integrated utility Constructive regulation with enhanced recovery of major capital projects Pipeline of investment opportunities Environmental leader, well–positioned for changing rules Attractive Total Return Sustainable annual EPS growth of 5% – 7% with upside potential Strong dividend yield of ~ 4.6% Sustainable annual dividend growth of 2% – 4%
  • 19. Company Profile Traditional Regulation NSP-Wisconsin Operate in 8 States NSP-Minnesota 6% of earnings * 40% of earnings * Combination Utility Electric 85% of net income Gas 15% of net income PSCo 49% of earnings * Customers 3.3 million electric 1.8 million gas SPS 2007 Financial Statistics 5% of earnings * NI Ongoing: $612 million NI GAAP: $577 million * Percentages based on 2007 Ongoing Earnings Assets: $23 billion Equity ratio: 43% 2007 EPS Ongoing: $1.43; GAAP: $1.35 2008 Dividend $0.95 per share annualized
  • 20. Reconciliation – Ongoing EPS to GAAP Dollars per share 2007 2005 2006 Ongoing Earnings $1.15 $1.30 $1.43 PSRI/COLI 0.05 0.05 (0.08) Continuing Operations $1.20 $1.35 $1.35 Disc Ops 0.03 0.01 – GAAP Earnings $1.23 $1.36 $1.35 As a result of the termination of the COLI program, Xcel Energy’s management Energy’s believes that ongoing earnings provide a more meaningful comparison of earnings comparison results between different periods in which the COLI program was in place and is more representative of Xcel Energy’s fundamental core earnings power. Energy’s Xcel Energy’s management uses ongoing earnings internally for financial planning Energy’s planning and analysis, for reporting of results to the Board of Directors, in determining Directors, whether performance targets are met for performance-based compensation, performance-based and when communicating its earnings outlook to analysts and investors. investors.
  • 21. Earnings Guidance Range Dollars per share 2007A 2008 Regulated Utility $1.55 $1.61 – $1.71 Holding Company (0.12) (0.16) Ongoing Earnings $1.43 $1.45 – $1.55 PSRI/COLI $(0.08) – Continuing Operations 1.35 1.45 – 1.55 Disc Ops – – GAAP Earnings $1.35 $1.45 – $1.55
  • 22. Capital Expenditure Forecast Denotes enhanced recovery mechanism Dollars in millions 2008 2009 2010 2011 Base & Other $1,245 $1,285 $1,310 $1,300 MERP 170 25 10 0 Comanche 3 330 60 10 0 MN Wind Tran/CapX 2020 40 65 115 270 Sherco Upgrade 5 20 75 230 MN Wind Generation 135 0 0 0 Nuclear Capacity/Life Ext 75 120 180 200 Fort St. Vrain CT 100 25 0 0 Total Committed $2,100 $1,600 $1,700 $2,000 Potential Projects 0-100 200-400 200-400 200-500 Range $2,100- $1,800- $1,900- $2,200- $2,200 $2,000 $2,100 $2,500
  • 23. Capital Expenditures by Operating Company* Dollars in millions 2008 2009 2010 2011 NSPM $935 $955 $1,060 $1,380 PSCo 945 650 680 750 SPS 170 205 180 140 NSPW 100 90 80 80 Total $2,150 $1,900 $2,000 $2,350 * Capital forecast based on middle of range
  • 24. Credit Ratings Secured Unsecured Fitch Moody’s S&P Fitch Moody’s S&P Holding Co. – – – BBB+ Baa1 BBB NSPM A+ A2 A A A3 BBB NSPW A+ A2 A A A3 BBB+ PSCo A A3 A A– Baa1 BBB A– SPS – – – BBB+ Baa1 BBB+
  • 25. Debt Maturities Dollars in millions $1,200 SPS $1,000 PSCo NSPW $800 NSPM $600 Xcel Energy $400 $200 $0 2008 2009 2010 2011 2012 2013 2014 2015
  • 26. Strong Access to Credit Markets in 2008 Hold Co - issued $400 million of retail hybrid securities with a 7.6% coupon in January NSP-Minnesota - issued $500 million of first mortgage bonds with 10 year maturity and 5.25% coupon in March PSCo - issued $600 million of first mortgage bonds in August: 10 year tranche with a 5.8% coupon 30 year tranche with a 6.5% coupon Potential debt issuances: 2nd half 2008 NSP–Wisconsin: Up to $250 million of first mortgage bonds SPS: Up to $250 million of unsecured debt
  • 27. Geographic Competitive Advantage Biomass Resource Wind Resource Source: National Renewable Energy Laboratory Solar Resource Wind Density High Low Xcel Energy States Served
  • 28. Reducing Carbon Dioxide Emissions* Millions of tons 80 75 70 65 60 2003 2004 2005 2006 2007 * Owned–generation carbon dioxide emissions
  • 29. Smart Grid Pilot Project Pilot project in Boulder, Colorado: Five major partners Total project cost ~ $100 million Xcel Energy portion ~ $15 million Build out completed in 2009 Scope: Smart meters Real time, high speed, two–way communications Intelligent home/smart appliances Demand Side Management Distributed generation Renewable energy sector growth Energy storage devices
  • 30. Regulatory Results Rate relief granted 2006-2007: $400 million 2006 Minnesota electric rate case: $131 million 2006 Colorado electric rate case: $151 million 2006 Wisconsin gas and electric rate cases: $47 million 2007 Colorado gas rate case: $32 million Other: $39 million
  • 31. 2007 Rate Base and ROE Dollars in millions Weather Normalized Rate Base Earned ROE Minnesota Electric $4,054 11.02% Minnesota Gas 456 7.74 North Dakota Electric 202 2.96 North Dakota Gas 44 7.66 South Dakota Electric 251 9.28 Colorado Electric 3,569 10.09 Colorado Gas 1,096 10.45 Wisconsin Electric 554 8.33 Wisconsin Gas 77 8.59 Texas Electric 940 4.61* New Mexico Electric 276 2.24* Wholesale 982 Not Reported Total Rate Base $12,501 * Texas and New Mexico ROE’s are actual earned, not weather normalized