Individual final 2

G

ICI

Proposal 2
By
Goh Jia Jun
0323302
Content
page
Introduction & objective 1
Suggestion and proposal 2
Rationale 3
Benefits 4
Impacts 5
Bubble diagram 6
Conceptual plan 7
Schematic plan 9
Elevation 10
Project concept 11
Project management 15
Page | 1
Introduction
The site is located at Persiaran Damai Utama 2, Taman
Damai Utama, 47180 Puchong, Selangor and the area of the
proposed site is decided to be 50m x 70m , which is 3500 m2.
The proposed site is surrounded by residential area which is
Taman Damai Utama and Kinrara residence and commercial
area which is Melodi and Simfoni Kinrara. Beside the site is a
pump station and a substation. Apart from that, that is an
educational area beside the commercial area. There is a
recreational area such as tennis court and football field in the
park which is a bit far from the residential area.
Objective
i. Empty land is planned in a benefit use
ii. Provide a place for residents to do exercise
iii. Provide a place where resident can spend their time
together with their family during their free time
Page | 2
Suggestion and proposal
I decide our side to be a recreational area with an area of
50m x 70m (3500m2) inside a residential area.
Throughout the analysis of our site, I explored that this
area is lacking of more recreational area for residents. There is
an area of 9821m2 residential park with 1 football field and 3
tennis court but there isn’t provide any gymnasium and a
swimming pool. If residents of this area want to go gymnasium
or swimming pool they will take about 16 min for 8.3 km
journey to the nearest gymnasium and 21 min for 13.2 km. This
will waste a lot of time and money.
Apart from that, a restaurant so as people can have their
meals after exercise. There is a garden adjoin the badminton
stadium, gymnasium and restaurant.
In addition, there are 65 parking spaces provided for the
visitors surrounding the building so as people no need to park
their vehicles opposite the site and walk through 2 triple lane
roads or even facing lacking parking space problem.
There is an advertising sign on the top of the building. The
building is building in front a T-junction and this will be seen by
the drivers that using these roads.
Page | 3
Rationale
After done our analysis of the area, I decide to build a
recreation building for the site.
According to the analysis of the site, there is commercial
area opposite the residential area and also 2 parks with a football
field and 3 tennis court. The only thing that is lacking in the site
is recreation area such as gymnasium and swimming pool.
Resident need to waste lot of their time and money to
gymnasium and swimming pool.
There isn’t any available parking space surrounding the
site except opposite of it. But visitors need to walk through 2
triple lane roads from the commercial area and it is very
dangerous way to pass the roads especially 2 triple lane roads.
i. Lack of recreational area: Residents need a nearly
gymnasium and swimming pool to exercise and relax
ii. Lack of parking space: Residents can park their vehicles
in the parking space provided which are located beside the
building
iii. Great spot to develop a sport center: Residents can go to
restaurant opposite the site to recover or the mini market to
buy daily supplies
Page | 4
Benefits
1. Provide entertainment to the residents as there is no
gymnasium and swimming pool around this residential
area.
2. Provide a healthier lifestyle for residents
3. There is an advertising sign on the top of the building to
introduce to the consumers about their products and gain
their business.
4. Resident come to the site and spend will increase the
economic growth of the site
Page | 5
Impacts
1. This site will become a busy corner.
2. During public holiday, there will be a lot of people
coming to gym and swimming and 65 parking spaces
provided are totally not enough parking spaces at all for
a large amount of people. People will need to park at
commercial area which is located opposite of our site.
3. If the building is built and it will cause visual pollution ,
sound pollution and light pollution.
Page | 6
Bubble diagram of the proposed site
Ground floor
1st floor
Page | 7
Conceptual plan of the proposed site
Swimming pool
Walkway
Toilet
Store
Parking lot
entrance
exit
6m
3m
3m
Page | 8
Conceptual plan of the 1st
floor
Badminton stadium
Restaurant
Garden
Gymnasium
Toilet
Page | 9
Schematic plan of ground floor
Schematic plan of 1st
floor
Page | 10
East elevation
North elevation
Page | 11
Swimming pool
The swimming pool a semi-public pool which means any
pool restricted for use by residents, members, or registered
guests that is intended to be used for swimming or bathing.
The swimming pool is located on the ground floor of the
building. The size of the swimming pool is 25m x20 m (500m2).
This swimming pool can used to hold a competition as it’s a
standard size for competition. While the size of the kiddie
swimming pool is 9m x 11m and divided into 2 different depth
with increasing depth form 0.5m to 1.5m.
There are pool chairs used to relax after swimming are
prepared beside the pool. Besides that, 1 life guard chair will
placed beside the pool.
Page | 12
Gymnasium
The size of the gymnasium is 22m x 18m and it is built on
the 1st floor. There are prepared with lot of gymnasium
apparatus such as barbells, bench press, dumb bells and etc. 2
wall mirrors with a size of 18m x 2.5m placed opposite each
other. The gymnasium is designed to be an air-conditioner
gymnasium. Apart from that, a beverage machine is prepared at
the gymnasium.
Page | 13
Badminton Stadium
The badminton stadium is located at the 1st floor. The
