Publicité
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
Publicité
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
Publicité
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
Publicité
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
Publicité
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
Publicité
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
Publicité
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
Publicité
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
Publicité
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
Publicité
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
IMP / IMS Step by Step
Prochain SlideShare
Integrated Master Plan DevelopmentIntegrated Master Plan Development
Chargement dans ... 3
1 sur 69
Publicité

Contenu connexe

Publicité

Dernier(20)

Publicité

IMP / IMS Step by Step

  1. Version 3.1.4 – May 11, 2021 IMP / IMS Step by Step Building the Integrated Master Plan (IMP) and Integrated Master Schedule (IMS) from Proposal and Successful Execution Building, deploying, and executing an IMP / IMS requires change in the conventional paradigm of project planning and controls and the management processes. This change starts by measuring progress as the completion of Accomplishment Criteria (AC) and the fulfillment of Significant Accomplishments (SA). This progress is described through the assessment of physical percent complete rather than measuring progress through the passage of time and consumption of resources. This change means planning Vertically for each Program Event (PE), from the exit criteria of Work Packages to their Accomplishment Criteria (AC), to the Significant Accomplishments (SA), to the PE. Only then, can planning take place Horizontally for the dependencies between Program Events. As well, a change takes place in conventional approach to Program Events. These Program Events are more than milestones. They are maturity assessment points in the program, where pre-defined deliverables are assessed to assure Technical Performance is being met against the pre-defined metrics. As well that the pre-defined levels of risk are being retired or mitigated as planned. All these changes mean defining the technical and programmatic performance measures for the critical AC describing what “done” looks like prior to starting the work. Copyright © 2007, 2008, 2009, 2010, 2011, 2012, 2013, 2014, 2015, 2016, 2017, 2018, 2021 All Rights Reserved Prepared by Glen B. Alleman Niwot Ridge Consulting, LLC 4347 Pebble Beach Drive, Niwot Colorado 80503 Motivation of this Guide “If a profession is to sharpen its skills, to develop new skills and applications, and to gain increasing respect and credibility, then theory and practice must be closely related” – Martin Shrub
  2. Integrated Master Plan / Integrated Master Schedule Step-by-Step Copyright © 2021, Glen B. Alleman, All Rights Reserved There is no single source for the mandatory use of IMP/IMS in the same way Earned Value and the IMS. However, the IMP references It start with the EVMS standards, and is supported by DID 81861 and the Systems Engineering approach of Event Based Performance Measurement. Many proposals call for an “Event Based Plan,” and provide the mandatory Events. The offeror is requested to provide an IMP and connect this to the IMS. Source of IMP/IMS in Defense Acquisition The IMP/IMS is called out in several acquisition guide, but the instructions on how to development and apply IMP/IMS starts with “Integrated Master Plan and Integrated Master Schedule, Preparation and Use Guide, Version 0.9, October 21, 2005. This guide is not the only source of guidance for developing an IMP and IMS. Each government program may have its own guidelines. Part 2.B.3 Acquisition Strategies, Exit Criteria, and Risk Management § Event driven acquisition strategies and program plans must be based on rigorous, objective assessments of a program’s status and the plans for managing risk during the next phase and the remainder of the program. § The acquisition strategy and associated contracting activities must explicitly link milestone decision reviews to events and demonstrated accomplishments in development, testing, and initial production. § The acquisition strategy must reflect the interrelationships and schedule of acquisition phases and events based on the logical sequence of demonstrated accomplishments not on fiscal or calendar expediency. DoD Inst 5000.2, Operation of Defense Acquisition System, May 12, 2003 § EVM is a regulatory Information Requirement § Implement EVM Guidelines in ANSI/EIA–748C Defense Acquisition Handbook June 7, 2016, Chapter 11.3.1.4.2 (Replaced DoD 5000.2–R) § Guidance on previous policy § Revised EVM contents in Chapter 11 Basic Requirements for EVMS § Earned Value Management System (EVMS) in compliance with ANSI/EIA–748 is required on all cost or incentive contracts equal to or greater than $20M. § A formally validated and accepted EVMS is required for cost or incentive contracts equal to or greater than $50M. § EVM may be imposed on contracts less than $20M as a risk–based decision of the program manager based on a cost/benefit analysis. DFARS Clauses § Notice of Earned Value Management System (MAR 2005), DFARS 252.242–7001. § Earned Value Management System (MAR 2005), DFARS 252.242–7002. Data Requirements § For contracts greater than $20M § Integrated Program Management Report (IPMR) DI-MGMT-81861 § Integrated Master Schedule (IMS) (DID DI–MGMT–81861) is required § A product–oriented Contract Work Breakdown Structure (CWBS) in accordance with the DoD WBS Handbook (MIL–STD–881C) and the CWBS DID (DI–MGMT–81334D) is mandatory when EVM is implemented and an IPMR and an IMS are required. § For contracts that require Contractor Cost Data Reports (CCDRs), the CWBS will be developed, approved, and maintained in accordance with DoD 5000.4–M–1, Cost and Software Data Reporting Manual, and the CWBS DID. § A single CWBS will be developed and maintained for all contractor reporting. § A Contract Funds Status Report (CFSR) (DI–MGMT–81468) is required.
  3. Integrated Master Plan / Integrated Master Schedule Step-by-Step Copyright © 2021, Glen B. Alleman, All Rights Reserved § No specific dollar thresholds are established for the CFSR, but application to contracts of less than $1.5M should be carefully evaluated. More Guidance § Systems Engineering Handbook, A Guide for system life-cycle-processes and activities, Fourth Edition, § DFARS 252.242–7001 and 252.242–7002 will be applied to all contracts requiring EVM in the interim period until the new DFARS clauses are approved and published. § However, for contracts equal to or greater than $20M but less than $50M the SOW must contain a special statement that excludes the requirement for the Government to formally validate/accept the contractor’s management system (no validation review). The Concept of Event Based Planning as “Strategy Making” Every project manager is looking for a “winning” strategy to manage projects. § Programmatic architecture defines the creation of increasing value as the schedule moves from left to right. The evaluation of this increasing value is performance through review and evaluation events. At each Event the predefined maturity and its associated value is evaluated for compliance with the plan. § These Events are capability assessment points in the program. These Events are mini- “Authorizations to Proceed.” At each Event, the program is assessed for its planned maturity as defined in the Review Entry and Exit criteria. A source of this criterion through CDR can be found at the NAVAIR site. § The capabilities available at each event can be substantiated using Significant Accomplishments (SA) and their Accomplishment Criteria (AC). § Completion of each Significant Accomplishment and their Accomplishment Criteria are the physical measures of the existence of the capability. This is the definition of Physical Percent Complete. § The program’s work tasks produce the products or services that enable the capabilities needed by the program. § The critical concept is that no work should be performed that does not result in the increasing maturity of a capability § Identifying this work should be performed for a needed capability for each program event. This is the connection between vertical (IMP) and horizontal (IMS). § The IMS describes the work required to produce the Significant Accomplishments (SA). The assessment that this work has resulted in an acceptable conclusion is defined in the narrative of the Accomplishment Criteria (AC). § The strategy for successfully completing the program is stated in the logical sequences of the Significant Accomplishments. As the SAs move through their logical sequence, the products and services they produce increase in their maturity for each Program Event (PE). Strategy Making, IMP/IMS and a Systems Engineering Process Building products or providing services using IMP/IMS within a systems engineering context is a step-by-step process: 1. Create a vision of the outcome – this is usually described in the Concept of Operations 2. Analyze the current situation – performance an Analysis of Alternatives 3. Determine a strategy for moving from the current situation to the outcome – what “maturity increasing” activities must be performed to move forward 4. Select the systems development activities needed to make this move – these are the Significant Accomplishments for each Program Event 5. Draft a plan based on these activities – arrange the SAs in a logical sequence for each Program Event 6. Perform a pilot set of activities to confirm they result in desirable outcomes 7. Evaluate these results – “test” the logic of the SAs to assure increasing maturity will result 8. Execute the processes in steps 6 and 7 until the outcome is reached – develop the Accomplishment Criteria for each SA and the top activities for each AC. This extremely simple-minded approach is the basis of all credible development activities. The challenge comes in finding how the details of each step are to be defined, developed, executed. This is the purpose of this document.
