1. Business Continuation – The Basics
Terminology
The terms Disaster Recovery and Business Continuation / Business Continuity are sometimes used inter-
changeably. However, the terms have two very different contexts.
In the early days of data processing the mainframe computer was usually housed in a large room with
very large windows so everyone could see the computer. This led to the term “Glass House”. The term
“Disaster Recovery” originally was associated with restoring the “Glass House” environment. Now the
term “Disaster Recovery” is commonly related to the restoration of the IT infrastructure and its many
technical components. In today’s complex business work environment we not only have to take the
“Glass House” into consideration, but also the client / server computer networks (which are spread all
over the place).
In today’s complex business environment there is also a particular focus on restoring a business unit’s
processes and that is commonly referred to as “Business Continuation” or “Business Continuity”.
Business Continuation also involves work-area space and needed facilities (i.e., desks, chairs,
telephones, office supplies, etc.). Another very important aspect of Business Continuation, which is
sometimes overlooked, is the human factor – the business unit staff who will actually perform the
recovery of the business unit’s processes.
What is a disaster?
When asked about disasters most people normally think of fires, floods, tornadoes, earthquakes, and
airplane crashes. These are certainly disasters. However, there are other types of events that many
people don’t normally think of, but they can certainly be deemed a disaster too:
A building is evacuated because of a gas leak. The building and all its contents are undamaged,
but the building and all its contents are placed off-limits.
A disgruntle employee sabotages essential computer hardware / software / data.
A database becomes hopelessly corrupted.
A person digging a ditch with a backhoe cuts a fiber optic cable. Network communications are
disrupted.
An employee downloads a file from the internet. The file just happens to be infected with a
computer virus. The virus is unintentionally introduced into the company’s network and causes
a multitude of significant problems. Major portions of the IT infrastructure has to be taken off-
line during the cleanup process.
So, with all this variety taken into consideration, the classic definition of a disaster is: an event, of
significant proportion, that disrupts normal business activities for an extended period of time.
Disasters occur everyday in varying degrees of magnitude. Sometimes there is little or no warning.
Sometimes there is little, if anything, that you can do to prevent them. However, you and your company
do have control over how you can prepare for a disaster.
Page 1 of 8
Copyright 2009 All Rights Reserved. Business As Usual, Inc.
2. Why do we need Business Continuation?
It should be fair to say that most operating companies would like to remain just that – operational.
However, statistics have proven that a company experiencing a disaster without a Business Continuation
Plan (Plan) usually ceases operating in a relatively short period of time. A prime reason for going out of
business is lost computer data. Without critical computer data (i.e., Accounts Receivable, Order Entry,
etc.) a company quickly loses its business focus. At least with a Plan a company can cripple along with
its few critical processes. This buys time to determine the extent of the damage and to estimate the
length of the outage.
If you can’t take care of your customers while experiencing a disaster, your competition most certainly
will. Once a customer is lost, it is extremely difficult to get them back.
For publicly owned companies, the fiduciary duty to protect the business and corporate assets continues
to gain legal standing. Senior management may be vulnerable to stockholder’s litigation if reasonable
and prudent steps have not been taken to address risks that may threaten the company’s continued
operation.
In some industries, primarily financial institutions, the Federal Government has mandated that Business
Continuation Programs be established and maintained.
How is a Business Continuation Strategy developed?
A Business Continuation Strategy can be described as a program (a continuous activity) as compared to
a project (a one-time activity with a specific start and a specific end).
A Business Continuation Strategy has a lifecycle:
Business Impact Analysis (B.I.A.)
Solutions
Planning
Testing
Maintenance
Each of these lifecycle components will be discussed in more detail below.
Business Impact Analysis
The classic first step in developing a Plan is conducting a B.I.A. survey. The B.I.A. is a consistent and
objective way to gather data regarding a business unit and its processes. Elements of risk are also
identified.
The survey asks a wide variety of questions. To list only a very few questions:
Questions regarding the Business Unit’s mission critical processes:
What are these processes?
What resources are needed to perform these processes?
Who provides inputs to these process?
Who receives the output from these processes?
What are the process’s deadlines?
Page 2 of 8
Copyright 2009 All Rights Reserved. Business As Usual, Inc.
3. How much (in terms of dollars) adverse financial impact would result from this business unit’s
downtime?
What is the bare minimum number of persons that would be needed to re-establish the business
unit’s critical processes at the recovery site?