standard size of a badminton court is 13.4m x 6.1m so there will
be 5 badminton courts in the stadium. The roof of the badminton
stadium and gymnasium will have a different height although
they are on the same floor because the height of badminton
stadium is 9.1m while gymnasium is 3.0m.
5 small benches against the wall are prepared for player to
put their personal belongings. Hanging lights will be 4.9m away
from floor.
Page | 14
Restaurant
The restaurant is located at the 1st floor and the size of the
restaurant is 8m x 22.4m. The restaurant is located beside the
badminton stadium and garden.
The restaurant is a place where the resident able to have
their meal to recover or rest after their exercises.
Page | 15
Project management task
Type of professioninvolvein this project
1. Architect
2. Contractor
3. Quantity surveyor
4. Landscape architect
5. Civil and structural engineer
6. Mechanical and electrical engineer
7. Supplier
Page | 16
Architect
Architect need to meet the client to discuss the concept
and design of the building and consult with other professionals.
He or she will leading a group of professionals such as
engineers, suppliers and etc. Architect needs to consider the
building and safety regulations, local planning regulations and
restrictions. Architect also advises the client on the project.
Architect produce detailed drawing and use computer-aided
design (CAD) to test feasibility of the building. He or she will
present feasibility reports and design proposals to clients
Architect need to keep within the budget that given by the client
and the deadline.
Architect will draw up tender document for contractors.
They will visit the site and meeting to ensure the project is
running on time and also the budget throughout the project and
they need to solve any problems that occur during construction.
Contractor
Contractor are responsible for overseeing construction on
the building. Contractor will work with architect to ensure the
project is implemented as planned and solve any issues during
constructions with architect. Contractor also gathers and
evaluate bids of the site and also from the sub-contractors.
Contractors must complete the project in daily to ensure that the
construction is complete in time and correct manner. They
coordinate specialty contractors and also provide skilled labour.
In addition, contractor also responsible for obtaining material.
Page | 17
Quantity surveyor
Quantity surveyor manage and control contract and cost
within construction project. They need to undertake the cost
analysis for repair and maintenance project work. Quantity
surveyor will use plans that drawn by architects to work out the
cost of constructing buildings and do a brief outline
specifications. They also prepare tender and contract documents.
As the development proceeds through many stages of design
phrase, the cost is always compared to the original construction
budget that was established at the feasibility stage. Quantity
surveyor prepare insurance replacement to estimate for building.
Apart from that, they need to identify, analysis and
develop responses to commercial risk. Lastly, they have to value
the completed work and arrange the payments.
LandscapeArchitect
Landscape architect need to research including urban
regeneration schemes, pedestrian schemes, road or retail
schemes, and maintaining the character of sites of natural beauty
before construction. He or she also need to meet the clients and
establish general landscape requirement with them. Beside that,
landscape architect need to match the client's wishes with your
knowledge of what will work best. Landscape architect need to
conduct preliminary studies of the site such as contours, soil,
ecology, buildings of the site.
They also carry out environment impact assessment. They
accurately preparing and presenting detailed plans and working
drawings, including applications, construction details and
specifications for the project using computer-aided design
(CAD) packages or similar design software . They also will
contact and coordinate manufacturers and suppliers.
Page | 18
Civil & structural engineer
Civil & structural engineer deal with the analysis and
design of structures that support loads. They undertake technical
and feasibility studies. They are responsible to design and plan
the hydraulic system and structure. They also advise architect
and client by using the most efficient method to provide in the
building. Apart from that, they prepare design calculations and
material specifications. They use software to calculate the load
and grade requirements, water flow rates, and also the material
stress factors. Before construction, they need to visit the site to
investigate and determine the suitability of the earth. Structural
engineer often take responsible in the organisation and delivery
of materials and equipment.
Electrical & mechanical engineer
Electrical & mechanical engineer carry out cost-effective
equipment modifications to ensure the safety of the building.
They develop, test and evaluate the design before the building is
used. They also discuss with the supplier, architect, contractor
and solve complex problems. They will use CAD to turn
research idea into technical plan before construction . After
construction, they need to take the responsible on maintenance
about 2-3 years.
Supplier
Supplier is responsible to supply material to the site. They
also need to ensure the quality and quantity of the material so as
the project goes smoothly. Supplier need to transport the
material to the site in time to make sure the project is done in
time. They sometimes also recognized as subcontractor because
of their large contributions to the project.

