Mohamed Elghazawy
EEAA / GEF Projects – The World Bank
Alexandria Integrated Coastal Zone Management
And
Pollution Reduction Measures for Lake Maryute
Egyptian Environmental Affairs Agency
Alexandria Coastal Zone Management Project
IW- GEF Projects – The World Bank
El-Qalaa drain
915790 m3/ d
11 %
Nubareya canal
2530000 m3/ d
31%
Western station
3410325 m3/ d
5%
Sea Locks
82200 m3/d
groundwater
24974 m3/ d
El-Mex Pumping station
7993945 m3/ d
evaporation
169344 m3/ day
inflow
outflow
Direct industrial discharge
46747 m3/ d
2014
USD 7.15 M
Ministry of state for environmental affairs
Egyptian Pollution Abatement Project
(Second Phase)
Background:
 The Egyptian Pollution Abatement Project (EPAP II) is one
of the main projects managed by Ministry of State for
Environmental Affairs (MSEA). Its main goals are to assist
the Egyptian industry to comply with the environmental
regulation, as well as improving its environmental
performance altogether.
 EPAP II is a project financed jointly by World Bank (WB),
the European Investment Bank (EIB), the Japanese Bank
for International Cooperation (JBIC) and the French
Development Agency, In addition to European
Commission (EC), the Government of Finland, and the
Government of Egypt.
6
Objectives of EPAP II:
 To provide soft financing package to support industrial
pollution abatement projects in industrial establishments
from both public & private sectors.
 To develop sustainable financial, technical and
institutional mechanisms for pollution abatement to
decrease the pollution loads in selected hot-spots areas in
greater Cairo and Alexandria governorates in order to
improve local environmental conditions.
 To introduce suitable environmental management
approaches, improve the quality of inspection activities,
develop technical capacity of environmental institutions
as well as participating banks and improve public
information, awareness and activity relating to industrial
environmental affairs in Egypt, particularly in Greater
Cairo and Alexandria Governorates.
7
Investment Component:
8
EPAP Co
financiers
Mission
Feb 09
The investment component provides soft financing package
to support industrial pollution abatement projects in
industrial establishments from both public and private
sectors.
The National Bank of Egypt (NBE) is the Apex bank
through which resources provided by the Co-financers will be
made available for financing environmental projects in
industrial establishments. The company should provide at
least 10% of the total investment to cover civil works, custom
& taxes.
The Co-financers package consists of a grant of 20% of the
total investments cost and 80% loan on commercial terms
with 1-2 years grace period and up to 8 years total repayment
period.
EPAP II Eligible Projects:
 Industrial investment projects in Greater Cairo and
Alexandria areas in all industrial sectors for:
 Pollution prevention projects: air emissions reduction,
work environment improvement and waste water
treatment and management.
 In process modification, in plant modification and end of
pipe treatment.
 Adoption of cleaner technology
 Improvement of energy efficiency and other resources in
addition to conversion to cleaner fuels.
 Hazardous Waste management projects.
 Environmental services projects.
9
Sub-project status:
Active projects and current status:
 At March 2014 there were 37 active project applications from 27
companies with a total value of US$ 175 million.
Alexandria Coastal Zone
Management Project (ACZMP)
2010 - 2015
Introduction
 The project is financed by a Grant from the Global
Environment Facility (GEF)) in the amount of US$ 7.15
million. Managed by the WB, and implemented by the
EEAA during the period of 2010-2015
 The main objective of the project is to reduce water
pollution reaches the Mediterranean from Lake
Maryout.
Current Environmental Problems
• Most of the lake area is covered by reeds which lead to a
decrease in the rates of dissolved oxygen and in fish
quantities in the lake.
• Decrease in the annual fish production which leads to social
and economic problems
• Deterioration of water quality
Project objectives
Supply a strategic framework and immediate small-
scale investments to reduce the load of land- based
sources of pollution entering the Mediterranean Sea in
the hot spots of El Mex Bay and Lake Mariout.
Protect/restore globally significant coastal heritage
and ecosystem processes by supporting the
Government of Egypt's efforts to develop and
implement a National Coastal Zone Management
Plan.
Project Components
Component (1): Planning, Institutional Capacity and
Monitoring.
Component (2): Pollution Reduction Measures.
Component(3): Project Management and Monitoring
and Evaluation.
Framework
Alexandria Coastal Zone Management Project (ACZMP)
Planning, Institutional
Capacity and Monitoring
Strengthening
Pollution reduction
Project Management and
Monitoring and Evaluation
COMPONENTSOUTCOMES
Increase capacities to manage
the coastal zone
Reduction in the land based
source througth pilot
measures
Completion of a M&E system
and dissemination
i) Preparation of an ICZM plan for Alexandria including Lake Mariut
ii) Development of an integrated water quality monitoring network for Lake
Mariut and Med. Sea including a water quality and hydraulic model
US$ 7.15 million
Component (1): Planning, Institutional Capacity and
Monitoring.
The expected outcome is an increased capacity for various relevant
entities to manage the coastal zones in and around Alexandria .
The outputs for this component include
(i) A master plan for the management of the coastal zones of
Alexandria including Lake Mariout
(ii) Development of a water quality monitoring network for Lake
Mariout.
Component (1): Planning, Institutional Capacity and
Monitoring.
STATUS:
- ICZM Plan has been awarded to Spanish Institute (IH Cantapria)
for 24 months contract started in May 2013.
- Mariut Lake Hydrodynamic and WQ Mathematical Modeling
completed
- IT, GIS, and WQ equipment and materials
has been assessed for different partners and purchase is ongoing
- Comprehensive Social Baseline Study has been conducted for the
project area
TASK1: LEGAL AND
REGULATORYSTUDY
TASK 2: KNOWLEDGE OF ACZ CHARACTERISTICSTASK 5: STAKEHOLDERS
PARTICIPATION AND CB
TASK 3: ALTERNATIVES, STRATEGIES AND GUIDELINES FOR ICZM
PHASEI:ISSUESIDENTIFICATIONANDASSESSMENT
Data
compilation
Local
Workshops
Legal and reg.
study
Stakeholders
identification
Meetings with
stakeholders
Temporal planning
SoW
Integrated diagnosis:
environmental, social, legal &
institutional / Key issues
Study area
Final Coastal Diagnosis /
Agreed key issues CM
Draft ICZM Objectives &
Governance Framework
1st DRAFT ICZMP
Component (2): Pollution Reduction Measures
The expected outcome is a reduction in the land based
source of pollution entering the Lake Mariout and
subsequently the Mediterranean Sea.
The output of this component is the completion of
small scale innovative pollution reduction measures
such as in-stream treatment (bio-films and aeration)
among others..
Component (2): Pollution Reduction Measures
STATUS:
- FS and DD has been awarded to Danish-Egyptian JV
(NYRAS & EcoConserv)
- FS completed and preferred pollution reduction
intervention has been determined and agreed upon
- DD is under going
January 2014 22
El MEX
EWTP
WWTP
Qalaa PS
1
1
2
Omoum
Nubaria
Pollution Reduction Measures Options
Biofilm
In lake Wetland
In Stream Wetland
4
Aeration
Iron Dosing System
Sludge dewatering
Primary Settling Basins
Sludge/harvest management
Basic Option 2B: Biofilm outside Primary
Settling Basin and Storm water wetland
Monitoring sites : 01 – 08
Frequency : 12/year
Samples : Water
Sample type: Vertical composite (3
levels), or grab mid level
Parameters: Chlorophyll-a,
Phosphate, T-P, NO3, NO2, NH4, T-N,
SiO3, TSS, COD, BOD, Oil &grease,
Metals (Fe, Mn, Zn, Cr, Cu, Ni, Cd,
Pb, Hg), Total coliform, Fecal
coliform, Fecal streptococci, Wind
speed.
Total number of samples : 96/year
Responsibility : Alexandria RBO
WQ Monitoring Program
Monitoring sites: 01, 02, 03, 05, 06, 08
Frequency : 12 /year
Samples: Water
Sample type: Grab, in situ at early
morning, midday, sunset , each point
Parameters : Transparency, pH, DO,
Oxygen saturation, Temperature, Salinity,
Conductivity , Depth, Wind speed.
Total number of readings: 216/year
Responsibility: Authority of Fish
Resources and Development & Ministry
of irrigation
WQ Monitoring Program
Monitoring sites : 04 and 07
Frequency : Continuous
Samples : Water
Parameters: Chlorophyll-a, DO,
pH, Conductivity, Blue green
algae, temperature, Turbidity,
Ammonia. Wind speed, Wind
direction, Flow rate.
Responsibility : Alexandria RBO
WQ Monitoring Program
Monitoring sites: 03 , 04, 06, 07
Frequency: Twice /year
Samples : Bottom sediments
Parameters :Al, , Cr, Pb, Ni, As,
Cu, Fe, Zn, Hg, TOC, Total-
phosphorus Total- hydrocarbons,
Total Pesticides, PCB’s
Total number of samples : 8/year
Responsibility : Alexandria RBO
& Authority of Fish Resources and
Development
WQ Monitoring Program
Monitoring sites: One storage area
Frequency: Twice /year
Samples: Excavated sediments (after
sediment dry out)
Parameters:Al, , Cr, Pb, Ni, As, Cu, Fe,
Zn, Hg, TOC, Total- phosphorus Total-
hydrocarbons, Total Pesticides, PCB’s
Total number of samples: 2/year
Responsibility: Alexandria RBO
WQ Monitoring Program
Monitoring sites: The main basin and
the fisheries basin
Frequency: Twice /year )each site)
Samples: Tissue of fish (Tilapia)
Parameters: Al, Cu, Ni, Zn, Cd, Cr, Pb,
Hg, As
Total number of samples: 4/year
Responsibility: Alexandria RBO
WQ Monitoring Program
Monitoring sites: One temporary
storage site
Frequency: Twice /year
Samples: Biota, removed reeds
Parameters: Al, Cu, Ni, Zn, Cd, Cr, Pb,
Hg, As
Total number of samples: 2/year
Responsibility: Alexandria RBO
WQ Monitoring Program
Monitoring sites: One temporary
storage site
Frequency: Twice /year
Samples: Biota, Duckweeds or
plants used in CW, after the plants
dry out
Parameters: Al, Cu, Ni, Zn, Cd, Cr,
Pb, Hg, As
Total number of samples: 2/year
Responsibility: Alexandria RBO
WQ Monitoring Program
Component (3): Project Management and Monitoring and
Evaluation
The expected outcome is the completion of a
comprehensive Monitoring and Evaluation scheme and the
documentation of the project results for the purpose of up-
scaling and replication.
Alexandria Coastal Zone Management Project Overview
Alexandria Coastal Zone Management Project Overview