  4. Integrated Master Plan / Integrated Master Schedule Step-by-Step Copyright © 2021, Glen B. Alleman, All Rights Reserved IMP/IMS Step By Step Table of Contents 1 First Principles of IMP/IMS.................................................................................................................................... 1 1.1 IMP/IMS Features and Benefits.................................................................................................................... 5 1.2 IMP/IMS is a Systems Engineering Process not a Scheduling Process ......................................................... 6 1.3 Step by Step for Building the Integrated Master Plan (IMP) ........................................................................ 8 1.4 Creating a Fully Integrated IMP/IMS.......................................................................................................... 12 1.5 Some Definitions Needed for IMP/IMS...................................................................................................... 13 1.6 Increasing Maturity is the Only Measure of Progress ................................................................................ 15 1.7 Logical Flow of Tasks within the Integrated Master Schedule (IMS).......................................................... 19 1.8 Decomposing the System........................................................................................................................... 20 1.9 Process Flow of the IMP and IMS Elements ............................................................................................... 22 1.10 Link Vertically within an Event ................................................................................................................... 23 1.11 Link Horizontally within an Event............................................................................................................... 25 1.12 Link Horizontally across Events .................................................................................................................. 26 1.13 Integrating the IMP and IMS with Earned Value........................................................................................ 28 1.14 Summary .................................................................................................................................................... 32 2 Process Flow to Build The Integrated Master Plan (IMP).................................................................................... 33 2.1 Defining the Program Events...................................................................................................................... 37 2.2 Defining the Significant Accomplishment for each Program Event............................................................ 38 2.3 Defining the ACs for each SA...................................................................................................................... 40 3 Building the Integrated Master Schedule (IMS) .................................................................................................. 41 3.1 Building a CDRLs plan ................................................................................................................................. 42 3.2 The Integrated Master Schedule (IMS)....................................................................................................... 42 3.3 Structuring the IMS .................................................................................................................................... 43 4 The Work Breakdown Structure (WBS)............................................................................................................... 44 4.1 To Indent or Not Indent That is the Question ............................................................................................ 45 4.2 Capturing the AC contents ......................................................................................................................... 45 4.3 Building the IMS ......................................................................................................................................... 46 4.4 Connecting Cost and Schedule................................................................................................................... 48 5 Integrating Cost and Schedule ............................................................................................................................ 49 5.1 Dollarized RAM........................................................................................................................................... 49 5.2 Cross Reference of all Materials................................................................................................................. 50 5.3 Resource Assignments, Loading and Leveling............................................................................................ 50 5.4 Establishing the Earned Value.................................................................................................................... 50 6 Working on an Execution Team .......................................................................................................................... 54 6.1 Integrating the Individual Event Schedules................................................................................................ 54 6.2 Defining the Functional Technical flows..................................................................................................... 54 6.3 Executing the Performance Measurement Baseline.................................................................................. 54 6.4 Business Rhythms....................................................................................................................................... 54 6.5 IMS Architecture and Execution................................................................................................................. 54 7 Working on a Proposal Team .............................................................................................................................. 55 7.1 Iterative and Incremental development of the IMP/IMS........................................................................... 56 7.2 Focus On Only Three (3) Things A Day For The Team................................................................................. 57 7.3 Have Automation ....................................................................................................................................... 57 7.4 Working On A Team ................................................................................................................................... 57 7.5 Never Leave the Room Without It ............................................................................................................. 58
  5. Integrated Master Plan / Integrated Master Schedule Step-by-Step Copyright © 2021, Glen B. Alleman, All Rights Reserved 7.6 Better Is The Enemy Of Good Enough........................................................................................................ 58 7.7 Vertical Linking ........................................................................................................................................... 59 7.8 Horizontal Linking....................................................................................................................................... 60 8 References........................................................................................................................................................... 61 Tables Table 1 – the use of IMP/IMS provides direct benefits to the program not found in traditional approaches. Each of these benefits needed to be tested in practice by defining the Program Management Plan (PMP) processes that produce the behaviors needed to deliver the benefits. Simply stating the benefits are present is not sufficient. And actual plan to deliver the benefits is needed................................................................................ 5 Table 2 – Each step in the development of the IMP builds an increasing fidelity of the final product...................... 10 Table 3 – Sample definitions of IMP verbs. Sometime the RFP provides a list of these verbs. Sometimes the verbs come from the standard procedures of the firm. In all cases, a dictionary of verbs is needed and should be limited to those verbs that describe actual outcomes meaningful to the customer and the provider. ............. 17 Table 4 – Action verbs to be used as the first word for each Task in the IMS. These verbs complement the verbs used at the end of the description of the IMP elements. ................................................................................... 19 Table 5 – These 10 processes must be implemented in order for Earned Value to be useful in the IMP/IMS environment. These concepts are taken directly from “Earned Value Project Management: A Powerful Tool for Software Projects,” Quentin Fleming and Joel Koppelman, Cross Talk, July 1998.............................................. 32 Table 6 – Not everyone is “wired up” to work on a proposal team. The success criteria for a proposal team member starts with some training on how the manage a proposal, which can be found in books and the class room as well as formal “on the job” training with a proposal management firm. However, more importantly are the personality attributes of a proposal team member............................................................................................ 55 Figures Figure 1 – The IMP and the IMS are a hierarchy of Program descriptions, each connected through a single parent and multiple children. This “well formed” tree topology is critical to the measurement of increasing maturity of the program. ..................................................................................................................................................... 1 Figure 2 – The DOD 5000.2 process model needs to be understood in order to define the types of maturity assessment processes for Accomplishment Criteria. “Done” has a different definition in a Concept and technology Development program than it does for a Product and Deployment Program and even more different for an Operational Support program. .................................................................................................... 7 Figure 3 – The Integrated Master Plan (IMP) and Integrated Master Schedule (IMS) are part of an overall Programmatic Architecture that starts with the RFP and ends with the execution of the program. The IMP and the supporting IMS are the framework for the execution of the program as well the framework for the programmatic win themes of the proposal........................................................................................................... 9 Figure 4 – Connecting the Statement of Work to the Contract Work Breakdown Structure, to the Integrated Master Plan, to the Integrated Master Schedule and finally to the Basis of Estimate. The traceability between these artifacts should be the IMP/IMS number. However, in many cases, this is not possible. The WBS is the next best trace number, if the WBS is well formed. In the absence of a well formed WBS, the IMP/IMS number is the best hope of connecting the programmatic aspects with the technical maturity aspects of a program. .... 13 Figure 5 – The content of the IMP elements (Event, Accomplishment, Criteria) makes use of a sentence ending in a past tense verb. There are a limited number of these verbs of most IMPs. They defined the state of the product or service that results from the activities that compose the Accomplishment Criteria – the tasks of the