Recommandé

Ici- final project par
Ici- final projectIci- final project
Ici- final projectdinnahanny
300 vues34 diapositives
Energy- Efficient Architecture: Punjab Mandi Bhawan, Mohali, Punjab. par
Energy- Efficient Architecture: Punjab Mandi Bhawan, Mohali, Punjab.Energy- Efficient Architecture: Punjab Mandi Bhawan, Mohali, Punjab.
Energy- Efficient Architecture: Punjab Mandi Bhawan, Mohali, Punjab.Sarbjit Bahga
2.5K vues31 diapositives
FORM FOLLOWS SUN: Agriculture Bhawan, Mohali par
FORM FOLLOWS SUN: Agriculture Bhawan, MohaliFORM FOLLOWS SUN: Agriculture Bhawan, Mohali
FORM FOLLOWS SUN: Agriculture Bhawan, MohaliSarbjit Bahga
1.2K vues20 diapositives
PUNJAB MANDI BHAWAN, MOHALI, PUNJAB par
PUNJAB MANDI BHAWAN, MOHALI, PUNJABPUNJAB MANDI BHAWAN, MOHALI, PUNJAB
PUNJAB MANDI BHAWAN, MOHALI, PUNJABSarbjit Bahga
1.2K vues5 diapositives
Georgi_Bibin_Portfolio par
Georgi_Bibin_PortfolioGeorgi_Bibin_Portfolio
Georgi_Bibin_PortfolioGeorge Bibin
325 vues10 diapositives
Sustainable Architecture: Fruit and Vegetable Market at Mohali, Punjab. par
Sustainable Architecture:  Fruit and Vegetable Market at Mohali, Punjab.Sustainable Architecture:  Fruit and Vegetable Market at Mohali, Punjab.
Sustainable Architecture: Fruit and Vegetable Market at Mohali, Punjab.Sarbjit Bahga
22.3K vues30 diapositives

Contenu connexe

Tendances

ICI final project report par
ICI final project reportICI final project report
ICI final project reportqayyum23
413 vues25 diapositives
Ici final project (final) par
Ici final project (final)Ici final project (final)
Ici final project (final)Joe Onn Lim
1.9K vues26 diapositives
www.piramalbyculla.in Ahan Aranya, Byculla | 2/3 Bhk start 2.59 Cr Onwards‎ c... par
www.piramalbyculla.in Ahan Aranya, Byculla | 2/3 Bhk start 2.59 Cr Onwards‎ c...www.piramalbyculla.in Ahan Aranya, Byculla | 2/3 Bhk start 2.59 Cr Onwards‎ c...
www.piramalbyculla.in Ahan Aranya, Byculla | 2/3 Bhk start 2.59 Cr Onwards‎ c...Real Estate & Property Investments
68 vues7 diapositives
Introduction to construction industry par
Introduction to construction industryIntroduction to construction industry
Introduction to construction industryyenweizheng
1.6K vues28 diapositives
Emma Shrestha Portfolio par
Emma Shrestha PortfolioEmma Shrestha Portfolio
Emma Shrestha PortfolioEMMA SHRESTHA
258 vues12 diapositives
Godrej vihaa Badlapur Project Details par
Godrej vihaa Badlapur Project Details Godrej vihaa Badlapur Project Details
Godrej vihaa Badlapur Project Details Anil menon
255 vues34 diapositives

Tendances(15)

En vedette

Nasscom Foundation par
Nasscom FoundationNasscom Foundation
Nasscom FoundationBeth Kanter
1.3K vues73 diapositives
English project 2 presentation par
English project 2 presentationEnglish project 2 presentation
English project 2 presentationgjj97
140 vues36 diapositives
Trabajo arte islámico 2ºESO B par
Trabajo arte islámico 2ºESO BTrabajo arte islámico 2ºESO B
Trabajo arte islámico 2ºESO BAj gps
566 vues6 diapositives
Teoria de la adm. par
Teoria de la adm.Teoria de la adm.
Teoria de la adm.escuela de derecho
48 vues4 diapositives
Ann Pettifor - Green New Deal par
Ann Pettifor - Green New DealAnn Pettifor - Green New Deal
Ann Pettifor - Green New Dealsearch_f
685 vues49 diapositives
Entrepreneurship & Business Ethics Unit Vocabulary par
Entrepreneurship & Business Ethics Unit VocabularyEntrepreneurship & Business Ethics Unit Vocabulary
Entrepreneurship & Business Ethics Unit Vocabularywhita1bd
768 vues6 diapositives

