More Related Content
Similar to TTS Presentation (20)
TTS Presentation
- 1. | We Know Gas Turbines
We Know Gas Turbines
‹#›
© 2009 Turbine Technology Services Corporation. Proprietary and Confidential. www.turbinetech.com
- 2. About Us
Since 1983 TTS has been proving the power generation industry with
high quality, cost-effective alternatives to the OEM.
TTS has offered its innovative control solutions, and modernization
and upgrade services to the gas turbine industry, from state-of-the-art
control components, combustion and dynamic tuning to performance
testing on the latest “F” technology equipment.
Turbine Technology Services is proud to celebrate 28 years of
engineering excellence and industry expertise, delivering results in the
gas turbine and power generation industries.
‹#›
© 2009 Turbine Technology Services Corporation. Proprietary and Confidential. www.turbinetech.com
- 3. Mission
Turbine Technology Services
Turbine Technology Services’
mission is to provide gas turbine
mission is to provide gas turbine
technology expertise and engineering
technology expertise and
construction services on a global
engineering construction services
scale.
on a global scale.
Experience and knowledge of
Experience and knowledge of
solutions has lead to the successful
solutions has lead to the
management of gas turbine
successful management of gas
installation and modernization
turbine installation and
projects, and the servicing of control
modernization projects, and the
components, combustion and
servicing of control components,
dynamic tuning for clients’ power
combustion and dynamic tuning
plants.
for clients’ power plants.
‹#›
© 2009 Turbine Technology Services Corporation. Proprietary and Confidential. www.turbinetech.com
- 4. Global Footprint
Turbine Technology Services’ engineers have worked for diverse
companies in the industry all around the globe and bring this depth of
knowledge and experience to our company to secure a strong global
presence:
Angola Ecuador Nigeria
Argentina Germany Philippines
Australia Hungary Thailand
Bangladesh Indonesia USA
Brazil Iraq UAE
Chile Kuwait Venezuela
Costa Rica Mexico Colombia
Canada Bolivia Curacao
Our team of professionals can work with local and state governments, as
well as other industry partners in developing solutions that can get the job
done on time, within budget and with efficiency.
‹#›
© 2009 Turbine Technology Services Corporation. Proprietary and Confidential. www.turbinetech.com
- 5. Engineering & Consulting Services
Industry-Leading Consulting
Turbine Technology offers industry-leading consulting, design and
construction services to gas turbine owners, operators and other power
plant developers worldwide. Our multi-disciplinary team provides expertise
through all phases of power generation.
•Control Systems
•Construction and Design Services
•Project Management
•Technical Direction
•Troubleshooting and Maintenance
•Start-Up Commissioning Services
•Combustor Dynamics and Emissions Tuning
•Unit Performance Optimization Program
•TTS Remote Access Support
‹#›
© 2009 Turbine Technology Services Corporation. Proprietary and Confidential. www.turbinetech.com
- 6. Conversion, Modification And Upgrade Services
REDUCING COST THROUGH MODERNIZATION
Modernizing or upgrading a gas turbine can lead to
the improvement of component durability and its
benefits can result in reducing the need to replace or
recondition parts and components. Turbine
Technology Services can provide engineering and
consulting services to include projects such as:
•Frequency Conversions
•Fuel System Conversions
•Emissions Abatement System
•Auxiliary System Modification
•Instrumentation and Control System Modification
‹#›
© 2009 Turbine Technology Services Corporation. Proprietary and Confidential. www.turbinetech.com
- 7. Turbine Installation And Reapplication Services
New Unit Installation and Commissions
Since 1988, we have been involved in the relocation of more
than 80 gas turbines in diverse locations throughout the
world and have a depth of knowledge about the demands
and requirements of such projects, including:
•Original plant disassembly
•Transportation and Logistics
•New plant layout engineering
•Fuel conversions
•Electrical one-line and protection engineering
•Emissions control and compliance
•Equipment upgrades and modifications
‹#›
© 2009 Turbine Technology Services Corporation. Proprietary and Confidential. www.turbinetech.com
- 8. Turbine Management Systems
We build our TMS-1000 utilizing the Allen Bradley®
ControlLogix® platform, one the most advanced
programmable controller platforms available today,in order
to take advantage of the latest in distributed control
philosophy.
Turbine Technology Services supplies a complete
package of engineering, hardware, and technical support to
complete the control system upgrade, which includes overall
system design; all controller and operator interface
hardware, software, and installation drawings; instruction
manuals; and technical direction for system commissioning.
‹#›
© 2009 Turbine Technology Services Corporation. Proprietary and Confidential. www.turbinetech.com
- 9. Turbine Management System
• Benefits:
– Open architecture design
– Locally available components and technical
support
– Independence from the OEM
– Reduced system lifetime costs
– Capability of interfacing with other systems
– Increased system flexibility and expandability
– Capability to interface with other
communication protocols
– Improved/Simplified remote control options
– Integration of balance of plant controls
‹#›
©© 2009 Turbine Technology Services Corporation. Proprietary and Confidential.
