Acting as Development Manager for the Defence Infrastructure
Organisation, Grainger’s role is to manage the delivery of the
Aldershot Urban Extension, known as Wellesley.
“The natural canvas that this site presents is unique. There’s a rich blend
of heritage, topography and established landscaping that gives us a head
start in transforming the former Garrison into a place uuhich has identity,
character and will stand the test of time. We uuant to create a scheme uuhich
looks as good in 100 years’ time as it does the day it’s completed. The scheme
uuill foster a sense of community uuhich uuas prevalent in the garden suburbs
of the last century.”
John Beresford
Grainger
1WELLESLEY, ALDERSHOT | GRAINGER
The Grainger story started over 100 years ago. Ever since
then, Grainger has been owning, developing and managing
residential property.
Today, as the UK’s largest specialist residential property owner on the
London Stock Exchange, we own and manage over £3bn of residential
assets across the UK. Grainger offers an incomparable mix of real
estate professionals, specialising in owning, developing, managing and
trading residential land and property.
Grainger is not a house builder, and as the development manager, our
role is to service land for sale to the house builders. Of key importance
is how Grainger interacts with the house builders to deliver the
scheme. Grainger’s role is to master plan the whole scheme so that it
accords with our vision. We will then obtain a detailed consent which
will be sold to house builders. When the house builders bid for the land
they will have to adopt the specified design and the quality standards.
The normal approach on similar sized schemes would be to sell off
phases to different house builders and let them build standardised
house types. This approach can often lead to large developments
looking the same. The approach on Wellesley is very different and will
create a scheme with its own identity as Grainger will ensure that the
long term interests are being considered when each phase is built.
It is in the interest of Grainger and the MoD to ensure that this is an
attractive place to live because this will be reflected in sales values
and land receipts in years to come.
As development partner, Grainger’s role is to obtain planning approval
for the masterplan and facilitate the delivery of the development over
the next approx. 15 years. In taking this forward Grainger has worked
closely with local stakeholders and the community on the proposals
for Wellesley, the Aldershot Urban Extension. This has resulted in our
submission of a hybrid planning application to Rushmoor Borough
Council. This comprises of an outline planning application for the
whole development plus a detailed planning application for Phase 1
comprising of 228 new homes. A summary of the main components
of the application is set out in the following pages.
WELLESLEY, ALDERSHOT | GRAINGER2
THE VISION
Wellesley will be a new area of Aldershot, integrated but
distinctive, that will enhance and add to the vitality of
the town. It will be an attractive and desirable place for
users and residents and will provide new facilities for the
wider community.
Wellesley will take its character from its history, its fine stock of
historic buildings and its mature landscape. Drawing on these assets
it will develop its own architectural and landscape legacy as it grows
over time.
Wellesley will build on the established pattern of streets, cycleways
and footpaths to provide safe and permeable links to the town
and to the wider countryside. It will also enhance the existing
mature landscape to provide a network of green spaces to provide
recreation, increase biological diversity and put all residents in
contact with nature.
The way the new development is used and constructed, its ease of
access, the provision of public transport and its servicing will come
together to promote an efficient use of energy in accordance with the
latest and most advanced practice.
Wellesley will grow organically and in a logical sequence. Community
facilities will be provided at each stage. Each area will have its own
character and interest created from its location, use and individual design
but will be managed to contribute creatively to a coherent overall identity.
The participation of the existing community and new residents will be
encouraged to establish a sense of community and ownership.
Key features of the development include:
- The protection and early delivery of the Cambridge Military Hospital
as a landmark and a principal defining feature of the area.
- A new active neighbourhood centre at the crossroads of
Queen’s Avenue and Alison’s Road incorporating the 4th Division
Headquarters Building. Proposals include new retail, leisure and
business space to support and service the community and act
as a focal point. This provision is an important component of the
sustainability strategy, intended to reduce the need to travel
within the Wellesley area. The scale of the facilities is such that the
neighbourhood centre will complement rather than compete with
the Aldershot town centre and North Camp village centre.
- The refurbishment of the Smith Dorrien House and the Maida
Gymnasium as a gateway to the area on the principal access from
the town centre.
- The creation of a heritage trail providing access to historically
significant monuments and memorials.
- The delivery of a new large open space at the centre of the
development, in the form of a central park will respond to the
existing road pattern and the historic Stanhope Lines.
- The restoration and development of the canal frontage to enhance
its nature conservation value while providing a recreational asset.
- The delivery of significant new areas devoted to SANGS (Suitable
Alternative Natural Green Space), allotments and sports fields for
existing and new communities.
WELLESLEY VISION
WELLESLEY, ALDERSHOT | GRAINGER 3
Neighbourhood Centre
Wellesley
WELLESLEY, ALDERSHOT | GRAINGER4
Proposal
The masterplan illustrates a number of key principles to
facilitate the delivery of a quality development. It’s important
that the master plan is not set in stone because over the life
of the development it will need to evolve as life changes.
Any future improvements to the master plan will be
developed with Rushmoor Borough Council.
Proposals Include:
- Up to 3,850 new homes
- 35% affordable homes
- Refurbishment of 6 listed buildings:
- Cambridge Military Hospital
- 4th Division Headquarters
- Smith Dorrien
- Maida Gymnasium
- Observatory
- Fitzwygram House
- A new heritage trail
- 2 new primary schools
- Day care facilities
- A local centre with new offices and local shops
- Pub/restaurant
- Community and leisure facilities
- Household waste recycling centre
- Approximately 2.4 ha of employment area
- Approximately 110 ha of SANGS
(Suitable Alternative Natural Green Space)
- New play areas and a local park
- Allotments
- Public access to sports fields
- Detailed proposals for Phase 1
Table 1:site wide quantum ofaffordable housing
Total No.Units
Private
65%
Total
Provision
(AHU) 35%
Affordable
Rent (AR)
60%
Intermediate
inc. shared
ownership
(Int) 40%
3850 2503 1347 808 539
Land Use
WELLESLEY, ALDERSHOT | GRAINGER 5
Masterplan
Maida Zone Phase 1
WELLESLEY, ALDERSHOT | GRAINGER6
Green Infrastructure
recreation, Landscape and Ecology
The natural topography and surroundings of the site offer
a fantastic opportunity to deliver a useable country park
approach to open space.
The green infrastructure is a combination of the on-site public open
space strategy and the off-site SANGs. The scheme ensures these
two strategies are intrinsically linked to deliver a comprehensive
approach to creating an attractive environment where people want
to live and play.
The scheme will deliver an extensive amount of green open space on
the door step for new residents. Furthermore this unique offering will
be equally available to the existing residents of Aldershot and
the surrounding area.
The green infrastructure comprises:
- 110 ha of a woodland park (SANGs)
- 10 ha of on-site woodlands
- Improved access to the canal side walks
- Access to previously restricted lakes at Camp Farm
- 2.4 ha of new allotments (approx 800 patches)
- 2 large destination play areas
- Sports pitches and a brand new pavilion
- A new central park following the historic Stanhope Lines
The approach to biodiversity has been developed alongside the green
infrastructure strategy and aims to protect and enhance all of the
existing on-site ecological interest. The long-term habitat continuity
for protected animal species affected by Wellesley is paramount.
WELLESLEY, ALDERSHOT | GRAINGER 7
Green Infrastructure STRATEGY
Category 1 - Trees to be retained
within woodland
Category 2 - Mature Trees
to be retained within green
infrastructure network
Category 3 - other Trees that
may/may not be retained
Category 4 - Trees to be removed
WELLESLEY, ALDERSHOT | GRAINGER8
Stanhope Lines
THE VISION
The Stanhope Lines are the original parade ground around
which the barracks grew. They were a large open area
running from east to west. They have subsequently been
eroded with new buildings and other subdivisions. The new
development at Wellesley will restore the Stanhope Lines to
become one of the defining features that hold together the
character of new area, creating a central park which provides
a major resource for residents and acts as a direct reference
to the historic origins of the barracks.
At the east end, the park is open to the landscape of Rushmoor Bottom
beyond but is terminated with a major new feature. At the west end it is
terminated where the land rises to a group of existing trees. In the middle
it becomes Parade Park and opens out to the neighbourhood centre.
While the building and landscape along the Lines will have a cohesive
character the detail will vary to create individual areas. There will be
formal and informal play areas along the Lines, together with footpaths
and other features to make it a valuable asset to the whole development.
As well as being an attractive part of the open space strategy the Lines
will also;
1.	Provideresidentswithanattractiveplacetomeetandplay
2.	Link the Wellesley development to the wider country park
3.	Create a green route through the development for mammals and birds
Stanhope lines
WELLESLEY, ALDERSHOT | GRAINGER 9
Stanhope Lines
Wellesley
WELLESLEY, ALDERSHOT | GRAINGER10
The site is well connected and as such the proposed
development will continue to utilise the existing highway
network and, where necessary, provide additional
connections via new junctions. As there is no single point
of access the traffic generated from this development will
use a combination of the existing and new points of entry
as set out below. This will minimise the risk of creating
bottlenecks at peak times.
- From the west, access will be from the existing Alison’s Road/
A325 Farnborough Road grade separated junction and via a
new connection (left in-left out) at A325 Farnborough Road/
Pennefathers Road.
- Access to the north and south of the site will still be achieved
via Queen’s Avenue, Hospital Hill and Ordnance Road corridors
which provide local connections to Aldershot, North Camp
and Farnborough.
- Government Road will provide a connection to the east of the site