  6. Integrated Master Plan / Integrated Master Schedule Step-by-Step Copyright © 2021, Glen B. Alleman, All Rights Reserved IMS. learning to speak in the past tense of the basis of the IMP. Describing what “done” looks like requires a past tense verb be connected with “done.”........................................................................................................ 16 Figure 6 – The source of guidance and materials for building the IMP and the IMS comes from a variety of sources. Some of official guidance from the government. Some from the RFP and many from training and guidance sources available on the web, through courses and books................................................................................. 20 Figure 7 – The flow from requirements to WBS to tasks is replicated in the IMP and IMS. This traceability of critical in both the proposal environment, mandated by the §L and §M guidelines and the execution environment for the EVMS collection of physical progress to plan. .............................................................................................. 21 Figure 8 – The connections between the IMP and IMS elements is used to demonstrate the increasing mature of the program. These flows can also be connected to the Cross Reference Matrix (CRM) required in most proposals. As well traceability for program performance (EVMS measures) is provided through the IMP and IMS elements from various points of view.......................................................................................................... 22 Figure 9 – The connections of tasks within the AC must land on the place holder for the AC. Because Microsoft Project does not allow linkage to Summary Tasks (Primavera calls these hammock task), an ersatz task is needed to “hold the place” of the AC. The same is the case for the SA and PE. With these place holders and complete “network” can be constructed for the IMS and IMP. No widows or orphans for any element. ......... 24 Figure 10 – The linkage to the SA and then to the PE is done in the same way the linkage from the Tasks within the AC. This linkage is critical in maintaining the vertical nature of the IMP while providing the basis for the horizontal connections of the IMS. Both Vertical and Horizontal connections are needed in the end. ............. 24 Figure 11 – Connections between Accomplishment Criteria – The only horizontal connections, others than the start of a collection of tasks from an SA or PE, is made from the predecessor AC to the first task in the Successor AC. In this way, the dependencies between collections of work are isolated to the completion of the previous collection of work. This topology improves the visibility into “done” and isolates partially completed work from be consumed by downstream activities resulting in “re work” once it is completed......................................... 26 Figure 12 – the horizontal connections between program files – the individual Program Events – is made through a Send (SND) and Receive (RCV) field. These connections are then made into actual predecessor and successor connections in a Master File through a VBA macro that locates matching pairs and inserts the proper linkage. ............................................................................................................................................................................. 27 Figure 13 – Microsoft Project Server 2007 provides an “out of the box” solution to the inter-file dependency issues described above – the DELIVERABLES field. This approach can replace the Visual Basic macros needed to connect the files.................................................................................................................................................. 28 Figure 14 – the process flow for developing the IMP should be strictly followed. It has been shown that not following this flow leads to confusion and rework of the IMP elements. Each step must be evaluated for its completeness and suitability for use. If this is not done rework and lost work will result. In the proposal environment, time and resources are limited. Managing the proposal as a “time boxed” project is the starting point for success.................................................................................................................................................. 33 Figure 15 – a sample of an IMP produced from a Microsoft Project file. This view is taken from the place holders in the file that represent the individual IMP elements. The IMP numbering is inserted by a macro as well as the prefix in front of each IMP phrase. The phrase contents are taken from the summary tasks in the Gantt view of the file. ................................................................................................................................................................ 36 Figure 16 – defining the Significant Accomplishments for a Program Event in this way shows both the increasing maturity and the IPT streams that produce this maturity. The development of this “picture” of the Program Event takes place using a Mini–Product Kaizen. Systems Engineering and Planning and Controls sit in a room and work out the process flow of the SAs for the Event. From this structure, the IMP can be developed directly. This is a much better approach then just listing the SAs and the resulting ACs in a linear manner. .... 38
  7. Integrated Master Plan / Integrated Master Schedule Step-by-Step Copyright © 2021, Glen B. Alleman, All Rights Reserved Figure 17 – The notional concept of an IMP and an IMS describes the Tasks needed to complete the Accomplishment Criteria (AC). These Accomplishment Criteria in turn define the increasing maturity of the work products in support of the Significant Accomplishments........................................................................... 41 Figure 18 – Linking the tasks to the Accomplishment Criteria within each AC first is the process used to maintain the integrity of the AC before starting to link between ACs. This structure is the basis of individual Work Packages that can then be measured with Physical Percent Complete for the Work Package and Apportioned Milestones within the Work Package itself......................................................................................................... 47 Figure 19 – one approach that has worked well in the past is to have a “preamble” on the front of each Program Event file that contains the Event names, dates, and deadlines. This information should be kept in a separate MSFT Project file and updated through a macro, either from a database our an internal process. Single source – multiple use keeps everything straight. Linking from within the body of the Program Event file is the way to isolate the events. Then the preamble is linked to the Master Program Event file when all the files are assembled into a single Master File .................................................................................................................... 59
  8. Integrated Master Plan / Integrated Master Schedule Step-by-Step Glen B. Alleman, Copyright © 2021 1 | P a g e § The Integrated Master Plan / Integrated Master Schedule (IMP/IMS) defines and tracks the increasing maturity of a Program through programmatic and technical performance measures. § The IMS is a vertically integrated execution schedule traceable to the Integrated Master Plan (IMP). § Once this vertical traceability has been established, the horizontal dependencies can be defined. § The IMP is an Event Based plan, not a time based schedule. The IMS is time based representation of the achievements needed for the defined program maturity of deliverables described in the Program Events 1 First Principles of IMP/IMS The terms Integrated, Master, Plan, and Schedule have special meaning in the IMP/IMS paradigm. These meanings are different from traditional project management usage: § Integrated – vertical and horizontal traceability between the planned work, the Program Events, and the customer requirements defined in the RFP, Statement of Work, Statement of Objectives and the supporting documents (CDRLs, DRDs and DIDs). § Master – the all-in plan and schedule defined at three levels of detail. § Plan – the strategy for completing the project. This plan represents the increasing maturity of the program through Program Events (PE), Significant Accomplishments (SA), and their Accomplishment Criteria (AC). § Schedule – the sequence of work activities needed to fulfill the Accomplishment Criteria (AC). Managing projects using IMP/IMS is new to many organizations and "old hat" to others. From the current US Department of Defense Guideline: § The IMP and IMS are business tools that enhance the management of development, acquisition, modification, and sustainment programs. They provide a systematic approach to program planning, scheduling, and execution. They are equally applicable to competitive and sole source procurements with industry, as well as Government in-house efforts. They provide a tool for improved day–to–day program execution and for ongoing insight into program status by both Government program office personnel and contractor personnel. They help develop and support “what–if” exercises and to identify and assess candidate problem workarounds. § The IMP is an event–based plan consisting of a hierarchy of program events, with each event being supported by specific accomplishments, and each accomplishment associated with specific criteria to be satisfied for its completion. The IMP is normally part of the contract and thus contractually binding. The IMP is a narrative explaining the overall management of the program. The Integrated Master Plan (IMP) and the associated Integrated Master Schedule (IMS) are composed of five (5) tiers shown in Figure 1. Program Events – are periodic assessments of the program’s maturity through reviews or physical demonstration of the Significant Accomplishments. Significant Accomplishments – are the Entry Criteria for the Program Events. Accomplishment Criteria – are the Exit Criteria for the work effort. The AC describes what “done” looks like for the collection of Tasks. Each AC is the terminal activity for this collection of Tasks in the network of activities. Tasks – are the first level work effort (Work Packages) needed to fulfill the Accomplishment Criteria. These Tasks are “self-contained” within the ACs and produce the deliverables that fulfill the “exit criteria.” Their duration defines the duration of the AC. Care is needed to understand and deploy this approach to avoid having tasks that span more than one Program Event. If this is the case, the Tasks Figure 1 – The IMP and the IMS are a hierarchy of Program descriptions, each connected through a single parent and multiple children. This “well formed” tree topology is critical to the measurement of increasing maturity of the program.
  9. Integrated Master Plan / Integrated Master Schedule Step-by-Step 2 | P a g e Glen B. Alleman, Copyright © 2021 and the resulting ACs and SAs must be split into smaller collections of work that remain within the boundaries of the Project Event. This is a critical concept in the development of the Vertical IMS traceability. All work in the IMS is vertically traceable to the Program Events – this is the definintion of a well formed plan Supplemental Schedules – detailed execution schedules for each task within an Accomplishment Criteria (AC). The first level tasks within the AC are usually the top-level activities of a Work Package. The supplemental schedules are private schedules usually held by the CAMs, describing the details of how these Work Package activities will be executed. The details of these supplemental schedules are many times the basis of the physical percent complete reporting system for the Work Package. Increasing Levels of Detail Connect Physical Progress with Increasing Maturity The IMP/IMS paradigm contains four levels of increasing detail. All levels are needed for success. No level cab be skipped or be missing. All milestones, deliverables, maturity assessment points must be traceable through all levels of the IMP/IMS. § Program Master Schedule (PMS) – Presents the Contract Period of Performance (POP), Program Events (PE), Key Milestones, Major Program Deliverables, and Reports Progress at a Summary Level. The Program Master Schedule includes the First Level WBS and Significant, Measurable Events for Each Level–Two WBS Element. § Integrated Master Plan (IMP) – Identifies Program Events (PE), Significant Accomplishments (SA), and Accomplishment Criteria (AC). The Program Master Schedule establishes the Structure, Parameters & Basis for the Integrated Master Schedule (IMS) Development. § Integrated Master schedule (IMS) – The IMS is a logic network schedule of program planned activities keyed to the IMP’s accomplishment criteria. The IMS is the basis of the performance measurement system; common element integrating cost, schedule, and performance. The IMS is constructed to provide integrated planning to the work package task level, provides horizontal and vertical traceability for this work and summarization of information and critical path identification and analysis. § Supplemental Schedules – are created – as needed – to provide lower levels of detail within the AC schedules. The supplemental schedules are summarized in the IMS and are part of the program’s Performance Measurement Baseline (PMB). The Supplemental Schedules support control account schedules and the management of day–to–day operations. These schedules are held by the CAMs and are not on baseline. However, these schedules are critical to the execution of the IMS, since they contain the details of how the program will be executed at the day–to–day level. The Core Concept of Event Based Scheduling is Measuring Planned Maturity The challenge in developing a credible plan and the supporting schedules is to ensure that all identified activties move the program forward in a measureable way. The “units of measure” of this movement must be meaningful to all the program’s participants and be assessible through the performance management processes by the Program Planning and Controls (PP&C) staff. The first impulse is to use the Work Breakdown Structure (WBS) as the means of organizing the program plan and schedules. Event based planning and scheduling provides an alternative approach for several benefits: § Measuring the increasing maturity of the products and services produced by the work effort must be directly connected to the value produced by the program for the customer. This is sometimes referred to a Capabilities Based Planning. The program plan states what capabilities will be available at what time, how these capabilities will be described and assessed and how these measures will be made visible in the plans and schedules. § By isolating all work to Accomplishment Criteria “containers,” the measurement of progress can be described by the Exit Criteria of this collection of work. This removes the default concept of measuring progress by the passage of time and consumption on money.