Specifically, who will perform these critical processes? Specifically, who are their trained back
ups?
What computer applications are absolutely critical to the business unit’s processes?
Who are the business unit’s customers and/or contacts (both internal and external to the
company) that would be most affected by its downtime? Do you have their contact information
stored off-site?
Where is the original application software install media stored?
Who are your critical vendors? Do you have their contact information and is this contact
information stored off-site?
What is the maximum amount of downtime that can be tolerated?
Any vital documents, reports, or microfiche? If so, what are they and where are they stored?
Are there fines or breach of contract conditions that can result from this business unit’s
downtime?
Are there highly modified or one-of-a-kind devices currently in production that are critical to the
business unit’s operation? If so, do they have back ups?
Are the business unit’s servers and/or PC hard drives backed up on a regular basis? If so, is the
backup media taken to a secure off-site location in a timely manner?
Another reason to perform a B.I.A. is to determine the relative degree of criticality of the company’s
business units. If you asked all the company’s managers about their business unit’s degree of
“criticality”, they would all say their business unit’s processes are very important to the company’s
survival. No one wants to refer to their business unit as non-critical. However, in reality, there will be
only a few business units that are truly mission critical, there will be many that are fairly important, and
several business units that are non-critical.
The reason for realistically classifying the business units to their degree of “criticality” is that you want
to recover only the most critical business processes first. Business processes considered less critical can
be recovered later in a phased manner. In many cases it is appropriate to tell non-critical business unit’s
staff to stay home until instructed to return to work or commandeer the staff to assist mission critical
business units. It is unwise, and probably impossible, to attempt restoring everyone at the same time.
The B.I.A. process assists senior management in objectively making this criticality evaluation by
providing facts and information that can be compared across the wide variety of business units.
When is the frequency for conducting B.I.A.s?:
It is common Business Continuation practice to conduct company wide B.I.A.s annually.
It is recommended that a B.I.A. be reviewed anytime there is a major change in a business unit’s
business processes, major changes in computer hardware/software, or when there has been a
major business unit organizational change (i.e., merger or divestiture, etc.). Any significant
changes identified should also be reflected in the business unit’s Plan in a timely manner.
Page 3 of 8
Copyright 2009 All Rights Reserved. Business As Usual, Inc.
4. Another set of questions normally answered at the preliminary stage is a Risk Assessment. A Risk
Assessment asks questions regarding events (i.e., Hurricane, ice/snow, riots, computer hardware failure,
flood, etc.) that a particular company location may encounter, an estimate of the probability of an event
occurring, and an estimate to the possible level of impact if this event occurs.
Solutions
Once a determination is made regarding which business units need a Plan, and many low criticality
business units may not need a Plan, it is determined just what would be the most appropriate response /
method(s) for recovering this business unit’s processes. These “Solutions” will be the foundation for the
subsequent step – the actual writing of the Plan.
Several factors are taken into consideration. For example:
Based on the B.I.A., how quickly does the business unit really need to recover its critical
business processes? The term for the recovery time aspect is Recovery Time Objective (R.T.O.).
R.T.O. is the maximum length of time, in hours or days, that can elapse before the loss of a
business process becomes unacceptable.
How much money has been budgeted for the business units’ recovery efforts and/or recovery
resources?
Do mission critical business units depend on the output of this business unit for their continued
processing?
Is management willing, based on a cost justification analysis, to assume the risk / consequences
of a business unit’s processes not being performed in the usual manner?
Examples of common response solutions:
Call Center – Re-route incoming calls to a sister site that handles similar calls.
Out-source work to an external vendor.
Go to a formal recovery site (i.e., internal/external to the company, or business unit staff work
from home, etc.) for recovery efforts.
“Hold Until Restored” – identify, hold, and manage incoming work until the computer system’s
functionality is restored. Work is subsequently processed on a First In / First Out or on a
prioritized basis.
Planning
The classic approach to prepare for a disaster is to create a detailed written Plan for each business unit as
deemed appropriate via the B.I.A.
Plans can be developed in a variety of ways:
There are many commercial proprietary software packages (i.e., LDRPS, Paragon, etc.) that
accommodate data input, plan generation, and reporting.
Many organization (both large and small) use Microsoft WORD and internally developed
templates.
There are pro’s / con’s to each of the development methods (i.e., cost, flexibility, maintainability, etc.).