En vedette(17)

Nasscom Foundation par Beth Kanter
Nasscom FoundationNasscom Foundation
Nasscom Foundation
Beth Kanter1.3K vues
English project 2 presentation par gjj97
English project 2 presentationEnglish project 2 presentation
English project 2 presentation
gjj97140 vues
Trabajo arte islámico 2ºESO B par Aj gps
Trabajo arte islámico 2ºESO BTrabajo arte islámico 2ºESO B
Trabajo arte islámico 2ºESO B
Aj gps566 vues
Ann Pettifor - Green New Deal par search_f
Ann Pettifor - Green New DealAnn Pettifor - Green New Deal
Ann Pettifor - Green New Deal
search_f685 vues
Entrepreneurship & Business Ethics Unit Vocabulary par whita1bd
Entrepreneurship & Business Ethics Unit VocabularyEntrepreneurship & Business Ethics Unit Vocabulary
Entrepreneurship & Business Ethics Unit Vocabulary
whita1bd768 vues
Top ten attractions in seattle par TraveleZe
Top ten attractions in seattleTop ten attractions in seattle
Top ten attractions in seattle
TraveleZe408 vues
Παρατηρήσεις - Συμπεράσματα par demikok
Παρατηρήσεις -  ΣυμπεράσματαΠαρατηρήσεις -  Συμπεράσματα
Παρατηρήσεις - Συμπεράσματα
demikok121 vues
Kuptimi i thelle i bashkepunimit te jashtem byirena kotobelli par irena kotobelli
Kuptimi i thelle i bashkepunimit te jashtem byirena kotobelliKuptimi i thelle i bashkepunimit te jashtem byirena kotobelli
Kuptimi i thelle i bashkepunimit te jashtem byirena kotobelli
irena kotobelli218 vues
Berita Paroki 31 Juli 2016 par karangpanas
Berita Paroki 31 Juli 2016Berita Paroki 31 Juli 2016
Berita Paroki 31 Juli 2016
karangpanas2K vues
Estimation immobilière: comment évaluer le prix de son bien immobilier ? par Tadam
Estimation immobilière: comment évaluer le prix de son bien immobilier ?Estimation immobilière: comment évaluer le prix de son bien immobilier ?
Estimation immobilière: comment évaluer le prix de son bien immobilier ?
Tadam2K vues
Plan aktiviteti me nxënësit si qender komunitare par Anisa Kreka
Plan aktiviteti me nxënësit si qender komunitarePlan aktiviteti me nxënësit si qender komunitare
Plan aktiviteti me nxënësit si qender komunitare
Anisa Kreka7.7K vues
Curso de-capacitación-avanzado par Vicky Guerra
Curso de-capacitación-avanzadoCurso de-capacitación-avanzado
Curso de-capacitación-avanzado
Vicky Guerra198 vues

Similaire à Individual final 2

ici copy par
ici copyici copy
ici copyjie0117
297 vues42 diapositives
ICI FINAL PROJECT par
ICI FINAL PROJECT ICI FINAL PROJECT
ICI FINAL PROJECT Yip Xiaojung
169 vues42 diapositives
ICI FINAL PROJECT (INDIVIDUAL) MARCH'15 par
ICI FINAL PROJECT (INDIVIDUAL) MARCH'15ICI FINAL PROJECT (INDIVIDUAL) MARCH'15
ICI FINAL PROJECT (INDIVIDUAL) MARCH'15kellyxc
723 vues20 diapositives
Individual ici par
Individual iciIndividual ici
Individual iciwongmeixin123
112 vues12 diapositives
ICI Final Project par
ICI Final ProjectICI Final Project
ICI Final ProjectLek Yuen
233 vues36 diapositives
Individual proposal par
 Individual proposal Individual proposal
Individual proposalchristinelee1996
237 vues29 diapositives