  10. Integrated Master Plan / Integrated Master Schedule Step-by-Step Glen B. Alleman, Copyright © 2021 3 | P a g e The term Integrated Master Schedule (IMS) should not be confused with a “schedule.” The IMS is derived from the Integrated Master Plan (IMP). Without this derivation – direct traceability of Tasks to the Accomplishment Criteria, the Significant Accomplishments, and the Program Event – the “schedule” is not integrated. It is simply a schedule. Possibly a useful schedule. But not an Integrated Master. Schedule. Without the discipline of vertical integration, the “schedule” turns into the all too familiar rat’s nest of tasks. The structural integrity, visible flow of increasing maturity and credibility is described in a robust, resilient, and risk tolerant schedule is then lost. Product v. Functional goes to the core of defining “what does done look like?” In the Functional approach to planning, “done” means the conclusion of the allotted time period of performance. This is not literally true, since deliverables result in the task effort performed by the functional units. In the Product approach to planning, “done” is defined upfront in the SA/AC descriptions. The accomplishments and the criteria state explicitly what must be “done” in order to complete an Event. This inversion of the definition of “done,” from the passage of time and reaching a milestone, to the description of the deliverables creates a new vocabulary for planning. Approaching each planning activity from the view of “what does done look like?” is the starting point of IMP/IMS. Once the answers to this question are developed, the planning of task durations becomes straight forward – well as straight forward as possible – since the outcome has been defined. § The “hard part” is IMP/IMS is changing our habits of defining the tasks first – instead we must define “what done looks like” first and only then define how to get to “done.” § Defining the events, the accomplishments that result from the event, the criteria for assessing the maturity of the accomplishment is the cycle of an IMP/IMS planner. § Gathering the raw materials for IMP/IMS is straight forward if approached in an iterative / incremental manner. § The difficulty is avoiding the natural tendency to arrange the raw materials in a time phased order by work effort. § Continually asking the question, “What does done look like” reinforces the IMP/IMS approach. If you are not asking questions and getting answers for “what does done look like” on event boundaries, then you are not doing IMP/IMS. The Beneficial Outcome of Using IMP/IMS to Manage a Program During the actual program execution, the IMP and IMS provide a framework for insight into the contractor's performance for both the program or project office and for the contractor's management team. The IMP and IMS when properly integrated with EVM through a sound technical management approach as documented enables the program or project office to: § Identify and assess actual progress versus the planned progress – this is done through the Earned Value processes at the Task level. Each Task in an AC has some EV measurement. This should be predominately 0/100 measures for short to moderate duration tasks. Some firms limit task duration to 45 elapsed days for the current rolling wave. The culture of this approach may not be in every firm but limited the duration to some reasonable time is critical to successfully managing performance. The assessment of actual performance must come from Physical Percent Complete. This means defining up front how the Earned Value (BCWP) will be recognized for each task and the Work Package as a whole. The simple formula of Percent Complete X BCWS is fine as a percent compete. However, the “percent complete” cannot be an opinion. It needs to be an assessable measure of the actual physical progress of the Task. § Monitor the program critical path and help develop workarounds to problem areas – the concept of a Critical Path is more than the path through the program with zero (0) or small Total Slack. It needs to be the “logical” critical path defined by the subject matter experts. This definition then needs to be reflected in the IMS. § Assess program maturity – program maturity is best assessed through Technical Performance Measures (TPM). Systems engineering uses technical performance measurements to balance cost, schedule, and performance throughout the life cycle. Technical performance measurements compare actual versus planned technical development and design. They also report the degree to which system requirements are met in terms of performance, cost, schedule, and progress in implementing risk handling. Performance metrics are traceable to
  11. Integrated Master Plan / Integrated Master Schedule Step-by-Step 4 | P a g e Glen B. Alleman, Copyright © 2021 user–defined capabilities. The IMS then connects actual versus planned progress (through the physical percent complete) with the technical actual versus planned progress. § Assess the status of risk management activities based on the inclusion of the program risk mitigation activities in the IMP and IMS – this programmatic risk starts with the modeled variance in the duration of tasks. This variance can be defined by a Most Likely, Optimistic, and Pessimistic estimate. This has calibration issues, since each person supplying these estimates has a different opinion of what is meant by optimistic, pessimistic, and even most likely. An ordinal ranking method is more reliable but itself needs calibration § Assess the progress on selected Key Performance Parameters (KPPs) and Technical Performance Measures (TPMs) – the units of measure for the Technical Performance Measure needs to be connected with the Key Performance Parameters of the Integrated Master Schedule. This connection answers the questions: how are we doing against our plan? § Provide an objective, quantitative basis for the performance assessment – the IMP and IMS should be the basis of objective and quantitative performance programmatic measures of the aspects of the program. This means that the simple passage of time and consumption of resource is not a good measure of this performance. Only by predefining the “units of measure,” starting with the technical performance measures, can the IMS be considered credible? § Develop and support “what–if” scenarios, and to identify and assess candidate problem workarounds – alternative paths, cost models, and risk adjusted estimates to complete are the raw materials for the “what if” assessment of the IMS. § Provide better insight into potential follow–on efforts that were not part of the original contract award. For example, the contractor should be able to more clearly define the activities, new interfaces, and other clarifying information necessary for a potential program increment or contract option. Changing the Program Planning Paradigm from Horizontal to Vertical Building an IMP / IMS requires a change in the normal paradigm of project management. This change means stopping the measurement of progress as the passage of time and consumption of funding to measuring progress by the completion of Accomplishment Criteria and the fulfillment of Significant Accomplishments. It means moving from horizontal scheduling to vertical planning. These words are probably meaningless at this point. The role of this step–by– step guide is to provide an understanding of this concept, the benefits to the project management, and the processes needed to deliver these benefits. In many cases, the horizontal schedules are the starting point for the program. This occurs for several reasons: § The program started without an IMP or a real IMS. They first built a horizontal schedule in the manner of “shop floor” schedule. This is usually for the Period of Performance of the Program. § The program was inherited from a higher or lower-level process. Either as a subcontractor or a part of on IPT team, the schedule is focused on the functional aspects of the program. In many cases, the conversation from horizontal to vertical is required or desired. The effort to do this conversation involves several steps: § Identify the Program Events and where in the schedule these events take place. § Identify which work in the schedule “lands” on which event. If there is work that crosses an Event boundary, then it will need to be “broken” into two (2) parts. One that “lands” on the Event and one that restarts at the completion of the Event. Work Breakdown Structure Paradigm versus the IMP/IMS Paradigm § Work Breakdown Structure –The WBS provides a basic framework for identifying each element of a project in increasing levels of detail. In essence, it describes the way work is performed. The WBS also provides a coherent method for reporting progress toward plan goals. If the schedule is WBS focused, cost tracking is possible, work packages can be defined, and the outcomes of these work packages can be made visible. However, the increasing of the maturity of the program is not explicitly visible from the outside. § Integrated Master Plan – The IMP is an event–based plan depicting the overall structure of the program and the key processes, activities, and milestones. It defines accomplishments and criteria for each event. With the IMP, the increasing maturity of the program is stated explicitly in the Significant Accomplishments (SA) and their
  12. Integrated Master Plan / Integrated Master Schedule Step-by-Step Glen B. Alleman, Copyright © 2021 5 | P a g e If you wish to persuade me, you must think my thoughts, feel my feelings, and speak my words. — Cicero, Roman Statesman (106 BC) Accomplishment Criteria (AC). The WBS can be assigned to the Tasks in each AC so cost can be traced to specific work. The IMP should be constructed from the logical decomposition of the Program Events, Significant Accomplishments, and their Accomplishment Criteria – not from the Work Breakdown Structure. This approach causes problems with the traditionalist, because they see the world through the WBS. The WBS and the CWBS are cost accounting structures, not program maturity assessment structures. The WBS and CWBS are important program performance measurement processes – they capture costs and assign these costs to the produced products and services. However, the WBS and CWBS does not provide any measurement of progress in terms of increasing maturity. That is the role of the IMP and the supporting IMS. Constructing the IMP and IMS with the WBS in mind may be required by contract, since separation of the work may be driven by the cost accounting processes. Resisting the lure of WBS and CWBS structuring is difficult. Ask the question – how does this structure reveal the increasing maturity of the program? What are the units of measure of this maturity in terms meaningful to the customer? How can the structure show the flow of maturity using a single notation? 1.1 IMP/IMS Features and Benefits The IMP and IMS focus on specific areas of the program, which have been shown to be problems with more traditional approaches. The primary focus is on program maturity Event based planning provides a “singularly” focused process allowing each IPT to answer the question – “what do I need to do for a specific event?” For example, PDR: List all the accomplishments needed for PDR? What activities need to be performed for each of these accomplishments? When all the activities are completed, the criteria satisfied, and the accomplishments completed then a measurement of “maturity” can take place? Features of IMP/IMS Benefits to the Program Provides an understanding and alignment of required tasks with events starting with the proposal Drives down cost of execution by connecting changes with the impact of changes that occur early in the program life cycle when costs are lower are made visible from day one. Integrates relationships of products and development processes Improves management visibility by connecting activities with events Permits better understanding of risk and how it impacts cost, schedule, performance A disciplined approach to planning and implementation activities Provides a framework for using integrated tools, teams, and processes with vertical traceability Serves as foundation for systematic programmatic improvement efforts Iterative planning, tracking, and reporting process Allows program flexibility – on ramps and off ramps tied to events Highlights details early – ties maturity events with activities Event–Driven Planning Relates program events in terms of success – Accomplishments and Criteria Reduces risk by ensuring that maturity of the plan is incrementally demonstrated prior to starting follow–on activities Increases visibility of entire program to the program team Improves measurable maturity and impact analysis Promotes program buy–in and team commitment through shared events Fosters proactive management at all levels through measurable outcomes Resource and Earned Value Loadable Provides foundation for Earned Value Reporting and EVMS Key customer events included Encourages a win–win attitude with customers Clear communication of how the team views the program Improves effectiveness through a common set of tools, measurements and defined outcomes Table 1 – The use of IMP/IMS provides direct benefits to the program not found in traditional approaches. Each of these benefits needed to be tested in practice by defining the Program Management Plan (PMP) processes that produce the behaviors needed to deliver the benefits. Simply stating the benefits are present is not sufficient. And actual plan to deliver the benefits is needed.