Contenu connexe

Tendances

T3 case study 5 nermin wafa exec summary
T3 case study 5 nermin wafa exec summaryT3 case study 5 nermin wafa exec summary
T3 case study 5 nermin wafa exec summaryNENAwaterscarcity
 
Presentation: Environmental Protection of the Río de la Plata and its Mariti...
Presentation: Environmental Protection of the Río de la Plata  and its Mariti...Presentation: Environmental Protection of the Río de la Plata  and its Mariti...
Presentation: Environmental Protection of the Río de la Plata and its Mariti...Iwl Pcu
 
5. Water Framework Directive and spatial planning - Clare Lee, Tipperary Coun...
5. Water Framework Directive and spatial planning - Clare Lee, Tipperary Coun...5. Water Framework Directive and spatial planning - Clare Lee, Tipperary Coun...
5. Water Framework Directive and spatial planning - Clare Lee, Tipperary Coun...Environmental Protection Agency, Ireland
 
Day 1 4. andreas scheidleder european commission
Day 1   4. andreas scheidleder european commissionDay 1   4. andreas scheidleder european commission
Day 1 4. andreas scheidleder european commissiongroundwatercop
 
Regional and transboundary cooperation WP1 GWPCAR case study_avril alexander_...
Regional and transboundary cooperation WP1 GWPCAR case study_avril alexander_...Regional and transboundary cooperation WP1 GWPCAR case study_avril alexander_...
Regional and transboundary cooperation WP1 GWPCAR case study_avril alexander_...Global Water Partnership
 
An Ecosystem-Based Approach to Management of Arctic LMEs: Experience of the G...
An Ecosystem-Based Approach to Management of Arctic LMEs: Experience of the G...An Ecosystem-Based Approach to Management of Arctic LMEs: Experience of the G...
An Ecosystem-Based Approach to Management of Arctic LMEs: Experience of the G...Iwl Pcu
 