Similaire à Individual final 2(20)

ici copy par jie0117
ici copyici copy
ici copy
jie0117297 vues
ICI FINAL PROJECT (INDIVIDUAL) MARCH'15 par kellyxc
ICI FINAL PROJECT (INDIVIDUAL) MARCH'15ICI FINAL PROJECT (INDIVIDUAL) MARCH'15
ICI FINAL PROJECT (INDIVIDUAL) MARCH'15
kellyxc723 vues
ICI Final Project par Lek Yuen
ICI Final ProjectICI Final Project
ICI Final Project
Lek Yuen233 vues
Ici proposal combined par Janson Chen
Ici proposal combinedIci proposal combined
Ici proposal combined
Janson Chen240 vues
LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT ) par IAMLETTY
LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )
LETTY'S INDIVIDUAL PROPOSAL ( ICI FINAL OROJECT )
IAMLETTY174 vues
Development Proposal par dtan97
Development ProposalDevelopment Proposal
Development Proposal
dtan97433 vues
Ici final-project (Individual) par Ong En
Ici final-project (Individual)Ici final-project (Individual)
Ici final-project (Individual)
Ong En277 vues
Summer Internship Report of Civil Engineering in Construction Site par RAVI KUMAR
Summer Internship Report of Civil Engineering in Construction SiteSummer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction Site
RAVI KUMAR27.1K vues
Congress heights community meeting 03 26 2019 par RamaChilamkurthy
Congress heights community meeting   03 26 2019Congress heights community meeting   03 26 2019
Congress heights community meeting 03 26 2019
RamaChilamkurthy1.7K vues
Ici final project par AdeleLu
Ici final projectIci final project
Ici final project
AdeleLu314 vues
Ici final-project proposal par Dana Kan
Ici final-project proposalIci final-project proposal
Ici final-project proposal
Dana Kan 2.4K vues
Ici final project par AdeleLu
Ici final projectIci final project
Ici final project
AdeleLu215 vues

Plus de gjj97

Cones and frustum slides par
Cones and frustum slidesCones and frustum slides
Cones and frustum slidesgjj97
623 vues17 diapositives
Psy report par
Psy reportPsy report
Psy reportgjj97
256 vues10 diapositives
Psychology final presentation slide(3) par
Psychology final presentation slide(3)Psychology final presentation slide(3)
Psychology final presentation slide(3)gjj97
208 vues9 diapositives
Project brief par
Project briefProject brief
Project briefgjj97
85 vues2 diapositives
Psycho par
PsychoPsycho
Psychogjj97
173 vues15 diapositives
Psychology final par
Psychology finalPsychology final
Psychology finalgjj97
143 vues15 diapositives

Plus de gjj97(20)

Cones and frustum slides par gjj97
Cones and frustum slidesCones and frustum slides
Cones and frustum slides
gjj97623 vues
Psy report par gjj97
Psy reportPsy report
Psy report
gjj97256 vues
Psychology final presentation slide(3) par gjj97
Psychology final presentation slide(3)Psychology final presentation slide(3)
Psychology final presentation slide(3)
gjj97208 vues
Project brief par gjj97
Project briefProject brief
Project brief
gjj9785 vues
Psycho par gjj97
PsychoPsycho
Psycho
gjj97173 vues
Psychology final par gjj97
Psychology finalPsychology final
Psychology final
gjj97143 vues
Final math par gjj97
Final math Final math
Final math
gjj97137 vues
Math module outline jan 2015 par gjj97
Math module outline jan 2015Math module outline jan 2015
Math module outline jan 2015
gjj97282 vues
Maths project brief jan 2015 project - statistics par gjj97
Maths project brief jan 2015 project - statisticsMaths project brief jan 2015 project - statistics
Maths project brief jan 2015 project - statistics
gjj97197 vues
Exercise 1 area and volume par gjj97
Exercise 1  area and volumeExercise 1  area and volume
Exercise 1 area and volume
gjj9798 vues
course outline september2015semester par gjj97
course outline september2015semestercourse outline september2015semester
course outline september2015semester
gjj97240 vues
economics assignment sept 2015 intake par gjj97
economics assignment sept 2015 intakeeconomics assignment sept 2015 intake
economics assignment sept 2015 intake
gjj97233 vues
Accounting final project 2 par gjj97
Accounting final project 2 Accounting final project 2
Accounting final project 2
gjj97142 vues
Lbs annualreport2012-160203133302 par gjj97
Lbs annualreport2012-160203133302Lbs annualreport2012-160203133302
Lbs annualreport2012-160203133302
gjj97322 vues
Lbs annualreport2013-160203133531 par gjj97
Lbs annualreport2013-160203133531Lbs annualreport2013-160203133531
Lbs annualreport2013-160203133531
gjj97472 vues
Acc30205 basic accounting assignment september 2015(1) par gjj97
Acc30205 basic accounting assignment   september 2015(1)Acc30205 basic accounting assignment   september 2015(1)
Acc30205 basic accounting assignment september 2015(1)
gjj97193 vues
Acc30205 new course outline september 2015 semester par gjj97
Acc30205 new course outline   september 2015 semesterAcc30205 new course outline   september 2015 semester
Acc30205 new course outline september 2015 semester
gjj97121 vues
Eng report final par gjj97
Eng report finalEng report final
Eng report final
gjj97301 vues
Presentationslides1 160124065549 par gjj97
Presentationslides1 160124065549Presentationslides1 160124065549
Presentationslides1 160124065549
gjj97125 vues
Course outline english par gjj97
Course outline englishCourse outline english
Course outline english
gjj97358 vues