and will improve links onto the A331 with the provision of a new
northbound on-slip
Transport
Pedestrian/Cycle network
WELLESLEY, ALDERSHOT | GRAINGER 11
Proposed StreetHierarchy
WELLESLEY, ALDERSHOT | GRAINGER12
CAMBRIDGE MILITARY HOSPITAL
The Cambridge Military Hospital (CMH) is one Aldershot’s
defining landmarks and sits on the highest ground in the
area. The tower was from its inception built to act as a visual
feature and can be seen for miles around. The building is a
fine example of late Victorian military architecture and its
use as both a military and civilian hospital has made it a key
part of the heritage of the town of Aldershot. The original
building has been much spoilt by later functional additions
and, since its closure in 1996, has deteriorated. The new
development of Wellesley will maintain and enhance the
landmark and architectural significance of the building and
secure its future and vitality by providing a viable new use.
The distinctive form of the building, with a small central administrative
block and radiating wards, when freed of its later accretions, offers
a number of options for re-use. The spacing of the radiating wards is
sufficient to allow for residential uses without sacrificing privacy and
allows for private areas and landscape. The Victorian construction is
robust and includes fine architectural features. In preparing options for a
viable re-use, the existing building fabric would be restored and retained
as much as feasible, the main entrance and tower would become the
focus of a new landscaped area and the wider setting would be designed
to complement the historic building.
Four options for converting the main hospital building into different uses
have been assessed:
Option 1.
Mixed use. The wards are converted to residential use. The administrative
block has offices in the basement and ground floor and there is a central
café overlooking the wooded slopes to the south. There are apartments
on the first and second floor.
Option 2.
Mixed use. The wards are residential as in Option 1. The administrative
block has community uses on the basement and ground floor. There is a
central café on the ground floor and apartments on the first and second
floor as in Option 1.
Option 3.
Mixed use. The wards are residential as in Option 1. The administrative
block has a mixture of offices and community uses in the basement and
ground floor. There is a central café on the ground floor and apartments
on the first and second floor as in Option 1.
Option 4.
Mixed use. The wards are residential as in Option 1. The administrative
block has a mixture of offices and community uses on all floors and there
are additional offices in the westernmost ward. There is a central café as
in Option 1.
Final proposals will be subject to further consultation and listed
building consent.
Option 1
Option 2
Option 3
Option 4
WELLESLEY, ALDERSHOT | GRAINGER 13
CAMBRIDGE MILITARY HOSPITAL
Wellesley
WELLESLEY, ALDERSHOT | GRAINGER14
CAMBRIDGE MILITARY HOSPITAL
ConceptualPlan showingthe potentialfor conversion
ofCMH side wings into residentialunits
ConceptualSectionthrough a pair ofside wings Options for conversion ofthe wards into differenttypes of
residentialunits - a mixofflats and houses
ConceptualSection
WELLESLEY, ALDERSHOT | GRAINGER 15
CAMBRIDGE MILITARYHOSPITALConceptualStrategy(subjectto Listed Buildings Consent)
s
s p
p
c p
c p
WELLESLEY, ALDERSHOT | GRAINGER16
Neighbourhood Centre
At the heart of Wellesley a local neighbourhood centre is
proposed, containing a number of non-residential functions,
such as retail, leisure and business space, to support and
service the community and act as a focal point.
This provision is an important component of the sustainability strategy,
intended to reduce the need to travel within the Wellesley area and
to provide shopping, leisure and other services for residents and
businesses. The scale of the facilities is such that the neighbourhood
centre complements, rather than competes with, the shopping and other
facilities within Aldershot town centre and North Camp village centre.
The group of historic buildings centred on the former 4th Division
Headquarters has been identified for the location of the neighbourhood
centre. Just as the buildings were originally sited there to be central to
the grid of barrack blocks, and strategically adjacent to both Queen’s
Avenue and the Parade Park, the location is correspondingly suitable
for the future new community’s needs, provided that certain design
constraints and sensitivities can be appropriately handled, particularly
with respect to:
• Preserving and enhancing the character of the conservation area
• The frontages presented to Queen’s Avenue, Alison’s Road and the new
Parade Park and Stanhope Lines
• The setting, scale and massing of the listed buildings
• The uses appropriate for the internal arrangement of the
existing buildings
• Facade treatment of both existing and proposed buildings
• The incorporation of historic and ceremonial features associated
with the existing buildings
The studies carried out by Grainger show how, through careful urban
design, historical and conservation objectives can be aligned with civic
and townscape objectives to breathe new life into these distinguished
buildings in their fine setting.
The 8th Division Memorial in front of the
4th Division Headquarters Building
The complex viewed from Queen’s Avenue4th Division Headquarters frontage with
8th Division Memorial, Cenotaph and
St Michael and St George RC Garrison
Church beyond
The Old Post Office fronting onto
Queen’s Avenue
WELLESLEY, ALDERSHOT | GRAINGER 17
Neighbourhood Centre
Wellesley
WELLESLEY, ALDERSHOT | GRAINGER18
Neighbourhood Centre Strategy(subjectto Listed Buildings Consent)
As part of the design options
considered for the neighbourhood
centre, proposals were also
considered for landscape treatment
and palette of materials. The
footpath and shared surface
directly links the school to the
neighbourhood centre on an east
west axis. Existing mature trees
will be retained wherever possible.
S
S
WELLESLEY, ALDERSHOT | GRAINGER 19
SPECIAL TREATMENT ZONE
SHARED SURFACE
PROPOSED PLANTING
GREEN SQUARE
landscape strategy(subjectto listed building consent)
WELLESLEY, ALDERSHOT | GRAINGER20
Phase 1
The identification of the first phase was carefully chosen due to:
-	Close proximity to the town centre and the Health Centre
-	Available transport services within walking distance of Aldershot
train station and the Gold bus route
-	Opportunities for the early provision of community facilities at
Smith Dorrien
-	Existing access off Queen’s Avenue
The design of the 228 units in phase 1 focuses on the needs of
families and creating a safe, secure and attractive environment
which will eventually become the hallmark for Wellesley. It creates
a series of residential neighbourhoods connected by a network
of green spaces, parks and recreation areas and punctuated by
carefully chosen and refurbished historic buildings.
The sustainability objective for Phase 1 is for all units to meet CfSH
Code Level 3 as a minimum with an additional 10% of all homes
(23 units) achieving CfSH Code Level 4.
All affordable housing has been designed to meet Lifetime Homes
Criteria 6-16 as a minimum standard and also to comply with Part M
of the Building Regulations. All affordable homes also comply with
current HQI standards.
MaidaZone - Phase 1 Housing Mix
Size of Units Private No. Units
Affordable/Social
Rent No. Units
Intermediate
No. Units
1 Bed Flat 9 10 13
2 Bed Flat 9 5 6
2 Bed House 16 14 7
3 Bed House 69 12 6
4 Bed House 40 7 0
5 Bed House 5 0 0
TOTAL 148 48 32
WELLESLEY, ALDERSHOT | GRAINGER 21
Phase 1 - Landscape masterplan
WELLESLEY, ALDERSHOT | GRAINGER22
Phase 1 HousingTenure Plan
WELLESLEY, ALDERSHOT | GRAINGER 23
Phase 1 Queen’s Avenue
Wellesley
WELLESLEY, ALDERSHOT | GRAINGER 25
Phase 1 Hope Grant’s Road
Wellesley
WELLESLEY, ALDERSHOT | GRAINGER26
landscape and open space
There is a provision for a Local Landscape Area of Play (LLAP)
space to provide informal play in the green open space
located at the corner of Hospital Road and Fire Station Road.
This is in line with the site-wide play strategy which has been
established for the whole of the Wellesley development.
This play space will provide an informal play area, which is to be
supplemented with destination play spaces constructed as part
of future development phases.
Phase 1
LocalLandscaped Areas ofPlay(LLAP)
Phase 1 - Vision for Local Landscaped Areas of Play
WELLESLEY, ALDERSHOT | GRAINGER 27
Phase 1 -Trees
TRANSITIONAL TREES - TERTIARY ROADS
FEATURE TREES - OPEN SPACES
RESIDENTIAL TREES - THE LANES
Quercus robur - Common oak
(8m x 12m High)
Tilia cordata ‘Greenspire’ - Small
leaved lime (5m x 10m High)
Native Native
QueensAvenue
HopeGrant’sRoad
HospitalRoad
Scarlett’sRoad
FireStationRoad
Pyrus calleryana ‘Chanticleer’ -
Callery pear (3m x 8m High)
Corylus colurna - Turkish hazel
(3m x 8m High)
Aesculus indica - India horse
chestnut (4m x 8m High)
TheLanes
Malus trilobata
Crab Apple (2.5m x 16m H)
Prunus ‘Spire’ (hillieri’Spire’)
Cherry Spire (3m x 6m )
OpenSpaces
Magnolia kobus - Kobus magnolia
(4m x 10m High)
Davidia involucrata -
Hankerchief tree(6m x 10m High)
Quercus coccinea ‘Splendens’-
Scarlet oak (8m x 12m High)
Prunus serrula -
Tibetan cherry (8m x 8m High)
Liquidambar styraciflua -
Sweet gum (5m x 10m High)
Much of the character and landscape quality of the site comes from the
existing trees, many of which were established as part of comprehensive planting
schemes from Victorian times. As part of this planned, historic redevelopment
of the site, tree lined avenues along the orthogonal road grid are a particularly
important element of the landscape character. Over time, these avenues have
become fragmented and a detailed planting strategy has been developed to
strengthen and re-integrate these avenues into the new development.
The palette of proposed trees is based on existing species within the site and
has been developed to reflect the different characters of the development
phases. This will create a hierarchy along the routes which will promote natural
wayfinding through the development. Formal, large scale trees such as Oak and
Lime are used along the main roads, with more upright, fastigate species on the
smaller roads and ornamental trees with strong form and colour in the public
open spaces.
TRANSITIONAL TREES - TERTIARY ROADS
FEATURE TREES - OPEN SPACES
RESIDENTIAL TREES - THE LANES
Quercus robur - Common oak
(8m x 12m High)
Tilia cordata ‘Greenspire’ - Small
leaved lime (5m x 10m High)
Native Native
QueensAvenue
HopeGrant’sRoad
HospitalRoad
Scarlett’sRoad
FireStationRoad
Pyrus calleryana ‘Chanticleer’ -
Callery pear (3m x 8m High)
Corylus colurna - Turkish hazel
(3m x 8m High)
Aesculus indica - India horse
chestnut (4m x 8m High)
TheLanes
Malus trilobata
Crab Apple (2.5m x 16m H)
Prunus ‘Spire’ (hillieri’Spire’)
Cherry Spire (3m x 6m )
OpenSpaces
Magnolia kobus - Kobus magnolia
(4m x 10m High)
Davidia involucrata -
Hankerchief tree(6m x 10m High)
Quercus coccinea ‘Splendens’-
Scarlet oak (8m x 12m High)
Prunus serrula -
Tibetan cherry (8m x 8m High)
Liquidambar styraciflua -
Sweet gum (5m x 10m High)
‘
WELLESLEY, ALDERSHOT | GRAINGER28
DELIVERY  IMPLEMENTATION
The masterplan demonstrates a variety of opportunities for
the delivery of Wellesley. It provides a platform to encourage
