4. WHAT IS NOT A PROJECT?
Operation work, on the other hand is
1. On going, repetitive
2. Not unique
(e.g. manufacturing goods)
3. No phasing
5. WHAT IS A PROJECT?
Project, according to the definition, is
1. Temporary
(with a beginning and an end)
2. Creates something unique
(product, service or result)
3. Progressive Elaboration
8. Framework
IA Development
Competitive
Analysis Mockup Copywriting
Feasibility Work Project Graphic
Study Breakdown Schedule Layout Production Programming QC UAT Launch
15. WHY BOTHER?
“We don‟t want to pay a PM. Our project is fine”
1. The project can‟t be done
(communication)
2. Nobody is happy about it
( Manage Stakeholder)
3. The product doesn‟t do what it „s supposed to do
(Identify/Shape requirements)
4. It takes a lot longer than anyone expected
(Decision/ Provide Recommendation )
5. Scope creep, non profitable, run overtime
(Balancing the competing demand)
16. It was the best of times,
it was the worst of times.