Dernier

Computer Introduction-Lecture06 par
Computer Introduction-Lecture06Computer Introduction-Lecture06
Computer Introduction-Lecture06Dr. Mazin Mohamed alkathiri
105 vues12 diapositives
Jibachha publishing Textbook.docx par
Jibachha publishing Textbook.docxJibachha publishing Textbook.docx
Jibachha publishing Textbook.docxDrJibachhaSahVetphys
51 vues14 diapositives
The Value and Role of Media and Information Literacy in the Information Age a... par
The Value and Role of Media and Information Literacy in the Information Age a...The Value and Role of Media and Information Literacy in the Information Age a...
The Value and Role of Media and Information Literacy in the Information Age a...Naseej Academy أكاديمية نسيج
58 vues42 diapositives
CONTENTS.pptx par
CONTENTS.pptxCONTENTS.pptx
CONTENTS.pptxiguerendiain
62 vues17 diapositives
The basics - information, data, technology and systems.pdf par
The basics - information, data, technology and systems.pdfThe basics - information, data, technology and systems.pdf
The basics - information, data, technology and systems.pdfJonathanCovena1
146 vues1 diapositive
ICS3211_lecture 09_2023.pdf par
ICS3211_lecture 09_2023.pdfICS3211_lecture 09_2023.pdf
ICS3211_lecture 09_2023.pdfVanessa Camilleri
115 vues10 diapositives

Dernier(20)

The basics - information, data, technology and systems.pdf par JonathanCovena1
The basics - information, data, technology and systems.pdfThe basics - information, data, technology and systems.pdf
The basics - information, data, technology and systems.pdf
JonathanCovena1146 vues
REPRESENTATION - GAUNTLET.pptx par iammrhaywood
REPRESENTATION - GAUNTLET.pptxREPRESENTATION - GAUNTLET.pptx
REPRESENTATION - GAUNTLET.pptx
iammrhaywood138 vues
How to empty an One2many field in Odoo par Celine George
How to empty an One2many field in OdooHow to empty an One2many field in Odoo
How to empty an One2many field in Odoo
Celine George87 vues
Relationship of psychology with other subjects. par palswagata2003
Relationship of psychology with other subjects.Relationship of psychology with other subjects.
Relationship of psychology with other subjects.
palswagata200352 vues
Classification of crude drugs.pptx par GayatriPatra14
Classification of crude drugs.pptxClassification of crude drugs.pptx
Classification of crude drugs.pptx
GayatriPatra14101 vues
Pharmaceutical Inorganic chemistry UNIT-V Radiopharmaceutical.pptx par Ms. Pooja Bhandare
Pharmaceutical Inorganic chemistry UNIT-V Radiopharmaceutical.pptxPharmaceutical Inorganic chemistry UNIT-V Radiopharmaceutical.pptx
Pharmaceutical Inorganic chemistry UNIT-V Radiopharmaceutical.pptx
CUNY IT Picciano.pptx par apicciano
CUNY IT Picciano.pptxCUNY IT Picciano.pptx
CUNY IT Picciano.pptx
apicciano54 vues
11.30.23 Poverty and Inequality in America.pptx par mary850239
11.30.23 Poverty and Inequality in America.pptx11.30.23 Poverty and Inequality in America.pptx
11.30.23 Poverty and Inequality in America.pptx
mary850239173 vues
Class 9 lesson plans par TARIQ KHAN
Class 9 lesson plansClass 9 lesson plans
Class 9 lesson plans
TARIQ KHAN51 vues
Psychology KS5 par WestHatch
Psychology KS5Psychology KS5
Psychology KS5
WestHatch119 vues
Ch. 7 Political Participation and Elections.pptx par Rommel Regala
Ch. 7 Political Participation and Elections.pptxCh. 7 Political Participation and Elections.pptx
Ch. 7 Political Participation and Elections.pptx
Rommel Regala111 vues
Solar System and Galaxies.pptx par DrHafizKosar
Solar System and Galaxies.pptxSolar System and Galaxies.pptx
Solar System and Galaxies.pptx
DrHafizKosar106 vues