new homes, community facilities, leisure activities and jobs.
The masterplan illustrates a number of key principles to facilitate the
delivery of a quality development. It’s important that the master plan
is not set in stone because it will need to evolve over the life of the
development as life changes. Any future improvements to the master
plan will be developed with Rushmoor Borough Council.
The development of the Wellesley community has the opportunity
to provide an important catalyst for the wider economic benefit of
Aldershot. In addition, the timing of the delivery of the local amenities
is critical to successful placemaking. Too late in the development and
the new residents will be left wanting. Too early and the scheme will
be a vacant underused facility which will deteriorate. It is a symbiotic
relationship where the uses rely on each other to create a successful
place to live. For these reasons Grainger’s approach to the illustrative
delivery plan allows flexibility in the delivery of Wellesley to respond
to the needs of the emerging and existing community while capturing
market opportunities.
Delivering the Vision
The proposed timescales for the delivery of each development zone are
set out in the illustrative delivery plan. Grainger will manage the delivery
of each development zone including the associated open spaces and
infrastructure as well as the detailed proposals for each monument
and listed building as shown in the adjacent table. This will ensure that
wherever the homes are delivered there will also be associated facilities
such as open space.
As each development zone may comprise more than one reserved matter
area the following control documents have been submitted as part of the
planning application:
-	Design codes: a set of quality controls which ensure that the new
developments have a cohesive character and a defined minimum
standard of quality.
-	Affordable housing strategy: sets out the site wide approach and
provision of affordable housing for the Wellesley
The aim of these documents is to ensure that each development
zone delivers a proportionate quantum of affordable housing, social
and physical infrastructure, in a manner and of a quality which is
sustainable for the emerging community. As part of the application
a site wide affordable housing strategy and design code have been
submitted as well as more detailed documents for Phase 1. In taking
the development forward, a detailed code and affordable housing
strategy will be submitted for approval for each development zone
prior to commencement of development. These documents will be
incorporated into the plot sale agreements, meaning that developers are
contractually bound to adhere to the parameters set down for the site
and development zones.
There are 6 grade II listed buildings on site which will be retained although
a number of later additions to the buildings have been identified which
could be demolished as they detract from and/or have a negative
impact on the original buildings and setting. Any work to these buildings
and those within the curtilage will be subject to listed building and
conservation area consent where relevant. Therefore there will be an
opportunity for the stakeholders and the local community to input into
the proposals.
There are areas within the development which Grainger deems to be
of significant importance in the creation of a high quality place e.g. the
Cambridge Military Hospital, Stanhope Lines, Parade Park and the
neighbourhood centre. Although not high value development sites, these
areas will set the standard for Wellesley. Consequently, Grainger may
still decide to directly develop these areas. The decision as to whether
to develop directly will solely be based upon the best decision for the
project in terms of value creation and long term quality.
As a key character area of Wellesley, the Cambridge Military Hospital has
been identified for delivery within the first few years of the development.
This allows sufficient time to finesse proposals and obtain the relevant
listed building consents without compromising the final usage and
marketability of the development zone.
Grainger will manage or directly deliver the on and off-site strategic
infrastructure (unless otherwise agreed with HCC) for the project,
enabling the parcelling up of development plots for sale/
self-development.
WELLESLEY, ALDERSHOT | GRAINGER 29
Property Management
Since the company’s inception in 1912, Grainger has invested
in property and land with a long term view. The company has
substantial in-house expertise in property and land management and
correspondingly, the Grainger development ethos is of sustained and
continual commitment to development projects. We recognise the value
this can bring to all stakeholders, including residents, adjoining owners
and the wider community.
Wellesley will be approached with the same commitment. We recognise
that good management of land and public areas, such as public open
space, roads and woodland, involves the right combination of key
partners, with each partner managing the areas which relate to their own
expertise. In this way all areas can be carefully managed from a short,
medium and long term perspective to the benefit of the development.
At Wellesley, Grainger has also focused attention on ensuring that the
site is secure and the vacant buildings are protected from the elements.
Since Grainger’s appointment as Development Manager in March 2011,
a detailed building assessment has been carried out across the whole
development area to identify which buildings could be retained as
part of the masterplan. Thereafter, detailed condition and structural
surveys have been undertaken to clarify whether the retention of the
identified buildings is physically viable. The outputs from these studies
have resulted in a detailed programme of short and medium term works
which Grainger is in the process of implementing to ensure the retained
buildings are watertight and protected until they are redeveloped.
As a number of the listed buildings, in particular the Cambridge
Military Hospital, have been vacant for a number of years. Grainger
has engaged with English Heritage and our own technical specialists
to ensure that during the period between submission and the
development starting the buildings are made water tight and secure
from the elements. These buildings will be periodically inspected and
works undertaken as necessary to safeguard them from any further
deterioration until redeveloped. Appropriate interim uses and tenants
will be identified for retained buildings where possible, to minimise
deterioration and vandalism.
Post development, Grainger intends to sell off all the residential elements
of the development with the roads, open spaces and infrastructure etc.
adopted by the relevant authorities or handed over to a management
company, subject to agreement with the relevant adopting authorities.
Keydeliverables associated with each DevelopmentZone ofWellesley
Development
Zone
Approx.
Units
Affordable
Listed
Buildings
Uses
A.Maida 228 80
Smith Dorrien 
MaidaGymnasium
Community Use,Offices  Gymnasium
B.Coruna 705 247
C.CMH 134 47
Cambridge
Military Hospital
Non-residential institutions / assembly
 leisure (community  day care) D1/D2,
B1 and ancillary
D. McGrigor 118 41
E. Gunhill 105 37
F. Knollys Road 22 8
G. Pennyfathers 123 43
H. Stanhope Lines West 162 57 The Stanhope Lines
I. School End 105 37 The Observatory The Observatory
J. Browning/Canalside 475 166
K. Stanhope Lines East 255 88 Parade Park and the Stanhope Lines
L. Neighbourhood Centre 16 6
Head Quarters
4th Division
Retail, B1, A2, Restaurant/pub
M. Buller 243 85 Eastern Primary School
N. God’s Acre 170 60 Play Area
O. Mandora 133 46
Fitzwygram
House
Day Care Facility
P. Peaked Hill 60 21
Q. Clayton 298 104
R. ABRO 0 0 Waste Facility, B1, B2  B8
S. REME 392 137 Retail
T. Parsons 106 37
TOTAL 3,850 1,347
WELLESLEY, ALDERSHOT | GRAINGER30
DevelopmentZone Plan
In order to manage the delivery of Wellesley the site has
been divided into the core development area, SANGs and
off-site infrastructure. The core development area is
divided into development zones (see above) to facilitate
the parcelling up of the approval and implementation
processes, which is influenced by the configuration of
listed buildings and their curtilages and conservation
areas, which occur across the site.
WELLESLEY, ALDERSHOT | GRAINGER 31
ILLUSTRATIVE DELIVERYPLAN
Masterplan
DevelopmentZone
MoD Site
Handover
No.
Units
Private
65%
AHU
35%
2013/
2014
2014/
2015
2015/
2016
2016/
2017
2017/
2018
2018/
2019
2019/
2020
2020/
2021
2021/
2022
2022/
2023
2023/
2024
2024/
2025
2025/
2026
Private AHU
Accum
Total
A.Maida Jul-13 228 148 80
175 53 228
228
114 61 34 19 148 80
B.Coruna 705 485 247
120 120 128 120 120 97 705
933
78 42 78 42 83 45 78 42 78 42 63 34 458 247
C.CMH 134 87 47
77 57 134
1067
50 27 37 20 87 47
D.McGrigor 118 77 41
73 45 118
1185
47 26 30 15 77 41
E.Gunhill 105 68 37
105 105
1290
68 37 68 37
F.Knollys Road May-13 22 14 8
22 22
1312
14 8 14 8
G.Pennyfathers 123 80 43
75 48 123
1435
49 26 31 17 80 43
H.Stanhope Lines West 162 105 57
57 105 162
1597
37 20 68 37 105 57
I.School End 105 68 37
80 25 105
1702
52 28 16 9 68 37
J.Browning/Canalside 475 309 166
59 100 122 120 74 475
2177
38 21 65 35 79 43 78 42 49 25 309 166
K.Stanhope Lines East Jul-14 255 167 88
110 112 33 255
2432
71 39 73 39 23 10 167 88
L.Neighbourhood Centre Jul-14 16 10 6
16 16
2448
10 6 10 6
M.Buller May-13 243 158 85
26 120 97 243
2691
17 9 78 42 63 34 158 85
N.God’s Acre May-13 170 110 60
Deliver 2nd
School Site
50 120 170
2861
33 17 77 43 110 60
O.Mandora Dec-12 133 87 46
47 86 133
2994
32 15 55 31 87 46
P.Peaked Hill 60 39 21
30 30 60
3054
20 10 19 11 39 21
Q.Clayton Aug-12 298 194 104
65 120 113 298
3552
42 23 78 42 74 39 194 104
R.ABRO 2015 0 0 0 0 3552
S.REME 392 255 137
17 120 119 136 392
3744
10 7 78 42 77 42 90 46 255 137
T.Parsons 106 69 37
44 62 106
3850
29 15 40 22 69 37
Total 3850 2503 1347 175 250 250 300 350 350 350 350 350 350 300 300 175 3850
3850
Total Mix 114 61 162 88 162 88 195 105 227 123 227 123 227 123 227 123 228 122 230 120 193 107 197 103 114 61 2503 1347
Total 175 250 250 300 350 350 350 350 350 350 300 300 175 3850
Note: The total number of units identified in each development zone above is approximate. In order to provide a degree of flexibility a 5% variance can be applied to each development zone to allow for site specific technical constraints and opportunities.
Notwithstanding this variance the site wide number of dwellings delivered at Wellesley is capped at 3,850. Where the actual numbers of units vary the quantum of affordable housing will adjust accordingly.
WELLESLEY, ALDERSHOT | GRAINGER32
CONTACTS
Key Contacts:
Grainger plc
161 Brompton Road
Knightsbridge
London
SW31QP
Contact: John Beresford
Tel: 0207 795 4727
Email: wellesleyaldershot@graingerplc.co.uk
www.graingerplc.co.uk
Tel: 020 7795 4700
www.wellesleyaldershot.co.uk
March 2013
Project Manager:
RM Regeneration Management Ltd
Contact: Marcia McGinty
Email: mmcginty@regeneration-management.co.uk
Tel: 07824 362 433
Managing the Delivery of the Wellesley Development in Aldershot
Managing the Delivery of the Wellesley Development in Aldershot
Managing the Delivery of the Wellesley Development in Aldershot