10. Greening our towns and cities using Green Infrastructure - John Stack, Du...
10. Greening our towns and cities using Green Infrastructure - John Stack, Du...10. Greening our towns and cities using Green Infrastructure - John Stack, Du...
10. Greening our towns and cities using Green Infrastructure - John Stack, Du...Environmental Protection Agency, Ireland
 
Addressing Transboundary Priorities in the Danube/Black Sea Basin. A Programm...
Addressing Transboundary Priorities in the Danube/Black Sea Basin. A Programm...Addressing Transboundary Priorities in the Danube/Black Sea Basin. A Programm...
Addressing Transboundary Priorities in the Danube/Black Sea Basin. A Programm...Iwl Pcu
 
Iw eco 9th_partnerswebinar_presentation_lbsprotocolandracs_nov2020_final
Iw eco 9th_partnerswebinar_presentation_lbsprotocolandracs_nov2020_finalIw eco 9th_partnerswebinar_presentation_lbsprotocolandracs_nov2020_final
Iw eco 9th_partnerswebinar_presentation_lbsprotocolandracs_nov2020_finaliweco-project
 
Session 4.4c Support to NAPs in Countries
Session 4.4c Support to NAPs in CountriesSession 4.4c Support to NAPs in Countries
Session 4.4c Support to NAPs in CountriesNAP Events
 
Catalysing Ocean Finance: Transforming Markets to Restore and Protect the G...
Catalysing Ocean Finance:  Transforming Markets to Restore  and Protect the G...Catalysing Ocean Finance:  Transforming Markets to Restore  and Protect the G...
Catalysing Ocean Finance: Transforming Markets to Restore and Protect the G...Iwl Pcu
 
Ms. marta Moren Abat IEWP @ Workshop on River Bassin Management Planning and ...
Ms. marta Moren Abat IEWP @ Workshop on River Bassin Management Planning and ...Ms. marta Moren Abat IEWP @ Workshop on River Bassin Management Planning and ...
Ms. marta Moren Abat IEWP @ Workshop on River Bassin Management Planning and ...India-EU Water Partnership
 
Conference Action Summary - Roger Crofts
Conference Action Summary - Roger Crofts Conference Action Summary - Roger Crofts
Conference Action Summary - Roger Crofts objectiveassociates
 
International Cooperation in Water Management and Pollution Control in the Da...
International Cooperation in Water Management and Pollution Control in the Da...International Cooperation in Water Management and Pollution Control in the Da...
International Cooperation in Water Management and Pollution Control in the Da...Iwl Pcu
 
Mr.Raimund mair IEWP@ 1st Indo-European Water Forum, 23-24 novembre 2015
Mr.Raimund mair IEWP@ 1st Indo-European Water Forum, 23-24 novembre 2015Mr.Raimund mair IEWP@ 1st Indo-European Water Forum, 23-24 novembre 2015
Mr.Raimund mair IEWP@ 1st Indo-European Water Forum, 23-24 novembre 2015India-EU Water Partnership
 
3 dave tickner strategic water mgt china
3 dave tickner strategic water mgt china3 dave tickner strategic water mgt china
3 dave tickner strategic water mgt chinaobjectiveassociates
 

Tendances (20)

T3 case study 5 nermin wafa exec summary
T3 case study 5 nermin wafa exec summaryT3 case study 5 nermin wafa exec summary
T3 case study 5 nermin wafa exec summary
 
Presentation: Environmental Protection of the Río de la Plata and its Mariti...
Presentation: Environmental Protection of the Río de la Plata  and its Mariti...Presentation: Environmental Protection of the Río de la Plata  and its Mariti...
Presentation: Environmental Protection of the Río de la Plata and its Mariti...
 
5. Water Framework Directive and spatial planning - Clare Lee, Tipperary Coun...
5. Water Framework Directive and spatial planning - Clare Lee, Tipperary Coun...5. Water Framework Directive and spatial planning - Clare Lee, Tipperary Coun...
5. Water Framework Directive and spatial planning - Clare Lee, Tipperary Coun...
 
Day 1 4. andreas scheidleder european commission
Day 1   4. andreas scheidleder european commissionDay 1   4. andreas scheidleder european commission
Day 1 4. andreas scheidleder european commission
 
Regional and transboundary cooperation WP1 GWPCAR case study_avril alexander_...
Regional and transboundary cooperation WP1 GWPCAR case study_avril alexander_...Regional and transboundary cooperation WP1 GWPCAR case study_avril alexander_...
Regional and transboundary cooperation WP1 GWPCAR case study_avril alexander_...
 
An Ecosystem-Based Approach to Management of Arctic LMEs: Experience of the G...
An Ecosystem-Based Approach to Management of Arctic LMEs: Experience of the G...An Ecosystem-Based Approach to Management of Arctic LMEs: Experience of the G...
An Ecosystem-Based Approach to Management of Arctic LMEs: Experience of the G...
 
10. Greening our towns and cities using Green Infrastructure - John Stack, Du...
10. Greening our towns and cities using Green Infrastructure - John Stack, Du...10. Greening our towns and cities using Green Infrastructure - John Stack, Du...
10. Greening our towns and cities using Green Infrastructure - John Stack, Du...
 
2. 3rd Cycle Characterisation - Marie Archbold, EPA Catchments
2. 3rd Cycle Characterisation - Marie Archbold, EPA Catchments2. 3rd Cycle Characterisation - Marie Archbold, EPA Catchments
2. 3rd Cycle Characterisation - Marie Archbold, EPA Catchments
 
Addressing Transboundary Priorities in the Danube/Black Sea Basin. A Programm...
Addressing Transboundary Priorities in the Danube/Black Sea Basin. A Programm...Addressing Transboundary Priorities in the Danube/Black Sea Basin. A Programm...
Addressing Transboundary Priorities in the Danube/Black Sea Basin. A Programm...
 
