SlideShare une entreprise Scribd logo
1  sur  2
Télécharger pour lire hors ligne
SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
Research Unit for Modern Architecture Studies in Southeast Asia
Foundation of Natural and Built Environments
Introduction To Drawing (ARC 30103)
Prerequisite: None
Lecturers: Ida Mazlan, Sufina Abu Bakar, Anna Kamelia, Noorul Iffa Mohd Nayan
_____________________________________________________________________
Project 1 (Group)
Drawings
Submission date – 9th Sept 2014
Introduction
“I prefer drawing to talking. Drawings are faster and leave less room for lies. “
Le Corbusier
Objectives of Project
• To introduce drawing as a communication tool in the construction industry.
Learning Outcomes
• Interpret the type of drawing representation used in the construction industry
Tasks
In a group of five or six people, you are required to choose and investigate ONE type drawings from the list
below. You are to study and investigate the use of the drawings as a means of communication. Using the
data gathered, you are to discuss and work as a team to generate a presentation and communicate your
findings to your audience. The data gathered should include types and function of drawings, stages and
examples of drawings used to communicate ideas and presentations.
• Architectural Drawings
• Interior Architecture Drawings
• Planners Drawings
• Product Design Drawings
• Quantity Surveying Drawings
• Landscape Architecture Drawings
• Engineering Drawings
• Mechanical & Electricals Drawings
Submission Requirement
Your team will be communicating and presenting their findings to your audience on Presentation Day.
You are advice to keep the presentation short and simple using any creative medium that best suits the
content and findings for your audience.
Date : 9th Sept 2014
Time : 10.00am – 12.00 pm/ 16:00 pm- 18:00 pm ( 10 mins each group )
Dress Code : Smart Casual
Presentation Flow: According to the posted list
To ensure the span of 4 hours is used wisely, please follow these guidelines on presentation day to
avoid interruptions and delay of time.
1. The whole class presentation will be using ONE laptop throughout all presentation.
2. You are advice to transfer all softcopies of presentation materials prior to class time.
3. For your e-portfolio purposes, each group need to setup and record presentation using their own
camera or ONE camera using different MEMORY CARD.
4. Please print the assessment sheet for each lecturer.
Post Presentation: All videos will be compiled by group leader in a CD with proper CD Casing with
proper information of title, group members name and information, module name and lecturer. CDs must
reach module coordinator by the next class session (16th Sept 2014).

Contenu connexe

Similaire à Drawing_Project1 (AUGUST - BRIEF - UPDATED).pdf

Drawingproject1august brief-updated-141202193914-conversion-gate01
Drawingproject1august brief-updated-141202193914-conversion-gate01Drawingproject1august brief-updated-141202193914-conversion-gate01
Drawingproject1august brief-updated-141202193914-conversion-gate01tfkc1212
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)limziahuei
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)Ang Averllen
 
ITD Project 1 - Drawings
ITD Project 1 - DrawingsITD Project 1 - Drawings
ITD Project 1 - Drawingsalianisaraflly
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)rivenhau
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)danielsong15
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)kychong1105
 
Drawing project1 (august brief - updated)(1)
Drawing project1 (august   brief - updated)(1)Drawing project1 (august   brief - updated)(1)
Drawing project1 (august brief - updated)(1)Jordon Wong
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)Jy Chong
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)WadeLim
 
Project 20brief-201-141210205054-conversion-gate01
Project 20brief-201-141210205054-conversion-gate01Project 20brief-201-141210205054-conversion-gate01
Project 20brief-201-141210205054-conversion-gate01Bridget Hsu
 
ITD Project 1 Brief August 2014
ITD Project 1 Brief August 2014ITD Project 1 Brief August 2014
ITD Project 1 Brief August 2014ForestedTiger
 
Drawing project1 (brief)
Drawing project1 (brief)Drawing project1 (brief)
Drawing project1 (brief)Darshiini Vig
 
Drawing project1 (brief)
Drawing project1 (brief)Drawing project1 (brief)
Drawing project1 (brief)Puisan Lim
 
Drawing project1 (brief)
Drawing project1 (brief)Drawing project1 (brief)
Drawing project1 (brief)Joe Onn Lim
 