Individual final 2

  • 1. Proposal 2 By Goh Jia Jun 0323302
  • 2. Content page Introduction & objective 1 Suggestion and proposal 2 Rationale 3 Benefits 4 Impacts 5 Bubble diagram 6 Conceptual plan 7 Schematic plan 9 Elevation 10 Project concept 11 Project management 15
  • 3. Page | 1 Introduction The site is located at Persiaran Damai Utama 2, Taman Damai Utama, 47180 Puchong, Selangor and the area of the proposed site is decided to be 50m x 70m , which is 3500 m2. The proposed site is surrounded by residential area which is Taman Damai Utama and Kinrara residence and commercial area which is Melodi and Simfoni Kinrara. Beside the site is a pump station and a substation. Apart from that, that is an educational area beside the commercial area. There is a recreational area such as tennis court and football field in the park which is a bit far from the residential area. Objective i. Empty land is planned in a benefit use ii. Provide a place for residents to do exercise iii. Provide a place where resident can spend their time together with their family during their free time
  • 4. Page | 2 Suggestion and proposal I decide our side to be a recreational area with an area of 50m x 70m (3500m2) inside a residential area. Throughout the analysis of our site, I explored that this area is lacking of more recreational area for residents. There is an area of 9821m2 residential park with 1 football field and 3 tennis court but there isn’t provide any gymnasium and a swimming pool. If residents of this area want to go gymnasium or swimming pool they will take about 16 min for 8.3 km journey to the nearest gymnasium and 21 min for 13.2 km. This will waste a lot of time and money. Apart from that, a restaurant so as people can have their meals after exercise. There is a garden adjoin the badminton stadium, gymnasium and restaurant. In addition, there are 65 parking spaces provided for the visitors surrounding the building so as people no need to park their vehicles opposite the site and walk through 2 triple lane roads or even facing lacking parking space problem. There is an advertising sign on the top of the building. The building is building in front a T-junction and this will be seen by the drivers that using these roads.
  • 5. Page | 3 Rationale After done our analysis of the area, I decide to build a recreation building for the site. According to the analysis of the site, there is commercial area opposite the residential area and also 2 parks with a football field and 3 tennis court. The only thing that is lacking in the site is recreation area such as gymnasium and swimming pool. Resident need to waste lot of their time and money to gymnasium and swimming pool. There isn’t any available parking space surrounding the site except opposite of it. But visitors need to walk through 2 triple lane roads from the commercial area and it is very dangerous way to pass the roads especially 2 triple lane roads. i. Lack of recreational area: Residents need a nearly gymnasium and swimming pool to exercise and relax ii. Lack of parking space: Residents can park their vehicles in the parking space provided which are located beside the building iii. Great spot to develop a sport center: Residents can go to restaurant opposite the site to recover or the mini market to buy daily supplies
  • 6. Page | 4 Benefits 1. Provide entertainment to the residents as there is no gymnasium and swimming pool around this residential area. 2. Provide a healthier lifestyle for residents 3. There is an advertising sign on the top of the building to introduce to the consumers about their products and gain their business. 4. Resident come to the site and spend will increase the economic growth of the site
  • 7. Page | 5 Impacts 1. This site will become a busy corner. 2. During public holiday, there will be a lot of people coming to gym and swimming and 65 parking spaces provided are totally not enough parking spaces at all for a large amount of people. People will need to park at commercial area which is located opposite of our site. 3. If the building is built and it will cause visual pollution , sound pollution and light pollution.
  • 8. Page | 6 Bubble diagram of the proposed site Ground floor 1st floor
  • 9. Page | 7 Conceptual plan of the proposed site Swimming pool Walkway Toilet Store Parking lot entrance exit 6m 3m 3m
  • 10. Page | 8 Conceptual plan of the 1st floor Badminton stadium Restaurant Garden Gymnasium Toilet
  • 11. Page | 9 Schematic plan of ground floor Schematic plan of 1st floor
  • 12. Page | 10 East elevation North elevation
  • 13. Page | 11 Swimming pool The swimming pool a semi-public pool which means any pool restricted for use by residents, members, or registered guests that is intended to be used for swimming or bathing. The swimming pool is located on the ground floor of the building. The size of the swimming pool is 25m x20 m (500m2). This swimming pool can used to hold a competition as it’s a standard size for competition. While the size of the kiddie swimming pool is 9m x 11m and divided into 2 different depth with increasing depth form 0.5m to 1.5m. There are pool chairs used to relax after swimming are prepared beside the pool. Besides that, 1 life guard chair will placed beside the pool.
  • 14. Page | 12 Gymnasium The size of the gymnasium is 22m x 18m and it is built on the 1st floor. There are prepared with lot of gymnasium apparatus such as barbells, bench press, dumb bells and etc. 2 wall mirrors with a size of 18m x 2.5m placed opposite each other. The gymnasium is designed to be an air-conditioner gymnasium. Apart from that, a beverage machine is prepared at the gymnasium.