Iw eco 9th_partnerswebinar_presentation_lbsprotocolandracs_nov2020_final
Iw eco 9th_partnerswebinar_presentation_lbsprotocolandracs_nov2020_finalIw eco 9th_partnerswebinar_presentation_lbsprotocolandracs_nov2020_final
Iw eco 9th_partnerswebinar_presentation_lbsprotocolandracs_nov2020_final
 
Presentation 1: Intro and Methodology
Presentation 1: Intro and MethodologyPresentation 1: Intro and Methodology
Presentation 1: Intro and Methodology
 
Session 4.4c Support to NAPs in Countries
Session 4.4c Support to NAPs in CountriesSession 4.4c Support to NAPs in Countries
Session 4.4c Support to NAPs in Countries
 
Catalysing Ocean Finance: Transforming Markets to Restore and Protect the G...
Catalysing Ocean Finance:  Transforming Markets to Restore  and Protect the G...Catalysing Ocean Finance:  Transforming Markets to Restore  and Protect the G...
Catalysing Ocean Finance: Transforming Markets to Restore and Protect the G...
 
Ms. marta Moren Abat IEWP @ Workshop on River Bassin Management Planning and ...
Ms. marta Moren Abat IEWP @ Workshop on River Bassin Management Planning and ...Ms. marta Moren Abat IEWP @ Workshop on River Bassin Management Planning and ...
Ms. marta Moren Abat IEWP @ Workshop on River Bassin Management Planning and ...
 
13. Lessons from abroad - Jenny Deakin, EPA Catchments
13. Lessons from abroad - Jenny Deakin, EPA Catchments13. Lessons from abroad - Jenny Deakin, EPA Catchments
13. Lessons from abroad - Jenny Deakin, EPA Catchments
 
Conference Action Summary - Roger Crofts
Conference Action Summary - Roger Crofts Conference Action Summary - Roger Crofts
Conference Action Summary - Roger Crofts
 
4 ed maltby ecosystem approach
4 ed maltby ecosystem approach4 ed maltby ecosystem approach
4 ed maltby ecosystem approach
 
International Cooperation in Water Management and Pollution Control in the Da...
International Cooperation in Water Management and Pollution Control in the Da...International Cooperation in Water Management and Pollution Control in the Da...
International Cooperation in Water Management and Pollution Control in the Da...
 
Mr.Raimund mair IEWP@ 1st Indo-European Water Forum, 23-24 novembre 2015
Mr.Raimund mair IEWP@ 1st Indo-European Water Forum, 23-24 novembre 2015Mr.Raimund mair IEWP@ 1st Indo-European Water Forum, 23-24 novembre 2015
Mr.Raimund mair IEWP@ 1st Indo-European Water Forum, 23-24 novembre 2015
 
3 dave tickner strategic water mgt china
3 dave tickner strategic water mgt china3 dave tickner strategic water mgt china
3 dave tickner strategic water mgt china
 

En vedette

The Holderness Coastline
The Holderness CoastlineThe Holderness Coastline
The Holderness Coastlinemeganltaylor
 
Sec 3 Na Coasts
Sec 3 Na CoastsSec 3 Na Coasts
Sec 3 Na Coastschua.geog
 
Coastal management
Coastal managementCoastal management
Coastal managementManYan So
 
Coastal Features Created By Erosion Sherry
Coastal Features Created By Erosion SherryCoastal Features Created By Erosion Sherry
Coastal Features Created By Erosion SherryMalia Damit
 
Coastal Revision Ppt
Coastal Revision PptCoastal Revision Ppt
Coastal Revision PptJames Foster
 
Coastal erosion processes
Coastal erosion processesCoastal erosion processes
Coastal erosion processesMsGeo
 

En vedette (8)

All about coasts
All about coastsAll about coasts
All about coasts
 
The Holderness Coastline
The Holderness CoastlineThe Holderness Coastline
The Holderness Coastline
 
Sec 3 Na Coasts
Sec 3 Na CoastsSec 3 Na Coasts
Sec 3 Na Coasts
 
Coastal management
Coastal managementCoastal management
Coastal management
 
3E 4E Coasts
3E 4E Coasts3E 4E Coasts
3E 4E Coasts
 
Coastal Features Created By Erosion Sherry
Coastal Features Created By Erosion SherryCoastal Features Created By Erosion Sherry
Coastal Features Created By Erosion Sherry
 
Coastal Revision Ppt
Coastal Revision PptCoastal Revision Ppt
Coastal Revision Ppt
 
Coastal erosion processes
Coastal erosion processesCoastal erosion processes
Coastal erosion processes
 

Similaire à Alexandria Coastal Zone Management Project Overview

EIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureEIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureKANTHARAJAN GANESAN
 
Manglares y Verra/VCS: Experiencias con Iniciativas Financiadas por Livelihoo...
Manglares y Verra/VCS: Experiencias con Iniciativas Financiadas por Livelihoo...Manglares y Verra/VCS: Experiencias con Iniciativas Financiadas por Livelihoo...
Manglares y Verra/VCS: Experiencias con Iniciativas Financiadas por Livelihoo...CIFOR-ICRAF
 
Welcoming Blue Carbon in Indonesian Climate Change Framework
Welcoming Blue Carbon in Indonesian Climate Change FrameworkWelcoming Blue Carbon in Indonesian Climate Change Framework
Welcoming Blue Carbon in Indonesian Climate Change FrameworkAndi Samyanugraha
 
GEF IW Projects Indicators Framework (Merla)
GEF IW Projects Indicators Framework (Merla)GEF IW Projects Indicators Framework (Merla)
GEF IW Projects Indicators Framework (Merla)Iwl Pcu
 
1- Presentation Medpartnership_Ivica Trumbic
1- Presentation Medpartnership_Ivica Trumbic1- Presentation Medpartnership_Ivica Trumbic
1- Presentation Medpartnership_Ivica TrumbicIwl Pcu
 
Mediterranean Sea: The GEF Strategic Partnership for the Mediterranean LME (L...
Mediterranean Sea: The GEF Strategic Partnership for the Mediterranean LME (L...Mediterranean Sea: The GEF Strategic Partnership for the Mediterranean LME (L...
Mediterranean Sea: The GEF Strategic Partnership for the Mediterranean LME (L...Iwl Pcu
 
Climate and carbon finance nov 17
Climate and carbon finance nov 17Climate and carbon finance nov 17
Climate and carbon finance nov 17ADFIAP
 
International Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdfInternational Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdfzubeditufail
 
Nick Tandi
Nick TandiNick Tandi
Nick Tandi7391456
 
Wastewater - source of bioenergy and clean water: The All-Gas and Incover dem...
Wastewater - source of bioenergy and clean water: The All-Gas and Incover dem...Wastewater - source of bioenergy and clean water: The All-Gas and Incover dem...
Wastewater - source of bioenergy and clean water: The All-Gas and Incover dem...EIP Water
 
Managing risk and delivering outcomes through Environmental Regulation
Managing risk and delivering outcomes through Environmental RegulationManaging risk and delivering outcomes through Environmental Regulation
Managing risk and delivering outcomes through Environmental RegulationDara Lynott Consultants LTD.
 