2011 Turbine Technology Services Corporation. Proprietary and Confidential. www.turbinetech.com
www.turbinetech.com
- 10. Recent Projects
‹#›
© 2009 Turbine Technology Services Corporation. Proprietary and Confidential. www.turbinetech.com
- 11. Frequency Conversion – Kuwait
•Four - Frame 7EA turbine-generator sets in 2009
•Made history being first company to engineer and install Frame
7EA turbine-generators in a 50HZ country
•Required long and complex engineering process, much had to be
performed on site
•Frequency conversion required the addition of:
•Gearbox, auxiliaries and generator modifications
•Plant layout engineering, generator design and protection
•Plant electrical design and diesel starting systems
•Modifications to all on base auxiliaries and control
engineering
•Further complicated by need to replace existing natural gas-
only DLN combustion system with a standard combustor, dual-
fuel and water injected system
‹#›
© 2009 Turbine Technology Services Corporation. Proprietary and Confidential. www.turbinetech.com
- 12. MK V Replacement - DLN 1
• Replace GE MK V system utilizing
commercially available PLC
processors and hardware
• Utilize existing control panel
footprint, install permanent
dynamics monitoring hardware and
provide portable dynamics
monitoring system
• Establish remote access to both the
gas turbine control system and
dynamics monitoring system
• Provide “real time” start-up and
operational support through remote
connections
‹#›
© 2009 Turbine Technology Services Corporation. Proprietary and Confidential. www.turbinetech.com
- 13. Emergency Control Cab
• Build of barge-mounted Frame 6 control cab, completed in 12
weeks and air freighted to Nigeria from Houston, TX
• Cab Equipment
• Turbine Controls, Barge MCC and medium and high voltage
switchgear
• Commissioning and start-up in 4 weeks
‹#›
© 2009 Turbine Technology Services Corporation. Proprietary and Confidential. www.turbinetech.com
- 14. Frame 5 Rehabilitation
•Williams Gas, Cameron, LA, 2005
•Electrical rehabilitation of MS5001
after Hurricane Rita
•Existing System-Woodward Netcon
5000.
•TTS scope included:
Rewire entire unit
Replace or repair all electrical
components
Rebuild control systems
TTS supplied Controls Engineer,
Project Manager, craft labor.
Service completed within (16
weeks).
‹#›
© 2009 Turbine Technology Services Corporation. Proprietary and Confidential. www.turbinetech.com
- 15. Frame 5 Upgrade - Indonesia
•Gas conversion
•Turbine control system upgrade, built
in Jebel Ali
•Generator control system upgrade
‹#›
© 2009 Turbine Technology Services Corporation. Proprietary and Confidential. www.turbinetech.com
- 16. Remote Monitoring - Iraq
•52 gas turbines at 13 sites in Iraq
•8 different control systems and 4 different Human-
Machine Interfaces (“HMI”)
•Modbus communication and VSAT data transfer
•Redundant hardware and alarm management
system
•Historian, trending and archive
•One central monitoring station (“CMS”) with
redundant processors at each site
•Information is compiled from each site, sent via
satellite to the CMS, and translated into a common
protocol for operator monitoring
‹#›
© 2009 Turbine Technology Services Corporation. Proprietary and Confidential. www.turbinetech.com
- 17. 100 MW Power Barge Construction Completion &
Commissioning – Westinghouse 251B11 Gas Turbine qty 2
•Barge was in storage for over 10 years in a shipyard in Malaysia where it had been
partially constructed.
•Managed dry dock operations in the Philippines including hull work and recertification
•Replaced Turbine Control System with TMS-1000 digital system.
•Replaced Generator Excitation System with Brush A32 digital system.
•Completed HV and MV electrical system installation and commissioning.
•Completed mechanical systems
installation and commissioning.
•Completed instrumentation system
installation, calibration and
commissioning.
•Completed total system
commissioning using a 50MVA load
bank.
•Less than 4 months in duration
•Barge relocated to Luanda, Angola.
‹#›
© 2009 Turbine Technology Services Corporation. Proprietary and Confidential. www.turbinetech.com
- 18. 100 MW Power Barge Total Plant Refurbishment –
Westinghouse 501D5 Gas Turbine
•Barge was in storage for 10 years without operation
•Managed dry dock operations including hull work and recertification
•Performed hot gas path inspection
•Replaced control system with TMS-1000 digital controls
•Complete HV and MV electrical system check out and
recertification
•Complete mechanical systems
check out and refurbishment
•Complete instrumentation check
out and calibration
•Main transformer replacement
•Total plant recomissioning
•Less than 3 months in duration
•Barge relocated to Lake
Maracaibo, Vz
‹#›
© 2009 Turbine Technology Services Corporation. Proprietary and Confidential. www.turbinetech.com
- 19. Additional Projects
•Two-Frame 5 Control System Conversion-
Mexico
•One-LM2500 Control System Conversion-
Chile
•Six-Frame 5 Control System Conversions-
Brazil
•Four-Relocation and reapplication of
Frame 5 gas turbines from USA to Angola
•Three-Frame 5 Control System
Conversions-Chile
‹#›
© 2009 Turbine Technology Services Corporation. Proprietary and Confidential. www.turbinetech.com
- 20. Contact Us
Glenn Ayala, Business Development Mgr
gayala@turbinetech.com
713-248-5219
General Inquiries: inquiry@turbinetech.com
Main Phone No: +1 (407) 677.0813
Main Office Address:
12661 Challenger Parkway
Suite 250
Orlando, Fl 32826
‹#›
© 2009 Turbine Technology Services Corporation. Proprietary and Confidential. www.turbinetech.com