Contenu connexe

Tendances

Sigler village
Sigler villageSigler village
Sigler villagekvon15
 
Trial for online
Trial for onlineTrial for online
Trial for onlineelogilvie
 
Staff report Revised final
Staff report Revised finalStaff report Revised final
Staff report Revised finalHunter Moore
 
Selectmen meeting 021014 final
Selectmen meeting 021014 finalSelectmen meeting 021014 final
Selectmen meeting 021014 finalKristi Armstrong
 
Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020RamaChilamkurthy
 
D321 wellesley app summary brochure
D321 wellesley app summary brochureD321 wellesley app summary brochure
D321 wellesley app summary brochureKurt Mueller
 
Vicksburg community park
Vicksburg community parkVicksburg community park
Vicksburg community parkJ03Van
 
Kaitlyn_Fulton_Portfolio
Kaitlyn_Fulton_PortfolioKaitlyn_Fulton_Portfolio
Kaitlyn_Fulton_PortfolioKaitlyn Fulton
 
Guildford Draft Local Plan - Worplesdon Public Meeting 2nd July
Guildford Draft Local Plan - Worplesdon Public Meeting 2nd JulyGuildford Draft Local Plan - Worplesdon Public Meeting 2nd July
Guildford Draft Local Plan - Worplesdon Public Meeting 2nd Julypaulkassell
 
GBF2007 Industrial Revitalization Joe Lobko
GBF2007 Industrial Revitalization Joe LobkoGBF2007 Industrial Revitalization Joe Lobko
GBF2007 Industrial Revitalization Joe LobkoToronto 2030 District
 
Final presentation for The Parklands
Final presentation for The Parklands Final presentation for The Parklands
Final presentation for The Parklands Matthew Crane
 
Rob CV Sept 16
Rob CV Sept 16Rob CV Sept 16
Rob CV Sept 16Rob Bourn
 

Tendances (20)

Sigler village
Sigler villageSigler village
Sigler village
 
Trial for online
Trial for onlineTrial for online
Trial for online
 
Staff report Revised final
Staff report Revised finalStaff report Revised final
Staff report Revised final
 
Selectmen meeting 021014 final
Selectmen meeting 021014 finalSelectmen meeting 021014 final
Selectmen meeting 021014 final
 
Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020
 
D321 wellesley app summary brochure
D321 wellesley app summary brochureD321 wellesley app summary brochure
D321 wellesley app summary brochure
 
Vicksburg community park
Vicksburg community parkVicksburg community park
Vicksburg community park
 
Kaitlyn_Fulton_Portfolio
Kaitlyn_Fulton_PortfolioKaitlyn_Fulton_Portfolio
Kaitlyn_Fulton_Portfolio
 
Guildford Draft Local Plan - Worplesdon Public Meeting 2nd July
Guildford Draft Local Plan - Worplesdon Public Meeting 2nd JulyGuildford Draft Local Plan - Worplesdon Public Meeting 2nd July
Guildford Draft Local Plan - Worplesdon Public Meeting 2nd July
 
Sectors 2 & 3 Charrette Closing Presentation
Sectors 2 & 3 Charrette Closing PresentationSectors 2 & 3 Charrette Closing Presentation
Sectors 2 & 3 Charrette Closing Presentation
 
Civic master plan overview presentation - March 20, 2013
Civic master plan overview presentation - March 20, 2013Civic master plan overview presentation - March 20, 2013
Civic master plan overview presentation - March 20, 2013
 
GBF2007 Industrial Revitalization Joe Lobko
GBF2007 Industrial Revitalization Joe LobkoGBF2007 Industrial Revitalization Joe Lobko
GBF2007 Industrial Revitalization Joe Lobko
 
Parks Master Plan Update
Parks Master Plan UpdateParks Master Plan Update
Parks Master Plan Update
 
Beaufort-Sector1-Charrette-FinalPresentation
Beaufort-Sector1-Charrette-FinalPresentationBeaufort-Sector1-Charrette-FinalPresentation
Beaufort-Sector1-Charrette-FinalPresentation
 
Final presentation for The Parklands
Final presentation for The Parklands Final presentation for The Parklands
Final presentation for The Parklands
 
Rob CV Sept 16
Rob CV Sept 16Rob CV Sept 16
Rob CV Sept 16
 
Chapter1
Chapter1Chapter1
Chapter1
 
Glen Echo land purchase
Glen Echo land purchaseGlen Echo land purchase
Glen Echo land purchase
 
New York's Next Great Waterfront Park - Urban Design
New York's Next Great Waterfront Park - Urban DesignNew York's Next Great Waterfront Park - Urban Design
New York's Next Great Waterfront Park - Urban Design
 
portfolio TUdelft τελικο
portfolio TUdelft τελικοportfolio TUdelft τελικο
portfolio TUdelft τελικο
 

En vedette

Wellesley application summary brochure
Wellesley application summary brochureWellesley application summary brochure
Wellesley application summary brochureKurt Mueller
 
Aldershot Urban Extension Public Exhibition Info Boards - Summer 2012 web
Aldershot Urban Extension Public Exhibition Info Boards -  Summer 2012 webAldershot Urban Extension Public Exhibition Info Boards -  Summer 2012 web
Aldershot Urban Extension Public Exhibition Info Boards - Summer 2012 webKurt Mueller
 
Ip Payback From Investment In Landscape
Ip   Payback From Investment In LandscapeIp   Payback From Investment In Landscape
Ip Payback From Investment In Landscapeiplfp
 
Wellesley newsletter Winter 2013
Wellesley newsletter Winter 2013Wellesley newsletter Winter 2013
Wellesley newsletter Winter 2013Kurt Mueller
 
Ficha 3 mantenimiento Máquinas CC
Ficha 3 mantenimiento Máquinas CCFicha 3 mantenimiento Máquinas CC
Ficha 3 mantenimiento Máquinas CCHMR2598
 
Design Tips for Non-Designers
Design Tips for Non-DesignersDesign Tips for Non-Designers
Design Tips for Non-DesignersWonderlabs
 
Beautiful sweet memories part vi
Beautiful sweet memories part viBeautiful sweet memories part vi
Beautiful sweet memories part vidtpamemories
 
Easy Back-link Clean Up with Two Useful Tools
Easy Back-link Clean Up with Two Useful ToolsEasy Back-link Clean Up with Two Useful Tools
Easy Back-link Clean Up with Two Useful ToolsWonderlabs
 
Equipo 3, temas 7 y 8 info
Equipo 3, temas 7 y 8 infoEquipo 3, temas 7 y 8 info
Equipo 3, temas 7 y 8 infoPollo de Yareni
 
Power semi 5 estadistica
Power semi 5 estadisticaPower semi 5 estadistica
Power semi 5 estadisticacarcolsan20
 
Carpe noctem prototype_0315
Carpe noctem prototype_0315Carpe noctem prototype_0315
Carpe noctem prototype_0315sithelement
 
Apresentação institucional maio de 2012
Apresentação institucional   maio de 2012Apresentação institucional   maio de 2012
Apresentação institucional maio de 2012brproperties
 
Tamanho de compacta, qualidade de reflex
Tamanho de compacta, qualidade de reflexTamanho de compacta, qualidade de reflex
Tamanho de compacta, qualidade de reflexPedro Trindade
 
I Will Let You Into A Secret; Anyone Can Draw
I Will Let You Into A Secret; Anyone Can DrawI Will Let You Into A Secret; Anyone Can Draw
I Will Let You Into A Secret; Anyone Can DrawWonderlabs
 
ทำบุญ
ทำบุญทำบุญ
ทำบุญarjarntoey
 

En vedette (20)

Wellesley application summary brochure
Wellesley application summary brochureWellesley application summary brochure
Wellesley application summary brochure
 