Pollution controlboard
Pollution controlboardPollution controlboard
Pollution controlboardOnkar Chauhan
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentSonikaPawar
 
Pollution Reduction Revloving Fund for the LMEs of East Asia
Pollution Reduction Revloving Fund for the LMEs of East AsiaPollution Reduction Revloving Fund for the LMEs of East Asia
Pollution Reduction Revloving Fund for the LMEs of East AsiaIwl Pcu
 
International Cooperation in Water Management and Pollution Control in the Da...
International Cooperation in Water Management and Pollution Control in the Da...International Cooperation in Water Management and Pollution Control in the Da...
International Cooperation in Water Management and Pollution Control in the Da...Iwl Pcu
 

Similaire à Alexandria Coastal Zone Management Project Overview (20)

EIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureEIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & Aquaculture
 
Manglares y Verra/VCS: Experiencias con Iniciativas Financiadas por Livelihoo...
Manglares y Verra/VCS: Experiencias con Iniciativas Financiadas por Livelihoo...Manglares y Verra/VCS: Experiencias con Iniciativas Financiadas por Livelihoo...
Manglares y Verra/VCS: Experiencias con Iniciativas Financiadas por Livelihoo...
 
Welcoming Blue Carbon in Indonesian Climate Change Framework
Welcoming Blue Carbon in Indonesian Climate Change FrameworkWelcoming Blue Carbon in Indonesian Climate Change Framework
Welcoming Blue Carbon in Indonesian Climate Change Framework
 
abdel-fatah2018.pdf
abdel-fatah2018.pdfabdel-fatah2018.pdf
abdel-fatah2018.pdf
 
Blue Growth focus area - topics not funded by SC5
Blue Growth focus area - topics not funded by SC5Blue Growth focus area - topics not funded by SC5
Blue Growth focus area - topics not funded by SC5
 
MED-DESIRE newsletter 01 eng
MED-DESIRE newsletter 01 engMED-DESIRE newsletter 01 eng
MED-DESIRE newsletter 01 eng
 
Modellers workshop
Modellers workshopModellers workshop
Modellers workshop
 
GEF IW Projects Indicators Framework (Merla)
GEF IW Projects Indicators Framework (Merla)GEF IW Projects Indicators Framework (Merla)
GEF IW Projects Indicators Framework (Merla)
 
1- Presentation Medpartnership_Ivica Trumbic
1- Presentation Medpartnership_Ivica Trumbic1- Presentation Medpartnership_Ivica Trumbic
1- Presentation Medpartnership_Ivica Trumbic
 
storage tanks
storage tanksstorage tanks
storage tanks
 
Mediterranean Sea: The GEF Strategic Partnership for the Mediterranean LME (L...
Mediterranean Sea: The GEF Strategic Partnership for the Mediterranean LME (L...Mediterranean Sea: The GEF Strategic Partnership for the Mediterranean LME (L...
Mediterranean Sea: The GEF Strategic Partnership for the Mediterranean LME (L...
 
Climate and carbon finance nov 17
Climate and carbon finance nov 17Climate and carbon finance nov 17
Climate and carbon finance nov 17
 
International Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdfInternational Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdf
 
Nick Tandi
Nick TandiNick Tandi
Nick Tandi
 
Wastewater - source of bioenergy and clean water: The All-Gas and Incover dem...
Wastewater - source of bioenergy and clean water: The All-Gas and Incover dem...Wastewater - source of bioenergy and clean water: The All-Gas and Incover dem...
Wastewater - source of bioenergy and clean water: The All-Gas and Incover dem...
 
Managing risk and delivering outcomes through Environmental Regulation
Managing risk and delivering outcomes through Environmental RegulationManaging risk and delivering outcomes through Environmental Regulation
Managing risk and delivering outcomes through Environmental Regulation
 
Pollution controlboard
Pollution controlboardPollution controlboard
Pollution controlboard
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Pollution Reduction Revloving Fund for the LMEs of East Asia
Pollution Reduction Revloving Fund for the LMEs of East AsiaPollution Reduction Revloving Fund for the LMEs of East Asia
Pollution Reduction Revloving Fund for the LMEs of East Asia
 
International Cooperation in Water Management and Pollution Control in the Da...
International Cooperation in Water Management and Pollution Control in the Da...International Cooperation in Water Management and Pollution Control in the Da...
International Cooperation in Water Management and Pollution Control in the Da...
 

Plus de groundwatercop

Day 2 valentina salybekova hydrogeology - kazakhstan
Day 2 valentina salybekova   hydrogeology - kazakhstanDay 2 valentina salybekova   hydrogeology - kazakhstan
Day 2 valentina salybekova hydrogeology - kazakhstangroundwatercop
 
Day 2 oleg podolny national coordinator kazakhstan - indicators
Day 2 oleg podolny   national coordinator kazakhstan - indicatorsDay 2 oleg podolny   national coordinator kazakhstan - indicators
Day 2 oleg podolny national coordinator kazakhstan - indicatorsgroundwatercop
 
Day 2 neno kukluric igrac- ims
Day 2 neno kukluric   igrac- imsDay 2 neno kukluric   igrac- ims
Day 2 neno kukluric igrac- imsgroundwatercop
 
Day 2 neno kukluric igrac- data processing
Day 2 neno kukluric   igrac- data processingDay 2 neno kukluric   igrac- data processing
Day 2 neno kukluric igrac- data processinggroundwatercop
 
Day 2 irina skoritseva socio-economic & environent - kazakhstan
Day 2 irina skoritseva   socio-economic & environent - kazakhstanDay 2 irina skoritseva   socio-economic & environent - kazakhstan
Day 2 irina skoritseva socio-economic & environent - kazakhstangroundwatercop
 