  13. Integrated Master Plan / Integrated Master Schedule Step-by-Step 6 | P a g e Glen B. Alleman, Copyright © 2021 Systems engineering is the intellectual, academic, and professional discipline whose principle concern is the responsibility of practicing Systems Engineers in a system design and acquisition project to ensure that all requirements for the system are satisfied through the life cycle(s) of the system. — Wayne Wymore, Professor Emeritus of Systems and Industrial Engineering, University of Arizona 1.2 IMP/IMS is a Systems Engineering Process not a Scheduling Process Building the Integrated Master Plan (IMP) and Integrated Master Schedule (IMS) is a Systems Engineering process. This means that systems engineering processes are used to construct the IMP and the supporting IMS. The processes of Systems Engineering While this may seem a bit out of place in a planning and scheduling discussion, the concept of Programmatic Architecture fits well with the concept of Systems Architecture. It is the Systems approach that is the basis on building the Integrated Master Plan (IMP). This approach defines and answers questions like: § How does the program define Technical Performance Measures? How will these TPMs be connected to the IMS? § What are the units of measure of maturity? § What is the unit of measure of credibility, as in: “Do we have a credible schedule?” In addition, if we claim we do: “How can it be proven to others?” Systems Thinking is the Basis of a Success IMP/IMS Development and Deployment The principles of Systems Engineering are founded on concepts important to the development of the IMP and IMS: § System exists throughout the natural and man–made world, wherever we have complex behavior “emerging” from the interaction between things. § We can only fully understand such behavior by considering “complete systems” as they interact within their “natural” environment. To solve complex “System Problems” we must engineer complete “System Solutions,” through a combination of: § The ability to understand, describe, predict, specify, and measure the ways in which elements of a complex system affect whole system behavior. § The ability to apply “Traditional” engineering knowledge to create, modify or use system elements to manipulate or maintain whole system behavior. § The ability to organize, manage and resource projects in such a way as to achieve the above aims, within realistic constraints of cost, time, and risk. What is a System – from the View of Systems Engineering? A system is – A set of Interacting Elements that form an Integrated Whole with a Common Goal or Purpose. Some more important concepts in Systems Engineering applicable to IMP/IMS: § Holism – considers the Whole–System, in its environment, through its Whole–Life. The IMP shows the entire period of performance for the Program. Each Program Event then has SAs and ACs for this performance period as well. With the IMP in place, the whole is integrated from the parts. The IMS can then show the dependencies and work activities to cause the ACs and SAs to appear. § System of Interest – collection of elements with a common identity, e.g., product, organization. The IMP is focused on the increasing maturity of the delivered products. Using the WBS to collect costs for product activities § Viable system – must include everything needed to maintain its existence and achieve its goals. The consequences of this Holistic approach exposed the notion that the viability of the product relies on interactions outside of its immediate (product) boundary. Those systems are engineered with the context of one or more "containing systems." As well, the concept of "emergence" becomes important. The system as a whole exhibits a property which is meaningful only when attributed to the "whole" and not to its parts. The emergent properties vary with environment and relationships with other systems.
  14. Integrated Master Plan / Integrated Master Schedule Step-by-Step Glen B. Alleman, Copyright © 2021 7 | P a g e The consequences of emergence are that there is no guarantee from optimizing the parts of the system, or even from the components independently. Changing the elements or their interactions within the system may affect its properties, which can cause emergent property to change on a number of levels. 1 A General Systems Lifecycle is represented in the Flow of the IMP and its IMS Understanding how IMP/IMS provides value to the management of projects starts with a general lifecycle model for programmatic aspects of the project. The assumption is that programmatic architecture is equivalent to the technical architecture in terms of interfaces, coupling and cohesion, and value stream flow. § State the problem – by identifying the customer, the customer’s needs, establishing the need for change, discovering requirements, and defining the system functions. § Investigate alternatives – based on cost, schedule, and risk as measures of effectiveness § Model the system – should be developed for alternative product designs. The modeling processes allow alternative assessment of schedule changes, sensitivity of change on cost and schedule that show the effect of delays or accelerations of the product development. § Integrate – the systems, business, and people so they interact smoothly. § Launch the system – by running the system (processes) to produce the products § Assess performance – using figure of merit, technical performance measures, and metrics. § Reevaluate – by observing outputs and using this information to modify the system, its inputs, products or processes The US Department of Defense has a top-level project lifecycle, shown Figure 2. This “picture” is the highest level of sequence for a program. When the discussion turns to “where are we in the Big Picture?” the answer can be, “we’re in SDD headed to Milestone C.” For the actual development of an IMP/IMS, this level of understanding is not very interesting. However, for a proposal team, it is important to understand what procurement guidance is applicable for what phase of the program. For SDD programs there are difference guides for the outcomes than for a post–Milestone–C program. Figure 2 – The DOD 5000.02 process model needs to be understood in order to define the types of maturity assessment processes for Accomplishment Criteria. “Done” has a different definition in a Concept and technology Development program than it does for a Product and Deployment Program and even more different for an Operational Support program. 1 There is a counter example to this in Wayne Wymore’s “Subsystem Optimization Implies Systems Suboptimization: Not!” referenced in “The Synthesis of Optimal System Design Solutions,” Systems Engineering, Volume 6, Issue 2, pp. 92–105, 10 March 2003.
  15. Integrated Master Plan / Integrated Master Schedule Step-by-Step 8 | P a g e Glen B. Alleman, Copyright © 2021 § Building the IMP is more than a process; it is a way of thinking. § The IMP represents the programmatic architecture and the implementation strategy for delivering the products and services represented by that architecture. § The IMP is the logical flow of the product’s increasing maturity, measured in units meaningful to the customer Putting These Concepts to Work in IMP/IMS The Integrated Master Plan (IMP) describes the strategy for completing the program as planned ‒ on budget, on schedule, and compliant with Measures of Effective, Measures of Performance, Technical Performance Measures, and Key Performance Parameters. This is the role of a PLAN. As such it represents the "Architecture" of the Program. The Programmatic Flow of increasing maturity of the individual components of the program. These individual components – the Program Events – interact with each other as a "System" of activities. The IMP process provides a disciplined approach to develop, implement, update, maintain, and manage a Program through a single, comprehensive plan. The IMP is used to accomplish upfront planning and commitment, provide a basis for subsequent detailed planning and scheduling, measure program progress, and provide management with verification of progress enabling informed decisions. The boundaries between these components are the Program Events and the horizontal dependencies between these events. 1.3 Step by Step for Building the Integrated Master Plan (IMP) There are several starting points for building the Integrated Master Plan. The first is to put the IMP in the context of a proposal and the execution of that proposal after award. The second shows the step-by-step activities needed to build the IMP in response to a proposal. First let us look at the context of an overall program and how the IMP fits. Figure 3 describes an “overview” of the IMP/IMS from beginning of the proposal process to the execution of the program. While this overview appears simple and straight forward there are many subtle aspects not shown here. Figure 3 is really a “data flow” of information between the stages of the IMP/IMS development process. Much more understanding is needed before the value produced by IMP/IMS can be produced. The steps shown in Figure 3 are notional in one aspect but are actual processes in practice. More than just a simple statement about building requirements or constructing the CWBS Dictionary is needed for a successful IMP/IMS. In fact, many of the failures of IMP/IMS come from assuming the simple or notional examples can be put into practice. This is a good time to be reminded of Yogi Berra’s quote: In theory there is no difference between Theory and Practice. In Practice there is. So, the only way forward is to build and rebuild the IMP and IMS, testing them against the requirements and other assessments of “Credibility.” The IMP states what “done” looks like in Measures of Effectiveness (MoE) of the delivered products or services. At each Program Event, the Significant Accomplishments (SA) defines what maturity levels must be achieved before the Program Event can be considered met.
  16. Integrated Master Plan / Integrated Master Schedule Step-by-Step Glen B. Alleman, Copyright © 2021 9 | P a g e For each Significant Accomplishment, work must be performance to meet the Accomplishment Criteria (AC). These are defined by the Measures of Performance (MoP). This “exit criteria” for the Packages of Work in the Integrated Master Schedule (IMS) are “entry” criteria for the SAs. Figure 3 – The Integrated Master Plan (IMP) and Integrated Master Schedule (IMS) are part of an overall Programmatic Architecture that starts with the RFP and ends with the execution of the program. The IMP and the supporting IMS are the framework for the execution of the program as well the framework for the programmatic win themes of the proposal.