Aldershot Urban Extension Public Exhibition Info Boards - Summer 2012 web
Aldershot Urban Extension Public Exhibition Info Boards -  Summer 2012 webAldershot Urban Extension Public Exhibition Info Boards -  Summer 2012 web
Aldershot Urban Extension Public Exhibition Info Boards - Summer 2012 web
 
Ip Payback From Investment In Landscape
Ip   Payback From Investment In LandscapeIp   Payback From Investment In Landscape
Ip Payback From Investment In Landscape
 
Wellesley newsletter Winter 2013
Wellesley newsletter Winter 2013Wellesley newsletter Winter 2013
Wellesley newsletter Winter 2013
 
Ficha 3 mantenimiento Máquinas CC
Ficha 3 mantenimiento Máquinas CCFicha 3 mantenimiento Máquinas CC
Ficha 3 mantenimiento Máquinas CC
 
Evolución de la web
Evolución de la webEvolución de la web
Evolución de la web
 
Design Tips for Non-Designers
Design Tips for Non-DesignersDesign Tips for Non-Designers
Design Tips for Non-Designers
 
Beautiful sweet memories part vi
Beautiful sweet memories part viBeautiful sweet memories part vi
Beautiful sweet memories part vi
 
Easy Back-link Clean Up with Two Useful Tools
Easy Back-link Clean Up with Two Useful ToolsEasy Back-link Clean Up with Two Useful Tools
Easy Back-link Clean Up with Two Useful Tools
 
Equipo 3, temas 7 y 8 info
Equipo 3, temas 7 y 8 infoEquipo 3, temas 7 y 8 info
Equipo 3, temas 7 y 8 info
 
Power semi 5 estadistica
Power semi 5 estadisticaPower semi 5 estadistica
Power semi 5 estadistica
 
Carpe noctem prototype_0315
Carpe noctem prototype_0315Carpe noctem prototype_0315
Carpe noctem prototype_0315
 
Q2
Q2Q2
Q2
 
Apresentação institucional maio de 2012
Apresentação institucional   maio de 2012Apresentação institucional   maio de 2012
Apresentação institucional maio de 2012
 
Por America
Por AmericaPor America
Por America
 
Tamanho de compacta, qualidade de reflex
Tamanho de compacta, qualidade de reflexTamanho de compacta, qualidade de reflex
Tamanho de compacta, qualidade de reflex
 
Feliz dia mama
Feliz dia mamaFeliz dia mama
Feliz dia mama
 
I Will Let You Into A Secret; Anyone Can Draw
I Will Let You Into A Secret; Anyone Can DrawI Will Let You Into A Secret; Anyone Can Draw
I Will Let You Into A Secret; Anyone Can Draw
 
ทำบุญ
ทำบุญทำบุญ
ทำบุญ
 
Teoria1
Teoria1Teoria1
Teoria1
 

Similaire à Managing the Delivery of the Wellesley Development in Aldershot

buttress masterplanning lr
buttress masterplanning lrbuttress masterplanning lr
buttress masterplanning lrGavin Sorby
 
PDR Housing estate renewal capability.FINAL[1]
PDR Housing estate renewal capability.FINAL[1]PDR Housing estate renewal capability.FINAL[1]
PDR Housing estate renewal capability.FINAL[1]Michael Walton
 
Simran deo- architectural conservation- neighbourhood design and planning
Simran deo- architectural conservation- neighbourhood design and planningSimran deo- architectural conservation- neighbourhood design and planning
Simran deo- architectural conservation- neighbourhood design and planningsimrandeo3
 
Urban Design Portfolio Tim Hays
Urban Design Portfolio Tim HaysUrban Design Portfolio Tim Hays
Urban Design Portfolio Tim HaysTim Hays
 
Ydf nhp-presentation-v2
Ydf nhp-presentation-v2Ydf nhp-presentation-v2
Ydf nhp-presentation-v2Peter Tipton
 
Strategic plan poster final
Strategic plan poster finalStrategic plan poster final
Strategic plan poster finalVanessa Baratta
 
Portfolio of Julia Kinzevskaja 72 dpi
Portfolio of Julia Kinzevskaja 72 dpiPortfolio of Julia Kinzevskaja 72 dpi
Portfolio of Julia Kinzevskaja 72 dpiJulia Kinzhevskaja
 
Land for Sale - The Glades at Byford Overview
Land for Sale - The Glades at Byford OverviewLand for Sale - The Glades at Byford Overview
Land for Sale - The Glades at Byford OverviewLWP Property Group
 
Flacq Profile
Flacq ProfileFlacq Profile
Flacq Profilejames.f
 
Placemaking, Innovation, and Planning: Dublin 8
Placemaking, Innovation, and Planning: Dublin 8Placemaking, Innovation, and Planning: Dublin 8
Placemaking, Innovation, and Planning: Dublin 8kieran rose
 
Kinneil Estate Masterplan final draft Feb 2015
Kinneil Estate Masterplan final draft Feb 2015Kinneil Estate Masterplan final draft Feb 2015
Kinneil Estate Masterplan final draft Feb 2015Chris Cutts
 
Environment for architecture.ppt
Environment for architecture.pptEnvironment for architecture.ppt
Environment for architecture.pptSanthushFernando2
 
Milpitas redevelopment case study,
Milpitas redevelopment case study, Milpitas redevelopment case study,
Milpitas redevelopment case study, Ar Pankaj Kumar
 
Humber Estuary 28112017
Humber Estuary 28112017Humber Estuary 28112017
Humber Estuary 28112017Richard Tracey
 
Parklands REGEN 2015 - final
Parklands REGEN 2015 - finalParklands REGEN 2015 - final
Parklands REGEN 2015 - finalRichard Tracey
 
Hierarchy Of Open Spaces
Hierarchy Of Open SpacesHierarchy Of Open Spaces
Hierarchy Of Open SpacesRavtej Singh
 

Similaire à Managing the Delivery of the Wellesley Development in Aldershot (20)

buttress masterplanning lr
buttress masterplanning lrbuttress masterplanning lr
buttress masterplanning lr
 
Cabe Report
Cabe ReportCabe Report
Cabe Report
 
PDR Housing estate renewal capability.FINAL[1]
PDR Housing estate renewal capability.FINAL[1]PDR Housing estate renewal capability.FINAL[1]
PDR Housing estate renewal capability.FINAL[1]
 
Simran deo- architectural conservation- neighbourhood design and planning
Simran deo- architectural conservation- neighbourhood design and planningSimran deo- architectural conservation- neighbourhood design and planning
Simran deo- architectural conservation- neighbourhood design and planning
 
Urban Design Portfolio Tim Hays
Urban Design Portfolio Tim HaysUrban Design Portfolio Tim Hays
Urban Design Portfolio Tim Hays
 
Ydf nhp-presentation-v2
Ydf nhp-presentation-v2Ydf nhp-presentation-v2
Ydf nhp-presentation-v2
 
Strategic plan poster final
Strategic plan poster finalStrategic plan poster final
Strategic plan poster final
 
SIRIUS HALL 2012-2020
SIRIUS HALL 2012-2020 SIRIUS HALL 2012-2020
SIRIUS HALL 2012-2020
 
Portfolio of Julia Kinzevskaja 72 dpi
Portfolio of Julia Kinzevskaja 72 dpiPortfolio of Julia Kinzevskaja 72 dpi
Portfolio of Julia Kinzevskaja 72 dpi
 
Land for Sale - The Glades at Byford Overview
Land for Sale - The Glades at Byford OverviewLand for Sale - The Glades at Byford Overview
Land for Sale - The Glades at Byford Overview
 
Flacq Profile
Flacq ProfileFlacq Profile
Flacq Profile
 
Placemaking, Innovation, and Planning: Dublin 8
Placemaking, Innovation, and Planning: Dublin 8Placemaking, Innovation, and Planning: Dublin 8
Placemaking, Innovation, and Planning: Dublin 8
 
A4 Long CV
A4 Long CVA4 Long CV
A4 Long CV
 
Kinneil Estate Masterplan final draft Feb 2015
Kinneil Estate Masterplan final draft Feb 2015Kinneil Estate Masterplan final draft Feb 2015
Kinneil Estate Masterplan final draft Feb 2015
 
Environment for architecture.ppt
Environment for architecture.pptEnvironment for architecture.ppt
Environment for architecture.ppt
 
Milpitas redevelopment case study,
Milpitas redevelopment case study, Milpitas redevelopment case study,
Milpitas redevelopment case study,
 
Humber Estuary 28112017
Humber Estuary 28112017Humber Estuary 28112017
Humber Estuary 28112017
 
Gaap info
Gaap infoGaap info
Gaap info
 
Parklands REGEN 2015 - final
Parklands REGEN 2015 - finalParklands REGEN 2015 - final
Parklands REGEN 2015 - final
 
Hierarchy Of Open Spaces
Hierarchy Of Open SpacesHierarchy Of Open Spaces
Hierarchy Of Open Spaces
 

Dernier

Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
What is Artificial Intelligence?????????
What is Artificial Intelligence?????????What is Artificial Intelligence?????????
What is Artificial Intelligence?????????blackmambaettijean
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 

Dernier (20)

Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
What is Artificial Intelligence?????????
What is Artificial Intelligence?????????What is Artificial Intelligence?????????
What is Artificial Intelligence?????????
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 