SEMESTER 1: Introduction to Drawing Project 1a Brief - Drawings (group)
SEMESTER 1: Introduction to Drawing Project 1a Brief - Drawings (group)SEMESTER 1: Introduction to Drawing Project 1a Brief - Drawings (group)
SEMESTER 1: Introduction to Drawing Project 1a Brief - Drawings (group)University of Nottingham
 

Similaire à Drawing_Project1 (AUGUST - BRIEF - UPDATED).pdf (20)

Drawingproject1august brief-updated-141202193914-conversion-gate01
Drawingproject1august brief-updated-141202193914-conversion-gate01Drawingproject1august brief-updated-141202193914-conversion-gate01
Drawingproject1august brief-updated-141202193914-conversion-gate01
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)
 
ITD 1 PROJECT BRIEF
ITD 1 PROJECT BRIEFITD 1 PROJECT BRIEF
ITD 1 PROJECT BRIEF
 
Itd project 1
Itd project 1Itd project 1
Itd project 1
 
ITD1
ITD1ITD1
ITD1
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)
 
ITD Project 1 - Drawings
ITD Project 1 - DrawingsITD Project 1 - Drawings
ITD Project 1 - Drawings
 
123
123123
123
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)
 
Drawing project1 (august brief - updated)(1)
Drawing project1 (august   brief - updated)(1)Drawing project1 (august   brief - updated)(1)
Drawing project1 (august brief - updated)(1)
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)
 
Project 20brief-201-141210205054-conversion-gate01
Project 20brief-201-141210205054-conversion-gate01Project 20brief-201-141210205054-conversion-gate01
Project 20brief-201-141210205054-conversion-gate01
 
ITD Project 1 Brief August 2014
ITD Project 1 Brief August 2014ITD Project 1 Brief August 2014
ITD Project 1 Brief August 2014
 
Drawing project1 (brief)
Drawing project1 (brief)Drawing project1 (brief)
Drawing project1 (brief)
 
Drawing project1 (brief)
Drawing project1 (brief)Drawing project1 (brief)
Drawing project1 (brief)
 
Drawing project1 (brief)
Drawing project1 (brief)Drawing project1 (brief)
Drawing project1 (brief)
 
SEMESTER 1: Introduction to Drawing Project 1a Brief - Drawings (group)
SEMESTER 1: Introduction to Drawing Project 1a Brief - Drawings (group)SEMESTER 1: Introduction to Drawing Project 1a Brief - Drawings (group)
SEMESTER 1: Introduction to Drawing Project 1a Brief - Drawings (group)
 

Plus de gabchin29

PSYCHO-Video-Slides.pptx
PSYCHO-Video-Slides.pptxPSYCHO-Video-Slides.pptx
PSYCHO-Video-Slides.pptxgabchin29
 
PSYCHO-Video-Slides.pptx
PSYCHO-Video-Slides.pptxPSYCHO-Video-Slides.pptx
PSYCHO-Video-Slides.pptxgabchin29
 
PSYCHO-SLIDES.pptx
PSYCHO-SLIDES.pptxPSYCHO-SLIDES.pptx
PSYCHO-SLIDES.pptxgabchin29
 
PSYCHO-SLIDES.pptx
PSYCHO-SLIDES.pptxPSYCHO-SLIDES.pptx
PSYCHO-SLIDES.pptxgabchin29
 
psych assignment journal.docx
psych assignment journal.docxpsych assignment journal.docx
psych assignment journal.docxgabchin29
 
business final report final.docx
business final report final.docxbusiness final report final.docx
business final report final.docxgabchin29
 
LIGHTERS.pptx
LIGHTERS.pptxLIGHTERS.pptx
LIGHTERS.pptxgabchin29
 
englishreport (2).pdf
englishreport (2).pdfenglishreport (2).pdf
englishreport (2).pdfgabchin29
 
English II (2).pdf
English II (2).pdfEnglish II (2).pdf
English II (2).pdfgabchin29
 
English II (2).pdf
English II (2).pdfEnglish II (2).pdf
English II (2).pdfgabchin29
 
PROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdfPROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdfgabchin29
 
PROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdfPROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdfgabchin29
 
PROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdfPROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdfgabchin29
 
PROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdfPROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdfgabchin29
 
PROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdfPROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdfgabchin29
 
PROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdfPROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdfgabchin29
 
PROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdfPROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdfgabchin29
 
PROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdfPROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdfgabchin29
 

Plus de gabchin29 (20)

PSYCHO-Video-Slides.pptx
PSYCHO-Video-Slides.pptxPSYCHO-Video-Slides.pptx
PSYCHO-Video-Slides.pptx
 
PSYCHO-Video-Slides.pptx
PSYCHO-Video-Slides.pptxPSYCHO-Video-Slides.pptx
PSYCHO-Video-Slides.pptx
 
PSYCHO-SLIDES.pptx
PSYCHO-SLIDES.pptxPSYCHO-SLIDES.pptx
PSYCHO-SLIDES.pptx
 
PSYCHO-SLIDES.pptx
PSYCHO-SLIDES.pptxPSYCHO-SLIDES.pptx
PSYCHO-SLIDES.pptx
 
psych assignment journal.docx
psych assignment journal.docxpsych assignment journal.docx
psych assignment journal.docx
 
business final report final.docx
business final report final.docxbusiness final report final.docx
business final report final.docx
 
LIGHTERS.pptx
LIGHTERS.pptxLIGHTERS.pptx
LIGHTERS.pptx
 
EPC.pdf
EPC.pdfEPC.pdf
EPC.pdf
 
EPC.pdf
EPC.pdfEPC.pdf
EPC.pdf
 
englishreport (2).pdf
englishreport (2).pdfenglishreport (2).pdf
englishreport (2).pdf
 
English II (2).pdf
English II (2).pdfEnglish II (2).pdf
English II (2).pdf
 
English II (2).pdf
English II (2).pdfEnglish II (2).pdf
English II (2).pdf
 
PROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdfPROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdf
 
PROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdfPROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdf
 
PROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdfPROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdf
 
PROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdfPROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdf
 
PROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdfPROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdf
 
PROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdfPROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdf
 
PROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdfPROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdf
 
PROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdfPROJECT BRIEF (AUG 2014).pdf
PROJECT BRIEF (AUG 2014).pdf
 

Drawing_Project1 (AUGUST - BRIEF - UPDATED).pdf

  • 1. SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Research Unit for Modern Architecture Studies in Southeast Asia Foundation of Natural and Built Environments Introduction To Drawing (ARC 30103) Prerequisite: None Lecturers: Ida Mazlan, Sufina Abu Bakar, Anna Kamelia, Noorul Iffa Mohd Nayan _____________________________________________________________________ Project 1 (Group) Drawings Submission date – 9th Sept 2014 Introduction “I prefer drawing to talking. Drawings are faster and leave less room for lies. “ Le Corbusier Objectives of Project • To introduce drawing as a communication tool in the construction industry. Learning Outcomes • Interpret the type of drawing representation used in the construction industry Tasks In a group of five or six people, you are required to choose and investigate ONE type drawings from the list below. You are to study and investigate the use of the drawings as a means of communication. Using the data gathered, you are to discuss and work as a team to generate a presentation and communicate your findings to your audience. The data gathered should include types and function of drawings, stages and examples of drawings used to communicate ideas and presentations. • Architectural Drawings • Interior Architecture Drawings • Planners Drawings • Product Design Drawings • Quantity Surveying Drawings • Landscape Architecture Drawings • Engineering Drawings • Mechanical & Electricals Drawings
  • 2. Submission Requirement Your team will be communicating and presenting their findings to your audience on Presentation Day. You are advice to keep the presentation short and simple using any creative medium that best suits the content and findings for your audience. Date : 9th Sept 2014 Time : 10.00am – 12.00 pm/ 16:00 pm- 18:00 pm ( 10 mins each group ) Dress Code : Smart Casual Presentation Flow: According to the posted list To ensure the span of 4 hours is used wisely, please follow these guidelines on presentation day to avoid interruptions and delay of time. 1. The whole class presentation will be using ONE laptop throughout all presentation. 2. You are advice to transfer all softcopies of presentation materials prior to class time. 3. For your e-portfolio purposes, each group need to setup and record presentation using their own camera or ONE camera using different MEMORY CARD. 4. Please print the assessment sheet for each lecturer. Post Presentation: All videos will be compiled by group leader in a CD with proper CD Casing with proper information of title, group members name and information, module name and lecturer. CDs must reach module coordinator by the next class session (16th Sept 2014).