  17. Integrated Master Plan / Integrated Master Schedule Step-by-Step 10 | P a g e Glen B. Alleman, Copyright © 2021 IMP IMS Development Steps Understand the Product § Identify Customer, the business processes, political aspects of the customer and any other attributes. § Compile customer requirements from SOO, SOW, CDRLs and other applicable documents. These documents define the master schedule and the deliverables around this schedule. § Document the ground rules and assumptions that describes how the Program Events, Significant Accomplishments and their Accomplishment Criteria. § Clarify the product requirements by cross references all the customer document through the Concept of Operations (ConOps). Develop Product Structure § Create Top Level CWBS that describes the product structure first, then the IPTs that will deliver those products. § Assess structure for completeness and workability by asking “how will the components of the product structure come together during the execution of the program?” § Is the assembling in a tree structure from the bottom to the top? Or is it scattered all over the WBS/CWBS. If it is the latter, the WBS will be nothing but trouble during execution. § Write the CWBS dictionary. This is a narrative stating what is being delivered for each element of the CWBS. It is from these descriptions that lower-level work efforts will be defined. § Define Teams – in terms of IPTs – who will deliver the products § Develop the top-level SOW task statement to assure the cross reference between the CWBS and SOW Form Integrated Product Teams § Form teams and define leaders and key resources. These teams are accountable for deliverables described in the WBS/CWBS. § Validate and extend the SOW, CWBS and CWBS dictionary across the IPTs for each product or process. Create Integrated Master Plan § Select Key events and decision points using government provided Events and program maturity assessment points that assure maturity is increasing and risk and being reduced. § Write the event descriptions describing the measurable outcomes of each event in terms of maturity assessment and risk reduction. § Development the Significant Accomplishments (SA) and Accomplishment Criteria (SA) for each Program Event in a top-down manner, with the focus on describing the increasing maturity of the products resulting from the work held in the ACs. § Develop the vertical logic between the PE/SA/AC describing the logical flow of increasing maturity, the physical assessment of the product’s performance against the Technical Performance Criteria, and the dependencies between each Accomplishment Criteria. § Write the IMP process narratives in the form of a product specification. § Prepare a logic flow diagram for the SAs, showing increasing maturity of the products Create Integrated Master Schedule § Define high level Work Packages from the ACs. One WP / AC if possible § Decompose tasks within the WP on a single work sheet § Define the logic and dependencies between the ACs first. Only then connect task dependencies § Apply the schedule constraints § Establish work package and supporting task durations § Add resources at the work package level § Asses the critical paths § Perform schedule risk assessment Generate Basis of Estimate § Receive flow down of requirements and the cost estimating processes around them § Determine appropriate methods of defining costs § Estimate the hours § Review and adjust the costs to match the allocations Table 2 – Each step in the development of the IMP builds an increasing fidelity of the final product.
  18. Integrated Master Plan / Integrated Master Schedule Step-by-Step Glen B. Alleman, Copyright © 2021 11 | P a g e Understand the Product Defining the program framework starts with understanding the product, the customer and the processes that will be used to deliver the product. By first identifying all the discrete work scope and categorizing them into – who, what, when, where, why and how categories, the pro duct structure can emerge. Develop Product Structure The product structure starts with the Work Breakdown Structure (WBS). A Program WBS “… shall be established that provides a framework for program and technical planning, cost estimating, resource allocations, performance measurements, and status reporting.” DODD 5000.2R The WBS establishes the primary portioning of the product and work needed to produce the product. The WBS outlines the products and services to be provided by the program in a “structured” manner where each product and or service is traceable to its parent product and or service. The result is a “Product Tree” that decomposes the program structure to a level where risks are made visible. This is usually Level 3 in the WBS. The WBS defines the logical structure of the program. Summary points for assessing technical and programmatic risk and the physical progress of the work activities. It is critical to not let the WBS be a representation of the organizational structure of the program. If this is done the ability to measure physical progress through the production of products or services is lost. Form Integrated Product Teams (IPTs) and Align Their Work Efforts “We trained hard, but it seemed that every time we were beginning to form up into teams, we would be reorganized. I was to learn later in life that we tend to meet any new situation by reorganizing; and a wonderful method it can be for creating the illusion of progress while producing confusion, inefficiency and demoralization.” – Petronius Arbiter (210 B.C.) Align the Work Between the IPTs § Our team structure needs to reflect the most cost-efficient way of organizing the work § Our team structure needs to be sized according to the work required § Our teams must not be too big or too small to be functional § Our team structure needs to account for vertical (product) and horizontal (process, system) integration § Our team structure must not unnecessarily complicate integration or production § Our team structure must have clear scope borders — know where one team’s scope ends, and another team’s scope begins Integrate across the products to deliver the system-level configurations and data to the customer: § Integrate, analyze, assemble, and test configurations made up of modules developed and delivered by IPTs § Integrate program / system level data and CDRL items § Electronic Information System (EIS) or Integrated Data Environment (IDE) [both terms used in RFPs] Own and audit the common program infrastructure resources employed by multiple teams: § Processes § Tools § Databases § Facilities § Equipment
  19. Integrated Master Plan / Integrated Master Schedule Step-by-Step 12 | P a g e Glen B. Alleman, Copyright © 2021 § The term “integrated” in the IMP and IMS paradigm means vertical and horizontal integration of the work activities. § Vertical connectivity shows how the planned maturity for each Program Event (PE) is achieved. § Horizontal connectivity shows how the work effort produces this maturity for the Program Event (PE) and across Program Events. Create Integrated Master Plan (IMP) Events are: § Project unique, key transition points between major program activities § Points of convergence across the entire program § Key decision points where it is necessary to assess progress in achieving objectives before proceeding § May include major DoD milestone reviews, program design reviews, tests, deliveries, and other key progress demonstration or risk mitigation points § Should be well distributed over the program/project period, and not inordinately clustered § Not desirable to have too long a period pass without checking critical program progress § Avoid this by including an event such as a “Production In-Process Review” to gain timely program progress visibility Event definitions include the purpose and expected results. Events may be tied in the contract to award or incentive fee payments, so they may affect the client’s cash flow too. Create Integrated Master Schedule (IMS) The Integrated Master Schedule is derived directly from the IMP. It is not – nor should ever be – built bottom up during the first round of IMS construction. In the IMP/IMS paradigm, all the work needed to move the program forward in its maturity is defined by the Significant Accomplishments and their Accomplishment Criteria. Once these are defined in the IMP, the physical work needed to produce the Accomplishment Criteria is obvious. It is at this point the IMS construction can start. The IMS is built with some simple steps: § Identify each Accomplishment Criteria (AC) by name from the IMP § Build a single page data capture sheet that provides a limited number of “lines” for entering the tasks for the AC. This sheet will contain the following information § The name of the task § The duration of the task § The ordinal risk ranking of the task § The predecessors and successors “within” the AC § The predecessor that starts the AC – this is the external AC that starts the current AC. Generate the Basis of Estimate (BOE) From the constructed IMS the next step is to determine the cost for this work. This can be derived in several ways: § Resource load the IMS in some simple way § Export the periods of performance for each work package into the Basis of Estimate tool and develop the cost profiles 1.4 Creating a Fully Integrated IMP/IMS Connecting the RFP's SOW to the CWBS to the IMP and the IMS and to the BOE's is the ideal example of a fully integrated system describing the programmatic architecture of any project. The example of a fully integrated IMP and IMS shown in Figure 4 is an ideal example and not usually found in practice. However, at a minimum the understanding of how each component of the integrated system relates to others. By first connecting the Significant Accomplishments vertically, the maturity assessment of the product or services can be defined for each Program Event. Once vertically connected, horizontal connections describe the work sequencing processes needed to produce this increasing maturity.
  20. Integrated Master Plan / Integrated Master Schedule Step-by-Step Glen B. Alleman, Copyright © 2021 13 | P a g e Figure 4 describes the relationships between the program elements. § Statement of Work (SOW) § Contractor Work Breakdown Structure (CWBS) § Integrated Master Plan (IMP) § Integrated Master Schedule (IMS) § Basis of Estimate (BOE) Figure 4 – Connecting the Statement of Work to the Contract Work Breakdown Structure, to the Integrated Master Plan, to the Integrated Master Schedule and finally to the Basis of Estimate. The traceability between these artifacts should be the IMP/IMS number. However, in many cases, this is not possible. The WBS is the next best trace number, if the WBS is well formed. In the absence of a well-formed WBS, the IMP/IMS number is the best hope of connecting the programmatic aspects with the technical maturity aspects of a program. 1.5 Some Definitions Needed for IMP/IMS The terms used in the IMP/IMS domain may be new to the traditional planner. These terms are specific and well defined. Resist redefining them for your local use. In many domains, the definition of these terms is provided by the customer in the RFP or some guidance document. Here are some examples of definitions used in the Integrated Master Plan (IMP): § Program Event (Event): § "Events should be envisioned as program reference points or milestones at which the Contractor and Government jointly assess program status."