Managing the Delivery of the Wellesley Development in Aldershot

  • 1.
  • 2. Acting as Development Manager for the Defence Infrastructure Organisation, Grainger’s role is to manage the delivery of the Aldershot Urban Extension, known as Wellesley. “The natural canvas that this site presents is unique. There’s a rich blend of heritage, topography and established landscaping that gives us a head start in transforming the former Garrison into a place uuhich has identity, character and will stand the test of time. We uuant to create a scheme uuhich looks as good in 100 years’ time as it does the day it’s completed. The scheme uuill foster a sense of community uuhich uuas prevalent in the garden suburbs of the last century.” John Beresford Grainger
  • 3.
  • 4. 1WELLESLEY, ALDERSHOT | GRAINGER The Grainger story started over 100 years ago. Ever since then, Grainger has been owning, developing and managing residential property. Today, as the UK’s largest specialist residential property owner on the London Stock Exchange, we own and manage over £3bn of residential assets across the UK. Grainger offers an incomparable mix of real estate professionals, specialising in owning, developing, managing and trading residential land and property. Grainger is not a house builder, and as the development manager, our role is to service land for sale to the house builders. Of key importance is how Grainger interacts with the house builders to deliver the scheme. Grainger’s role is to master plan the whole scheme so that it accords with our vision. We will then obtain a detailed consent which will be sold to house builders. When the house builders bid for the land they will have to adopt the specified design and the quality standards. The normal approach on similar sized schemes would be to sell off phases to different house builders and let them build standardised house types. This approach can often lead to large developments looking the same. The approach on Wellesley is very different and will create a scheme with its own identity as Grainger will ensure that the long term interests are being considered when each phase is built. It is in the interest of Grainger and the MoD to ensure that this is an attractive place to live because this will be reflected in sales values and land receipts in years to come. As development partner, Grainger’s role is to obtain planning approval for the masterplan and facilitate the delivery of the development over the next approx. 15 years. In taking this forward Grainger has worked closely with local stakeholders and the community on the proposals for Wellesley, the Aldershot Urban Extension. This has resulted in our submission of a hybrid planning application to Rushmoor Borough Council. This comprises of an outline planning application for the whole development plus a detailed planning application for Phase 1 comprising of 228 new homes. A summary of the main components of the application is set out in the following pages.
  • 5. WELLESLEY, ALDERSHOT | GRAINGER2 THE VISION Wellesley will be a new area of Aldershot, integrated but distinctive, that will enhance and add to the vitality of the town. It will be an attractive and desirable place for users and residents and will provide new facilities for the wider community. Wellesley will take its character from its history, its fine stock of historic buildings and its mature landscape. Drawing on these assets it will develop its own architectural and landscape legacy as it grows over time. Wellesley will build on the established pattern of streets, cycleways and footpaths to provide safe and permeable links to the town and to the wider countryside. It will also enhance the existing mature landscape to provide a network of green spaces to provide recreation, increase biological diversity and put all residents in contact with nature. The way the new development is used and constructed, its ease of access, the provision of public transport and its servicing will come together to promote an efficient use of energy in accordance with the latest and most advanced practice. Wellesley will grow organically and in a logical sequence. Community facilities will be provided at each stage. Each area will have its own character and interest created from its location, use and individual design but will be managed to contribute creatively to a coherent overall identity. The participation of the existing community and new residents will be encouraged to establish a sense of community and ownership. Key features of the development include: - The protection and early delivery of the Cambridge Military Hospital as a landmark and a principal defining feature of the area. - A new active neighbourhood centre at the crossroads of Queen’s Avenue and Alison’s Road incorporating the 4th Division Headquarters Building. Proposals include new retail, leisure and business space to support and service the community and act as a focal point. This provision is an important component of the sustainability strategy, intended to reduce the need to travel within the Wellesley area. The scale of the facilities is such that the neighbourhood centre will complement rather than compete with the Aldershot town centre and North Camp village centre. - The refurbishment of the Smith Dorrien House and the Maida Gymnasium as a gateway to the area on the principal access from the town centre. - The creation of a heritage trail providing access to historically significant monuments and memorials. - The delivery of a new large open space at the centre of the development, in the form of a central park will respond to the existing road pattern and the historic Stanhope Lines. - The restoration and development of the canal frontage to enhance its nature conservation value while providing a recreational asset. - The delivery of significant new areas devoted to SANGS (Suitable Alternative Natural Green Space), allotments and sports fields for existing and new communities. WELLESLEY VISION
  • 6. WELLESLEY, ALDERSHOT | GRAINGER 3 Neighbourhood Centre Wellesley
  • 7. WELLESLEY, ALDERSHOT | GRAINGER4 Proposal The masterplan illustrates a number of key principles to facilitate the delivery of a quality development. It’s important that the master plan is not set in stone because over the life of the development it will need to evolve as life changes. Any future improvements to the master plan will be developed with Rushmoor Borough Council. Proposals Include: - Up to 3,850 new homes - 35% affordable homes - Refurbishment of 6 listed buildings: - Cambridge Military Hospital - 4th Division Headquarters - Smith Dorrien - Maida Gymnasium - Observatory - Fitzwygram House - A new heritage trail - 2 new primary schools - Day care facilities - A local centre with new offices and local shops - Pub/restaurant - Community and leisure facilities - Household waste recycling centre - Approximately 2.4 ha of employment area - Approximately 110 ha of SANGS (Suitable Alternative Natural Green Space) - New play areas and a local park - Allotments - Public access to sports fields - Detailed proposals for Phase 1 Table 1:site wide quantum ofaffordable housing Total No.Units Private 65% Total Provision (AHU) 35% Affordable Rent (AR) 60% Intermediate inc. shared ownership (Int) 40% 3850 2503 1347 808 539 Land Use
  • 8. WELLESLEY, ALDERSHOT | GRAINGER 5 Masterplan Maida Zone Phase 1
  • 9. WELLESLEY, ALDERSHOT | GRAINGER6 Green Infrastructure recreation, Landscape and Ecology The natural topography and surroundings of the site offer a fantastic opportunity to deliver a useable country park approach to open space. The green infrastructure is a combination of the on-site public open space strategy and the off-site SANGs. The scheme ensures these two strategies are intrinsically linked to deliver a comprehensive approach to creating an attractive environment where people want to live and play. The scheme will deliver an extensive amount of green open space on the door step for new residents. Furthermore this unique offering will be equally available to the existing residents of Aldershot and the surrounding area. The green infrastructure comprises: - 110 ha of a woodland park (SANGs) - 10 ha of on-site woodlands - Improved access to the canal side walks - Access to previously restricted lakes at Camp Farm - 2.4 ha of new allotments (approx 800 patches) - 2 large destination play areas - Sports pitches and a brand new pavilion - A new central park following the historic Stanhope Lines The approach to biodiversity has been developed alongside the green infrastructure strategy and aims to protect and enhance all of the existing on-site ecological interest. The long-term habitat continuity for protected animal species affected by Wellesley is paramount.
  • 10. WELLESLEY, ALDERSHOT | GRAINGER 7 Green Infrastructure STRATEGY Category 1 - Trees to be retained within woodland Category 2 - Mature Trees to be retained within green infrastructure network Category 3 - other Trees that may/may not be retained Category 4 - Trees to be removed
  • 11. WELLESLEY, ALDERSHOT | GRAINGER8 Stanhope Lines THE VISION The Stanhope Lines are the original parade ground around which the barracks grew. They were a large open area running from east to west. They have subsequently been eroded with new buildings and other subdivisions. The new development at Wellesley will restore the Stanhope Lines to become one of the defining features that hold together the character of new area, creating a central park which provides a major resource for residents and acts as a direct reference to the historic origins of the barracks. At the east end, the park is open to the landscape of Rushmoor Bottom beyond but is terminated with a major new feature. At the west end it is terminated where the land rises to a group of existing trees. In the middle it becomes Parade Park and opens out to the neighbourhood centre. While the building and landscape along the Lines will have a cohesive character the detail will vary to create individual areas. There will be formal and informal play areas along the Lines, together with footpaths and other features to make it a valuable asset to the whole development. As well as being an attractive part of the open space strategy the Lines will also; 1. Provideresidentswithanattractiveplacetomeetandplay 2. Link the Wellesley development to the wider country park 3. Create a green route through the development for mammals and birds Stanhope lines
  • 12. WELLESLEY, ALDERSHOT | GRAINGER 9 Stanhope Lines Wellesley
  • 13. WELLESLEY, ALDERSHOT | GRAINGER10 The site is well connected and as such the proposed development will continue to utilise the existing highway network and, where necessary, provide additional connections via new junctions. As there is no single point of access the traffic generated from this development will use a combination of the existing and new points of entry as set out below. This will minimise the risk of creating bottlenecks at peak times. - From the west, access will be from the existing Alison’s Road/ A325 Farnborough Road grade separated junction and via a new connection (left in-left out) at A325 Farnborough Road/ Pennefathers Road. - Access to the north and south of the site will still be achieved via Queen’s Avenue, Hospital Hill and Ordnance Road corridors which provide local connections to Aldershot, North Camp and Farnborough. - Government Road will provide a connection to the east of the site and will improve links onto the A331 with the provision of a new northbound on-slip Transport Pedestrian/Cycle network