  • 15. Page | 13 Badminton Stadium The badminton stadium is located at the 1st floor. The standard size of a badminton court is 13.4m x 6.1m so there will be 5 badminton courts in the stadium. The roof of the badminton stadium and gymnasium will have a different height although they are on the same floor because the height of badminton stadium is 9.1m while gymnasium is 3.0m. 5 small benches against the wall are prepared for player to put their personal belongings. Hanging lights will be 4.9m away from floor.
  • 16. Page | 14 Restaurant The restaurant is located at the 1st floor and the size of the restaurant is 8m x 22.4m. The restaurant is located beside the badminton stadium and garden. The restaurant is a place where the resident able to have their meal to recover or rest after their exercises.
  • 17. Page | 15 Project management task Type of professioninvolvein this project 1. Architect 2. Contractor 3. Quantity surveyor 4. Landscape architect 5. Civil and structural engineer 6. Mechanical and electrical engineer 7. Supplier
  • 18. Page | 16 Architect Architect need to meet the client to discuss the concept and design of the building and consult with other professionals. He or she will leading a group of professionals such as engineers, suppliers and etc. Architect needs to consider the building and safety regulations, local planning regulations and restrictions. Architect also advises the client on the project. Architect produce detailed drawing and use computer-aided design (CAD) to test feasibility of the building. He or she will present feasibility reports and design proposals to clients Architect need to keep within the budget that given by the client and the deadline. Architect will draw up tender document for contractors. They will visit the site and meeting to ensure the project is running on time and also the budget throughout the project and they need to solve any problems that occur during construction. Contractor Contractor are responsible for overseeing construction on the building. Contractor will work with architect to ensure the project is implemented as planned and solve any issues during constructions with architect. Contractor also gathers and evaluate bids of the site and also from the sub-contractors. Contractors must complete the project in daily to ensure that the construction is complete in time and correct manner. They coordinate specialty contractors and also provide skilled labour. In addition, contractor also responsible for obtaining material.
  • 19. Page | 17 Quantity surveyor Quantity surveyor manage and control contract and cost within construction project. They need to undertake the cost analysis for repair and maintenance project work. Quantity surveyor will use plans that drawn by architects to work out the cost of constructing buildings and do a brief outline specifications. They also prepare tender and contract documents. As the development proceeds through many stages of design phrase, the cost is always compared to the original construction budget that was established at the feasibility stage. Quantity surveyor prepare insurance replacement to estimate for building. Apart from that, they need to identify, analysis and develop responses to commercial risk. Lastly, they have to value the completed work and arrange the payments. LandscapeArchitect Landscape architect need to research including urban regeneration schemes, pedestrian schemes, road or retail schemes, and maintaining the character of sites of natural beauty before construction. He or she also need to meet the clients and establish general landscape requirement with them. Beside that, landscape architect need to match the client's wishes with your knowledge of what will work best. Landscape architect need to conduct preliminary studies of the site such as contours, soil, ecology, buildings of the site. They also carry out environment impact assessment. They accurately preparing and presenting detailed plans and working drawings, including applications, construction details and specifications for the project using computer-aided design (CAD) packages or similar design software . They also will contact and coordinate manufacturers and suppliers.
  • 20. Page | 18 Civil & structural engineer Civil & structural engineer deal with the analysis and design of structures that support loads. They undertake technical and feasibility studies. They are responsible to design and plan the hydraulic system and structure. They also advise architect and client by using the most efficient method to provide in the building. Apart from that, they prepare design calculations and material specifications. They use software to calculate the load and grade requirements, water flow rates, and also the material stress factors. Before construction, they need to visit the site to investigate and determine the suitability of the earth. Structural engineer often take responsible in the organisation and delivery of materials and equipment. Electrical & mechanical engineer Electrical & mechanical engineer carry out cost-effective equipment modifications to ensure the safety of the building. They develop, test and evaluate the design before the building is used. They also discuss with the supplier, architect, contractor and solve complex problems. They will use CAD to turn research idea into technical plan before construction . After construction, they need to take the responsible on maintenance about 2-3 years. Supplier Supplier is responsible to supply material to the site. They also need to ensure the quality and quantity of the material so as the project goes smoothly. Supplier need to transport the material to the site in time to make sure the project is done in time. They sometimes also recognized as subcontractor because of their large contributions to the project.