Day 2 igor petrakov legal - kazakhstan
Day 2 igor petrakov  legal - kazakhstanDay 2 igor petrakov  legal - kazakhstan
Day 2 igor petrakov legal - kazakhstangroundwatercop
 
Day 1 oleg podolny national coordinator - kazakhstan - workplan
Day 1 oleg podolny   national coordinator - kazakhstan - workplanDay 1 oleg podolny   national coordinator - kazakhstan - workplan
Day 1 oleg podolny national coordinator - kazakhstan - workplangroundwatercop
 
Day 1 oleg podolny natinal coordinator - kazakhstan
Day 1 oleg podolny   natinal coordinator - kazakhstanDay 1 oleg podolny   natinal coordinator - kazakhstan
Day 1 oleg podolny natinal coordinator - kazakhstangroundwatercop
 
Day 1 neno kukuric igrac- ggreta project
Day 1 neno kukuric   igrac- ggreta projectDay 1 neno kukuric   igrac- ggreta project
Day 1 neno kukuric igrac- ggreta projectgroundwatercop
 
Day 1 neno kukuric igrac - methodology
Day 1 neno kukuric   igrac - methodologyDay 1 neno kukuric   igrac - methodology
Day 1 neno kukuric igrac - methodologygroundwatercop
 
Pretashkent organigramme
Pretashkent organigrammePretashkent organigramme
Pretashkent organigrammegroundwatercop
 
Agenda almaty 2014 final
Agenda almaty 2014 finalAgenda almaty 2014 final
Agenda almaty 2014 finalgroundwatercop
 
Participants list technical meeting - july 2014
Participants list   technical meeting - july 2014Participants list   technical meeting - july 2014
Participants list technical meeting - july 2014groundwatercop
 
7 neno kukuric- igrac - assessment and ims-sdc
7 neno kukuric- igrac - assessment and ims-sdc7 neno kukuric- igrac - assessment and ims-sdc
7 neno kukuric- igrac - assessment and ims-sdcgroundwatercop
 
6 akmal karimov - uzbekistan
6 akmal karimov - uzbekistan6 akmal karimov - uzbekistan
6 akmal karimov - uzbekistangroundwatercop
 
5 batyr hajiyev -unece - convention&groundwater
5 batyr hajiyev -unece - convention&groundwater5 batyr hajiyev -unece - convention&groundwater
5 batyr hajiyev -unece - convention&groundwatergroundwatercop
 
4 oleg podolny - kazakhstan
4 oleg podolny - kazakhstan4 oleg podolny - kazakhstan
4 oleg podolny - kazakhstangroundwatercop
 
3 neno kukuric- igrac - global tba activities twap
3  neno kukuric- igrac - global tba activities twap3  neno kukuric- igrac - global tba activities twap
3 neno kukuric- igrac - global tba activities twapgroundwatercop
 
2 aureli-objective of the workshop aa
2 aureli-objective of the workshop aa2 aureli-objective of the workshop aa
2 aureli-objective of the workshop aagroundwatercop
 
Report national exprt workshop- july 2013
Report  national exprt workshop- july 2013Report  national exprt workshop- july 2013
Report national exprt workshop- july 2013groundwatercop
 

Plus de groundwatercop (20)

Day 2 valentina salybekova hydrogeology - kazakhstan
Day 2 valentina salybekova   hydrogeology - kazakhstanDay 2 valentina salybekova   hydrogeology - kazakhstan
Day 2 valentina salybekova hydrogeology - kazakhstan
 
Day 2 oleg podolny national coordinator kazakhstan - indicators
Day 2 oleg podolny   national coordinator kazakhstan - indicatorsDay 2 oleg podolny   national coordinator kazakhstan - indicators
Day 2 oleg podolny national coordinator kazakhstan - indicators
 
Day 2 neno kukluric igrac- ims
Day 2 neno kukluric   igrac- imsDay 2 neno kukluric   igrac- ims
Day 2 neno kukluric igrac- ims
 
Day 2 neno kukluric igrac- data processing
Day 2 neno kukluric   igrac- data processingDay 2 neno kukluric   igrac- data processing
Day 2 neno kukluric igrac- data processing
 
Day 2 irina skoritseva socio-economic & environent - kazakhstan
Day 2 irina skoritseva   socio-economic & environent - kazakhstanDay 2 irina skoritseva   socio-economic & environent - kazakhstan
Day 2 irina skoritseva socio-economic & environent - kazakhstan
 
Day 2 igor petrakov legal - kazakhstan
Day 2 igor petrakov  legal - kazakhstanDay 2 igor petrakov  legal - kazakhstan
Day 2 igor petrakov legal - kazakhstan
 
Day 1 oleg podolny national coordinator - kazakhstan - workplan
Day 1 oleg podolny   national coordinator - kazakhstan - workplanDay 1 oleg podolny   national coordinator - kazakhstan - workplan
Day 1 oleg podolny national coordinator - kazakhstan - workplan
 
Day 1 oleg podolny natinal coordinator - kazakhstan
Day 1 oleg podolny   natinal coordinator - kazakhstanDay 1 oleg podolny   natinal coordinator - kazakhstan
Day 1 oleg podolny natinal coordinator - kazakhstan
 
Day 1 neno kukuric igrac- ggreta project
Day 1 neno kukuric   igrac- ggreta projectDay 1 neno kukuric   igrac- ggreta project
Day 1 neno kukuric igrac- ggreta project
 
Day 1 neno kukuric igrac - methodology
Day 1 neno kukuric   igrac - methodologyDay 1 neno kukuric   igrac - methodology
Day 1 neno kukuric igrac - methodology
 
Pretashkent organigramme
Pretashkent organigrammePretashkent organigramme
Pretashkent organigramme
 
Agenda almaty 2014 final
Agenda almaty 2014 finalAgenda almaty 2014 final
Agenda almaty 2014 final
 
Participants list technical meeting - july 2014
Participants list   technical meeting - july 2014Participants list   technical meeting - july 2014
Participants list technical meeting - july 2014
 
7 neno kukuric- igrac - assessment and ims-sdc
7 neno kukuric- igrac - assessment and ims-sdc7 neno kukuric- igrac - assessment and ims-sdc
7 neno kukuric- igrac - assessment and ims-sdc
 