Page 4 of 8
Copyright 2009 All Rights Reserved. Business As Usual, Inc.
5. Regardless of how the Plan is written, at a minimum, it should answer the following basic recovery
questions:
1. Where do we go?
There are several generic options:
Recovery Sites can have a variety of preparedness:
Hot-Site – with minimal preparation; walk in, sit down, and begin processing.
Minimal delays are expected before a business unit can begin its recovery steps.
Warm Site – some recovery resources are in place, but some degree of
preparation is still needed (i.e., hardware may need to be reconfigured from a
test environment to a production environment, etc.). Some delays can be
expected before a business unit can begin its recovery steps.
Cold Site – The bare basics are in place (i.e., raised floor, HVAC, etc.), but an
extensive amount of preparation / build out is still needed in order to become
fully functional for a recovery effort. Considerable delays are to be expected
before a business unit can begin its recovery steps.
The degree of preparedness depends on how quickly the business unit needs to be
back in operation and what kind of budget has been allocated. The cost to recover
increases exponentially as the recovery time objective shortens.
There are several recovery location options available:
An external commercial recovery resource provider. For a subscription fee, these
companies will provide various resources (i.e., hardware, telecomm connectivity,
work-area recovery space, system software, mobile recovery units, etc.) needed for a
recovery. The recovery resources to be provided are specified in a contract.
Recovering companies are responsible for supplying their respective application
software, data, and personnel.
Reciprocal recovery agreement between two companies or business units within a
company. The agreement basically says that if one party experiences a disaster it
can use the other party’s computer / facility / resources. This alternative is
particularly suited to large companies that have large data centers located around the
country that can serve as backups for each other. The creation of a Memorandum of
Understanding document is common practice to formalize this recovery relationship.
The relationship may be bilateral or unilateral.
Commandeer internal work-area / resources – It is common for non-critical business
unit staff’s work-area / resources to be taken over by mission critical business units
during a recovery effort.
With high speed networks and many computer applications being offered via the
internet, recovering business units’ processes at employees’ homes may be an
option.
Page 5 of 8
Copyright 2009 All Rights Reserved. Business As Usual, Inc.
6. 2. What should we do when we get there?
When a business unit manager receives a phone call in the middle of the night informing
them that their building is on fire is probably not the best time for them to start thinking
about what needs to be done. It is really hard to think clearly, objectively, and rationally
in this kind of situation. A better approach is to develop a portion of the Plan that is
called the “Day 1 List”. This portion of the Plan summarizes the critical few (no more
than 10 – 15) items that MUST be performed in the first twelve hours of a disaster. This
way the business unit manager and/or their key personnel can go bing-bing right down
the list and not overlook something important. If you can act in an efficient / organized
manner in the first twelve hours of a disaster, you’re a long way down the road to
survival, and hopefully, to recovery.
A major aspect of the “Day 1 List” is contacting a wide variety of persons (internal and
external to the business unit) and/or organizations and informing them that you are
experiencing a problem. This portion of the Plan should detail their contact information
(i.e., name, address, telephone number, FAX number, after hours telephone number,
email address (office and home), pager number, and cell phone number, etc.). If the
person to be contacted is a VIP, who within the organization should make the call?
People normally can be very understanding and helpful if they know up front that you are
experiencing a problem. However, what they don’t like are surprises.
3. What resources are needed at the recovery site?
Some needed items (i.e., desk/chairs, PCs, general office supplies, copy of the Plan, etc.)
can be pre-staged at the recovery site. However, there are some items (i.e., backup data
from off-site storage, special pre-printed forms from your vendor’s warehouse, etc.) that
the business unit will need to obtain once staff arrives at the recovery site. These items
need to be detailed in the Plan along with the vendor’s contact information and the time
frame in which the items are needed (i.e., immediate, 1 – 2 days, etc.).
Another important aspect of the Plan is to have it stored at several secure off-site locations (i.e., key
employees’ homes) so the Plan can be quickly and easily accessed. The Plan should be marked and
treated as a confidential document.
It is recommended that, on an annual basis, the individual Plans be presented to senior management for
their review / approval.
Testing
The initial writing of the Plan is important, but even more important is subsequent testing of the Plan. A
very lengthy, eloquently worded Plan can be written and place it in a fancy binder, but is this Plan really
capable of doing its intended job (i.e., facilitating the recovery of the respective business unit’s critical
business processes)? There is only one way to find out. Test It! As a Plan is tested there will be items
identified that will necessitate additions and/or corrections to the Plan.