  21. Integrated Master Plan / Integrated Master Schedule Step-by-Step 14 | P a g e Glen B. Alleman, Copyright © 2021 § "An event is a program assessment point that occurs at the culmination of significant program activities: accomplishments and criteria." § “An IMP event is a key program milestone defined by the customer or the provider, which defines progress at a specific point in time. IMP events mark the conclusion/initiation of intervals of major project activity and serve as decision–oriented measures of project activity related to the project’s maturity assigned to a specific subsystem or organizational element.” § “An Event is a program assessment point which occurs at the culmination of significant program activities (Accomplishments and Criteria).” § Significant Accomplishment (Accomplishment) § "For each event, the Offeror shall state what progress is to be measured at the event. This breakdown of principal tasks and activities become the Offeror's accomplishments." § "An accomplishment is the desired result(s) prior to or at completion of an event that indicates a level of the program's progress." § “Significant accomplishments are critical efforts that must be completed prior to completing an event. The accomplishments shall be sequenced in a manner that ensures a logical path is maintained throughout the effort and tracks against key events.” § Accomplishment Criteria (Criteria) § "For each accomplishment, the Offeror shall state how progress is to be measured. Criteria should be stated using objective methods to verify that the accomplishment has been achieved. The Offeror should be able to document that the criteria have been satisfied. In total the criteria shall demonstrate that the accomplishment has been achieved." Criteria provide definitive evidence that a specific accomplishment has been completed. § “Accomplishment Criteria are measurable and useful indicators demonstrating the required level of maturity and or progress has been achieved. Accomplishment Criteria include the use of Technical Performance Measures and other metrics wherever possible to provide measurable criteria. Preferably the accomplishment criteria should avoid the use of percent completed and avoid citing data item report numbers rather than identifying and summarizing results.” Program Event (PE) Maturity Assessment The Program Event is a Maturity Assessment point in the Program. It asks and answers questions: Do we understand the technical aspects of the program to a sufficient level at this point in time to proceed for? § Preliminary Design – define the attributes of “preliminary” as appropriate for the program. § Critical Design – critical design usually means the products or services are ready for first production runs. Define the units of measure of this “readiness” § Integrated Baseline – are the cost, schedule, and technical baseline aligned and ready for execution? § Flight Readiness – are the products ready to “go flying” There are many "check lists" for these Program Events. One place to look for these are the NAVAIR and Defense Acquisition University y library site. The post–CDR events need similar check list. Significant Accomplishment (SA) Maturity Assessment For each Program Event (PE) a statement about the progress will be measures is contained in the Significant Accomplishments. Significant Accomplishments define the Entry Criteria for the Program Events: § What is the maturity of the work products needed to successfully conduct the PE? Specific knowledge about design, testing, performance, or other behaviors of the system § What program activities must have been conducted to successfully conduct the PE? Specific process steps that must be performed prior to the Program Event. Review, document production, meetings, "states" of relationships, organizational processes There are both Product and Process maturity assessments that must take place as "entry" criteria.
  22. Integrated Master Plan / Integrated Master Schedule Step-by-Step Glen B. Alleman, Copyright © 2021 15 | P a g e § Defining the expected maturity of the products or services at each assessment point in the project is the basis of a credible performance measurement paradigm. § Measuring the increase in maturity using Technical Performance Measures (TPM) or tangible deliverables defines the units of measure of success. § Using past tense verbs to describe progress has a powerful effect on the commitments to the outcome. Accomplishment Criteria (AC) Maturity Assessment For each Significant Accomplishment progress needs to be described in terms of tasks completed and the measurement of those tasks. The Accomplishment Criteria (AC) documents the Exit Criteria for the collection of tasks that move a product or service to the next level of maturity. § What is the maturity of the products produced from the work tasks for each AC? § How is this maturity assessed within the metrics of the Technical Performance Measures (TPM)? Tasks are the Raw Material for the IMS This is where the heavy lifting takes place. The work performed to deliver the "exit criteria" – the Accomplishment Criteria (AC) which forms the "entry criteria" (the Significant Accomplishments) for the Program Event are the work activities defined in the Integrated Master Schedule (IMS) The tasks that compose the Integrated Master Schedule (IMS) are defined through various examples: § “The Offeror shall provide an Integrated Master Schedule (IMS) in Annex X that delineates the Offeror's planned schedule for all activities, events, milestones, and critical paths associated with all program efforts in accordance with DID DI–MGMT 81650. The IMS shall include the program schedule with technical tasks and activities necessary to complete the work effort scoped within the IMP. The program's critical path(s), based on critical path analyses, shall be identified in the IMS. The Offeror shall develop the IMS in accordance with MIL–HDBK 881A (as a guide). The Offeror shall provide in the submitted IMS all contractors tasks, events, milestones which should be traceable to the contract WBS and contractor's cost management systems. The IMS shall be developed by logically networking (predecessor and successor logic) all discrete Contractor and principle subcontractor, critical subcontractor, and team member activities from contract award through program completion.” § “The IMS is an integrated, master schedule containing the networked, detailed tasks necessary to support the events, accomplishments, and criteria of the IMP, if applicable. The IMS should be a logical network–based schedule, based on sound technical planning, that is directly traceable to the contractor's cost and schedule reporting instrument used to address variances.” 1.6 Increasing Maturity is the Only Measure of Progress Measure the increasing maturity of the program work products and process as the indicator of progress. This is done by first identifying the Program Event where maturity assessment will take place. Using the DoD 5000.2 guidelines, this usually means § Contract Award (CA) or Authorization to Proceed (ATP) § System Requirements Review (SRR) § Integrated Baseline Review (IBR) § System Functional Review (SFR) § Preliminary Design Review (PDR) § Critical Design Review (CDR) § Test Readiness Review (TRR) § Flight or some kind of Operational Test (FT) When speaking to the increasing maturity of the program, we need to use the right semantics. The wording in the next picture is an approach for this wording. For each Program Event, Significant Accomplishment, and Accomplishment Criteria a past tense verb is needed. This approach is unsettling at first. But once put into practice it changes how work is discussed and progress is measured.
  23. Integrated Master Plan / Integrated Master Schedule Step-by-Step 16 | P a g e Glen B. Alleman, Copyright © 2021 Figure 5 – The content of the IMP elements (Event, Accomplishment, Criteria) makes use of a sentence ending in a past tense verb. There are a limited number of these verbs of most IMPs. They defined the state of the product or service that results from the activities that compose the Accomplishment Criteria – the tasks of the IMS. Learning to speak in the past tense of the basis of the IMP. Describing what “done” looks like requires a past tense verb be connected with “done.” Data Dictionary of IMP/IMS Verbs The best way out of these semantics discussions is to have a pre–defined data dictionary for the verbs in the IMP and IMS. Many RFP provides this dictionary and there are sources of verbs in other places. Verb Definition Approved The subject item, data, or document has been submitted to the Government and the Government has notified the contractor that it is acceptable. For some data items, it is specified that no response constitutes approval. Available The subject item is in place or the subject process is operational. The subject data or document is added to the Data Accession List and is accessible through Program/Project Assets or other media. Acquired Procured and/or fabricated and available Completed The subject item, data, document, or process is prepared or concluded and reviewed and accepted by the IPT or responsible team. Analyzed The subject parameter(s) has been technically evaluated through equations, charts, simulations, prototype testing, reduced data, etc. Conducted The subject meeting or review has been held with all required program participants. The presentation charts or minutes are available through Program/Project baseline along with assigned action items. Defined The subject item, data, document, or process is described in an appropriate description document that is available through Program/Project Assets or other media. Deficiencies Corrected New designs and/or procedures to correct documented deficiencies to requirements have been identified and incorporated into Delivered The appropriate user accepted the subject configuration item, data, or document. Documented Properly recorded items or activities requiring formal paperwork; completed reports and review by appropriate technical or management personnel. (If soft copy is available, it is made accessible on Program/Project Assets. Demonstrated The subject configuration item, data, or document demonstrates requirements compliance through verification or validation. Drafted An initial version (usually of a document) has been created which will require updating to finalize. Ended Complete; over Established The subject item is created and set in place in a manner consistent with its intended use, after review and acceptance by the IPT. The subject item has been set and documented. Finalized The subject data or document received contractor approvals, was distributed, and is available through Program/Project Assets or other media. Last set of planned revisions has been made or final approval has been obtained. Implemented The procedure or process is executed regularly, in accordance with established practice. Initiated The subject policy, approach, or procedure has started. Installed The subject item, system, or system provisions have been attached to their structural interfaces and to each other per their designs. Integrated The subject item or system has been consolidated into an entity (e.g., data requirements, document, and