6 akmal karimov - uzbekistan
6 akmal karimov - uzbekistan6 akmal karimov - uzbekistan
6 akmal karimov - uzbekistan
 
5 batyr hajiyev -unece - convention&groundwater
5 batyr hajiyev -unece - convention&groundwater5 batyr hajiyev -unece - convention&groundwater
5 batyr hajiyev -unece - convention&groundwater
 
4 oleg podolny - kazakhstan
4 oleg podolny - kazakhstan4 oleg podolny - kazakhstan
4 oleg podolny - kazakhstan
 
3 neno kukuric- igrac - global tba activities twap
3  neno kukuric- igrac - global tba activities twap3  neno kukuric- igrac - global tba activities twap
3 neno kukuric- igrac - global tba activities twap
 
2 aureli-objective of the workshop aa
2 aureli-objective of the workshop aa2 aureli-objective of the workshop aa
2 aureli-objective of the workshop aa
 
Report national exprt workshop- july 2013
Report  national exprt workshop- july 2013Report  national exprt workshop- july 2013
Report national exprt workshop- july 2013
 

Dernier

BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxSayali Powar
 
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDhatriParmar
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6Vanessa Camilleri
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
ARTERIAL BLOOD GAS ANALYSIS........pptx
ARTERIAL BLOOD  GAS ANALYSIS........pptxARTERIAL BLOOD  GAS ANALYSIS........pptx
ARTERIAL BLOOD GAS ANALYSIS........pptxAneriPatwari
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptxmary850239
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17Celine George
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxAnupam32727
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWQuiz Club NITW
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptxmary850239
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxkarenfajardo43
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...DhatriParmar
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...DhatriParmar
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfChristalin Nelson
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Developmentchesterberbo7
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 

Dernier (20)

BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
 
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
ARTERIAL BLOOD GAS ANALYSIS........pptx
ARTERIAL BLOOD  GAS ANALYSIS........pptxARTERIAL BLOOD  GAS ANALYSIS........pptx
ARTERIAL BLOOD GAS ANALYSIS........pptx
 
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of EngineeringFaculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITW
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx
 
prashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Professionprashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Profession
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdf
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Development
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 