  • 14. WELLESLEY, ALDERSHOT | GRAINGER 11 Proposed StreetHierarchy
  • 15. WELLESLEY, ALDERSHOT | GRAINGER12 CAMBRIDGE MILITARY HOSPITAL The Cambridge Military Hospital (CMH) is one Aldershot’s defining landmarks and sits on the highest ground in the area. The tower was from its inception built to act as a visual feature and can be seen for miles around. The building is a fine example of late Victorian military architecture and its use as both a military and civilian hospital has made it a key part of the heritage of the town of Aldershot. The original building has been much spoilt by later functional additions and, since its closure in 1996, has deteriorated. The new development of Wellesley will maintain and enhance the landmark and architectural significance of the building and secure its future and vitality by providing a viable new use. The distinctive form of the building, with a small central administrative block and radiating wards, when freed of its later accretions, offers a number of options for re-use. The spacing of the radiating wards is sufficient to allow for residential uses without sacrificing privacy and allows for private areas and landscape. The Victorian construction is robust and includes fine architectural features. In preparing options for a viable re-use, the existing building fabric would be restored and retained as much as feasible, the main entrance and tower would become the focus of a new landscaped area and the wider setting would be designed to complement the historic building. Four options for converting the main hospital building into different uses have been assessed: Option 1. Mixed use. The wards are converted to residential use. The administrative block has offices in the basement and ground floor and there is a central café overlooking the wooded slopes to the south. There are apartments on the first and second floor. Option 2. Mixed use. The wards are residential as in Option 1. The administrative block has community uses on the basement and ground floor. There is a central café on the ground floor and apartments on the first and second floor as in Option 1. Option 3. Mixed use. The wards are residential as in Option 1. The administrative block has a mixture of offices and community uses in the basement and ground floor. There is a central café on the ground floor and apartments on the first and second floor as in Option 1. Option 4. Mixed use. The wards are residential as in Option 1. The administrative block has a mixture of offices and community uses on all floors and there are additional offices in the westernmost ward. There is a central café as in Option 1. Final proposals will be subject to further consultation and listed building consent. Option 1 Option 2 Option 3 Option 4
  • 16. WELLESLEY, ALDERSHOT | GRAINGER 13 CAMBRIDGE MILITARY HOSPITAL Wellesley
  • 17. WELLESLEY, ALDERSHOT | GRAINGER14 CAMBRIDGE MILITARY HOSPITAL ConceptualPlan showingthe potentialfor conversion ofCMH side wings into residentialunits ConceptualSectionthrough a pair ofside wings Options for conversion ofthe wards into differenttypes of residentialunits - a mixofflats and houses ConceptualSection
  • 18. WELLESLEY, ALDERSHOT | GRAINGER 15 CAMBRIDGE MILITARYHOSPITALConceptualStrategy(subjectto Listed Buildings Consent) s s p p c p c p
  • 19. WELLESLEY, ALDERSHOT | GRAINGER16 Neighbourhood Centre At the heart of Wellesley a local neighbourhood centre is proposed, containing a number of non-residential functions, such as retail, leisure and business space, to support and service the community and act as a focal point. This provision is an important component of the sustainability strategy, intended to reduce the need to travel within the Wellesley area and to provide shopping, leisure and other services for residents and businesses. The scale of the facilities is such that the neighbourhood centre complements, rather than competes with, the shopping and other facilities within Aldershot town centre and North Camp village centre. The group of historic buildings centred on the former 4th Division Headquarters has been identified for the location of the neighbourhood centre. Just as the buildings were originally sited there to be central to the grid of barrack blocks, and strategically adjacent to both Queen’s Avenue and the Parade Park, the location is correspondingly suitable for the future new community’s needs, provided that certain design constraints and sensitivities can be appropriately handled, particularly with respect to: • Preserving and enhancing the character of the conservation area • The frontages presented to Queen’s Avenue, Alison’s Road and the new Parade Park and Stanhope Lines • The setting, scale and massing of the listed buildings • The uses appropriate for the internal arrangement of the existing buildings • Facade treatment of both existing and proposed buildings • The incorporation of historic and ceremonial features associated with the existing buildings The studies carried out by Grainger show how, through careful urban design, historical and conservation objectives can be aligned with civic and townscape objectives to breathe new life into these distinguished buildings in their fine setting. The 8th Division Memorial in front of the 4th Division Headquarters Building The complex viewed from Queen’s Avenue4th Division Headquarters frontage with 8th Division Memorial, Cenotaph and St Michael and St George RC Garrison Church beyond The Old Post Office fronting onto Queen’s Avenue
  • 20. WELLESLEY, ALDERSHOT | GRAINGER 17 Neighbourhood Centre Wellesley
  • 21. WELLESLEY, ALDERSHOT | GRAINGER18 Neighbourhood Centre Strategy(subjectto Listed Buildings Consent) As part of the design options considered for the neighbourhood centre, proposals were also considered for landscape treatment and palette of materials. The footpath and shared surface directly links the school to the neighbourhood centre on an east west axis. Existing mature trees will be retained wherever possible. S S
  • 22. WELLESLEY, ALDERSHOT | GRAINGER 19 SPECIAL TREATMENT ZONE SHARED SURFACE PROPOSED PLANTING GREEN SQUARE landscape strategy(subjectto listed building consent)
  • 23. WELLESLEY, ALDERSHOT | GRAINGER20 Phase 1 The identification of the first phase was carefully chosen due to: - Close proximity to the town centre and the Health Centre - Available transport services within walking distance of Aldershot train station and the Gold bus route - Opportunities for the early provision of community facilities at Smith Dorrien - Existing access off Queen’s Avenue The design of the 228 units in phase 1 focuses on the needs of families and creating a safe, secure and attractive environment which will eventually become the hallmark for Wellesley. It creates a series of residential neighbourhoods connected by a network of green spaces, parks and recreation areas and punctuated by carefully chosen and refurbished historic buildings. The sustainability objective for Phase 1 is for all units to meet CfSH Code Level 3 as a minimum with an additional 10% of all homes (23 units) achieving CfSH Code Level 4. All affordable housing has been designed to meet Lifetime Homes Criteria 6-16 as a minimum standard and also to comply with Part M of the Building Regulations. All affordable homes also comply with current HQI standards. MaidaZone - Phase 1 Housing Mix Size of Units Private No. Units Affordable/Social Rent No. Units Intermediate No. Units 1 Bed Flat 9 10 13 2 Bed Flat 9 5 6 2 Bed House 16 14 7 3 Bed House 69 12 6 4 Bed House 40 7 0 5 Bed House 5 0 0 TOTAL 148 48 32
  • 24. WELLESLEY, ALDERSHOT | GRAINGER 21 Phase 1 - Landscape masterplan
  • 25. WELLESLEY, ALDERSHOT | GRAINGER22 Phase 1 HousingTenure Plan
  • 26. WELLESLEY, ALDERSHOT | GRAINGER 23 Phase 1 Queen’s Avenue Wellesley
  • 27.
  • 28. WELLESLEY, ALDERSHOT | GRAINGER 25 Phase 1 Hope Grant’s Road Wellesley
  • 29. WELLESLEY, ALDERSHOT | GRAINGER26 landscape and open space There is a provision for a Local Landscape Area of Play (LLAP) space to provide informal play in the green open space located at the corner of Hospital Road and Fire Station Road. This is in line with the site-wide play strategy which has been established for the whole of the Wellesley development. This play space will provide an informal play area, which is to be supplemented with destination play spaces constructed as part of future development phases. Phase 1 LocalLandscaped Areas ofPlay(LLAP) Phase 1 - Vision for Local Landscaped Areas of Play
  • 30. WELLESLEY, ALDERSHOT | GRAINGER 27 Phase 1 -Trees TRANSITIONAL TREES - TERTIARY ROADS FEATURE TREES - OPEN SPACES RESIDENTIAL TREES - THE LANES Quercus robur - Common oak (8m x 12m High) Tilia cordata ‘Greenspire’ - Small leaved lime (5m x 10m High) Native Native QueensAvenue HopeGrant’sRoad HospitalRoad Scarlett’sRoad FireStationRoad Pyrus calleryana ‘Chanticleer’ - Callery pear (3m x 8m High) Corylus colurna - Turkish hazel (3m x 8m High) Aesculus indica - India horse chestnut (4m x 8m High) TheLanes Malus trilobata Crab Apple (2.5m x 16m H) Prunus ‘Spire’ (hillieri’Spire’) Cherry Spire (3m x 6m ) OpenSpaces Magnolia kobus - Kobus magnolia (4m x 10m High) Davidia involucrata - Hankerchief tree(6m x 10m High) Quercus coccinea ‘Splendens’- Scarlet oak (8m x 12m High) Prunus serrula - Tibetan cherry (8m x 8m High) Liquidambar styraciflua - Sweet gum (5m x 10m High) Much of the character and landscape quality of the site comes from the existing trees, many of which were established as part of comprehensive planting schemes from Victorian times. As part of this planned, historic redevelopment of the site, tree lined avenues along the orthogonal road grid are a particularly important element of the landscape character. Over time, these avenues have become fragmented and a detailed planting strategy has been developed to strengthen and re-integrate these avenues into the new development. The palette of proposed trees is based on existing species within the site and has been developed to reflect the different characters of the development phases. This will create a hierarchy along the routes which will promote natural wayfinding through the development. Formal, large scale trees such as Oak and Lime are used along the main roads, with more upright, fastigate species on the smaller roads and ornamental trees with strong form and colour in the public open spaces. TRANSITIONAL TREES - TERTIARY ROADS FEATURE TREES - OPEN SPACES RESIDENTIAL TREES - THE LANES Quercus robur - Common oak (8m x 12m High) Tilia cordata ‘Greenspire’ - Small leaved lime (5m x 10m High) Native Native QueensAvenue HopeGrant’sRoad HospitalRoad Scarlett’sRoad FireStationRoad Pyrus calleryana ‘Chanticleer’ - Callery pear (3m x 8m High) Corylus colurna - Turkish hazel (3m x 8m High) Aesculus indica - India horse chestnut (4m x 8m High) TheLanes Malus trilobata Crab Apple (2.5m x 16m H) Prunus ‘Spire’ (hillieri’Spire’) Cherry Spire (3m x 6m ) OpenSpaces Magnolia kobus - Kobus magnolia (4m x 10m High) Davidia involucrata - Hankerchief tree(6m x 10m High) Quercus coccinea ‘Splendens’- Scarlet oak (8m x 12m High) Prunus serrula - Tibetan cherry (8m x 8m High) Liquidambar styraciflua - Sweet gum (5m x 10m High) ‘