A testing program should be established with a crawl, walk, run philosophy in mind. Begin with basic
test goals and steadily increase the scope and complexity of the tests over time. This builds confidence
of the test participants and ferrets out the most basic “Gaps In Excellence” first.
Page 6 of 8
Copyright 2009 All Rights Reserved. Business As Usual, Inc.
7. There are a variety of ways that a Plan can be tested:
A table-top exercise is conducted. Normally the exercise is set in the context of a specific
scenario (i.e., building is inaccessible due to storm damage). Business unit staff discuss their
response participation based on the steps outlined in the Plan.
A formal scheduled test with limited and specific test objectives conducted with a limited
number of business unit staff. Conducted in a test environment.
A formal scheduled test of all the business unit’s mission critical recovery activities conducted
by the business unit’s key staff. Conducted in a test environment.
An unscheduled test of all the business units’ mission critical recovery activities conducted by
the business unit’s key staff. Conducted in a production environment. This is the ultimate
recovery test challenge.
How frequently the Plan is to be tested depends on the business unit’s degree of criticality. Minimally,
the Plan should be tested once a year. For Business Units that are deemed “mission critical” more
frequently is recommended. It just depends on the business unit’s situation and criticality.
Components of a good test:
Specific test goals set prior to the test.
Adequate preparation by testing participants.
During the test the participants record specific issues that occur, recorded on an Issue Form, in a
timely manner.
A formal test Post-mortem should be conducted by the test participants to determine:
What went well.
What didn’t go so well and make specific recommendations to address the situation.
Did the actual time for the recovery meet the business unit’s stated R.T.O.
The goal of the Post-mortem is not to assign blame or point the finger. The Post-mortem’s goal
is to determine how the response / recovery processes can be improved.
The outcome of the Post-mortem should be a detailed list of action items needed to address the
“Gaps In Excellence”. Each topic should be assigned a responsible person and a deadline for
completion. The action items should be completed, at the latest, before the next test.
It is recommended that the test results, Post-mortem documentation, and the improvement action items
be presented to senior management for their review / approval.
Some Business Continuation professionals grade the test’s outcome as pass / fail. In a recovery event
either the business process is recovered or it isn’t. Not much middle ground. This may sound a little
harsh, but Mother Nature/God won’t cut you any slack when you attempt a recovery. Even if you are
successful with a test or a real recovery, the recovery event will be a learning experience. There will
always be portions of the recovery event that can be improved in some fashion or form. Always look at
a recovery event as a learning experience with the goal of improving the response / recovery process.
Page 7 of 8
Copyright 2009 All Rights Reserved. Business As Usual, Inc.
8. Maintenance
Have you ever seen a business unit that didn’t have personnel turnover and/or changes in its business
processes? Probably not many.
The Plan must be kept current and reflect an accurate picture of the business unit, its processes,
supporting information, and its recovery / response strategies.
Maintenance of the Plan should be periodically performed, minimally once a year, or when there is a
significant change in:
business unit staff
computer hardware / software
business processes
significant business unit organizational change (i.e., merger or divestiture, etc.)
Lifecycle Conclusion
This lifecycle is iterative. Once we finish the sequence, we start all over again. So, we’re never really
finished.
Summary
This article is obviously highly summarized and an over simplification of the Business Continuation
Planning process. However, it at least illustrates some of the data gathering, data analysis, and thought
processes that goes into developing a Business Continuation Strategy.
Also, this article is meant to be thought provoking:
If your senior management asked business unit managers some of the sample B.I.A. questions,
what kind of answers do you think they’d get?
Is your company / business units adequately prepared to address the three basic Business
Continuation questions?:
Where do we go?
What should we do when we get there?
What resources are needed at the recovery site?
Today’s business environments are very complicated and the recovery window is ever shrinking. This
places great challenges on management to be ready for whatever may come their company’s way.
Being prepared for a disaster may mean the difference of the company staying in business or not.
If there are any questions, please call:
John Small, C.B.C.P.
Business As Usual, Inc.
3532 Pinehurst Drive, Suite 350
Plano, Texas 75075
Office 972-743-2631
john-small@business-as-usual.com
http://www.business-as-usual.com
Page 8 of 8
Copyright 2009 All Rights Reserved. Business As Usual, Inc.