Alexandria Coastal Zone Management Project Overview

  • 1. Mohamed Elghazawy EEAA / GEF Projects – The World Bank Alexandria Integrated Coastal Zone Management And Pollution Reduction Measures for Lake Maryute Egyptian Environmental Affairs Agency Alexandria Coastal Zone Management Project IW- GEF Projects – The World Bank
  • 2.
  • 3. El-Qalaa drain 915790 m3/ d 11 % Nubareya canal 2530000 m3/ d 31% Western station 3410325 m3/ d 5% Sea Locks 82200 m3/d groundwater 24974 m3/ d El-Mex Pumping station 7993945 m3/ d evaporation 169344 m3/ day inflow outflow Direct industrial discharge 46747 m3/ d
  • 5. Ministry of state for environmental affairs Egyptian Pollution Abatement Project (Second Phase)
  • 6. Background:  The Egyptian Pollution Abatement Project (EPAP II) is one of the main projects managed by Ministry of State for Environmental Affairs (MSEA). Its main goals are to assist the Egyptian industry to comply with the environmental regulation, as well as improving its environmental performance altogether.  EPAP II is a project financed jointly by World Bank (WB), the European Investment Bank (EIB), the Japanese Bank for International Cooperation (JBIC) and the French Development Agency, In addition to European Commission (EC), the Government of Finland, and the Government of Egypt. 6
  • 7. Objectives of EPAP II:  To provide soft financing package to support industrial pollution abatement projects in industrial establishments from both public & private sectors.  To develop sustainable financial, technical and institutional mechanisms for pollution abatement to decrease the pollution loads in selected hot-spots areas in greater Cairo and Alexandria governorates in order to improve local environmental conditions.  To introduce suitable environmental management approaches, improve the quality of inspection activities, develop technical capacity of environmental institutions as well as participating banks and improve public information, awareness and activity relating to industrial environmental affairs in Egypt, particularly in Greater Cairo and Alexandria Governorates. 7
  • 8. Investment Component: 8 EPAP Co financiers Mission Feb 09 The investment component provides soft financing package to support industrial pollution abatement projects in industrial establishments from both public and private sectors. The National Bank of Egypt (NBE) is the Apex bank through which resources provided by the Co-financers will be made available for financing environmental projects in industrial establishments. The company should provide at least 10% of the total investment to cover civil works, custom & taxes. The Co-financers package consists of a grant of 20% of the total investments cost and 80% loan on commercial terms with 1-2 years grace period and up to 8 years total repayment period.
  • 9. EPAP II Eligible Projects:  Industrial investment projects in Greater Cairo and Alexandria areas in all industrial sectors for:  Pollution prevention projects: air emissions reduction, work environment improvement and waste water treatment and management.  In process modification, in plant modification and end of pipe treatment.  Adoption of cleaner technology  Improvement of energy efficiency and other resources in addition to conversion to cleaner fuels.  Hazardous Waste management projects.  Environmental services projects. 9
  • 10. Sub-project status: Active projects and current status:  At March 2014 there were 37 active project applications from 27 companies with a total value of US$ 175 million.
  • 11. Alexandria Coastal Zone Management Project (ACZMP) 2010 - 2015
  • 12. Introduction  The project is financed by a Grant from the Global Environment Facility (GEF)) in the amount of US$ 7.15 million. Managed by the WB, and implemented by the EEAA during the period of 2010-2015  The main objective of the project is to reduce water pollution reaches the Mediterranean from Lake Maryout.
  • 13. Current Environmental Problems • Most of the lake area is covered by reeds which lead to a decrease in the rates of dissolved oxygen and in fish quantities in the lake. • Decrease in the annual fish production which leads to social and economic problems • Deterioration of water quality
  • 14. Project objectives Supply a strategic framework and immediate small- scale investments to reduce the load of land- based sources of pollution entering the Mediterranean Sea in the hot spots of El Mex Bay and Lake Mariout. Protect/restore globally significant coastal heritage and ecosystem processes by supporting the Government of Egypt's efforts to develop and implement a National Coastal Zone Management Plan.
  • 15. Project Components Component (1): Planning, Institutional Capacity and Monitoring. Component (2): Pollution Reduction Measures. Component(3): Project Management and Monitoring and Evaluation.
  • 16. Framework Alexandria Coastal Zone Management Project (ACZMP) Planning, Institutional Capacity and Monitoring Strengthening Pollution reduction Project Management and Monitoring and Evaluation COMPONENTSOUTCOMES Increase capacities to manage the coastal zone Reduction in the land based source througth pilot measures Completion of a M&E system and dissemination i) Preparation of an ICZM plan for Alexandria including Lake Mariut ii) Development of an integrated water quality monitoring network for Lake Mariut and Med. Sea including a water quality and hydraulic model US$ 7.15 million
  • 17. Component (1): Planning, Institutional Capacity and Monitoring. The expected outcome is an increased capacity for various relevant entities to manage the coastal zones in and around Alexandria . The outputs for this component include (i) A master plan for the management of the coastal zones of Alexandria including Lake Mariout (ii) Development of a water quality monitoring network for Lake Mariout.
  • 18. Component (1): Planning, Institutional Capacity and Monitoring. STATUS: - ICZM Plan has been awarded to Spanish Institute (IH Cantapria) for 24 months contract started in May 2013. - Mariut Lake Hydrodynamic and WQ Mathematical Modeling completed - IT, GIS, and WQ equipment and materials has been assessed for different partners and purchase is ongoing - Comprehensive Social Baseline Study has been conducted for the project area
  • 19. TASK1: LEGAL AND REGULATORYSTUDY TASK 2: KNOWLEDGE OF ACZ CHARACTERISTICSTASK 5: STAKEHOLDERS PARTICIPATION AND CB TASK 3: ALTERNATIVES, STRATEGIES AND GUIDELINES FOR ICZM PHASEI:ISSUESIDENTIFICATIONANDASSESSMENT Data compilation Local Workshops Legal and reg. study Stakeholders identification Meetings with stakeholders Temporal planning SoW Integrated diagnosis: environmental, social, legal & institutional / Key issues Study area Final Coastal Diagnosis / Agreed key issues CM Draft ICZM Objectives & Governance Framework 1st DRAFT ICZMP
  • 20. Component (2): Pollution Reduction Measures The expected outcome is a reduction in the land based source of pollution entering the Lake Mariout and subsequently the Mediterranean Sea. The output of this component is the completion of small scale innovative pollution reduction measures such as in-stream treatment (bio-films and aeration) among others..
  • 21. Component (2): Pollution Reduction Measures STATUS: - FS and DD has been awarded to Danish-Egyptian JV (NYRAS & EcoConserv) - FS completed and preferred pollution reduction intervention has been determined and agreed upon - DD is under going
  • 22. January 2014 22 El MEX EWTP WWTP Qalaa PS 1 1 2 Omoum Nubaria Pollution Reduction Measures Options Biofilm In lake Wetland In Stream Wetland 4 Aeration Iron Dosing System
  • 23. Sludge dewatering Primary Settling Basins Sludge/harvest management Basic Option 2B: Biofilm outside Primary Settling Basin and Storm water wetland
  • 24. Monitoring sites : 01 – 08 Frequency : 12/year Samples : Water Sample type: Vertical composite (3 levels), or grab mid level Parameters: Chlorophyll-a, Phosphate, T-P, NO3, NO2, NH4, T-N, SiO3, TSS, COD, BOD, Oil &grease, Metals (Fe, Mn, Zn, Cr, Cu, Ni, Cd, Pb, Hg), Total coliform, Fecal coliform, Fecal streptococci, Wind speed. Total number of samples : 96/year Responsibility : Alexandria RBO WQ Monitoring Program
  • 25. Monitoring sites: 01, 02, 03, 05, 06, 08 Frequency : 12 /year Samples: Water Sample type: Grab, in situ at early morning, midday, sunset , each point Parameters : Transparency, pH, DO, Oxygen saturation, Temperature, Salinity, Conductivity , Depth, Wind speed. Total number of readings: 216/year Responsibility: Authority of Fish Resources and Development & Ministry of irrigation WQ Monitoring Program
  • 26. Monitoring sites : 04 and 07 Frequency : Continuous Samples : Water Parameters: Chlorophyll-a, DO, pH, Conductivity, Blue green algae, temperature, Turbidity, Ammonia. Wind speed, Wind direction, Flow rate. Responsibility : Alexandria RBO WQ Monitoring Program
  • 27. Monitoring sites: 03 , 04, 06, 07 Frequency: Twice /year Samples : Bottom sediments Parameters :Al, , Cr, Pb, Ni, As, Cu, Fe, Zn, Hg, TOC, Total- phosphorus Total- hydrocarbons, Total Pesticides, PCB’s Total number of samples : 8/year Responsibility : Alexandria RBO & Authority of Fish Resources and Development WQ Monitoring Program
  • 28. Monitoring sites: One storage area Frequency: Twice /year Samples: Excavated sediments (after sediment dry out) Parameters:Al, , Cr, Pb, Ni, As, Cu, Fe, Zn, Hg, TOC, Total- phosphorus Total- hydrocarbons, Total Pesticides, PCB’s Total number of samples: 2/year Responsibility: Alexandria RBO WQ Monitoring Program
  • 29. Monitoring sites: The main basin and the fisheries basin Frequency: Twice /year )each site) Samples: Tissue of fish (Tilapia) Parameters: Al, Cu, Ni, Zn, Cd, Cr, Pb, Hg, As Total number of samples: 4/year Responsibility: Alexandria RBO WQ Monitoring Program
  • 30. Monitoring sites: One temporary storage site Frequency: Twice /year Samples: Biota, removed reeds Parameters: Al, Cu, Ni, Zn, Cd, Cr, Pb, Hg, As Total number of samples: 2/year Responsibility: Alexandria RBO WQ Monitoring Program
  • 31. Monitoring sites: One temporary storage site Frequency: Twice /year Samples: Biota, Duckweeds or plants used in CW, after the plants dry out Parameters: Al, Cu, Ni, Zn, Cd, Cr, Pb, Hg, As Total number of samples: 2/year Responsibility: Alexandria RBO WQ Monitoring Program
  • 32. Component (3): Project Management and Monitoring and Evaluation The expected outcome is the completion of a comprehensive Monitoring and Evaluation scheme and the documentation of the project results for the purpose of up- scaling and replication.