  • 31. WELLESLEY, ALDERSHOT | GRAINGER28 DELIVERY IMPLEMENTATION The masterplan demonstrates a variety of opportunities for the delivery of Wellesley. It provides a platform to encourage new homes, community facilities, leisure activities and jobs. The masterplan illustrates a number of key principles to facilitate the delivery of a quality development. It’s important that the master plan is not set in stone because it will need to evolve over the life of the development as life changes. Any future improvements to the master plan will be developed with Rushmoor Borough Council. The development of the Wellesley community has the opportunity to provide an important catalyst for the wider economic benefit of Aldershot. In addition, the timing of the delivery of the local amenities is critical to successful placemaking. Too late in the development and the new residents will be left wanting. Too early and the scheme will be a vacant underused facility which will deteriorate. It is a symbiotic relationship where the uses rely on each other to create a successful place to live. For these reasons Grainger’s approach to the illustrative delivery plan allows flexibility in the delivery of Wellesley to respond to the needs of the emerging and existing community while capturing market opportunities. Delivering the Vision The proposed timescales for the delivery of each development zone are set out in the illustrative delivery plan. Grainger will manage the delivery of each development zone including the associated open spaces and infrastructure as well as the detailed proposals for each monument and listed building as shown in the adjacent table. This will ensure that wherever the homes are delivered there will also be associated facilities such as open space. As each development zone may comprise more than one reserved matter area the following control documents have been submitted as part of the planning application: - Design codes: a set of quality controls which ensure that the new developments have a cohesive character and a defined minimum standard of quality. - Affordable housing strategy: sets out the site wide approach and provision of affordable housing for the Wellesley The aim of these documents is to ensure that each development zone delivers a proportionate quantum of affordable housing, social and physical infrastructure, in a manner and of a quality which is sustainable for the emerging community. As part of the application a site wide affordable housing strategy and design code have been submitted as well as more detailed documents for Phase 1. In taking the development forward, a detailed code and affordable housing strategy will be submitted for approval for each development zone prior to commencement of development. These documents will be incorporated into the plot sale agreements, meaning that developers are contractually bound to adhere to the parameters set down for the site and development zones. There are 6 grade II listed buildings on site which will be retained although a number of later additions to the buildings have been identified which could be demolished as they detract from and/or have a negative impact on the original buildings and setting. Any work to these buildings and those within the curtilage will be subject to listed building and conservation area consent where relevant. Therefore there will be an opportunity for the stakeholders and the local community to input into the proposals. There are areas within the development which Grainger deems to be of significant importance in the creation of a high quality place e.g. the Cambridge Military Hospital, Stanhope Lines, Parade Park and the neighbourhood centre. Although not high value development sites, these areas will set the standard for Wellesley. Consequently, Grainger may still decide to directly develop these areas. The decision as to whether to develop directly will solely be based upon the best decision for the project in terms of value creation and long term quality. As a key character area of Wellesley, the Cambridge Military Hospital has been identified for delivery within the first few years of the development. This allows sufficient time to finesse proposals and obtain the relevant listed building consents without compromising the final usage and marketability of the development zone. Grainger will manage or directly deliver the on and off-site strategic infrastructure (unless otherwise agreed with HCC) for the project, enabling the parcelling up of development plots for sale/ self-development.
  • 32. WELLESLEY, ALDERSHOT | GRAINGER 29 Property Management Since the company’s inception in 1912, Grainger has invested in property and land with a long term view. The company has substantial in-house expertise in property and land management and correspondingly, the Grainger development ethos is of sustained and continual commitment to development projects. We recognise the value this can bring to all stakeholders, including residents, adjoining owners and the wider community. Wellesley will be approached with the same commitment. We recognise that good management of land and public areas, such as public open space, roads and woodland, involves the right combination of key partners, with each partner managing the areas which relate to their own expertise. In this way all areas can be carefully managed from a short, medium and long term perspective to the benefit of the development. At Wellesley, Grainger has also focused attention on ensuring that the site is secure and the vacant buildings are protected from the elements. Since Grainger’s appointment as Development Manager in March 2011, a detailed building assessment has been carried out across the whole development area to identify which buildings could be retained as part of the masterplan. Thereafter, detailed condition and structural surveys have been undertaken to clarify whether the retention of the identified buildings is physically viable. The outputs from these studies have resulted in a detailed programme of short and medium term works which Grainger is in the process of implementing to ensure the retained buildings are watertight and protected until they are redeveloped. As a number of the listed buildings, in particular the Cambridge Military Hospital, have been vacant for a number of years. Grainger has engaged with English Heritage and our own technical specialists to ensure that during the period between submission and the development starting the buildings are made water tight and secure from the elements. These buildings will be periodically inspected and works undertaken as necessary to safeguard them from any further deterioration until redeveloped. Appropriate interim uses and tenants will be identified for retained buildings where possible, to minimise deterioration and vandalism. Post development, Grainger intends to sell off all the residential elements of the development with the roads, open spaces and infrastructure etc. adopted by the relevant authorities or handed over to a management company, subject to agreement with the relevant adopting authorities. Keydeliverables associated with each DevelopmentZone ofWellesley Development Zone Approx. Units Affordable Listed Buildings Uses A.Maida 228 80 Smith Dorrien MaidaGymnasium Community Use,Offices Gymnasium B.Coruna 705 247 C.CMH 134 47 Cambridge Military Hospital Non-residential institutions / assembly leisure (community day care) D1/D2, B1 and ancillary D. McGrigor 118 41 E. Gunhill 105 37 F. Knollys Road 22 8 G. Pennyfathers 123 43 H. Stanhope Lines West 162 57 The Stanhope Lines I. School End 105 37 The Observatory The Observatory J. Browning/Canalside 475 166 K. Stanhope Lines East 255 88 Parade Park and the Stanhope Lines L. Neighbourhood Centre 16 6 Head Quarters 4th Division Retail, B1, A2, Restaurant/pub M. Buller 243 85 Eastern Primary School N. God’s Acre 170 60 Play Area O. Mandora 133 46 Fitzwygram House Day Care Facility P. Peaked Hill 60 21 Q. Clayton 298 104 R. ABRO 0 0 Waste Facility, B1, B2 B8 S. REME 392 137 Retail T. Parsons 106 37 TOTAL 3,850 1,347
  • 33. WELLESLEY, ALDERSHOT | GRAINGER30 DevelopmentZone Plan In order to manage the delivery of Wellesley the site has been divided into the core development area, SANGs and off-site infrastructure. The core development area is divided into development zones (see above) to facilitate the parcelling up of the approval and implementation processes, which is influenced by the configuration of listed buildings and their curtilages and conservation areas, which occur across the site.
  • 34. WELLESLEY, ALDERSHOT | GRAINGER 31 ILLUSTRATIVE DELIVERYPLAN Masterplan DevelopmentZone MoD Site Handover No. Units Private 65% AHU 35% 2013/ 2014 2014/ 2015 2015/ 2016 2016/ 2017 2017/ 2018 2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 Private AHU Accum Total A.Maida Jul-13 228 148 80 175 53 228 228 114 61 34 19 148 80 B.Coruna 705 485 247 120 120 128 120 120 97 705 933 78 42 78 42 83 45 78 42 78 42 63 34 458 247 C.CMH 134 87 47 77 57 134 1067 50 27 37 20 87 47 D.McGrigor 118 77 41 73 45 118 1185 47 26 30 15 77 41 E.Gunhill 105 68 37 105 105 1290 68 37 68 37 F.Knollys Road May-13 22 14 8 22 22 1312 14 8 14 8 G.Pennyfathers 123 80 43 75 48 123 1435 49 26 31 17 80 43 H.Stanhope Lines West 162 105 57 57 105 162 1597 37 20 68 37 105 57 I.School End 105 68 37 80 25 105 1702 52 28 16 9 68 37 J.Browning/Canalside 475 309 166 59 100 122 120 74 475 2177 38 21 65 35 79 43 78 42 49 25 309 166 K.Stanhope Lines East Jul-14 255 167 88 110 112 33 255 2432 71 39 73 39 23 10 167 88 L.Neighbourhood Centre Jul-14 16 10 6 16 16 2448 10 6 10 6 M.Buller May-13 243 158 85 26 120 97 243 2691 17 9 78 42 63 34 158 85 N.God’s Acre May-13 170 110 60 Deliver 2nd School Site 50 120 170 2861 33 17 77 43 110 60 O.Mandora Dec-12 133 87 46 47 86 133 2994 32 15 55 31 87 46 P.Peaked Hill 60 39 21 30 30 60 3054 20 10 19 11 39 21 Q.Clayton Aug-12 298 194 104 65 120 113 298 3552 42 23 78 42 74 39 194 104 R.ABRO 2015 0 0 0 0 3552 S.REME 392 255 137 17 120 119 136 392 3744 10 7 78 42 77 42 90 46 255 137 T.Parsons 106 69 37 44 62 106 3850 29 15 40 22 69 37 Total 3850 2503 1347 175 250 250 300 350 350 350 350 350 350 300 300 175 3850 3850 Total Mix 114 61 162 88 162 88 195 105 227 123 227 123 227 123 227 123 228 122 230 120 193 107 197 103 114 61 2503 1347 Total 175 250 250 300 350 350 350 350 350 350 300 300 175 3850 Note: The total number of units identified in each development zone above is approximate. In order to provide a degree of flexibility a 5% variance can be applied to each development zone to allow for site specific technical constraints and opportunities. Notwithstanding this variance the site wide number of dwellings delivered at Wellesley is capped at 3,850. Where the actual numbers of units vary the quantum of affordable housing will adjust accordingly.
  • 35. WELLESLEY, ALDERSHOT | GRAINGER32 CONTACTS Key Contacts: Grainger plc 161 Brompton Road Knightsbridge London SW31QP Contact: John Beresford Tel: 0207 795 4727 Email: wellesleyaldershot@graingerplc.co.uk www.graingerplc.co.uk Tel: 020 7795 4700 www.wellesleyaldershot.co.uk March 2013 Project Manager: RM Regeneration Management Ltd Contact: Marcia McGinty Email: mmcginty@regeneration-management.co.uk Tel: 07824 362 433