  24. Integrated Master Plan / Integrated Master Schedule Step-by-Step Glen B. Alleman, Copyright © 2021 17 | P a g e Verb Definition configuration item) by appropriately combining separate requirements, functional disciplines, and configuration item considerations. Generated Required information has been placed into written form. Identified Made known and documented Implemented Put in place and/or begun Loaded The subject software item has been entered into the appropriate processor or processors’ memory space to allow program execution. Mated The subject structural item or modules and installed systems provisions have been attached at their interfaces per their designs. Operational The product or elements have been “delivered, tested, and certified ready for operation by the customer. Ready The subject configuration item was delivered to and accepted by the requiring IPT. Reduced The risk of the subject item is lowered according to the criteria established in the Risk Management Plan and approved by Risk Management Board (ROMB). Refined Next level of detail has been added or updates made. Released The subject item, data, or documents are complete, have contractor management approval, and are under revision control. Retired The risk of the subject item has been lowered sufficiently for the RMB to be removed from the program’s risk list. Submitted Formally submitted to the Government Tested The subject item, element, or process has been exercised under appropriate conditions in accordance with test plans, procedures, and measurements with an analysis of the data generated. Updated The subject item, process, data or document has been re–evaluated using later information, and adjustments have been incorporated. Validated The subject item, process, data, or document has been confirmed by objective evidence (e.g., tested using existing, accepted/approved procedures, instructions, or checklists) to have been accurately derived or determined, or has met all requirements for its intended use and performs its intended function(s). The Contractor/Customer team usually performs this certification. Verified The subject item has been evaluated against its specified requirements and characteristics and proven to meet documented requirements using analyses, demonstrations, inspections, or tests. Table 3 – Sample definitions of IMP verbs. Sometime the RFP provides a list of these verbs. Sometimes the verbs come from the standard procedures of the firm. In all cases, a dictionary of verbs is needed and should be limited to those verbs that describe actual outcomes meaningful to the customer and the provider. One example of why the dictionary shown in Table 3 is useful is in the simple use of the word completed. Many use the word Completed when they should use Complete. Complete is the state of the effort. Subtleties like this may seem wasteful but are critically important for the integrity of the IMP and IMS. Action verbs used in the Integrated Master Schedule (IMS) Tasks Another source of verbs for the IMP elements comes from the INCOSE Systems Engineering Glossary Verb Definition Allocate Apportion for a specific purpose or to a particular thing Analyze Solve by analysis Annotate Provide with comments Apply Put to use Ascertain Find out with certainty Assess Appraise critically. Attend Be present at Audit Officially examine Build Make by putting together Calculate Find out by computation Certify Endorse officially to attest conformance to set standards
  25. Integrated Master Plan / Integrated Master Schedule Step-by-Step 18 | P a g e Glen B. Alleman, Copyright © 2021 Verb Definition Chair Preside as chairman of Co-chair Chair jointly Collect Bring together into one body or place by careful selection Compare Find out likeness or differences Conduct Guide, lead, direct Consider Think about, decide Construct Put together, build Contribute Share in a joint effort (suggests furthering an end) Control Direct, regulate Coordinate Bring into a common action. movement or condition smoothly Create Cause to be, make Define Make clear, settle the limits; determine precise meaning of Demonstrate Prove or make clear by reasoning or evidence, illustrate, explain Design Perform an original act Determine Resolve, settle, decide Develop Bring into being or activity Differentiate Make a distinction between Down select Select a smaller number or group than originally existing Egress To depart from a mission, target, or threat area Erect Put together, set upright Establish Make firm, prove beyond dispute, gain acceptance of Estimate Approximate an opinion of Evaluate Find or fix the value of; examine and judge (non-monetary) Evolve Develop gradually, work out Examine Scrutinize to determine the nature, condition or quality of Explore Examine for discovery Extract Take out, deduce, select Fabricate Build, manufacture, invent Form Give shape to, establish Formulate Put together and express Generate Produce, cause to be Incorporate Unite thoroughly with something existing, blend Ingress To enter into a mission, target, or threat area Initiate Begin, take the first step of something that is to continue Input Feed information into a computer Inquire Ask, make a search of Inspect Examine carefully or officially; scrutinize for error or defect Install Place, put into position Institute Set up; establish, begin Integrate Add parts to make whole Interpret Explain the meaning of Investigate Search into, examine closely Judge Decide, form an estimate of Maintain Keep in an existing state, preserve from failure or decline Make Cause to come into being Manage Succeed in accomplishing, direct, achieve one's purpose
  26. Integrated Master Plan / Integrated Master Schedule Step-by-Step Glen B. Alleman, Copyright © 2021 19 | P a g e Verb Definition Manufacture Fabricate from raw materials Notice Comment upon, review Observe Inspect, watch Organize Integrate, arrange in a coherent unit Originate Initiate, give rise to Participate Take part in an undertaking, activity or discussion Perform Do, carry out, accomplish Plan Devise a scheme for doing or arranging activities to achieve an objective Prepare Make ready, put into written form Prioritize Assign priority Probe Investigate thoroughly Process Subject to a special process or treatment Produce Give birth or rise to Provide Supply what is needed for sustenance or support Pursue Seek, obtain, or accomplish Reason Think, influence another's actions Recommend Advise, attract favor of Record Set down in writing, or act of recording electronic reproduction Resolve Reduce by analysis, clear up Review Inspection, examination or evaluation Scan Look through hastily, survey from point to point Scrutinize Examine closely with attention to minute detail Search Examine to find something Seek Try to discover, make an attempt Select Take by preference from a number or group, make a choice Solve Find an answer Study Carefully examine or analyze Support Assist, help Trace Copy, or find by searching Track Observe or plot the path of Update Bring up to date Validate Verify, substantiate, and grant official sanction to. Table 4 – Action verbs to be used as the first word for each Task in the IMS. These verbs complement the verbs used at the end of the description of the IMP elements. 1.7 Logical Flow of Tasks within the Integrated Master Schedule (IMS) The linking of tasks starts with vertical linking of the AC collection of tasks. § Assign all tasks to As Late As Possible (ALAP) when building the Vertical Linking and the initial Horizontal linking. This allows a visible indication if the work fits "in the box" for each Program Event. § Link all tasks to their respective ACs and the ACs to their respective SAs and the SAs to the Program Event
  27. Integrated Master Plan / Integrated Master Schedule Step-by-Step 20 | P a g e Glen B. Alleman, Copyright © 2021 1.8 Decomposing the System There are several approaches to decomposing the system: § Pure top-down flow from a single system into sub–systems and sub– sub– systems. § Interfaces definitions between disparate systems managed through Interface Control Documents (ICD) in some way. § Functional decomposition through different engineering disciplines § Never should the decomposition be in a horizontal manner. Only a vertical approach should be used to develop the IMP and resulting IMS. There are many sources for this material. The following figure describes most of these and how they are arranged to produce the IMP and the IMS. Figure 6 – The source of guidance and materials for building the IMP and the IMS comes from a variety of sources. Some of official guidance from the government. Some from the RFP and many from training and guidance sources available on the web, through courses and books. Sources of Information for the IMP and IMS Another view of the source materials for the IMP and IMS is the DoD Version of PMBOK in Figure 7. This “notional” concept can actually be put into practice. The key is to make sure the WBS structure does not dominate the topology of the IMS. Instead, focus on the product deliverables as part of an “increasing maturity” process flow. This structure is the guiding framework for the IMP/IMS integration and emphasizes the fact that while the WBS/CWBS is critical, the Program Events and the decomposition of the Significant Accomplishments and Accomplishment Criteria are the real drivers of the IMS.
  28. Integrated Master Plan / Integrated Master Schedule Step-by-Step Glen B. Alleman, Copyright © 2021 21 | P a g e Figure 7 – The flow from requirements to WBS to tasks is replicated in the IMP and IMS. This traceability of critical in both the proposal environment, mandated by the §L and §M guidelines and the execution environment for the EVMS collection of physical progress to plan. Subsystems in DOORS or Some Requirements Management System If DOORS is used for the systems engineering requirements flowdown, then this is a good place to look for the structure of the program through a systems engineering point of view. Using the DOORS export the Requirements Tree can be exported. This requirements tree can then be used to structure the “product oriented” IMP elements past CDR, where the work is focused on delivering hardware or software. Work Break Down Structure (WBS) If there is a product WBS that decomposes the system properly into subsystems – and does NOT model the functional activities or functional departments. Remember the WBS is NOT the IMP. The WBS is a cost accounting and cost collection process. Starting with the WBS leads to an IMP that is focused cost, not on defining the increasing maturity of the program. Define the Program Events, their SAs and ACs – then add the WBS numbers to collect the costs of performing the work in the ACs. Logical Process Flow In every program, there is some kind of logical process flow to get from the contract award to the final product and contract close out. Defining this process flow is critical to defining the IMP. This can be done in several ways: § The best way is to convene a group of subject matter experts that understand how the product is designed, build, manufactured, and used. They can layout the process flow. With this layout, program events can be allocated to the various stages of the process flow. § Using the government’s program events, assign SAs and ACs from the process flow. This a reverse engineering approach, but very useful.
  29. Integrated Master Plan / Integrated Master Schedule Step-by-Step 22 | P a g e Glen B. Alleman, Copyright © 2021 § Connections between the IMP/IMS elements define how maturity is measured. § Fully defining each element and its interface is required – no missing elements are allowed. § The vertical and horizontal flows – together – are needed for success. 1.9 Process Flow of the IMP and IMS Elements The flow between the IMP and IMS elements is focused on demonstrating increasing maturity of the program. With this approach, the measurement of the program performance can take place using Earned Value measures of the deliverables produced by the Accomplishment Criteria. While Earned Value traditionally is applied to the Tasks within the Accomplishment Criteria, additional insight can be gained through the assessment of the ACs. These literally become the “accomplishment criteria” is measuring the increasing maturity. Figure 8 – The connections between the IMP and IMS elements are used to demonstrate the increasing mature of the program. These flows can also be connected to the Cross Reference Matrix (CRM) required in most proposals. As well traceability for program performance (EVMS measures) is provided through the IMP and IMS elements from various points of view. These connections are critical to the structural integrity of the IMS. There may be other attributes – SOW, SOO, IPT and the like, but the core connections are shown above. This allows the IMS to be "picked up" as an IMS or a WBS structure. The WBS can be used as a grouping field for the Activities, SAs, ACs and PEs if the summary tasks are ignored. This is another reason to structure the IMS first as a Vertical topology. Then the connections between work, the Exit Criteria of that work (AC) and the entry criteria for the Events – SAs can be separated from the WBS. While the WBS is very important to the cost accounting function and the cost structure for the customer, it has little value to the assessment of the increasing maturity of the IMS. This understanding is usually not found at first, when the concept of IMP/IMS is introduced. At first the concept of a CDRL as the deliverable is hard to grasp. Especially for those coming from the functional or production planning domain. Through PDR, the “product” of the program of represented in its physical form by the contents of the CDRL’s. it is the CDRL that is delivered at the review meetings. There may be long lead items, test software of hardware at PDR, but the majority of what “done” looks like at PDR and possibly CDR and 100% at SRR and SFR is the content of the CDRL documents.
Publicité